A method for positioning the steel shell of the No. 0 block of a bridge tower
By measuring and adjusting the azimuth and coordinates on the bridge cable tower No. 0 steel shell, the problem of cable tower positioning deviation is solved, and high-precision steel shell positioning is achieved, ensuring the accuracy of cable tower segment splicing and construction reliability.
Patent Information
- Application Number
- CN202311341309.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-17
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2043-10-17
AI Technical Summary
In the construction of bridge cable towers, the positioning deviation of the steel shell of the cable tower No. 0 will affect the overall design line shape and shape, resulting in stress and reliability problems. The existing technology lacks effective positioning methods.
By selecting five monitoring points on the steel shell of Cable Tower No. 0, calculate their theoretical azimuth angle, and use the total station to measure the actual azimuth angle and adjust the position of the steel shell until the deviation between the actual coordinates and the theoretical coordinates is less than the allowable value. Digital display level and jack adjust the horizontal state and elevation of the steel shell to ensure accurate positioning.
It realizes high-precision positioning of the steel shell of the cable tower No. 0, which is convenient to operate, ensures the accuracy of subsequent cable tower segment splicing, and improves the reliability and efficiency of construction.
Smart Images

Figure CN118225059B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction, and in particular to a method for positioning a No. 0 steel shell of a bridge pylon. Background Art
[0002] The cable tower consists of a tower base, a tower column, a crossbeam, and a tower crown. It is an important component of a suspension bridge and a cable-stayed bridge, and plays the role of supporting the main cable or the cable-stayed cable. There are many types of cable tower structures, including vertical single-column type, vertical double-column type, arch type, etc. The commonly used construction process of the cable tower is to first manufacture and process the steel cable tower segments in the machinery workshop, then transport the steel cable tower segments to the bridge site for on-site hoisting and splicing, and then pour concrete after the steel cable tower segments are spliced. During the construction of the cable tower, the deviation of the position of the cable tower segments will change the overall design line type and shape of the cable tower, and ultimately seriously affect the force of the cable tower and the reliability of the bridge. Among them, a very important step is the positioning of the steel shell of the cable tower block 0, which is an important prerequisite for ensuring the accuracy of the subsequent splicing of the cable tower segments. Therefore, to ensure the overall line type and shape of the cable tower, the steel shell of the cable tower block 0 should be positioned first. However, there are few reports on the positioning device and method of the steel shell of the cable tower block 0. Summary of the invention
[0003] In order to solve the above problems, the present invention provides a method for positioning the No. 0 steel shell of a bridge pylon which is easy to operate, high in precision and good in use effect.
[0004] The technical solution of the present invention is a method for positioning a No. 0 steel shell of a bridge pylon, which is characterized by comprising the following steps:
[0005] Select five points on the upper surface of the steel shell of the cable tower block 0 as monitoring points. According to the engineering measurement reference points and design drawings, the theoretical coordinates of the five monitoring points are (x1, y1), (x2, y2), (x3, y3), (x4, y4) and (x5, y5).
[0006] A digital level is installed on the upper surface of the steel shell of the cable tower block 0, and a total station is arranged around the installation position of the steel shell of the cable tower block 0. The coordinates of the measuring station of the total station are determined as (x0, y0) according to the engineering measurement reference point;
[0007] The theoretical azimuths of the five monitoring points are calculated based on the theoretical coordinates of the five monitoring points and the coordinates of the measuring station of the total station;
[0008] Hoist the steel shell of cable tower block 0 to the top of its installation position, use a total station to measure the actual azimuths corresponding to the five monitoring points of the steel shell, and adjust the position of cable tower block 0 according to the deviations between the actual azimuths corresponding to the five monitoring points and the theoretical azimuths, until the position of cable tower block 0 is adjusted to the point where the deviations between the actual x-axis coordinates and y-axis coordinates of the five monitoring points and the theoretical coordinates are less than the allowable values;
[0009] A jack is placed under the steel shell of cable tower block 0, and the elevation of the steel shell of cable tower block 0 is adjusted by the jack until the deviation between the elevation of the steel shell of cable tower block 0 and the theoretical design elevation is less than the allowable value; and the horizontal state of the steel shell of cable tower block 0 is adjusted according to the digital level ruler so that the horizontal state of the steel shell of cable tower block 0 meets the requirements;
[0010] After determining the position of the steel shell, provide support for the steel shell.
