High-efficiency energy storage and low-temperature refrigeration integrated machine for wind power
By designing components such as absorption heat pumps and DAC devices in wind turbines, the problems of overheating and low condensation efficiency of wind turbines are solved, efficient low-temperature refrigeration and energy storage conversion are achieved, extending equipment life and reducing energy consumption.
Patent Information
- Application Number
- CN202410592124.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-14
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-05-14
AI Technical Summary
Wind turbines cause the generator and energy storage device to overheat under high-intensity wind, and the contact area between the condensation water pipe and the hot and humid air is small, resulting in poor low-temperature refrigeration and low condensation efficiency.
A high-efficiency energy storage low-temperature refrigeration integrated machine for wind power is designed, which uses absorption heat pumps, DAC devices, Hall sensors, frequency converters, energy storage converters and other components to guide the air flow through the air inlet low-pressure pipe and vortex generator to form a solid state Dry ice particles are converted into electrical energy using dynamic potential energy, combined with a condenser and evaporator to improve condensation efficiency, and a hydrogen-oxygen separator and proton exchange fuel cell are used to improve energy storage efficiency.
Efficient low-temperature refrigeration is achieved, extending the service life of the generator, improving condensation efficiency and energy storage conversion efficiency, and reducing energy consumption.
Smart Images

Figure CN118167575B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of low-temperature refrigeration of fans, and in particular to a high-efficiency energy storage low-temperature refrigeration integrated machine for wind power. Background Art
[0002] At present, most small and medium-sized wind turbines adopt a direct-drive structure, which is characterized by a direct connection between the fan blade flange and the engine shaft, the rotation speed of the fan blade is consistent with the motor speed, and the wind turbine generally consists of components such as a wind wheel, a generator, a direction regulator, a tower, a speed limiting safety mechanism and an energy storage device. Therefore, the demand for low-temperature environments is increasing. The traditional refrigeration system mainly includes a compressor, a condenser, a throttling device and an evaporator that are connected in sequence to form a circulation pipeline, which are used to form a low-temperature refrigeration integrated machine and perform operations.
[0003] However, in the prior art, during the use of wind turbines, the continuous high-intensity wind power generation of the wind turbines can easily cause the generator and energy storage device inside the tower to overheat, resulting in internal generator overload and unable to guarantee its service life. In addition, since the contact area between the condensate pipe and the hot and humid air inside the wind turbine is small, the low-temperature refrigeration effect is poor, resulting in low condensation efficiency. Therefore, it is necessary to propose a high-efficiency energy storage low-temperature refrigeration integrated machine for wind power. Summary of the invention
[0004] The purpose of the present invention is to provide a high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power, so as to solve the problem proposed in the above background technology that during the use of the wind turbine, the continuous high-intensity wind power generation of the wind turbine can easily cause the generator and energy storage device inside the tower to overheat, and the contact area between the condensation water pipe and the hot and humid air inside the wind turbine is small, resulting in poor low-temperature refrigeration effect and low condensation efficiency.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical scheme: a high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power, comprising a cabin, a body is arranged on the top of the cabin, an air supply body is installed inside the cabin, an absorption heat pump is installed on the side end of the air supply body, the left and right side ends of the absorption heat pump are connected with four surface cooling pipes, the side ends of the four surface cooling pipes are connected with exhaust condensing fiber fabric air ducts, the top of the exhaust condensing fiber fabric air duct is butt-connected with a light-transmitting pipeline, the top of the light-transmitting pipeline is sealed and connected with a pipeline connecting component, the top of the pipeline connecting component is connected with an air inlet low-temperature component, the exhaust condensing fiber fabric air duct The pipes are arranged to be connected in multiple groups in a spliced manner, and the installation height of the exhaust condensing fiber fabric duct is dependent on the tower height, a DAC device is arranged inside the exhaust condensing fiber fabric duct, and a fixed angle iron mounting frame is equally sleeved and fastened on the outside of the exhaust condensing fiber fabric duct, and multiple groups of Hall sensors are installed on the bottom wall surface of the absorption heat pump, and the bottom of the absorption heat pump is connected to a frequency converter through a line, and the side end of the frequency converter is connected to an exchanger through a line, and the side end of the exchanger is connected to an energy storage converter, and the bottom of the energy storage converter is connected to an energy storage pump, and the top of the energy storage converter is connected to an energy storage tube;
[0006] The air inlet low-temperature component includes an air inlet low-pressure pipe, and low-pressure air inlet ends are cross-opened on the two wall surfaces at the top of the air inlet low-pressure pipe, and vortex generators are installed inside the low-pressure air inlet ends. A mounting angle bracket is fastened to the outside of the low-pressure air inlet end, and an air compressor is fastened to the side end of the mounting angle bracket. The bottom of the air compressor is connected to a condenser, and the side end of the condenser is connected to an evaporator. The bottom of the evaporator is connected to a condensing air pipe, the bottom of the condensing air pipe is connected to a gas liquefier, and the bottom of the condenser is connected to a gas circulation pipe.
