A joint optimization scheduling method for river network live sluice stations based on minimum ecological flow velocity
By establishing a live water system model and optimization algorithm, the uneven flow rate of the river channel caused by unscientific operation of the pump station is solved, the high live water rate and energy consumption savings of the river network are achieved, the river channel flow rate reaches the minimum ecological flow rate, and the water environment quality is improved .
Patent Information
- Application Number
- CN202410246854.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-03-05
AI Technical Summary
The existing pump stations operate unscientifically in the dispatch of live water in the river network, resulting in excessive flow velocity of some rivers and small flow velocity of some rivers, which cannot reach the minimum ecological flow velocity, resulting in poor live water effect and high energy consumption.
通过建立活水系统模型,获取最小生态流速,建立河道结点流量平衡方程和水闸、河道、泵站水力平衡方程,优化算法求解以满足流速和能耗的数学模型,得到各水闸闸门开度和泵站运行方案,确保河道流速达到最小生态流速并节省能耗。
The river network has achieved high live water rate and energy consumption saving, ensuring that the flow rate of the main river channel reaches the minimum ecological flow rate, improving the quality of the water environment, and reducing the energy consumption of the pump station.
Smart Images

Figure CN117952388B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pump stations and environmental engineering, and in particular to a joint optimization dispatching method of river network live water sluice stations based on minimum ecological flow velocity. Background Art
[0002] As the process of industrialization and urbanization continues to advance, urban water systems are increasingly damaged by human activities. Garbage dumping and sewage discharge have caused the water quality of rivers to deteriorate, resulting in serious environmental problems such as a sharp decline in aquatic life and siltation of rivers, destroying the circulation function of the water ecosystem and endangering the natural landscape of cities and residents' water use. Therefore, it is necessary to focus on improving the coordinated mechanism for water pollution prevention and control, strengthen the comprehensive management of key lakes and urban water bodies, actively promote the protection and construction of beautiful rivers and lakes, basically eliminate Class V national control sections and urban black and smelly water bodies, and optimize the water quality of urban inland rivers.
[0003] To achieve the above goals, it is an effective measure to use river water to live and meet the minimum ecological flow rate requirements. However, the plain embankment area is low and flat, and there is no water level difference between the water bodies inside and outside the area. There is no live water power for a long time. According to the actual situation, it is necessary to set up a pump station at the entrance of the area to pump water, or set up a pump station at the exit of the area to drain water, so as to form a water level difference to effectively live water in the river network. However, the current situation is that when the system is live, most of them open the live water pump station without control when all the sluices are fully opened, and the selection of the number of operating pump stations and their operating units is unscientific and unreasonable. As a result, the flow rate of a small number of rivers is too large, while the flow rate of most rivers is small, and the minimum ecological flow rate is not reached, or even there is no flow rate, the live water effect is poor, and the pump station operation energy consumption is high. Summary of the invention
[0004] Purpose of the invention: The purpose of the present invention is to provide a method for joint optimization scheduling of river network water sluice stations based on minimum ecological flow velocity, which saves energy and has a high water activation rate.
[0005] Technical solution: The combined optimization dispatching method of river network live water gate stations based on minimum ecological flow velocity of the present invention comprises:
[0006] A model of a living water system is established through generalization processing, wherein the living water system includes a plurality of peripheral sluices, a river network formed by a plurality of river channels, and a plurality of peripheral pumping stations; and a minimum ecological flow rate of the river channel is obtained;
[0007] Establish the flow balance equation of river node and the hydraulic balance equation of sluice, river and pump station to calculate the hydraulic performance of sluice, river and pump station; when establishing the flow balance equation of river node, each river intersection is a node, and the total number of active water systems is m x nodes, the i-th node has x i The flow rate of the jth river at the i-th node is Q ij, flow inflow is positive, flow outflow is negative, list m x The node flow balance equation is:
[0008]
[0009] When establishing the hydraulic balance equation of the sluice and river channel, the optimized step length is used to iteratively calculate the hydraulic loss of the river channel; the water flow from node A to node B through the river channel has n r There are m paths, assuming that the jth path has m j The hydraulic loss of the jth path is:
[0010]
[0011] The number of nodes from node A to node B r If the hydraulic losses of the two paths are equal, the hydraulic balance equations of the sluice and river channel are as follows:
[0012] △H 1 =△H 2 =... = △H j =... = △H nr
[0013] There are multiple sets of nodes in the live water system, and multiple sets of hydraulic balance equations for sluice gates and river channels are established;
[0014] The hydraulic balance equation of the pump station passing through the i-th pump station is:
[0015]
[0016] The following optimization model is established with the constraints that the river flow velocity is not less than the minimum ecological flow velocity, the pump flow-head performance is satisfied, the flow balance equation, the hydraulic balance equation of the sluice, river and pump station are satisfied, and the number of pumps in operation at each pump station is not greater than the number of installed pumps, and the goal is to minimize the total operating power of all pump stations in the living water system:
[0017]
[0018] Where, P is the total power of the system pump station; P min is the minimum power of the system pump station; P i is the power of the i-th pump station; m ps is the total number of pumping stations; ρ is the water density; g is the gravitational acceleration; H 泵i is the pump head of the i-th pump station; Q 泵i is the flow rate of a single pump in the i-th pump station; n i is the number of pumps in operation at the i-th pump station; η 泵i is the pump efficiency of the i-th pump station; η 机i is the motor efficiency of the i-th pump station; v kis the actual flow velocity of the kth river; v kmin is the minimum ecological flow velocity of the kth river; Q 泵站i is the operating flow of the i-th pump station; a 1 、b 1 、c 1 is a constant; x i is the number of river intersections at the i-th river node; Q ij is the flow rate of the jth river at the i-th river node, where inflow is positive and outflow is negative; m x is the number of river nodes; n r is the number of river paths between any two nodes in the river; △H j is the total hydraulic loss of the jth path; Z k is the hydraulic loss of the kth sluice on the path. If the path does not pass through a sluice, or passes through a sluice but the sluice is fully open and not regulated, then Z k =0; △h ji is the hydraulic loss of the ith river channel connected in series with the jth path; △h jl is the hydraulic loss of the lth series channel of the jth path from the kth sluice gate in the periphery to the i-th pump station; S is the hydraulic loss coefficient of the inlet and outlet pipelines of the pump station; Q 泵站i is the flow rate of the i-th pump station; n iP H is the number of pumps installed in the i-th pump station; 泵imin is the minimum operating head of the pump in the i-th pump station; H 泵imax is the maximum operating head of the pump in the i-th pump station;
[0019] The optimization model is solved by applying an optimization algorithm, and the required opening of each sluice gate and the total power of the pumping station are further calculated to obtain the optimized operation plan for scheduling the living water system. During operation, the opening of each sluice gate is controlled according to the optimized operation plan to divert water, and the water flow is distributed to each river channel of the river network according to the requirement that the flow rate of the main river channel is not less than the minimum ecological flow rate, and each pumping station is operated to discharge the water according to the minimum number of units required.
