A heat treatment process for metal link

Through the high-efficiency quenching component and the quenching guarantee component, batch heating, cooling, cleaning and drying of the link links are realized in the same equipment, which solves the problem of low efficiency of the link link quenching process in the existing technology and improves the processing efficiency and equipment. Integration reduces production costs.

CN117965873BActive Publication Date: 2024-10-29帕森斯(张家口)工业技术有限责任公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410150182.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-02-02
Publication Date
2024-10-29
Estimated Expiration
2044-02-02

AI Technical Summary

Technical Problem

The existing link ring quenching heat treatment process has low efficiency. It needs to be heated one by one or in batches and then cooled, cleaned and dried separately. The transfer time between processes is long, resulting in low processing efficiency.

Method used

Using high-efficiency quenching components and quenching protection components, through the design of the lifting cylinder and conversion baffle, the link rings can be heated, cooled, cleaned and dried in the same equipment in batches. Induction coils and drive motors are used to improve processing efficiency and reduce quenching. Fluid waste and impurity accumulation.

Benefits of technology

It improves the efficiency and equipment integration of the link quenching process, reduces the transfer time between processes, realizes efficient heating, cooling, cleaning and drying, saves equipment space, and reduces production costs through the purification of quenching fluid. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117965873B_ABST
    Figure CN117965873B_ABST
Patent Text Reader

Abstract

The invention discloses a heat treatment process method for a metal chain link, and relates to the technical field of metal chain link processing. S2, a quenching and heating process, uses a fixing screw to connect the corresponding connecting platform and the connecting ear, controls the corresponding lifting cylinder to run, and the lifting cylinder drives the connecting platform and the supporting platform to enter the adjacent heating tube. The external air pump is started and the induction coil runs; S3, a quenching and cooling process, a conversion motor drives the conversion baffle to separate from the bottom of the heating tube, controls the lifting cylinder on this side to drive the supporting platform to descend, and makes the supporting platform immersed in the quenching liquid inside the liquid storage tank for cooling; when heating a chain link inside a heating tube, the invention uses the heating time to place the subsequent chain link on the placing rack on the supporting platform belonging to the other heating tubes, and uses the adjacent lifting cylinders to send the subsequent supporting platforms with the chain link placed thereon into the other free heating tubes in sequence, and multiple heating tubes are processed in batches for connecting chain links, so that the processing efficiency is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of metal chain link processing, in particular to a heat treatment process method for a metal chain link. Background Art

[0002] The connecting link is a key moving force-bearing component on the scraper chain of the scraper conveyor of coal mining equipment. The annual consumption of connecting links of various specifications is very large. In order to ensure the quality of the vertical connecting link, the connecting link needs to be quenched and heat treated during the processing. The purpose of quenching is to transform the supercooled austenite into martensite or bainite to obtain martensite or bainite structure, and then cooperate with tempering at different temperatures to greatly improve the strength, hardness, wear resistance, fatigue strength and toughness of the steel, so as to meet the different use requirements of various mechanical parts and tools.

[0003] During the quenching heat treatment, the existing connecting links are either quenched one by one or quenched in batches in a quenching furnace. However, during the heat treatment of the existing quenching connecting links, the quenching furnace can only quench and heat a batch of connecting links at one time. After heating, the heated connecting links need to be cooled, cleaned and dried separately. The transportation time interval between each process is long, and the processing efficiency is low. Summary of the invention

[0004] The present invention provides a heat treatment process method for metal connecting links, which can effectively solve the problems in the above-mentioned background technology that the existing connecting links in the background technology are either quenched one by one during the quenching heat treatment, or quenched in batches of connecting links using a quenching furnace. However, when the existing quenched connecting links are heat treated, the quenching furnace can only quench and heat a batch of connecting links at one time, and after heating, the heated connecting links need to be cooled, cleaned and dried separately, the transportation time interval between each process is long, and the processing efficiency is low.

[0005] To achieve the above object, the present invention provides the following technical solution: a heat treatment process for a metal link ring, comprising the following steps:

[0006] S1, material placement process, place a limit hole plate into the limit opening on one side of the same vertical plane, place the quenched link rings in sequence between the adjacent partition frames on the corresponding placement frames, and after all the gaps on the placement frames on the support platform are placed, place another limit hole plate into the limit opening on the other side of the same vertical plane;

[0007] S2, quenching and heating process, use fixing screws to connect the corresponding connecting platform and the connecting ear. After the connection is completed, control the corresponding lifting cylinder to operate, and the lifting cylinder drives the connecting platform and the supporting platform to move, so that the supporting platforms connected by the supporting rods enter the adjacent heating cylinders, the external air pump is started, and the induction coil is operated;

[0008] S3, quenching and cooling process, the conversion motor drives the conversion baffle at the bottom of the heating cylinder to rotate around the central axis, so that the conversion baffle is separated from the bottom of the heating cylinder, and the side lifting cylinder is controlled to drive the support platform to descend, so that the support platform is immersed in the quenching liquid inside the liquid storage tank for cooling;

[0009] S4, quenching and cleaning process, the lifting cylinder drives the connecting platform to rise and enter the heating cylinder, the conversion baffle moves, the bottom of the heating cylinder is sealed, the corresponding electric water control valve is opened, the water inside the water supply ring is passed into the water supply cavity through the water supply pipe, and sprayed out from the water spray hole, the driving motor drives the support platform to rotate, and all parts of the surface of the connecting chain ring are cleaned;

[0010] S5, drying and discharging process, after cleaning is completed, close the corresponding electric water control valve, the induction coil outside the heating cylinder is started, and the internal chain ring is dried. After drying is completed, the lifting cylinder moves the support platform out of the heating cylinder, separates the connecting platform from the connecting ear, pulls out one side of the limit hole plate, and moves the placed chain ring out from the placement frame.

