Thermal power plant metal boiler heating surface wall temperature monitoring and early warning system

By designing a wall temperature monitoring and early warning system in the metal boiler of the thermal power plant, the operating status of the boiler heated surface is monitored and analyzed in real time, the problems of untimely management and low safety in the existing technology are solved, and the effective treatment of the boiler heated surface is achieved. Risk management and security improvement.

CN118189141BActive Publication Date: 2024-11-12ANHUI HUADIAN SUZHOU POWER GENERATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410469868.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2024-11-12
Estimated Expiration
2044-04-18

AI Technical Summary

Technical Problem

The existing technology cannot effectively monitor and manage the operating status of the heating surface of the metal boiler in the thermal power plant, resulting in reduced safety, large deviations in management results, and untimely management of the heating surface, which increases the risk of damage.

Method used

A wall temperature monitoring and early warning system including a supervision platform, information retrieval unit, operation supervision unit, status evaluation unit, wall temperature supervision unit, damage assessment unit and management feedback unit was designed to carry out risks through real-time data collection and analysis. Supervision feedback and management response reduce the risk of damage to the heating surface and improve management timeliness and accuracy.

Benefits of technology

Real-time risk monitoring and early warning of the boiler heating surface is realized, reducing the risk of damage to the heating surface, and improving operational safety and management effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118189141B_ABST
    Figure CN118189141B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of boiler wall temperature monitoring, and in particular to a wall temperature monitoring and early warning system for a heating surface of a metal boiler in a thermal power plant, comprising a supervision platform, an information retrieval unit, an operation supervision unit, a state assessment unit, a wall temperature supervision unit, a damage assessment unit, a management feedback unit and a management response unit; under the premise of steady-state operation of the boiler, the present invention performs wall temperature risk supervision feedback analysis on the state risk data of the wall temperature of the heating surface of the boiler to determine whether the wall temperature risk of the heating surface of the boiler is too high, so as to provide timely early warning feedback management to reduce the damage risk of the heating surface of the boiler, and under the premise of early warning of the heating surface of the boiler, the interference risk data of the heating surface of the metal boiler is analyzed for over-temperature risk management needs by means of information feedback, and management is performed in combination with potential risks, and reasonable and targeted management is performed according to the feedback information to improve the timeliness of management and early warning supervision effect of the heating surface of the metal boiler.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of boiler wall temperature monitoring, and in particular to a wall temperature monitoring and early warning system for a heating surface of a metal boiler in a thermal power plant. Background Art

[0002] Boiler is one of the most important main units of thermal power units, and it is very important to ensure its safe and stable operation. At present, the most common boiler accident is "four-tube explosion". Since the reheater works in a harsh environment for a long time, the number of overheating and tube explosion accounts for the largest proportion. The occurrence of tube explosion will reduce the availability of equipment and increase the cost of power generation;

[0003] Accurately and effectively monitoring the operating temperature of the heating surface tubes in the furnace is an important measure to ensure that the high-temperature heating surface serves according to the designed service life. However, in the prior art, it is impossible to monitor the operating status of the boiler, which reduces the safety of the boiler on the one hand, and causes the monitoring results of the metal boiler heating surface to deviate too much on the other hand, which is not conducive to the management of the boiler heating surface. In addition, it is impossible to accurately and timely monitor the metal boiler heating surface, which leads to untimely management of the metal boiler heating surface, reduces the management effect of the metal boiler heating surface, and aggravates the degree of damage to the metal boiler heating surface.

[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention

[0005] The purpose of the present invention is to provide a wall temperature monitoring and early warning system for the heating surface of a metal boiler in a thermal power plant to solve the technical defects mentioned above. Under the premise of steady-state operation of the boiler, the present invention performs wall temperature risk supervision feedback analysis on the state risk data of the wall temperature of the boiler heating surface to determine whether the wall temperature risk of the boiler heating surface is too high, so as to provide timely early warning feedback management to reduce the risk of damage to the boiler heating surface and improve the operating safety of the boiler heating surface. Under the premise of early warning of the boiler heating surface, the interference risk data of the metal boiler heating surface is analyzed for over-temperature risk management needs through information feedback, and rational management is carried out in combination with potential risks, so as to carry out reasonable and targeted management according to the feedback information, so as to improve the timeliness and accuracy of management of the metal boiler heating surface, and to improve the early warning and supervision effect of the metal boiler heating surface.