[0007] Preferably, the bottom end of the gas transmission circulation pipe is connected to an oxygen condensation pipeline, the bottom end of the oxygen condensation pipeline is connected to an air pump, the left and right side ends of the air pump are connected to gas collecting pipes, the bottom end of the gas collecting pipes is connected to a gas storage chamber, the side ends of the gas storage chamber are connected to two groups of gas pipes, and the side ends of the two groups of gas pipes are connected to hydrogen delivery ends.
[0008] Preferably, a pressure pump is connected to the side end of the hydrogen delivery end, a gas refrigerant delivery pipeline is connected to the bottom of the pressure pump, a gas-liquid separator is installed at the inner bottom end of the gas refrigerant delivery pipeline, a plurality of groups of liquid refrigerant delivery pipelines are connected to the bottom end of the gas-liquid separator, and a condensing fin heat exchange structure is connected to the side ends of the plurality of groups of liquid refrigerant delivery pipelines.
[0009] Preferably, the side end of the condensing fin heat exchange structure is connected to a hydrogen storage tank, the bottom end of the hydrogen storage tank is connected to multiple groups of hydrogen energy delivery pipelines, the side ends of the multiple groups of hydrogen energy delivery pipelines are connected to proton exchange fuel cells, the side end of the proton exchange fuel cell is provided with an energy storage connector, the side end of the energy storage connector is connected to an energy storage group, and the top of the energy storage group is connected to an energy exchange tube.
[0010] Preferably, the side end of the hydrogen delivery end is connected to a hydrogen-oxygen separator, the side end of the hydrogen-oxygen separator is connected to a gas distribution pipe, the bottom end of the gas distribution pipe is connected to a gas collecting chamber, a high-efficiency battery is arranged on the side of the gas collecting chamber, the side end of the high-efficiency battery is electrically connected to an electrolysis chamber, and the two ends of the electrolysis chamber are connected to the gas pipe and the gas collecting chamber with a vertical height difference.
[0011] Preferably, a shaft-blade group is installed inside the air supply body, and a side end of the shaft-blade group is connected to a power supply structure.
[0012] Preferably, a static pressure end is installed at the side end of the air supply body, the side end of the static pressure end is connected to a low-temperature static pressure air outlet end, and the side end of the low-temperature static pressure air outlet end is connected to an air outlet.
[0013] Preferably, a circulating air pump is installed on the top of the cabin, and the side ends of the circulating air pump are respectively connected to the first air pipe and the second air pipe, and the side ends of the second air pipe and the first air pipe are both connected to the condensing fin heat exchange structure.
[0014] Preferably, an axial flow cooling fan is symmetrically installed on the back surface of the cabin body, and a PLC controller is provided on the surface of the body.
[0015] Preferably, the pipe connection assembly includes a flange, the bottom end of the flange is fastened to a sealing disk by bolts, and the side end of the sealing disk is fastened to a fixing seat, wherein the fixing seat is fastened and installed in a plurality of equally divided groups on the outside of the exhaust condensing fiber fabric air duct.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] 1. In the present invention, by cooperating with the air inlet low-temperature component, the absorption heat pump and the Hall sensor, it is convenient to use the air inlet low-pressure pipe and the low-pressure air inlet end to guide and transport the low-pressure airflow at a high place, and with the cooperation of the vortex generator, the strength of the airflow guided and transported is guaranteed, so that the high-altitude airflow is converted into liquid under the cooperation of the air compressor, the condenser, the evaporator, the condensation air pipe and the gas liquefier, and then the generated liquid is dripped into the DAC device inside the exhaust condensation fiber fabric air duct, and the collected and recovered carbon dioxide is transported to the air compressor through the exhaust condensation fiber fabric air duct by the DAC device for compression, thereby forming solid dry ice particles, so that the solid dry ice particles and the condensed water are absorbed in the air compressor. With the cooperation of the heat pump, the air is gathered and falls along the exhaust condensation fiber fabric duct. The kinetic potential energy generated when falling is converted into electrical energy by the frequency converter, exchanger and energy storage converter with the cooperation of multiple sets of Hall sensors, and then transported to the energy storage pump. Then the absorption heat pump can be used to facilitate the transportation of heat from the low-temperature heat source to the high-temperature heat source pump, so that the gas evaporated by the fallen water and dry ice particles is transported along the exhaust condensation fiber fabric duct to the inside of the air compressor again, and then the air compressor is used to compress and transport the evaporated gas again. Then, the condenser and the gas circulation pipe are used to evaporate the mixture and absorb the heat in the flowing gas with the cooperation of the air compressor, the expansion valve and the evaporator, so that the gas flowing through the evaporator can be condensed and cooled, and the condensed gas is transported to the inside of the air supply body through the exhaust condensation fiber fabric duct. With the cooperation of the low-temperature static pressure air outlet and the air outlet, the low-temperature condensation gas transportation operation is convenient. In use, the overall device is highly efficient and energy-saving.
