A meteorological and hydrological early warning method suitable for plain water network areas

By adjusting the parameters of the hydrodynamic model and applying the FloodArea model in the plain water network area, and combining the characteristics of the disaster-bearing body, the problem of dynamic assessment and early warning of flood risk in the plain water network area was solved, and rapid and refined risk assessment and early warning were achieved.

CN117196305BActive Publication Date: 2024-11-26JIANGSU CLIMATE CENT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311160635.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-08
Publication Date
2024-11-26
Estimated Expiration
2043-09-08

AI Technical Summary

Technical Problem

Existing technologies are insufficient for dynamically assessing the risk of rainstorms and floods in plain water network areas, and lack relevant analysis of disaster-bearing bodies, resulting in limited applicability and an inability to achieve rapid and precise early warning.

Method used

By combining the analysis of precipitation differences and confluence patterns in the plain water network area, adjusting the parameters of the hydrodynamic model, applying the FloodArea model to simulate flood levels, and combining the spatial distribution characteristics of disaster-bearing bodies, a quantitative risk assessment model is constructed to achieve dynamic assessment and early warning.

Benefits of technology

It enables refined and quantitative dynamic assessment and early warning of flood risk in plain water network areas, and can respond quickly to heavy rainfall events, improving the accuracy and efficiency of assessment and early warning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117196305B_ABST
    Figure CN117196305B_ABST
Patent Text Reader

Abstract

The present invention provides a meteorological and hydrological early warning method applicable to plain water network areas. The meteorological and hydrological early warning method of the present invention comprises: after determining the flood-causing heavy rainfall process and the assessment area, forming a process rainfall grid according to the rainfall data of the historical monitoring, real-time monitoring and forecasting process, applying the FloodArea (FloodArea) model to simulate the flood level results of the plain water network area facing the heavy rainfall process; performing a hazard analysis of disaster-causing factors according to the above-mentioned flood level results, combining the Logistic model and superposition analysis to achieve risk assessment and risk early warning. The meteorological and hydrological early warning method of the present invention can quantitatively express the differences in the flooding range and flooding depth in the study area, and can extract the risk levels of different sections of small and medium-sized rivers, and combine the spatial distribution characteristics and disaster-causing conditions of different types of disaster-bearing bodies to construct a risk quantitative assessment model to form the risk of different disaster-bearing bodies being affected by the flood-causing heavy rainfall process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of meteorological and hydrological early warning, and in particular to a meteorological and hydrological early warning method suitable for plain water network areas. Background Art

[0002] The patent "A Regional Rainstorm Disaster Risk Assessment Method" records the integration of meteorological, geographic information, remote sensing and other data. By constructing a GA vector database, relying on rainstorm information extraction technology and rainstorm monitoring standard homogenization and intensity calibration methods, it sets the core algorithm formula and can adjust the parameters. It provides decision-making services based on the calculated risk level. The central idea is to extract rainstorm information, combined with the rainstorm impact simulation formula to obtain the risk level of a specified area being affected by rainstorm disasters.

[0003] The patent "A method for assessing the risk of flood disasters in power facilities considering the influence of reservoirs" (Shi Tianru et al.) discloses a method for assessing the risk of flood disasters in power facilities considering the influence of reservoirs, including the following steps: according to the precipitation data of the basin where the power facilities are located, the precipitation intensity and spatial distribution of precipitation in the mountain torrent basin are obtained, and the precipitation frequency is calculated using the Gumbel extreme value method; the flood flow is calculated according to the precipitation intensity of the basin where the power facilities are located and the collected reservoir information; the flood flow data is used as an important input field, and is substituted into the rainstorm flood inundation model together with the terrain and land use data to simulate the flood inundation evolution process, and the inundation depth and area spatial distribution of the basin where the power facilities are located are obtained; according to the flood inundation depth and flood inundation range of the disaster area, or the measured hydrological data, the disaster matching rate is used to analyze the simulation accuracy of the inundation depth and area. This invention considers the flood impact of the reservoir on the downstream basin, and fundamentally uses the rainstorm flood inundation model simulation combined with the disaster matching results to assess the flood impact. The rainstorm flood inundation model is the main tool for assessing flood risks. (Patent source: A method for assessing flood disaster risks of power facilities considering the impact of reservoirs. Shi Tianru; Ye Limei; Hu Danhui; Zhou Yuehua; Zhang Yaodong; Gao Zhengxu; Zhou Xueming; Ren Xiang; Huang Zeqi; Huang Junjie; Mao Xiaopo; Feng Zhiqiang; Fu Jianjin; Zhou Yue. Chinese patent: CN112287539B, 2021-01-29)

