An intelligent monitoring system for high voltage equipment
Through the high-speed camera monitoring and intelligent monitoring system, the pantograph movement distance is adjusted, and the problem of difficulty in controlling the pantograph movement distance of the high-speed rail pantograph is solved, achieving stable contact and efficient power supply of transmission lines.
Patent Information
- Application Number
- CN202410013337.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-06
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2043-04-06
AI Technical Summary
The movement distance of the pantograph of the high-speed rail cannot be controlled in real time, resulting in damage to the transmission line. It is necessary to design an intelligent monitoring system for high-voltage equipment to ensure the safety and stability of the power supply of high-speed rail.
Install a high-speed camera to monitor pantographs and transmission lines in real time, establish a movement error compensation database based on different road conditions, combine the surrounding environment of the high-speed rail and the body movement data, adjust the movement distance of the pantograph through an intelligent monitoring system, and adjust it in real time according to wind speed and shaking conditions. Move upward to ensure stable contact.
It effectively reduces the wear level of transmission lines and pantographs, ensures the normal and stable power supply of high-speed rail, improves the contact between the pantograph and the transmission lines, and reduces the separation situation.
Smart Images

Figure CN118011891B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of high-voltage equipment monitoring, and in particular to an intelligent monitoring system for high-voltage equipment. Background Art
[0002] High-speed rail is an electric vehicle, and the electricity used is not carried by the high-speed rail itself, so every other carriage, a pantograph will be raised on the high-speed rail, and after it contacts the power transmission line above, the circuit can be connected, and the pantograph will properly push up the wire, because once the pantograph does not contact the power transmission line, the whole high-speed rail will be powered off, which is very dangerous;
[0003] However, the movement distance of the pantograph cannot be controlled in real time, which may cause the pantograph to move too far and damage the transmission line. Therefore, it is necessary to design an intelligent monitoring system for high-voltage equipment. Summary of the invention
[0004] The purpose of the present invention is to provide an intelligent monitoring system for high-voltage equipment to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a high-voltage equipment intelligent monitoring system, the execution process of the system is:
[0006] Step S1, installing a professional high-speed camera on the top of the high-speed rail, and the high-speed camera takes real-time photos of the pantograph and transmission lines;
[0007] Step S2, establishing a pantograph movement error compensation database based on different road conditions;
[0008] Step S3, analyzing the surrounding environment data of the high-speed rail and the movement data of the high-speed rail body;
[0009] Step S4, exporting data to the high-speed rail cab, and calculating through the intelligent monitoring system in the cab, outputting execution instructions, and adjusting the moving distance of the pantograph.
[0010] According to the above technical solution, the installation position of the high-speed camera is on one side of the pantograph, and the installation path is a circular track with the bottom of the pantograph and the outer wall of the top of the high-speed rail as the center and a radius of 0.5 meters. The high-speed camera is set on this track, and the bearing seat installed at the bottom of the high-speed camera slides on the track to control the movement of the high-speed camera. The pantograph and the transmission line are monitored from multiple angles by sliding on the circular track. The monitoring path of the high-speed camera is displayed in the intelligent monitoring system, and the position of the high-speed camera is displayed in real time and fitted with animation effects.
[0011] According to the above technical solution, step S3 further includes:
[0012] The intelligent monitoring system records the speed of the high-speed rail itself, acquires data when the speed of the high-speed rail changes, and sends the data of the speed change to the high-speed camera at the same time;
[0013] The intelligent monitoring system is equipped with a weather monitoring transmission point at each high-speed rail station. At the same time, a corresponding receiving point is set up on the high-speed rail. The weather monitoring transmission point transmits local climate data to the intelligent monitoring system on the high-speed rail when the high-speed rail enters the jurisdiction;
[0014] The weather monitoring transmission point divides the weather into low wind speed weather and high wind speed weather. The high-speed camera is adjusted according to the weather data transmitted to the weather monitoring transmission point to ensure that the high-speed camera can accurately monitor the pantograph and transmission line.
