An assembled T-type pile cap and pile core structure and its prefabrication method and installation method
Through the horizontal prefabrication and erecting integrated machine hoisting of prefabricated T-shaped pile cap and pile core structure, the problems of complex construction processes and difficult to guarantee prefabricated quality in high pile docks are solved, and efficient and safe installation and prefabrication effects are achieved.
Patent Information
- Application Number
- CN202311272268.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-28
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2043-09-28
AI Technical Summary
In the high pile dock, the construction process of existing pile caps and pile core structures is complicated, and the formwork transportation and installation are cumbersome, and there is a problem that prefabricated quality is difficult to ensure and installation and lifting is difficult, especially in the tide level change area, the operation risk of personnel is high, and the project quality is difficult to guarantee. .
The structure of prefabricated T-shaped pile cap and pile core is adopted, including the welded circular steel plate and ridge at the bottom of the pile cap. The pile core is a cylinder. It is lifted by horizontal prefabricating method and an integrated machine, and uses hydraulic devices and lifting rings to achieve rapid Accurate installation to ensure prefabricated quality and installation safety.
It improves installation efficiency and prefabricated quality, reduces construction costs, ensures accurate alignment between pile cores and steel pipe piles and seawater seepage prevention, improves project quality and safety, and reduces the difficulty of lifting under the influence of wind and waves.
Smart Images

Figure CN117328435B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of prefabricated component construction of high-pile docks, and more specifically, to an assembled T-shaped pile cap and pile core structure and a prefabrication method and an installation method thereof. Background Art
[0002] In the construction of high-pile docks, the pile cap and pile core structure are often constructed in cast-in-place. Among them, the pile core construction needs to go through multiple processes such as the construction of the bottom formwork platform, the installation of the pile core steel cage, the sealing of the bottom of the pile core, and the pouring of the pile core concrete. After the pile core is constructed, it is necessary to locate the plane position of the pile cap, tie the pile cap steel bars, set up the side formwork, pour the pile cap concrete, and remove the formwork to complete the construction of the pile cap. There are problems such as complicated procedures, cumbersome transportation, installation, and removal of the formwork. In addition, since the operation area is located in the tidal level change zone, the operating risk of personnel is high. During high tide, the steel bars, concrete, and formwork are soaked in seawater, and the quality of the project cannot be guaranteed.
[0003] Prefabricated T-type pile caps and pile core structures have been proposed to replace the traditional existing pile caps and cast pile core structures. After being prefabricated on site, they are transported to the site and directly installed on the steel pipe piles. The construction process is greatly reduced, and it is a dry construction environment with low safety risks. However, the T-type pile cap and pile core structure are generally irregular, and the weight of the components is large and mainly distributed at the position of the pile cap. During prefabrication, there are problems such as heavy template weight, inconvenient installation, difficult concrete vibration, and difficulty in forming in some places. The prefabrication quality cannot be guaranteed; during installation, if a single device is used to hoist the T-type pile cap and pile core structure, under the influence of wind and waves, the hoisting difficulty is high, and the pile core is easy to collide with the steel pipe pile, which has a high risk factor; if multiple devices are used to assist in installation, the construction cost is high. Summary of the invention
[0004] Another object of the present invention is to provide an assembled T-type pile cap and pile core structure with high installation efficiency, good prefabrication quality and high economic benefit, and a prefabrication method and an installation method thereof.
[0005] In order to achieve these purposes and other advantages according to the present invention, there is provided an assembled T-type pile cap and pile core structure, comprising:
[0006] A pile cap, a circular steel plate is welded to the bottom thereof, a plurality of first grouting holes are opened on the pile cap, a plurality of second grouting holes are opened on the circular steel plate, and the plurality of first grouting holes are respectively connected with the plurality of second grouting holes;
[0007] The pile core is a cylinder, the pile core is arranged at the bottom of the pile cap, the outer circumference of the pile core is in contact with the inner circumference of the annular steel plate, and a truncated cone is arranged at the bottom of the pile core;
[0008] A circular retaining ridge is arranged at the bottom of the pile cap, the inner circumference of the retaining ridge is in contact with the outer circumference of the circular steel plate, and the pile cap, pile core, retaining ridge and truncated platform are integrally cast by concrete;
[0009] The annular steel plate and the retaining wall form an annular groove structure, and the annular groove is used to accommodate the top of the steel pipe pile.
[0010] Preferably, the pile cap is rectangular, and a rectangular groove is provided on the top thereof, and the opposite sides of the rectangular groove respectively pass through the two sides of the pile cap, and a pile cap steel cage is buried inside the pile cap, and a plurality of protruding steel bars on the pile cap steel cage extend out of the top of the pile cap and are distributed at the four corners of the pile cap; a pile core steel cage is buried in the pile core, and the pile core steel cage partially extends into the pile cap.