[0020] Furthermore, the optimized operation plan includes the resistance of each sluice gate, the minimum number of units required to be started at each pump station, the operating flow, the pump head, the actual flow rate of each river channel, the required opening of each sluice gate and the total power of the pump station.
[0021] Furthermore, the gate hydraulic performance includes gate orifice flow coefficient, free orifice flow, gate resistance and opening height calculation, and all are calculated based on SL537-2011 "Specifications for Hydraulic Structures and Weir Flow Measurement".
[0022] Furthermore, the hydraulic performance of the river channel adopts the hydraulic performance of uniform flow in the open channel of the river channel and is calculated based on the Xie Cai formula.
[0023] Furthermore, in the hydraulic performance of the river channel, when calculating the optimized step length, the river channel with unchanged cross-section is divided into several segments along the length direction with different step lengths, and the hydraulic loss of the entire length of the river channel is iteratively calculated with the segment length as the calculation step length. It is considered that the hydraulic performance of the river channel is the same in the same calculation step length, and the step length is gradually reduced until the calculated hydraulic loss of the entire length of the river channel approaches a constant, thereby determining the optimized step length of the river channel hydraulic calculation.
[0024] Furthermore, the water pump performance includes a water pump flow-lift performance curve.
[0025] Beneficial effects: The present invention has the following significant effects: 1. Energy saving: In the prior art, when conducting joint optimization and dispatching of river network live water sluice stations, most schemes start live water pumping stations without control when all sluices are fully opened. The selection of the number of operating pumping stations and their operating units is unscientific and unreasonable, and the live water effect is not good. On the basis of ensuring the live water effect, the present invention takes the minimum operating power of multiple live water pumping station units in the system as the goal, takes the minimum ecological flow rate of the main river as the constraint condition, and satisfies the system flow balance, hydraulic balance conditions and optimization mathematical conditions of pump performance. The optimization model is solved by the optimization algorithm to obtain the optimal gate station combination operation plan for the outer sluice gate opening height and the number of pump units in the live water pump station, thereby saving the operating energy consumption of the live water pump station; 2. The river network has a high live water rate: in the usual operation plan, the flow rate of a few rivers is too high, while the flow rate of most rivers is small, does not reach the minimum ecological flow rate, or even has no flow rate. The present invention establishes a model of the live water project, obtains information related to the minimum ecological flow rate, and ensures that the main rivers reach the minimum ecological flow rate, so as to improve the river water quality indicators and improve the water environment. Under the premise of energy saving, the water quality of the regional water body is guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a comparative flow chart for determining the live water scheduling operation scheme provided by the present invention;
[0027] Figure 2 It is a diagram for determining the iterative step length of the river hydraulic calculation method provided by the present invention;
[0028] Figure 3 It is a schematic diagram of a trapezoidal cross section of a river channel according to an embodiment of the present invention;
[0029] Figure 4 This is a generalized diagram of the river network and sluice station layout in the polder area according to an embodiment of the present invention;
[0030] Figure 5 This is a schematic diagram of the actual flow rate of each river channel when the water inlet gate is fully opened without control and the four units of each of the three pumping stations are fully opened;
[0031] Figure 6This is a schematic diagram of the actual flow rates of each river channel in Scheme 2, where the water inlet gates are fully opened without control, the number of units in the three pumping stations is not limited, and the main river channels meet the minimum ecological flow rate requirements;
[0032] Figure 7 It is a schematic diagram of the actual flow rate of each river channel in which the sluice-river network-pump station joint control proposed in the present invention optimizes the control of the sluice, the number of operating units of the three pump stations is constrained by the number of installed units, and the main river channels meet the minimum ecological flow rate requirements. DETAILED DESCRIPTION
[0033] The present invention is further explained below in conjunction with the accompanying drawings and specific implementation methods.
[0034] See also Figure 1 As shown, the present invention discloses a joint optimization scheduling method of river network live water gate stations based on minimum ecological flow rate, comprising:
[0035] A model of a living water system is established through generalization processing, wherein the living water system includes a plurality of peripheral sluices, a river network formed by a plurality of river channels, and a plurality of peripheral pumping stations; and a minimum ecological flow rate of the river channel is obtained;
[0036] Establish the flow balance equation of river node and the hydraulic balance equation of sluice, river and pump station to calculate the hydraulic performance of sluice, river and pump station; when establishing the flow balance equation of river node, each river intersection is a node, and the total number of active water systems is m x nodes, the i-th node has x i The flow rate of the jth river at the i-th node is Q ij , flow inflow is positive, flow outflow is negative, list m x The node flow balance equation is:
[0037]
[0038] When establishing the hydraulic balance equation of the sluice and river channel, the optimized step length is used to iteratively calculate the hydraulic loss of the river channel; the water flow from node A to node B through the river channel has n r There are m paths, assuming that the jth path has m j The hydraulic loss of the jth path is:
[0039]
[0040] The number of nodes from node A to node B r If the hydraulic losses of the two paths are equal, the hydraulic balance equations of the sluice and river channel are as follows:
[0041]
[0042] There are multiple sets of nodes in the live water system, and multiple sets of hydraulic balance equations for sluice gates and river channels are established;
[0043] The hydraulic balance equation of the pump station passing through the i-th pump station is:
[0044]
[0045] The following optimization model is established with the constraints that the river flow velocity is not less than the minimum ecological flow velocity, the pump flow-head performance is satisfied, the flow balance equation, the hydraulic balance equation of the sluice, river and pump station are satisfied, and the number of pumps in operation at each pump station is not greater than the number of installed pumps, and the goal is to minimize the total operating power of all pump stations in the living water system:
[0046]
[0047] Where, P is the total power of the system pump station; P min is the minimum power of the system pump station; P i is the power of the i-th pump station; m ps is the total number of pumping stations; ρ is the water density; g is the gravitational acceleration; H 泵i is the pump head of the i-th pump station; Q 泵i is the flow rate of a single pump in the i-th pump station; n i is the number of pumps in operation at the i-th pump station; η 泵i is the pump efficiency of the i-th pump station; η 机i is the motor efficiency of the i-th pump station; v k is the actual flow velocity of the kth river; v kmin is the minimum ecological flow velocity of the kth river; Q 泵站i is the operating flow of the i-th pump station; a 1 、b 1 、c 1 is a constant; x i is the number of river intersections at the i-th river node; Q ij is the flow rate of the jth river at the i-th river node, where inflow is positive and outflow is negative; m x is the number of river nodes; n r is the number of river paths between any two nodes in the river; △H j is the total hydraulic loss of the jth path; Z k is the hydraulic loss of the kth sluice on the path. If the path does not pass through a sluice, or passes through a sluice but the sluice is fully open and not regulated, then Z k =0; △h ji is the hydraulic loss of the ith river channel connected in series with the jth path; △h jl is the hydraulic loss of the lth series channel of the jth path from the kth sluice gate in the periphery to the i-th pump station; S is the hydraulic loss coefficient of the inlet and outlet pipelines of the pump station; Q 泵站i is the flow rate of the i-th pump station; n iPH is the number of pumps installed in the i-th pump station; 泵imin is the minimum operating head of the pump in the i-th pump station; H 泵imax is the maximum operating head of the pump in the i-th pump station;
[0048] The optimization model is solved by applying an optimization algorithm, and the required opening of each sluice gate and the total power of the pumping station are further calculated to obtain the optimized operation plan for scheduling the living water system. During operation, the opening of each sluice gate is controlled according to the optimized operation plan to divert water, and the water flow is distributed to each river channel of the river network according to the requirement that the flow rate of the main river channel is not less than the minimum ecological flow rate. The water is discharged by each pumping station according to the minimum number of units required to meet the minimum operating power requirement.