[0006] The object of the present invention can be achieved by the following technical scheme: A wall temperature monitoring and early warning system for a heating surface of a metal boiler in a thermal power plant comprises a supervision platform, an information retrieval unit, an operation supervision unit, a state assessment unit, a wall temperature supervision unit, a damage assessment unit, a management feedback unit, and a management response unit;

[0007] When the supervision platform generates an operation management instruction, the operation management instruction is sent to the information retrieval unit and the operation supervision unit. When the operation supervision unit receives the operation management instruction, it immediately retrieves the operation risk data of the boiler when it is working. The operation risk data includes the state risk value and the water level deviation value, and performs operation supervision feedback operation on the operation risk data, sends the obtained stability signal to the state evaluation unit, and sends the obtained risk signal to the management response unit;

[0008] After receiving the stable signal, the status evaluation unit immediately collects the status data of the boiler, including the carbon dioxide concentration, flue gas temperature and steam temperature, and performs operation tracking, supervision, evaluation and analysis on the status data, and sends the obtained steady-state signal to the information retrieval unit;

[0009] After receiving the operation and management instructions and steady-state signals, the information retrieval unit immediately retrieves the state risk data and management risk data of the boiler heating surface. The state risk data includes the inner wall temperature value curve and the outer wall temperature value curve. The management risk data includes the number of historical over-temperature alarms and the duration of the alarms. The state risk data and the management risk data are sent to the wall temperature monitoring unit and the damage assessment unit respectively. After receiving the state risk data, the wall temperature monitoring unit immediately performs wall temperature risk monitoring feedback analysis on the state risk data and sends the obtained alarm signal to the management feedback unit and the damage assessment unit.

[0010] After receiving the management risk data and the alarm signal, the damage assessment unit immediately performs potential damage interference analysis on the management risk data and sends the obtained potential damage assessment coefficient Qn to the management feedback unit;

[0011] After receiving the alarm signal and the potential damage assessment coefficient Qn, the management feedback unit immediately collects the interference risk data of the heating surface of the metal boiler where the detection point corresponding to the alarm signal is located. The interference risk data includes the scaling area and scaling thickness, and performs over-temperature risk management demand analysis on the interference risk data, and sends the obtained low-level warning signal and high-level warning signal to the management response unit.

[0012] Preferably, the operation supervision feedback operation process of the operation supervision unit is as follows:

[0013] S1: Set the detection cycle and set it as the time threshold, divide the time threshold into i sub-time periods, obtain the state risk value of the boiler in each sub-time period, the state risk value represents the part of the abnormal sound decibel value exceeding the set abnormal sound value in the sub-time period, and the product value obtained after data normalization processing with the duration of the abnormal sound decibel value exceeding the set abnormal sound value, establish a rectangular coordinate system with the number of sub-time periods as the X-axis and the state risk value as the Y-axis, draw the state risk value curve by plotting points, and then obtain the area enclosed by the state risk value curve and the X-axis, and set it as the operation assessment value;

[0014] S2: Obtain the water level deviation value of the boiler in each sub-time period, where the water level deviation value represents the product of the portion of the boiler water level in the sub-time period that deviates from the set water level range and the duration of the water level deviation from the set water level range after data normalization processing, compare and analyze the water level deviation value with the stored preset water level deviation value threshold, and set the ratio of the number of sub-time periods corresponding to the water level deviation value greater than the preset water level deviation value threshold to the total number of sub-time periods as the water treatment obstacle value;

[0015] S3: Compare and analyze the operation evaluation value and the water treatment obstacle value with the preset operation evaluation value and the water treatment obstacle value threshold value recorded and stored internally:

[0016] If the operation evaluation value is less than the preset operation evaluation value threshold, and the water treatment resistance value is less than the preset water treatment resistance value threshold, a stable signal is generated;

[0017] If the operation evaluation value is greater than or equal to the preset operation evaluation value threshold, or the water treatment obstacle value is greater than or equal to the preset water treatment obstacle value threshold, a risk signal is generated.

[0018] Preferably, the operation tracking, supervision, evaluation and analysis process of the status evaluation unit is as follows:

[0019] The carbon dioxide concentration at the boiler exhaust port, the flue gas temperature at the exhaust port, and the steam temperature in the boiler are obtained within the time threshold, and the carbon dioxide concentration at the boiler exhaust port, the flue gas temperature at the exhaust port, and the steam temperature in the boiler are labeled PC, PY, and ZQ respectively;

[0020] According to the formula The real-time work evaluation coefficient is obtained, where a1 is the preset correction factor coefficient, which is 1.228, and R is the real-time work evaluation coefficient. The real-time work evaluation coefficient Rm of the m normal boiler steady-state operations in history within the time threshold is obtained, and m is a natural number greater than zero. The minimum value of the real-time work evaluation coefficient Rm in the historical normal boiler steady-state operation is obtained and set as the historical steady-state work evaluation coefficient. The real-time work evaluation coefficient R is compared and analyzed with the historical steady-state work evaluation coefficient:

[0021] If the ratio of the real-time work evaluation coefficient R to the historical steady-state work evaluation coefficient is less than 1, no signal is generated;

[0022] If the ratio of the real-time work evaluation coefficient R to the historical steady-state work evaluation coefficient is greater than or equal to 1, a steady-state signal is generated.