[0018] 2. In the present invention, the electrolysis reaction operation can be carried out in the electrolysis chamber through the cooperation of the gas distribution pipe, the gas storage chamber, the gas collecting pipe, the air pump, the electrolysis chamber, the gas collecting chamber and the gas distribution pipe, and then the high-efficiency storage battery can be used to carry out the electrolysis reaction operation. Then, with the cooperation of the hydrogen-oxygen separator, it is convenient to separate and collect the hydrogen and oxygen. The gas pipe with a vertical height difference at both ends of the electrolysis chamber is connected to the gas collecting chamber, so that the gas distribution pipe can separate and transport the generated hydrogen and oxygen. Then, when the electrolysis chamber generates oxygen through electrolysis, the oxygen is transported to the gas storage chamber. Then, with the cooperation of the air pump, the gas collecting pipe, the gas storage chamber, the oxygen condensation pipeline and the gas transmission circulation pipe, it is convenient for the subsequent low-temperature condensation operation. Then, under the action of the booster pump, the gas refrigerant is transported through the gas refrigerant transmission pipe. The collected hydrogen is transported through the channel, and then with the cooperation of the gas-liquid separator, the excess refrigerant liquid is stored and utilized, and then multiple sets of liquid refrigerant transport pipelines are used to transport the generated hydrogen liquid to the condensing fin heat exchange structure for heat exchange operation to ensure the utilization efficiency of the hydrogen energy generated by electrolysis. After that, after the generated hydrogen energy is heat exchanged, it can be transported to the hydrogen storage tank for hydrogen energy storage, and then with the cooperation of multiple sets of hydrogen energy transport pipelines, proton exchange fuel cells, energy storage connectors and energy exchange tubes, the excess load electrical energy can be converted into hydrogen energy and transported to the energy storage group for storage for subsequent utilization. The overall device effectively ensures the efficient energy storage operation of the wind turbine, with low energy consumption and high energy storage conversion efficiency.
[0019] 3. In the present invention, the axial flow cooling fan, the circulating air pump, the first air pipe and the second air pipe cooperate to enable the axial flow cooling fan to drain the condensed gas inside the second air pipe inside the overall device, so that the condensed gas inside the second air pipe can cool down the interior of the overall device and ensure the service life of the overall device. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the main structure of the high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power of the present invention;
[0021] Figure 2 It is a schematic structural diagram of a side view of a high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power of the present invention;
[0022] Figure 3 It is a schematic diagram of the separation structure of the main body in the high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power of the present invention;
[0023] Figure 4 It is a schematic diagram of the internal cross-sectional structure of the main body of the high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power of the present invention;
[0024] Figure 5 It is a structural schematic diagram of the air inlet low-temperature component in the high-efficiency energy storage low-temperature refrigeration integrated machine for wind power of the present invention;
[0025] Figure 6 It is a schematic diagram of the internal structure of the cabin and the machine body of the high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power of the present invention;
[0026] Figure 7 This is a schematic diagram of the installation position structure of the Hall sensor in the high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power of the present invention;
[0027] Figure 8 It is a schematic diagram of the installation structure of the proton exchange fuel cell and the energy storage connector in the high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power of the present invention;
[0028] Fig. 9 It is a schematic diagram of the installation structure of the gas-liquid separator in the high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power of the present invention.