[0011] According to the above technical solution, a high-efficiency quenching assembly is provided on the top of the base, and the high-efficiency quenching assembly includes a liquid storage tank;

[0012] A liquid storage tank is installed on the top of the base, a mounting plate is installed on the top of the liquid storage tank, a sealing cylinder is installed on the top of the mounting plate, a sealing bottom plate is installed on the bottom of the sealing cylinder, an isolation cylinder is installed at the middle opening on the top of the sealing bottom plate, isolation plates are evenly arranged between the outside of the isolation cylinder and the sealing cylinder, a heating cylinder is installed between two adjacent isolation plates, an induction coil is installed on the outside of the heating cylinder, a sealing cover is installed on the top of the sealing cylinder, and a feed port is opened through the top of the sealing cover corresponding to the top of the heating cylinder;

[0013] Supports are evenly arranged inside the heating cylinder, a connecting port is opened through the middle of the support platform, and the support platforms located inside the same heating cylinder are connected to each other through support rods, and a mounting frame is installed on the top of several support platforms, and a partition frame is evenly welded on the top of the mounting frame. Limiting openings are opened through both sides of the support platform, and limiting orifice plates are slidably installed between the limiting openings located in the same vertical plane. Connecting ears are welded on both sides of the top of the support platform located at the top, and the tops of two adjacent connecting ears are connected to the connecting platform by screws;

[0014] Lifting cylinders are evenly installed on the outside of the liquid storage tank, the output end of the lifting cylinder is connected to a connecting suspension, a lifting pipe is rotatably installed on the top of the connecting suspension, and the bottom of the lifting pipe is connected to the middle of the top of the adjacent connecting platform.

[0015] According to the above technical solution, a rotating shaft is installed at the bottom of the isolation cylinder, a conversion baffle is evenly connected to the outside of the rotating shaft for rotation, an arc-shaped rack is connected to the top of the conversion baffle, through-holes are evenly penetrated on the outside of the mounting plate, a conversion motor is evenly installed at the bottom of the through-hole corresponding to the top of the outside of the liquid storage tank, a conversion gear is connected to the output end of the conversion motor, and one side of the conversion gear penetrates the adjacent through-hole and meshes with one end of the adjacent arc-shaped rack.

[0016] According to the above technical solution, the top surface of the conversion baffle is tightly fitted with the bottom surface of the sealing bottom plate, and two adjacent arc-shaped racks are staggered with each other.

[0017] According to the above technical solution, a cooling sleeve is installed on the outside of the sealing cylinder, a water passage cavity is opened inside the heating cylinder, water spray holes are evenly opened on the inside of the heating cylinder, a water delivery pipe is connected to the top of one side of the heating cylinder, the water delivery pipe is connected to the corresponding water passage cavity, the open end of the water delivery pipe passes through the cooling sleeve and is connected to the water outlet end of the electric water control valve, a water delivery ring is connected between the water inlet ends of the electric water control valve, and the water inlet end of the water delivery ring is connected to the water outlet end of the external water pump;

[0018] The bottom of the inner side of the heating cylinder is connected with a drain pipe, the outer side of the cooling sleeve is provided with a drain ring, and the open end of the drain pipe passes through the cooling sleeve and is connected with one side of the drain ring.

[0019] According to the above technical solution, the induction coil, the conversion motor and the electric water control valve input end are electrically connected to the external controller output end, and the external controller input end is electrically connected to the external power supply output end.

[0020] According to the above technical solution, one side of the water inlet end of the electric water control valve is connected to a branch pipe, the other end of the branch pipe is connected to the top of the inner side of the cooling sleeve, and the outer bottom of the cooling sleeve is connected to a water outlet pipe;

[0021] The sealing cylinder is connected with a vacuum tube at the position corresponding to each heating cylinder, and the other end of the vacuum tube passes through the cooling sleeve and is connected with the suction end of an external vacuum pump.

[0022] According to the above technical solution, a quenching guarantee component is provided on the top of the base, and the quenching guarantee component includes a driving motor;

[0023] A driving motor is installed at one end of the top of the connecting suspension, and a driving gear is connected to the output end of the driving motor. A driven gear is connected to the top of the outer side of the lifting tube, and the driving gear and the driven gear are meshed with each other. A rotating head is connected to the top of the lifting tube, and an auxiliary water pipe is connected to the other end of the rotating head. A top spray hole is opened through the bottom of the inner side of the connecting platform;

[0024] A dilution water pipe is connected between one side of the bottom of the water delivery ring and the top of one side of the liquid storage tank, a quantitative electric valve is installed in the middle of the dilution water pipe, a diversion box is installed on one side of the liquid storage tank, one end of the dilution water pipe is connected to the top of one side of the diversion box, and one side of the diversion box is evenly provided with diversion holes;

[0025] A feed pipe is connected to the top of one side of the liquid storage tank, a circulating water valve is connected to the bottom of one side of the liquid storage tank, a filter is installed inside the circulating water valve, a temporary storage tank is arranged on one side outside the liquid storage tank, a circulating inlet pipe is connected between the bottom of the temporary storage tank and the circulating water valve, and a circulating outlet pipe is connected to the top of one side of the temporary storage tank.

[0026] According to the above technical solution, a stirring motor is installed in the middle of the bottom of the liquid storage tank, a stirring plate is connected to the output end of the stirring motor, a debris discharge port is opened on one side of the bottom of the liquid storage tank, a sealing baffle is rotatably installed at the bottom of the liquid storage tank, a pull rod is connected to the top of the sealing baffle, and a drainage fan is installed on the top of the isolation cylinder.

[0027] According to the above technical solution, the bottom of the stirring plate fits closely with the inner bottom surface of the liquid storage tank, and the top surface of the sealing baffle fits closely with the outer bottom surface of the liquid storage tank;

[0028] The input ends of the driving motor, the quantitative electric valve, the stirring motor and the drainage fan are electrically connected to the output end of the external controller.

[0029] Compared with the prior art, the present invention has the following beneficial effects:

[0030] 1. Equipped with a high-efficiency quenching assembly, the chain links are sequentially placed between the adjacent partition frames on the corresponding placement frames. The partition frames play an isolating role and can prevent the chain links from sticking together during quenching. At the same time, when the induction coil heats the chain link inside a heating cylinder, the subsequent chain link can be placed on the placement frame on the support platform to which the remaining heating cylinders belong by utilizing the heating time of the induction coil. The support platform with the subsequent chain link placed is sequentially sent into the remaining free heating cylinders by utilizing the adjacent lifting cylinder. Multiple heating cylinders are processed in batches with the chain links, and the entire equipment does not need to be stopped in the middle, so the processing efficiency is higher;

[0031] After the chain ring inside the heating cylinder is heated, the conversion motor corresponding to the bottom of the heating cylinder drives the conversion baffle to separate from the bottom of the heating cylinder, and the lifting cylinder drives the support platform to descend, and the chain ring is immersed in the quenching liquid inside the liquid storage tank to complete the cooling of the chain ring. There is no need to transfer the chain ring separately for cooling treatment in the middle. At the same time, after the cooling is completed, the lifting cylinder drives the cooled chain ring to return to the inside of the heating cylinder, and the corresponding driving motor drives the support platform to rotate. Under the action of centrifugal force, the residual quenching liquid on the surface of the support platform, support rod, mounting frame and chain ring is thrown off, and the thrown quenching liquid drips into the liquid storage tank along the inner wall of the heating cylinder, which greatly reduces the waste of quenching liquid.