[0011] Preferably, the pile core is further provided with a plurality of right-angled steel plates distributed on the periphery of the pile core, and two right-angled sides of any right-angled steel plate are respectively welded to the bottom of the circular steel plate and the outer side wall of the pile core.
[0012] Preferably, it further comprises a plurality of lifting rings, which are distributed on the top surface of the pile cap, the outer side wall of the pile cap and the outer side wall of the pile core.
[0013] A method for prefabricating an assembled T-shaped pile cap and a pile core structure, wherein the assembled T-shaped pile cap and the pile core structure adopt a horizontal prefabrication method, specifically comprising the following steps:
[0014] Step 1: Install a pile cap bottom pedestal and a plurality of pile core bottom pedestals, wherein a rectangular steel plate is horizontally installed on the top surface of the pile cap bottom pedestal;
[0015] Step 2: Install a first pile cap side form on the top surface of the rectangular steel plate, wherein the first pile cap side form is a U-shaped structure with its opening facing the direction in which the pile core is set, and install a pile cap steel cage in the first pile cap side form;
[0016] Step 3: Install the second pile cap side form at the opening of the first pile cap side form, the first pile cap side form, the second pile cap side form and the rectangular steel plate form a cavity structure with an opening on the upper part, and a casting groove with a circular retaining sill is reserved on the second pile cap side form; pre-embed the lifting rings located on the outer wall of the pile cap and the top surface of the pile cap;
[0017] Step 4: Install the pile core bottom formwork on the pile core bottom pedestal, install the pile core steel cage in the pile core bottom formwork, and partially extend the pile core steel cage into the pile cap steel cage; install the pile core top formwork on the pile core bottom formwork, the pile core bottom formwork and the pile core top formwork are assembled to form a hollow cylinder, and the pile core top formwork is provided with a concrete pouring channel and a plurality of vibration holes; pre-embed the lifting ring located on the outer side wall of the pile core; install a truncated cone formwork at the pile core top formwork and the pile core bottom formwork away from the second pile cap side formwork;
[0018] Step 5: Install the circular steel plate, pour concrete into the formwork, and perform concrete curing after pouring. After concrete curing is completed, remove the formwork;
[0019] Step 6: Install the right-angle steel plate, and the assembled T-type pile cap and pile core structure are prefabricated.
[0020] Preferably, the first pile cap side formwork is assembled from three side formwork units, wherein two side formwork units located on both sides of the pile core are respectively connected to two hydraulic devices, and any one of the hydraulic devices comprises a displacement wall, which is arranged on the outside of the corresponding side formwork unit, and a plurality of hydraulic push rods are arranged between the displacement wall and the outer side wall of the side formwork unit, and the hydraulic push rods are used to drive the two side formwork units to move closer to or away from each other;
[0021] A plurality of hydraulic cylinders are installed between any pile core bottom pedestal and the pile core bottom mold, and the hydraulic cylinders are used to lift or lower the pile core bottom mold.
[0022] A method for installing an assembled T-type pile cap and a pile core structure specifically comprises the following steps:
[0023] S1. Use a horizontal transportation method to transport the T-shaped pile cap and the pile core structure to the bottom of the erection machine, connect the steel wire ropes of multiple overhead crane hoists on the erection machine to multiple lifting rings on the T-shaped pile cap and the pile core structure respectively, and start multiple overhead cranes simultaneously to lift the T-shaped pile cap and the pile core structure to where they are located above the steel pipe pile;
[0024] S2, adjusting the length of the steel wire ropes lowered by the multiple hangers to adjust the posture of the T-type pile cap and the pile core structure, and adjusting the T-type pile cap and the pile core structure to a horizontal state;
[0025] S3, synchronously drive multiple overhead cranes to move the T-shaped pile cap and the pile core structure to the top of the steel pipe pile to be installed with the T-shaped pile cap and the pile core structure, adjust the length of the steel wire ropes lowered by the multiple hoists again, and adjust the T-shaped pile cap and the pile core structure to a vertical state; loosen the steel wire rope connected to the lifting ring on the outer wall of the pile cap and the pile core;
[0026] S4, lowering the T-shaped pile cap and the pile core structure, and installing the T-shaped pile cap and the pile core structure into the steel pipe pile; wherein the pile core and the right-angle steel plate are located inside the steel pipe pile, the circular steel plate is in contact with the top surface of the steel pipe pile, and the annular retaining ridge is covered on the outer periphery of the steel pipe pile;
[0027] S5. Measure the left and right deviations of the pile cap by using the measuring system, and drive the T-shaped pile cap and the pile core structure to rotate by using the overhead crane until the multiple right-angled steel plates fit the rectangular steel plates in the steel pipe pile;
[0028] S6. Grout is poured into the first grouting hole until the gap between the pile core and the steel pipe pile and the gap between the retaining wall and the outer wall of the steel pipe pile are filled with grout. The grouting is completed and the installation of the T-type pile cap and the pile core structure is completed.