[0029] In the figure: 1, cabin; 2, air outlet; 3, body; 4, first air pipe; 5, circulating air pump; 6, PLC controller; 7, energy storage pipe; 8, energy storage converter; 9, energy storage pump; 10, gas distribution pipe; 11, gas storage chamber; 12, gas collecting pipe; 13, air pump; 14, oxygen condensation pipeline; 15, pipeline connection assembly; 151, flange; 152, fixing seat; 153, sealing plate; 16, light-transmitting pipeline; 17, exhaust condensation fiber fabric air duct; 18, air inlet low-temperature assembly; 181, air inlet low-pressure pipe; 182, low-pressure air inlet end; 183, vortex generator; 184, installation fixing angle bracket; 185, air compressor; 186, condenser; 187, evaporator; 188, condensation air pipe; 189, gas liquefier; 1890, gas circulation pipe; 19, second Air pipe; 20. Fixed angle iron mounting frame; 21. Surface cooling pipe; 22. Absorption heat pump; 23. Air supply body; 24. Axial flow cooling fan; 25. Hall sensor; 26. Frequency converter; 28. Hydrogen and oxygen separator; 29. Hydrogen delivery end; 30. Booster pump; 31. Gas refrigerant delivery pipeline; 32. Gas-liquid separator; 33. Liquid refrigerant delivery pipeline; 34. High-efficiency battery; 35. Electrolysis chamber; 36. Gas collecting chamber; 37. Gas distribution pipeline; 38. Power supply structure; 39. Shaft impeller group; 40. Energy exchange tube; 41. Energy storage group; 42. Static pressure end; 43. Low-temperature static pressure air outlet; 44. DAC device; 45. Condensing fin heat exchange structure; 46. Hydrogen energy delivery pipeline; 47. Proton exchange fuel cell; 48. Energy storage connector; 49. Exchanger. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] Reference Figure 1-Figure 9 As shown: a high-efficiency energy storage low-temperature refrigeration integrated machine for wind power, comprising a cabin 1, a body 3 is arranged on the top of the cabin 1, an air supply body 23 is installed inside the cabin 1, an absorption heat pump 22 is installed on the side end of the air supply body 23, the left and right side ends of the absorption heat pump 22 are connected with four surface cooling pipes 21, the side ends of the four surface cooling pipes 21 are connected with exhaust condensation fiber fabric air ducts 17, the top of the exhaust condensation fiber fabric air duct 17 is butt-connected with a light-transmitting pipeline 16, and the top of the light-transmitting pipeline 16 is sealed and connected to the A pipe connection assembly 15 is connected, and the top of the pipe connection assembly 15 is connected to an air inlet low-temperature assembly 18. The exhaust condensing fiber fabric air duct 17 is set as a plurality of groups of spliced connections, and the installation height of the exhaust condensing fiber fabric air duct 17 depends on the tower height. The exhaust condensing fiber fabric air duct 17 is provided with a DAC device 44 inside. The outside of the exhaust condensing fiber fabric air duct 17 is equally divided and fastened with a fixed angle iron mounting frame 20. The bottom wall surface of the absorption heat pump 22 is provided with a plurality of Hall sensors. 25, and the bottom of the absorption heat pump 22 is connected to the inverter 26 through a line, the side end of the inverter 26 is connected to the exchanger 49 through a line, the side end of the exchanger 49 is connected to the energy storage converter 8, the bottom of the energy storage converter 8 is connected to the energy storage pump 9, and the top of the energy storage converter 8 is connected to the energy storage pipe 7; the air inlet low-temperature component 18 includes an air inlet low-pressure pipe 181, and the top two wall surfaces of the air inlet low-pressure pipe 181 are cross-opened with a low-pressure air inlet end 182, and the low-pressure air inlet end 182 is installed inside A vortex generator 183 is provided, and a mounting bracket 184 is fastened to the outside of the low-pressure air inlet end 182, an air compressor 185 is fastened to the side end of the mounting bracket 184, a condenser 186 is connected to the bottom of the air compressor 185, a side end of the condenser 186 is connected to an evaporator 187, a condensing air pipe 188 is connected to the bottom of the evaporator 187, a gas liquefier 189 is connected to the bottom of the condenser 186, and a gas circulation pipe 1890 is connected to the bottom of the condenser 186.
[0032] according to Figure 1 , Figure 2 and Figure 4As shown, the bottom end of the gas circulation pipe 1890 is connected to the oxygen condensation pipeline 14, the bottom end of the oxygen condensation pipeline 14 is connected to the air pump 13, the left and right side ends of the air pump 13 are connected to the gas collecting pipe 12, the bottom end of the gas collecting pipe 12 is connected to the gas storage chamber 11, the side end of the gas storage chamber 11 is connected to the two-component gas pipe 10, the side end of the two-component gas pipe 10 is connected to the hydrogen delivery end 29, with the cooperation of the two-component gas pipe 10, when the electrolysis chamber 35 performs electrolysis to generate oxygen, the oxygen is transported up to the gas storage chamber 11, and then under the action of the air pump 13, the gas collecting pipe 12 is used to extract the oxygen inside the gas storage chamber 11, and then it is transported to the gas circulation pipe 1890 through the oxygen condensation pipeline 14, which is convenient for subsequent low-temperature condensation operations.
[0033] according to Figure 3 , Figure 4 , Figure 6 , Figure 8 and Fig. 9 As shown, the side end of the hydrogen delivery end 29 is connected to a booster pump 30, the bottom of the booster pump 30 is connected to a gas refrigerant delivery pipeline 31, the inner bottom end of the gas refrigerant delivery pipeline 31 is installed with a gas-liquid separator 32, the bottom end of the gas-liquid separator 32 is connected to multiple groups of liquid refrigerant delivery pipelines 33, the side ends of the multiple groups of liquid refrigerant delivery pipelines 33 are connected to a condensing fin heat exchange structure 45, under the action of the booster pump 30, the collected hydrogen is transported through the gas refrigerant delivery pipeline 31, and then with the cooperation of the gas-liquid separator 32, the excess refrigerant liquid is stored and utilized, and then the multiple groups of liquid refrigerant delivery pipelines 33 are used to transport the generated hydrogen liquid to the condensing fin heat exchange structure 45 for heat exchange operation, so as to ensure the utilization efficiency of the hydrogen energy generated by electrolysis.
