AR operation and maintenance system and method for power network
By dividing the inspection route of the power network into inspection units and dividing model areas, comparing and updating areas with differences exceeding the threshold in real time, the problem of frequent reconstruction of three-dimensional AR models in the existing technology is solved, and the operation and maintenance efficiency is improved and the accuracy of the model.
Patent Information
- Application Number
- CN202311340800.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-17
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2043-10-17
AI Technical Summary
The existing power network AR operation and maintenance system needs to reconstruct the three-dimensional AR model every time it is detected, which has affected real-time, computing resources, user experience and network requirements, reducing the efficiency of equipment operation and maintenance.
By dividing the inspection route of the power network into inspection units, and dividing the three-dimensional AR model of each unit into multiple model areas, the physical area information of the current and previous inspections is compared in real time, and only the difference exceeds the threshold value is updated. the model area to avoid unnecessary model reconstruction.
It improves inspection efficiency, saves resources, ensures the accuracy and reliability of the model, and improves equipment operation and maintenance efficiency.
Smart Images

Figure CN117253019B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of intelligent operation and maintenance of electric power equipment, and in particular to an AR operation and maintenance system and method for an electric power network. Background Art
[0002] In order to improve the efficiency and safety of power network operation and maintenance, augmented reality (AR) technology has been introduced into the field of power network operation and maintenance. AR technology provides real-time guidance, data and simulation for operation and maintenance personnel by superimposing virtual information on real scenes, helping them better understand and operate equipment and improve work efficiency and accuracy. They can intuitively understand the status, connection relationship and fault information of equipment through AR technology, obtain data in real time, conduct real-time monitoring and analysis, and perform remote operation and maintenance. AR technology can also compare and analyze the real-time data of power equipment with historical data, help operation and maintenance personnel identify potential problems and trends, and provide predictive maintenance suggestions. In addition, AR technology can also be used for training and knowledge transfer, providing practical operation experience and training content through simulation and virtual experiments, helping operation and maintenance personnel to quickly learn and improve their skills. The background of power network AR operation and maintenance is to meet the challenges of power network operation and maintenance and improve operation and maintenance efficiency, safety and reliability.
[0003] The Chinese patent publication number CN114662714A discloses a computer room operation and maintenance management system and method based on AR equipment. The system includes multiple modules: a live broadcast module is used for online communication and message sending between operation and maintenance personnel and experts or leaders; an augmented reality scene generation module is used to generate a three-dimensional reconstruction point cloud model of the computer room; an indoor navigation module is used to guide the operation and maintenance personnel to quickly find the equipment marked by the expert in the live broadcast for operation and maintenance; an information push module is used to collect the operation and maintenance operation steps sent by the expert; a fault detection module is used for the operation and maintenance personnel to report the fault when they find the equipment fault; a remote multi-person collaboration module is used for remote viewing by external visitors and one-to-many guidance by experts for operation and maintenance personnel; a review audit module is used to view historical operation and maintenance records; AR equipment is used to create a chat room for experts and operation and maintenance personnel to broadcast live, display indoor navigation paths, computer room scene models, and push policy guidance information sent by the expert end; the present invention enables the operation and maintenance personnel to carry out inspection work by wearing AR equipment, thereby improving the inspection efficiency. However, each detection requires the reconstruction of the three-dimensional AR model, which is likely to have an adverse impact on real-time performance, computing resources, user experience, and network requirements, and at the same time, it also reduces the equipment operation and maintenance efficiency. Summary of the invention
[0004] The present invention provides an AR operation and maintenance system and method for an electric power network, which solves the technical problem that a three-dimensional AR model needs to be rebuilt for each detection, which may have an adverse effect on real-time performance, computing resources, user experience, network requirements, etc., and at the same time, reduces the equipment operation and maintenance efficiency.