[0029] Preferably, the erection integrated machine comprises:
[0030] A main beam, on which a plurality of cantilevers are arranged, any of which is movably arranged on the main beam, and a crane is installed on any of the cantilevers, and the crane is arranged to drive the T-type pile cap and the pile core structure to a position to be installed;
[0031] A supporting system is arranged below the main beam and is used for supporting the main beam.
[0032] Preferably, a plurality of sliding rails are installed on the support system, and the main beam is slidably arranged on the sliding rails.
[0033] The present invention has at least the following beneficial effects:
[0034] 1. The bottom of the assembled T-type pile cap and pile core structure of the present invention is provided with a truncated cone, and a right-angled steel plate is provided at the node of the pile core and the pile cap. When installing the T-type pile cap and the pile core structure, the guiding effect of the truncated cone and the right-angled steel plate can improve the alignment speed of the pile core and the steel pipe pile, ensuring that the pile core can be quickly and accurately inserted into the steel pipe pile, thereby improving work efficiency; after the pile core is inserted into the steel pipe, it is limited to the center of the steel pipe pile by the right-angled steel plate, which can ensure the grouting thickness between the pile core and the steel pipe pile, thereby ensuring the installation quality;
[0035] 2. A circular retaining ridge is provided at the bottom of the pile cap of the present invention. After the T-shaped pile cap and the pile core structure are installed on the steel pipe pile, the retaining ridge is wrapped around the outer periphery of the top of the steel pipe pile to prevent seawater from penetrating into the interior of the steel pipe pile and corroding the interior of the steel pipe pile, thereby ensuring the quality of the project;
[0036] 3. The pile core and pile cap templates of the present invention are both assembled steel structures, which are convenient for installation and disassembly of the templates. The installation and disassembly are assisted by hydraulic devices. Compared with the traditional manual installation and disassembly method, the uneven force during manual installation and removal of the templates is avoided, and the templates are offset, the joints are large, the slurry leaks, and the concrete surface is damaged. The prefabrication accuracy and work efficiency can be greatly improved. The horizontal prefabrication method can ensure uniform vibration of the concrete, reduce the generation of bubbles, ensure the appearance quality of the prefabricated components, and solve the problems of low prefabrication efficiency and poor appearance quality of special-shaped components.
[0037] 4. The present invention adopts an all-in-one erection machine to hoist the T-type pile cap and the pile core structure, and adjusts its posture in time during the hoisting process, thereby ensuring the stability of the hoisting process and being less affected by the wind and wave environment; and after the hoisting is completed, the all-in-one erection machine is also used for the installation of crossbeams and longitudinal beams. During the construction process, there is no need to use additional hoisting equipment to hoist the T-type pile cap and the pile core structure, and the economic benefit is high.
[0038] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 It is a side view structural schematic diagram of the T-shaped pile cap and pile core structure of the present invention;
[0040] Figure 2 It is a schematic diagram of the bottom structure of the T-shaped pile cap and the pile core structure of the present invention;
[0041] Figure 3 It is a schematic diagram of the structure of the circular steel plate, the retaining ridge and the right-angle steel plate of the present invention;
[0042] Figure 4 It is a structural schematic diagram of a pile cap template and a pile core template of the present invention;
[0043] Figure 5 for Figure 4 A cross-sectional view of
[0044] Figure 6 It is a structural schematic diagram of the hydraulic device of the present invention;
[0045] Figure 7 This is a schematic diagram of the top view of the integrated machine of the present invention;
[0046] Figure 8 It is a schematic diagram of the T-shaped pile cap and the pile core structure of the present invention being in a horizontal state;
[0047] Fig. 9 It is a schematic diagram of the T-shaped pile cap and the pile core structure of the present invention in a vertical state;
[0048] Fig.10 This is a schematic diagram of the installation of the T-type pile cap and the pile core structure of the present invention;
[0049] Description of the Figures in the Specification:
[0050] 1. Pile cap, 101. Pile cap steel cage, 102. Outer reinforcement, 103. Circular steel plate, 104. Bumper, 105. Rectangular groove, 2. Pile core, 201. Pile core steel cage, 202. Right-angle steel plate, 203. Round table, 204. Lifting ring, 3. Pile cap bottom pedestal, 301. Rectangular steel plate, 4. Pile core bottom pedestal, 401. Pile core bottom mold, 402. Pile core top mold, 403. Casting channel, 404. Vibration hole, 405. Hydraulic cylinder, 5. First pile cap side mold, 50 1. Side form unit, 502. First side form unit component, 503. Second side form unit component, 6. Second pile cap side form, 601. Third side form unit component, 602. Shift wall, 603. Hydraulic push rod, 7. Main beam, 701. Cantilever, 702. Sliding track, 703. Main support, 704. Auxiliary support, 705. Trestle, 8. Overhead crane, 801. Horizontal overhead crane, 802. Longitudinal overhead crane, 803. Hoist, 9. Steel pipe pile, 901. Blocking plate, 10. Inclined pile, 11. Cone formwork. DETAILED DESCRIPTION
[0051] The present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.
