A method and system for adjusting environmental compliance in industrial parks based on big data
Through big data analysis and two-way learning data models, the environmental compliance system of industrial parks is adjusted and optimized, and the problem of insufficient adaptability of compliance adjustments in the existing technology is solved, and higher adaptability and accuracy are achieved, ensuring the park. environmental operations and compliance.
Patent Information
- Application Number
- CN202410531116.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-04-29
AI Technical Summary
The existing environmental compliance adjustment methods for industrial parks are weak in adaptability to actual conditions, resulting in low adaptability between environmental laws and regulations and industrial parks, and cannot effectively ensure the sustainable and stable development and safety compliance of the parks.
Using a big data-based method, obtain the current park environmental compliance system and industrial environmental protection data, adjust the compliance system through comprehensive adaptability evaluation, and use the two-way learning data model to generate more adaptable compliance systems and evaluation rules to ensure compliance The regulations are in line with the environmental protection operation and development of industrial parks.
The adaptability and accuracy of environmental compliance adjustments in industrial parks have been improved, and a complete evaluation system has been formed to ensure that the compliance system can dynamically adapt to changes in industrial parks and ensure the stability and compliance of environmental protection operations of the parks.
Smart Images

Figure CN118261490B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of industrial park compliance adjustment, and in particular to a method and system for industrial park environmental protection compliance adjustment based on big data. Background Art
[0002] An industrial park is a specially planned and constructed area designed to accommodate multiple enterprises, companies or organizations that share resources and form synergies in the same geographical area. These parks usually have certain industrial characteristics, such as science and technology parks, industrial parks, innovation parks, etc., to promote the development of related industries and collaborative innovation. Timely adjustments to the environmental compliance of industrial parks can ensure the sustainable and stable development of industrial parks, as well as safety compliance.
[0003] In the related technologies, the environmental compliance adjustment of industrial parks is mainly carried out by inputting the latest environmental laws, regulations and related rules and regulations into the data interpretation model for interpretation and analysis. The basic situation of the current industrial park is preset in the model. Through the intelligent learning of the model, the latest environmental laws, regulations and related rules and regulations are judged for the system requirements of different types of industrial parks, so as to find out the system for the current type of industrial park and use it. However, due to the large number of enterprises in industrial parks and the complex operation conditions, the data interpretation model trained based on the standard park operation data cannot analyze the actual situation of the park, and the analysis ability of the adaptability of the system to the park is weak, resulting in the low adaptability of the adjusted environmental laws, regulations and related rules and regulations to the industrial park. Summary of the invention
[0004] In order to improve the adaptability and accuracy of environmental protection compliance adjustments in industrial parks, the present application provides an industrial park environmental protection compliance adjustment method and system based on big data.
[0005] In the first aspect, the above-mentioned invention objective of the present application is achieved through the following technical solutions:
[0006] A method for adjusting environmental protection compliance of an industrial park based on big data, the method comprising:
[0007] Obtain the current park's environmental compliance system and industrial environmental data;
[0008] According to the current park environmental protection compliance system and the park industry environmental protection data, determine the adaptability of the current park environmental protection compliance system to obtain a comprehensive adaptability evaluation result;
[0009] Adjusting the current environmental protection compliance system of the park based on the comprehensive adaptability evaluation result to obtain a first adaptable environmental protection compliance system;
[0010] Inputting the first adaptive environmental compliance system into a preset two-way learning data model, and generating a second adaptive environmental compliance system based on the two-way learning data model and the first adaptive environmental compliance system;
[0011] Based on the second adaptive environmental compliance system, corresponding adaptive environmental compliance evaluation rules are generated.
[0012] By adopting the above technical solution, environmental protection-related data of the industrial park can be obtained through visits and surveys or through public information of enterprises. The current environmental protection compliance of the industrial park can be analyzed through the industrial environmental protection data of the park, and it can be judged whether the existing environmental protection compliance system of the industrial park is suitable for the environmental protection operation and development of the industrial park. Therefore, the environmental protection compliance system of the industrial park is adjusted according to the judgment result. That is, after making corresponding adjustments to the environmental protection compliance situation, the park operation simulation is carried out based on the two-way learning data model to make the current environmental protection compliance system adapt to the environmental protection operation and development of the industrial park, and at the same time generate corresponding compliance evaluation rules to form a complete evaluation system to improve the adaptability and accuracy of the environmental protection compliance adjustment of the industrial park.
