An infrared vision positioning method for concrete pumping level in steel pipe arch bridge

Through the infrared vision positioning method, using the PNP algorithm and orthographic projection transformation, the problem of low liquid level positioning accuracy in concrete pumping liquid level monitoring in the steel pipe arch bridge tube is solved, and fast, non-destructive and accurate liquid level position measurement is achieved, which improves the efficiency of the liquid level position measurement. Construction efficiency and safety.

CN117968796BActive Publication Date: 2024-10-01CHONGQING JIAOTONG UNIV

Patent Information

Application Number
CN202410125151.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2024-10-01
Estimated Expiration
2044-01-30

AI Technical Summary

Technical Problem

The existing technology has the problems of low liquid level positioning accuracy, low construction efficiency and possible damage to the structure when monitoring the concrete pumping liquid level in the steel pipe arch bridge. Especially when the infrared equipment is not arranged parallel to the arch bridge, oblique photography causes The image pixel scales are not equal, resulting in large liquid level coordinate conversion errors.

Method used

The infrared vision positioning method is used to calibrate the infrared thermal imaging camera, use the PNP algorithm to construct the pose transformation matrix, perform camera pose estimation and orthographic projection transformation, and convert the oblique photography image into an orthographic image, thereby achieving accurate positioning of the liquid level. .

Benefits of technology

It achieves fast, non-destructive and accurate liquid level positioning, improves construction efficiency and safety, avoids structural damage, improves the accuracy of liquid level measurement, and solves the problem of large image measurement errors under oblique photography.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117968796B_ABST
    Figure CN117968796B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of steel tube concrete arch bridge construction, and discloses an infrared vision positioning method for concrete pumping liquid level in a steel tube arch bridge. The method adopts a perspective geometry algorithm to construct a posture transformation matrix to obtain the relative posture of a camera and the steel tube of the arch bridge, and converts the image into an orthographic image through perspective transformation, so that the real coordinates of the liquid level in the infrared image can be directly solved through a scale, and the accurate positioning of the liquid surface position can be achieved. The proposed method has a simple structure and can realize real-time calculation, which greatly improves the efficiency of measuring the coordinates in the infrared image. Compared with the traditional knocking method, the method has the advantage that no personnel are required to work in the air, and the feedback of the liquid surface position can be faster and more efficient, which not only improves the safety of the construction process, but also realizes non-destructive monitoring. The liquid level is determined more accurately by machine vision than by human eyes, and the problem of large errors caused by manual determination of the liquid level in the image is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel tube concrete arch bridge construction, in particular to an infrared visual positioning method for concrete pumping liquid level in a steel tube arch bridge. Background Art

[0002] In order to ensure that the concrete in the main arch tube of the steel tube concrete arch bridge is dense and not empty, the steel tube concrete pumping and jacking method is currently the main construction method used. However, steel tube concrete is a closed environment, so it is impossible to directly observe the liquid level of the concrete in the tube. The existing technology often uses the knocking method, the hole observation method, the pressure sensor method and the like to detect the liquid level of the concrete in the tube and feedback the real liquid level position (the world coordinate system of the bridge) to the on-site construction personnel. However, in actual application, the knocking method and the hole observation method require personnel to operate in the air, which is time-consuming and labor-intensive, has low construction efficiency, and may also cause artificial damage to the structure; the pressure sensor is greatly affected by the instability of the concrete liquid level and the bending of the pipe shape, and cannot stably measure the liquid level position. Therefore, in order to achieve remote, safe, fast and accurate liquid level positioning, an intelligent liquid level positioning method is necessary. Using infrared thermal imaging technology to monitor the steel tube concrete pumping process in real time is an intelligent method. Due to the hydration of the concrete in the tube, a temperature mutation area appears near the liquid level position. The liquid level position can be judged by observing the infrared image. However, the existing method for monitoring the liquid level of concrete pumping in steel pipe arch bridges based on infrared imaging still has the following technical defects: when the infrared equipment is not arranged parallel to the arch bridge (monitoring object), there will be problems with unequal image pixel scales due to oblique photography, and then directly converting the liquid level coordinates through the image (to the world coordinate system) will result in large errors, resulting in low accuracy of liquid level positioning and failure to meet construction monitoring needs.

