Control method, device, converter and control system of phase-shifted full-bridge converter

By dynamically adjusting the low-voltage side duty cycle of the phase-shifted full-bridge converter, the problems of control switching and current stress in the existing technology are solved, and the applicability and safety of its application in high-power situations are improved.

CN117674562BActive Publication Date: 2024-10-11BYD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211060799.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-31
Publication Date
2024-10-11
Estimated Expiration
2042-08-31

AI Technical Summary

Technical Problem

Existing phase-shifted full-bridge converters have problems in controlling switching and current stress, which limits their application in high-power applications and affects their practicability and scalability.

Method used

By obtaining the output voltage and output current of the low-voltage module, the target duty cycle of the second control switch is dynamically adjusted, and the first control switch is controlled according to the specified duty cycle to achieve the target voltage output of the phase-shifted full-bridge converter and ensure band load capacity while reducing the current stress and heat generation on the low voltage side.

Benefits of technology

It improves the practicality and scalability of the phase-shifted full-bridge converter, reduces the current stress on the low-voltage side and the heat generated by the control switch, and enhances the safety of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117674562B_ABST
    Figure CN117674562B_ABST
Patent Text Reader

Abstract

The present disclosure relates to a control method, device, converter and control system of a phase-shifted full-bridge converter, and relates to the field of power electronics technology. The method includes: determining the target duty ratio corresponding to multiple second control switches according to the output voltage of a low-voltage module and the output current of the low-voltage module, controlling the multiple second control switches according to the target duty ratio, and controlling the multiple first control switches according to the specified duty ratio, so that the phase-shifted full-bridge converter outputs the target voltage, and the target duty ratio is greater than the specified duty ratio. The present disclosure can control the second control switch according to the target duty ratio determined by the output voltage and output current of the low-voltage side, and can dynamically adjust the duty ratio of the low-voltage side, so that the phase-shifted full-bridge converter can be applied to more application scenarios, improve the practicality and scalability of the phase-shifted full-bridge converter, and can reduce the current stress on the low-voltage side, reduce the heat generated by the second control switch on the low-voltage side, and improve the safety of the phase-shifted full-bridge converter.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power electronics technology, and in particular to a control method, device, converter and control system of a phase-shifted full-bridge converter. Background Art

[0002] With the continuous development of distributed energy systems such as new energy power generation and electric vehicles, the phase-shifted full-bridge converter has been widely used as a practical topology in various high-power occasions due to its good electrical isolation and high power density. At present, the control switch on the low-voltage side of the phase-shifted full-bridge converter and the control switch on the high-voltage side of the phase-shifted full-bridge converter are controlled respectively according to a 50% duty cycle to make the phase-shifted full-bridge converter output the corresponding voltage. However, the use of this control method will cause the current stress on the low-voltage side of the phase-shifted full-bridge converter to be large, and the heat generated by the control switch on the low-voltage side is large, resulting in the phase-shifted full-bridge converter can only meet the application scenarios of small voltage input, small voltage and small current output, affecting the practicality and scalability of the phase-shifted full-bridge converter. Summary of the invention

[0003] In order to solve the problems existing in the related art, the present disclosure provides a control method, device, converter and control system of a phase-shifted full-bridge converter.

[0004] In order to achieve the above-mentioned object, according to a first aspect of an embodiment of the present disclosure, a control method of a phase-shifted full-bridge converter is provided, wherein the phase-shifted full-bridge converter comprises a high-voltage module, a low-voltage module and a transformer; the high-voltage module is connected to the low-voltage module through the transformer; the high-voltage module comprises a plurality of first control switches, and the low-voltage module comprises a plurality of second control switches; the method comprises:

[0005] Obtaining the output voltage of the low-voltage module and the output current of the low-voltage module;

[0006] Determining target duty ratios corresponding to the plurality of second control switches according to the output voltage and the output current;

[0007] Controlling the plurality of second control switches according to the target duty cycle, and controlling the plurality of first control switches according to a specified duty cycle, so that the phase-shifted full-bridge converter outputs a target voltage;

[0008] Wherein, the target duty cycle is greater than the specified duty cycle.

[0009] Optionally, determining target duty cycles corresponding to the plurality of second control switches according to the output voltage and the output current includes:

[0010] Determining to-be-selected duty ratios corresponding to the plurality of second control switches according to the output voltage and the output current;

[0011] The target duty cycle is determined according to the duty cycle to be selected and the peak-to-peak value of the current on the low-voltage side of the transformer.