[0034] according to Figure 3 , Figure 6 and Figure 8 As shown, the side end of the condensing fin heat exchange structure 45 is connected to a hydrogen storage tank, the bottom end of the hydrogen storage tank is connected to multiple groups of hydrogen energy delivery pipelines 46, the side ends of the multiple groups of hydrogen energy delivery pipelines 46 are connected to a proton exchange fuel cell 47, the side end of the proton exchange fuel cell 47 is provided with an energy storage connector 48, the side end of the energy storage connector 48 is connected to the energy storage group 41, and the top of the energy storage group 41 is connected to an energy exchange tube 40. After the generated hydrogen energy is heat exchanged, it can be transported to the hydrogen storage tank for hydrogen energy storage, and then under the action of the multiple groups of hydrogen energy delivery pipelines 46, the stored hydrogen energy can be transported and utilized, and under the action of the proton exchange fuel cell 47, hydrogen energy is used as fuel and then converted into required electrical energy, and with the cooperation of the energy storage connector 48 and the energy exchange tube 40, excess load electrical energy can be converted into hydrogen energy and transported to the energy storage group 41 for storage, which is convenient for subsequent use.
[0035] according to Figure 4 , Figure 6 and Fig. 9 As shown, the side end of the hydrogen delivery end 29 is connected to the hydrogen-oxygen separator 28, the side end of the hydrogen-oxygen separator 28 is connected to the gas distribution pipe 37, the bottom end of the gas distribution pipe 37 is connected to the gas collecting chamber 36, the side of the gas collecting chamber 36 is provided with a high-efficiency battery 34, the side end of the high-efficiency battery 34 is electrically connected to the electrolysis chamber 35, and the two ends of the electrolysis chamber 35 are connected to the gas collecting chamber 36 with a gas pipe with a vertical height difference, with the cooperation of the high-efficiency battery 34, it is convenient to electrolyze the positive and negative electrodes in the electrolysis chamber 35, so that the generated oxygen is adsorbed on the surface of the positive electrode, and the hydrogen is attached to the surface of the negative electrode, and then with the cooperation of the hydrogen-oxygen separator 28, the characteristics of oxygen rising and hydrogen falling in the electrolysis reaction process are utilized to separate and collect hydrogen and oxygen, and the two ends of the electrolysis chamber 35 are connected to the gas pipe with a vertical height difference, so that the gas distribution pipe 37 can separate and transport the hydrogen and oxygen generated in the gas collecting chamber 36.
[0036] according to Figure 6 As shown, the interior of the air supply body 23 is provided with a shaft-blade group 39, and the side end of the shaft-blade group 39 is connected to the power supply structure 38. The exhaust condensation fiber fabric duct 17 attached to the tower height is used to make the condensed aggregate liquid fall from a high place and generate kinetic potential energy to enable the power supply structure 38 to operate, and the high-efficiency exhaust air generated is used to make the shaft-blade group 39 drive the power supply structure 38 to operate. The overall device has high energy supply efficiency, reduces energy consumption, and is convenient for high-efficiency energy storage operations.
[0037] according to Figure 1 , Figure 3 , Figure 4 , Figure 6 and Figure 8 As shown, a static pressure end 42 is installed at the side end of the air supply body 23, and the side end of the static pressure end 42 is connected to a low-temperature static pressure air outlet end 43, and the side end of the low-temperature static pressure air outlet end 43 is connected to the air outlet 2. With the cooperation of the air supply body 23, the low-temperature static pressure air outlet end 43 and the air outlet 2, low-temperature condensation operations are facilitated.
[0038] according to Figure 1 , Figure 2 , Figure 6 , Figure 7 and Figure 8As shown, a circulating air pump 5 is installed on the top of the cabin 1, and the side ends of the circulating air pump 5 are respectively connected to the first air pipe 4 and the second air pipe 19, and the side ends of the second air pipe 19 and the first air pipe 4 are connected to the condensing fin heat exchange structure 45. With the cooperation of the circulating air pump 5, the gas generated by the heat exchange of the condensing fin heat exchange structure 45 is converted into condensed gas under the action of the first air pipe 4 and then transported to the second air pipe 19, and the condensed gas inside the second air pipe 19 is convenient for cooling the entire device to ensure the service life of the entire device.
[0039] according to Figure 1 , Figure 2 and Figure 7 As shown, an axial flow cooling fan 24 is symmetrically installed on the back surface of the cabin 1, and a PLC controller 6 is provided on the surface of the body 3. The axial flow cooling fan 24 cooperates with the second air pipe 19, so that the axial flow cooling fan 24 can drain the condensed gas transported inside the second air pipe 19 inside the overall device, so that the condensed gas inside the second air pipe 19 can cool down the interior of the overall device.