[0003] Therefore, we propose an infrared vision positioning method for the concrete pumping level in the steel tube arch bridge to solve the above technical problems. Summary of the invention

[0004] 1. Technical issues to be solved

[0005] In view of the shortcomings of the prior art, the present invention provides an infrared visual positioning method for the concrete pumping liquid level in a steel tube arch bridge, which has the advantages of quickly and non-destructively positioning the steel tube concrete liquid level in real time and accurately, thereby enabling construction personnel to intuitively describe the specific position of the liquid level at this time, thereby solving the above-mentioned technical problems.

[0006] (II) Technical solution

[0007] In order to achieve the above-mentioned purpose of quickly and non-destructively locating the liquid level of steel tube concrete in real time and accurately, so that construction personnel can intuitively describe the specific position of the liquid level at this time, the present invention provides the following technical solutions: an infrared visual positioning method for concrete pumping liquid level in a steel tube arch bridge, comprising the following steps:

[0008] Step 1: Use the calibration board to calibrate the infrared thermal imaging camera to obtain the camera's intrinsic parameter matrix K and distortion parameter D;

[0009] Step 2: Before concrete pumping construction, set up the camera and adjust the camera direction so that the half-arch bridge from the pumping port to the arch top is included in the infrared thermal imaging picture, and then adjust the focal length and related parameters to make the picture clear and stable;

[0010] Step 3: After the steel tube concrete pumping starts, the camera is turned on to collect images. Since the liquid level rises slowly, it is set to collect one frame of image every 1 minute, and the collected images are distorted;

[0011] Step 4: Import the feature point coordinates, use the PNP (perspective decoupling) algorithm to solve the camera pose at this time, obtain the camera pose matrix [R|T], and transform the world coordinates of the feature points to the camera coordinate system;

[0012] Step 5: Invert the [R|T] matrix to obtain the matrix [C|t], and construct the pose transformation matrix [W1] for the camera coordinate system O according to the rotation matrix C. c Perform a rotation transformation to obtain O c’ , construct the pose transformation matrix [W2] from the translation vector t at this time, and c’ Make a translation transformation to move the camera coordinate system to the front of the world coordinate system;

[0013] Step 6: Project the feature points onto the camera plane by orthographic projection to obtain the 2D orthographic projection coordinates of the feature points;

[0014] Step 7: Change the default pixel coordinate system O p The pixel coordinates of the feature points under the condition are transformed into the pixel coordinate system O with the world coordinate system as the origin. p 'Down;

[0015] Step 8. Use 2D orthographic projection coordinates and O p 'The one-to-one correspondence between 2D pixel coordinates in the coordinate system obtains the perspective transformation matrix P;

[0016] Step nine, performing perspective transformation on the arch bridge image of the current frame to obtain an orthographic projection of the arch bridge image;

[0017] Step 10: Calculate the image pixel scale S=L / d;

[0018] Step 11: Detect the liquid level position on the orthographically projected arch bridge image using a target detection algorithm, and return the default pixel coordinates of the liquid level;

[0019] Step 12: transform the default pixel coordinates of the liquid level into the real coordinate system of the liquid surface with the arch foot as the origin, calculate the mileage x and elevation y of the liquid level at this time by pixel scale, and thus complete the positioning.

[0020] Preferably, the specific steps of step one are as follows:

[0021] A1. Place the specially made calibration plate at the desired shooting location, ensuring that the calibration plate fully occupies the field of view of the feature points in the camera imaging area;

[0022] A2. Use the camera to take pictures of the calibration plate in sequence, and take more than 5 pictures of the calibration plate;

[0023] A3. Extract feature points from each calibration plate image and calculate the coordinates of the feature points on the calibration plate in each image.