[0032] After centrifugation is completed, the corresponding conversion motor drives the conversion baffle to move, seals the bottom of the heating cylinder, controls the corresponding electric water control valve to open, and the water inside the water delivery ring enters the water passage cavity and is sprayed out from the water spray hole. The sprayed clean water flushes the connecting chain ring inside the heating cylinder and cleans the connecting chain ring. With the rotation of the driving motor, the clean water sprayed from the water spray hole can clean all parts of the surface of the connecting chain ring. While the cleaning effect is better, there is no need to transfer the connecting chain ring separately for cleaning. After cleaning, the corresponding induction coil is used to dry the connecting chain ring. The quenching heating, cooling, cleaning and drying of the connecting chain ring are all processed in the same equipment. The equipment is more integrated and the processing efficiency is high, which also saves the space required for the equipment.

[0033] 2. A quenching guarantee component is provided. An external water pump delivers clean water to the auxiliary water pipe. The clean water delivered by the external water pump flows through the auxiliary water pipe and the lifting pipe into the inside of the connecting platform, and finally sprays out from the top spray hole. The sprayed clean water passes through the connecting port on the support platform and contacts the chain ring on the placement frame, and cooperates with the flushing of the chain ring with the water spray hole, which further improves the cleaning speed and cleaning quality;

[0034] When there are many impurities in the quenching liquid, the quenching liquid in the liquid storage tank is transferred to the temporary storage tank. Under the filtering effect of the filter screen, the impurities in the quenching liquid fall to the bottom of the liquid storage tank. A collection container is placed at the bottom of the impurity discharge port. The pull rod is pulled to drive the sealing baffle to move. The stirring plate rotates to push the impurities inside the liquid storage tank to be discharged from the impurity discharge port. After the impurities are discharged, the sealing baffle seals the impurity discharge port, and the circulating outlet pipe and the feed pipe are connected. The quenching liquid inside the temporary storage tank is then returned to the liquid storage tank through the circulating outlet pipe and the feed pipe for reuse, thereby achieving purification of the quenching liquid and saving production costs.

[0035] At the same time, during quenching, the rotation of the stirring plate can drive the quenching liquid inside the liquid storage tank to stir. When the connecting link contacts the quenching liquid, the cooling speed of the connecting link can be accelerated, and the quenching liquid can be prevented from stratifying, thereby achieving a better quenching effect.

[0036] To sum up, the water inside the water delivery ring in the high-efficiency quenching component enters the water passage cavity and is sprayed out from the water spray hole. The sprayed clean water flushes the chain ring inside the heating cylinder, and the docking chain ring is cleaned. The driving motor in the quenching guarantee component drives the support table to rotate, so that the clean water sprayed from the water spray hole can clean all parts of the surface of the chain ring, and cooperates with the top spray hole to clean the docking chain ring from above. The two components cooperate with each other to make the cleaning speed faster and the cleaning effect better. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.

[0038] In the attached picture:

[0039] Figure 1 It is a schematic diagram of the heat treatment process of the present invention;

[0040] Figure 2 It is a three-dimensional structural schematic diagram of the present invention;

[0041] Figure 3 It is a schematic diagram of the structure of the high-efficiency quenching assembly of the present invention;

[0042] Figure 4 It is a schematic diagram of the installation structure of the heating tube of the present invention;

[0043] Figure 5 The present invention comes from Figure 4 A magnified image of area A;

[0044] Figure 6 It is a schematic diagram of the installation structure of the limiting orifice plate of the present invention;

[0045] Figure 7 It is a structural schematic diagram of the partition frame of the present invention;

[0046] Figure 8 It is a schematic diagram of the installation structure of the water delivery ring of the present invention;

[0047] Fig. 9 It is a schematic diagram of the installation structure of the conversion baffle of the present invention;

[0048] Fig.10 It is a structural schematic diagram of the quenching guarantee component of the present invention;

[0049] Fig.11 The present invention comes from Fig.10 A magnified view of area B;

[0050] Fig.12 It is a schematic diagram of the installation structure of the shunt box of the present invention;

[0051] Fig.13 It is a schematic diagram of the installation structure of the sealing baffle of the present invention;

[0052] Numbers in the figure: 1, base;

[0053] 2. High-efficiency quenching assembly; 201. Liquid storage tank; 202. Mounting plate; 203. Sealing cylinder; 204. Sealing bottom plate; 205. Isolation cylinder; 206. Isolation plate; 207. Heating cylinder; 208. Induction coil; 209. Sealing cover; 210. Feeding port; 211. Support platform; 212. Connecting port; 213. Support rod; 214. Placement rack; 215. Separation rack; 216. Limiting port; 217. Limiting orifice plate; 218. Connecting ear; 219. Connecting platform; 22 0, lifting cylinder; 221, connecting suspension; 222, lifting pipe; 223, transfer shaft; 224, conversion baffle; 225, arc-shaped rack; 226, through-hole; 227, conversion motor; 228, conversion gear; 229, cooling sleeve; 230, water passage cavity; 231, water spray hole; 232, water pipe; 233, electric water control valve; 234, water supply ring; 235, drainage pipe; 236, drainage ring; 237, branch pipe; 238, water outlet pipe; 239, vacuum tube;

[0054] 3. Quenching guarantee component; 301. Driving motor; 302. Driving gear; 303. Driven gear; 304. Rotating head; 305. Auxiliary water pipe; 306. Top spray hole; 307. Dilution water pipe; 308. Quantitative electric valve; 309. Diverter box; 310. Diverter hole; 311. Feed pipe; 312. Circulating water valve; 313. Filter; 314. Temporary storage tank; 315. Circulating inlet pipe; 316. Circulating outlet pipe; 317. Stirring motor; 318. Stirring plate; 319. Exhaust port; 320. Sealing baffle; 321. Pull rod; 322. Drainage fan. DETAILED DESCRIPTION

[0055] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0056] Example: Figure 1 As shown, the present invention provides a technical solution for a heat treatment process of a metal connecting link, comprising the following steps:

[0057] S1, material placement process, place a limiting orifice plate 217 into the limiting opening 216 on one side of the same vertical plane, place the quenched link rings in sequence between the adjacent partition frames 215 on the corresponding placement frames 214, and after all the gaps on the placement frames 214 on the support platform 211 are placed, place another limiting orifice plate 217 into the limiting opening 216 on the other side of the same vertical plane;

[0058] S2, quenching and heating process, use fixing screws to connect the corresponding connecting platform 219 with the connecting ear 218. After the connection is completed, control the corresponding lifting cylinder 220 to operate, and the lifting cylinder 220 drives the connecting platform 219 and the supporting platform 211 to move, so that the supporting platforms 211 connected to the supporting rod 213 enter the adjacent heating cylinder 207, the external air pump is started, and the induction coil 208 is operated;

[0059] S3, quenching and cooling process, the conversion motor 227 drives the conversion baffle 224 at the bottom of the heating cylinder 207 to rotate around the central shaft 223, so that the conversion baffle 224 is separated from the bottom of the heating cylinder 207, and the side lifting cylinder 220 is controlled to drive the support platform 211 to descend, so that the support platform 211 is immersed in the quenching liquid inside the liquid storage tank 201 for cooling;

[0060] S4, quenching and cleaning process, the lifting cylinder 220 drives the connecting platform 219 to rise and enter the interior of the heating cylinder 207, the conversion baffle 224 moves, the bottom of the heating cylinder 207 is sealed, the corresponding electric water control valve 233 is opened, the water inside the water delivery ring 234 is passed into the water passage cavity 230 through the water delivery pipe 232, and sprayed out from the water spray hole 231, the driving motor 301 drives the support platform 211 to rotate, and all parts of the surface of the connecting ring are cleaned;

[0061] S5, drying and discharging process, after cleaning is completed, close the corresponding electric water control valve 233, the induction coil 208 outside the heating cylinder 207 is started, and the internal chain ring is dried. After drying is completed, the lifting cylinder 220 moves the support platform 211 out of the heating cylinder 207, separates the connecting platform 219 from the connecting ear 218, pulls out one side limit hole plate 217, and moves the placed chain ring out from the placement frame 214.

[0062] like Figure 2-13 As shown;

[0063] The invention comprises a base 1, a high-efficiency quenching assembly 2 is arranged on the top of the base 1, and the high-efficiency quenching assembly 2 comprises a liquid storage tank 201, a mounting plate 202, a sealing cylinder 203, a sealing bottom plate 204, an isolation cylinder 205, an isolation plate 206, a heating cylinder 207, an induction coil 208, a sealing cover 209, a feed port 210, a support platform 211, a connecting port 212, a support rod 213, a placing frame 214, a partition frame 215, a limiting port 216, a limiting orifice plate 217, and a connecting ear 2 18. Connecting platform 219, lifting cylinder 220, connecting suspension 221, lifting pipe 222, central shaft 223, conversion baffle 224, arc-shaped rack 225, through-hole 226, conversion motor 227, conversion gear 228, cooling sleeve 229, water passage cavity 230, water spray hole 231, water delivery pipe 232, electric water control valve 233, water delivery ring 234, drainage pipe 235, drainage ring 236, branch pipe 237, water outlet pipe 238 and vacuum tube 239;

[0064] A liquid storage tank 201 is installed on the top of the base 1, a mounting plate 202 is installed on the top of the liquid storage tank 201, a sealing cylinder 203 is installed on the top of the mounting plate 202, a sealing bottom plate 204 is installed on the bottom of the sealing cylinder 203, an isolation cylinder 205 is installed on the middle opening of the top of the sealing bottom plate 204, and isolation plates 206 are evenly arranged between the outer side of the isolation cylinder 205 and the sealing cylinder 203. The isolation plates 206 are electromagnetic shielding plates, and the isolation plates 206 can isolate the various induction coils 208 to prevent the magnetic fields generated by the induction coils 208 from affecting each other;

[0065] A heating cylinder 207 is installed between two adjacent isolation plates 206, an induction coil 208 is installed outside the heating cylinder 207, a sealing cover 209 is installed on the top of the sealing cylinder 203, and a feed port 210 is opened through the top of the sealing cover 209 corresponding to the top of the heating cylinder 207;

[0066] Support platforms 211 are evenly arranged inside the heating tube 207, and a connecting port 212 is opened through the middle of the support platforms 211. The support platforms 211 located inside the same heating tube 207 are connected to each other through support rods 213. A mounting frame 214 is installed on the top of a plurality of support platforms 211, and a partition frame 215 is evenly welded on the top of the mounting frame 214. Limiting openings 216 are opened through both sides of the support platforms 211, and a limiting orifice plate 217 is slidably installed between the limiting openings 216 located in the same vertical plane. Connecting ears 218 are welded on both sides of the top of the support platform 211 located at the top, and a connecting platform 219 is connected to the top of two adjacent connecting ears 218 by screws;

[0067] Lifting cylinders 220 are evenly installed on the outside of the liquid storage tank 201, and the output end of the lifting cylinder 220 is connected to a connecting suspension 221, and a lifting pipe 222 is rotatably installed on the top of the connecting suspension 221, and the bottom of the lifting pipe 222 is connected to the middle of the top of the adjacent connecting platform 219;

[0068] A rotating shaft 223 is installed at the bottom of the isolation cylinder 205, and a conversion baffle 224 is evenly connected to the outer side of the rotating shaft 223, and an arc-shaped rack 225 is connected to the top of the conversion baffle 224. A through hole 226 is evenly penetrated and opened on the outer side of the installation plate 202, and a conversion motor 227 is evenly installed at the bottom of the through hole 226 corresponding to the outer top of the liquid storage tank 201. A conversion gear 228 is connected to the output end of the conversion motor 227, and one side of the conversion gear 228 penetrates the adjacent through hole 226 and meshes with one end of the adjacent arc-shaped rack 225;

[0069] Under the rotational connection between the conversion baffle 224 and the rotating shaft 223, by controlling the corresponding conversion motor 227 to drive the conversion gear 228 to rotate, the corresponding arc-shaped rack 225 and the conversion baffle 224 can be controlled to move, and the top surface of the conversion baffle 224 is tightly fitted with the bottom surface of the sealing bottom plate 204, so that the conversion baffle 224 can seal the bottom of the heating tube 207, so that the sealing performance of the heating tube 207 is better, and the two adjacent arc-shaped racks 225 are staggered with each other. When the conversion motor 227 drives the arc-shaped rack 225 to move, the arc-shaped rack 225 has enough space to move;