[0052] It should be noted that, in the description of the present invention, the terms "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc. indicating orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0053] like Figure 1-10 As shown, the present invention provides an assembled T-type pile cap and pile core structure, which is applied to the construction of high-pile docks. The high-pile dock structure is a cast-in-place pile cap and pile core structure using a combined inclined pile 10 on both sides of the sea and the shore, and a straight pile in the middle. The assembled T-type pile cap and pile core structure of the present invention is installed on the straight pile. When the steel pipe pile of the straight pile is manufactured in the factory, a plugging plate 901 is welded in advance at a corresponding position inside the steel pipe pile according to the insertion length of the pile core, which is used as grouting plugging. After the pile is sunk on site, a limit plate is welded on the inner side of the top of the steel pipe pile; the assembled T-type pile cap and pile core structure of the present invention includes:
[0054] A pile cap 1, a circular steel plate 103 is welded to the bottom thereof, a plurality of first grouting holes are opened on the pile cap 1, a plurality of second grouting holes are opened on the circular steel plate 103, and the plurality of first grouting holes are respectively connected to the plurality of second grouting holes;
[0055] The pile core 2 is a cylinder, and the pile core 2 is arranged at the bottom of the pile cap 1. The outer circumference of the pile core 2 is in contact with the inner circumference of the annular steel plate 103, and a truncated cone 203 is arranged at the bottom of the pile core 2;
[0056] A circular retaining ridge 104 is arranged at the bottom of the pile cap 1, the inner circumference of the retaining ridge 104 is in contact with the outer circumference of the circular steel plate 103, and the pile cap 1, the pile core 2, the retaining ridge 104 and the truncated platform 203 are integrally cast by concrete;
[0057] The annular steel plate 103 and the retaining wall 104 form an annular groove structure, and the annular groove is used to accommodate the top of the steel pipe pile 9.
[0058] In the above technical solution, if Figure 1-3 As shown, the assembled T-type pile cap and pile core structure consists of a pile cap 1 and a pile core 2. The pile cap 1 is used to place the cross beams and longitudinal beams, and transmit the vertical load of the wharf through the pile core 2. In order to ensure that the pile core 2 can be quickly and accurately inserted into the steel pipe pile 9, a truncated cone 203-shaped concrete is added to the tail of the pile core 2 during prefabrication. When installing the T-type pile cap and pile core structure, the pile core 2 can be introduced from the arc edge of the truncated cone 203, thereby increasing the alignment speed of the pile core 2 and the steel pipe pile 9, and also preventing the pile core 2 from directly colliding with the steel pipe pile 9, causing collisions and affecting the alignment efficiency and construction safety. A circular steel plate 103 is provided at the bottom of the pile cap 1, and the outer periphery of the circular steel plate 103 is provided with There is a protruding annular retaining ridge 104. After the pile core 2 is inserted into the steel pipe pile 9, the top of the steel pipe pile 9 extends into the interior of the retaining ridge 104 and contacts the annular steel plate 103, avoiding direct contact between the bottom of the pile cap 1 and the steel pipe pile 9, causing the concrete at the bottom of the pile cap 1 to be squeezed and damaged by the top of the steel pipe pile 9, thereby ensuring the installation quality. At the same time, grouting is performed between the pile core 2 and the steel pipe pile 9 through the first grouting hole and the second grouting hole. After the gap between the pile core 2 and the steel pipe pile 9 is filled with slurry, the slurry overflows and fills the gap between the retaining ridge 104 and the steel pipe pile 9, which can prevent seawater from penetrating into the interior of the steel pipe pile 9, thereby corroding the steel pipe pile 9 and ensuring the quality of the project.
[0059] In another technical solution, the pile cap 1 is rectangular, and a rectangular groove 105 is arranged on the top thereof. The opposite sides of the rectangular groove 105 respectively pass through the two sides of the pile cap 1. A pile cap steel cage 101 is buried inside the pile cap 1. A plurality of protruding steel bars 102 on the pile cap steel cage 101 extend out of the top of the pile cap 1 and are distributed at the four corners of the pile cap 1; a pile core steel cage 201 is buried in the pile core 2, and a portion of the pile core steel cage 201 extends into the pile cap 1.