[0011] A further solution is that the steps include adjusting the horizontal state of the steel shell of the No. 0 block of the cable tower according to the digital level so that the horizontal state of the steel shell of the No. 0 block of the cable tower meets the requirements and then comprising:
[0012] The three-dimensional coordinates of the five monitoring points on the steel shell are verified by using a total station to determine whether the deviation between the actual coordinates and the theoretical design coordinates exceeds the allowable value;
[0013] If the deviation exceeds the allowable value, continue to fine-tune the position of the steel shell of tower block 0 according to the deviation between the actual coordinates and the theoretical coordinates and ensure that the horizontal state of the steel shell meets the requirements until the deviation between the measured values and the theoretical values of the coordinates of the five monitoring points of the steel shell of tower block 0 meets the accuracy requirements.
[0014] A further solution is that the calculation formula for the theoretical azimuths of the five monitoring points calculated based on the theoretical coordinates of the five monitoring points and the coordinates of the measuring station of the total station is:
[0015]
[0016] When x i -x0>0,y i -y0>0,
[0017] When x i -x0<0,y i -y0>0,
[0018] When x i -x0<0,y i When -y0<0,
[0019] When x i -x0>0,y i When -y0<0,
[0020] Where α is the theoretical azimuth angle.
[0021] A further solution is that there are four digital level rulers, which are arranged on four side lines of the upper surface of the steel shell of block 0 of the tower, and the digital level rulers have an accuracy of 0.05 degrees.
[0022] A further solution is that the upper surface of the steel shell of tower block No. 0 includes three straight lines and one arc line, and the five monitoring points include the four endpoints of the four lines of the steel shell of tower block No. 0 and the center point of the arc.
[0023] A further solution is that the steps of placing a jack under the steel shell of the cable tower block 0 and adjusting the elevation of the steel shell of the cable tower block 0 by the jack specifically include:
[0024] A saddle is placed under the steel shell of cable tower block No. 0. A jack is installed inside the saddle. The steel shell of cable tower block No. 0 is lowered onto the saddle using a tower crane or a hoist. After the telescopic end of the jack rests against the lower surface of the steel shell of cable tower block No. 0, the elevation of the steel shell of cable tower block No. 0 is adjusted by the jack.
[0025] A further solution is that the allowable value is 1 mm.
[0026] A further solution is that the number of the jacks is five, and the five jacks are respectively arranged below the monitoring points.
[0027] A further solution is to install five laser transmitters at the same elevation of the total station, rotate the total station so that the total station emits indicating infrared rays of the theoretical azimuths corresponding to the five monitoring points, and adjust the positions of the five laser transmitters by indicating infrared rays so that the azimuths between the rays emitted by the five laser transmitters and the total station are respectively equal to the theoretical azimuths corresponding to the five monitoring points;
[0028] Using the light emitted by the five laser transmitters as the baseline, adjust the positions of the five monitoring points on the steel shell of the tower block No. 0 so that the actual azimuth angles corresponding to the five monitoring points are consistent with the theoretical azimuth angles.