[0023] Preferably, the wall temperature risk supervision feedback analysis process of the wall temperature supervision unit is as follows:

[0024] T1: Obtain the duration of a period of time after the steady-state signal is generated within the time threshold, and set it as the analysis duration, set a number of monitoring points at equal intervals on the outer wall of the boiler heating surface, and set a number of monitoring points at equal intervals on the inner wall of the boiler heating surface at the symmetrical points of the outer wall, obtain the inner wall temperature value curve and the outer wall temperature value curve of the boiler heating surface within the analysis duration, divide the analysis duration into o sub-time periods, o is a natural number greater than zero, and then obtain the area enclosed by the inner wall temperature value curve and the outer wall temperature value curve in each sub-time period, and set it as the temperature deviation coefficient, compare and analyze the temperature deviation coefficient with the stored preset temperature deviation coefficient threshold, and set the part of the temperature deviation coefficient that is greater than the preset temperature deviation coefficient threshold as the deviation risk value;

[0025] T2: A rectangular coordinate system is established with the number of sub-time periods as the X-axis and the deviation risk value as the Y-axis. The deviation risk value curve is drawn by plotting points to obtain the change trend value of the deviation risk value curve and set it as the temperature deviation assessment coefficient. The detection point is marked as g, where g is a natural number greater than zero. The temperature deviation assessment coefficient WPg of each detection point is obtained and compared with the preset temperature deviation assessment coefficient threshold value stored in the internal data entry:

[0026] If the ratio between the temperature deviation evaluation coefficient WPg and the preset temperature deviation evaluation coefficient threshold is greater than or equal to 1, no signal is generated;

[0027] If the ratio between the temperature deviation evaluation coefficient WPg and the preset temperature deviation evaluation coefficient threshold is greater than 1, an alarm signal is generated.

[0028] Preferably, the potential damage interference analysis process of the damaged assessment unit is as follows:

[0029] TT1: Set the heating surface of the metal boiler where the detection point corresponding to the alarm signal is located as the analysis area n, where n is a natural number greater than zero, and obtain the historical over-temperature alarm times and alarm duration of each analysis area within the analysis time. The historical over-temperature alarm times indicate the number of times the alarm signal was generated historically, and the alarm duration indicates the time between the time when the alarm signal was generated and the time when the management operation was executed;

[0030] TT2: Obtain the historical maintenance times and the average maintenance interval duration of each analysis area within the analysis time, and set the ratio of the historical maintenance times and the average maintenance interval duration after data normalization as the management value, and label the historical over-temperature alarm times, alarm duration, and management value as LCn, GCn, and GZn, respectively;

[0031] TT3: According to the formula The potential damage assessment coefficient of each analysis area is obtained, where v1, v2 and v3 are the preset weight factor coefficients of the historical over-temperature alarm times, alarm duration and management value, respectively, v4 is the preset compensation factor coefficient, v1, v2, v3 and v4 are all greater than zero, and Qn is the potential damage assessment coefficient of each analysis area.

[0032] Preferably, the over-temperature risk management demand analysis process of the management feedback unit is as follows:

[0033] SS1: Obtain the scaling area and scaling thickness of each analysis area within the analysis time, and set the product value obtained after data normalization of the scaling area and scaling thickness as the thermal insulation interference value, and then obtain the change value of the thermal insulation interference value of each analysis area in each sub-time period, and set it as the thermal insulation interference increase value, and then obtain the average value of the thermal insulation interference increase value, and set the average value of the thermal insulation interference increase value as the scaling ratio value;

[0034] SS2: Obtain the part of the temperature deviation evaluation coefficient of each analysis area within the analysis time that is greater than the preset temperature deviation evaluation coefficient threshold, and set it as the management risk value, and label the scaling ratio value and the management risk value as JGn and GFn respectively;

[0035] SS3: According to the formula The management demand assessment coefficient of each analysis area is obtained, where f1, f2 and f3 are preset proportional factor coefficients of scaling ratio value, management risk value and potential damage assessment coefficient respectively, f1, f2 and f3 are all greater than zero, f4 is the preset fault tolerance factor coefficient, and its value is 2.181, Gn is the management demand assessment coefficient of each analysis area, and then the maximum value of the management demand assessment coefficient Gn is obtained, and the maximum value of the management demand assessment coefficient Gn is set as the damaged management demand coefficient, and the damaged management demand coefficient is compared and analyzed with the preset damaged management demand coefficient threshold value stored in the internal input:

[0036] If the ratio between the damaged management demand coefficient and the preset damaged management demand coefficient threshold is less than 1, a low-level warning signal is generated;

[0037] If the ratio between the damaged management demand coefficient and the preset damaged management demand coefficient threshold is greater than or equal to 1, an advanced warning signal is generated.

[0038] The beneficial effects of the present invention are as follows:

[0039] (1) The present invention preliminarily performs operation supervision and feedback operation on the operation risk data of the boiler during operation to determine whether the boiler is operating normally, so as to provide timely early warning feedback to improve the operation safety of the boiler. Under the premise that the boiler is operating normally, the present invention further performs operation tracking supervision and evaluation analysis on the state data of the boiler to determine whether the boiler is operating in a steady state, so as to provide data support for subsequent analysis. Under the premise that the boiler is operating in a steady state, the present invention performs wall temperature risk supervision and feedback analysis on the state risk data of the wall temperature of the boiler heating surface to determine whether the wall temperature risk of the boiler heating surface is too high, so as to provide timely early warning feedback management, thereby reducing the risk of damage to the boiler heating surface and improving the operation safety of the boiler heating surface.