[0004] The article "Study on critical rainfall for disasters in plain water network areas based on statistics-FloodArea" lists the method of combining statistical methods with FloodArea hydrodynamic model simulation based on regional / basin precipitation, water level and flow observation data, and constructs statistical models of cumulative surface rainfall-flood increase in multiple periods in two methods from the perspective of water level fluctuation. The two methods are verified to be similar, proving that the critical rainfall for disasters can be used in plain water network areas to capture flood-causing heavy precipitation processes. The critical rainfall for disasters formed is based on multi-year precipitation data and can serve as the technical background of this patent, supporting the selection of heavy precipitation processes that cause waterlogging in this patent, and providing meteorological risk assessment and early warning services for flood-causing heavy precipitation processes. (Article source: Miao Qian, Xie Zhiqing, Zeng Yan, et al. Study on critical rainfall for disasters in plain water network areas based on statistics-FloodArea. Journal of Natural Resources, 2018, 33(9):1563-1574.).

[0005] The article "Dynamic Assessment Method of Heavy Rain and Flood Disaster Risks Oriented to the Disaster-causing Process" starts from the mechanism of disaster occurrence and takes the disaster-causing process as the idea to establish a dynamic assessment method for heavy rain and flood risks in mountainous basins. According to the characteristics of the occurrence and development of heavy rain and flood disasters, the risk assessment process is decomposed into a series of meteorological, hydrological and social statistical links, including basin surface rainfall calculation, description of precipitation flooding process and determination of critical rainfall for disasters, dynamic analysis of disaster impact range and intensity, exposure of disaster-bearing bodies and disaster damage sensitivity assessment. A method for dynamic assessment of precipitation, basin surface rainfall, river flow or water level, inundation range and water depth distribution, and disaster damage risk is established to achieve real-time assessment of disaster risk. (Author: Lu Yanyu, Tian Hong)

[0006] Among the above-mentioned existing technologies, the patent "A regional rainstorm disaster risk assessment method" has three main defects: first, the use of satellite data to extract rainstorm information is limited by weather conditions and interpretation methods; second, although the linear weighted method is simple to implement, the weights are difficult to determine, and the quality of the solution is difficult to guarantee; third, no method for dynamically assessing the risk of rainstorms and floods has been proposed. The patent "A method for assessing the risk of floods and waterlogging in power facilities considering the impact of reservoirs" has the following defects: it only uses the spatiotemporal characteristics of historical precipitation to assess flood risk under a specific precipitation frequency, and does not access real-time and predicted precipitation data for dynamic assessment. It assesses the scope and depth of rainstorm floods and waterlogging, etc., and does not involve relevant analysis of the disaster-bearing body, and the method is applicable to mountain torrent gully basins. The technology in the article "Research on critical rainfall for disasters in plain water network areas based on statistics-FloodArea" only provides a calculation and verification method for critical rainfall for disasters, which can only be used as one of the basic tasks for meteorological disaster risk assessment and early warning, or as a part / module of the assessment and early warning system.

[0007] In summary, the current assessment and early warning methods driven by dynamic models are suitable for areas with large terrain fluctuations, and there is no specific description of the applicable technology for plain water network areas. In addition, due to the densely distributed engineering projects and complex confluence patterns in plain river network areas, there is no obvious watershed boundary. There is no existing technology in China that clearly proposes and elaborates on the dynamic assessment and early warning technology of meteorological disaster risks for flood-causing heavy rainfall processes in plain river network areas.

[0008] In view of this, the present invention is proposed. Summary of the invention

[0009] In view of this, the present invention discloses a meteorological and hydrological early warning method suitable for plain water network areas. Based on the technical methods of previous patents and articles, the early warning method adds the analysis of precipitation differences and confluence rules in the river basins (or water resource divisions) of the plain water network areas, and timely adjusts the combination of hydrodynamic model parameters to adapt to changes in the dynamic evaluation process. The results can quantitatively express the differences in flooding range and flooding depth in the study area, and can extract the risk levels of different sections of small and medium-sized rivers. Combined with the spatial distribution characteristics and disaster-causing conditions of different types of disaster-bearing bodies, a risk quantitative assessment model is constructed to form the risk of different disaster-bearing bodies being affected by flood-causing heavy precipitation processes.