[0013] In a preferred example, the present application can be further configured as follows: judging the adaptability of the current park environmental protection compliance system according to the current park environmental protection compliance system and the park industry environmental protection data, and obtaining a comprehensive adaptability evaluation result, specifically including:
[0014] Determine the park type, obtain the system evaluation frequency and the system update frequency from the current park environmental protection compliance system, judge whether the system evaluation frequency and the system update frequency correspond to the park type, and obtain a frequency adaptability judgment result;
[0015] The frequency of system implementation, employee evaluation level and surrounding community evaluation level are obtained from the industrial environmental protection data of the park, and a comprehensive adaptability evaluation result is obtained based on the frequency adaptability judgment result, the system implementation frequency, the employee evaluation level and the surrounding community evaluation level.
[0016] By adopting the above technical solution, there are many types of industrial parks, and the environmental protection compliance of different industrial parks is different. Therefore, the type of the current industrial park is determined, and the system evaluation frequency and system update frequency are obtained from the current park's environmental protection compliance system, that is, the frequency of evaluating and updating the current industrial park, judging whether the frequency of evaluation and updating of the industrial park corresponds to the frequency of changes in regulations, and whether the evaluation frequency of the environmental protection compliance system of the industrial park corresponds to the speed of change of the industrial park. For example, the speed of change of the entrepreneurial incubation park is fast, and the corresponding evaluation and update frequency should be increased simultaneously. For industrial production enterprises in the industrial park, the life cycle or use cycle of the environmental protection equipment of such enterprises is judged, and the corresponding evaluation frequency should be synchronized with the life cycle or use cycle of the environmental protection equipment. For port industrial zones, the frequency of changes in enterprises or updates of relevant policies is relatively low, and the corresponding evaluation and update frequency does not need to be too high. In addition, the acceptance of the environmental protection compliance system by enterprises in the industrial park is judged by the frequency of system execution, and the comprehensive adaptability evaluation results of the adaptability of the current environmental protection compliance system to the industrial park are obtained by combining the employee evaluation level and the surrounding community evaluation level, so as to ensure the accuracy of the analysis of the current compliance system.
[0017] In a preferred example, the present application can be further configured as follows: adjusting the current environmental protection compliance system of the park based on the comprehensive adaptability evaluation result to obtain a first adaptable environmental protection compliance system specifically includes:
[0018] Obtaining a high-requirement compliance adjustment coefficient according to the park type and the comprehensive adaptability evaluation result;
[0019] Based on the high-requirement compliance adjustment coefficient, the current environmental protection compliance system of the park is adjusted to obtain a first adaptive environmental protection compliance system.
[0020] By adopting the above technical solution, the high-requirement environmental protection compliance of the park can be judged according to the type of park. For example, corresponding to the biomedical park, the current ordinary environmental protection compliance in the park may be the requirement for harmful substances in emissions. High-requirement environmental protection compliance rules require lower restrictions on harmful substances in emissions or even require zero emissions. In addition, there will be environmental protection compliance such as waste recycling; the evaluation results of the enterprises in the park are extracted from the comprehensive adaptability evaluation results. Because in order to meet the environmental protection operation and development of the industrial park, each enterprise needs to abide by relevant systems. Therefore, the evaluation results of the enterprises are further analyzed, and a high-requirement compliance adjustment coefficient is generated to improve the adjustment standards for enterprises. In this way, while ensuring the environmental protection operation and development of the park, the positive role of each enterprise is fully played to ensure the smooth progress of the environmental protection operation and development of the industrial park.
[0021] In a preferred example, the present application can be further configured as follows: obtaining a high-requirement compliance adjustment coefficient according to the park type and the comprehensive adaptability evaluation result, specifically including:
[0022] According to the park type, determine the corresponding park environmental protection compliance benchmark object information;
[0023] Based on the comprehensive adaptability evaluation results and the environmental compliance benchmark information, obtaining high-requirement compliance object information;
[0024] According to the high-requirement compliance object information and a preset high-requirement evaluation model, a high-requirement compliance adjustment coefficient is obtained.