[0040] according to Figure 1 and Figure 4 As shown, the pipe connection assembly 15 includes a flange 151, the bottom end of the flange 151 is fastened with a sealing disk 153 by bolts, and the side end of the sealing disk 153 is fastened with a fixing seat 152, wherein the fixing seat 152 is formed on the outside of the exhaust condensing fiber fabric air duct 17 to form a plurality of equally divided sets of sleeves and fastening installations, and with the cooperation of the sealing disk 153 and the flange 151, it is convenient to make the air inlet low-pressure pipe 181, the exhaust condensing fiber fabric air duct 17 and the light-transmitting pipe 16 be sealed and installed and connected, and the fixing seat 152 is used to facilitate the fixed installation of the air supply circulation pipe 1890 on the outside of the exhaust condensing fiber fabric air duct 17, and the overall structure is arranged that the exhaust condensing fiber fabric air duct 17 is divided into multiple sections for installation, so that the light-transmitting pipe 16 is installed at the middle end of the two groups of exhaust condensing fiber fabric air ducts 17, and then the air inlet low-pressure pipe 181 is installed at the top of the exhaust condensing fiber fabric air duct 17.
[0041] The wiring diagram of the gas liquefier 189, absorption heat pump 22, Hall sensor 25, inverter 26, hydrogen-oxygen separator 28, gas-liquid separator 32, energy exchange tube 40, DAC device 44, proton exchange fuel cell 47, energy storage connector 48 and exchanger 49 in the present invention belongs to the common knowledge in the field, and its working principle is a well-known technology. The model is selected according to the actual use. Therefore, the control method and wiring arrangement of the gas liquefier 189, absorption heat pump 22, Hall sensor 25, inverter 26, hydrogen-oxygen separator 28, gas-liquid separator 32, energy exchange tube 40, DAC device 44, proton exchange fuel cell 47, energy storage connector 48 and exchanger 49 are no longer explained in detail.
[0042] The use method and working principle of the device are as follows: first, with the cooperation of the sealing disk 153 and the flange 151, it is convenient to seal and install the air inlet low-pressure pipe 181, the exhaust condensation fiber fabric air duct 17 and the light-transmitting pipeline 16, and the fixing seat 152 is used to fix the air circulation pipe 1890 on the outside of the exhaust condensation fiber fabric air duct 17, so that the overall exhaust condensation fiber fabric air duct 17 is installed in multiple sections on the outside of the tower body, so that the light-transmitting pipeline 16 is installed at the middle end of the two groups of exhaust condensation fiber fabric air ducts 17, and the air inlet low-pressure pipe 181 is installed at the top of the exhaust condensation fiber fabric air duct 17, thereby forming a high degree of pipeline operation, and with the cooperation of the fixed angle iron mounting frame 20, it is convenient to install the bottom end and The side walls of the cabin 1 and the body 3 are installed firmly, and then, with the cooperation of the air inlet low-pressure pipe 181, the low-pressure air inlet end 182 cross-opened on the two wall surfaces is used to guide and transport the low-pressure airflow at a high altitude, and with the cooperation of the vortex generator 183, the strength of the airflow guided and transported is guaranteed. When the high-altitude airflow is compressed and transported under the action of the air compressor 185, the condenser 186 is used to facilitate the gas transported by the air compressor 185 to the condenser 186 and the evaporator 187 for condensation and evaporation, so that the gas is converted into liquid in the cooperation of the condensation air pipe 188 and the gas liquefier 189, and then the generated liquid is dripped into the DAC device 44 inside the exhaust condensation fiber fabric air duct 17, and the DAC device 4 The DAC system inside 4 uses the filter surface covered with special chemical reagents to capture carbon dioxide, and then forms a compound there. When the new compound is heated, the captured carbon dioxide is released and separated from the chemical reagent, and then can be recycled, so that the DAC device 44 can more efficiently realize the recycling of carbon dioxide. Then, the collected and recycled carbon dioxide is transported to the air compressor 185 through the exhaust condensation fiber fabric air duct 17 for compression, thereby forming solid dry ice particles. The solid dry ice particles and the condensed water are gathered and fallen along the exhaust condensation fiber fabric air duct 17 with the cooperation of the absorption heat pump 22. The dynamic potential energy generated when falling is used in cooperation with multiple sets of Hall sensors 25, and the frequency converter 26 is used to generate the kinetic energy. , the exchanger 49 and the energy storage converter 8 convert the dynamic potential energy into electrical energy, which is then transmitted to the energy storage pump 9, and then the absorption heat pump 22 can be used to facilitate the transmission of heat from the low-temperature heat source to the high-temperature heat source pump, so that the gas evaporated by the fallen water and dry ice particles is again transported along the exhaust condensation fiber fabric duct 17 to the inside of the air compressor 185, and then the air compressor 185 is used again to compress and transport the evaporated gas, and then the condenser 186 and the gas circulation pipe 1890 are used to condense the high-temperature and high-pressure gas compressed by the air compressor 185. After the high-temperature and high-pressure gas is converted into liquid, it is adjusted by the expansion valve to become a low-temperature and low-pressure gas-liquid mixture that enters the evaporator 187. With the cooperation of the evaporator 187,The mixture is evaporated and the heat in the flowing gas is absorbed, so that the gas flowing through the evaporator 187 can be condensed and cooled, and the condensed gas is discharged to the air supply body 23 by using the exhaust condensation fiber fabric duct 17, so that the low-temperature static pressure air