[0010] Specifically, the present invention is achieved through the following technical solutions:

[0011] The present invention provides a meteorological and hydrological early warning method applicable to plain water network areas, which specifically comprises the following steps: after determining the flood-causing heavy rainfall process and the assessment area, forming a process rainfall grid based on rainfall data of historical monitoring, real-time monitoring and forecasting processes, and applying the FloodArea model to simulate and obtain the flood level results of the plain water network area facing the heavy rainfall process;

[0012] After conducting a hazard analysis of disaster-causing factors based on the above flood level results, the method is divided into two methods: risk assessment and risk warning according to the quantitative impact of heavy rain and floods on the disaster-stricken body.

[0013] The existing rainstorm disaster risk assessment and early warning technology can solve the quantitative problem to a certain extent, but it lacks mechanism support and is difficult to capture and extract all higher-level and above areas. Its applicability in plain water network areas is also relatively limited. Specifically:

[0014] 1. There is no effective river channel DEM correction method suitable for plain water network areas. Since the current DEM data of plain water network areas do not express the river channel attribute information (width, depth, etc.), the water flow evolution state simulated by the FloodArea model does not match the actual situation; in response to this situation, we extracted and generalized the main river channel data and corrected the original DEM data according to the river channel attribute information.

[0015] 2. Meteorological-hydrological quantitative relationship Under the influence of different heavy rainfall events, different rivers and their different river sections are also different. The regional / basin representativeness of the critical rainfall for disasters is achieved by dividing the area where the hydrological water level station is located using the Thiessen polygon method. It is necessary to quantitatively express the meteorological-hydrological characteristics of the river channel based on the extraction of the heavy rainfall process affecting the regional river channel and the combination of water level changes.

[0016] 3. In the original technology, the risk assessment of rainstorm and flooding is implemented by using a risk assessment model. The model indicators and parameters are adjusted according to the analysis area and spatial resolution. The overall regional assessment effect is good, but the local assessment effect cannot be guaranteed.

[0017] 4. Taking heavy rainfall as an example, existing assessment and zoning technologies are mostly aimed at historical events. The assessment of ongoing or upcoming heavy rainfall events and their characteristics is not mentioned or the effect is poor.

[0018] 5. It can quantify the evaluation results, but it cannot solve the problem of dynamic evaluation. When heavy rainfall occurs frequently, the previous heavy rainfall will indirectly affect the heavy rainfall process that is occurring or about to occur by changing the ground runoff and flooding depth. Conventional quantitative evaluation methods cannot solve this problem.

[0019] In order to solve the above technical problems, the present invention, under the complex meteorological and hydrological conditions of the plain water network area, integrates the series of links of river selection, river DEM correction, land use type inspection, and Manning coefficient determination, and obtains the disaster-pregnant environment of regional inundation dynamics. The applicability evaluation of the hydrodynamic model solves the problem of the dynamic evolution of floods and inundation in the plain water network area, and seamlessly combines precipitation with different time effects (historical observation precipitation, real-time observation precipitation, and refined grid precipitation forecast products) to form a full-chain automation system, which can quickly form evaluation results and warn of rainstorm and flood risks in a short time. It not only takes into account the superposition effect of precipitation with different time effects on flood risks, but also takes into account the changes in regional drainage measures. By simulating the dynamic changes of water levels and combining risk assessment indicators, it realizes the dynamic evaluation and early warning of flood risks in a refined and quantitative manner. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Various other advantages and benefits will become apparent to those skilled in the art by reading the following detailed description of the preferred embodiments. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. The same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0021] Figure 1 A schematic diagram of the flow structure of meteorological and hydrological warning provided by an embodiment of the present invention;

[0022] Figure 2 The comparison results of water depth at different stations under different maximum water exchange rates for the same input scenario;

[0023] Figure 3 A flowchart of a computer device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0024] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present disclosure. Instead, they are only examples of devices and methods consistent with some aspects of the present disclosure as detailed in the appended claims.

[0025] The terms used in the present disclosure are only for the purpose of describing specific embodiments and are not intended to limit the present disclosure. The singular forms "a", "said" and "the" used in the present disclosure and the appended claims are also intended to include plural forms, unless the context clearly indicates otherwise. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more of the associated listed items.

[0026] It should be understood that although the terms first, second, third, etc. may be used in the present disclosure to describe various information, such information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present disclosure, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information, depending on the context. For example, the word "if" used herein may be interpreted as "at" or "when" or "in response to a determination."

