A prefabricated steel structure component for building construction and construction method thereof

By adopting locking components and sliding rod structures in prefabricated steel structure components for building construction, the problems of sleeve sliding in and outer column insert sliding during construction are solved, and fast and accurate column installation is achieved, reducing manpower demand and An error occurred.

CN117966907BActive Publication Date: 2024-11-12JILIN YUEYANG STEEL STRUCTURE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410183716.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-02-19
Publication Date
2024-11-12
Estimated Expiration
2044-02-19

AI Technical Summary

Technical Problem

In the construction of modular prefabricated building, construction personnel need to slide the pre-prepared built-in sleeve into the column and initially fix it with bolts, but it is not locked, resulting in the outer panel of the column being slideable, resulting in cumbersome assembly process and need Multiple personnel cooperate and are prone to loosening and falling off or misalignment.

Method used

A prefabricated steel structure component for building construction is designed, including base, column and built-in sleeve. It adopts locking assembly and sliding rod structure, and realizes the locking of the sleeve and the fastness of the outer column patch panel by rotating the cross knob and rotating ring. Align and secure to ensure proper installation of the columns.

Benefits of technology

The construction process is simplified, labor demand is reduced, and the loosening of the outer columns and misalignment of the columns is avoided, which improves construction efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117966907B_ABST
    Figure CN117966907B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of steel structure assembly, and specifically is an assembled steel structure component for building construction and a construction method thereof; the component comprises a base, a column one and a column two, the top end of the base is fixedly connected to the column one, the top end of the column one is fitted with the bottom end of the column two, the four side outer walls of the connection between the column one and the column two are provided with column outer plates, the top end of the column one is fixedly connected to the four side outer walls, a group of support plates are provided on the support plates, the bottom end of the column outer plate is matched with the locking assembly, and the column outer plate is provided with an opening one; the present invention solves the problem that the traditional steel structure assembly process is relatively cumbersome, requires the cooperation of multiple construction workers to complete, and is very likely to cause the column outer plate to loosen and fall off or the second-floor columns to be misaligned during the assembly process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of steel structure assembly, in particular to an assembled steel structure component for building construction and a construction method thereof. Background Art

[0002] Steel structure refers to a structural form that uses steel materials as the main load-bearing components, mainly composed of steel. Steel structure is widely used in high-rise buildings, bridges, large-span houses and other buildings because of its light weight, high strength, fast construction speed, good corrosion resistance and reusability.

[0003] In the prior art, when modular prefabricated building construction is carried out, the columns, base and beams are generally used as a first-layer frame, and new columns and beams are built on the columns of the first-layer frame as a second-layer frame, and so on. This steel structure assembly method for building a building is not only convenient for construction workers to quickly build the main body of the building, but also convenient for workers to quickly disassemble and recycle when the building needs to be demolished; however, when construction workers build columns above the first layer, they usually need to slide the pre-prepared built-in sleeve into the first-layer column, and fix the sleeve by hand until it does not slip, and then use bolts to preliminarily fix the column outer plate, the first-layer column and the built-in sleeve together, but do not lock the bolts, so that when the second-layer column is placed later, the column outer plate can slide slightly outward, so that the construction workers can slide the column between the four column outer plates and align it with the top of the first-layer column. The assembly process of this steel structure is relatively cumbersome and requires the cooperation of multiple construction workers. In addition, it is very easy for the column outer plate to loosen and fall off or the second-layer column to be misplaced during the assembly process.

[0004] To this end, the present invention provides a prefabricated steel structure component for building construction and a construction method thereof. Summary of the invention

[0005] In order to make up for the shortcomings of the prior art and solve the problem that in the prior art, when carrying out modular prefabricated building construction, the columns, base and beams are generally used as a first-layer frame, and new columns and beams are built on the columns of the first-layer frame as a second-layer frame, and so on. This steel structure assembly method for building a building is not only convenient for construction workers to quickly build the main body of the building, but also convenient for workers to quickly disassemble and recycle when the building needs to be demolished; however, when construction workers build columns above one layer, they usually need to slide the pre-prepared built-in sleeves into the columns of the first layer, and then use their hands to While fixing the inner sleeve to prevent it from slipping, the column outer plate, the first-layer column and the built-in sleeve are initially fixed together by bolts, but the bolts are not locked, so that when the second-layer column is placed later, the column outer plate can slide slightly outward to facilitate the construction workers to slide the column between the four column outer plates and align it with the top of the first-layer column. The assembly process of this steel structure is relatively cumbersome and requires the cooperation of multiple construction workers. In addition, it is very easy for the column outer plate to loosen and fall off or the second-layer column to be misplaced during the assembly process. The present invention proposes an assembled steel structure component for building construction and a construction method thereof.