[0024] A4. Use the RANSAC algorithm to match the feature points and calculate the world coordinates of the 3D space corresponding to the feature points in each calibration plate image;

[0025] A5. Use the calibration algorithm to calculate the camera's intrinsic parameter matrix K and distortion parameter D using the obtained 3D feature point coordinates and 2D feature point image coordinates.

[0026] Preferably, the specific steps in step 4 are as follows:

[0027] B1. Let the 3D world coordinates of n (n≥3) feature points on the arch bridge plane be P1, P2, ..., P n and the corresponding 2D pixel coordinates are p1, p2, ..., p n ;

[0028] B2, then the camera internal parameter matrix K and the elimination ratio Z c Solve for the world coordinate system O of the arch bridge w To the camera coordinate system O c The transformed pose transformation matrix [R|T] is solved as follows:

[0029]

[0030] Where R is the rotation matrix and T is the translation vector.

[0031] Preferably, in step 5, the world coordinate system O of the arch bridge is w The point under the rotation and translation transformation is transformed to transform the world coordinates of the 3D point into the camera coordinate system. The expression is as follows:

[0032]

[0033] Preferably, in step 5, the matrix [R|T] is inverted to obtain the matrix [C|t], and the camera coordinate system O c Perform rotation transformation to obtain the world coordinate system O of the arch bridge w X w , Y w , Z w The camera coordinate system O with three coordinate axes in the same direction c’ , and its calculation expression is as follows:

[0034]

[0035] Preferably, in step 5, the camera coordinate system O c’ Perform translation transformation to obtain the final camera coordinate system O c '', translate the rotated camera coordinate system to the front of the world coordinate system, and its calculation expression is as follows:

[0036]

[0037] Preferably, the default pixel coordinates of the known world coordinate system origin and the arch bridge feature point in step 7 are (u0, v0) and (u i ,v i ), the image pixel coordinate system O p Transform to O p ', so that at this time O p The 2D pixel coordinates in the coordinate system correspond one-to-one to the 2D coordinates of the orthographic projection, and the calculation expression is as follows:

[0038]

[0039] Preferably, in step eight and step nine, the perspective transformation matrix P is obtained according to the one-to-one correspondence between the 2D pixel coordinates before and after the camera posture transformation, and the image taken by the camera in real time is perspective transformed to convert the originally tilted image into an orthographic projection of the arch bridge image.

[0040] Preferably, in step 12, the pixel coordinate system O p Transform to the liquid surface coordinate system O with the arch foot as the origin l Then, the liquid surface pixel coordinates after coordinate transformation are multiplied by the image pixel scale, so as to return the liquid surface pixel coordinates to the real world coordinates, thereby feeding back the mileage x and elevation y of the liquid level. The calculation expression is as follows:

[0041]

[0042] Compared with the prior art, the present invention provides an infrared visual positioning method for the concrete pumping level in a steel pipe arch bridge, which has the following beneficial effects:

[0043] The present invention aims at the problem that it is difficult to accurately measure the real distance in the oblique photography image in the prior art, and adopts the PNP (perspective decoupling) algorithm to construct a posture transformation matrix to obtain the posture of the camera orthophoto arch bridge steel pipe, and converts the oblique photography arch bridge image into an orthophoto through perspective transformation. At this time, the scale of each pixel in the image is the same, and the real distance between two points in the image can be directly calculated through the scale. The PNP (perspective decoupling) algorithm has a simple structure and a fast operation speed, which greatly improves the efficiency of measuring the real distance of the image. By transforming the camera posture and the orthophoto projection image, the accurate positioning of the liquid level position is achieved. Compared with the traditional knocking method, the advantage is that no personnel are required to work in the air, and the feedback of the liquid level position can be faster and more efficient, which not only improves the safety of the construction process, but also realizes non-destructive monitoring to avoid damage to the structure; compared with the direct infrared imaging method, the advantage is that the liquid level is more accurately determined by machine vision than the human eye, and the problem of large errors caused by directly measuring the liquid level in the image is solved. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 It is a flow chart of the method for monitoring the position coordinates of the liquid level of steel tube concrete pumping of the present invention;

[0045] Figure 2 Schematic diagram of camera posture transformation in Example 1 of the present invention.