[0070] A cooling sleeve 229 is installed on the outside of the sealing cylinder 203, a water passage cavity 230 is opened inside the heating cylinder 207, water spray holes 231 are evenly opened on the inside of the heating cylinder 207, a water delivery pipe 232 is connected to the top of one side of the heating cylinder 207, the water delivery pipe 232 is connected to the corresponding water passage cavity 230, the open end of the water delivery pipe 232 passes through the cooling sleeve 229 and is connected to the water outlet end of the electric water control valve 233, a water delivery ring 234 is connected between the water inlet end of the electric water control valve 233, and the water inlet end of the water delivery ring 234 is connected to the water outlet end of the external water pump;

[0071] The external water pump inputs clean water into the water delivery ring 234. When the quenching and cooling of the connecting chain ring in the corresponding heating cylinder 207 is completed, the corresponding electric water control valve 233 is controlled to open, so that the water in the water delivery ring 234 passes through the water delivery pipe 232 into the water passage cavity 230 in the heating cylinder 207, and finally sprays out from the water spray hole 231. The sprayed clean water flushes the connecting chain ring on the mounting frame 214 in the heating cylinder 207, and cleans the connecting chain ring;

[0072] A drain pipe 235 is connected to the bottom of the inner side of the heating cylinder 207, and a drain ring 236 is installed on the outer side of the cooling sleeve 229. The open end of the drain pipe 235 passes through the cooling sleeve 229 and is connected to one side of the drain ring 236. The cleaned water is collected into the drain ring 236 through the drain pipe 235, which is convenient for the centralized treatment of the cleaned water.

[0073] The input ends of the induction coil 208, the conversion motor 227 and the electric water control valve 233 are electrically connected to the output end of the external controller, and the input end of the external controller is electrically connected to the output end of the external power supply. The corresponding electrical components are controlled by the external controller, which is more convenient and faster, and has a higher degree of automation.

[0074] One side of the water inlet end of the electric water control valve 233 is connected with a branch pipe 237, the other end of the branch pipe 237 is connected to the inner top of the cooling sleeve 229, and the outer bottom of the cooling sleeve 229 is connected with a water outlet pipe 238. When the link is quenched, the water inside the water delivery ring 234 enters the cavity between the cooling sleeve 229 and the sealing cylinder 203 from the branch pipe 237, and the flowing clean water quickly drives the heat on the sealing cylinder 203, making the on-site working environment more comfortable;

[0075] The sealing cylinder 203 is connected to a vacuum tube 239 at the position corresponding to each heating cylinder 207. The other end of the vacuum tube 239 passes through the cooling sleeve 229 and is connected to the suction end of the external vacuum pump. Before the induction coil 208 is connected to the chain link for heating, the conversion baffle 224 seals the bottom of the heating cylinder 207, and the connecting platform 219 seals the feed port 210 at the top of the heating cylinder 207. The space corresponding to the heating cylinder 207 is in a sealed state. The external air pump draws out the air in the corresponding space, making the corresponding space in a vacuum state. When the chain link is heated, the reaction between the surface of the connecting link and the oxygen in the air to form oxide scale can be greatly reduced, thereby greatly improving the quenching quality.

[0076] A quenching support component 3 is provided on the top of the base 1, and the quenching support component 3 includes a driving motor 301, a driving gear 302, a driven gear 303, a rotating head 304, an auxiliary water pipe 305, a top spray hole 306, a dilution water pipe 307, a quantitative electric valve 308, a diversion box 309, a diversion hole 310, a feed pipe 311, a circulating water valve 312, a filter screen 313, a temporary storage tank 314, a circulating inlet pipe 315, a circulating outlet pipe 316, a stirring motor 317, a stirring plate 318, a debris discharge port 319, a sealing baffle 320, a pull rod 321 and a drainage fan 322;

[0077] A driving motor 301 is installed at one end of the top of the connecting suspension 221, and a driving gear 302 is connected to the output end of the driving motor 301. A driven gear 303 is connected to the top of the outer side of the lifting tube 222, and the driving gear 302 and the driven gear 303 are meshed with each other. A rotating head 304 is connected to the top of the lifting tube 222, and an auxiliary water pipe 305 is connected to the other end of the rotating head 304. A top spray hole 306 is opened through the bottom of the inner side of the connecting platform 219;

[0078] A dilution water pipe 307 is connected between the bottom side of the water delivery ring 234 and the top of one side of the liquid storage tank 201, a quantitative electric valve 308 is installed in the middle of the dilution water pipe 307, a diversion box 309 is installed on one side of the liquid storage tank 201, one end of the dilution water pipe 307 is connected to the top of one side of the diversion box 309, and one side of the diversion box 309 is evenly provided with diversion holes 310;

[0079] A feed pipe 311 is connected to the top of one side of the liquid storage tank 201, a circulating water valve 312 is connected to the bottom of one side of the liquid storage tank 201, a filter screen 313 is installed inside the circulating water valve 312, a temporary storage tank 314 is arranged on the outside of the liquid storage tank 201, a circulating inlet pipe 315 is connected between the bottom of the temporary storage tank 314 and the circulating water valve 312, and a circulating outlet pipe 316 is connected to the top of one side of the temporary storage tank 314;

[0080] A stirring motor 317 is installed in the middle of the bottom of the liquid storage tank 201, and a stirring plate 318 is connected to the output end of the stirring motor 317. A debris discharge port 319 is opened on one side of the bottom of the liquid storage tank 201. A sealing baffle 320 is rotatably installed at the bottom of the liquid storage tank 201, and a pull rod 321 is connected to the top of the sealing baffle 320. A drainage fan 322 is installed on the top of the isolation cylinder 205. The drainage fan 322 can cool the quenching liquid inside the liquid storage tank 201 to prevent the quenching liquid from being too high in temperature.

[0081] When there are many impurities in the quenching liquid, open the circulating water valve 312 to transfer the quenching liquid in the liquid storage tank 201 to the temporary storage tank 314. Under the filtering action of the filter 313, the impurities in the quenching liquid fall into the bottom of the liquid storage tank 201. When the quenching liquid is completely transferred to the temporary storage tank 314, place a collection container at the bottom of the impurity discharge port 319, pull the pull rod 321 to drive the sealing baffle 320 to move, and the stirring plate 318 rotates to push the impurities in the liquid storage tank 201 to be discharged from the impurity discharge port 319. After the impurities are discharged, move the sealing baffle 320 to seal the impurity discharge port 319, connect the circulating outlet pipe 316 and the feed pipe 311, and the temporarily stored quenching liquid in the temporary storage tank 314 flows back into the liquid storage tank 201 through the circulating outlet pipe 316 and the feed pipe 311 for reuse.