[0006] The technical solution applicable to the present invention for solving its technical problem is: the present invention is a prefabricated steel structure component for building construction, including a base, a column one and a column two, the top of the base is fixedly connected to the column one, the top of the column one is matched with the bottom of the column two, the four side outer walls of the connection between the column one and the column two are provided with column outer plates, the top of the column one is fixedly connected to the four side outer walls, a group of support plates are provided on the support plates, and the bottom of the column outer plate is matched with the locking component. The column outer plate is provided with an opening one, and the four side outer walls of the column one are each provided with an opening two, the opening one is adapted to the opening two, and the inner cavity connection of the column one and the column two is provided with a built-in sleeve, and four arc grooves two are provided in the built-in sleeve, and an arc plate is slidably connected in the arc groove two, and the outer end of the arc plate passes through the opening one and the opening two, and a spring two is fixedly connected between the inner end of the arc plate and the inner wall of the arc groove two, and a retaining bolt is threadedly connected to the bottom of the outer end of the arc plate.

[0007] Preferably, the locking assembly includes a fixed frame and a rotating ring, the fixed frame is composed of two circular plates and a circular rod, the two ends of the circular rod respectively extend to the outside of the two circular plates, the rotating ring is located between the two circular plates, and elastic sliding units are provided between the rotating ring and the two circular plates, a slot is provided on the outer wall of the rotating ring, the column outer plate is fitted with the slot, a ratchet locking unit is provided between the rotating ring and the circular rod, a locking unit is provided between the circular plate and the support plate, and a handle is fixed to the outer wall of the rotating ring.

[0008] Preferably, the elastic sliding unit includes a positioning block and a spring four, the opposite side end faces of the two circular plates are provided with an arc groove three, the arc groove three is slidably connected with a positioning block, a spring four is fixedly connected between the positioning block and the inner wall of the arc groove three, and the positioning block is fixedly connected to the outer wall of the rotating ring.

[0009] Preferably, the ratchet locking unit includes an inner ratchet gear, a pawl and an L-shaped rod, the inner ratchet gear is fixedly connected to the inner wall of the rotating ring, a rotating shaft three is rotatably connected between the two circular plates, a pawl is fixedly connected to the rotating shaft three, the pawl is meshingly connected to the inner ratchet gear, a torsion spring is fixedly connected between the pawl and the circular plate, and both ends of the rotating shaft three extend to the outside of the two circular plates and are fixedly connected to L-shaped rods.

[0010] Preferably, the positioning unit includes an annular plate, spring three and a positioning ring, both ends of the circular rod are fixed with annular plates, spring three is fixed on the annular plate, the other end of spring three is fixed to the positioning ring, the positioning ring is slidably connected to the circular rod, a groove is provided on the support plate, the positioning ring fits into the groove, and the positioning ring consists of a circular ring and four protrusions.

[0011] Preferably, the built-in sleeve is provided with a stepped cavity, four circular grooves and four arc grooves 1, the stepped cavity is located on the central axis of the built-in sleeve, the stepped cavity is connected to the circular groove, arc groove 1 and arc groove 2, a sliding rod is slidably connected in the stepped cavity, the end face of the sliding rod is square, and a straight rack plate 1 is inlaid on the four side outer walls of the sliding rod, a rotating shaft 1 is rotatably connected in the circular groove, a gear 1 is fixedly connected to the rotating shaft 1, the gear 1 is meshingly connected with a straight rack plate 1, a curved rack plate is slidably connected in the curved groove 1, the curved rack plate is meshingly connected with a gear 1, a slider is fixedly connected to the curved plate, and the other end of the slider is fixedly connected to the curved rack plate.

[0012] Preferably, the top end of the sliding rod is fixedly connected to a limiting plate, one side of the limiting plate is fixedly connected to a spur rack plate 2, a spring 1 is fixedly connected between the top of the limiting plate and the top of the inner wall of the stepped cavity, a cylindrical groove is provided on the outer wall of one side of the built-in sleeve, a rotating shaft 2 is rotatably connected in the cylindrical groove, the inner side end of the rotating shaft 2 extends into the stepped cavity and is fixedly connected to a gear 2, and the gear 2 is meshingly connected to the spur rack plate 2.

[0013] Preferably, a cross knob is fixedly connected to the outer end of the second rotating shaft.

[0014] Preferably, prefabricated grooves are symmetrically formed at the top of the built-in sleeve, and rubber protrusions are evenly fixed to inner walls on both sides of the prefabricated grooves.