[0046] Figure 3 This is an image rendering of the arch bridge after orthophotography in Example 1 of the present invention.

[0047] Figure 4 This is a diagram showing the effect of liquid level coordinate feedback in Example 2 of the present invention. DETAILED DESCRIPTION

[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] The present invention proposes an infrared visual positioning method for the pumping liquid level of concrete in a steel tube arch bridge. By calibrating an infrared thermal imaging camera to replace the human eye, a machine vision measurement system is constructed. The position of the liquid surface is accurately detected using a posture estimation algorithm and an orthographic projection transformation, and the real-world coordinates of the liquid surface at this time are calculated. This method can quickly and non-destructively locate the liquid surface position of steel tube concrete in real time and accurately, so that construction personnel can intuitively describe the specific position of the liquid surface at this time. The use of this method can greatly improve construction efficiency and safety, and the implementation process does not damage the structure, and the monitoring results are intuitive and accurate.

[0050] Example 1

[0051] Before concrete pumping, select a suitable point to set up the camera and adjust the camera direction so that the half-arch bridge from the pumping port to the arch is included in the infrared thermal imaging screen, and then adjust the focal length and related parameters to make the picture clear and stable. After the steel tube concrete pumping starts, turn on the camera to collect images. Due to the slow rise of the liquid level, set it to collect one frame of image every 1 minute, and perform distortion correction on the collected images. Figure 2 The six pillar points on the arch bridge are selected as feature points, and their world coordinates The corresponding default pixel coordinates are The camera internal parameter matrix K and the scale coefficient Zc are calculated by the formula Solve the camera's pose matrix [R|T] at this time, and then use the formula Transform the world coordinates of the feature points to the camera coordinate system O c In the camera coordinates of the feature points, Take the inverse of the matrix [R|T] to get the matrix [C|t], and construct the pose transformation matrix [W1] based on the rotation matrix C at this time. Coordinates Perform a rotation transformation to obtain the world coordinate system X w , Y w , Z w The camera coordinate system O with the same axis c’ The coordinates of the feature points under The pose transformation matrix [W2] is constructed from the translation vector t at this time, and then the formula For the camera coordinate system O c’ Perform translation transformation to obtain the final camera coordinate system O c '', translate the rotated camera coordinate system to the front of the world coordinate system, so that when the camera is shooting the arch bridge, the six 3D points on the arch bridge are located in the camera coordinate system O c ''Coordinates under Finally, the 2D pixel coordinates of these 6 3D points on the camera plane are obtained by orthographic projection By The pixel coordinate system Op Transform to O p ', at this time O p '2D pixel coordinates in the coordinate system 2D coordinates with orthographic projection One-to-one correspondence; the perspective transformation matrix P is obtained according to the correspondence between the 2D pixel coordinates before and after the posture transformation, and the current frame image is perspective transformed to convert the originally tilted image into an orthographic arch bridge image. Figure 3 The figure shows the effect of converting the oblique photography arch bridge image into an orthographic image using the above calculation method.

[0052] Example 2

[0053] On the arch bridge image after orthography, feature points P1 and P4 are selected to calculate the scale of the image after perspective transformation, where the world coordinates and default pixel coordinates of P1 are and The world coordinates and pixel coordinates of P4 are and The image scale The liquid level is located using a pixel scale, and the real coordinate system of the liquid level is O l The default pixel coordinates of the origin are The default pixel coordinates for the liquid level are Then the mileage of the liquid level x = (u-u0)S = (438-182) × 1.07 ≈ 273.92dm = 27.392m, the elevation y = (v0-v)S = (798-591) × 1.07 ≈ 221.49dm = 22.149m, Figure 4 The figure shows the effect of liquid level coordinate feedback after the liquid surface is located using the above calculation method.

