Pumped-storage power station water diversion branch pipe plug drainage maintenance channel

By building a drainage maintenance channel connecting the underground factory building at the construction branch hole and the plug of the pumped storage power station water diversion branch pipe, and using the terrain to drain water, the problems of high maintenance costs, safety hazards and inconvenient inspection in the drainage plan of the pumped storage power station are solved. A low-cost, safe and reliable drainage solution is achieved.

CN117051789BActive Publication Date: 2024-11-29GUANGDONG ELECTRIC POWER PLANNING SURVEY & DESIGN INST
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311135614.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-05
Publication Date
2024-11-29
Estimated Expiration
2043-09-05

AI Technical Summary

Technical Problem

The drainage plan of the water diversion branch of the pumped storage power station has problems such as large daily maintenance work, high costs, safety hazards, inconvenient inspection and maintenance, and cumbersome construction.

Method used

A drainage maintenance channel is built at the intersection of the construction branch hole of the water diversion branch pipe and the plug of the water diversion branch pipe, connecting the construction branch hole of the water diversion branch pipe and the lower drainage corridor of the underground factory building of the pumped storage power station, including the upper flat hole, inclined hole and the lower flat hole, using the terrain The water flows to the underground factory, avoiding the need for equipment installation and power lines.

Benefits of technology

It has realized a drainage solution with low operating costs, safe and reliable operation, simplified the inspection and maintenance process, reduced construction complexity and safety risks, and avoided the risk of flooding caused by power outages or equipment failures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117051789B_ABST
    Figure CN117051789B_ABST
Patent Text Reader

Abstract

The present invention provides a drainage inspection channel for the plug of the water diversion branch pipe of a pumped storage power station. The drainage inspection channel is built at the intersection of the water diversion branch pipe construction branch hole and the water diversion branch pipe plug. One end of the drainage inspection channel is connected to the water diversion branch pipe construction branch hole, and the other end is connected to the lower drainage gallery of the underground powerhouse of the pumped storage power station. The drainage inspection channel includes an upper flat hole, an inclined hole and a lower flat hole; the upper flat hole is connected to the water diversion branch pipe construction branch hole; the left and right sides of the hole are provided with water measuring weirs connected to the drainage ditch of the water diversion branch pipe construction branch hole and the drainage ditch of the water diversion branch pipe plug respectively; the lower flat hole is connected to the lower drainage gallery of the underground powerhouse; the inclined hole connects the upper flat hole and the lower flat hole, and steps are built in the inclined hole for maintenance personnel to walk. The drainage inspection channel of the present invention uses the terrain to automatically divert the water in the construction branch hole and the surrounding cofferdam to the lower drainage gallery of the underground powerhouse. The present invention has the advantages of simple structure, low construction cost and operation cost, safety and reliability, and convenient inspection, maintenance and monitoring during operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a drainage inspection channel for a pumped storage power station, in particular to a drainage inspection channel for a pumped storage power station water diversion pipe plug constructed at a reverse slope construction branch hole of the pumped storage power station water diversion pipe. Background Art

[0002] The construction tunnel of the water diversion branch of a pumped storage power station is generally led downhill from the traffic tunnel to the water diversion branch area, usually on a reverse slope. After the construction of the water diversion branch section is completed, a certain length of concrete sealing section, namely the water diversion branch plug, needs to be set to ensure the structural safety of the diversion branch steel pipe at the intersection with the construction branch tunnel, prevent the groundwater in the surrounding rock of the water diversion branch construction tunnel from seeping into the water diversion branch area, and extend the seepage length of the water in the high-pressure reinforced concrete lined tunnel from the open face of the construction branch tunnel excavation. Usually, a water collection pipe is provided in the water diversion branch construction tunnel to centrally lead the seepage water collected by the drainage system in the water diversion branch area to the water collection pool outside the water diversion branch plug. At the same time, the water from the rock seepage around the water diversion branch construction tunnel is also collected in the water collection pool. At present, the water from the two directions cannot flow by itself after being gathered here, and it is necessary to use a water pump to pump the water in the water collection pool to the water collection well in the underground powerhouse of the pumped storage power station. The problems with this drainage scheme are:

[0003] 1. Daily maintenance workload is large and the cost is high.