[0005] In view of this, a first aspect of the present invention provides an AR operation and maintenance system for a power network, comprising: a region division module, a data acquisition module, a first data comparison module, a second data comparison module and a model establishment module;
[0006] The area division module is used to divide the inspection route of the power network into a number of inspection units, divide the three-dimensional AR model corresponding to each inspection unit into a number of model areas, and locate each of the model areas to obtain the location information of each of the model areas;
[0007] The data acquisition module is used to acquire entity information of each inspection unit, and divide the acquired entity information into corresponding entity area information according to each model area;
[0008] The first data comparison module is used to compare the current entity area information obtained by the current inspection with the entity area information corresponding to the previous inspection one by one to determine the first difference degree of each entity area information, and is also used to determine whether the first difference degree of each entity area information exceeds a preset first difference degree threshold, and determine the model area of the AR model that needs to be updated according to the judgment result;
[0009] The second data comparison module is used to determine the model area connected to the model area of the AR model to be updated according to the position information of the model area of the AR model to be updated, compare the current entity area information corresponding to the model area determined to be connected to the model area of the AR model to be updated with the entity area information corresponding to the previous inspection, determine the second difference degree of each entity area information, and further determine whether the second difference degree of each entity area information exceeds a preset second difference threshold, and determine the model area of the AR model to be updated according to the judgment result;
[0010] The model building module is used to build a three-dimensional AR model of the model area that needs to be updated based on the model area of the AR model that needs to be updated and its corresponding entity area information.
[0011] Preferably, the system further includes:
[0012] A storage module, the storage module is used to store the three-dimensional AR model of the power network and the entity information and entity area information of the power network obtained in each inspection, the entity information includes the entity image information of the power network, and the entity area information includes the entity image information corresponding to the model area.
[0013] Preferably, the first data comparison module is further configured to determine the corresponding model area as a model area for which the AR model needs to be updated when it is determined that the first difference of the entity area information exceeds a preset first difference threshold.
[0014] Preferably, the first data comparison module is further used to determine the first difference degree of each entity area information according to the similarity between the entity image information corresponding to the current entity area information obtained by the current inspection and the entity image information corresponding to the entity area information corresponding to the previous inspection.
[0015] Preferably, the second data comparison module is further configured to determine that the corresponding model region is a model region for which the AR model needs to be updated if it is determined that the second difference of the entity region information exceeds a preset second difference threshold.
[0016] Preferably, the model building module is further used to construct a corresponding three-dimensional AR model for the model area of the AR model to be updated based on a preset model update cycle.
[0017] Preferably, the system also includes: a periodic update module, which is used to adjust the update period of the three-dimensional AR model of the model area according to the average update period of the model area within a preset adjustment time period, and is also used to adjust the update period of the three-dimensional AR model of the model area to the minimum update interval of the model area within the preset adjustment time period if the interval duration of the average update period is less than the interval duration of the update period of the current model area.
[0018] Preferably, the data acquisition module comprises a sensor and a camera, the sensor is used to acquire electrical parameters in the model area, and the camera is used to acquire image and video data in the model area.
[0019] Preferably, the storage module is used to back up the stored data to the file systems of several computers based on a preset backup period.
[0020] In a second aspect, the present invention further provides an AR operation and maintenance method for a power network, comprising the following steps:
[0021] The inspection route of the power network is divided into a plurality of inspection units, the three-dimensional AR model corresponding to each inspection unit is divided into a plurality of model areas, each of the model areas is positioned, and the position information of each of the model areas is obtained;
[0022] Acquire entity information of each inspection unit, and divide the acquired entity information into corresponding entity area information according to each model area;
[0023] Compare the current entity area information obtained by the current inspection with the entity area information corresponding to the previous inspection one by one, determine the first difference of each entity area information, judge whether the first difference of each entity area information exceeds a preset first difference threshold, and determine the model area of the AR model that needs to be updated according to the judgment result;
[0024] Determining the model area connected to the model area of the AR model to be updated according to the position information of the model area of the AR model to be updated, comparing the current entity area information corresponding to the model area connected to the model area of the AR model to be updated with the entity area information corresponding to the previous inspection, determining the second difference of each entity area information, judging whether the second difference of each entity area information exceeds a preset second difference threshold, and determining the model area of the AR model to be updated according to the judgment result;
[0025] A three-dimensional AR model of the model area that needs to be updated is constructed based on the model area of the AR model that needs to be updated and its corresponding entity area information.