[0040] (2) Under the premise of early warning of the boiler heating surface, the present invention analyzes the over-temperature risk management needs of the interference risk data of the metal boiler heating surface by means of information feedback, and rationalizes the management in combination with potential risks, so as to carry out reasonable and targeted management according to the feedback information, so as to improve the timeliness and accuracy of the management of the metal boiler heating surface, and improve the early warning and supervision effect of the metal boiler heating surface. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] The present invention will be further described below in conjunction with the accompanying drawings;

[0042] Figure 1 It is a flowchart of the system of the present invention;

[0043] Figure 2 It is a partial reference diagram of the second embodiment of the present invention. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] Embodiment 1:

[0046] See also Figure 1 to Figure 2As shown, the present invention is a wall temperature monitoring and early warning system for the heating surface of a metal boiler in a thermal power plant, comprising a supervision platform, an information retrieval unit, an operation supervision unit, a state assessment unit, a wall temperature supervision unit, a damage assessment unit, a management feedback unit and a management response unit, the supervision platform is in one-way communication connection with the information retrieval unit and the operation supervision unit, the operation supervision unit is in one-way communication connection with the state assessment unit and the management response unit, the state assessment unit is in one-way communication connection with the information retrieval unit, the information retrieval unit is in one-way communication connection with the wall temperature supervision unit and the damage assessment unit, the wall temperature supervision unit is in one-way communication connection with the damage assessment unit and the management feedback unit, the damage assessment unit is in one-way communication connection with the management feedback unit, and the management feedback unit is in one-way communication connection with the management response unit;

[0047] When the supervision platform generates an operation management instruction, it sends the operation management instruction to the information retrieval unit and the operation supervision unit. When the operation supervision unit receives the operation management instruction, it immediately retrieves the operation risk data of the boiler during operation. The operation risk data includes the state risk value and the water level deviation value, and performs operation supervision feedback operation on the operation risk data to determine whether the boiler is operating normally, so as to provide timely early warning feedback to improve the operation safety of the boiler. The specific operation supervision feedback operation process is as follows:

[0048] Set a detection cycle and set it as a time threshold, divide the time threshold into i sub-time periods, obtain the state risk value of the boiler in each sub-time period, the state risk value represents the part of the sub-time period where the maximum value of the abnormal sound decibel exceeds the set abnormal sound value, and the product value obtained after data normalization processing with the duration of the maximum value of the abnormal sound decibel exceeding the set abnormal sound value, establish a rectangular coordinate system with the number of sub-time periods as the X-axis and the state risk value as the Y-axis, draw a state risk value curve by plotting points, and then obtain the area enclosed by the state risk value curve and the X-axis, and set it as the operation evaluation value. It should be noted that the larger the value of the operation evaluation value, the greater the risk of abnormal operation of the boiler;

[0049] The water level deviation value of the boiler in each sub-time period is obtained. The water level deviation value represents the product of the portion of the boiler water level in the sub-time period that deviates from the set water level range and the duration of the water level deviation from the set water level range after data normalization processing. The water level deviation value is compared and analyzed with the stored preset water level deviation value threshold. The ratio of the number of sub-time periods corresponding to the water level deviation value greater than the preset water level deviation value threshold to the total number of sub-time periods is set as the water treatment obstacle value. It should be noted that the larger the value of the water treatment obstacle value is, the greater the risk of abnormal operation of the boiler is, and the greater the risk of boiler damage is.

[0050] Compare and analyze the operation evaluation value and water treatment obstacle value with the preset operation evaluation value and water treatment obstacle value thresholds stored in the system:

[0051] If the operation evaluation value is less than the preset operation evaluation value threshold, and the water treatment obstacle value is less than the preset water treatment obstacle value threshold, a stabilization signal is generated and sent to the state evaluation unit;

[0052] If the operation evaluation value is greater than or equal to the preset operation evaluation value threshold, or the water treatment obstacle value is greater than or equal to the preset water treatment obstacle value threshold, a risk signal is generated and sent to the management response unit. After receiving the risk signal, the management response unit immediately performs the preset early warning operation corresponding to the risk signal, so as to manage the boiler according to the information feedback to ensure the operation stability of the boiler;

[0053] After receiving the stable signal, the status evaluation unit immediately collects the status data of the boiler, including the carbon dioxide concentration, flue gas temperature and steam temperature, and performs operation tracking, supervision, evaluation and analysis on the status data to determine whether the boiler is operating in a steady state, so as to provide data support for subsequent analysis. The specific operation tracking, supervision, evaluation and analysis process is as follows:

[0054] The carbon dioxide concentration at the boiler exhaust port, the flue gas temperature at the exhaust port, and the steam temperature in the boiler are obtained within the time threshold, and the carbon dioxide concentration at the boiler exhaust port, the flue gas temperature at the exhaust port, and the steam temperature in the boiler are labeled PC, PY, and ZQ respectively;