[0027] The present invention provides a meteorological and hydrological early warning method suitable for plain water network areas, such as Figure 1 As shown, the following steps are included:

[0028] After determining the flood-causing heavy rainfall process and the assessment area, the rainfall grid is formed according to the rainfall data of historical monitoring, real-time monitoring and forecasting process, and the flood level results of the plain water network area facing the heavy rainfall process are obtained by FloodArea model simulation;

[0029] After conducting a hazard analysis of disaster-causing factors based on the above flood level results, the method is divided into two methods: risk assessment and risk warning according to the quantitative impact of heavy rain and floods on the disaster-stricken body.

[0030] Specifically, the design of the dynamic assessment and early warning process for rainstorm and flood risks in small and medium-sized rivers of the present invention is mainly divided into two parts: human-computer interaction and internal calculation.

[0031] The human-computer interaction process is the basis of the internal calculation process, which mainly includes four parts: evaluation unit selection, evaluation period selection, meteorological data source selection and weight parameter adjustment. The purpose is to determine the flood-causing heavy rainfall process and assessment area.

[0032] ① The assessment units mainly include river basins, water resource zones or study areas, etc. A selection mode is provided by default, and the system also supports manual editing and acquisition.

[0033] ② Select the disaster assessment period according to needs. The system supports two methods: calendar selection and manual editing and filling. You can also directly locate it through the button of the historical flood-causing heavy rainfall process statistically displayed by the system.

[0034] ③ Two forecast data sources have been added, one is the meteorological station observation data, and the other is the refined grid forecast product. After converting the station observation precipitation data into surface rainfall data, the spatial coordinates, range, and resolution of the two sources are processed to be consistent with the DEM data prepared in the background. The observed precipitation data includes four indicators: precipitation process, daily hourly precipitation, cumulative precipitation, and maximum precipitation time. The forecast product provides data at 08 and 20 hours on a certain day, as well as 3h, 12h, 24h, and 72h.

[0035] ④ The purpose of adjusting the weight parameters is to avoid missing flood-causing heavy precipitation processes (screening flood-causing heavy precipitation processes to the greatest extent). The weight parameters are mainly set based on the proportional relationship between the accumulated precipitation of the heavy precipitation process and the critical rainfall for flooding. Due to the different convergence laws of each basin, water resource division or study area, the weight adjustment is based on two basic rules: first, the parameter setting of the downstream area under the influence of the same heavy precipitation process is lower than that of the upper and middle reaches; second, the weight setting is adjusted downward in the case of heavy precipitation processes in the early stage. The adjustment and setting are based on the precipitation-water level change relationship, and the range is [0,1]. The linear weight interpolation method is used for process surface rainfall calculation. The weight size corresponds to the representative area of ​​the selected station. If the selected stations are different, the Thiessen polygon area corresponding to each station and its weight in the evaluation unit are also different.

[0036] Based on the human-computer interaction process, the internal calculation process mainly realizes the functions of risk assessment and risk warning through five main links. Among them, process rainfall gridding, FloodArea model simulation and disaster factor hazard analysis are the basis of risk assessment and risk warning. The meteorological and hydrological data used in the two are consistent. Risk assessment focuses on assessing the impact of major disaster-bearing bodies such as population and GDP on rainstorm and flood disasters or their risks. Risk warning is mainly based on the defense indicators of the warning water level of the hydrological and water conservancy departments or the relevant indicators in the emergency plan.

[0037] ① Calculate the rainfall during historical monitoring, real-time monitoring and forecasting. The rainfall data of forecasting process mainly comes from the refined grid numerical forecast products. Various grid forecast precipitation products have specific spatial resolutions. When the spatial resolution of the forecast product is inconsistent with the resolution of other input spatial distribution data, the resampling method is applied. The system provides this function to adjust the spatial resolution of the data. The historical monitoring and real-time monitoring precipitation products are accumulated and calculated accordingly according to the needs, and the spatial distribution weight is realized by interpolation methods such as Kriging.

[0038] ② For watersheds, water resource zones or study areas, the surface precipitation input by the FloodArea model is controlled by rainfall intensity and rainfall intensity spatial distribution. Taking hourly rainfall data as an example, one is hourly rainfall intensity and the other is rainfall spatial weight. In the absence of direct hourly rainfall intensity data, it is obtained by the time average of total rainfall. According to the requirements of the FloodArea model, the value of the spatial weight of precipitation is between [0, 1]. The spatial weight of forecast precipitation is realized by spatial redistribution of grid forecast precipitation intensity. At present, the system sets the spatial distribution weight of historical and real-time precipitation data to 1.