[0015] A construction method for an assembled steel structure component for building construction, the construction method is applicable to the assembled steel structure component for building construction described above, and the construction method comprises the following steps:

[0016] S1: When the staff builds the second column after fixing the first column to the base, they first fix the fixing frame to the four sets of support plates on the outer wall of the first column, and then insert the four column outer plates into the rotating ring to complete the initial limit;

[0017] S2: The staff rotates the cross knob to drive the second shaft to rotate, so that the arc plate is retracted into the built-in sleeve, which is convenient for sliding the built-in sleeve from the top of the column one until the arc plate pops out under the action of the second spring, and then the locking bolt is rotated outward to lock the column outer plate and the built-in sleeve;

[0018] S3: By turning the handle to drive the rotating ring and the column outer plate to rotate, the staff can quickly insert the column two and align it with the column one. After that, the column outer plate is reset and the column outer plate, column one, column two and the built-in sleeve are locked and fixed by bolts. After completing all the installation work, the fixing frame can be removed from the support plate for easy reuse.

[0019] The beneficial effects of the present invention are as follows:

[0020] 1. The present invention discloses an assembled steel structure assembly for building construction and a construction method thereof. The device solves the problem that when construction workers build columns above one layer, they usually need to slide a pre-prepared built-in sleeve into the column of the first layer, and then fix the sleeve by hand to prevent it from slipping, and then preliminarily fix the column outer plate, the first layer of column and the built-in sleeve together by bolts, but do not lock the bolts, so that when placing the second layer of columns later, the column outer plate can slide slightly outward, so that the construction workers can slide the column between the four column outer plates and align it with the top of the first layer of columns. The assembly process of this steel structure is relatively cumbersome and requires the cooperation of multiple construction workers. In addition, the problem of the column outer plate loosening and falling off or the second layer of columns being misaligned may easily occur during the assembly process.

[0021] 2. The present invention describes an assembled steel structure assembly for building construction and a construction method thereof. Through the cooperation between four straight rack plates, four gears and four arc-shaped rack plates on the sliding rod, when a worker slides a limit plate, the other limit plates on the four sides of the built-in sleeve will slide accordingly, which greatly facilitates the installation operation of the worker. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The present invention will be further described below in conjunction with the accompanying drawings.

[0023] Figure 1 It is a three-dimensional diagram of the pillar 1 and the pillar 2 of the present invention;

[0024] Figure 2 It is a cross-sectional view of the connection between the first column and the second column of the present invention;

[0025] Figure 3 yes Figure 2 A partial enlarged view of the middle part;

[0026] Figure 4 yes Figure 2 A partial enlarged view of point B in the middle;

[0027] Figure 5 yes Figure 2 A partial enlarged view of point C in the middle;

[0028] Figure 6 is a cross-sectional view of the fixing frame of the present invention;

[0029] Figure 7 yes Figure 6 A partial enlarged view of point D in the middle;

[0030] Figure 8 It is an exploded view of the fixing frame of the present invention;

[0031] Fig. 9 It is a schematic diagram of the limiting plate of the present invention;

[0032] Fig.10 is a cross-sectional view of the built-in sleeve of the present invention;

[0033] In the figure: 1, base; 2, column 1; 3, column 2; 4, column outer plate; 5, built-in sleeve; 6, stepped cavity; 7, cylindrical groove; 8, circular groove; 9, arc groove 1; 10, arc groove 2; 11, prefabricated groove; 12, spring 1; 13, limit plate; 14, sliding rod; 15, straight rack plate 1; 16, gear 1; 17, rotating shaft 1; 18, arc rack plate; 19, slider; 20, arc plate; 21, spring 2 ; 22. Gear 2; 23. Straight rack plate 2; 24. Rotating shaft 2; 25. Cross knob; 26. Stop bolt; 27. Support plate; 28. Fixed frame; 29. ​​Rotating ring; 30. Slot; 31. Internal ratchet gear; 32. Positioning block; 33. Handle; 34. Ring plate; 35. Spring 3; 36. Positioning ring; 37. Arc groove 3; 38. Spring 4; 39. Rotating shaft 3; 40. Ratchet; 41. Torsion spring; 42. L-shaped rod. DETAILED DESCRIPTION