[0054] In summary, the method proposed by the present invention can be used to quickly and non-destructively monitor the steel tube concrete level in real time. The method can make the scale of each pixel in the image the same. At this time, the real distance between two points in the image can be directly calculated by the scale, and the algorithm structure is simple and the operation speed is fast, which greatly improves the efficiency of measuring the real distance of the image. The liquid level position is accurately located by posture calculation and orthographic projection image. Compared with the traditional knocking method, the advantage is that no personnel are required to work in the air, and the feedback of the liquid level position can be faster and more efficient, which not only improves the safety of the construction process, but also realizes non-destructive monitoring and avoids damage to the structure. Compared with the direct infrared imaging method, the advantage is that the liquid level is determined by machine vision more accurately than the human eye, and the problem of large errors caused by directly measuring the liquid level in the image is solved. Using the method of the present invention, accurate liquid level measurement can be achieved even in the case of oblique photography.

[0055] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An infrared visual positioning method for the concrete pumping level in a steel tube arch bridge, characterized in that: The following steps are involved: Step 1: Use the calibration board to calibrate the infrared thermal imaging camera to obtain the camera's intrinsic parameter matrix K and distortion parameter D; Step 2: Before concrete pumping construction, set up the camera and adjust the camera direction so that the half-arch bridge from the pumping port to the arch top is included in the infrared thermal imaging picture, and then adjust the focal length and related parameters to make the picture clear and stable; Step 3: After the steel tube concrete pumping starts, the camera is turned on to collect images. Since the liquid level rises slowly, it is set to collect one frame of image every 1 minute, and the collected images are distorted; Step 4: Import the coordinates of the arch bridge feature points, use the PNP perspective decoupling algorithm to solve the camera pose at this time, obtain the camera pose matrix [R|T], and transform the world coordinates of the feature points to the camera coordinate system; Step 5: Invert the [R|T] matrix to obtain the matrix [C|t], and construct the pose transformation matrix [W1] for the camera coordinate system O according to the rotation matrix C. c Perform a rotation transformation to obtain O c ', and then construct the pose transformation matrix [W2] from the translation vector t at this time, and transform the camera coordinate system O c 'Perform translation transformation to move the camera coordinate system to the front of the world coordinate system; Step 6: Project the feature points onto the camera plane by orthographic projection to obtain the 2D orthographic projection coordinates of the feature points; Step 7: Change the default pixel coordinate system O p The pixel coordinates of the feature points under the condition are transformed into the pixel coordinate system O with the world coordinate system as the origin. p 'Down; Step 8. Use 2D orthographic projection coordinates and O p 'The one-to-one correspondence between 2D pixel coordinates in the coordinate system obtains the perspective transformation matrix P; Step nine, performing perspective transformation on the arch bridge image of the current frame to obtain an orthographic projection of the arch bridge image; Step 10: Calculate the image pixel scale S=L / d; Step 11: Detect the liquid level position on the orthographically projected arch bridge image using a target detection algorithm, and return the default pixel coordinates of the liquid level; Step 12: transform the default pixel coordinates of the liquid level into the real coordinate system of the liquid surface with the arch foot as the origin, calculate the mileage x and elevation y of the liquid level at this time by pixel scale, and thus complete the positioning.

2. The infrared visual positioning method for the concrete pumping level in a steel pipe arch bridge according to claim 1 is characterized in that: The specific steps of step one are as follows: A1. Place the specially made calibration plate at the desired shooting location, ensuring that the calibration plate fully occupies the field of view of the feature points in the camera imaging area; A2. Use the camera to take pictures of the calibration plate in sequence, and take more than 5 pictures of the calibration plate; A3. Extract feature points from each calibration plate image and calculate the coordinates of the feature points on the calibration plate in each image. A4. Use the RANSAC algorithm to match the feature points and calculate the world coordinates of the 3D space corresponding to the feature points in each calibration plate image; A5. Use the calibration algorithm to calculate the camera's intrinsic parameter matrix K and distortion parameter D using the obtained 3D feature point coordinates and 2D feature point image coordinates.