[0012] Optionally, determining the to-be-selected duty ratios corresponding to the plurality of second control switches according to the output voltage and the output current includes:

[0013] The duty cycle to be selected is determined according to the output voltage and the output current, and based on a preset relationship; the preset relationship is to determine a target current parameter according to the output current and a first parameter, and to determine a target voltage parameter according to the output voltage and a second parameter, and to determine the duty cycle to be selected according to a ratio of the target current parameter to the target voltage parameter and a preset parameter.

[0014] Optionally, the low-voltage module includes a target capacitor, and the target capacitor is connected to an output terminal of the low-voltage module; and determining, according to the output voltage and the output current, the duty ratios to be selected corresponding to the plurality of second control switches includes:

[0015] A target capacitance value corresponding to the target capacitance is determined according to the output voltage and the output current, and the duty cycle to be selected is determined according to the target capacitance value and preset parameters.

[0016] Optionally, determining the target duty cycle according to the duty cycle to be selected and the peak-to-peak value of the current on the low-voltage side of the transformer includes:

[0017] Within a preset threshold range, the preset parameter is adjusted to increase or decrease the duty cycle to be selected, and the plurality of second control switches are controlled respectively according to the plurality of adjusted duty cycles to be selected, and the peak-to-peak value of the current corresponding to each of the adjusted duty cycles to be selected is obtained;

[0018] Among the current peak-to-peak values ​​corresponding to the multiple adjusted candidate duty ratios, the adjusted candidate duty ratio corresponding to the smallest current peak-to-peak value is used as the target duty ratio.

[0019] Optionally, the specified duty cycle is 50%.

[0020] According to a second aspect of an embodiment of the present disclosure, a control device for a phase-shifted full-bridge converter is provided, the device comprising:

[0021] a memory having a computer program stored thereon;

[0022] A processor is used to execute the computer program in the memory to implement the steps of any one of the methods in the first aspect.

[0023] According to the third aspect of the embodiment of the present disclosure, a phase-shifted full-bridge converter is provided, which includes a high-voltage module, a low-voltage module, a transformer and the control device described in the second aspect; the high-voltage module is connected to the low-voltage module through the transformer; the high-voltage module includes a plurality of first control switches, and the low-voltage module includes a plurality of second control switches; the control device is respectively connected to the high-voltage module and the low-voltage module.

[0024] Optionally, the high-voltage module includes a first control switch, a second control switch, a third control switch, a fourth control switch, a first capacitor, a second capacitor and a first inductor; the first end of the first control switch is respectively connected to the first end of the third control switch and the first end of the first capacitor, and the second end of the second control switch is respectively connected to the second end of the fourth control switch and the second end of the first capacitor; the second end of the first control switch is respectively connected to the first end of the second control switch and the first end of the second capacitor, and the second end of the second capacitor is connected to the first end of the first inductor; the second end of the first inductor is connected to the first end of the low-voltage side of the transformer, and the second end of the third control switch is respectively connected to the first end of the fourth control switch and the second end of the low-voltage side of the transformer; the first end of the first control switch and the second end of the second control switch serve as the input end of the high-voltage module;

[0025] The low-voltage module includes a fifth control switch, a sixth control switch, a seventh control switch, an eighth control switch, a target capacitor and a second inductor; the first end of the fifth control switch is respectively connected to the first end of the seventh control switch, the first end of the target capacitor and the first end of the second inductor, and the second end of the sixth control switch is respectively connected to the second end of the eighth control switch and the second end of the target capacitor; the second end of the fifth control switch is respectively connected to the first end of the sixth control switch and the first end of the high-voltage side of the transformer, and the second end of the seventh control switch is respectively connected to the first end of the eighth control switch and the second end of the high-voltage side of the transformer; the second end of the second inductor and the second end of the eighth control switch serve as the output end of the low-voltage module.

[0026] According to a fourth aspect of the embodiments of the present disclosure, a control system for a phase-shifted full-bridge converter is provided, the control system comprising a phase-shifted full-bridge converter and the control device according to the second aspect; the phase-shifted full-bridge converter is connected to the control device.