[0034] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0035] like Figure 1-Figure 10As shown, an assembled steel structure component for building construction described in an embodiment of the present invention includes a base 1, a column 1 2 and a column 2 3, the top of the base 1 is fixedly connected to the column 1 2, the top of the column 1 2 is matched with the bottom of the column 2 3, the four side outer walls of the connection between the column 1 2 and the column 2 3 are provided with column outer plates 4, the top of the column 1 2 is fixedly connected to the four side outer walls, the support plate 27 is provided with a locking component, the bottom end of the column outer plate 4 is matched with the locking component, the column outer plate 4 is provided with an opening 1, the four side outer walls of the column 1 2 are provided with an opening 2, the opening 1 is connected to the opening 2 Adaptation, the inner cavity connection of the column 1 2 and the column 2 3 is provided with a built-in sleeve 5, and four arc grooves 2 10 are provided in the built-in sleeve 5, and an arc plate 20 is slidably connected in the arc groove 2 10, and the outer end of the arc plate 20 passes through the opening 1 and the opening 2, and a spring 21 is fixed between the inner end of the arc plate 20 and the inner wall of the arc groove 2 10, and a locking bolt 26 is threadedly connected to the bottom of the outer end of the arc plate 20; when working, after the staff fixes the column 1 2 and the base 1 to build the column 2 3, they first fix the locking assembly to the four groups of support plates 27 on the top of the outer wall of the column 1 2, and then fix the four columns The outer plate 4 is inserted into the locking assembly to complete the initial limit. After that, the staff presses the four arc plates 20 on the built-in sleeve 5 so that the built-in sleeve 5 can slide in from the top of the column 1 2 until the arc plate 20 corresponds to the opening 2 on the column 1 2. The arc plate 20 pops out of the opening 1 and the opening 2 under the elastic force of the spring 21, and the end of the locking bolt 26 slides out and limits the outer plate 4 of the column again by rotating the locking bolt 26 outward, so that the outer plate 4 of the column and the built-in sleeve 5 are both locked, avoiding the situation that the staff need to hold the built-in sleeve 5 by hand during subsequent installation, and solving the problem of construction personnel in the prior art when erecting When building columns above the first floor, it is usually necessary to slide the pre-prepared built-in sleeve 5 into the column of the first floor, and then fix the sleeve by hand to prevent it from slipping, and then use bolts to preliminarily fix the column outer plate 4, the first-floor column and the built-in sleeve 5 together, but do not lock the bolts, so that when placing the second-floor column later, the column outer plate 4 can slide slightly outward to facilitate the construction workers to slide the column between the four column outer plates 4 and align it with the top of the first-floor column. The assembly process of this steel structure is relatively cumbersome and requires the cooperation of multiple construction workers. In addition, it is very easy for the column outer plate 4 to loosen and fall off or the second-floor column to be misplaced during the assembly process.

[0036] The locking assembly includes a fixed frame 28 and a rotating ring 29. The fixed frame 28 is composed of two circular plates and a circular rod. The two ends of the circular rod extend to the outside of the two circular plates respectively. The rotating ring 29 is located between the two circular plates, and elastic sliding units are provided between the rotating ring 29 and the two circular plates. A slot 30 is opened on the outer wall of the rotating ring 29. The column outer plate 4 fits with the slot 30. A ratchet locking unit is provided between the rotating ring 29 and the circular rod. A clamping unit is provided between the circular plate and the support plate 27. A handle 33 is fixed to the outer wall of the rotating ring 29. When working, when installing the locking assembly, The fixing frame 28 can be fixed on the two support plates 27 through the locking unit, and the initial locking of the column outer plate 4 can be achieved through the slot 30 on the rotating ring 29. The rotating ring 29 is driven to rotate by rotating the handle 33 to cooperate with the ratchet locking unit inside the rotating ring, so that the rotating ring 29 can be stable after rotation, which is convenient for the staff to slide the column 2 3 into the four column outer plates 4 and align them with the column 1 2, avoiding the situation that the column outer plates 4 are easy to loosen and fall off when installing the column 2 3 in the traditional assembly process. The ratchet locking unit is combined with the elastic sliding unit, so that after the column 2 3 slides into the column 1 2, the column outer plate 4 can be reset, which is convenient for subsequent installation.

[0037] The elastic sliding unit includes a positioning block 32 and a spring four 38. The opposite side end surfaces of the two circular plates are provided with an arc groove three 37. The positioning block 32 is slidably connected in the arc groove three 37. The spring four 38 is fixedly connected between the positioning block 32 and the inner wall of the arc groove three 37. The positioning block 32 is fixedly connected to the outer wall of the rotating ring 29. During operation, when the rotating ring 29 is rotated, the positioning block 32 fixed to the rotating ring 29 slides in the arc groove three 37 and squeezes the spring four 38 until the column two 3 slides into the column one 2, and the elastic force of the spring four 38 can drive the column outer plate 4 to quickly reset.