[0060] In the above technical solution, in order to ensure that the prefabricated components (crossbeams and longitudinal beams) on the pile cap 1 can be quickly positioned during installation, a rectangular groove 105 structure is set on the top of the pile cap 1, and the groove is used to place the crossbeam and limit the crossbeam, and the longitudinal beam is placed on the crossbeam; the protruding steel bars 102 are distributed at the four corners of the pile cap 1 to increase the node bearing capacity and avoid the protruding steel bars 102 interfering with the placement of the crossbeams and longitudinal beams; the pile core steel cage 201 and the pile cap steel cage 101 are used to enhance the strength performance of the overall structure.
[0061] In another technical solution, the pile core 2 is further provided with a plurality of right-angled steel plates 202 distributed on the outer periphery of the pile core 2 , and the two right-angled sides of any right-angled steel plate 202 are respectively welded to the bottom of the circular steel plate 103 and the outer side wall of the pile core 2 .
[0062] In the above technical scheme, a right-angled steel plate 202 is arranged at the node between the pile core 2 and the pile cap 1. First, the inclined plate of the right-angled steel plate 202 can also play a guiding role when the pile core 2 enters the steel pipe pile 9, so that the top of the pile core 2 can fall in quickly, further improving the installation efficiency; second, the right-angled steel plate 202 can also be used to control the plane torsion angle of the pile cap 1. After the pile core 2 is fully inserted into the steel pipe pile 9, the right-angled steel plate 202 at the node is fitted with the limit plate in the steel pipe pile 9 by fine-tuning and rotating the pile cap 1, so as to ensure that the plane torsion angle is zero and the installation accuracy of the T-type pile cap and the pile core structure is ensured; third, the right-angled steel plate 202 can also be used to control the distance between the pile core 2 and the steel pipe pile 9. After the pile core 2 is inserted into the steel pipe, the pile core 2 is controlled to be located at the center of the steel pipe pile 9. When the grouting material is poured later, the grouting thickness between the pile core 2 and the steel pipe pile 9 can be ensured, thereby ensuring the installation quality.
[0063] In another technical solution, a plurality of lifting rings 204 are further included, which are distributed on the top surface of the pile cap 1, the outer side wall of the pile cap 1 and the outer side wall of the pile core 2. In the above technical solution, the lifting rings 204 facilitate the connection between the T-type pile cap and the pile core structure and the lifting equipment.
[0064] A method for prefabricating an assembled T-type pile cap and a pile core structure, such as Figure 4-6 As shown, the assembled T-type pile cap and pile core structure adopts a horizontal prefabrication method, which specifically includes the following steps:
[0065] Step 1: Install a pile cap bottom pedestal 3 and a plurality of pile core bottom pedestals 4, wherein a rectangular steel plate 301 is horizontally installed on the top surface of the pile cap bottom pedestal 3;
[0066] Step 2: Install the first pile cap side form 5 on the top surface of the rectangular steel plate 301. The rectangular steel plate 301 is connected to the first pile cap side form 5 as a part of the pile cap formwork. The first pile cap side form is a U-shaped structure with its opening direction facing the setting direction of the pile core 2. The pile cap steel cage 101 is installed in the first pile cap side form; the first pile cap side form is assembled from three side form units 501, wherein the two side form units 501 located on both sides of the pile core 2 are respectively connected to two hydraulic devices, and any hydraulic device includes a displacement wall 602, which is arranged on the outside of the corresponding side form unit 501, and a plurality of hydraulic push rods 603 are arranged between the displacement wall 602 and the outer side wall of the side form unit 501, and the hydraulic push rods 603 are used to drive the two side form units 501 to move closer to or away from each other;
[0067] Step 3: Install the second pile cap side mold 6 at the opening of the first pile cap side mold. The first pile cap side mold, the second pile cap side mold and the rectangular steel plate 301 form a cavity structure with an opening at the top. A casting groove with a circular retaining sill is reserved on the second pile cap side mold; pre-embed the lifting ring 204 on the outer wall and the top surface of the pile cap;
[0068] Step 4, install a pile core bottom mold 401 on the pile core bottom pedestal 4, a plurality of hydraulic cylinders 405 are installed between any pile core bottom pedestal 4 and the pile core bottom mold 401, the hydraulic cylinders 405 are used to lift or lower the pile core bottom mold 401, install a pile core steel cage 201 in the pile core bottom mold 401 plate, and part of the pile core steel cage 201 extends into the pile cap steel cage 101; install a pile core top mold 402 on the pile core bottom mold 401, the pile core bottom mold 401 and the pile core top mold 402 are assembled to form a hollow cylinder, and a concrete pouring channel 403 and a plurality of vibration holes 404 are opened on the pile core top mold 402; pre-embed a lifting ring 204 on the outer wall of the pile core; install a truncated cone template 11 on the pile core top mold 402 and the pile core bottom mold 401 away from the second pile cap side mold 6;
[0069] Step 5: Install the annular steel plate 103, pour concrete into the formwork, and perform concrete curing after pouring. After concrete curing is completed, remove the formwork;
[0070] Step 6: Install the right-angle steel plate 202, and the assembled T-type pile cap and pile core structure are prefabricated.