[0027] Through the above technical solution, the present disclosure first obtains the output voltage of the low-voltage module and the output current of the low-voltage module, and then determines the target duty ratio corresponding to the plurality of second control switches according to the output voltage and the output current, and then controls the plurality of second control switches according to the target duty ratio, and controls the plurality of first control switches according to the specified duty ratio, so that the phase-shifted full-bridge converter outputs the target voltage. The present disclosure can determine a target duty ratio higher than the specified duty ratio of the high-voltage side through the output voltage and the output current of the low-voltage side, and control the second control switch according to the target duty ratio, so that the duty ratio of the low-voltage side can be dynamically adjusted while ensuring the load-carrying capacity of the phase-shifted full-bridge converter, so that the phase-shifted full-bridge converter can be applied to more application scenarios, and the practicality and scalability of the phase-shifted full-bridge converter are improved, and by limiting the target duty ratio to be less than the specified duty ratio, the current stress on the low-voltage side can be reduced, the heat generation of the second control switch on the low-voltage side can be reduced, and the safety of the phase-shifted full-bridge converter can be improved.

[0028] Other features and advantages of the present disclosure will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The accompanying drawings are used to provide a further understanding of the present disclosure and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present disclosure but do not constitute a limitation of the present disclosure. In the accompanying drawings:

[0030] Figure 1 is a flow chart showing a control method of a phase-shifted full-bridge converter according to an exemplary embodiment;

[0031] Figure 2 is a schematic diagram showing a phase-shifted full-bridge converter connected in series in a loop application according to an exemplary embodiment;

[0032] Figure 3 is based on Figure 1 A flow chart of step 102 is shown in the illustrated embodiment;

[0033] Figure 4 The invention is a block diagram of a control device of a phase-shifted full-bridge converter according to an exemplary embodiment.

[0034] Figure 5 is a block diagram of a phase-shifted full-bridge converter according to an exemplary embodiment;

[0035] Figure 6 is a schematic diagram of a control device for a phase-shifted full-bridge converter according to an exemplary embodiment;

[0036] Figure 7 is a block diagram of a control system of a phase-shifted full-bridge converter according to an exemplary embodiment. DETAILED DESCRIPTION

[0037] The specific implementation of the present disclosure is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described herein is only used to illustrate and explain the present disclosure, and is not used to limit the present disclosure.

[0038] Figure 1 FIG. 1 is a flow chart showing a control method of a phase-shifted full-bridge converter according to an exemplary embodiment. Figure 1 As shown, the phase-shifted full-bridge converter includes a high-voltage module, a low-voltage module and a transformer, the high-voltage module is connected to the low-voltage module through the transformer, the high-voltage module includes a plurality of first control switches, and the low-voltage module includes a plurality of second control switches. The method may include the following steps:

[0039] Step 101, obtaining the output voltage of the low voltage module and the output current of the low voltage module.

[0040] Step 102: determining target duty ratios corresponding to a plurality of second control switches according to the output voltage and the output current.

[0041] Step 103: Control the plurality of second control switches according to the target duty cycle, and control the plurality of first control switches according to the specified duty cycle, so that the phase-shifted full-bridge converter outputs a target voltage.

[0042] Among them, the target duty cycle is greater than the specified duty cycle.

[0043] For example, the current stress on the low-voltage side of the phase-shifted full-bridge converter can be reduced by changing the duty cycle of the control switch on the low-voltage side of the phase-shifted full-bridge converter, and the heat generated by the control switch on the low-voltage side can be reduced. Specifically, the phase-shifted full-bridge converter can be composed of a high-voltage module, a low-voltage module and a transformer. Among them, the high-voltage module is a module composed of devices on the high-voltage side of the phase-shifted full-bridge converter, which may include multiple first control switches, and the low-voltage module is a module composed of devices on the low-voltage side of the phase-shifted full-bridge converter, which may include multiple second control switches. Among them, the first control switch and the second control switch can be, for example, MOSFET (English: Metal-Oxide-Semiconductor Field-Effect Transistor, Chinese: Metal-Oxide Semiconductor Field Effect Transistor), IGBT (English: Insulated Gate Bipolar Transistor, Chinese: Insulated Gate Bipolar Transistor) and other switching elements.