[0029] Compared with the prior art, the beneficial effects of the present invention are as follows: (1) The present invention first calculates the theoretical azimuths of the five monitoring points on the steel shell of the cable tower block No. 0 through the design coordinates of the five monitoring points, and then measures the actual azimuths of the five monitoring points on the steel shell through a total station, and adjusts the position of the steel shell of the cable tower block No. 0 according to the deviation between the theoretical azimuth and the actual azimuth, until the position of the steel shell of the cable tower block No. 0 is adjusted to the point where the deviations of the actual x-axis coordinates and y-axis coordinates of the five monitoring points from the theoretical coordinates are less than the allowable value; the present invention adjusts the position of the steel shell of the cable tower block No. 0 based on the single parameter of the azimuth, which is more convenient to operate than adjusting the position of the steel shell through the two parameters of the x-axis coordinates and y-axis coordinates of the monitoring points; the present invention achieves high-precision positioning of the position of the steel shell of the cable tower block No. 0, ensuring the accuracy of the subsequent splicing and installation of the cable tower segments. The present invention is easy to operate, has high precision, and good use effect, and can be widely used in the positioning, measurement and construction of bridge cable towers;
[0030] (2) The present invention installs five laser transmitters at the same elevation of the total station, and adjusts the azimuths between the light emitted by the five laser transmitters and the total station to be equal to the theoretical azimuths corresponding to the five monitoring points; the positions of the five monitoring points on the steel shell of the tower block No. 0 are adjusted by using the light emitted by the laser transmitter as a reference line, thereby further improving the convenience of operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0032] Figure 1 It is a schematic diagram of the device arrangement structure of the present invention;
[0033] Figure 2 It is a schematic diagram of the positioning test of the present invention;
[0034] Figure 3 It is a schematic diagram of the horse stool and the jack;
[0035] Figure numerals: 1. horse stool, 2. jack, 3. total station, 4. digital level, 5. laser transmitter. DETAILED DESCRIPTION
[0036] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0037] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be an intermediate element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be an intermediate element at the same time.
[0038] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0039] See also Figure 1-Figure 3 The present invention provides a method for positioning a No. 0 steel shell of a bridge pylon, which specifically comprises the following steps:
[0040] Step S1, select five points on the upper surface of the steel shell of the cable tower block 0 as monitoring points, and obtain the theoretical coordinates of the five monitoring points (x1, y1), (x2, y2), (x3, y3), (x4, y4) and (x5, y5) according to the engineering measurement reference points and design drawings;
[0041] It should be noted that the engineering survey reference point refers to the basic point used to determine the location, elevation, direction and other characteristics of the ground in the construction project. It is usually specified on the map by the National Bureau of Surveying and Mapping or the local surveying and mapping bureau and accurately measured to provide the absolute position, elevation and coordinates of the construction project. Basic information, such as the engineering survey reference point will be marked on the ground at the construction site. Based on the engineering survey reference point and after obtaining the tower design drawings, the design coordinates of any point on the steel shell of tower block No. 0 can be calculated, that is, the theoretical coordinates. Among them, the surface of the steel shell of tower block No. 0 includes three straight lines and one arc line. In this embodiment, five points on the upper surface of the steel shell of tower block No. 0 are selected as monitoring points. The five monitoring points specifically include the four endpoints of the three straight lines on the upper surface of the steel shell of tower block No. 0 and the center point of the arc edge. See Figure 2 A, B, C, D and E. As mentioned above, the theoretical coordinates of the five monitoring points can be obtained through engineering measurement benchmarks and design drawings, which are (x1, y1), (x2, y2), (x3, y3), (x4, y4) and (x5, y5).
[0042] Step S2, install a digital level ruler on the upper surface of the steel shell of the cable tower block 0, arrange a total station around the installation position of the steel shell of the cable tower block 0, and determine the coordinates of the measuring station of the total station as (x0, y0) according to the engineering measurement reference point;
[0043] Specifically, a digital level is installed on the upper surface of the steel shell of the cable tower block No. 0 to be installed. There are four digital levels, which are arranged on the four side lines of the upper surface of the steel shell of the cable tower block No. 0. The digital level has an accuracy of 0.05 degrees.
[0044] In addition, total stations are arranged around the installation position of the steel shell of tower block No. 0. The total station, that is, the total station electronic rangefinder (Electronic Total Station), is a high-tech measuring instrument that integrates optics, mechanics and electronics, and can measure the azimuth and coordinate values of the target point.