[0015] According to the above technical solution, when the weather monitoring transmission point detects that the weather in the jurisdiction area is low wind speed weather, the high-speed camera does not need to transmit the pantograph movement error compensation data;
[0016] When the weather monitoring transmission point detects that the weather in the jurisdiction area is high wind speed weather, the high-speed camera needs to transmit pantograph movement error compensation data to ensure that the images monitored by the high-speed camera are accurate.
[0017] According to the above technical solution, step S2 further includes:
[0018] The establishment of the pantograph movement error compensation database is to monitor the real-time distance between the pantograph and the transmission line in real time, and obtain the real-time image of the transmission line through scanning with a high-speed camera, and transmit the image of the transmission line to the intelligent monitoring system. The intelligent monitoring system linearizes the transmission line image, sets the cross-sectional radius of the transmission line to L1, sets the fixed horizontal position height of the transmission line to H3, and sets the undulation height of the transmission line to the range of H1-H2, that is, the amplitude of the transmission line shaking down and up is (H3-H1)-(H2-H3). Since the lateral length of the pantograph is much larger than the cross-sectional radius of the transmission line, the lateral movement data of the transmission line is not calculated, and the pantograph movement error compensation data range is (H3-H1)-(H2-H3);
[0019] Under low wind speed conditions, before the pantograph is started, the pantograph rise data is calculated and the basic pantograph rise data is set to H4, H4=H3+L1. After the pantograph rises to a fixed horizontal position, the pantograph is driven to rise by L1 again, that is, the pantograph pushes the transmission line upward to ensure that the pantograph is in continuous contact with the transmission line.
[0020] In high wind speed conditions, before the pantograph rises, the intelligent monitoring system determines the wind speed data that has been obtained and sets the wind speed at this time to M, which is divided into 9 levels from M1 to M9. M1 indicates that the wind speed data is the lowest among M1 to M9, and M9 indicates that the wind speed data is the highest among M1 to M9. The corresponding pantograph rising distance data under high wind speed conditions requires the intelligent monitoring system to select between (H3-H1)-(H2-H3), and (H3-H1)-(H2-H3) 3) The interval is divided into 9 levels from N1 to N9. N1-N9 correspond to M1-M9 one by one. When the wind speed is low, the compensated distance data of the pantograph movement is small, so that the force of the pantograph moving up to support the transmission line is small. When the wind speed is high, the compensated distance data of the pantograph movement is large, so that the force of the pantograph moving up to support the transmission line is large. The upward movement amplitude of the pantograph is adjusted in real time according to the condition of the transmission line to reduce the wear of the transmission line and the pantograph, and maintain normal power supply of the high-speed rail.
[0021] According to the above technical solution, the high-speed camera performs real-time monitoring of the transmission line according to the wind speed level. This monitoring method serves as an auxiliary monitoring of step S2, that is, the regulation of the pantograph in step S2 is forced to be urgently regulated through step S4 to ensure that the transmission line is in continuous contact with the pantograph;
[0022] During the operation of the high-speed railway, it will shake from time to time due to the influence of the external environment. The pantograph will follow the shaking and then separate from the transmission line. At this time, the pantograph control requirements cannot be met based on the error database alone. The pantograph and transmission line will still separate due to the shaking amplitude of the high-speed railway itself. At this time, it is necessary to determine how to adjust the pantograph based on the status of the high-speed railway itself.
[0023] According to the above technical solution, step S4 further includes:
[0024] A vibration detection device is installed on the high-speed rail, and the vibration detection device detects the shaking amplitude of the high-speed rail in real time. The shaking amplitude of the high-speed rail is caused by the high-speed rail itself being affected by external airflow or external terrain, which in turn causes the pantograph to move involuntarily, before the involuntarily movement;
[0025] The movement path of the high-speed rail is fixed. The special terrain on the movement path, that is, the terrain where the high-speed rail shakes, is marked. Before entering such marked path, the pantograph is driven to move at the N9 level, so that the pantograph moves to the highest point and pushes the transmission line with the maximum amplitude, so as to increase the friction between the pantograph and the transmission line and then improve the stability of the pantograph and the transmission line. The marked path is short, and the degree of wear of the pantograph and the transmission line during this period is low and can be ignored.