[0044] When the phase-shifted full-bridge converter is applied in series in a loop, the output voltage and output current of the low-voltage module can be obtained first, and then the duty cycle to be selected corresponding to all the second control switches of the low-voltage module when the output parameter index of the phase-shifted full-bridge converter (such as the voltage ripple parameter index and the current ripple parameter index) is calculated based on the output voltage and the output current (that is, the duty cycle to be selected is actually a theoretical value). Then, the phase-shifted full-bridge converter can be debugged by changing the duty cycle to be selected to find a suitable target duty cycle corresponding to multiple second control switches that can reduce the current stress on the low-voltage side and reduce the heat generation of the second control switch. Finally, all the second control switches can be controlled according to the target duty cycle, and all the first control switches can be controlled according to the specified duty cycle, so that the phase-shifted full-bridge converter outputs the corresponding target voltage according to the output parameter index. Among them, the specified duty cycle is 50%, and the target duty cycle is greater than 50%. When the phase-shifted full-bridge converter is used to realize the charging and discharging function of the battery, the schematic diagram of the phase-shifted full-bridge converter in series in the loop application can be as follows Figure 2 As shown, Figure 2 HDC+ is the positive input terminal of the high-voltage module, HDC- is the negative input terminal of the high-voltage module, LDC+ is the positive output terminal of the low-voltage module, and LDC- is the negative output terminal of the low-voltage module.

[0045] It should be noted that the control process of step 101 to step 103 can be completed by a controller, which can be, for example, a processor with control functions such as an MCU (English: Microcontroller Unit, Chinese: Micro Control Unit), a PLC (English: Programmable Logic Controller, Chinese: Programmable Logic Controller) or a CPU (English: Central Processing Unit, Chinese: Central Processing Unit).

[0046] In summary, the present disclosure first obtains the output voltage of the low-voltage module and the output current of the low-voltage module, and then determines the target duty ratios corresponding to the multiple second control switches according to the output voltage and the output current, and then controls the multiple second control switches according to the target duty ratio, and controls the multiple first control switches according to the specified duty ratio, so that the phase-shifted full-bridge converter outputs the target voltage. The present disclosure can determine a target duty ratio higher than the specified duty ratio of the high-voltage side through the output voltage and the output current of the low-voltage side, and control the second control switch according to the target duty ratio, so that the duty ratio of the low-voltage side can be dynamically adjusted while ensuring the load capacity of the phase-shifted full-bridge converter, so that the phase-shifted full-bridge converter can be applied to more application scenarios, and the practicality and scalability of the phase-shifted full-bridge converter are improved. Moreover, by limiting the target duty ratio to be less than the specified duty ratio, the current stress on the low-voltage side can be reduced, the heat generation of the second control switch on the low-voltage side can be reduced, and the safety of the phase-shifted full-bridge converter can be improved.

[0047] Figure 3 is based on Figure 1 The embodiment shown is a flow chart of step 102. Figure 3 As shown, step 102 may include the following steps:

[0048] Step 1021: Determine the duty ratios to be selected corresponding to the plurality of second control switches according to the output voltage and the output current.

[0049] Step 1022, determining a target duty cycle according to the duty cycle to be selected and the peak-to-peak value of the current on the low-voltage side of the transformer.

[0050] For example, the duty cycle to be selected corresponding to all the second control switches when the output parameter index of the phase-shifted full-bridge converter is met can be calculated based on the output voltage and the output current. In order to further reduce the current stress on the low-voltage side and the heat generated by the second control switch, the phase-shifted full-bridge converter can be debugged by changing the duty cycle to be selected and controlling the second control switch according to the changed duty cycle to be selected, so as to find the target duty cycle corresponding to the multiple second control switches when the current stress on the low-voltage side is minimized.

[0051] In an achievable manner, the duty cycle to be selected can be determined according to the output voltage and the output current, and based on a preset relationship. The preset relationship is used to determine the target current parameter according to the output current and the first parameter, and to determine the target voltage parameter according to the output voltage and the second parameter, and to determine the duty cycle to be selected according to the ratio of the target current parameter to the target voltage parameter and the preset parameter. For example, when the preset relationship is a preset formula, the preset formula can be expressed as: D = [(K1*Ic) / (K2*Uo)] / K3. Wherein, Uo is the output voltage, Ic is the output current, K1 is the first parameter, K2 is the second parameter and K3 is the preset parameter, K1, K2 and K3 can be constants determined according to empirical data and / or experimental data, for example, K1 can be 40, K2 can be 0.1, and K3 can be 32.