[0045] In order to facilitate the total station to measure the azimuth angles of the five monitoring points on the upper surface of the steel shell of the tower block No. 0 to be installed, it is preferred to install the total station's measuring station higher than the upper surface of the steel shell, and then determine the coordinates of the total station's measuring station as (x0, y0) based on the engineering measurement reference point, and set the coordinates (x0, y0) as the coordinates of the measuring station in the input interface of the total station.
[0046] Step S3, calculating the theoretical azimuths of the five monitoring points according to the theoretical coordinates of the five monitoring points and the coordinates of the measuring station of the total station;
[0047] Specifically, according to the theoretical coordinates of the five monitoring points and the coordinates of the measuring station of the total station, the calculation formula for the theoretical azimuths of the five monitoring points is calculated as follows:
[0048]
[0049] When x i -x0>0,y i -y0>0,
[0050] When x i -x0<0,y i -y0>0,
[0051] When x i -x0<0,y i When -y0<0,
[0052] When x i -x0>0,y i When -y0<0,
[0053] Where α is the theoretical azimuth angle.
[0054] Step S4, hoist the steel shell of cable tower block 0 to the top of its installation position, use a total station to measure the actual azimuths corresponding to the five monitoring points of the steel shell, and adjust the position of cable tower block 0 according to the deviations between the actual azimuths corresponding to the five monitoring points and the theoretical azimuths, until the position of cable tower block 0 is adjusted to the point where the deviations between the actual x-axis coordinates and y-axis coordinates of the five monitoring points and the theoretical coordinates are less than the allowable values;
[0055] It should be noted that the present invention continuously corrects and adjusts the position of the steel shell of the cable tower block 0 based on the single parameter of the azimuth angle, which is more convenient to operate than adjusting the position of the steel shell by two parameters of the x-axis coordinate and y-axis coordinate of the monitoring point; when the position of the steel shell of the cable tower block 0 is adjusted to the theoretical position by the azimuth angle, that is, the actual azimuth angle of each monitoring point is consistent with the theoretical azimuth angle, the actual x-axis coordinates and y-axis coordinates of the five monitoring points of the cable tower block 0 are compared with the theoretical coordinates to determine whether the deviations of the x-axis coordinates and y-axis coordinates of the five monitoring points are all less than the allowable value. If so, it indicates that the adjustment is in place. In this embodiment, the allowable value is set to 1mm.
[0056] Step S5, placing a jack under the steel shell of cable tower block 0, and adjusting the elevation of the steel shell of cable tower block 0 by the jack until the deviation between the elevation of the steel shell of cable tower block 0 and the theoretical design elevation is less than the allowable value; and adjusting the horizontal state of the steel shell of cable tower block 0 according to the digital level ruler, so that the horizontal state of the steel shell of cable tower block 0 meets the requirements;
[0057] Specifically, a horse stool is placed under the steel shell of the cable tower block 0, and a jack is arranged inside the horse stool. The steel shell of the cable tower block 0 is lowered onto the horse stool using a tower crane or a hoist. Then, after the telescopic end of the jack is pressed against the lower surface of the steel shell of the cable tower block 0, the elevation of the steel shell of the cable tower block 0 is adjusted by the jack until the deviation between the elevation of the steel shell of the cable tower block 0 and the theoretical design elevation is less than the allowable value. During the elevation adjustment process, the horizontal state of the steel shell of the cable tower block 0 is adjusted according to the digital level ruler so that the horizontal state of the steel shell of the cable tower block 0 meets the requirements.
[0058] It should be noted that when the steel shell of cable tower block No. 0 is placed on the saddle, the elevation of the steel shell of cable tower block No. 0 will be lower than the design elevation. Therefore, the jack is used to adjust the elevation of the steel shell of cable tower block No. 0 by lifting the steel shell of cable tower block No. 0 upwards without removing the saddle.
[0059] In this embodiment, the number of the jacks is five, and the five jacks are respectively arranged below the monitoring points.