[0039] ③FloodArea is a powerful tool for simulating the dynamic evolution of floods by using a heavy precipitation-driven model under the conditions of DEM and Manning coefficient. It requires that all kinds of input data have consistent geographic coordinates and projection information. Process ② provides precipitation and spatial weight data, and processes the data coordinate system and projection information to be consistent with DEM and Manning coefficient. Another key parameter affecting the simulation effect of FloodArea is the maximum water flow exchange rate. After applying historical precipitation data to calibrate the most suitable maximum water flow exchange rate for the region ( Figure 2 ), the flood level results for heavy rainfall processes in plain water network areas can be obtained as basic data for hazard analysis of disaster-causing factors.

[0040] For example, the DEM data under the two sets of river channel attribute configuration schemes before and after optimization were selected, the same precipitation data was input, and only the maximum water flow exchange rate parameter was changed. The parameter range was [0.5-10], and 20 parameters were counted in 0.5 steps to form 20 sets of scenario parameters. Since the maximum water flow exchange rate affects the peak time and rising rate of the simulated water level, in order to reduce the analysis events, the "binary method" was used to optimize the maximum water flow exchange rate parameters driven by one set of DEM. The specific operation was based on the historical heavy precipitation event from September 24 to 25, 2017. The simulated water level of the hydrological water level station was extracted using ArcGIS software. After comparison with the observed water level, the maximum water flow exchange rate in Wucheng Xiyu District was finally located at [1.0, 2.0]. On this basis, the optimized river data was used to continue simulating the same heavy rainfall event, and effective rainfall was added. By setting single-station rainfall, multi-station rainfall average superimposed effective rainfall, and whether to add guest water, five scenarios were simulated. First, the maximum water flow exchange rate parameter of the FloodArea model in the study area was determined. Second, the quantitative relationship between effective rainfall and observed rainfall in Wucheng Xiyu District was evaluated. Finally, the maximum water flow exchange rate parameter of the flood evolution process in Wucheng Xiyu District was determined to be 1.0, and the effective rainfall was the hourly observed rainfall minus 3mm intensity. If the result at a certain moment is used as the basis for risk assessment, the segmented warning can be achieved by directly combining the warning water level of small and medium-sized rivers, and the risk analysis of the rainstorm and flood disaster factors can be completed by comparing the disaster loss index of the disaster-bearing body; if the comprehensive impact of each time of the heavy rainfall process is considered, the maximum water level is extracted from each grid to form the maximum risk result of the basin or region, and the risk analysis of the rainstorm and flood disaster factors can be completed by combining the warning water level of small and medium-sized rivers and comparing the disaster loss index of the disaster-bearing body. The model results are consistent with the spatial resolution of the input precipitation, DEM, and land use (Manning coefficient) data, and are set to multiple time periods according to demand. After the hazard factor hazard results are generated, the system further evaluates the quantitative impact of heavy rain and floods on the disaster-prone body. At this time, it is divided into two processes: risk assessment and risk warning according to service needs.

[0041] ④ Risk assessment is to assess the risk level of the disaster-bearing body on each grid unit affected by heavy rain and flood disasters, and the premise is to obtain the refined spatial distribution results of the disaster-bearing body. Based on the availability, accuracy and attention of the data, the 2010 population and GDP grid data of two types of disaster-bearing bodies were selected as the evaluation objects. Combined with the 2010 population and GDP census statistics, data verification was completed at the four levels of province, city, county (district), township and street. After the verification, the population and GDP data resolutions were resampled to be consistent with the FloodArea model simulation results to prepare for the subsequent risk assessment process. Since the risk increases with the increase of flood level, the risk remains unchanged after it increases to a certain limit point. It has been proved in practice that the Logistic model can better express the risk change trend / curve and fix the risk assessment value / index in the range of (0,1). The model parameters are determined according to the critical indicators of various disaster-bearing bodies affected by floods, and the corresponding risk result assessment value / index is the assessment level cutoff point. The risk index is presented grid by grid. The independent variable of the model is the hazard result of the disaster-causing factor in ③, which provides quantitative assessment results of the population and GDP under different levels of risk, and is presented in a table. Then, the risk assessment results of different types of disaster-prone bodies under the background of floods are obtained. Risk assessment can complete the assessment of flood inundation results and disaster-prone bodies affected by floods in different periods of history, real time and in the future.