[0049] The present invention is further described in detail below.
[0050] A. First, it is necessary to collect basic information on the living water project, and establish a model of the living water system by generalizing the regional river network and the layout of the sluice station. Including: numbering the sluices, rivers, and pumping stations in the living water area of the living water project; determining the width of each gate and the elevation of the bottom plate, the length, cross-sectional shape and size of each river channel, the elevation of the riverbed and its slope, and the number, model and performance parameters of each living water pumping station unit. According to the actual location of the sluices, rivers, and pumping stations, make a generalized map and number the sluices, rivers, and pumping stations. The cross-sectional shape of each river channel, the set water flow direction, flow velocity, water level difference (hydraulic loss) along the way correspond to the number, and the flow rate of the i-th river channel is Q i , the water level difference is Δh i When the regional live water is in operation, the outer gates are opened to divert water, which flows through the river network in the region and is discharged from the live water pumping station.
[0051] B. Obtain the minimum ecological flow rate, calculate the hydraulic performance of the sluice and river channel, and fit the pump performance curve equation.
[0052] Among them, based on river ecological data, the survey determined the minimum ecological flow velocity of each river in the river network.
[0053] The gate hydraulic performance calculation includes gate orifice flow coefficient, free orifice flow, gate resistance and opening height calculation, and all are calculated based on SL537-2011 "Specifications for Hydraulic Structures and Weir Flow Measurement". The specific calculation process is as follows: When calculating the gate hydraulics, the water head before the gate is known. According to the "Specifications for Hydraulic Structures and Weir Flow Measurement" (SL537-2011), the gate orifice flow coefficient calculation formula is:
[0054]
[0055] The free hole flow formula is:
[0056]
[0057] Where, μ is the free hole flow coefficient; e is the gate opening height, unit is m; H 前 is the water head before the gate, that is, the difference between the upstream water surface and the bottom plate elevation, in meters; Q is the gate hole flow, in meters 3 / s; q is the number of gate holes; b is the net width of a single gate hole, in m; g is the acceleration of gravity; Z is the hydraulic loss of water flowing through the gate, in m. Combining equations (1) and (2), we get the gate opening height calculation formula:
[0058]
[0059] The hydraulic performance of the river channel is calculated using the hydraulic performance of uniform flow in the open channel of the river channel and based on the Xie Cai formula. In the hydraulic performance of the river channel, the method of calculating the optimal step length includes dividing the river channel with unchanged cross-section into several segments along the length direction with different step lengths, and iteratively calculating the hydraulic loss of the entire length of the river channel with the segment length as the calculation step length. It is considered that the hydraulic performance of the river channel is the same in the same calculation step length, and the step length is gradually reduced until the calculated hydraulic loss of the entire length of the river channel approaches a constant, and the optimal step length of the river channel is determined. The specific calculation process is as follows:
[0060] The hydraulic calculation of uniform flow in open channel of river adopts Xie Cai formula:
[0061]
[0062] Where: Q d is the cross-sectional flow rate, in m 3 / s; A is the cross-sectional area of water flow, unit: m 2 ; C is Xie Cai coefficient; R is hydraulic radius, unit is m; i d is the hydraulic gradient, where:
[0063]
[0064] Where: n z is the roughness of the river channel. Solving formulas (4) and (5) together yields:
[0065]
[0066] in:
[0067]
[0068]
[0069] Where: L is the length of the river, m; Δh is the hydraulic loss of the L-long river, m; χ is the wetted perimeter of the section, m.
[0070] In order to improve the accuracy of river hydraulic calculation, the full length of the river with unchanged cross-section is divided into several sections for iterative calculation. The length of each section is the calculation step length. The flow parameters of each section of the river with the same step length are considered to be the same value. The river water level, flow cross-sectional area, flow rate, head loss and other hydraulic parameters are calculated accordingly. The larger the step length, the shorter the calculation time, but the accuracy is poor; the smaller the step length, the higher the accuracy, but the calculation time is long. Therefore, it is necessary to reasonably select the calculation step length as the optimized step length. Take a river with a length of 500m, a slope coefficient of 2.5, a headwater depth of 2.5m, and a river roughness of 0.025. The hydraulic loss of the entire length of the river is calculated with step lengths of 500m, 250m, 100m, 50m, 25m, 20m, 10m, and 5m, respectively, and compare the changes in hydraulic loss, such as Figure 2 As shown, when the iteration step is greater than 25m, the hydraulic loss calculation result varies greatly with the step length; when the step length is less than 20m, the calculated hydraulic loss result tends to be stable and basically unchanged, so the present invention selects a step length of 20m for iterative calculation.