[0025] By adopting the above technical solution, the park environmental protection compliance benchmark object information refers to the overall environmental protection requirements of the industrial park. For example, for the science and technology park, the overall environmental protection requirement is resource conservation and utilization, and for the industrial park, the overall environmental protection requirement is to reduce pollution emissions. The high-requirement compliance object information is a higher-level environmental protection requirement that is consistent with the overall environmental protection requirements of the park and conforms to the current actual situation of the park. For example, for the science and technology park, the higher-level environmental protection requirement is the proportion of green production and clean technology, and the higher-level environmental protection requirement for the industrial park is the proportion of circular economy. Therefore, by judging the overall environmental protection requirements of the industrial park, the overall environmental protection requirements are analyzed in combination with the comprehensive adaptability evaluation results to formulate appropriate higher-level environmental protection requirements; in addition, the preset high-requirement evaluation model is based on the analysis of the high-requirement compliance object information to generate an adjustment coefficient that meets the environmental protection compliance adjustment requirements. The high-requirement compliance adjustment coefficient can be a coefficient corresponding to each different environmental protection compliance. Based on this, a compliance adjustment coefficient for the higher-level environmental protection requirements of the industrial park is formed, thereby ensuring the adaptability and accuracy of the environmental protection compliance adjustment of the industrial park.
[0026] In a preferred example, the present application may be further configured as follows: the first adaptive environmental compliance system is input into a preset two-way learning data model, and based on the two-way learning data model, a second adaptive environmental compliance system is generated, specifically including:
[0027] Inputting the first adaptive environmental compliance system into a preset two-way learning data model, and generating park two-way simulation information based on the two-way learning data model;
[0028] According to the park's two-way simulation information, the first adaptive environmental compliance system is adjusted to generate a second adaptive environmental compliance system.
[0029] By adopting the above technical solution, the two-way learning data model refers to a model that simulates the overall operation of the industrial park through the established environmental compliance values and the production conditions of each enterprise in the industrial park, when all enterprises comply with the regulations. The two-way simulation information of the industrial park generated by the two-way learning data model represents the average environmental indicators of the industrial park in the absence of accidents. Therefore, through the learning and simulation capabilities of the two-way learning data model, the adaptability of the first adaptive environmental compliance system to the industrial park is judged in a virtual environment, and then the first adaptive environmental compliance system is adjusted to generate a second adaptive environmental compliance system with stronger adaptability, thereby improving the adaptability and accuracy of the environmental compliance adjustment of the industrial park.
[0030] In a preferred example, the present application can be further configured as follows: based on the second adaptive environmental compliance system, generating corresponding adaptive environmental compliance evaluation rules specifically includes:
[0031] Based on the second adaptive environmental compliance system, generate adaptive development evaluation indicators for the park;
[0032] Determine the corresponding park environmental protection potential hazard object information according to the park type and the park industry environmental protection data;
[0033] The adaptive development evaluation index is adjusted according to the environmental hazard object information to obtain adaptive environmental compliance evaluation rules.
[0034] By adopting the above technical solution, after the second adaptive environmental compliance system is generated, corresponding indicators and rules are required for substantive compliance evaluation. The method of obtaining indicators can be based on the ratio of the second adaptive environmental compliance system to the original current park environmental compliance system, and the evaluation indicators of the current park environmental compliance system are adjusted accordingly to obtain the evaluation indicators of the corresponding second adaptive environmental compliance system, or through time-step evaluation indicators, that is, by gradually improving the indicators of compliance evaluation, it is convenient for enterprises in the industrial park to transition, or for enterprises whose evaluation indicators of the second adaptive environmental compliance system and the original current park environmental compliance system have too large a difference, the historical environmental data of the enterprise is analyzed to determine whether the enterprise is applicable to the evaluation of the second adaptive environmental compliance system. If it is difficult for the enterprise to make changes, there is no need to adjust the compliance evaluation indicators of the enterprise based on the second adaptive environmental protection compliance system. Instead, the evaluation indicators suitable for the enterprise can be re-determined through the historical environmental protection data of the enterprise. In addition, the generated second adaptive environmental protection compliance system and the corresponding evaluation indicators are not a set of systems for a short period of time. The stable environmental protection operation of the industrial park is a long-term system. Therefore, the environmental protection hazards of the industrial park are an important basis for judging whether the industrial park can maintain stable environmental protection operation and whether the second adaptive environmental protection compliance system is suitable for the industrial park. Therefore, based on the environmental protection hazards of the industrial park, indicators of environmental protection hazards are generated, so that the evaluation indicators are more in line with the actual situation of the industrial park, ensuring the adaptability and accuracy of the environmental protection compliance adjustments of the industrial park.