[0038] The ratchet locking unit includes an inner ratchet gear 31, a pawl 40 and an L-shaped rod 42. The inner ratchet gear 31 is fixedly connected to the inner wall of the rotating ring 29. A rotating shaft 39 is rotatably connected between the two circular plates. A pawl 40 is fixedly connected to the rotating shaft 39. The pawl 40 is meshed and connected with the inner ratchet gear 31. A torsion spring 41 is fixedly connected between the pawl 40 and the circular plate. The two ends of the rotating shaft 39 extend to the outer sides of the two circular plates and are fixedly connected to the L-shaped rod 42. When working, when it is needed, When inserting the column 2 3, the inner ratchet gear 31 rotates by rotating the rotating ring 29, and the inner ratchet gear 31 can be locked after rotation by cooperating with the torsion spring 41 through the pawl 40, thereby locking the rotating ring 29, effectively ensuring the stability of the column outer plate 4 during the insertion process of the column 2 3. When it is necessary to release the lock and reset the rotating ring 29, the pawl 40 is disengaged from the inner ratchet gear 31 by rotating the L-shaped rod 42, and the rotating ring 29 is quickly reset under the elastic force of the spring 4 38.

[0039] The positioning unit includes an annular plate 34, a spring three 35 and a positioning ring 36. The two ends of the circular rod are fixedly connected with an annular plate 34, the spring three 35 is fixedly connected to the annular plate 34, the other end of the spring three 35 is fixedly connected to the positioning ring 36, the positioning ring 36 is slidably connected to the circular rod, the support plate 27 is provided with a groove, the positioning ring 36 is fitted with the groove, and the positioning ring 36 is composed of a circular ring and four protrusions; when working, when the fixing frame 28 is installed on the two support plates 27, by The positioning rings 36 at both ends of the rod slide inwardly so that the fixing frame 28 can slide between the two support plates 27. After sliding in, the positioning ring 36 is released, and the positioning ring 36 is driven to slide into the groove on the support plate 27 by the elastic force of the spring three 35. Because of the convex design on the positioning ring 36, the fixing frame 28 is locked and will not be affected by the rotation of the rotating ring 29. When the installation of the column 2 3 is completed, the positioning ring 36 can be detached from the two support plates 27 by sliding the positioning ring 36 inward again, so that the fixing frame 28 is convenient for repeated use.

[0040] The built-in sleeve 5 is provided with a stepped cavity 6, four circular grooves 8 and four arc grooves 19, the stepped cavity 6 is located on the central axis of the built-in sleeve 5, the stepped cavity 6 is connected with the circular groove 8, the arc groove 19 and the arc groove 2 10, a sliding rod 14 is slidably connected in the stepped cavity 6, the end face of the sliding rod 14 is square, and the four side outer walls of the sliding rod 14 are inlaid with straight rack plates 15, a rotating shaft 17 is rotatably connected in the circular groove 8, a gear 16 is fixed to the rotating shaft 17, and the gear 16 is connected to the straight gear The strip plate 15 is meshed and connected, and an arc-shaped rack plate 18 is slidably connected in the arc-shaped groove 9, and the arc-shaped rack plate 18 is meshed and connected with the gear 16. A slider 19 is fixedly connected to the arc-shaped plate 20, and the other end of the slider 19 is fixedly connected to the arc-shaped rack plate 18. When working, through the cooperation between the four straight rack plates 15 on the sliding rod 14 and the four gears 16 and the four arc-shaped rack plates 18, when the staff slides a limit plate 13, the other limit plates 13 on the four sides of the built-in sleeve 5 will slide accordingly, which greatly facilitates the installation operation of the staff.

[0041] The top end of the sliding rod 14 is fixedly connected to the limit plate 13, and a straight rack plate 23 is fixedly connected to one side of the limit plate 13. A spring 12 is fixedly connected between the top of the limit plate 13 and the top of the inner wall of the stepped cavity 6. A cylindrical groove 7 is provided on the outer wall of one side of the built-in sleeve 5. A rotating shaft 24 is rotatably connected in the cylindrical groove 7. The inner side end of the rotating shaft 24 extends to the stepped cavity 6 and is fixedly connected to a gear 22. The gear 22 and the straight rack plate When the support rod 23 is engaged and connected, when it is necessary to disassemble the support rod 23 and the support rod 23, the support rod 23 is slid out from the support rod 2 and the retaining bolt 26 is rotated inward. The staff can quickly remove the outer plates 4 on the four sides of the column, and then rotate the shaft 24 to make the gear 22 drive the spur rack plate 23 to slide upward, so that the limit plate 13 drives the sliding rod 14 to slide upward, and then the arc plate 20 is retracted inward, which is convenient for the staff to slide out the built-in sleeve 5.