[0004] During the operation period of a pumped-storage power station, it is necessary to install a pumping pump set and a power line access system to pump out water regularly. The daily maintenance of the pump set pipelines is labor-intensive, the cost of pumping out water is high, and daily operation and equipment maintenance are relatively troublesome.

[0005] 2. There are certain safety risks.

[0006] Because the pumped storage power station is located in a remote, mountainous area, there is no dedicated person on duty 24 hours a day at the pumping station. Once the pump fails to work properly due to power outages, equipment failures, etc., there will be a risk of flooding the branch hole for the water diversion branch pipe. In addition, there is also the safety risk of leakage caused by improper maintenance and management of power lines.

[0007] 3. Inspection and maintenance are inconvenient.

[0008] Since the inspection passage between the construction branch tunnel of the water diversion branch pipe and the lower drainage corridor of the pumped-storage power station building is not connected, inspection or maintenance equipment needs to detour from the underground plant of the pumped-storage power station through the traffic tunnel and the construction branch tunnel to the water diversion branch pipe plugging location. The two locations are far away and generally require travel by car, which is time-consuming and laborious.

[0009] 4. It is necessary to install drainage equipment, which is expensive and the construction is complicated.

[0010] In order to drain the water in the water collection tank outside the water diversion branch pipe plug in time, it is necessary to install auxiliary equipment such as water pump sets, connecting pipes, power lines and control systems, which is costly and cumbersome to construct. Summary of the invention

[0011] In view of the above reasons, the purpose of the present invention is to provide a drainage inspection channel for the water diversion branch pipe of a pumped storage power station, which is easy to repair and inspect, has low daily equipment maintenance and operating costs, and is safe and reliable in operation.

[0012] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a drainage inspection channel for a water diversion branch pipe plug of a pumped storage power station, the drainage inspection channel is built at the intersection of the water diversion branch pipe construction branch hole and the water diversion branch pipe plug, one end of which is connected to the water diversion branch pipe construction branch hole, and the other end is connected to the drainage gallery of the lower floor of the underground powerhouse of the pumped storage power station;

[0013] The drainage inspection channel includes an upper flat tunnel, an inclined tunnel and a lower flat tunnel;

[0014] The upper flat tunnel is connected to the branch tunnel for the construction of the water diversion branch pipe; water measuring weirs are arranged on the left and right sides of the tunnel opening, and the water measuring weirs are respectively connected to the drainage ditch of the branch tunnel for the construction of the water diversion branch pipe and the drainage ditch of the plugging head of the water diversion branch pipe;

[0015] The lower flat tunnel is connected to the drainage gallery of the lower floor of the underground powerhouse;

[0016] The inclined tunnel connects the upper flat tunnel and the lower flat tunnel, and steps are built in the inclined tunnel for maintenance personnel to walk on.

[0017] Preferably, drainage ditches are built on both sides of the bottom of the upper flat hole, the inclined hole and the lower flat hole, and the drainage ditches in the three holes are connected; the drainage ditch in the upper flat hole is connected to the water measuring weir at the hole entrance.

[0018] Preferably, the bottom of the upper flat hole drainage ditch and the bottom of the lower flat hole drainage ditch are both provided with a water dispersion slope to promote water flow.

[0019] Preferably, the width and height of the drainage inspection channel meet the normal passage requirements of inspection and maintenance personnel.

[0020] Compared with the traditional pumping and drainage method, the drainage inspection channel of the water diversion branch pipe of the pumped storage power station of the present invention has the following advantages:

[0021] (1) Low operating cost, safe and reliable.