[0026] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention, by providing an intelligent monitoring system, under the condition of low wind speed, the compensated distance data of the pantograph movement is small, so that the force of the pantograph moving up to support the transmission line is small; under the condition of high wind speed, the compensated distance data of the pantograph movement is large, so that the force of the pantograph moving up to support the transmission line is large, and the upward movement amplitude of the pantograph is adjusted in real time according to the condition of the transmission line, thereby reducing the degree of wear of the transmission line and the pantograph and maintaining normal power supply of the high-speed railway. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0028] Figure 1 It is a schematic diagram of the overall system of the present invention; DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] See also Figure 1 The present invention provides a technical solution: an intelligent monitoring system for high-voltage equipment, the execution process of which is:
[0031] Step S1, installing a professional high-speed camera on the top of the high-speed rail, and the high-speed camera takes real-time photos of the pantograph and transmission lines;
[0032] Step S2, establishing a pantograph movement error compensation database based on different road conditions;
[0033] Step S3, analyzing the surrounding environment data of the high-speed rail and the movement data of the high-speed rail body;
[0034] Step S4, exporting data to the high-speed rail cab, and calculating through the intelligent monitoring system in the cab, outputting execution instructions, and adjusting the moving distance of the pantograph.
[0035] The high-speed camera is installed on one side of the pantograph. The installation path is to set a circular track with the bottom of the pantograph and the outer wall of the top of the high-speed rail as the center and a radius of 0.5 meters. The high-speed camera is set on this track. The bearing seat installed at the bottom of the high-speed camera slides on the track to control the movement of the high-speed camera. The pantograph and transmission line are monitored from multiple angles by sliding on the circular track. The monitoring path of the high-speed camera is displayed in the intelligent monitoring system, and the position of the high-speed camera is displayed in real time with fitted animation effects.
[0036] Step S3 further comprises:
[0037] The intelligent monitoring system records the speed of the high-speed rail itself, acquires data when the speed of the high-speed rail changes, and sends the data of the speed change to the high-speed camera at the same time;
[0038] The intelligent monitoring system is equipped with a weather monitoring transmission point at each high-speed rail station. At the same time, a corresponding receiving point is set up on the high-speed rail. The weather monitoring transmission point transmits local climate data to the intelligent monitoring system on the high-speed rail when the high-speed rail enters the jurisdiction;
[0039] The weather monitoring transmission point divides the weather into low wind speed weather and high wind speed weather. The high-speed camera is adjusted according to the weather data transmitted to the weather monitoring transmission point to ensure that the high-speed camera can accurately monitor the pantograph and transmission line.
[0040] If the weather monitoring transmission point detects that the weather in the jurisdiction area is low wind speed weather, the high-speed camera does not need to transmit the pantograph movement error compensation data;
[0041] If the weather monitoring transmission point detects that the weather in the jurisdiction area is high wind speed, the high-speed camera needs to transmit pantograph movement error compensation data to ensure the accuracy of the images monitored by the high-speed camera.
[0042] Step S2 further comprises:
[0043] The establishment of the pantograph movement error compensation database is to monitor the real-time distance between the pantograph and the transmission line in real time, and obtain the real-time image of the transmission line through scanning with a high-speed camera, and transmit the image of the transmission line to the intelligent monitoring system. The intelligent monitoring system linearizes the transmission line image, sets the cross-sectional radius of the transmission line to L1, sets the fixed horizontal position height of the transmission line to H3, and sets the undulation height of the transmission line to the range of H1-H2, that is, the amplitude of the transmission line shaking down and up is (H3-H1)-(H2-H3). Since the lateral length of the pantograph is much larger than the cross-sectional radius of the transmission line, the lateral movement data of the transmission line is not calculated, and the pantograph movement error compensation data range is (H3-H1)-(H2-H3);
[0044] Under low wind speed conditions, before the pantograph is started, the pantograph rise data is calculated and the basic pantograph rise data is set to H4, H4=H3+L1. After the pantograph rises to a fixed horizontal position, the pantograph is driven to rise by L1 again, that is, the pantograph pushes the transmission line upward to ensure that the pantograph is in continuous contact with the transmission line.