[0052] In another achievable manner, the low-voltage module may include a target capacitor, and the target capacitor is connected to the output end of the low-voltage module. By calculating the target capacitance value corresponding to the target capacitance, the output parameter index of the phase-shifted full-bridge converter can be obtained. At the same time, since the target capacitance has the function of supporting energy output and has a great influence on the duty cycle, the duty cycle to be selected can be determined by calculating the target capacitance. Therefore, after obtaining the output voltage and output current, the target capacitance value corresponding to the target capacitance can be determined according to the output voltage and output current, and the duty cycle to be selected can be determined according to the target capacitance value and preset parameters. For example, the target capacitance value can be determined according to the output voltage and output current using the capacitance value calculation formula. The capacitance value calculation formula can be expressed as: C = (K4*ΔI) / ΔV, ΔV = K5*Uo, ΔI = K6*Ic, and the unit of C is uF. Wherein, C is the target capacitance value, Uo is the output voltage, and Ic is the output current. K4 can be the product of the equivalent series resistance of the target capacitor and the capacitance, which is a constant, generally between 50 and 80. In order to ensure the stability of the output voltage and the stability of the current, K4 can be selected as 80. K5 and K6 are general index parameters designed according to the output parameter index of the phase-shifted full-bridge converter (for example, K5 can be 0.1, and K6 can be 0.5). In addition, in other embodiments of the present application, there are other implementation methods for calculating the target capacitance based on voltage and current. This content belongs to conventional technology for those skilled in the art, so this disclosure does not limit how to obtain capacitance based on voltage and current.

[0053] Then, according to the target capacitance value and preset parameters, the candidate duty cycle can be determined using an empirical calculation formula. The empirical calculation formula can be expressed as: D = C / K7, where D is the candidate duty cycle, C is the target capacitance value, and K7 is the preset parameter. Taking the input voltage of 1200V, output voltage of 17V, and output current of 80A as an example, when K4 is 80, K5 is 0.1, K6 is 0.5, and K7 is 30, the target capacitance value can be calculated according to the capacitance value calculation formula: ΔV = 0.1 * 17 = 1.7, ΔI = 0.5 * 80 = 40, C = (80 * 40) / 1.7 = 1882.35uF. Then, according to the empirical calculation formula, the candidate duty cycle can be calculated as: D = 1882.35 / 30 = 62.745, and the candidate duty cycle can be rounded to 60%.

[0054] Optionally, step 1022 can be implemented in the following manner:

[0055] Within a preset threshold range, adjust the preset parameters to increase or decrease the candidate duty cycle, control multiple second control switches respectively according to multiple adjusted candidate duty cycles, and obtain the peak-to-peak current corresponding to each adjusted candidate duty cycle.

[0056] Among the peak-to-peak currents corresponding to multiple adjusted candidate duty cycles, take the adjusted candidate duty cycle corresponding to the minimum peak-to-peak current as the target duty cycle.

[0057] Specifically, within a preset threshold range, adjust the preset parameters to increase or decrease the candidate duty cycle. After each adjustment of the preset parameters, control multiple second control switches according to the adjusted candidate duty cycle at this time. At the same time, during the process of controlling multiple second control switches according to the adjusted candidate duty cycle at this time, obtain the peak-to-peak current on the low-voltage side of the transformer, and take this peak-to-peak current as the peak-to-peak current corresponding to the adjusted candidate duty cycle at this time. Finally, among the peak-to-peak currents corresponding to multiple adjusted candidate duty cycles, take the adjusted candidate duty cycle corresponding to the minimum peak-to-peak current as the target duty cycle.

[0058] It should be noted that according to different application scenarios, the preset threshold range can be different. For example, when the phase-shifted full-bridge converter is used to implement the charging and discharging function of the battery and the low-voltage module includes a target capacitor, the preset threshold range can be: 25 < K7 < 35, and at this time, the adjustment range of the candidate duty cycle can be: C3 / 35 < D < C3 / 25.

[0059] In summary, the present disclosure first obtains the output voltage of the low-voltage module and the output current of the low-voltage module, and then determines the target duty ratios corresponding to the multiple second control switches according to the output voltage and the output current, and then controls the multiple second control switches according to the target duty ratio, and controls the multiple first control switches according to the specified duty ratio, so that the phase-shifted full-bridge converter outputs the target voltage. The present disclosure can determine a target duty ratio higher than the specified duty ratio of the high-voltage side through the output voltage and the output current of the low-voltage side, and control the second control switch according to the target duty ratio, so that the duty ratio of the low-voltage side can be dynamically adjusted while ensuring the load capacity of the phase-shifted full-bridge converter, so that the phase-shifted full-bridge converter can be applied to more application scenarios, and the practicality and scalability of the phase-shifted full-bridge converter are improved. Moreover, by limiting the target duty ratio to be less than the specified duty ratio, the current stress on the low-voltage side can be reduced, the heat generation of the second control switch on the low-voltage side can be reduced, and the safety of the phase-shifted full-bridge converter can be improved.