[0071] In the above technical scheme, a horizontal prefabrication method is adopted to prefabricate the T-shaped pile cap and the pile core structure, which can facilitate the installation of the pile cap 1 template and the pile core 2 template and the concrete vibration, thereby ensuring the prefabrication quality; the pile cap 1 template is a template structure with an opening at the top, which includes a first pile cap side template 5 and a second pile cap side template 6, and a rectangular steel plate 301 on the pile cap bottom pedestal 3 is connected to the first pile cap side template and the second pile cap side template by bolts. The first pile cap side template is assembled from three side template units 501, wherein the side template unit 501 corresponding to the top surface of the pile cap 1 is assembled from two first side template units 502 and one second side template unit 503, and any A rectangular through hole is provided on the first side formwork unit component for the extension steel bar 102 to pass through; the second pile cap side formwork corresponding to the bottom end of the pile cap 1 is assembled by two third side formwork units 601, and any third side formwork unit component 601 is L-shaped, which includes a vertical formwork and a horizontal formwork, the horizontal formwork is a part of the pile core, and a casting groove for an annular retaining wall 104 is reserved on the vertical formwork; steel bar holes can be reserved on the vertical formwork, and the circular ring steel plate 103 is installed on the pile cap 1 through the steel bar; the pile core 2 template is a hollow cylindrical form, which is opened and closed up and down, and is composed of a pile core bottom formwork 401 and a pile core top formwork 402, and the tail of the pile core 2 is a truncated cone template 11;
[0072] When installing and removing the formwork, the two side formwork units 501 are assisted in installation and removal by hydraulic push rods 603, the pile core bottom formwork 401 is assisted in installation and removal by hydraulic cylinders 405, and the remaining formworks are installed and removed by overhead cranes or hand winches; the pile core 2 and pile cap 1 formworks are both assembled steel structures, which are convenient for installation and removal of the formwork. At the same time, due to the heavy weight of the side formwork units 501 and the pile core bottom formwork 401, installation and removal are difficult. Compared with the traditional manual installation and removal method, the installation assisted by liquid push rods and hydraulic cylinders avoids uneven force during manual installation and removal of the formwork, resulting in formwork deviation, large joints, leakage, and damage to the concrete surface. It can greatly improve the prefabrication accuracy and work efficiency, ensure the appearance quality of prefabricated components, and solve the problems of low prefabrication efficiency and poor appearance quality of special-shaped components; the components of the pile cap formwork and the pile core formwork are all steel plates, which can reduce the bubbles generated during concrete pouring.
[0073] A method for installing a prefabricated T-type pile cap and a pile core structure, such as Figure 7-10 As shown, the specific steps include:
[0074] S1. Use a horizontal transportation method to transport the T-shaped pile cap and the pile core structure to the bottom of the erection machine, connect the steel wire ropes of the multiple overhead crane hoists 803 on the erection machine to the multiple lifting rings 204 on the T-shaped pile cap and the pile core structure respectively, and start the multiple overhead cranes 8 simultaneously to lift the T-shaped pile cap and the pile core structure to the top of the steel pipe pile 9; the horizontal transportation method can improve the transportation efficiency;
[0075] S2, adjusting the length of the steel wire ropes lowered by the plurality of hoists 803 to adjust the posture of the T-shaped pile cap and the pile core structure, and adjusting the T-shaped pile cap and the pile core structure to a horizontal state;
[0076] S3, synchronously drive multiple overhead cranes to move the T-shaped pile cap and the pile core structure to the top of the steel pipe pile 9 to be installed with the T-shaped pile cap and the pile core structure, adjust the length of the steel wire ropes lowered by the multiple hangers 803 again, and adjust the T-shaped pile cap and the pile core structure to a vertical state; loosen the steel wire rope connected to the lifting ring 204 on the outer wall of the pile cap 1 and the pile core 2;
[0077] S4, lower the T-shaped pile cap and the pile core structure, the bottom of the pile core 2 is aligned with the steel pipe pile 9 through the truncated cone 203, and continue to lower the T-shaped pile cap and the pile core structure to install them in the steel pipe pile 9; wherein the pile core 2 and the right-angled steel plate 202 are located inside the steel pipe pile 9, the annular steel plate 103 is in contact with the top surface of the steel pipe pile 9, and the annular retaining ridge 104 is covered on the outer periphery of the steel pipe pile 9;
[0078] S5, measuring the left and right deviation of the pile cap 1, and driving the T-shaped pile cap and the pile core structure by the overhead crane to slightly rotate until the plurality of right-angle steel plates 202 fit with the rectangular steel plates 301 in the steel pipe pile 9 to ensure that there is no plane torsion angle;
[0079] S6. Pour grout into the first grouting hole, and the grout enters the gap between the pile core 2 and the steel pipe pile 9 from the second grouting hole until the gap between the pile core 2 and the steel pipe pile 9 and the gap between the retaining ridge 104 and the outer wall of the steel pipe pile 9 are filled with grout. The grouting is completed, and the installation of the T-type pile cap and the pile core structure is completed.