[0060] Step S6, use a total station to check whether the deviation between the three-dimensional coordinates of the five monitoring points on the steel shell and the theoretical design coordinates exceeds the allowable value; if the deviation exceeds the allowable value, continue to fine-tune the position of the steel shell of tower block 0 according to the deviation between the actual coordinates and the theoretical coordinates and ensure that the horizontal state of the steel shell meets the requirements, until the deviation between the measured values of the coordinates of the five monitoring points on the steel shell of tower block 0 and the theoretical values meets the accuracy requirements.
[0061] Step S7: After the position of the steel shell is determined, support the steel shell.
[0062] Optionally, the step of adjusting the position of the steel shell of the No. 0 block of the cable tower according to the deviation between the actual azimuth angles corresponding to the five monitoring points and the theoretical azimuth angles specifically includes:
[0063] Five laser transmitters are installed at the same elevation of the total station, and the total station is rotated so that the total station emits indicating infrared rays of the theoretical azimuths corresponding to the five monitoring points, and the positions of the five laser transmitters are adjusted by the indicating infrared rays so that the azimuths between the rays emitted by the five laser transmitters and the total station are respectively equal to the theoretical azimuths corresponding to the five monitoring points;
[0064] Using the light emitted by the five laser transmitters as the baseline, adjust the positions of the five monitoring points on the steel shell of the tower block No. 0 so that the actual azimuth angles corresponding to the five monitoring points are consistent with the theoretical azimuth angles.
[0065] In summary, the present invention adjusts the position of the steel shell of the cable tower block No. 0 based on the single parameter of the azimuth angle, which is more convenient to operate than adjusting the position of the steel shell through the two parameters of the x-axis coordinate and the y-axis coordinate of the monitoring point; in addition, the present invention installs five laser emitters at the same elevation of the total station, and adjusts the azimuth angle between the light emitted by the five laser emitters and the total station to be equal to the theoretical azimuth angle corresponding to the five monitoring points; the light emitted by the laser emitter is used as a reference line to adjust the position of the five monitoring points on the steel shell of the cable tower block No. 0, thereby further improving the convenience of operation. The present invention achieves high-precision positioning of the position of the steel shell of the cable tower block No. 0, ensuring the accuracy of the subsequent splicing and installation of the cable tower segments. The present invention is easy to operate, has high precision, and good use effect, and can be widely used in the positioning, measurement and construction of bridge cable towers;
[0066] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation to the invention.
[0067] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example.
[0068] Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. Mentioning "embodiment" in this article means that the specific features, structures or characteristics described in conjunction with the embodiment may be included in at least one embodiment of the present embodiment application. The appearance of this phrase in various positions in the specification is not necessarily the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It can be explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0069] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A method for positioning the steel shell of the No. 0 block of a bridge pylon, characterized in that: The specific steps include: Five points on the upper surface of the steel shell of the cable tower block 0 were selected as monitoring points. The theoretical coordinates of the five monitoring points were obtained according to the engineering measurement reference points and design drawings. x 1, y 1) ( x 2, y 2) ( x 3. y 3) x 4. y 4) and ( x 5. y 5); A digital level is installed on the upper surface of the steel shell of the cable tower block 0, and a total station is arranged around the installation position of the steel shell of the cable tower block 0. The coordinates of the measuring station of the total station are determined according to the engineering measurement benchmark point: ( x 0, y 0); The theoretical azimuths of the five monitoring points are calculated based on the theoretical coordinates of the five monitoring points and the coordinates of the measuring station of the total station; The steel shell of cable tower block 0 was hoisted above its installation location, and the actual azimuths corresponding to the five monitoring points of the steel shell of cable tower block 0 were measured using a total station. According to the deviation between the actual azimuth