[0042] The outer end of the second rotating shaft 24 is fixedly connected with a cross knob 25 ; during operation, the second rotating shaft 24 can be rotated conveniently by the staff through the cross knob 25 provided on the second rotating shaft 24 .

[0043] The top of the built-in sleeve 5 is symmetrically provided with prefabricated grooves 11, and the inner walls on both sides of the prefabricated grooves 11 are evenly fixed with rubber protrusions; during operation, the prefabricated grooves 11 and the rubber protrusions on the built-in sleeve 5 allow the staff to insert their fingers to apply external force when sliding the built-in sleeve 5.

[0044] A construction method for an assembled steel structure component for building construction, the construction method is applicable to the assembled steel structure component for building construction described above, and the construction method comprises the following steps:

[0045] S1: When the staff builds the column 2 3 after fixing the column 1 2 and the base 1, they first fix the fixing frame 28 and the four sets of supporting plates 27 on the outer wall of the column 1 2, and then insert the four column outer plates 4 into the rotating ring 29 to complete the initial limit;

[0046] S2: The staff rotates the cross knob 25 to drive the second shaft 24 to rotate, so that the arc plate 20 is retracted into the built-in sleeve 5, which is convenient for sliding the built-in sleeve 5 from the top of the column 1 2 until the arc plate 20 pops out under the action of the second spring 21, and then the locking bolt 26 is rotated outward to achieve the locking of the column outer plate 4 and the built-in sleeve 5;

[0047] S3: By turning the handle 33 to drive the rotating ring 29 and the column outer plate 4 to rotate, the staff can quickly insert the column 2 3 and align it with the column 1 2. After that, the column outer plate 4 is reset and the column outer plate 4, the column 1 2, the column 2 3 and the built-in sleeve 5 are locked and fixed by bolts. After completing all the installation work, the fixing frame 28 is removed from the support plate 27 for easy reuse.

[0048] Working principle: after fixing the column 1 2 and the base 1, when the staff builds the column 2 3, they first fix the locking assembly to the four groups of support plates 27 on the top of the outer wall of the column 2, and then insert the four column outer plates 4 into the locking assembly to complete the initial limiting. After that, the staff presses the four arc plates 20 on the built-in sleeve 5 so that the built-in sleeve 5 can slide in from the top of the column 2 until the arc plate 20 corresponds to the opening 2 on the column 1 2. The arc plate 20 pops out of the opening 1 and the opening 2 under the elastic force of the spring 21, and the locking bolt 26 is rotated outward to make the end of the locking bolt 26 slide out and limit the column outer plate 4 again, so that the column outer plate 4 and the built-in sleeve 5 are both locked, avoiding the staff's subsequent installation The problem that the built-in sleeve 5 needs to be held by hand during installation is solved. In the prior art, when constructing columns above one layer, the construction workers usually need to slide the pre-prepared built-in sleeve 5 into the column of the first layer, and fix the sleeve by hand until the sleeve does not slip, and then use bolts to preliminarily fix the column outer plate 4, the first layer column and the built-in sleeve 5 together, but do not lock the bolts, so that when placing the second layer column later, the column outer plate 4 can slide slightly outward, so that the construction workers can slide the column between the four column outer plates 4 and align it with the top of the first layer column. The assembly process of this steel structure is relatively cumbersome and requires the cooperation of multiple construction workers. In addition, it is very easy for the column outer plate 4 to loosen and fall off or the second layer column to be misplaced during the assembly process. When installing the locking component, The fixing frame 28 can be fixed on the two support plates 27 through the locking unit, and the initial locking of the column outer plate 4 can be achieved through the slot 30 on the rotating ring 29. The rotating ring 29 is driven to rotate by rotating the handle 33 to cooperate with the ratchet locking unit in the rotation, so that the rotating ring 29 can be stable after rotation, which is convenient for the staff to slide the column 2 3 into the four column outer plates 4 and align them with the column 1 2, avoiding the situation that the column outer plates 4 are easy to loosen and fall off when installing the column 2 3 in the traditional assembly process. The ratchet locking unit is combined with the elastic sliding unit, so that after the column 2 3 slides into the column 1 2, the column outer plate 4 can be reset, which is convenient for subsequent installation. When the rotating ring 29 is rotated, the positioning block 32 fixed to the rotating ring 29 slides and squeezes in the arc groove 3 37. The spring 4 38 is used to release the outer plate 4 of the column until the column 2 3 slides into the column 1 2. The elastic force of the spring 4 38 can drive the outer plate 4 of the column to quickly reset. When the column 2 3 needs to be inserted, the inner ratchet gear 31 can be rotated by rotating the rotating ring 29, and the inner ratchet gear 31 can be locked after rotation by the ratchet 40 cooperating with the torsion spring 41, so that the rotating ring 29 is locked, which effectively ensures the stability of the outer plate 4 of the column during the insertion of the column 2 3. When the lock needs to be released to reset the rotating ring 29, the ratchet 40 is disengaged from the inner ratchet gear 31 by rotating the L-shaped rod 42. The rotating ring 29 is quickly reset under the elastic force of the spring 4 38. When the fixing frame 28 is installed on the two support plates 27, the positioning rings 36 at both ends of the circular rod are slid inward.The fixing frame 28 can slide between the two support plates 27. After sliding in, the positioning ring 36 is released, and the positioning ring 36 is driven to slide into the groove on the support plate 27 by the elastic force of the spring three 35. Because of the convex design on the positioning ring 36, the fixing frame 28 is locked and will not be affected by the rotation of the rotating ring 29. When the column 23 is installed, the positioning ring 36 is slid inward again to make the fixing frame 28 detached from the two support plates 27, which is convenient for repeated use of the fixing frame 28. The four straight rack plates 15 on the sliding rod 14 and the four gears 16 and the four arc-shaped rack plates 18 are matched. When the staff slides a limit plate 13, the other limit plates 13 on the four sides of the built-in sleeve 5 will slide accordingly, which greatly facilitates the installation operation of the staff. When it is necessary to disassemble the column 1 2 and the column 2 3, the column 2 3 is slid out of the column 1 2, and then the locking bolt 26 is rotated inward. The staff can quickly remove the column outer plates 4 on the four sides, and then rotate the rotating shaft 24 to make the gear 2 22 drive the spur rack plate 2 23 to slide upward, so that the limit plate 13 drives the sliding rod 14 to slide upward, and then the arc plate 20 is retracted inward, which is convenient for the staff to slide out the built-in sleeve 5.