[0055] According to the formula The real-time work evaluation coefficient is obtained, where a1 is the preset correction factor coefficient, which is 1.228, and R is the real-time work evaluation coefficient. The real-time work evaluation coefficient Rm of the m normal boiler steady-state operations in history within the time threshold is obtained, and m is a natural number greater than zero. The minimum value of the real-time work evaluation coefficient Rm in the historical normal boiler steady-state operation is obtained and set as the historical steady-state work evaluation coefficient. The real-time work evaluation coefficient R is compared and analyzed with the historical steady-state work evaluation coefficient:

[0056] If the ratio of the real-time work evaluation coefficient R to the historical steady-state work evaluation coefficient is less than 1, no signal is generated;

[0057] If the ratio of the real-time work evaluation coefficient R to the historical steady-state work evaluation coefficient is greater than or equal to 1, a steady-state signal is generated and sent to the information retrieval unit.

[0058] Embodiment 2:

[0059] After receiving the operation and management instructions and steady-state signals, the information retrieval unit immediately retrieves the state risk data and management risk data of the boiler heating surface. The state risk data includes the inner wall temperature value curve and the outer wall temperature value curve. The management risk data includes the number of historical over-temperature alarms and the duration of the alarms. The state risk data and the management risk data are sent to the wall temperature supervision unit and the damage assessment unit respectively. After receiving the state risk data, the wall temperature supervision unit immediately performs wall temperature risk supervision feedback analysis on the state risk data to determine whether the wall temperature risk of the boiler heating surface is too high, so as to provide timely early warning feedback management to reduce the damage risk of the boiler heating surface and improve the operation safety of the boiler heating surface. The specific wall temperature risk supervision feedback analysis process is as follows:

[0060] The duration of a period of time after the steady-state signal is generated within the time threshold is obtained, and it is set as the analysis duration, a number of monitoring points are set at equal intervals on the outer wall of the boiler heating surface, and a number of monitoring points are set at equal intervals on the inner wall of the boiler heating surface at symmetrical points on the outer wall, and the inner wall temperature value curve and the outer wall temperature value curve of the boiler heating surface within the analysis time are obtained, and the analysis time is divided into o sub-time periods, o is a natural number greater than zero, and then the area enclosed by the inner wall temperature value curve and the outer wall temperature value curve in each sub-time period is obtained, and it is set as the temperature deviation coefficient, and the temperature deviation coefficient is compared and analyzed with the stored preset temperature deviation coefficient threshold, and the temperature deviation coefficient is greater than the threshold. The part of the preset temperature deviation coefficient threshold is set as the deviation risk value, and a rectangular coordinate system is established with the number of sub-time periods as the X-axis and the deviation risk value as the Y-axis. The deviation risk value curve is drawn by plotting points, and then the change trend value of the deviation risk value curve is obtained, and it is set as the temperature deviation assessment coefficient, and the detection point is marked as g, g is a natural number greater than zero, and then the temperature deviation assessment coefficient WPg of each detection point is obtained. It should be noted that the larger the value of the temperature deviation assessment coefficient WPg, the greater the wall temperature risk of the boiler heating surface. The temperature deviation assessment coefficient WPg is compared and analyzed with the preset temperature deviation assessment coefficient threshold value stored internally:

[0061] If the ratio between the temperature deviation evaluation coefficient WPg and the preset temperature deviation evaluation coefficient threshold is greater than or equal to 1, no signal is generated;

[0062] If the ratio between the temperature deviation evaluation coefficient WPg and the preset temperature deviation evaluation coefficient threshold is greater than 1, an alarm signal is generated and sent to the management feedback unit and the damage assessment unit;

[0063] After receiving the management risk data and alarm signal, the damage assessment unit immediately performs potential damage interference analysis on the management risk data to understand the potential risk situation of the heating surface of the metal boiler, so as to conduct rational management based on the potential risks and provide data support for subsequent management. The specific potential damage interference analysis process is as follows:

[0064] The heating surface of the metal boiler where the detection point corresponding to the alarm signal is located is set as the analysis area n, where n is a natural number greater than zero, and the historical over-temperature alarm times and alarm duration of each analysis area within the analysis time are obtained. The historical over-temperature alarm times represent the times corresponding to the historical generation of alarm signals, and the alarm duration represents the time between the time when the alarm signal is generated and the time when the management operation is executed. It should be noted that the historical over-temperature alarm times and the alarm duration are two influencing parameters reflecting the potential risks of the analysis area;

[0065] The historical maintenance times and the average maintenance interval duration of each analysis area within the analysis time are obtained, and the ratio of the historical maintenance times and the average maintenance interval duration after data normalization is set as the management value. The historical over-temperature alarm times, alarm duration, and management value are labeled as LCn, GCn, and GZn, respectively.