[0060] Figure 4 FIG. 7 is a block diagram of a control device 700 for a phase-shifted full-bridge converter according to an exemplary embodiment. Figure 4 As shown, the control device 700 of the phase-shifted full-bridge converter may include: a processor 701 and a memory 702. The control device 700 of the phase-shifted full-bridge converter may also include one or more of a multimedia component 703, an input / output (I / O) interface 704, and a communication component 705.

[0061] The processor 701 is used to control the overall operation of the control device 700 of the phase-shifted full-bridge converter to complete all or part of the steps in the control method of the phase-shifted full-bridge converter. The memory 702 is used to store various types of data to support the operation of the control device 700 of the phase-shifted full-bridge converter. These data may include, for example, instructions for any application or method operating on the control device 700 of the phase-shifted full-bridge converter, and application-related data, such as contact data, sent and received messages, pictures, audio, video, etc. The memory 702 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, disk or optical disk. The multimedia component 703 may include a screen and an audio component. The screen may be, for example, a touch screen, and the audio component is used to output and / or input audio signals. For example, the audio component may include a microphone for receiving external audio signals. The received audio signal may be further stored in the memory 702 or sent via the communication component 705. The audio component also includes at least one speaker for outputting audio signals. The I / O interface 704 provides an interface between the processor 701 and other interface modules, and the above-mentioned other interface modules can be a keyboard, a mouse, buttons, etc. These buttons can be virtual buttons or physical buttons. The communication component 705 is used for wired or wireless communication between the control device 700 of the phase-shifted full-bridge converter and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G, 4G, NB-IOT, eMTC, or other 5G, etc., or a combination of one or more of them, is not limited here. Therefore, the corresponding communication component 705 may include: Wi-Fi module, Bluetooth module, NFC module, etc.

[0062] In an exemplary embodiment, the control device 700 of the phase-shifted full-bridge converter can be implemented by one or more application specific integrated circuits (Application Specific Integrated Circuit, referred to as ASIC), digital signal processors (Digital Signal Processor, referred to as DSP), digital signal processing devices (Digital Signal Processing Device, referred to as DSPD), programmable logic devices (Programmable Logic Device, referred to as PLD), field programmable gate arrays (Field Programmable Gate Array, referred to as FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the above-mentioned control method of the phase-shifted full-bridge converter.

[0063] In another exemplary embodiment, a computer-readable storage medium including program instructions is also provided, and when the program instructions are executed by a processor, the steps of the control method of the above-mentioned phase-shifted full-bridge converter are implemented. For example, the computer-readable storage medium can be the above-mentioned memory 702 including program instructions, and the above-mentioned program instructions can be executed by the processor 701 of the control device 700 of the phase-shifted full-bridge converter to complete the above-mentioned control method of the phase-shifted full-bridge converter.

[0064] Figure 5 FIG. 1 is a block diagram of a phase-shifted full-bridge converter according to an exemplary embodiment. Figure 5 As shown, the phase-shifted full-bridge converter 200 includes a high-voltage module 1, a low-voltage module 2, a transformer 3 and Figure 4 The control device 700 shown. The high voltage module 1 is connected to the low voltage module 2 through the transformer 3, the high voltage module 1 includes a plurality of first control switches, the low voltage module 2 includes a plurality of second control switches, and the control device 700 is connected to the high voltage module 1 and the low voltage module 2 respectively.

[0065] In one scenario, Figure 6As shown, the high-voltage module 1 may include a first control switch 11, a second control switch 12, a third control switch 13, a fourth control switch 14, a first capacitor 15, a second capacitor 16 and a first inductor 17. The first end of the first control switch 11 is connected to the first end of the third control switch 13 and the first end of the first capacitor 15, respectively, and the second end of the second control switch 12 is connected to the second end of the fourth control switch 14 and the second end of the first capacitor 15, respectively. The second end of the first control switch 11 is connected to the first end of the second control switch 12 and the first end of the second capacitor 16, respectively, and the second end of the second capacitor 16 is connected to the first end of the first inductor 17. The second end of the first inductor 17 is connected to the first end of the low-voltage side of the transformer 3, and the second end of the third control switch 13 is connected to the first end of the fourth control switch 14 and the second end of the low-voltage side of the transformer 3, respectively. The first end of the first control switch 11 and the second end of the second control switch 12 serve as the input end of the high-voltage module 1.