[0071] Pump performance curve equation fitting, water pump performance includes water pump flow-head performance curve. Assume that the live water system has a total of m ps Pump stations, each pump station is equipped with the same type of pump units. ps The flow-head performance curve equation and efficiency curve equation of this water pump are expressed as:
[0072]
[0073]
[0074] In the formula, H 泵i is the pump head of the i-th pump station, m; Q 泵站i is the flow rate of the i-th pump station, m 3 / s;n i is the number of pumps in operation at the i-th pump station; a 1 、b 1 、c 1 、a 2 、b 2 、c 2 is a constant.
[0075] The input power of the motor for a single water pump with direct drive is as follows:
[0076]
[0077] Where P is the motor input power, kW; ρ is the water density, which is 1×10 3 kg / m 3 ; g is the acceleration due to gravity, which is 9.8m / s 2 ;H 泵is the pump head, m; Q 泵 is the pump flow rate, m 3 / s; η 泵 is the pump efficiency; η 机 is the motor efficiency.
[0078] C. Establish the flow balance equations for river nodes and the hydraulic balance equations for sluices, river networks, and pumping stations. According to the basic information and generalized diagram of the living water project, establish the flow balance equations for river nodes and the hydraulic balance equations for sluices, river networks, and pumping stations.
[0079] (1) When establishing the flow balance equation for river nodes, the intersections of each river in the generalized diagram are taken as nodes, with inflow being positive and outflow being negative. Suppose there are m x nodes, the i-th node has x i The flow rate of the jth river at the i-th node is Q ij , list m x The node flow balance equation is:
[0080]
[0081] (2) Hydraulic balance equation for sluice gates and river channels: In a river network, water flows from node A through the river channel to node B with n r There are n paths. r The hydraulic losses of the jth path are equal. j The hydraulic loss of the jth path is:
[0082]
[0083] In the formula, △H j is the hydraulic loss of the jth path; Z k is the hydraulic loss of the kth sluice on the path. If the path does not pass through a sluice, or passes through a sluice but the sluice is fully open and not regulated, then Z k =0; △h ji is the hydraulic loss of the ith series channel in the jth path. r If the hydraulic losses of the two paths are equal, the hydraulic balance equation of the sluice and the river channel is:
[0084]
[0085] There are multiple sets of nodes in the running water system, and multiple sets of hydraulic balance equations in the form of equation (14) can be established.
[0086] (3) The hydraulic balance equation of the path passing through the i-th pump station is:
[0087]
[0088] Where S is the hydraulic loss coefficient of the inlet and outlet pipes of the pump station, s2 / m 5 ; △h jl is the hydraulic loss of the lth series channel of the jth path that diverts water from the kth sluice gate in the periphery to the i-th pump station.
[0089] D. The present invention proposes to establish the following optimization model with the constraints that the river flow velocity is not less than the minimum ecological flow velocity, the pump flow-lift performance is satisfied, the flow balance equation, the hydraulic balance equation of the sluice, river and pump station are satisfied, and the number of pumps in operation at each pump station is not greater than the number of installed pumps, and the goal is to minimize the total operating power of all pump stations in the living water system:
[0090]
[0091] Where, P is the total power of the system pump station; P min is the minimum power of the system pump station; P i is the power of the i-th pump station; m ps is the total number of pumping stations; ρ is the water density; g is the gravitational acceleration; Q 泵i is the flow rate of a single pump in the i-th pump station; η 泵i is the pump efficiency of the i-th pump station; η 机i is the motor efficiency of the i-th pump station; v k is the actual flow velocity of the kth river; v kmin is the minimum ecological flow velocity of the kth river; Q 泵站i is the operating flow of the i-th pump station; a 1 、b 1 、c 1 is a constant; x i is the number of river intersections at the i-th river node; Q ij is the flow rate of the jth river at the i-th river node, where inflow is positive and outflow is negative; m x is the number of river nodes; n r is the number of river paths between any two nodes in the river; △H j is the total hydraulic loss of the jth path; Z k is the hydraulic loss of the kth sluice on the path. If the path does not pass through a sluice, or passes through a sluice but the sluice is fully open and not regulated, then Z k =0; △h ji is the hydraulic loss of the ith river channel connected in series with the jth path; △h jl is the hydraulic loss of the lth series channel of the jth path from the kth sluice gate in the periphery to the i-th pump station; S is the hydraulic loss coefficient of the inlet and outlet pipelines of the pump station; n iP H is the number of pumps installed in the i-th pump station; 泵imin is the minimum operating head of the pump in the i-th pump station; H 泵imax is the maximum operating head of the water pump in the i-th pump station.
[0092] The optimization model uses an optimization algorithm to solve the optimization model, and further calculates the required opening of each sluice gate and the total power of the pump station to obtain the optimized operation plan for the live water system scheduling; during operation, the opening of each sluice gate is controlled according to the optimized operation plan to divert water, and the water flow is distributed to each river channel of the river network according to the requirement that the flow rate of the main river channel is not less than the minimum ecological flow rate, and each pump station is operated and discharged according to the minimum number of units required to start up to meet the minimum operating power requirement. The content of the live water optimization scheduling operation plan includes the resistance of each sluice, the minimum number of units required to start up each pump station, the operating flow, the pump head, the actual flow rate of each river channel, the required opening of each sluice gate and the total power of the pump station.
[0093] Specifically, it can be seen that the above optimization model is based on the joint control of sluice-river network-pump station, including objective function and constraints: the objective function is to minimize the total input power of the system live water pump station; the constraints include: the flow rate of the main river channel of the system is not less than the minimum ecological flow rate, the flow-head performance constraints of each pump station, the flow balance equation of each node of the system, the hydraulic balance equation of each path and pump station, the head range constraint of each pump station and the number of units started, and the gate resistance constraint. When solving, the number of units started at each pump station and the sluice resistance are used as decision variables for optimization operation, and the sluice-river network-pump station joint control and dispatching operation plan is constructed. Solve the optimization model to obtain the resistance of each sluice that meets the minimum ecological flow rate requirements of the main river channel when the peripheral sluice control is adopted, the minimum number of units required for each pump station to start, the operating flow and head, and the actual flow rate of each river channel. According to the pump flow and head, the single machine power and the total power of the pump station are calculated, and the gate opening height is calculated according to the water level, flow and resistance upstream and downstream of the sluice.