[0042] ⑤ The risk warning function needs to correspond to the critical threshold of disaster-causing hazards, risk potential points and other landmark geographic information data. The location of risk potential points should be verified based on the landmark geographic information data, and possible risk potential points should be extracted in combination with hydrological analysis and terrain analysis. Overlay analysis is the basis of risk warning, which is mainly set for risk potential points and key flood-prone objects. According to the established critical indicators of risk potential points and key focus objects, the risk level is set and risk warnings are issued. Risk warning products are produced in combination with the terrain and geomorphic conditions of various places and the contents of flood control and drainage emergency plans. The feature of risk warning products is refinement. For small and medium-sized rivers, segmented warning information is provided, and the segments correspond to the monitoring range of hydrological water level stations.

[0043] The results of constructing the Logistic model parameters corresponding to the impact of floods on different types of disaster-prone bodies are as follows:

[0044] For the population as a disaster-bearing body, the two inflection points of the normalized target conversion function of the Logistic model are corresponding to 0.6m and 1.2m affected by floods, and the Logistic formula for the population affected by heavy rain and floods is obtained:

[0045]

[0046] For GDP, considering that houses, cars, and crops are the main bodies that suffer from flooding losses, houses are mainly used to accommodate people, and the two key depths of population affected by floods are as mentioned above. The 0.2m and 0.6m depths of cars affected by floods correspond to the two inflection points of the normalized target conversion function of the Logistic model, and the 0.33m and 0.66m depths of rice correspond to the two inflection points of the normalized target conversion function of the Logistic model. Considering the above, the two key depths of GDP affected by heavy rain and floods are 0.2m and 0.6m, and the corresponding Logistic formula is:

[0047]

[0048] Among them, 51.99 and 4.39, 13.93 and 6.585 are all Logistic normalized target conversion functions The coefficient of

[0049] 0.6m and 1.2m, 0.2m and 0.6m correspond to two inflection points x where the acceleration is 0. l and x r , x l and x r It is the key point to distinguish the risk level.

[0050] According to the different flooding depths of different disaster-bearing bodies, x l and x r These two inflection points are set as the corresponding risk level inflection points in the present invention, which are 0.6m and 1.2m for population, and 0.2m and 0.6m for GDP.

[0051] ⑥ Risk assessment and risk warning are processed in parallel. According to specific service needs and process trends, risk assessment reports and risk warning products are generated respectively. Reports and products support manual modification and improvement. After confirming that the contents of reports and products are correct, the meteorological disaster risk assessment and warning process is terminated. The dynamic assessment and warning technical functions are mainly embedded in the internal calculation process, calculating the forecast process rainfall and gridding the process rainfall, so as to prepare for the use of the FloodArea model to simulate the dynamic evolution of floods. Under disaster-prone environments such as DEM and land use types, FloodArea drives precipitation data to generate hourly water level data, and compares the intensity of water level changes with the warning water level to conduct a risk analysis of disaster-causing factors.

[0052] The solution of the present invention has the following beneficial effects:

[0053] 1. Abandon the multi-index evaluation method that considers disaster hazard, sensitivity of disaster-prone environment, exposure of disaster-prone body, vulnerability of disaster-prone body and disaster prevention and mitigation capacity, and turn to the analysis of disaster-causing mechanism. Start with the spatial refinement of precipitation data, combine the refined construction of disaster-prone environment, calculation and improvement of critical rainfall for disaster, introduce hydrodynamic model to simulate confluence law, complete the spatial refinement and quantitative simulation of rainstorm disaster hazard, and the hazard result is more objective and accurate than interpolation.

[0054] 2. The set technical process is complete, the data content is comprehensive, and the simulated water level and parameter adjustment can support the dynamic completion of the entire process of pre-disaster risk warning / assessment, mid-disaster risk assessment and post-disaster risk assessment. It is integrated into the system and realizes one-click production and release functions, which not only realizes quantitative assessment and warning, but also greatly saves the time of assessment and warning services.

[0055] 3. The system can work uninterruptedly around the clock. When the cumulative precipitation in a region, river basin or study area exceeds the critical rainfall that causes disasters, the alarm function will be activated. After manual verification that assessment and early warning work is necessary, risk assessment and risk early warning can be carried out in areas where flood risks may occur selected by the system, and big data results of assessment and early warning samples will be generated in the process.