[0035] In the second aspect, the above invention objective of the present application is achieved through the following technical solutions:
[0036] An industrial park environmental protection compliance adjustment system based on big data, the industrial park environmental protection compliance adjustment system based on big data comprising:
[0037] The data acquisition module is used to obtain the current park's environmental protection compliance system and the park's industrial environmental protection data;
[0038] An adaptability judgment module, used to judge the adaptability of the current park environmental protection compliance system according to the current park environmental protection compliance system and the park industry environmental protection data, and obtain a comprehensive adaptability evaluation result;
[0039] A first system module, used to adjust the current environmental protection compliance system of the park based on the comprehensive adaptability evaluation result to obtain a first adaptable environmental protection compliance system;
[0040] A second system module, used to input the first adaptive environmental compliance system into a preset two-way learning data model, and generate a second adaptive environmental compliance system based on the two-way learning data model and the first adaptive environmental compliance system;
[0041] A rule generation module is used to generate corresponding adaptive environmental compliance evaluation rules based on the second adaptive environmental compliance system.
[0042] Optionally, the adaptability judgment module includes:
[0043] A system judgment submodule is used to determine the park type, obtain the system evaluation frequency and the system update frequency from the current park environmental protection compliance system, judge whether the system evaluation frequency and the system update frequency correspond to the park type, and obtain a frequency adaptability judgment result;
[0044] The adaptability judgment submodule is used to obtain the system implementation frequency, employee evaluation level and surrounding community evaluation level from the industrial environmental protection data of the park, and obtain a comprehensive adaptability evaluation result based on the frequency adaptability judgment result, the system implementation frequency, the employee evaluation level and the surrounding community evaluation level.
[0045] In the third aspect, the above invention objective of the present application is achieved through the following technical solutions:
[0046] A computer device includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the above-mentioned industrial park environmental protection compliance adjustment method based on big data are implemented.
[0047] In a fourth aspect, the above-mentioned invention objective of the present application is achieved through the following technical solutions:
[0048] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the above-mentioned industrial park environmental protection compliance adjustment method based on big data.
[0049] In summary, the present application includes at least one of the following beneficial technical effects:
[0050] 1. Obtain environmental protection-related data of the industrial park, which can be obtained through visits and surveys or through public information of enterprises. Analyze the current environmental protection compliance of the industrial park through the industrial environmental protection data of the industrial park, and judge whether the existing environmental protection compliance system of the industrial park is suitable for the environmental protection operation and development of the industrial park. In this way, adjust the environmental protection compliance system of the industrial park according to the judgment results, that is, after making corresponding adjustments to the environmental protection compliance situation, simulate the operation of the park based on the two-way learning data model, so that the current environmental protection compliance system is adapted to the environmental protection operation and development of the industrial park, and generate corresponding compliance evaluation rules at the same time, form a complete evaluation system, and improve the adaptability and accuracy of environmental protection compliance adjustments in the industrial park;
[0051] 2. There are many types of industrial parks, and the environmental protection compliance of different industrial parks is different. Therefore, determine the type of the current industrial park and obtain the system evaluation frequency and system update frequency from the current park's environmental protection compliance system, that is, the frequency of evaluating and updating the current industrial park, and judge whether the frequency of evaluation and updating of the industrial park corresponds to the frequency of changes in regulations, and whether the evaluation frequency of the environmental protection compliance system of the industrial park corresponds to the speed of change of the industrial park. For example, the speed of change of the entrepreneurial incubation park is fast, and the corresponding evaluation and update frequency should be increased simultaneously. For industrial production enterprises in industrial parks, the life cycle or use cycle of the environmental protection equipment of such enterprises is judged, and the corresponding evaluation frequency should be synchronized with the life cycle or use cycle of the environmental protection equipment. For port industrial zones, the frequency of enterprise changes or related policy updates is relatively low, and the corresponding evaluation and update frequency does not need to be too high. In addition, the acceptance of the environmental protection compliance system by enterprises in the industrial park is judged by the frequency of system execution, and the comprehensive adaptability evaluation results of the adaptability of the current environmental protection compliance system to the industrial park are obtained by combining the employee evaluation level and the surrounding community evaluation level, so as to ensure the accuracy of the analysis of the current compliance system;