[0094] G. The present invention also proposes a method for comparing the energy consumption of the system live water operation scheme before and after optimization, and solves and calculates the maximum number of units and total power required for each pump station under different operation modes. On the basis of the above, two other schemes are proposed, and the energy consumption is compared with the optimization scheme proposed by the present invention to verify the effect of the scheme proposed by the present invention. They are scheme one and scheme two respectively, and the method proposed by the present invention is scheme three.
[0095] In Scheme 1, no constraints or objective functions are set, all water inlet gates are fully opened without regulation, and Z k = 0. Solve the simultaneous equations (9), (12) to (15). Given the number of units in operation at each pumping station and the water level of the water body outside the area, solve the flow rate of each pumping station, the operating head of the pump, and the flow rate of each river. The number of independent equations must be equal to the number of unknown quantities to be solved. Use equations (10) and (11) to respectively obtain the pump efficiency and unit operating power of each pumping station, and then calculate the total input power of the pumping station.
[0096] In the second scheme, the objective function and constraint conditions are set, which are different from the method of the present invention: the objective function is to minimize the total input power of the system live water pump station; the constraint conditions include: the flow rate of the main river of the system is not lower than the minimum ecological flow rate, the flow-lift performance constraint of each pump station, the flow balance equation of each river node of the system, the hydraulic balance equation of each path and pump station, and the lift range constraint of each pump station. In order to achieve the minimum live water flow rate requirement of the main river, the number of units started at each pump station is an integer constraint, but the upper limit is not constrained. At this time, the peripheral sluice gates are fully opened and not controlled, that is, Z k = 0. The number of units in operation at each pumping station is used as the decision variable for optimal scheduling, that is, the number of units in operation at the i-th pumping station n i Unknown, build a river network-pump station joint control scheduling operation plan optimization model:
[0097]
[0098] Where, P is the total power of the system pump station; P min is the minimum power of the system pump station; P i is the power of the i-th pump station; m ps is the total number of pumping stations; ρ is the water density; g is the gravitational acceleration; H 泵i is the pump head of the i-th pump station; Q 泵i is the water pump flow rate of the i-th pump station; η 泵i is the pump efficiency of the i-th pump station; η 机i is the motor efficiency of the i-th pump station; n i is the number of pumps in operation at the i-th pump station; v k is the actual flow velocity of the kth river; v kmin is the minimum ecological flow velocity of the kth river; Q 泵站i is the operating flow of the i-th pump station; a 1 、b 1 、c 1 is a constant; x i is the number of river intersections at the i-th river node; Q ij is the flow rate of the jth river at the i-th river node; m x is the number of river nodes; n r is the number of river paths between any two nodes in the river; △H j is the hydraulic loss of the jth path; Z k is the hydraulic loss of the kth sluice on the path. If the path does not pass through a sluice, or passes through a sluice but the sluice is fully open and not regulated, then Z k =0; △h ji is the hydraulic loss of the ith river channel connected in series with the jth path; △h jl is the hydraulic loss of the lth series channel of the jth path from the kth sluice gate in the periphery to the i-th pump station; S is the hydraulic loss coefficient of the inlet and outlet pipelines of the pump station; niP H is the number of pumps installed in the i-th pump station; 泵imin is the minimum operating head of the pump in the i-th pump station; H 泵imax is the maximum operating head of the water pump in the i-th pump station.
[0099] Using the optimization algorithm, we solve the optimization model (I) and obtain the minimum number of pumping stations, operating flow and head, and actual flow rate of each river channel required to meet the minimum ecological flow rate requirements when the peripheral sluice gates are fully opened and uncontrolled. Based on the pump flow and head, we use formula (10) to calculate the power of each unit and the total input power of the pump station.
[0100] The following is a specific example to further illustrate in detail the method proposed in the present invention and the process of comparing it with Schemes 1 and 2. The data of a living water project in a certain polder area in Jiangsu is used as data support. There are 43 main rivers in the polder area, including Baidang Bay, Beiluxu Port, Chengsi Port, Jiantianshi River, etc., as well as 8 tributary rivers, including Xinkaigang Branch 1, Sujiagang Branch 1, Qiudian River Branch 1, Qiushuitan Branch 1, Jiantianshi River Branch 1, Jiantianshi River Branch 2, Jiantianshi River Branch 3, and Sigudiangang Branch 1. The cross section of the river is as follows Figure 3 The trapezoidal section shown has a bottom width of B and a slope coefficient of m. p , m p =cotα, where α is the angle between the slope and the horizontal plane, and the roughness of the river surface is n z . The water level at the head of the river channel is known, and the riverbed slope, the roughness of the river flow surface, the riverbed width and the slope coefficient are comprehensively considered to deduce and calculate the water surface line along the river channel and the water level at the end of the channel. Since the west, north and east sides of the polder area are surrounded by connected lake water bodies, there is no height difference between the water level of the river channel in the polder and the surrounding water bodies, making it difficult to form flow. For this reason, 18 water intake gates such as Jinchegang Gate, Lufang Gate, and Xiaodangwan Gate were built on the west, north and east sides of the polder area, Xintagang Pumping Station and Xiaohegang Pumping Station were built on the west, and Donggudang Pumping Station was built on the south. These three active pumping stations are used to pump water outward, causing a water level difference in the polder area and forming the flow required for active water.
[0101] A. Collect basic information on living water projects and generalize the layout of regional river networks and sluice stations.
[0102] There are 18 water inlet gates, 65 rivers, and 3 live water pumping stations in the polder area. The gates, rivers, and pumping stations are numbered, and basic information is filled in based on existing data and on-site measurements. The river flow, water level difference, and number are matched. The flow of the i-th river is Q i , the water level difference is Δh i . Figure 4This is a generalized diagram of the river network and sluice station layout in the polder area. When the regional live water is running, the outer gates are opened to divert water, which flows through the river network in the region and is discharged by the live water pump station. Table 1 shows the data of 18 sluices, Table 2 shows the length of 65 rivers and the flow section parameters under typical working conditions, and Table 3 shows the installed capacity of 3 pump stations.
[0103] Table 1 Sluice structure and operation parameters of Fenhu District
[0104]
[0105]
[0106] Table 2 Length of each river in Fenhu District and cross-sectional parameters of typical working conditions
[0107]
[0108]
[0109]
[0110] Table 3 Fenhu District Live Water Pump Station Installed Capacity Performance Parameters
[0111]
[0112] B. Obtain the minimum ecological flow rate, hydraulic calculation of gates and river channels, and fitting of pump performance curve equations.