[0045] In high wind speed conditions, before the pantograph rises, the intelligent monitoring system determines the wind speed data that has been obtained and sets the wind speed at this time to M, which is divided into 9 levels from M1 to M9. M1 indicates that the wind speed data is the lowest among M1 to M9, and M9 indicates that the wind speed data is the highest among M1 to M9. The corresponding pantograph rising distance data under high wind speed conditions requires the intelligent monitoring system to select between (H3-H1)-(H2-H3), and (H3-H1)-(H2-H3) 3) The interval is divided into 9 levels from N1 to N9. N1-N9 correspond to M1-M9 one by one. When the wind speed is low, the compensated distance data of the pantograph movement is small, so that the force of the pantograph moving up to support the transmission line is small. When the wind speed is high, the compensated distance data of the pantograph movement is large, so that the force of the pantograph moving up to support the transmission line is large. The upward movement amplitude of the pantograph is adjusted in real time according to the condition of the transmission line to reduce the wear of the transmission line and the pantograph, and maintain normal power supply of the high-speed rail.
[0046] The high-speed camera monitors the transmission line in real time according to the wind speed level. This monitoring method serves as an auxiliary monitoring of step S2, that is, the regulation of the pantograph in step S2 is forced to be urgently regulated through step S4 to ensure that the transmission line is in continuous contact with the pantograph;
[0047] During the operation of the high-speed railway, it will shake from time to time due to the influence of the external environment. The pantograph will follow the shaking and then separate from the transmission line. At this time, the pantograph control requirements cannot be met based on the error database alone. The pantograph and transmission line will still separate due to the shaking amplitude of the high-speed railway itself. At this time, it is necessary to determine how to adjust the pantograph based on the status of the high-speed railway itself.
[0048] Step S4 further comprises:
[0049] A vibration detection device is installed on the high-speed rail to detect the shaking amplitude of the high-speed rail in real time. The shaking amplitude of the high-speed rail is caused by the high-speed rail itself being affected by external airflow or external terrain, which in turn causes the pantograph to move involuntarily. Before the involuntarily movement occurs;
[0050] The movement path of the high-speed rail is fixed. The special terrain on the movement path, that is, the terrain where the high-speed rail shakes, is marked. Before entering such marked path, the pantograph is driven to move at the N9 level, so that the pantograph moves to the highest point and pushes the transmission line with the maximum amplitude, so as to increase the friction between the pantograph and the transmission line and then improve the stability of the pantograph and the transmission line. The marked path is short, and the degree of wear of the pantograph and the transmission line during this period is low and can be ignored.
[0051] If there are adjacent high-speed railways along the route, the high-speed railway system will monitor the positions of all high-speed railways along the route in real time. When it is about to approach the adjacent high-speed railway, it will drive the pantograph to move at the N9 level in advance, so that the pantograph moves to a high point to ensure the stability of the pantograph and the transmission line.
[0052] High-speed cameras monitor the status of transmission lines and pantographs in real time, and transmit images of the junction of transmission lines and pantographs to the high-speed railway in real time, while also backing up a copy and transmitting it to the high-speed railway station.