outlet 43 and the air outlet 2 cooperate to facilitate the low-temperature condensation and gas transportation operation, and the energy converted in the energy storage pump 9 can be transported to the high-efficiency battery 34 with the cooperation of the energy storage tube 7, so that with the cooperation of the high-efficiency battery 34, it is convenient to electrolyze the positive and negative electrodes inside the electrolysis chamber 35, so that the generated oxygen is adsorbed on the surface of the positive electrode, and the hydrogen is attached to the surface of the negative electrode, and then with the cooperation of the hydrogen-oxygen separator 28, the electrolysis reaction process is used. In the process, oxygen rises and hydrogen falls, and hydrogen and oxygen are separated and collected. The gas pipes at both ends of the electrolysis chamber 35 are connected to the gas collecting chamber 36 with a vertical difference, which is convenient for using the gas distribution pipe 37 to separate and transport the generated hydrogen and oxygen. When the electrolysis chamber 35 generates oxygen by electrolysis, the oxygen is transported to the gas storage chamber 11. Then, under the action of the air pump 13, the gas collecting pipe 12 is used to extract the oxygen inside the gas storage chamber 11, and then it is transported to the gas circulation pipe 1890 through the oxygen condensation pipeline 14, which is convenient for the subsequent low-temperature condensation operation, and it is convenient for the gas refrigerant to be transported under the action of the booster pump 30. The pipeline 31 transports the collected hydrogen gas, and then, with the cooperation of the gas-liquid separator 32, the excess refrigerant liquid is stored and utilized. After that, the generated hydrogen liquid is transported to the condensing fin heat exchange structure 45 for heat exchange operation using multiple groups of liquid refrigerant transport pipelines 33 to ensure the utilization efficiency of the hydrogen energy generated by electrolysis. After the heat exchange operation, the generated hydrogen energy can be transported to the hydrogen storage tank for hydrogen energy storage. Then, under the action of multiple groups of hydrogen energy transport pipelines 46, the stored hydrogen energy can be transported and utilized. Under the action of the proton exchange fuel cell 47, the hydrogen energy is used as fuel and then converted into the required electrical energy, and in the energy storage connection With the cooperation of the connector 48 and the energy exchange tube 40, the excess load electrical energy can be converted into hydrogen energy and transported to the energy storage group 41 for storage, so as to facilitate subsequent use. At the same time, with the cooperation of the axial flow cooling fan 24, the gas generated by the heat exchange of the condensing fin heat exchange structure 45 can be transported to the first air pipe 4 under the action of the circulating air pump 5, and then converted into condensed gas and transported to the second air pipe 19, so that the axial flow cooling fan 24 can drain the condensed gas inside the second air pipe 19 inside the whole device, so that the condensed gas inside the second air pipe 19 can cool down the whole device, thereby ensuring the service life of the whole device.
[0043] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. High-efficiency energy storage and low-temperature refrigeration integrated machine for wind power, characterized by: The invention comprises a cabin (1), wherein a body (3) is arranged on the top of the cabin (1), an air supply body (23) is installed inside the cabin (1), an absorption heat pump (22) is installed on the side end of the air supply body (23), the left and right side ends of the absorption heat pump (22) are connected to four surface cooling pipes (21), the side ends of the four surface cooling pipes (21) are connected to exhaust condensation fiber fabric air ducts (17), a light-transmitting pipeline (16) is butt-connected to the top of the exhaust condensation fiber fabric air duct (17), a pipeline connection component (15) is sealed at the top of the light-transmitting pipeline (16), the top of the pipeline connection component (15) is connected to an air inlet low-temperature component (18), the exhaust condensation fiber fabric air duct (17) is arranged to be a plurality of groups of spliced connections, and the The installation height of the exhaust condensing fiber fabric duct (17) depends on the tower height, a DAC device (44) is arranged inside the exhaust condensing fiber fabric duct (17), and a fixed angle iron mounting frame (20) is equally sleeved and fastened on the outside of the exhaust condensing fiber fabric duct (17), a plurality of groups of Hall sensors (25) are installed on the bottom wall surface of the absorption heat pump (22), and the bottom of the absorption heat pump (22) is connected to a frequency converter (26) through a line, the side end of the frequency converter (26) is connected to an exchanger (49) through a line, the side end of the exchanger (49) is connected to an energy storage converter (8), the bottom of the energy storage converter (8) is connected to an energy storage pump (9), and the top of the energy storage converter (8) is connected to an energy storage tube (7); The air inlet low-temperature component (18) comprises an air inlet low-pressure pipe (181), the two wall surfaces at the top of the air inlet low-pressure pipe (181) are cross-opened with low-pressure air inlet ends (182), the interior of the low-pressure air inlet ends (182) are both installed with vortex generators (183), the exterior of the low-pressure air inlet end (182) is fastened with a mounting angle bracket (184), the side end of the mounting angle bracket (184) is fastened with an air compressor (185), the bottom of the air compressor (185) is connected to a condenser (186), the side end of the condenser (186) is connected to an evaporator (187), the bottom of the evaporator (187) is connected to a condensing air pipe (188), the bottom of the condensing air pipe (188) is connected to a gas liquefier (189), and the bottom of the condenser (186) is connected to a gas circulation pipe (1890).