[0022] Conventional pumped-storage power station water diversion branch pipe construction branch holes are generally reverse slopes, and the drainage of the water diversion branch pipe construction branch holes and water diversion branch pipe plugs needs to be pumped out by water pumps, which has high equipment maintenance and operation costs. The present invention builds a drainage inspection channel between the water diversion branch pipe construction branch hole and the lower drainage gallery of the underground powerhouse of the power station, and uses the terrain to drain the water in the water diversion branch pipe construction branch hole and the water diversion branch pipe plug and the seepage water of the surrounding rock mass into the lower drainage gallery of the underground powerhouse of the power station by gravity. There is no need to install and maintain any electrical equipment, and there is no need to lay power supply. The operation cost is low, maintenance is not required, and it can operate safely 24 hours a day, and it is safe and reliable, avoiding the risk of flooding caused by the failure of the water pump to operate normally due to power outages, equipment failures, etc.; it also avoids the safety risk of leakage caused by improper maintenance and management of power lines and control switches.

[0023] (2) It is convenient for inspection, maintenance and monitoring during operation.

[0024] The drainage channel of the present invention connects the water diversion branch pipe construction branch hole with the lower drainage corridor of the underground powerhouse of the power station without obstacles, and a walking staircase is built in the drainage channel. Inspection and maintenance personnel can directly climb up the stairs from the lower drainage corridor of the underground powerhouse of the power station to the water diversion branch pipe construction branch hole and the water diversion branch pipe area to check the drainage situation and water seepage, which greatly facilitates inspection, maintenance and monitoring during operation.

[0025] (3) The structure of the present invention is simple and safe and reliable.

[0026] Since the branch tunnel area for the construction of the water diversion branch pipe is a reverse slope, the present invention makes full use of the terrain characteristics of the area and forms a drainage inspection and maintenance channel connecting the branch tunnel for the construction of the water diversion branch pipe and the lower drainage gallery of the underground powerhouse through blasting the surrounding surrounding rock structure. The structure is simple in layout, safe and reliable, and inspection and maintenance during operation can be normalized.

[0027] (4) Simple construction.

[0028] The present invention only requires blasting and excavating a tunnel during the construction period, and the construction is simple, the technical requirements are low, and there is no need to add a relatively cumbersome construction and installation process such as a water pump set and a power supply line. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the plan layout of the drainage maintenance channel of the present invention;

[0030] Figure 2 It is a schematic diagram of the longitudinal section layout of the drainage maintenance channel of the present invention;

[0031] Figure 3 It is a cross-sectional view of the drainage inspection channel of the present invention. DETAILED DESCRIPTION

[0032] The structure and features of the present invention are described in detail below in conjunction with the accompanying drawings and embodiments. It should be noted that various modifications can be made to the embodiments disclosed herein, and therefore, the embodiments disclosed in the specification should not be regarded as limiting the present invention, but are merely examples of embodiments, the purpose of which is to make the features of the present invention obvious.

[0033] like Figure 1 , Figure 2 As shown, the construction branch tunnel 1 of the water diversion branch pipe of the pumped storage power station generally branches off from the traffic tunnel 2 and leads downhill to the water diversion branch pipe 3 area, usually in a reverse slope. After the construction of the water diversion branch pipe section is completed, a concrete plugging section, namely the water diversion branch pipe plug 4, is set upstream of the water diversion branch pipe area. The present invention constructs a drainage inspection channel 5 at the intersection of the water diversion branch pipe construction branch tunnel 1 and the water diversion branch pipe plug 4. One end of the drainage inspection channel 5 is connected to the water diversion branch pipe construction branch tunnel 1, and the other end is connected to the lower drainage gallery 6 of the underground powerhouse of the pumped storage power station. The drainage inspection channel 5 leads the water in the water diversion branch pipe construction branch tunnel 1 and the leakage water of the surrounding cofferdam to the lower drainage gallery 6 of the underground powerhouse, and then discharges it into the underground powerhouse water collection well 7. The width and height of the drainage inspection channel meet the normal passage requirements of maintenance personnel.

[0034] like Figure 1-Figure 3 As shown, the drainage inspection channel 5 of the water diversion branch pipe plug of the pumped storage power station of the present invention includes an upper flat hole 51, an inclined hole 52 and a lower flat hole 53.