[0113] Survey river ecological data and determine that the minimum ecological flow velocity of each river is 0.06m / s;
[0114] Formulas (1) to (3) are used to calculate the hydraulic flow of the sluice gate;
[0115] A step length of 20 m was selected for the iterative calculation of river hydraulics, and equations (6) to (8) were used in the calculation;
[0116] There are three live water pumping stations in the dike, namely Donggudang Pumping Station, Xiaohegang Pumping Station and Xintagang Pumping Station. Each pumping station is equipped with four 800ZLB-125 axial flow pumps to undertake live water tasks. The design flow rate of each pump is 2m 3 / s, the flow-head and flow-efficiency curves of the pump are obtained by fitting:
[0117]
[0118]
[0119] Where: H 泵 , η 泵 are pump head and pump efficiency respectively; Q 泵 is the pump flow rate.
[0120] The flow rate, head and efficiency of the water pump under a certain working condition are calculated, and the motor efficiency is found. The input power of the water pump motor is calculated using formula (11).
[0121] C. Establish the flow balance and hydraulic balance equations of sluice-river network-pump station
[0122] Now according to Figure 4 The system overview diagram shown lists the flow balance of each node in the river, the hydraulic balance relationship of each path, and the equation of the pump flow-head performance curve.
[0123] Q 1 +Q 2 +Q 3 +Q 60 +Q 61 =Q 4 +Q 63 (18)
[0124] Q 4 =Q 5 (19)
[0125] Q 5 +Q 17 +Q 7 +Q 27 =Q 6 +Q 8 (20)
[0126] Q 8 =Q 9 +Q 10 +Q 16 (twenty one)
[0127] Q 11 =Q 12 (twenty two)
[0128] Q 10 +Q 12 +Q 13 =Q 14 (twenty three)
[0129] Q 9 +Q 14 =Q 15 (twenty four)
[0130] Q 15 +Q 28 +Q 29 +Q 30 +Q 37 +Q 36 +Q 39 +Q 41 +Q 47 =Q 38+Q 40 +Q 16 +Q 泵3 (25)
[0131] Q 18 =Q 19 (26)
[0132] Q 20 +Q 21 =Q 19 (27)
[0133] Q 17 +Q 24 =Q 20 (28)
[0134] Q 21 +Q 22 =Q 23 (29)
[0135] Q 24 =Q 25 (30)
[0136] Q 23 +Q 25 =Q 26 (31)
[0137] Q 51 +Q 52 =Q 53 (32)
[0138] Q 53 =Q 22 (33)
[0139] Q 27 +Q 28 =Q 26 (34)
[0140] Q 31 +Q 32 +Q 34 +Q 38 =Q 29 +Q 30 (35)
[0141] Q 48 +Q 49 =Q 50 (36)
[0142] Q 31 +Q 32 =Q 33 (37)
[0143] Q 33 +Q34 +Q 35 =Q 50 (38)
[0144] Q 36 +Q 37 =Q 35 (39)
[0145] Q 44 +Q 45 =Q 43 (40)
[0146] Q 46 +Q 47 =Q 44 (41)
[0147] Q 45 +Q 46 =Q 42 (42)
[0148] Q 40 +Q 42 =Q 41 (43)
[0149] Q 54 +Q 55 =Q 56 (44)
[0150] Q 56 +Q 57 =Q 58 (45)
[0151] Q 58 +Q 59 =Q 60 (46)
[0152] Q 61 +Q 62 =Q 64 (47)
[0153] Q 63 +Q 64 =Q 65 (48)
[0154] △h 18 +△h 19 +△h 21 +△h 23 +△h 26 +△h 28 =△h 43 +△h 44 +△h 47 (49)
[0155] △h43 +△h 44 +△h 47 =△h 48 +△h 50 +△h 34 +△h 29 (50)
[0156] △h 48 +△h 29 =△h 49 +△h 30 (51)
[0157] △h 49 +△h 50 +△h 34 +△h 30 =△h 41 +△h 42 +△h 43 +△h 45 (52)
[0158] △h 36 =△h 37 (53)
[0159] △h 34 +△h 30 =△h 35 +△h 37 (54)
[0160] △h 18 +△h 19 +△h 21 =△h 51 +△h 53 +△h 22 (55)
[0161] △h 20 +△h 24 +△h 25 =△h 21 +△h 23 (56)
[0162] △h 51 =△h 52 (57)
[0163] △h 48 =△h 49 (58)
[0164] △h 44 +△h 46 =△h 45 (59)
[0165] △h 39+△h 40 =△h 42 +△h 43 +△h 45 (60)
[0166] △h 34 =△h 33 +△h 31 (61)
[0167] △h 33 +△h 31 =△h 35 +△h 37 +△h 38 (62)
[0168] △h 31 =△h 32 (63)
[0169] △h 57 +△h 58 =△h 59 (64)
[0170] △h 13 +△h 14 +△h 15 =△h 39 (65)
[0171] WITH 1 +△h 54 =Z 2 +△h 55 (66)
[0172] WITH 1 +△h 54 +△h 56 =Z 3 +△h 57 (67)
[0173] WITH 3 +△h 57 +△h 58 =Z 4 +△h 59 (68)
[0174] WITH 4 +△h 59 +△h 60 =Z 5 +△h 1 (69)
[0175] WITH 4 +△h 59 +△h 60 =Z 7 +△h2 (70)
[0176] WITH 4 +△h 59 +△h 60 =Z 8 +△h 3 (71)
[0177] WITH 5 +△h 1 +△h 4 +△h 5 =Z 10 +△h 7 (72)
[0178] WITH 9 +△h 17 +△h 18 +△h 19 +△h 20 =Z 10 +△h 7 (73)
[0179] WITH 9 +△h 17 +△h 18 +△h 19 +△h 20 =Z 13 +△h 22 +△h 23 +△h 26 +△h 27 +△h 51 +△h 53 (74)
[0180] WITH 11 +△h 11 +△h 12 =Z 12 +△h 13 (75)
[0181] WITH 13 +△h 51 =Z 14 +△h 52 (76)
[0182] WITH 15 +△h 49 =Z 16 +△h 48 (77)
[0183] WITH 17 +△h 39 =Z 15 +△h 35 +△h 36+△h 49 +△h 50 (78)
[0184] Z 17 +△h 39 =Z 18 +△h 41 +△h 42 +△h 43 +△h 45 (79)
[0185] Z 17 +△h 39 =Z 10 +△h 7 +△h 8 +△h 16 (80)
[0186]
[0187]
[0188]
[0189]
[0190]
[0191]
[0192] The system of equations consists of 69 independent equations.