[0052] 3. According to the type of industrial park, determine the high-requirement environmental protection compliance of the industrial park. For example, for a biomedical industrial park, the general environmental protection compliance in the industrial park may be the requirement for harmful substances in emissions. High-requirement environmental protection compliance requires lower restrictions on harmful substances in emissions or even requires zero emissions. In addition, there will be environmental protection compliance such as waste recycling. The evaluation results of the industrial park’s enterprises are extracted from the comprehensive adaptability evaluation results. Because each enterprise needs to comply with relevant systems to meet the environmental protection operation and development of the industrial park, the evaluation results of the enterprises are further analyzed, and a high-requirement compliance adjustment coefficient is generated to improve the adjustment standards for the enterprises. In this way, while ensuring the environmental protection operation and development of the industrial park, the positive role of each enterprise is fully utilized to ensure the smooth progress of the environmental protection operation and development of the industrial park. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Figure 1 It is a flowchart of an implementation method of an industrial park environmental protection compliance adjustment method based on big data in an embodiment of the present application;
[0054] Figure 2 It is a flowchart for implementing S20 of the industrial park environmental protection compliance adjustment method based on big data in an embodiment of the present application;
[0055] Figure 3 It is a flowchart for implementing S30 of the industrial park environmental protection compliance adjustment method based on big data in an embodiment of the present application;
[0056] Figure 4It is a flowchart for implementing S31 of the environmental protection compliance adjustment method of an industrial park based on big data in an embodiment of the present application;
[0057] Figure 5 It is a flowchart for implementing S40 of the industrial park environmental protection compliance adjustment method based on big data in an embodiment of the present application;
[0058] Figure 6 It is a flowchart for implementing S50 of the industrial park environmental protection compliance adjustment method based on big data in the embodiment of the present application;
[0059] Figure 7 It is a principle block diagram of an industrial park environmental protection compliance adjustment system based on big data in an embodiment of the present application;
[0060] Figure 8 It is an internal structure diagram of the computer equipment for adjusting environmental compliance in an industrial park based on big data in an embodiment of the present application. DETAILED DESCRIPTION
[0061] The following is combined with Figure 1-8 This application is described in further detail.
[0062] In one embodiment, if Figure 1 As shown, the present application discloses a method for adjusting environmental protection compliance of industrial parks based on big data, which specifically includes the following steps:
[0063] S10: Obtain the current environmental protection compliance system of the park and the environmental protection data of the park’s industries.
[0064] In this embodiment, the current industrial park environmental protection compliance system refers to the compliance system currently used by the industrial park. The industrial park environmental protection data refers to the environmental protection data of the industrial park.
[0065] Specifically, an industrial park is a specially planned and constructed area designed to accommodate multiple enterprises, companies or organizations. In order to facilitate the management of enterprises in the industrial park, the industrial park is equipped with an environmental compliance system for managing the entire park. For example, for an industrial park including chemical production enterprises, there are environmental compliance systems such as air emission standards and water quality standards, as well as environmental compliance standards and systems for greening and ecology of the corresponding park. Therefore, the compliance system set and used by the current industrial park, that is, the current park environmental compliance system, and the overall environmental data of the industrial park, that is, the park industry environmental data, are obtained. In this embodiment, the park environmental compliance system includes a variety of environmental compliance systems, and the way to obtain the park industry environmental data can be through visits and surveys or through public information of enterprises.
[0066] S20: Based on the current park environmental protection compliance system and the park industry environmental protection data, determine the adaptability of the current park environmental protection compliance system and obtain a comprehensive adaptability evaluation result.
[0067] In this embodiment, the comprehensive adaptability evaluation result refers to the result of judging the adaptability of the existing park environmental protection compliance system to the industrial park.
[0068] Specifically, the industrial environmental protection data of the park includes the survey results of environmental protection data of each enterprise and the industrial park as a whole. The environmental protection data include, for example, energy consumption, carbon emissions, water resource utilization rate, water pollutant emissions, waste generation in the park, hazardous waste treatment rate and waste classification utilization rate, as well as historical results of compliance investigations. For the current environmental protection compliance system of the park, the correlation between the compliance records of each enterprise and the overall environmental protection compliance of the industrial park is judged, that is, when the enterprise fails the compliance investigation, the change trend of the overall environmental protection compliance of the industrial park is judged, and then the adaptability of the current environmental protection compliance system of the park to the enterprises in the industrial park is judged. In addition, by analyzing the specific unqualified projects when the enterprise fails the compliance investigation, such as environmental and greening protection projects, combined with the performance of other enterprises in the industrial park on the project, it is judged whether the failure of the compliance investigation of the enterprise is due to the compliance system or the execution of the enterprise. Based on this, the result of judging the adaptability of the current environmental protection compliance system of the park to the industrial park is obtained, that is, the comprehensive adaptability evaluation result.
[0069] S30: Based on the comprehensive adaptability evaluation results, the current environmental protection compliance system of the park is adjusted to obtain the first adaptability environmental protection compliance system.