[0080] In another technical solution, the erection integrated machine includes:
[0081] A main beam 7, on which a plurality of cantilevers 701 are arranged, any of which is movably arranged on the main beam 7, and a crane 8 is installed on any of which, and the crane is arranged to drive the T-type pile cap and the pile core structure to a position to be installed;
[0082] The supporting system is arranged below the main beam 7 and is used for supporting the main beam 7 .
[0083] In the above technical solution, if Figure 6As shown, the main beam 7 is a skeleton structure for erecting an integrated machine. When installed, it is set vertically to the wharf. A support system is provided at the bottom of the main beam 7. The support system includes two groups of symmetrically arranged support subsystems. Any support subsystem includes two main supports 703 and three auxiliary supports 704. The two main supports 703 and one auxiliary support 704 are distributed on the top of the pile cap of the corresponding side-slanting pile, and the other two auxiliary supports 704 are located on the shore-side trestle 705. Two overhead cranes are provided, which can be moved along the length direction of the main beam 7 through a cantilever 701; the overhead crane 8 includes a transverse overhead crane 801 and a longitudinal overhead crane 802. The transverse overhead crane 801 is arranged On the cantilever 701, the longitudinal moving crane 802 is arranged on the transverse moving crane 801, and moves on the transverse moving crane 801 along the length direction of the main beam 7. The longitudinal moving crane 802 is also provided with a rotating mechanism. The transverse moving crane 801, the longitudinal moving crane 802 and the cantilever 701 cooperate with each other, and finally the T-type pile cap and the pile core structure can be driven to the installation position and their postures can be adjusted during the installation process; the T-type pile cap and the pile core structure are installed by setting up an integrated machine and the postures of the T-type pile cap and the pile core structure can be adjusted at any time during the lifting process, thereby ensuring the stability of the lifting process, being less affected by the wind and wave environment, and ensuring the safety of the lifting.
[0084] In another technical solution, a plurality of sliding rails 702 are installed on the support system, and the main beam 7 is slidably arranged on the sliding rails 702 .
[0085] In the present technical solution, sliding rails 702 are installed on two adjacent main supports 703, and the sliding rails 702 are arranged along the width direction of the main beam 7. After the T-type pile cap and the pile core structure on the current frame are installed, the main beam 7 can be moved to other frames through the sliding rails 702 to install the T-type pile cap and the pile core structure. After the T-type pile cap and the pile core structure are installed, the erection integrated machine is also used for the installation of the cross beam and the longitudinal beam, which has higher economic benefits.
[0086] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.
Claims
1. A method for installing an assembled T-type pile cap and a pile core structure, characterized in that: include: A pile cap, a circular steel plate is welded to the bottom thereof, a plurality of first grouting holes are opened on the pile cap, a plurality of second grouting holes are opened on the circular steel plate, and the plurality of first grouting holes are respectively connected with the plurality of second grouting holes; The pile core is a cylinder, the pile core is arranged at the bottom of the pile cap, the outer circumference of the pile core is in contact with the inner circumference of the circular steel plate, and a truncated cone is arranged at the bottom of the pile core; a plurality of right-angled steel plates are also arranged on the pile core, and the plurality of right-angled steel plates are distributed on the outer circumference of the pile core, and the two right-angled sides of any right-angled steel plate are respectively welded to the bottom of the circular steel plate and the outer side wall of the pile core; The pile cap is rectangular, and a rectangular groove is arranged on the top of the pile cap. The two opposite sides of the rectangular groove respectively pass through the two sides of the pile cap. A pile cap steel cage is buried inside the pile cap. A plurality of protruding steel bars on the pile cap steel cage extend out of the top of the pile cap. The plurality of protruding steel bars are distributed at the four corners of the pile cap. A pile core steel cage is buried in the pile core, and a portion of the pile core steel cage extends into the pile cap. A circular retaining ridge is arranged at the bottom of the pile cap, the inner circumference of the retaining ridge is in contact with the outer circumference of the circular steel plate, and the pile cap, pile core, retaining ridge and truncated platform are integrally cast by concrete; Wherein, the annular steel plate and the retaining wall form an annular groove structure, and the annular groove is used to accommodate the top of the steel pipe pile; The assembled T-type pile cap and pile core structure adopts a horizontal prefabrication method, which specifically includes the following steps: Step 1: Install a pile cap bottom pedestal and a plurality of pile core bottom pedestals, wherein a rectangular steel plate is horizontally installed on the top surface of the pile cap bottom pedestal; Step 2: Install a first pile cap side formwork on the top