[0082] The stirring motor 317 drives the stirring plate 318 to rotate, and the stirring plate 318 drives the quenching liquid in the liquid storage tank 201 to stir. When the connecting link contacts the quenching liquid, the cooling speed of the connecting link is accelerated, and the quenching liquid can be prevented from being stratified, so that the quenching effect is better;

[0083] The top surface of the sealing baffle 320 is closely fitted with the outer bottom surface of the liquid storage tank 201 to prevent the quenching liquid from overflowing from the contact between the sealing baffle 320 and the impurity discharge port 319, so that the sealing is better. The bottom of the stirring plate 318 is in contact with the inner bottom surface of the liquid storage tank 201. The rotation of the stirring plate 318 can push the impurities inside the liquid storage tank 201 to be discharged from the impurity discharge port 319, so that the impurity removal effect is better.

[0084] The input ends of the driving motor 301, the quantitative electric valve 308, the stirring motor 317 and the drainage fan 322 are electrically connected to the output end of the external controller, and the corresponding electrical components are controlled by the external controller to facilitate automatic control.

[0085] The working principle and use process of the present invention are as follows: a limiting orifice plate 217 is placed inside the limiting opening 216 on one side of the same vertical plane, and the quenched connecting chain rings are placed in turn between the adjacent partition frames 215 on the corresponding placement frame 214. The partition frames 215 play an isolating role to prevent the connecting chain rings from sticking together during quenching. After all the gaps on the placement frames 214 on the support platform 211 are placed, another limiting orifice plate 217 is placed inside the limiting opening 216 on the other side of the same vertical plane. The limiting orifice plate 217 is placed on the placement frame 214 to place the connecting chain ring for limiting, so as to prevent the connecting chain ring from falling off the placement frame 214 during the subsequent processing;

[0086] After the installation of the limiting orifice plate 217 is completed, the corresponding connecting platform 219 is connected to the connecting ear 218 with fixing screws. After the connection is completed, the corresponding lifting cylinder 220 is controlled to operate, and the lifting cylinder 220 drives the connecting platform 219 and the supporting platform 211 to move, so that the supporting platforms 211 connected to the supporting rod 213 enter the adjacent heating cylinder 207. When the top surface of the connecting platform 219 is flush with the feed port 210, the output end of the lifting cylinder 220 stops moving;

[0087] At this time, the conversion baffle 224 seals the bottom of the heating cylinder 207, and the connecting platform 219 seals the feed port 210 on the top of the heating cylinder 207. At this time, the space corresponding to the heating cylinder 207 is in a sealed state, and the external air pump is started to pump out the air in the corresponding space, so that the corresponding space is in a vacuum state, and the corresponding induction coil 208 is started, and the induction coil 208 heats the connecting link inside the heating cylinder 207. When the connecting link is heated, the vacuum environment greatly reduces the reaction between the surface of the connecting link and the oxygen in the air to form oxide scale, thereby improving the quenching quality;

[0088] At the same time, when the induction coil 208 heats the connecting link inside the heating cylinder 207, the above process is repeated to place the connecting link on the placing frame 214 on another supporting platform 211, and the supporting platform 211 with the connecting link placed thereon is sequentially sent into the remaining free heating cylinders 207 by the adjacent lifting cylinder 220, so as to heat the connecting link batch by batch.

[0089] During the heating process of the docking chain link, the external water pump delivers clean water to the inside of the water delivery ring 234. The clean water inside the water delivery ring 234 enters the cavity between the cooling sleeve 229 and the sealing cylinder 203 from the branch pipe 237. The flowing clean water quickly drives the heat on the sealing cylinder 203, reduces the temperature of the space environment, and makes the on-site working environment more comfortable.

[0090] When the heating of the connecting link inside a heating cylinder 207 is completed, the conversion motor 227 corresponding to the bottom of the heating cylinder 207 is started, and the conversion motor 227 drives the conversion gear 228 to rotate. Under the gear connection, the conversion motor 227 drives the conversion baffle 224 at the bottom of the heating cylinder 207 to rotate around the central shaft 223, so that the conversion baffle 224 is separated from the bottom of the heating cylinder 207, and the side lifting cylinder 220 is controlled to drive the support platform 211 to descend, so that the support platform 211 is immersed in the quenching liquid inside the liquid storage tank 201 for cooling. The support platform 211, the mounting frame 214 and the support rod 213 are made of high-temperature resistant industrial ceramics, which can withstand high temperatures and cool quickly without breaking under high temperature conditions;

[0091] During quenching and cooling, the stirring motor 317 drives the stirring plate 318 to rotate at all times, and the stirring plate 318 drives the quenching liquid inside the liquid storage tank 201 to stir. When the connecting link contacts the quenching liquid, the cooling speed of the connecting link is accelerated, and the quenching liquid can be prevented from being stratified, so that the quenching effect is better;

[0092] After cooling in the quenching liquid is completed, the lifting cylinder 220 on this side drives the connecting platform 219 to rise, so that the cooled connecting chain ring returns to the inside of the heating cylinder 207. After the supporting platform 211 enters the inside of the heating cylinder 207, the driving motor 301 on the connecting suspension 221 connected to the output end of the lifting cylinder 220 is started. Under the connection between the driving gear 302 and the driven gear 303, the driving motor 301 drives the supporting platform 211 to rotate. Under the action of centrifugal force, the residual quenching liquid on the surface of the supporting platform 211, the supporting rod 213, the placing frame 214 and the connecting chain ring is thrown off, and the thrown off quenching liquid drips into the liquid storage tank 201 along the inner wall of the heating cylinder 207, which greatly reduces the waste of quenching liquid.