[0053] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0054] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A high-voltage equipment intelligent monitoring system, characterized in that: The execution process of the system is: Step S1, installing a professional high-speed camera on the top of the high-speed rail, and the high-speed camera takes real-time photos of the pantograph and transmission lines; Step S2, establishing a pantograph movement error compensation database based on different road conditions; Step S3, analyzing the surrounding environment data of the high-speed rail and the movement data of the high-speed rail body; Step S4, exporting data to the high-speed rail cab, calculating through the intelligent monitoring system in the cab, outputting execution instructions, and adjusting the moving distance of the pantograph; The installation position of the high-speed camera is on one side of the pantograph. The installation path is to set a circular track with the bottom of the pantograph and the outer wall of the top of the high-speed rail as the center and a radius of 0.5 meters. The high-speed camera is set on this track. The bearing seat installed at the bottom of the high-speed camera slides on the track to control the movement of the high-speed camera. The pantograph and the transmission line are monitored from multiple angles by sliding on the circular track. The monitoring path of the high-speed camera is displayed in the intelligent monitoring system and the position of the high-speed camera is displayed in real time with a fitted animation effect. The step S3 further comprises: The intelligent monitoring system records the speed of the high-speed rail itself, acquires data when the speed of the high-speed rail changes, and sends the data of the speed change to the high-speed camera at the same time; The intelligent monitoring system is equipped with a weather monitoring transmission point at each high-speed rail station. At the same time, a corresponding receiving point is set up on the high-speed rail. The weather monitoring transmission point transmits local climate data to the intelligent monitoring system on the high-speed rail when the high-speed rail enters the jurisdiction; The weather monitoring transmission point divides the weather into low wind speed weather and high wind speed weather, and adjusts the high-speed camera according to the weather data transmitted to the weather monitoring transmission point to ensure that the high-speed camera can accurately monitor the pantograph and transmission line; If the weather monitoring transmission point detects that the weather in the jurisdiction area is low wind speed weather, the high-speed camera does not need to transmit the pantograph movement error compensation data; The step S2 further comprises: The establishment of the pantograph movement error compensation database is to monitor the real-time distance between the pantograph and the transmission line in real time, and obtain the real-time image of the transmission line through scanning with a high-speed camera, and transmit the image of the transmission line to the intelligent monitoring system. The intelligent monitoring system linearizes the transmission line image, sets the cross-sectional radius of the transmission line to L1, sets the fixed horizontal position height of the transmission line to H3, and sets the undulation height of the transmission line to the range of H1-H2, that is, the amplitude of the transmission line shaking down and up is (H3-H1)-(H2-H3). Since the lateral length of the pantograph is much larger than the cross-sectional radius of the transmission line, the lateral movement data of the transmission line is not calculated, and the pantograph movement error compensation data range is (H3-H1)-(H2-H3); Under low wind speed conditions, before the pantograph is started, the pantograph rise data is calculated and the basic pantograph rise data is set to H4, H4=H3+L1. After the pantograph rises to a fixed horizontal position, the pantograph is driven to rise by L1 again, that is, the pantograph pushes the transmission line upward to ensure that the pantograph is in continuous contact with the transmission line. Under high wind speed conditions, before the pantograph rises, the intelligent monitoring system determines the wind speed data that has been obtained, sets the wind speed at this time to M, and divides it into 9 levels from M1 to M9. M1 indicates that the wind speed data is the lowest among M1-M9, and M9 indicates that the wind speed data is the highest among M1-M9. The corresponding pantograph rising distance data under high wind speed conditions requires the intelligent monitoring system to select between (H3-H1)-(H2-H3), and divide the (H3-H1)-(H2-H3) interval into 9 levels from N1 to N9. N1-N9 corresponds to M1-M9 one by one. Under low wind speed conditions, the pantograph movement is compensated for a small distance data, which makes the pantograph's upward movement against the transmission line small. Under high wind speed conditions, the pantograph movement is compensated for a large distance data, which makes the pantograph's upward movement against the transmission line large. If there are adjacent high-speed railways along the route, the high-speed railway system will monitor the positions of all high-speed railways along the route in real time. When it is about to approach the adjacent high-speed railway, it will drive the pantograph to move at the N9 level in advance, so that the pantograph moves to a high point to ensure the stability of the pantograph and the transmission line.
2. The intelligent monitoring system for high-voltage equipment according to claim 1 is characterized in that: The high-speed camera monitors the status of the transmission line and the pantograph in real time, transmits the image of the junction of the transmission line and the pantograph to the high-speed railway in real time, and backups a copy to the high-speed railway station.
Citation Information
Patent Citations
Pantograph movement control system
CN101612896A
Pantograph control device
CN101856975A
Train pantograph control method and device
CN112817232A
Wind velocity distribution estimation device and wind velocity distribution estimation method
JP2020118536A