[0035] The upper flat tunnel 51 is connected to the branch tunnel 1 for the construction of the water diversion branch pipe. Water measuring weirs 51B are provided on the left and right sides of the tunnel opening. The water measuring weirs 51B are connected to the drainage ditch of the branch tunnel for the construction of the water diversion branch pipe and the drainage ditch of the plugging head of the water diversion branch pipe, respectively, to monitor the amount of water coming in from the water diversion branch pipe area and the upstream side of the branch tunnel for the construction of the water diversion branch pipe, and collect the incoming water into the upper flat tunnel 51. Drainage ditches 51A are built on both sides of the bottom of the upper flat tunnel. The left and right drainage ditches 51A are connected to the water measuring weirs 51B on the left and right sides of the entrance of the upper flat tunnel, respectively. The bottom plate of the drainage ditch is provided with a water dispersion slope to ensure that the water collected at the bottom of the upper flat tunnel flows to the inclined tunnel 52 as soon as possible.

[0036] The lower flat tunnel 53 is connected to the lower drainage gallery 6 of the underground powerhouse. Drainage ditches 53A are built on both sides of the bottom of the tunnel. The bottom plate of the drainage ditch is set with a water dispersion slope to ensure that the water collected at the bottom of the lower flat tunnel flows to the lower drainage gallery 6 of the underground powerhouse as soon as possible.

[0037] The inclined hole 52 connects the upper flat hole 51 and the lower flat hole 53. A step 52B is built in the hole for maintenance personnel to walk on. Drainage ditches 52A are built on both sides of the bottom of the hole. The drainage ditches 52A on both sides of the bottom of the inclined hole 52 are connected with the upper flat hole drainage ditch 51A and the lower flat hole drainage ditch 53A. The water collected in the upper flat hole 51 is discharged into the lower drainage gallery 6 of the underground powerhouse through the upper flat hole drainage ditch 51A, the inclined hole drainage ditch 52A, and the lower flat hole drainage ditch 53A, and then discharged into the underground powerhouse water collection well 7.

[0038] Finally, it should be noted that the above-described embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some or all of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A drainage inspection channel for a water diversion branch pipe of a pumped storage power station, characterized in that: The drainage inspection channel is built at the intersection of the water diversion branch pipe construction tunnel and the water diversion branch pipe plug. One end of the channel is connected to the water diversion branch pipe construction tunnel, and the other end is connected to the drainage gallery on the lower floor of the underground powerhouse of the pumped storage power station. The drainage inspection channel includes an upper flat tunnel, an inclined tunnel and a lower flat tunnel; The upper flat tunnel is connected to the branch tunnel for the construction of the water diversion branch pipe; a water measuring weir is arranged on the left and right sides of the opening of the upper flat tunnel, and the water measuring weir is respectively connected to the drainage ditch of the branch tunnel for the construction of the water diversion branch pipe and the drainage ditch of the plugging head of the water diversion branch pipe; The lower flat tunnel is connected to the drainage gallery of the lower floor of the underground powerhouse; The inclined tunnel connects the upper flat tunnel and the lower flat tunnel, and steps are built in the inclined tunnel for maintenance personnel to walk on.

2. The drainage inspection channel for the water diversion branch pipe of a pumped storage power station according to claim 1 is characterized by: Drainage ditches are built on both sides of the bottom of the upper flat hole, the inclined hole and the lower flat hole, and the drainage ditches in the three holes are connected; The drainage ditch in the upper flat tunnel is connected to the water measuring weir at the tunnel entrance.

3. The drainage inspection channel for the water diversion branch pipe of the pumped storage power station according to claim 2 is characterized by: The bottom of the upper flat hole drainage ditch and the bottom of the lower flat hole drainage ditch are both provided with a water dispersion slope to promote water flow.

4. The drainage inspection channel for the water diversion branch pipe plug of a pumped storage power station according to any one of claims 1 to 3, characterized in that: The width and height of the drainage inspection channel meet the normal passage requirements of inspection and maintenance personnel.

Citation Information

Patent Citations

  • Diversion tunnel maintenance hole arrangement structure

    CN217267334U