[0093] After the driving motor 301 rotates for a period of time, the speed of the output end of the driving motor 301 slows down, and the conversion motor 227 corresponding to the heating cylinder 207 drives the conversion baffle 224 to move, so as to seal the bottom of the heating cylinder 207, and control the corresponding electric water control valve 233 to open, and the water inside the water delivery ring 234 passes through the water delivery pipe 232 into the water passage cavity 230 inside the heating cylinder 207, and finally sprays out from the water spray hole 231, and the sprayed clean water flushes the connecting chain ring on the mounting frame 214 inside the heating cylinder 207, and cleans the connecting chain ring. With the rotation of the driving motor 301, the clean water sprayed from the water spray hole 231 can clean various parts of the surface of the connecting chain ring, and the cleaning effect is better;

[0094] At the same time, the external water pump delivers clean water to the auxiliary water pipe 305. Under the connection of the rotating head 304, the auxiliary water pipe 305 will not be driven to rotate when the lifting pipe 222 rotates. The clean water delivered by the external water pump flows through the auxiliary water pipe 305 and the lifting pipe 222 into the interior of the connecting platform 219, and finally sprays out from the top spray hole 306. The sprayed clean water passes through the connecting port 212 on the supporting platform 211 and contacts the connecting chain ring on the mounting frame 214, and cooperates with the flushing of the water spray hole 231, thereby further improving the cleaning speed and cleaning quality.

[0095] A drainage pipe 235 is connected to the bottom of the inner side of the heating cylinder 207. The water after cleaning is collected into the drainage ring 236 through the drainage pipe 235, which is convenient for centralized treatment of the cleaning water. After cleaning, the corresponding electric water control valve 233 is closed, and the induction coil 208 outside the heating cylinder 207 is started to dry the internal chain ring. After drying, the lifting cylinder 220 moves the support platform 211 out of the heating cylinder 207, separates the connecting platform 219 from the connecting ear 218, and pulls out the limiting orifice plate 217 on one side, and moves the placed chain ring out of the mounting frame 214. After moving out, a new chain ring can be replaced.

[0096] The connecting links in the subsequent heating cylinder 207 repeat the above steps, and the connecting links are heated, cooled, cleaned and dried in sequence. Multiple heating cylinders 207 are used to process the connecting links in batches, and the entire equipment does not need to be stopped in the middle, so the processing efficiency is high.

[0097] After the quenching liquid is used for a long time, the water in the quenching liquid will evaporate into water vapor and fly away as the connecting ring cools, which increases the concentration of the quenching liquid. The increase in the concentration of the quenching liquid will reduce the quenching cooling speed. When the concentration of the quenching liquid increases, the quantitative electric valve 308 is controlled to allow the clean water inside the water delivery ring 234 to enter the diversion box 309 through the dilution water pipe 307, and finally be evenly transported to the inside of the liquid storage tank 201 from the diversion hole 310. The stirring motor 317 drives the stirring plate 318 to rotate, which can quickly dilute the quenching liquid and prevent the increase in the quenching liquid concentration from affecting the quenching cooling of the connecting ring.

[0098] When there are many impurities in the quenching liquid, open the circulating water valve 312 to transfer the quenching liquid in the liquid storage tank 201 to the temporary storage tank 314. Under the filtering action of the filter 313, the impurities in the quenching liquid fall into the bottom of the liquid storage tank 201. When the quenching liquid is completely transferred to the temporary storage tank 314, a collection container is placed at the bottom of the impurity discharge port 319, and the pull rod 321 is pulled to drive the sealing baffle 320 to move. The stirring plate 318 rotates to push the impurities in the liquid storage tank 201 to be discharged from the impurity discharge port 319. After the impurities are discharged, the sealing baffle 320 is moved to seal the impurity discharge port 319, and the circulating outlet pipe 316 and the feed pipe 311 are connected. The temporarily stored quenching liquid in the temporary storage tank 314 is then returned to the liquid storage tank 201 through the circulating outlet pipe 316 and the feed pipe 311 for reuse.