[0066] According to the formula Obtain the potential damage assessment coefficient of each analysis area, wherein v1, v2 and v3 are respectively the preset weight factor coefficients of the number of historical over-temperature alarms, the duration of the alarm and the management value, v4 is the preset compensation factor coefficient, v1, v2, v3 and v4 are all greater than zero, Qn is the potential damage assessment coefficient of each analysis area, and the potential damage assessment coefficient Qn is sent to the management feedback unit;

[0067] After receiving the alarm signal and the potential damage assessment coefficient Qn, the management feedback unit immediately collects the interference risk data of the metal boiler heating surface where the detection point corresponding to the alarm signal is located. The interference risk data includes scaling area and scaling thickness, and performs over-temperature risk management demand analysis on the interference risk data, so as to carry out reasonable and targeted management according to the feedback information, so as to improve the timeliness and accuracy of the management of the metal boiler heating surface. The specific over-temperature risk management demand analysis process is as follows:

[0068] The scaling area and scaling thickness of each analysis area within the analysis time are obtained, and the product value obtained after data normalization of the scaling area and scaling thickness is set as the thermal insulation interference value, and then the change value of the thermal insulation interference value of each analysis area in each sub-time period is obtained, and it is set as the thermal insulation interference increase value, and then the average value of the thermal insulation interference increase value is obtained, and the average value of the thermal insulation interference increase value is set as the scaling ratio value. It should be noted that the larger the scaling ratio value, the greater the abnormal risk of the analysis area and the greater the management demand;

[0069] The part of the temperature deviation evaluation coefficient of each analysis area within the analysis time that is greater than the preset temperature deviation evaluation coefficient threshold is obtained, and it is set as the management risk value, and the scaling ratio value and the management risk value are labeled JGn and GFn respectively;

[0070] According to the formula The management demand assessment coefficient of each analysis area is obtained, where f1, f2 and f3 are respectively the preset proportional factor coefficients of the scaling ratio value, the management risk value and the potential damage assessment coefficient. The proportional factor coefficient is used to correct the deviation of various parameters in the formula calculation process, so as to make the calculation result more accurate. f1, f2 and f3 are all greater than zero. f4 is the preset fault tolerance factor coefficient, which is 2.181. Gn is the management demand assessment coefficient of each analysis area, and then the maximum value of the management demand assessment coefficient Gn is obtained, and the maximum value of the management demand assessment coefficient Gn is set as the damaged management demand coefficient. The damaged management demand coefficient is compared and analyzed with the preset damaged management demand coefficient threshold value stored in the internal input:

[0071] If the ratio between the damaged management demand coefficient and the preset damaged management demand coefficient threshold is less than 1, a low-level warning signal is generated;

[0072] If the ratio between the damaged management demand coefficient and the preset damaged management demand coefficient threshold is greater than or equal to 1, a high-level warning signal is generated, and the low-level warning signal and the high-level warning signal are sent to the management response unit. After receiving the low-level warning signal and the high-level warning signal, the management response unit immediately performs the preset warning operation corresponding to the low-level warning signal and the high-level warning signal, and displays the number of each analysis area at the same time, so as to timely and accurately manage the abnormal wall temperature points of the metal boiler heating surface, so as to reduce the risk of damage to the metal boiler heating surface, so as to improve the operation safety of the metal boiler heating surface;

[0073] In summary, the present invention preliminarily performs operation supervision feedback operation on the operation risk data of the boiler when it is working to determine whether the boiler is operating normally, so as to provide timely early warning feedback to improve the operation safety of the boiler. Under the premise of normal operation of the boiler, the state data of the boiler is further subjected to operation tracking supervision evaluation analysis to determine whether the boiler is operating in a steady state, so as to provide data support for subsequent analysis. Under the premise of steady-state operation of the boiler, the state risk data of the wall temperature of the boiler heating surface is subjected to wall temperature risk supervision feedback analysis to determine whether the wall temperature risk of the boiler heating surface is too high, so as to provide timely early warning feedback management to reduce the risk of damage to the boiler heating surface and improve the operation safety of the boiler heating surface. Under the premise of early warning of the boiler heating surface, the interference risk data of the metal boiler heating surface is analyzed for over-temperature risk management needs by means of information feedback, and rational management is carried out in combination with potential risks, so as to carry out reasonable and targeted management according to the feedback information, so as to improve the timeliness and accuracy of management of the metal boiler heating surface, so as to improve the early warning supervision effect of the metal boiler heating surface.

[0074] The threshold is set to facilitate comparison. The size of the threshold depends on the amount of sample data and the number of bases set by technicians in this field for each group of sample data; as long as it does not affect the proportional relationship between the parameter and the quantized value.

[0075] The above formulas are obtained by collecting a large amount of data for software simulation and selecting a formula that is close to the actual value. The coefficients in the formula are set by technical personnel in this field according to actual conditions. The above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited to this. Any technical personnel familiar with the technical field within the technical scope disclosed by the present invention, according to the technical solution and the inventive concept of the present invention, make equivalent replacement or change, which should be covered within the protection scope of the present invention.