and the theoretical azimuth corresponding to the five monitoring points, the position of the steel shell of the cable tower block 0 is adjusted, including: Five laser transmitters are installed at the same elevation of the total station. By rotating the total station, the total station emits infrared rays indicating the theoretical azimuths corresponding to the five monitoring points. The positions of the five laser transmitters are adjusted by the indicating infrared rays. Make the azimuth angles of the light emitted by the five laser transmitters equal to the theoretical azimuth angles corresponding to the five monitoring points. Using the light emitted by the five laser transmitters as the reference line, adjust the positions of the five monitoring points on the steel shell of the tower block 0 so that the actual azimuths corresponding to the five monitoring points are consistent with the theoretical azimuths. Until the position of the steel shell of the tower block 0 is adjusted to the actual position of its five monitoring points x Axis coordinates and y The deviations between the axis coordinates and the theoretical coordinates are all less than the allowable value; Place a jack under the steel shell of cable tower block 0, and adjust the elevation of the steel shell of cable tower block 0 by using the jack until the deviation between the elevation of cable tower block 0 and the theoretical design elevation is less than the allowable value; adjust the horizontal state of the steel shell of cable tower block 0 according to the digital level ruler, so that the horizontal state of the steel shell of cable tower block 0 meets the requirements; After determining the position of the steel shell of tower block 0, provide support for the steel shell of tower block 0.
2. A method for positioning the steel shell of the No. 0 block of a bridge pylon according to claim 1, characterized in that: Adjust the horizontal state of the steel shell of the cable tower block 0 according to the digital level ruler so that the horizontal state of the steel shell of the cable tower block 0 meets the requirements, including: Use a total station to check the three-dimensional coordinates of the five monitoring points on the steel shell of the cable tower block 0 to determine whether the deviation between the actual coordinates and the theoretical coordinates exceeds the allowable value; If the deviation exceeds the allowable value, continue to fine-tune the position of the steel shell of tower block 0 according to the deviation between the actual coordinates and the theoretical coordinates and ensure that the horizontal state of the steel shell of tower block 0 meets the requirements, until the deviation between the measured values and the theoretical values of the coordinates of the five monitoring points of the steel shell of tower block 0 meets the accuracy requirements.
3. The method for positioning the No. 0 steel shell of a bridge pylon according to claim 1, characterized in that: The calculation formula for the theoretical azimuths of the five monitoring points is calculated based on the theoretical coordinates of the five monitoring points and the coordinates of the measuring station of the total station: in α is the theoretical azimuth.
4. The method for positioning the steel shell of the bridge pylon block No. 0 according to claim 1 is characterized by: There are four digital level rulers, which are arranged on the four side lines of the upper surface of the steel shell of block 0 of the tower. The accuracy of the digital level ruler is 0.05 degrees.
5. The method for positioning the steel shell of the bridge pylon block No. 0 according to claim 1 is characterized by: The upper surface of the steel shell of the cable tower block No. 0 includes three straight lines and one arc line, and the five monitoring points include the four endpoints of the four lines of the steel shell of the cable tower block No. 0 and the center point of the arc line.
6. The method for positioning the steel shell of the bridge pylon block No. 0 according to claim 1 is characterized by: A jack is placed under the steel shell of cable tower block 0. The elevation of the steel shell of cable tower block 0 is adjusted by the jack, including: A saddle is placed under the steel shell of cable tower block No.
0. A jack is installed inside the saddle. The steel shell of cable tower block No. 0 is lowered onto the saddle using a tower crane or a hoist. After the telescopic end of the jack rests against the lower surface of the steel shell of cable tower block No. 0, the elevation of the steel shell of cable tower block No. 0 is adjusted by the jack.
7. The method for positioning the steel shell of the bridge pylon block No. 0 according to claim 1 is characterized by: The actual situation of the five monitoring points x Axis coordinates and y The allowable value of the deviation between the axis coordinate and the theoretical coordinate is 1 mm.
8. The method for positioning the steel shell of the bridge pylon block No. 0 according to claim 5 is characterized by: The number of the jacks is five, and the five jacks are respectively arranged below the monitoring points.