[0193] D. Calculation of the flow rate of each river channel and the operating parameters of the pump station in the original operation plan - Plan 1
[0194] The simultaneous equations (18) to (86) consist of 69 equations, among which all gates are fully open and not regulated, Z i =0, i=1, ..., 18, all three pumping station units are fully open, that is, n 1 =n 2 =n 3 =4, all are known; 65 river flow rates, 1 pump station flow rate, 3 pump station pump heads, a total of 69 unknown quantities to be calculated, the unknown quantities are equal to the number of equations, and there is only one set of definite solutions that are useful for engineering. The solution to the flow rate of each river is as follows Figure 5 The total system power is 439.42kW.
[0195] Since the sections of rivers 1, 2, 3, 7, 11, 13, 17, 54, and 55 are large or located at the regional entrance and have good water quality, their flow rates do not need to be controlled. The remaining rivers are main rivers and their flow rates need to be controlled to be no less than the minimum ecological flow rate. Figure 5It can be seen that the original operation plan does not control the opening of the water inlet gate. Even if the four units of each of the three pumping stations are fully opened, there is still a main river channel of 7,980 m long, that is, 67.00% of the length of the main river channel has a flow rate lower than the required minimum ecological flow rate of 0.06 m / s.
[0196] E. Establishment and solution of the optimization model for the dispatching and operation scheme of the main river channel that meets the minimum ecological flow rate requirements based on the joint control of the river network and pumping stations - Scheme 2
[0197] Assume the number of units in operation at each pump station is n 1 , n 2 , n 3 is an unknown number, the goal is to minimize the system power, and the constraint condition is that the main river channels reach the minimum ecological flow rate, that is, v i ≥0.06m / s (i=4, 5, …, 65, but not 7, 11, 13, 17, 54, 55), and satisfying the flow balance conditions, hydraulic balance conditions and pump unit performance constraints of formulas (18) to (86), calculate the number of units that need to be turned on and the operating conditions of the three pumping stations when the peripheral sluice gates are not controlled and the main river meets the minimum ecological flow rate requirements, and calculate the power.
[0198]
[0199] The optimization algorithm is used to solve the above optimization model, and the flow rate of each river channel that meets the minimum ecological flow rate requirements when the peripheral sluice gates are not controlled, the number of units required to be started and the operating conditions of the three pumping stations are obtained, and the total power of the pumping stations is calculated. The actual flow rate of all rivers is as follows Figure 6 The minimum number of units required to be started at Xinta Port, Xiaohe Port, and Donggudang Pump Station are 7, 7, and 10 respectively. The total system power is 953.82kW. The minimum number of units required to be started is far more than the actual installed number, and the operating power is large.
[0200] F. Establishment and solution of the optimization model for the dispatching and operation scheme of the main river channel that meets the minimum ecological flow rate requirements based on the joint control of sluice-river network-pumping station - Scheme 3
[0201] Assume that the number of units in operation of the three pumping stations is n 1 , n 2 , n 3 , is an unknown quantity, with the minimum system power as the goal and the minimum ecological flow rate of the main river as the constraint condition, that is, v i ≥0.06m / s (i=4, 5, ..., 65, but not 7, 11, 13, 17, 54, 55), and satisfy the flow balance, hydraulic balance conditions and pump unit performance constraints of formulas (18) to (86).
[0202]
[0203] The optimization algorithm is used to solve the above optimization model, calculate the control resistance coefficient of each sluice, the actual flow rate of all rivers, the minimum number of units required for the three pumping stations and their operating conditions, and calculate the total power of the pumping stations. According to the sluice resistance, upstream and downstream water levels and flow, the gate opening height is calculated as shown in Table 4. The actual flow rate of all rivers is as follows Figure 7 The minimum number of units required to be started at Xinta Port, Xiaohe Port and Donggudang Pumping Station are 0, 4 and 4 respectively, and the total system power is 341.96kW.
[0204] Table 4 Optimal operation scheme based on sluice-river network-pump station joint control Hydraulic loss and opening height of peripheral sluice
[0205]
[0206]
[0207] G. Comparison of the effects and energy consumption before and after optimization of the system live water operation scheme.
[0208] In order to ensure the minimum ecological flow rate of the inland river water in a high-tech zone, improve the water environment quality, and effectively save the operating power of the pump station, a joint optimization scheduling method of the system live water sluice station based on the minimum ecological flow rate is proposed. This method establishes an optimization model and solves it to obtain the optimal operation plan of the sluice station regulation. An optimization mathematical model with the minimum power of the system pump station as the objective function, the main river channel meeting the minimum ecological flow rate as the constraint condition, and meeting the system flow balance, hydraulic balance and pump performance conditions is established. The minimum number of units and total power required for each pump station under different operating modes are calculated and solved (see Table 5).
[0209] Table 5 Minimum number of units and total power required for each pump station under different operation schemes
[0210]
[0211] From Table 5, we compare the system power of different operation schemes and determine the best operation scheme. The specific data analysis is as follows:
[0212] (1) In the current operation plan, i.e., Plan 1, when the outer sluice gates are not controlled and all four units of the three pumping stations, namely, Xintagang Pumping Station, Xiaohegang Pumping Station, and Donggudang Pumping Station, are fully opened, there is still 67.00% of the length of the main river channel that cannot reach the minimum ecological flow rate, and the total system power is 439.42 kW.
[0213] (2) When the river network-pump station joint control, i.e., Scheme 2, is adopted, the outer sluice gates are not controlled to ensure that all major rivers meet the minimum ecological flow rate requirements and optimize the operation plan. The Xintagang Pumping Station, Xiaohegang Pumping Station, and Donggudang Pumping Station each require 7, 7, and 10 units to be turned on, with a total system power of 953.82 kW.
[0214] (3) When the sluice-river network-pump station joint control and the scheme proposed by the present invention are adopted, the optimized operation scheme is ensured to ensure that all major rivers meet the minimum ecological flow rate requirements. Only 4 units of Xiaohegang Pumping Station and Donggudang Pumping Station need to be turned on, and the total system power is 341.96kW. Compared with the second scheme in which 100% of the major rivers meet the minimum ecological flow rate, the system saves 64.15% of energy.