[0066] The low voltage module 2 may include a fifth control switch 21, a sixth control switch 22, a seventh control switch 23, an eighth control switch 24, a target capacitor 25, and a second inductor 26. The first end of the fifth control switch 21 is connected to the first end of the seventh control switch 23, the first end of the target capacitor 25, and the first end of the second inductor 26, respectively. The second end of the sixth control switch 22 is connected to the second end of the eighth control switch 24 and the second end of the target capacitor 25, respectively. The second end of the fifth control switch 21 is connected to the first end of the sixth control switch 22 and the first end of the high voltage side of the transformer 3, respectively. The second end of the seventh control switch 23 is connected to the first end of the eighth control switch 24 and the second end of the high voltage side of the transformer 3, respectively. The second end of the second inductor 26 and the second end of the eighth control switch 24 serve as the output end of the low voltage module 2.

[0067] For example, when the phase-shifted full-bridge converter is applied in series in a loop, the output voltage (i.e., Figure 6 Uo in) and the output current of low voltage module 2 (i.e. Figure 6 Ic in). After that, the duty ratios to be selected corresponding to all the second control switches can be calculated according to the output voltage and the output current. Then, the duty ratio to be selected can be changed within the preset parameter range to debug the phase-shifted full-bridge converter to find the target duty ratio. Finally, all the second control switches can be controlled according to the target duty ratio, and all the first control switches can be controlled according to the specified duty ratio, so that the phase-shifted full-bridge converter outputs the corresponding target voltage according to the output parameter index.

[0068] Since the target duty cycle is greater than 50% (i.e., the duty cycle of the low-voltage side of the phase-shifted full-bridge converter is greater than 50%), at a certain moment, the fifth control switch 21 and the sixth control switch 22 will be turned on at the same time, or the seventh control switch 23 and the eighth control switch 24 will be turned on at the same time, at which time the low-voltage side of the transformer 3 will be in a short-circuit state, and the energy of the transformer 3 cannot be transmitted to the low-voltage side of the transformer 3, thus suppressing the increase of the peak-to-peak value of the current on the low-voltage side of the transformer 3 and reducing the current stress of the low-voltage module 2. At this time, the output current of the low-voltage module 2 is provided by the target capacitor 25, which can ensure the load capacity of the phase-shifted full-bridge converter. In addition, since the current stress of the low-voltage module is reduced, the turn-on loss of the second control switch of the low-voltage module will also be reduced, thereby reducing the heat generation of the second control switch.

[0069] Figure 7 FIG. 1 is a block diagram of a control system of a phase-shifted full-bridge converter according to an exemplary embodiment. Figure 7 As shown, the control system 300 includes a phase-shifted full-bridge converter 200 and Figure 4 The control device 700 shown is connected to the phase-shifted full-bridge converter 200 .

[0070] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings; however, the present disclosure is not limited to the specific details in the above embodiments. Within the technical concept of the present disclosure, a variety of simple modifications can be made to the technical solution of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.

[0071] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.

[0072] In addition, various embodiments of the present disclosure may be arbitrarily combined, and as long as they do not violate the concept of the present disclosure, they should also be regarded as the contents disclosed by the present disclosure.

Claims

1. A control method for a phase-shifted full-bridge converter, characterized in that: The phase-shifted full-bridge converter includes a high-voltage module, a low-voltage module and a transformer; the high-voltage module is connected to the low-voltage module through the transformer; the high-voltage module includes a plurality of first control switches, and the low-voltage module includes a plurality of second control switches; the method includes: Obtaining the output voltage of the low-voltage module and the output current of the low-voltage module; Determining target duty ratios corresponding to the plurality of second control switches according to the output voltage and the output current; Controlling the plurality of second control switches according to the target duty cycle, and controlling the plurality of first control switches according to a specified duty cycle, so that the phase-shifted full-bridge converter outputs a target voltage; wherein the target duty cycle is greater than the specified duty cycle; The step of determining target duty ratios corresponding to the plurality of second control switches according to the output voltage and the output current includes: Determining to-be-selected duty ratios corresponding to the plurality of second control switches according to the output voltage and the output current; The target duty cycle is determined according to the duty cycle to be selected and the peak-to-peak value of the current on the low-voltage side of the transformer.