[0070] In this embodiment, the first adaptive environmental compliance system refers to the environmental compliance system of the industrial park that is adjusted for the first time.
[0071] Specifically, for the adaptability of the current park's environmental protection compliance system and the industrial park as represented by the comprehensive adaptability evaluation results, the comprehensive adaptability evaluation results corresponding to the compliance systems judged as inappropriate in the comprehensive adaptability evaluation results are extracted, including the corresponding enterprises, the enterprises' environmental protection data, the historical results of compliance investigations, the industrial park's overall environmental protection data, and the historical results of compliance investigations. The extracted information is analyzed in combination with the preset development indicators. For example, if the comprehensive adaptability evaluation results indicate that the emission compliance system of the enterprise and the industrial park requires that the enterprise's air, water quality, and pollutant emissions and other indicators are lower than the development indicators, resulting in a greater potential impact of the park's production activities on the surrounding environment, the emission compliance system of the enterprise and the industrial park will be adjusted to make the emission compliance system of the enterprise and the industrial park meet the development indicators.
[0072] S40: Inputting the first adaptive environmental protection compliance system into a preset two-way learning data model, and generating a second adaptive environmental protection compliance system based on the two-way learning data model and the first adaptive environmental protection compliance system.
[0073] In this embodiment, the second adaptive environmental compliance system refers to the environmental compliance system of the industrial park that has undergone secondary adjustments.
[0074] Specifically, the preset two-way learning data model refers to a data simulation model through a two-way deduction process of results. The two-way learning data model can simulate the environmental protection data of different enterprises during production through a large number of environmental protection data of different types of industrial parks and corresponding compliance training, and simulate the environmental protection data of different enterprises during production through environmental protection compliance. Therefore, after the first adaptive environmental protection compliance system is input into the preset two-way learning data model, the degree of adaptability of the current first adaptive environmental protection compliance system to the industrial park is judged through the data simulation of the two-way learning data model, and then the first adaptive environmental protection compliance system is adjusted according to the degree of adaptability of the current first adaptive environmental protection compliance system to the industrial park to generate a second adaptive environmental protection compliance system.
[0075] S50: Based on the second adaptive environmental compliance system, generate corresponding adaptive environmental compliance evaluation rules.
[0076] In this embodiment, the adaptive environmental compliance evaluation rules refer to the rules used to evaluate the environmental compliance system of the industrial park.
[0077] Specifically, after the second adaptive environmental compliance system is generated, the evaluation rules of the original second adaptive environmental compliance system are not applicable to the second adaptive environmental compliance system, and the evaluation rules corresponding to the second adaptive environmental compliance system need to be used. Therefore, the preset development indicators are used as the evaluation criteria for qualification, and then all the evaluation criteria in the original current park environmental protection compliance system are adjusted according to the ratio of the preset development indicators to the evaluation criteria for qualification in the original current park environmental protection compliance system, so as to obtain the corresponding adaptive environmental protection compliance evaluation rules; in addition, for the evaluation rules of non-evaluation indicators in the original current park environmental protection compliance system, such as the equipment types at environmental monitoring points and the scope of hidden danger investigation, an evaluation is conducted on whether the enterprise has established a management system that complies with ISO 14001 and other environmental management system certifications. That is, for enterprises that have established environmental management system certifications, the equipment types at environmental monitoring points and the scope of hidden danger investigation do not need to be changed in the evaluation rules of the second adaptive environmental protection compliance system, while for enterprises that have not established environmental management system certifications, the equipment types at environmental monitoring points and the scope of hidden danger investigation need to be upgraded in the evaluation rules of the second adaptive environmental protection compliance system. For example, the monitoring accuracy of the equipment types at environmental monitoring points is improved, and the proportion of the scope of hidden danger investigation to the overall area of the enterprise is expanded.
[0078] In one embodiment, if Figure 2 As shown, in step S20, the adaptability of the current park environmental protection compliance system is judged according to the current park environmental protection compliance system and the park industry environmental protection data, and a comprehensive adaptability evaluation result is obtained, which specifically includes:
[0079] S21: Determine the park type, obtain the system evaluation frequency and system update frequency from the current park environmental protection compliance system, determine whether the system evaluation frequency and system update frequency correspond to the park type, and obtain the frequency adaptability judgment result.
[0080] In this embodiment, the park type refers to the type of industrial park. The system evaluation frequency refers to the frequency of implementing compliance evaluation. The system update frequency refers to the frequency of updating the compliance system. The system judgment result refers to the judgment result used to indicate whether the compliance system can support high-quality development.