[0026] It can be seen from the above technical solutions that the present invention has the following advantages:
[0027] The present invention divides the inspection route of the power network into several inspection units, and divides the three-dimensional AR model corresponding to each inspection unit into several model areas, and each model area corresponds to a three-dimensional AR model, which can improve the inspection efficiency and facilitate the rapid discovery of abnormalities. At the same time, the current entity area information obtained by the current inspection is compared with the entity area information corresponding to the previous inspection one by one, and the model area that needs to update the AR model is determined based on the difference, and the current entity area information corresponding to the model area connected to the model area of the AR model that needs to be updated is compared with the entity area information corresponding to the previous inspection, so as to determine the model area that needs to be updated of the AR model, and re-model the model area of the AR model that needs to be updated, thereby avoiding unnecessary model reconstruction, saving resources, ensuring the accuracy and reliability of the model, and improving the equipment operation and maintenance efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 A schematic diagram of the structure of an AR operation and maintenance system for a power network provided by an embodiment of the present invention;
[0029] Figure 2 A schematic diagram of the division of the inspection unit provided in an embodiment of the present invention;
[0030] Figure 3 A flowchart of an AR operation and maintenance method for a power network provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0031] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] For easier understanding, see Figure 1 , Figure 1 The structure diagram of an AR operation and maintenance system for a power network provided by the present invention is illustrated. An AR operation and maintenance system for a power network provided by the present invention comprises: a region division module 10, a data acquisition module 20, a first data comparison module 30, a second data comparison module 40 and a model establishment module 50;
[0033] The area division module 10 is used to divide the inspection route of the power network into several inspection units, divide the three-dimensional AR model corresponding to each inspection unit into several model areas, and locate each model area to obtain the position information of each model area.
[0034] Among them, the inspection route can be divided into several inspection units based on the location of the connecting switch on the inspection route. At the same time, the three-dimensional AR model corresponding to the inspection unit can be divided into several model areas according to the functional area.
[0035] At the same time, you can also set numbers for each model area.
[0036] The data acquisition module 20 is used to acquire entity information of each inspection unit, and divide the acquired entity information into corresponding entity area information according to each model area.
[0037] The entity information is composed of a plurality of entity region information. After the entity information is divided into a plurality of corresponding entity region information according to each model region, each model region corresponds to one entity region information.
[0038] The first data comparison module 30 is used to compare the current entity area information obtained by the current inspection with the entity area information corresponding to the previous inspection one by one to determine the first difference degree of each entity area information, and is also used to determine whether the first difference degree of each entity area information exceeds a preset first difference degree threshold, and determine the model area of the AR model that needs to be updated based on the judgment result.
[0039] It should be noted that the difference of a single model area may be determined based on the similarity between an image of current entity area information obtained by a current inspection and an image of entity area information corresponding to a previous inspection.
[0040] The similarity of the images can be calculated according to any image similarity calculation method in the prior art. In the present invention, the higher the similarity between the image of the current single region information and the image of the corresponding previous region information, the more similar the images are, the smaller the difference between the single model regions is, and the similarity is inversely proportional to the difference between the single model regions. The specific difference can be calculated or assigned based on the similarity. The determination method is not unique, but the similarity should be inversely proportional to the difference between the single model regions. Generally, the first difference threshold is set to 90%.
[0041] The second data comparison module 40 is used to determine the model area connected to the model area of the AR model that needs to be updated based on the position information of the model area, and compare the current entity area information corresponding to the model area connected to the model area of the AR model that needs to be updated with the entity area information corresponding to the previous inspection to determine the second difference between each entity area information, and is also used to judge whether the second difference between each entity area information exceeds a preset second difference threshold, and determine the model area of the AR model that needs to be updated according to the judgment result.
[0042] Specifically, all model regions connected to a single model region are determined according to the position information of the model region, and the current region information of all connected model regions is re-compared with the corresponding previous region information to determine the model region of the AR model that needs to be updated.