surface of the rectangular steel plate, wherein the first pile cap side formwork is a U-shaped structure with its opening direction facing the direction in which the pile core is set, and a pile cap steel cage is installed in the first pile cap side formwork; the first pile cap side formwork is assembled from three side formwork units, wherein two side formwork units located on both sides of the pile core are respectively connected to two hydraulic devices, and any one of the hydraulic devices includes a displacement wall, which is arranged on the outside of the corresponding side formwork unit, and a plurality of hydraulic push rods are arranged between the displacement wall and the outer side wall of the side formwork unit, and the hydraulic push rods are used to drive the two side formwork units to move closer to or away from each other; Step 3: Install the second pile cap side form at the opening of the first pile cap side form, the first pile cap side form, the second pile cap side form and the rectangular steel plate form a cavity structure with an opening on the upper part, and a casting groove with a circular retaining sill is reserved on the second pile cap side form; pre-embed the lifting rings located on the outer wall of the pile cap and the top surface of the pile cap; Step 4, install the pile core bottom formwork on the pile core bottom pedestal, install the pile core steel cage in the pile core bottom formwork, and part of the pile core steel cage extends into the pile cap steel cage; install the pile core top formwork on the pile core bottom formwork, the pile core bottom formwork and the pile core top formwork are assembled to form a hollow cylinder, and the pile core top formwork is provided with a concrete pouring channel and a plurality of vibration holes; pre-embed the lifting ring located on the outer wall of the pile core; install a truncated cone formwork at the pile core top formwork and the pile core bottom formwork away from the second pile cap side formwork; a plurality of hydraulic cylinders are installed between any pile core bottom pedestal and the pile core bottom formwork, and the hydraulic cylinders are used to lift or lower the pile core bottom formwork; Step 5: Install the circular steel plate, pour concrete into the formwork, and perform concrete curing after pouring. After concrete curing is completed, remove the formwork; Step 6: Install the right-angle steel plate, and prefabricate the assembled T-type pile cap and pile core structure; The method for installing the assembled T-type pile cap and pile core structure is characterized by comprising the following steps: S1. Use a horizontal transportation method to transport the T-shaped pile cap and the pile core structure to the bottom of the erection machine, connect the steel wire ropes of multiple overhead crane hoists on the erection machine to multiple lifting rings on the T-shaped pile cap and the pile core structure respectively, and start multiple overhead cranes simultaneously to lift the T-shaped pile cap and the pile core structure to where they are located above the steel pipe pile; S2, adjusting the length of the steel wire ropes lowered by the multiple hangers to adjust the posture of the T-type pile cap and the pile core structure, and adjusting the T-type pile cap and the pile core structure to a horizontal state; S3, synchronously drive multiple overhead cranes to move the T-shaped pile cap and the pile core structure to the top of the steel pipe pile to be installed with the T-shaped pile cap and the pile core structure, adjust the length of the steel wire ropes lowered by the multiple hoists again, and adjust the T-shaped pile cap and the pile core structure to a vertical state; loosen the steel wire rope connected to the lifting ring on the outer wall of the pile cap and the pile core; S4, lowering the T-shaped pile cap and the pile core structure, and installing the T-shaped pile cap and the pile core structure into the steel pipe pile; wherein the pile core and the right-angle steel plate are located inside the steel pipe pile, the circular steel plate is in contact with the top surface of the steel pipe pile, and the annular retaining ridge is covered on the outer periphery of the steel pipe pile; S5. Measure the left and right deviations of the pile cap by using the measuring system, and drive the T-shaped pile cap and the pile core structure to rotate until the plurality of right-angled steel plates fit the rectangular steel plates in the steel pipe pile by using the overhead crane; S6. Grout is poured into the first grouting hole until the gap between the pile core and the steel pipe pile and the gap between the retaining wall and the outer wall of the steel pipe pile are filled with grout. The grouting is completed and the installation of the T-type pile cap and the pile core structure is completed.
2. The method for installing the assembled T-type pile cap and pile core structure according to claim 1, characterized in that: The erection integrated machine comprises: A main beam, on which a plurality of cantilevers are arranged, any of which is movably arranged on the main beam, and a crane is installed on any of the cantilevers, and the crane is arranged to drive the T-type pile cap and the pile core structure to a position to be installed; A supporting system is arranged below the main beam and is used for supporting the main beam.
3. The method for installing the assembled T-type pile cap and pile core structure according to claim 2, characterized in that: A plurality of sliding rails are installed on the support system, and the main beam is slidably arranged on the sliding rails.