[0099] Finally, it should be noted that the above description is only a preferred example of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A heat treatment process for a metal link, characterized in that: The steps include: S1, material placement process, placing a limiting orifice plate (217) into a limiting opening (216) on one side of the same vertical plane, placing the quenched link rings in sequence between adjacent partition frames (215) on the corresponding placement frames (214), and after all the gaps on the placement frames (214) on the support platforms (211) are placed, placing another limiting orifice plate (217) into the limiting opening (216) on the other side of the same vertical plane; S2, a quenching and heating process, using fixing screws to connect the corresponding connecting platform (219) and the connecting ear (218), after the connection is completed, the corresponding lifting cylinder (220) is controlled to operate, and the lifting cylinder (220) drives the connecting platform (219) and the supporting platform (211) to move, so that the supporting platforms (211) connected by the supporting rod (213) enter the adjacent heating cylinder (207), the external air pump is started, and the induction coil (208) is operated; S3, a quenching and cooling process, wherein the conversion motor (227) drives the conversion baffle (224) at the bottom of the heating cylinder (207) to rotate around the central shaft (223), so that the conversion baffle (224) is separated from the bottom of the heating cylinder (207), and the side lifting cylinder (220) is controlled to drive the support platform (211) to descend, so that the support platform (211) is immersed in the quenching liquid inside the liquid storage tank (201) for cooling; S4, quenching and cleaning process, the lifting cylinder (220) drives the connecting platform (219) to rise and enter the interior of the heating cylinder (207), the conversion baffle (224) moves, the bottom of the heating cylinder (207) is sealed, the corresponding electric water control valve (233) is opened, the water inside the water supply ring (234) is passed into the water passage cavity (230) through the water supply pipe (232), and is sprayed out from the water spray hole (231), the driving motor (301) drives the support platform (211) to rotate, and various parts of the surface of the connecting ring are cleaned; S5, drying and discharging process, after the cleaning is completed, the corresponding electric water control valve (233) is closed, the induction coil (208) outside the heating cylinder (207) is started, and the internal chain connecting ring is dried. After the drying is completed, the lifting cylinder (220) moves the support platform (211) out of the heating cylinder (207), separates the connecting platform (219) from the connecting ear (218), and pulls out the one side limit hole plate (217), and moves the placed chain connecting ring out of the placement frame (214); A high-efficiency quenching component (2) is arranged on the top of the base platform (1), and the high-efficiency quenching component (2) comprises a liquid storage tank (201); A liquid storage tank (201) is installed on the top of the base (1), a mounting plate (202) is installed on the top of the liquid storage tank (201), a sealing cylinder (203) is installed on the top of the mounting plate (202), a sealing bottom plate (204) is installed on the bottom of the sealing cylinder (203), an isolation cylinder (205) is installed in the middle opening of the top of the sealing bottom plate (204), isolation plates (206) are evenly arranged between the outer side of the isolation cylinder (205) and the sealing cylinder (203), a heating cylinder (207) is installed between two adjacent isolation plates (206), an induction coil (208) is installed on the outer side of the heating cylinder (207), a sealing cover (209) is installed on the top of the sealing cylinder (203), and a feed port (210) is opened through the top of the sealing cover (209) corresponding to the top of the heating cylinder (207); Support platforms (211) are evenly arranged inside the heating tube (207), a connecting port (212) is provided through the middle of the support platforms (211), the support platforms (211) located inside the same heating tube (207) are connected to each other through support rods (213), a plurality of support platforms (211) are installed with mounting frames (214) on the top, a partition frame (215) is evenly welded on the top of the mounting frames (214), limiting openings (216) are provided through the sides of the support platforms (211), limiting orifice plates (217) are slidably installed between the limiting openings (216) located on the same vertical plane, connecting ears (218) are welded on both sides of the top of the support platform (211) located at the top, and the tops of two adjacent connecting ears (218) are connected to connecting platforms (219) by screws; Lifting cylinders (220) are evenly installed on the outside of the liquid storage tank (201), the output end of the lifting cylinder (220) is connected to a connecting suspension (221), a lifting tube (222) is rotatably installed on the top of the connecting suspension (221), and the bottom of the lifting tube (222) is connected to the middle of the top of the adjacent connecting platform (219); A central rotating shaft (223) is installed at the bottom of the isolation cylinder (205), a conversion baffle (224) is evenly connected to the outside of the central rotating shaft (223) for rotation, an arc-shaped rack (225) is connected to the top of the conversion baffle (224), a through-hole (226) is evenly penetrated through the outside of the mounting plate (202), a conversion motor (227) is evenly installed at the bottom of the top of the outside of the liquid storage tank (201) corresponding to the through-hole (226), a conversion gear (228) is connected to the output end of the conversion motor (227), and one side of the conversion gear (228) penetrates the adjacent through-hole (226) and meshes with one end of the adjacent arc-shaped rack (225); A cooling sleeve (229) is installed on the outside of the sealing sleeve (203); a water passage cavity (230) is provided inside the heating sleeve (207); water spray holes (231) are evenly provided on the inside of the heating sleeve (207); a water delivery pipe (232) is connected to the top of one side of the heating sleeve (207); the water delivery pipe (232) is in communication with the corresponding water passage cavity (230); an open end of the water delivery pipe (232) passes through the cooling sleeve (229) and is connected to the water outlet end of the electric water control valve (233); a water delivery ring (234) is connected between the water inlet end of the electric water control valve (233); and the water inlet end of the water delivery ring (234) is connected to the water outlet end of an external water pump; The bottom of the inner side of the heating cylinder (207) is connected to a drainage pipe (235), the outer side of the cooling sleeve (229) is provided with a drainage ring (236), and the open end of the drainage pipe (235) passes through the cooling sleeve (229) and is connected to one side of the drainage ring (236); One side of the water inlet end of the electric water control valve (233) is connected to a branch pipe (237), the other end of the branch pipe (237) is connected to the inner top of the cooling sleeve (229), and the outer bottom of the cooling sleeve (229) is connected to a water outlet pipe (238); The sealing cylinder (203) is connected to a vacuum tube (239) at a position corresponding to each heating cylinder (207), and the other end of the vacuum tube (239) passes through the cooling sleeve (229) and is connected to an air suction end of an external vacuum pump; A quenching guarantee component (3) is arranged on the top of the base (1), and the quenching guarantee component (3) comprises a driving motor (301); A driving motor (301) is installed at one end of the top of the connecting suspension (221); the output end of the driving motor (301) is connected to a driving gear (302); the top of the outer side of the lifting tube (222) is connected to a driven gear (303); the driving gear (302) and the driven gear (303) are meshed with each other; the top of the lifting tube (222) is connected to a rotating head (304); the other end of the rotating head (304) is connected to an auxiliary water pipe (305); and a top spray hole (306) is provided through the bottom of the inner side of the connecting platform (219); A dilution water pipe (307) is connected between the bottom side of the water delivery ring (234) and the top of one side of the liquid storage tank (201); a quantitative electric valve (308) is installed in the middle of the dilution water pipe (307); a diversion box (309) is installed on one side of the liquid storage tank (201); one end of the dilution water pipe (307) is connected to the top of one side of the diversion box (309); and diversion holes (310) are evenly opened on one side of the diversion box (309); A feed pipe (311) is connected to the top of one side of the liquid storage tank (201), a circulating water valve (312) is connected to the bottom of one side of the liquid storage tank (201), a filter screen (313) is installed inside the circulating water valve (312), a temporary storage tank (314) is provided on the outside of the liquid storage tank (201), a circulating inlet pipe (315) is connected between the bottom of the temporary storage tank (314) and the circulating water valve (312), and a circulating outlet pipe (316) is connected to the top of one side of the temporary storage tank (314); A stirring motor (317) is installed in the middle of the bottom of the liquid storage tank (201), and the output end of the stirring motor (317) is connected to a stirring plate (318). A debris discharge port (319) is opened on one side of the bottom of the liquid storage tank (201). A sealing baffle (320) is rotatably installed at the bottom of the liquid storage tank (201), and a pull rod (321) is connected to the top of the sealing baffle (320). A drainage fan (322) is installed on the top of the isolation cylinder (205).

2. A heat treatment process for a metal link according to claim 1, characterized in that: The top surface of the conversion baffle (224) is tightly fitted to the bottom surface of the sealing bottom plate (204), and two adjacent arc-shaped racks (225) are offset from each other.

3. The heat treatment process of a metal connecting link according to claim 1, characterized in that: The input ends of the induction coil (208), the conversion motor (227) and the electric water control valve (233) are electrically connected to the output end of the external controller, and the input end of the external controller is electrically connected to the output end of the external power supply.

4. The heat treatment process of a metal connecting link according to claim 1, characterized in that: The bottom of the stirring plate (318) is in contact with the inner bottom surface of the liquid storage tank (201), and the top surface of the sealing baffle (320) is in contact with the outer bottom surface of the liquid storage tank (201); The input ends of the driving motor (301), the quantitative electric valve (308), the stirring motor (317) and the drainage fan (322) are electrically connected to the output end of the external controller.

Citation Information

Patent Citations

  • Ring part heat treatment system

    CN115558771A