Claims

1. The wall temperature monitoring and early warning system of the heating surface of the metal boiler in the thermal power plant is characterized by: It includes a supervision platform, an information retrieval unit, an operation supervision unit, a state assessment unit, a wall temperature supervision unit, a damage assessment unit, a management feedback unit and a management response unit; When the supervision platform generates an operation management instruction, the operation management instruction is sent to the information retrieval unit and the operation supervision unit. When the operation supervision unit receives the operation management instruction, it immediately retrieves the operation risk data of the boiler when it is working. The operation risk data includes the state risk value and the water level deviation value, and performs operation supervision feedback operation on the operation risk data, sends the obtained stability signal to the state evaluation unit, and sends the obtained risk signal to the management response unit; After receiving the stable signal, the status evaluation unit immediately collects the status data of the boiler, including the carbon dioxide concentration, flue gas temperature and steam temperature, and performs operation tracking, supervision, evaluation and analysis on the status data, and sends the obtained steady-state signal to the information retrieval unit; After receiving the operation and management instructions and steady-state signals, the information retrieval unit immediately retrieves the state risk data and management risk data of the boiler heating surface. The state risk data includes the inner wall temperature value curve and the outer wall temperature value curve. The management risk data includes the number of historical over-temperature alarms and the duration of the alarms. The state risk data and the management risk data are sent to the wall temperature monitoring unit and the damage assessment unit respectively. After receiving the state risk data, the wall temperature monitoring unit immediately performs wall temperature risk monitoring feedback analysis on the state risk data and sends the obtained alarm signal to the management feedback unit and the damage assessment unit. After receiving the management risk data and the alarm signal, the damage assessment unit immediately performs potential damage interference analysis on the management risk data and sends the obtained potential damage assessment coefficient Qn to the management feedback unit; After receiving the alarm signal and the potential damage assessment coefficient Qn, the management feedback unit immediately collects the interference risk data of the heating surface of the metal boiler where the detection point corresponding to the alarm signal is located. The interference risk data includes the scaling area and scaling thickness, and performs over-temperature risk management demand analysis on the interference risk data, and sends the obtained low-level warning signal and high-level warning signal to the management response unit.

2. The wall temperature monitoring and early warning system for the heating surface of a metal boiler in a thermal power plant according to claim 1 is characterized in that: The operation supervision feedback operation process of the operation supervision unit is as follows: S1: Set the detection cycle and set it as the time threshold, divide the time threshold into i sub-time periods, obtain the state risk value of the boiler in each sub-time period, the state risk value represents the part of the abnormal sound decibel value exceeding the set abnormal sound value in the sub-time period, and the product value obtained after data normalization processing with the duration of the abnormal sound decibel value exceeding the set abnormal sound value, establish a rectangular coordinate system with the number of sub-time periods as the X-axis and the state risk value as the Y-axis, draw the state risk value curve by plotting points, and then obtain the area enclosed by the state risk value curve and the X-axis, and set it as the operation assessment value; S2: Obtain the water level deviation value of the boiler in each sub-time period, where the water level deviation value represents the product of the portion of the boiler water level in the sub-time period that deviates from the set water level range and the duration of the water level deviation from the set water level range after data normalization processing, compare and analyze the water level deviation value with the stored preset water level deviation value threshold, and set the ratio of the number of sub-time periods corresponding to the water level deviation value greater than the preset water level deviation value threshold to the total number of sub-time periods as the water treatment obstacle value; S3: Compare and analyze the operation evaluation value and the water treatment obstacle value with the preset operation evaluation value and the water treatment obstacle value threshold value recorded and stored internally: If the operation evaluation value is less than the preset operation evaluation value threshold, and the water treatment resistance value is less than the preset water treatment resistance value threshold, a stable signal is generated; If the operation evaluation value is greater than or equal to the preset operation evaluation value threshold, or the water treatment obstacle value is greater than or equal to the preset water treatment obstacle value threshold, a risk signal is generated.

3. The wall temperature monitoring and early warning system for the heating surface of a metal boiler in a thermal power plant according to claim 1 is characterized in that: The operation tracking supervision evaluation and analysis process of the status evaluation unit is as follows: The carbon dioxide concentration at the boiler exhaust port, the flue gas temperature at the exhaust port, and the steam temperature in the boiler are obtained within the time threshold, and the carbon dioxide concentration at the boiler exhaust port, the flue gas temperature at the exhaust port, and the steam temperature in the boiler are labeled PC, PY, and ZQ respectively; According to the formula The real-time work evaluation coefficient is obtained, where a1 is the preset correction factor coefficient, which is 1.228, and R is the real-time work evaluation coefficient. The real-time work evaluation coefficient Rm of the m normal boiler steady-state operations in history within the time threshold is obtained, and m is a natural number greater than zero. The minimum value of the real-time work evaluation coefficient Rm in the historical normal boiler steady-state operation is obtained and set as the historical steady-state work evaluation coefficient. The real-time work evaluation coefficient R is compared and analyzed with the historical steady-state work evaluation coefficient: If the ratio of the real-time work evaluation coefficient R to the historical steady-state work evaluation coefficient is less than 1, no signal is generated; If the ratio of the real-time work evaluation coefficient R to the historical steady-state work evaluation coefficient is greater than or equal to 1, a steady-state signal is generated.