[0215] The following conclusions are drawn from the above analysis: Scheme 1, i.e. the current operation scheme, is that the gates are fully open without regulation, and most of the river channels in the river network cannot meet the minimum ecological flow rate requirements; Scheme 2, i.e. the river network-pump station joint control optimization operation, the main river channels meet the minimum ecological flow rate requirements, but the minimum number of units required to be started at each pump station is much larger than the actual number of units installed at the pump station, which cannot be achieved and causes serious energy waste; Scheme 3 proposed in the present invention, i.e. the sluice-river network-pump station joint control optimization operation, through gate regulation, the river network flow is reasonably distributed, all major river channels meet the minimum ecological flow rate requirements, the pumping flow of the pump station is small, and at the same time the goal of living water to improve the water environment and save energy is achieved.
Claims
1. A method for joint optimization scheduling of river network live water gate stations based on minimum ecological flow velocity, characterized in that: The joint optimization scheduling method comprises: A model of a living water system is established through generalization processing, wherein the living water system includes a plurality of peripheral sluices, a river network formed by a plurality of river channels, and a plurality of peripheral pumping stations; and a minimum ecological flow rate of the river channel is obtained; Establish the flow balance equation of river node and the hydraulic balance equation of sluice, river and pump station to calculate the hydraulic performance of sluice, river and pump station; when establishing the flow balance equation of river node, each river intersection is a node, and the total number of active water systems is m x nodes, the i-th node has x i The flow rate of the jth river at the i-th node is Q ij , flow inflow is positive, flow outflow is negative, list m x The node flow balance equation is: When establishing the hydraulic balance equation of the sluice and river channel, the optimized step length is used to iteratively calculate the hydraulic loss of the river channel; the water flow from node A to node B through the river channel has n r There are m paths, assuming that the jth path has m j The hydraulic loss of the jth path is: The number of nodes from node A to node B r If the hydraulic losses of the two paths are equal, the hydraulic balance equations of the sluice and river channel are as follows: There are multiple groups of nodes in the live water system, and multiple groups of hydraulic balance equations for sluice gates and river channels are established; The hydraulic balance equation of the pump station passing through the i-th pump station is: The following optimization model is established with the constraints that the river flow velocity is not less than the minimum ecological flow velocity, the pump flow-head performance is satisfied, the flow balance equation, the hydraulic balance equation of the sluice, river and pump station are satisfied, and the number of pumps in operation at each pump station is not greater than the number of installed pumps, and the goal is to minimize the total operating power of all pump stations in the living water system: Where, P is the total power of the system pump station; P min is the minimum power of the system pump station; P i is the power of the i-th pump station; m ps is the total number of pumping stations; ρ is the water density; g is the gravitational acceleration; H 泵i is the pump head of the i-th pump station; Q 泵i is the flow rate of a single pump in the i-th pump station; n i is the number of pumps in operation at the i-th pump station; η 泵i is the pump efficiency of the i-th pump station; η 机i is the motor efficiency of the i-th pump station; v k is the actual flow velocity of the kth river; v kmin is the minimum ecological flow velocity of the kth river; Q 泵站i is the operating flow of the i-th pump station; a1, b1, c1 are constants; x i is the number of river intersections at the i-th river node; Q ij is the flow rate of the jth river at the i-th river node, where inflow is positive and outflow is negative; m x is the number of river nodes; n r is the number of river paths between any two nodes in the river; △H j is the total hydraulic loss of the jth path; Z k is the hydraulic loss of the kth sluice on the path. If the path does not pass through a sluice, or passes through a sluice but the sluice is fully open and not regulated, then Z k =0; △h ji is the hydraulic loss of the ith river channel connected in series with the jth path; △h jl is the hydraulic loss of the lth series channel of the jth path from the kth sluice gate in the periphery to the i-th pump station; S is the hydraulic loss coefficient of the inlet and outlet pipelines of the pump station; Q 泵站i is the flow rate of the i-th pump station; n iP H is the number of pumps installed in the i-th pump station; 泵imin is the minimum operating head of the pump in the i-th pump station; H 泵imax is the maximum operating head of the water pump in the i-th pump station; The optimization model is solved by applying an optimization algorithm, and the required opening of each sluice gate and the total power of the pumping station are further calculated to obtain the optimized operation plan for scheduling the living water system. During operation, the opening of each sluice gate is controlled according to the optimized operation plan to divert water, and the water flow is distributed to each river channel of the river network according to the requirement that the flow rate of the main river channel is not less than the minimum ecological flow rate, and each pumping station is operated to discharge the water according to the minimum number of units required.
2. The method for joint optimization scheduling of river network live water gate stations based on minimum ecological flow velocity according to claim 1 is characterized in that: The optimized operation plan includes the resistance of each sluice gate, the minimum number of units required to be started at each pump station, the operating flow, the pump head, the actual flow rate of each river channel, the required opening of each sluice gate and the total power of the pump station.
3. The method for joint optimization scheduling of river network live water gate stations based on minimum ecological flow velocity according to claim 1 is characterized in that: The hydraulic performance of the sluice gate includes the gate orifice flow coefficient, free hole flow, gate resistance and opening height calculation, and all are calculated based on SL537-2011 "Specifications for Hydraulic Structures and Weir Flow Measurement".
4. The method for joint optimization scheduling of river network live water gate stations based on minimum ecological flow velocity according to claim 1 is characterized in that: The hydraulic performance of the river channel adopts the hydraulic performance of uniform flow in the open channel of the river channel and is calculated based on the Xie Cai formula.
5. The method for joint optimization scheduling of river network live water gate stations based on minimum ecological flow velocity according to claim 4 is characterized in that: In the hydraulic performance of the river channel, when calculating the optimized step size, the river channel with unchanged cross-section is divided into several segments along the length direction with different step sizes, and the hydraulic loss of the entire length of the river channel is iteratively calculated with the segment length as the calculation step size. It is considered that the hydraulic performance of the river channel is the same in the same calculation step size, and the step size is gradually reduced until the calculated hydraulic loss of the entire length of the river channel tends to a constant, and the optimized step size of the river channel hydraulic calculation is determined.
6. The method for joint optimization scheduling of river network live water gate stations based on minimum ecological flow velocity according to claim 1 is characterized in that: The hydraulic performance of the pump station includes a pump flow-lift performance curve.
Citation Information
Patent Citations
Ultra-large type hydroelectric power plant
CN103696899A
Fish habitat protection cascade reservoir hydropower station group scheduling control system and method
CN107506909A