[0043] The preset second difference threshold can be set by setting a threshold range, and can be set as the maximum boundary value of the threshold range.
[0044] Among them, all connected model regions include two model regions connected by vertices, two model regions connected by edges, and two model regions connected by faces.
[0045] In an example, see Figure 2 As shown, it is a schematic diagram of the division of a single inspection unit in an embodiment of the present invention. In the figure, a single inspection unit 1 includes a first model area 11, a second model area 12 and a third model area 13, wherein the first model area 11 and the second model area 12 are coplanar, the first model area 11 and the third model area 13 are colinear, the first model area 11 and the fourth model area 14 have a common vertex, and the second model area 12, the third model area 13 and the fourth model area 14 are all model areas connected to the first model area 11.
[0046] It should be noted that in the process of determining the model area that needs to update the AR model, in actual applications, if there are at least two model areas that are connected, the connected model areas are regarded as an overall model area, and it is determined whether the model area connected to the overall model area needs to rebuild the three-dimensional AR model; if any model area is not connected, it is determined whether the connected model areas of a single model area need to rebuild the three-dimensional AR model.
[0047] The model building module 50 is used to build a three-dimensional AR model of the model area that needs to be updated based on the model area of the AR model that needs to be updated and its corresponding entity area information.
[0048] It should be noted that the present invention divides the inspection route of the power network into several inspection units, and divides the three-dimensional AR model corresponding to each inspection unit into several model areas, and each model area corresponds to a three-dimensional AR model, which can improve the inspection efficiency and facilitate the rapid discovery of abnormalities. At the same time, the current entity area information obtained by the current inspection is compared with the entity area information corresponding to the previous inspection one by one, and the model area of the AR model that needs to be updated is determined based on the difference, and the current entity area information corresponding to the model area connected to the model area of the AR model that needs to be updated is compared with the entity area information corresponding to the previous inspection, so as to determine the model area of the AR model that needs to be updated, and re-model the model area of the AR model that needs to be updated, thereby avoiding unnecessary model reconstruction, saving resources, ensuring the accuracy and reliability of the model, and improving the equipment operation and maintenance efficiency.
[0049] In a specific embodiment, the system further includes:
[0050] The storage module is used to store the three-dimensional AR model of the power network and the entity information and entity area information of the power network obtained during each inspection. The entity information includes the entity image information of the power network, and the entity area information includes the entity image information corresponding to the model area.
[0051] The storage module can use a database or cloud storage to save the data and provide read and write functions for the data.
[0052] In one example, the storage module is used to back up the stored data to the file systems of several computers based on a preset backup period.
[0053] It can be understood that the storage module has data backup and recovery functions to ensure the security and reliability of data. At the same time, data can be backed up regularly and the distributed file system can be used to store the backup data in the file systems of several computers to provide data redundancy and fault tolerance mechanisms to prevent data loss or damage. When necessary, the backup data can be used for data recovery and recovery operations.
[0054] In a specific embodiment, the first data comparison module is further configured to determine the corresponding model region as the model region requiring updating of the AR model when it is determined that the first difference of the entity region information exceeds a preset first difference threshold.
[0055] In a specific embodiment, the first data comparison module is further used to determine the first difference degree of each entity area information according to the similarity between the entity image information corresponding to the current entity area information obtained by the current inspection and the entity image information corresponding to the entity area information corresponding to the previous inspection.
[0056] In a specific embodiment, the second data comparison module is further used to determine that the corresponding model area is a model area that needs to update the AR model if the second difference of the entity area information exceeds a preset second difference threshold, wherein the second difference threshold is less than the first difference threshold.
[0057] In a specific embodiment, the model building module is further used to construct a corresponding three-dimensional AR model for the model area where the AR model needs to be updated based on a preset model update cycle.
[0058] In a specific embodiment, the system also includes: a periodic update module, which is used to adjust the update period of the three-dimensional AR model of the model area according to the average update period of the model area within a preset adjustment time period; and is also used to adjust the update period of the three-dimensional AR model of the model area to the minimum update interval of the model area within the preset adjustment time period if the interval duration of the average update period is less than the interval duration of the update period of the current model area.