2. The high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power according to claim 1 is characterized in that: The bottom end of the gas transmission circulation pipe (1890) is connected to an oxygen condensation pipeline (14), the bottom end of the oxygen condensation pipeline (14) is connected to an air pump (13), the left and right side ends of the air pump (13) are connected to a gas collecting pipe (12), the bottom end of the gas collecting pipe (12) is connected to a gas storage chamber (11), the side end of the gas storage chamber (11) is connected to two groups of gas pipes (10), and the side ends of the two groups of gas pipes (10) are connected to a hydrogen delivery end (29).
3. The high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power according to claim 2 is characterized in that: The side end of the hydrogen delivery end (29) is connected to a booster pump (30), the bottom of the booster pump (30) is connected to a gas refrigerant delivery pipeline (31), the inner bottom end of the gas refrigerant delivery pipeline (31) is installed with a gas-liquid separator (32), the bottom end of the gas-liquid separator (32) is connected to multiple groups of liquid refrigerant delivery pipelines (33), and the side ends of the multiple groups of liquid refrigerant delivery pipelines (33) are connected to condensing fin heat exchange structures (45).
4. The high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power according to claim 3 is characterized in that: The side end of the condensing fin heat exchange structure (45) is connected to a hydrogen storage tank, the bottom end of the hydrogen storage tank is connected to multiple groups of hydrogen energy delivery pipelines (46), the side ends of the multiple groups of hydrogen energy delivery pipelines (46) are connected to a proton exchange fuel cell (47), the side end of the proton exchange fuel cell (47) is provided with an energy storage connector (48), the side end of the energy storage connector (48) is connected to an energy storage group (41), and the top of the energy storage group (41) is connected to an energy exchange tube (40).
5. The high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power according to claim 2 is characterized in that: The side end of the hydrogen delivery end (29) is connected to a hydrogen-oxygen separator (28), the side end of the hydrogen-oxygen separator (28) is connected to a gas distribution pipe (37), the bottom end of the gas distribution pipe (37) is connected to a gas collecting chamber (36), a high-efficiency storage battery (34) is arranged on the side of the gas collecting chamber (36), the side end of the high-efficiency storage battery (34) is electrically connected to an electrolysis chamber (35), and the two ends of the electrolysis chamber (35) are connected to the gas pipe and the gas collecting chamber (36) with a height difference between the upper and lower ends.
6. The high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power according to claim 1, characterized in that: A shaft-blade assembly (39) is installed inside the air supply machine body (23), and a side end of the shaft-blade assembly (39) is connected to a power supply structure (38).
7. The high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power according to claim 1, characterized in that: A static pressure end (42) is installed at the side end of the air supply body (23), the side end of the static pressure end (42) is connected to a low-temperature static pressure air outlet end (43), and the side end of the low-temperature static pressure air outlet end (43) is connected to an air outlet (2).
8. The high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power according to claim 1, characterized in that: A circulating air pump (5) is installed on the top of the cabin (1), and the side ends of the circulating air pump (5) are respectively connected to the first air pipe (4) and the second air pipe (19), and the side ends of the second air pipe (19) and the first air pipe (4) are both connected to the condensing fin heat exchange structure (45).
9. The high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power according to claim 1, characterized in that: An axial-flow cooling fan (24) is symmetrically installed on the back surface of the cabin (1), and a PLC controller (6) is arranged on the surface of the machine body (3).
10. The high-efficiency energy storage and low-temperature refrigeration integrated machine for wind power according to claim 1, characterized in that: The pipe connection assembly (15) comprises a flange (151), the bottom end of the flange (151) being fastened to a sealing disk (153) by bolts, and the side end of the sealing disk (153) being fastened to a fixing seat (152), wherein the fixing seat (152) is fastened and installed in a plurality of equally divided groups on the outside of the exhaust condensation fiber fabric air duct (17).