[0081] Specifically, determine the type of industrial park, that is, the park type. Park types include science and technology parks, industrial parks, trade and logistics parks, cultural and creative parks, and agricultural parks. In detail, science and technology parks include digital technology parks, innovation incubation parks, scientific research institutes parks, and biomedicine parks. Industrial parks include high-end manufacturing parks, new energy parks, chemical parks, and advanced manufacturing parks. Trade and logistics parks include e-commerce parks, logistics center parks, international trade parks, and cross-border e-commerce parks. Cultural and creative parks include art and creative parks, digital entertainment parks, cultural and creative industrial parks, and film and television industrial parks. Agricultural parks include organic agricultural parks, characteristic agricultural parks, modern agricultural science and technology parks, and leisure agricultural parks. Different industrial parks have corresponding environmental protection compliance systems. The frequency of compliance evaluation and the frequency of updating the compliance system in the industrial park, that is, the system evaluation frequency and the system update frequency, are obtained from the original current environmental protection compliance system of the industrial park. Both the system evaluation frequency and the system update frequency can reflect the degree of attention the industrial park attaches to the compliance system, that is, whether the industrial park conducts compliance evaluation within the organization in a timely manner and whether it uses a newer and more standardized compliance system based on the internal situation of the organization. Therefore, based on the system evaluation frequency and system update frequency in the preset development indicators, the system evaluation frequency and system update frequency of the current environmental protection compliance system of the industrial park are compared and judged to obtain the frequency adaptability judgment result.
[0082] S22: Obtain the frequency of system implementation, employee evaluation level and surrounding community evaluation level from the industrial environmental protection data of the park, and obtain the comprehensive adaptability evaluation results based on the frequency adaptability judgment results, system implementation frequency, employee evaluation level and surrounding community evaluation level.
[0083] In this embodiment, the frequency of system implementation refers to the frequency of implementing the compliance system. The employee evaluation level refers to the evaluation level of the compliance system by the employees of the enterprise or industrial park. The surrounding community evaluation level refers to the evaluation level of the enterprise or industrial park by the community surrounding the industrial park.
[0084] Specifically, the frequency of the industrial park's implementation of rewards and punishments and equipment replacement based on the current park's environmental protection compliance system, i.e., the frequency of system implementation, and the evaluation level of the industrial park's employees on the compliance system, i.e., the employee evaluation level, and the evaluation level of the community around the industrial park on the industrial park, i.e., the surrounding community evaluation level. In this embodiment, the employee evaluation level and the surrounding community evaluation level are divided into the same level. The employee evaluation level represents the evaluation level of the employees of the industrial park on the rationality and enforceability of the environmental protection compliance system, and the surrounding community evaluation level represents the evaluation level of the community around the industrial park on the environmental protection quality of the industrial park. Therefore, the system execution frequency reflects the rationality and practicality of the existing park's environmental protection compliance system, i.e., the more times the beneficial behavior of the system execution frequency is executed, the better the environmental protection data is after the execution is completed, indicating that the current park's environmental protection compliance system meets the requirements of environmental protection development, and the employee evaluation level and the surrounding community evaluation level respectively reflect the rationality and standardization of the current park's environmental protection compliance system from the inside and outside, i.e., the higher the employee evaluation level and the surrounding community evaluation level, the higher the current park's environmental protection compliance system meets the requirements of environmental protection development. Therefore, by combining the system judgment results, system execution frequency, employee evaluation level and surrounding community evaluation level, the comprehensive adaptability evaluation results of the industrial park and each enterprise in the industrial park are obtained respectively (the comprehensive adaptability evaluation result of the industrial park is the comprehensive result of the comprehensive adaptability evaluation results of each enterprise in the industrial park). In this embodiment, based on the system execution frequency, employee evaluation level and surrounding community evaluation level in the preset development indicators, the obtained system execution frequency, employee evaluation level and surrounding community evaluation level are judged, and the preset development indicators have different judgment criteria corresponding to different types of industrial parks.
[0085] In one embodiment, if Figure 3 As shown, in step S30, the current environmental protection compliance system of the park is adjusted based on the comprehensive adaptability evaluation result to obtain a first adaptable environmental protection compliance system, which specifically includes:
[0086] S31: Obtain high-requirement compliance adjustment coefficient based on the park type and comprehensive adaptability evaluation results.
[0087] In this embodiment, the high-requirement compliance adjustment coefficient refers to the adjustment coefficient of a compliance system with higher requirements.