[0059] The average update cycle is determined according to the total duration of the preset adjustment time period and the number of updates.
[0060] For example, if there are 5 updates within a month (30 days), the interval between the first update is 6 days, the interval between the second update is 4 days, the interval between the third update is 5 days, the interval between the fourth update is 5 days, and the interval between the fifth update is 10 days, then the average update cycle is 6 times. If the interval between the update cycles of the current model area is set to less than 6 days, it means that the interval between the update cycles of the current model area is too long to meet the update requirements. In this case, the minimum update interval within the past month is determined, that is, the update cycle of the 3D AR model of the model area is adjusted to 6 days.
[0061] In a specific embodiment, the data acquisition module includes a sensor and a camera, the sensor is used to acquire electrical parameters in the model area, and the camera is used to acquire image and video data in the model area.
[0062] In actual applications, sensors convert electrical parameters in the model area into digital signals to provide real-time environmental data to the model building module to create augmented reality (AR) scenes. Several interference cameras are set in the power network corresponding to each inspection unit to obtain image and video data in AR operation and maintenance. The scenes in the real world are captured by the camera and combined with virtual elements to achieve augmented reality effects.
[0063] The above is a detailed description of an embodiment of an AR operation and maintenance system for a power network provided by the present invention. The following is a detailed description of an embodiment of an AR operation and maintenance method for a power network provided by the present invention.
[0064] For easier understanding, see Figure 3 The present invention provides an AR operation and maintenance method for a power network, comprising the following steps:
[0065] 101. Divide the inspection route of the power network into a number of inspection units, divide the three-dimensional AR model corresponding to each inspection unit into a number of model areas, locate each model area, and obtain the location information of each model area;
[0066] 102. Acquire entity information of each inspection unit, and divide the acquired entity information into corresponding entity area information according to each model area;
[0067] 103. Compare the current entity area information obtained by the current inspection with the entity area information corresponding to the previous inspection one by one, determine the first difference of each entity area information, judge whether the first difference of each entity area information exceeds a preset first difference threshold, and determine the model area of the AR model that needs to be updated according to the judgment result;
[0068] 104. Determine the model area connected to the model area of the AR model to be updated according to the position information of the model area of the AR model to be updated, compare the current entity area information corresponding to the model area connected to the model area of the AR model to be updated with the entity area information corresponding to the previous inspection, determine the second difference of each entity area information, judge whether the second difference of each entity area information exceeds a preset second difference threshold, and determine the model area of the AR model to be updated according to the judgment result;
[0069] 105. Construct a three-dimensional AR model of the model area that needs to be updated based on the model area of the AR model that needs to be updated and its corresponding entity area information.
[0070] In an example, the three-dimensional AR model of the model area of the updated AR model and the last constructed three-dimensional AR model of the model area of the AR model that does not need to be updated can be used to construct a three-dimensional AR model of the inspection route of the power network.
[0071] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the method described above can refer to the corresponding process in the aforementioned system embodiment, and will not be repeated here.
[0072] In the several embodiments provided by the present invention, it should be understood that the disclosed systems and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0073] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An AR operation and maintenance system for a power network, characterized in that: include: A region division module, a data acquisition module, a first data comparison module, a second data comparison module and a model building module; The area division module is used to divide the inspection route of the power network into a number of inspection units, divide the three-dimensional AR model corresponding to each inspection unit into a number of model areas, and locate each of the model areas to obtain the location information of each of the model areas; The data acquisition module is used to acquire entity information of each inspection unit, and divide the acquired entity information into corresponding entity area information according to each model area; wherein the entity information includes entity image information of the power network, and the entity area information includes entity image information corresponding to the model area; The first data comparison module is used to compare the current entity area information obtained by the current inspection with the entity area information corresponding to the previous inspection one by one to determine the first difference degree of each entity area information, and is also used to determine whether the first difference degree of each entity area information exceeds a preset first difference degree threshold, and determine the model area of the AR model that needs to be updated according to the judgment result; The second data comparison module is used to determine the model area connected to the model area of the AR model to be updated according to the position information of the model area of the AR model to be updated, compare the current entity area information corresponding to the model area determined to be connected to the model area of the AR model to be updated with the entity area information corresponding to the previous inspection, determine the second difference degree of each entity area information, and further determine whether the second difference degree of each entity area information exceeds a preset second difference threshold, and determine the model area of the AR model to be updated according to the judgment result; The model building module is used to build a three-dimensional AR model of the model area of the AR model that needs to be updated based on the model area of the AR model that needs to be updated and its corresponding entity area information; The model building module is also used to build a corresponding three-dimensional AR model for the model area of the AR model that needs to be updated based on a preset model update cycle; It also includes: a periodic update module, which is used to adjust the update period of the three-dimensional AR model of the model area according to the average update period of the model area within a preset adjustment time period, and is also used to adjust the update period of the three-dimensional AR model of the model area to the minimum update interval of the model area within the preset adjustment time period if the interval duration of the average update period is less than the interval duration of the update period of the current model area.