[0049] The above-mentioned front, back, left, right, top and bottom are all based on the figures in the specification. Figure 1 As a benchmark, according to the person's observation perspective, the side of the device facing the observer is defined as the front, the left side of the observer is defined as the left, and so on.

[0050] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the scope of protection of the present invention.

[0051] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. An assembled steel structure assembly for building construction, characterized in that: The invention comprises a base (1), a column 1 (2) and a column 2 (3), wherein the top of the base (1) is fixedly connected to the column 1 (2), the top of the column 1 (2) is matched with the bottom of the column 2 (3), the four side outer walls of the connection between the column 1 (2) and the column 2 (3) are provided with column outer plates (4), the top of the column 1 (2) is fixedly connected to the four side outer walls, the support plates (27) are provided with a locking assembly, the bottom of the column outer plate (4) is matched with the locking assembly, the column outer plate (4) is provided with an opening 1, and the column 1 (2) is provided with a plurality of support plates (27). The four side outer walls are each provided with an opening two, the opening one being matched with the opening two, the inner cavity connection of the column one (2) and the column two (3) is provided with an internal sleeve (5), four arc-shaped grooves two (10) are provided in the internal sleeve (5), an arc-shaped plate (20) is slidably connected in the arc-shaped groove two (10), the outer end of the arc-shaped plate (20) passes through the opening one and the opening two, a spring two (21) is fixedly connected between the inner end of the arc-shaped plate (20) and the inner wall of the arc-shaped groove two (10), and a retaining bolt (26) is threadedly connected to the bottom of the outer end of the arc-shaped plate (20).

2. The assembled steel structure assembly for building construction according to claim 1, characterized in that: The locking assembly comprises a fixed frame (28) and a rotating ring (29), the fixed frame (28) being composed of two circular plates and a circular rod, the two ends of the circular rod respectively extending to the outside of the two circular plates, the rotating ring (29) being located between the two circular plates, and elastic sliding units being provided between the rotating ring (29) and the two circular plates, a slot (30) being provided on the outer wall of the rotating ring (29), the column outer plate (4) being fitted with the slot (30), a ratchet locking unit being provided between the rotating ring (29) and the circular rod, a locking unit being provided between the circular plate and the support plate (27), and a handle (33) being fixedly connected to the outer wall of the rotating ring (29).

3. The assembled steel structure assembly for building construction according to claim 2, characterized in that: The elastic sliding unit comprises a positioning block (32) and a spring four (38), the opposite side end surfaces of the two circular plates are provided with an arc-shaped groove three (37), the positioning block (32) is slidably connected in the arc-shaped groove three (37), the spring four (38) is fixedly connected between the positioning block (32) and the inner wall of the arc-shaped groove three (37), and the positioning block (32) is fixedly connected to the outer wall of the rotating ring (29).