4. The wall temperature monitoring and early warning system for the heating surface of a metal boiler in a thermal power plant according to claim 1 is characterized in that: The wall temperature risk supervision feedback analysis process of the wall temperature supervision unit is as follows: T1: Obtain the duration of a period of time after the steady-state signal is generated within the time threshold, and set it as the analysis duration, set a number of monitoring points at equal intervals on the outer wall of the boiler heating surface, and set a number of monitoring points at equal intervals on the inner wall of the boiler heating surface at the symmetrical points of the outer wall, obtain the inner wall temperature value curve and the outer wall temperature value curve of the boiler heating surface within the analysis duration, divide the analysis duration into o sub-time periods, o is a natural number greater than zero, and then obtain the area enclosed by the inner wall temperature value curve and the outer wall temperature value curve in each sub-time period, and set it as the temperature deviation coefficient, compare and analyze the temperature deviation coefficient with the stored preset temperature deviation coefficient threshold, and set the part of the temperature deviation coefficient that is greater than the preset temperature deviation coefficient threshold as the deviation risk value; T2: A rectangular coordinate system is established with the number of sub-time periods as the X-axis and the deviation risk value as the Y-axis. The deviation risk value curve is drawn by plotting points to obtain the change trend value of the deviation risk value curve and set it as the temperature deviation assessment coefficient. The detection point is marked as g, where g is a natural number greater than zero. The temperature deviation assessment coefficient WPg of each detection point is obtained and compared with the preset temperature deviation assessment coefficient threshold value stored in the internal data entry: If the ratio between the temperature deviation evaluation coefficient WPg and the preset temperature deviation evaluation coefficient threshold is greater than or equal to 1, no signal is generated; If the ratio between the temperature deviation evaluation coefficient WPg and the preset temperature deviation evaluation coefficient threshold is greater than 1, an alarm signal is generated.

5. The wall temperature monitoring and early warning system for the heating surface of a metal boiler in a thermal power plant according to claim 1 is characterized in that: The potential damage interference analysis process of the damaged assessment unit is as follows: TT1: Set the heating surface of the metal boiler where the detection point corresponding to the alarm signal is located as the analysis area n, where n is a natural number greater than zero, and obtain the historical over-temperature alarm times and alarm duration of each analysis area within the analysis time. The historical over-temperature alarm times indicate the number of times the alarm signal was generated historically, and the alarm duration indicates the time between the time when the alarm signal was generated and the time when the management operation was executed; TT2: Obtain the historical maintenance times and the average maintenance interval duration of each analysis area within the analysis time, and set the ratio of the historical maintenance times and the average maintenance interval duration after data normalization as the management value, and label the historical over-temperature alarm times, alarm duration, and management value as LCn, GCn, and GZn, respectively; TT3: According to the formula The potential damage assessment coefficient of each analysis area is obtained, where v1, v2 and v3 are the preset weight factor coefficients of the historical over-temperature alarm times, alarm duration and management value, respectively, v4 is the preset compensation factor coefficient, v1, v2, v3 and v4 are all greater than zero, and Qn is the potential damage assessment coefficient of each analysis area.

6. The wall temperature monitoring and early warning system for the heating surface of a metal boiler in a thermal power plant according to claim 1 is characterized in that: The over-temperature risk management demand analysis process of the management feedback unit is as follows: SS1: Obtain the scaling area and scaling thickness of each analysis area within the analysis time, and set the product value obtained after data normalization of the scaling area and scaling thickness as the thermal insulation interference value, and then obtain the change value of the thermal insulation interference value of each analysis area in each sub-time period, and set it as the thermal insulation interference increase value, and then obtain the average value of the thermal insulation interference increase value, and set the average value of the thermal insulation interference increase value as the scaling ratio value; SS2: Obtain the part of the temperature deviation evaluation coefficient of each analysis area within the analysis time that is greater than the preset temperature deviation evaluation coefficient threshold, and set it as the management risk value, and label the scaling ratio value and the management risk value as JGn and GFn respectively; SS3: According to the formula The management demand assessment coefficient of each analysis area is obtained, where f1, f2 and f3 are preset proportional factor coefficients of scaling ratio value, management risk value and potential damage assessment coefficient respectively, f1, f2 and f3 are all greater than zero, f4 is the preset fault tolerance factor coefficient, and its value is 2.181, Gn is the management demand assessment coefficient of each analysis area, and then the maximum value of the management demand assessment coefficient Gn is obtained, and the maximum value of the management demand assessment coefficient Gn is set as the damaged management demand coefficient, and the damaged management demand coefficient is compared and analyzed with the preset damaged management demand coefficient threshold value stored in the internal input: If the ratio between the damaged management demand coefficient and the preset damaged management demand coefficient threshold is less than 1, a low-level warning signal is generated; If the ratio between the damaged management demand coefficient and the preset damaged management demand coefficient threshold is greater than or equal to 1, an advanced warning signal is generated.