3. The infrared visual positioning method for the concrete pumping level in a steel pipe arch bridge according to claim 2 is characterized in that: The specific steps in step 4 are as follows: B1. Let the 3D world coordinates of n≥3 feature points on the arch bridge plane be P1, P2, ..., P n and the corresponding 2D pixel coordinates are p1, p2, ..., p n ; B2, then the camera internal parameter matrix K and the elimination ratio Z c Solve for the world coordinate system O of the arch bridge w To the camera coordinate system O c The transformed pose transformation matrix [R|T] is solved as follows: Where R is the rotation matrix, T is the translation vector, u and v are n feature points in the default pixel coordinate system O p The 2D pixel coordinates under X w , Y w , Z w is the number of n feature points in the world coordinate system O of the arch bridge w The 3D coordinates of the following.

4. The infrared visual positioning method for the concrete pumping level in a steel pipe arch bridge according to claim 3 is characterized by: In step 4, the world coordinate system O of the arch bridge is w The point under the pose transformation is transformed to transform the world coordinates of the 3D point into the camera coordinate system. The expression is as follows: Among them, X c , Y c , Z c is n feature points in the camera coordinate system O c The 3D coordinates of the following.

5. The infrared visual positioning method for the concrete pumping level in a steel pipe arch bridge according to claim 4 is characterized in that: In step 5, the matrix [R|T] is inverted to obtain the matrix [C|t], and the camera coordinate system O c Perform rotation transformation to obtain the world coordinate system O of the arch bridge w X w , Y w , Z w The camera coordinate system O with three coordinate axes in the same direction c ', its calculation expression is as follows: Among them, X c ', Y c ', Z c ' is n feature points in the camera coordinate system O c 'The 3D coordinates of the 6. The infrared vision positioning method for the concrete pumping level in a steel pipe arch bridge according to claim 5 is characterized by: In step 5, the camera coordinate system O c 'Perform translation transformation to obtain the final camera coordinate system O c '', translate the rotated camera coordinate system to the front of the world coordinate system, so that when the camera is shooting the arch bridge, n 3D points on the arch bridge are located in the camera coordinate system O c The coordinates under '' are calculated as follows: Among them, X c '', Y c '', Z c '' is n feature points in the camera coordinate system O c '' 3D coordinates under.

7. The infrared vision positioning method for the concrete pumping level in a steel pipe arch bridge according to claim 6 is characterized by: In step 7, the default pixel coordinates of the origin of the world coordinate system and the arch bridge feature point are known to be (u0, v0) and (ui, vi) respectively. p Transform to O p ', so that O p The 2D pixel coordinates in the coordinate system correspond one-to-one to the 2D coordinates of the orthographic projection, and the calculation expression is as follows: Among them, u i '、v i ' is n feature points in the default pixel coordinate system O p The transformed coordinate system O p 'The 2D pixel coordinates below.

8. The infrared vision positioning method for the concrete pumping level in a steel pipe arch bridge according to claim 7 is characterized by: In step eight and step nine, the perspective transformation matrix P is obtained according to the one-to-one correspondence between the 2D pixel coordinates before and after the camera posture transformation, and the image captured by the camera in real time is transformed into an orthographic projection of the arch bridge.

9. The infrared vision positioning method for the concrete pumping level in a steel pipe arch bridge according to claim 8 is characterized by: In the step 12, the default pixel coordinate system O p Transform to the liquid surface coordinate system O with the arch foot as the origin l Then, the liquid surface pixel coordinates after coordinate transformation are multiplied by the image pixel scale S, so as to return the liquid surface pixel coordinates to the real world coordinates, thereby feeding back the mileage x and elevation y of the liquid level. The calculation expression is as follows:

Citation Information

Patent Citations

  • Grain-piling height measuring method and apparatus based on single camera image

    CN105466523A

  • Liquid level measurement system and method based on monocular vision

    CN110763306A

  • Large-view-field stereoscopic vision calibration method

    CN114705122A

  • Bridge tower displacement measuring device and method based on computer intelligent vision

    CN117190875A

  • Arch bridge deformation monitoring device

    CN219830245U

Cited By

  • CFST arch bridge concrete pouring pressure regulation and control method based on infrared vision

    CN119877401A