2. The method according to claim 1, characterized in that: The step of determining the duty ratios to be selected corresponding to the plurality of second control switches according to the output voltage and the output current includes: The duty cycle to be selected is determined according to the output voltage and the output current, and based on a preset relationship; the preset relationship is to determine a target current parameter according to the output current and a first parameter, and to determine a target voltage parameter according to the output voltage and a second parameter, and to determine the duty cycle to be selected according to a ratio of the target current parameter to the target voltage parameter and a preset parameter.

3. The method according to claim 1, characterized in that The low voltage module includes a target capacitor, and the target capacitor is connected to the output end of the low voltage module; and determining the duty ratios to be selected corresponding to the plurality of second control switches according to the output voltage and the output current includes: A target capacitance value corresponding to the target capacitance is determined according to the output voltage and the output current, and the duty cycle to be selected is determined according to the target capacitance value and preset parameters.

4. The method according to claim 2 or 3, characterized in that: The step of determining the target duty cycle according to the duty cycle to be selected and the peak-to-peak value of the current on the low-voltage side of the transformer includes: Within a preset threshold range, the preset parameter is adjusted to increase or decrease the duty cycle to be selected, and the plurality of second control switches are controlled respectively according to the plurality of adjusted duty cycles to be selected, and the peak-to-peak value of the current corresponding to each of the adjusted duty cycles to be selected is obtained; Among the current peak-to-peak values ​​corresponding to the multiple adjusted candidate duty ratios, the adjusted candidate duty ratio corresponding to the smallest current peak-to-peak value is used as the target duty ratio.

5. The method according to any one of claims 1 to 3, characterized in that: The specified duty cycle is 50%.

6. A control device for a phase-shifted full-bridge converter, characterized in that: The control device comprises: a memory having a computer program stored thereon; A processor, configured to execute the computer program in the memory to implement the steps of the method according to any one of claims 1 to 5.

7. A phase-shifted full-bridge converter, characterized in that: The phase-shifted full-bridge converter includes a high-voltage module, a low-voltage module, a transformer and the control device described in claim 6; the high-voltage module is connected to the low-voltage module through the transformer; the high-voltage module includes multiple first control switches, and the low-voltage module includes multiple second control switches; the control device is connected to the high-voltage module and the low-voltage module respectively.

8. The phase-shifted full-bridge converter according to claim 7, characterized in that: The high-voltage module includes a first control switch, a second control switch, a third control switch, a fourth control switch, a first capacitor, a second capacitor and a first inductor; the first end of the first control switch is respectively connected to the first end of the third control switch and the first end of the first capacitor, and the second end of the second control switch is respectively connected to the second end of the fourth control switch and the second end of the first capacitor; the second end of the first control switch is respectively connected to the first end of the second control switch and the first end of the second capacitor, and the second end of the second capacitor is connected to the first end of the first inductor; the second end of the first inductor is connected to the first end of the high-voltage side of the transformer, and the second end of the third control switch is respectively connected to the first end of the fourth control switch and the second end of the high-voltage side of the transformer; the first end of the first control switch and the second end of the second control switch serve as the input end of the high-voltage module; The low-voltage module includes a fifth control switch, a sixth control switch, a seventh control switch, an eighth control switch, a target capacitor and a second inductor; the first end of the fifth control switch is respectively connected to the first end of the seventh control switch, the first end of the target capacitor and the first end of the second inductor, and the second end of the sixth control switch is respectively connected to the second end of the eighth control switch and the second end of the target capacitor; the second end of the fifth control switch is respectively connected to the first end of the sixth control switch and the first end of the low-voltage side of the transformer, and the second end of the seventh control switch is respectively connected to the first end of the eighth control switch and the second end of the low-voltage side of the transformer; the second end of the second inductor and the second end of the eighth control switch serve as output ends of the low-voltage module.

9. A control system for a phase-shifted full-bridge converter, characterized in that: The control system comprises a phase-shifted full-bridge converter and the control device according to claim 6; the phase-shifted full-bridge converter is connected to the control device.