[0056] 4. Based on the critical rainfall that causes disasters in different regions, we can select heavy precipitation processes that may cause regional flood disasters in various places, complete risk assessment results for different heavy precipitation event locations and intensity characteristics, filter out the impact of non-flood-causing processes, and screen out rainstorm flood risk assessment and risk warning results under the influence of heavy precipitation processes. The system has high operating efficiency, the degree of refinement is consistent with the input data, the spatial distribution of risk size is closer to the actual situation, and the accuracy of assessment and warning is improved.

[0057] 5. By adopting the hydrodynamic model, the calculation and simulation of the dynamic evolution of the water level are involved. The risk assessment process adds the vulnerability curve of the disaster-bearing body and the analysis of disaster prevention and mitigation capabilities, which is achieved by changing the inflection point position of the Logistic model and converting the Logistic model type. The high vulnerability of the disaster-bearing body and the weak disaster prevention and mitigation capabilities can be achieved by lowering the inflection point position of the Logistic model and converting the Logistic model type. Conversely, it can be achieved by increasing the inflection point position of the Logistic model and converting the Logistic model type. The specific position of the inflection point is determined based on the statistical disaster situation or simulation results.

[0058] The meteorological and hydrological early warning method of the present invention forms a complete early warning system, in which risk assessment and risk early warning are the two most important functions of the system. After completing the risk assessment and risk early warning functions, a product production and release module is set up, and a manual editing function is added on the basis of product generation, taking advantage of the refinement of comprehensive model simulation and the higher accuracy of manual experience. The product is released after being reviewed and approved. The risk early warning product includes two parts: rainfall analysis and water situation forecast. It runs through the technical idea of ​​risk early warning service: refined grid forecast precipitation input - FloodArea model simulation of real-time water level dynamics - superimposed disaster-causing critical rainfall analysis - comparative early warning water level estimation risk level.

[0059] In addition, since the actual application is mainly aimed at plain water networks, especially for Jiangsu Province, which is located in the lower reaches of the Yangtze River and Huaihe River, bordering the Yellow Sea to the east, with low terrain and dense river networks, it is a typical plain water network area. In order to quickly drain the waterlogging, water conservancy engineering facilities such as dike dams were built. In addition, the drainage efficiency of the drainage facilities affects the simulation results of the FloodArea hydrodynamic model, resulting in the extracted river water level information being locally high or low. Therefore, a manual editing module is set up, which can be modified individually or in batches according to the level, so that the warning results are reasonable without other conditions that can better improve the model simulation results.

[0060] Figure 3 This is a schematic diagram of the structure of a computer device disclosed in the present invention. Figure 3 As shown, the computer device 400 includes at least a memory 402 and a processor 401; the memory 402 is connected to the processor via a communication bus 403, and is used to store computer instructions executable by the processor 401, and the processor 401 is used to read computer instructions from the memory 402 to implement the steps of the meteorological and hydrological early warning method applicable to plain water network areas described in any of the above embodiments.

[0061] For the above-mentioned device embodiments, since they basically correspond to the method embodiments, the relevant parts can refer to the partial description of the method embodiments. The device embodiments described above are only schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the disclosed solution. A person of ordinary skill in the art can understand and implement it without paying any creative work.

[0062] Computer readable media suitable for storing computer program instructions and data include all forms of non-volatile memory, media and memory devices, including, for example, semiconductor memory devices (e.g., EPROM, EEPROM and flash memory devices), magnetic disks (e.g., internal disks or removable disks), magneto-optical disks, and CD ROM and DVD-ROM disks. The processor and memory may be supplemented by, or incorporated in, special purpose logic circuits.

[0063] Finally, it should be noted that although this specification contains many specific implementation details, these should not be interpreted as limiting the scope of any invention or the scope of protection claimed, but are mainly used to describe the features of specific embodiments of specific inventions. Certain features described in multiple embodiments within this specification may also be implemented in combination in a single embodiment. On the other hand, the various features described in a single embodiment may also be implemented separately in multiple embodiments or in any suitable sub-combination. In addition, although features may work in certain combinations as described above and even initially claimed as such, one or more features from the claimed combination may be removed from the combination in some cases, and the claimed combination may point to a sub-combination or a variation of a sub-combination.

[0064] Similarly, although operations are depicted in a particular order in the accompanying drawings, this should not be understood as requiring that these operations be performed in the particular order shown or performed sequentially, or requiring that all illustrated operations be performed to achieve the desired results. In some cases, multitasking and parallel processing may be advantageous. In addition, the separation of various system modules and components in the above-described embodiments should not be understood as requiring such separation in all embodiments, and it should be understood that the described program components and systems can generally be integrated together in a single software product, or packaged into multiple software products.