2. The AR operation and maintenance system of the power network according to claim 1, characterized in that: Also includes: A storage module, wherein the storage module is used to store the three-dimensional AR model of the power network and the entity information and entity area information of the power network obtained in each inspection.
3. The AR operation and maintenance system of the power network according to claim 1, characterized in that: The first data comparison module is further configured to determine the corresponding model region as a model region requiring updating of the AR model when it is determined that the first difference of the entity region information exceeds a preset first difference threshold.
4. The AR operation and maintenance system of the power network according to claim 2, characterized in that: The first data comparison module is further used to determine the first difference degree of each entity area information according to the similarity between the entity image information corresponding to the current entity area information obtained by the current inspection and the entity image information corresponding to the entity area information corresponding to the previous inspection.
5. The AR operation and maintenance system of the power network according to claim 2, characterized in that: The second data comparison module is further configured to determine that the corresponding model region is a model region for which the AR model needs to be updated if the second difference of the entity region information exceeds a preset second difference threshold.
6. The AR operation and maintenance system of the power network according to claim 1, characterized in that: The data acquisition module includes a sensor and a camera, wherein the sensor is used to acquire electrical parameters in the model area, and the camera is used to acquire image and video data in the model area.
7. The AR operation and maintenance system of the power network according to claim 2, characterized in that: The storage module is used to back up the stored data to the file systems of several computers based on a preset backup period.
8. An AR operation and maintenance method for a power network, characterized in that: The following steps are involved: The inspection route of the power network is divided into a plurality of inspection units, the three-dimensional AR model corresponding to each inspection unit is divided into a plurality of model areas, each of the model areas is positioned, and the position information of each of the model areas is obtained; Acquire entity information of each inspection unit, and divide the acquired entity information into corresponding entity area information according to each model area; wherein the entity information includes entity image information of the power network, and the entity area information includes entity image information corresponding to the model area; Compare the current entity area information obtained by the current inspection with the entity area information corresponding to the previous inspection one by one, determine the first difference of each entity area information, judge whether the first difference of each entity area information exceeds a preset first difference threshold, and determine the model area of the AR model that needs to be updated according to the judgment result; Determining the model area connected to the model area of the AR model to be updated according to the position information of the model area of the AR model to be updated, comparing the current entity area information corresponding to the model area connected to the model area of the AR model to be updated with the entity area information corresponding to the previous inspection, determining the second difference of each entity area information, judging whether the second difference of each entity area information exceeds a preset second difference threshold, and determining the model area of the AR model to be updated according to the judgment result; Constructing a three-dimensional AR model of the model area of the AR model that needs to be updated based on the model area of the AR model that needs to be updated and its corresponding entity area information; Also includes: Constructing a corresponding three-dimensional AR model for the model area of the AR model to be updated based on a preset model update cycle; Among them, the update period of the three-dimensional AR model of the model area is adjusted according to the average update period of the model area within the preset adjustment time period. If the interval duration of the average update period is smaller than the interval duration of the update period of the current model area, the update period of the three-dimensional AR model of the model area is adjusted to the minimum update interval duration of the model area within the preset adjustment time period.