4. The assembled steel structure assembly for building construction according to claim 3, characterized in that: The ratchet locking unit comprises an inner ratchet gear (31), a ratchet pawl (40) and an L-shaped rod (42); the inner wall of the rotating ring (29) is fixedly connected to the inner ratchet gear (31); a rotating shaft (39) is rotatably connected between the two circular plates; a ratchet pawl (40) is fixedly connected to the rotating shaft (39); the ratchet pawl (40) is meshedly connected to the inner ratchet gear (31); a torsion spring (41) is fixedly connected between the ratchet pawl (40) and the circular plate; and two ends of the rotating shaft (39) extend to the outer sides of the two circular plates and are fixedly connected to the L-shaped rods (42).

5. The assembled steel structure assembly for building construction according to claim 4, characterized in that: The locking unit comprises an annular plate (34), a spring three (35) and a positioning ring (36); both ends of the circular rod are fixedly connected to the annular plate (34); the spring three (35) is fixedly connected to the annular plate (34); the other end of the spring three (35) is fixedly connected to the positioning ring (36); the positioning ring (36) is slidably connected to the circular rod; a groove is formed on the support plate (27); the positioning ring (36) fits in the groove; the positioning ring (36) consists of a circular ring and four protrusions.

6. The assembled steel structure assembly for building construction according to claim 5, characterized in that: The built-in sleeve (5) is provided with a stepped cavity (6), four circular grooves (8) and four arc-shaped grooves (9); the stepped cavity (6) is located on the central axis of the built-in sleeve (5); the stepped cavity (6) is connected to the circular groove (8), the arc-shaped groove (9) and the arc-shaped groove (10); a sliding rod (14) is slidably connected to the stepped cavity (6); the end face of the sliding rod (14) is square; and straight rack plates are inlaid on the outer walls of the four sides of the sliding rod (14). A rotating shaft (17) is rotatably connected in the circular groove (8), a gear (16) is fixedly connected to the rotating shaft (17), the gear (16) is meshingly connected with a spur rack plate (15), an arc-shaped rack plate (18) is slidably connected in the arc-shaped groove (9), the arc-shaped rack plate (18) is meshingly connected with the gear (16), a slider (19) is fixedly connected to the arc-shaped plate (20), and the other end of the slider (19) is fixedly connected to the arc-shaped rack plate (18).

7. The assembled steel structure assembly for building construction according to claim 6, characterized in that: The top end of the sliding rod (14) is fixedly connected to a limit plate (13), one side of the limit plate (13) is fixedly connected to a second spur rack plate (23), a spring (12) is fixedly connected between the top end of the limit plate (13) and the top of the inner wall of the stepped cavity (6), a cylindrical groove (7) is provided on the outer wall of one side of the built-in sleeve (5), a second rotating shaft (24) is rotatably connected in the cylindrical groove (7), the inner side end of the second rotating shaft (24) extends into the stepped cavity (6) and is fixedly connected to a second gear (22), the second gear (22) is meshingly connected to the second spur rack plate (23).

8. The assembled steel structure assembly for building construction according to claim 7, characterized in that: A cross knob (25) is fixedly connected to the outer end of the second rotating shaft (24).

9. The assembled steel structure assembly for building construction according to claim 8, characterized in that: A prefabricated groove (11) is symmetrically formed at the top of the built-in sleeve (5), and rubber protrusions are evenly fixed to the inner walls on both sides of the prefabricated groove (11).

10. A construction method for an assembled steel structure assembly for building construction, characterized in that: The construction method is applicable to a prefabricated steel structure assembly for building construction as described in any one of claims 8-9, and the construction method comprises the following steps: S1: After fixing the first column (2) to the base (1), the staff first fixes the fixing frame (28) to the four sets of supporting plates (27) on the outer wall of the first column (2), and then inserts the four column outer plates (4) into the rotating ring (29) to complete the initial positioning; S2: The staff rotates the cross knob (25) to drive the second rotating shaft (24) to rotate, so that the arc plate (20) is retracted into the built-in sleeve (5), which facilitates the built-in sleeve (5) to slide from the top of the column one (2) until the arc plate (20) pops out under the action of the second spring (21), and then the locking bolt (26) is rotated outward to achieve the locking of the column outer plate (4) and the built-in sleeve (5); S3: By turning the handle (33), the rotating ring (29) and the column outer plate (4) are driven to rotate, so that the staff can quickly insert the second column (3) and align it with the first column (2). After that, the column outer plate (4) is reset, and the column outer plate (4), the column first (2), the column second (3) and the built-in sleeve (5) are locked and fixed by bolts. After all the installation work is completed, the fixing frame (28) is removed from the support plate (27) for easy reuse.