[0065] Thus, specific embodiments of the subject matter have been described. Other embodiments are within the scope of the appended claims. In some cases, the actions recited in the claims can be performed in a different order and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the particular order or sequential order shown to achieve the desired results. In some implementations, multitasking and parallel processing may be advantageous.

[0066] The above description is only a preferred embodiment of the present disclosure and is not intended to limit the present disclosure. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present disclosure shall be included in the scope of protection of the present disclosure.

Claims

1. A meteorological and hydrological early warning method applicable to plain water network areas, specifically used in Wucheng Xiyu District, Jiangsu Province, characterized in that: The steps include: After determining the flood-causing heavy rainfall process and the assessment area, the rainfall grid is formed according to the rainfall data of historical monitoring, real-time monitoring and forecasting process, and the flood level results of the plain water network area facing the heavy rainfall process are obtained by FloodArea model simulation; After conducting a hazard analysis of the hazard factors based on the above flood level results, the risk assessment and risk warning are divided into two methods according to the quantitative impact of the rainstorm and flood on the disaster-bearing body; The risk assessment method is to obtain the refined spatial distribution results of the disaster-prone body and use the Logistic model to assess the risk level of the disaster-prone body on each grid unit being affected by the heavy rain and flood disaster; Methods for evaluating using the Logistic model include: For the population as a disaster-bearing body, the two inflection points of the normalized target conversion function of the Logistic model are corresponding to 0.6m and 1.2m affected by floods, and the Logistic formula for the population affected by heavy rain and floods is obtained: For GDP, the 0.2m and 0.6m where cars are affected by floods correspond to the two inflection points of the normalized target conversion function of the Logistic model, and the corresponding Logistic formula is: Among them, 51.99 and 4.39, 13.93 and 6.585 are all Logistic normalized target conversion functions The coefficient of 0.6m and 1.2m, 0.2m and 0.6m correspond to two inflection points x where the acceleration is 0. l and x r , x l and x r It is the key point to distinguish the risk level. The method for determining flood-causing heavy rainfall processes and assessment areas includes the following steps: Select the evaluation unit, evaluation period and precipitation data source, and then adjust the weight parameters according to the precipitation-water level change relationship. The precipitation data source is the meteorological station observation data and refined grid forecast products; The rainfall data in the forecast process comes from the refined grid numerical forecast products. When the spatial resolution of the forecast products is different from the resolution of other input spatial distribution data, resampling is used for processing; The rainfall data from historical monitoring and real-time monitoring are accumulated and calculated, and interpolation methods such as Kriging are used to adjust the spatial distribution weights; The simulation method of the FloodArea model includes: adjusting various data to consistent geographic coordinates and projection information, and processing the geographic coordinates and projection information to be consistent with DEM and Manning coefficient, and then obtaining the maximum water flow exchange rate based on historical precipitation data, and obtaining the flood level results of the plain water network area facing the heavy precipitation process; ArcGIS software was used to extract the simulated water level of the hydrological and water level stations. After comparison with the observed water level, the maximum water flow exchange rate in Wucheng Xiyu District was finally located at [1.0, 2.0].

2. The meteorological and hydrological early warning method according to claim 1, characterized in that: In the process of risk analysis of disaster-causing factors, if the result at a certain moment is used as the basis for risk assessment, the early warning can be realized by directly combining the early warning water level of small and medium-sized rivers, and the risk assessment can be completed by comparing the disaster loss index of the disaster-bearing body and the risk analysis of the disaster-causing factors of rainstorm and flood; If the comprehensive impact of heavy rainfall processes at all times is taken into account, the maximum water level is extracted grid by grid to form the maximum hazard result for the basin or region. The risk assessment is completed by combining the warning water levels of small and medium-sized rivers, the disaster loss indicators of the disaster-bearing bodies, and the hazard analysis of rainstorm and flood disaster-causing factors.

3. The meteorological and hydrological early warning method according to claim 1, characterized in that: The risk early warning method includes: For risk potential points and key flood-prone objects, the risk level is set based on the established critical indicators of the risk potential points and key focus objects, and risk warnings are issued through superimposed analysis.

4. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed, the steps of the meteorological and hydrological early warning method applicable to plain water network areas as described in any one of claims 1-3 are implemented.

5. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the steps of the meteorological and hydrological early warning method applicable to plain water network areas as described in any one of claims 1 to 3 are implemented.