[0088] Specifically, for the adaptability of the current park's environmental protection compliance system and the industrial park represented by the comprehensive adaptability evaluation results, the comprehensive adaptability evaluation results and enterprises judged to be adaptable in the comprehensive adaptability evaluation results are extracted, and the comprehensive adaptability evaluation results judged to be adaptable are analyzed, and the environmental protection data of the enterprises and the comprehensive adaptability evaluation results are comprehensively analyzed to extract the enterprises with excellent environmental protection data performance and high comprehensive adaptability evaluation results, and the high-requirement development indicators of the enterprises and the corresponding parameter values are obtained from the preset development indicators, and the average value of the ratio of the high-requirement development indicators and the corresponding parameter values of the enterprise to the corresponding indicators and parameter values of enterprises with high environmental protection data and high comprehensive adaptability evaluation results is calculated to obtain the adjustment coefficient of the compliance system for such enterprises, that is, the high-requirement compliance adjustment coefficient. For example, the type of industrial park is industrial park. Among the corresponding preset development indicators, the high-requirement development indicators of enterprises adopt DB44 / 26-2001 "Water Pollutant Emission Limits", and the corresponding wastewater discharge ammonia nitrogen content is level one: not more than 10 mg / L, and DB44 / 27-2001 "Air Pollutant Emission Limits" is adopted. The corresponding atmospheric particulate matter of the air pollutant emission standard is level one: the maximum allowable emission rate is not more than 1.8 kg / hour (exhaust chimney height 15m).
[0089] S32: Based on the high-requirement compliance adjustment coefficient, the current environmental protection compliance system of the park is adjusted to obtain a first adaptive environmental protection compliance system.
[0090] Specifically, based on the high-requirement compliance adjustment coefficient, the current park environmental protection compliance system is adjusted to obtain the first adaptive environmental protection compliance system.
[0091] In one embodiment, if Figure 4 As shown, in step S31, according to the park type and the comprehensive adaptability evaluation result, a high-requirement compliance adjustment coefficient is obtained, which specifically includes:
[0092] S311: Determine the corresponding park environmental protection compliance benchmark object information according to the park type.
[0093] In this embodiment, the park environmental protection compliance benchmark object information refers to the overall environmental protection requirements and objects of the industrial park.
[0094] Specifically, different types of industrial parks have different emphasis on environmental protection objects. For example, for science and technology parks, the overall environmental protection requirement is resource conservation and utilization; for industrial parks, the overall environmental protection requirement is to reduce pollution emissions.
[0095] S312: Based on the comprehensive adaptability evaluation results and environmental compliance benchmark information, obtain information on high-requirement compliance objects.
[0096] In this embodiment, the high-requirement compliance object information refers to the higher-level environmental protection requirements and objects of the industrial park.
[0097] Specifically, after determining the environmental protection compliance benchmark object information of the industrial park, based on the adaptability of the current environmental protection compliance system of the industrial park and the industrial park in the comprehensive adaptability evaluation results, the high-requirement compliance object information corresponding to the current environmental protection compliance system of the industrial park and the adaptability of the industrial park in the comprehensive adaptability evaluation results is queried from the preset multi-level environmental protection requirements index table, that is, the higher-level environmental protection requirements and objects of the industrial park.
[0098] S313: Obtain a high-requirement compliance adjustment coefficient according to the high-requirement compliance object information and a preset high-requirement evaluation model.
[0099] Specifically, the preset high-requirement evaluation model is used to generate an adjustment coefficient that meets the environmental compliance adjustment requirements based on the analysis of the high-requirement compliance object information. The high-requirement compliance adjustment coefficient can be a coefficient corresponding to each different environmental compliance, or it can be a coefficient corresponding to multiple environmental compliances of the same type. Based on this, a compliance adjustment coefficient for higher-level environmental requirements of the industrial park is formed, thereby ensuring the adaptability and accuracy of the environmental compliance adjustment of the industrial park. In this embodiment, the training samples of the high-requirement evaluation model are the environmental compliance of multiple groups of industrial parks in actual operation before and after adjustment, as well as the environmental compliance before and after adjustment specified by data technicians to represent abnormal operation of the industrial park. Through learning from the above samples, the high-requirement evaluation model can analyze the current park environmental compliance system, and based on the current park environmental compliance system, the high-requirement compliance object information is the value-added sample, and the current park environmental compliance system is uniformly value-added, thereby obtaining the high-requirement compliance adjustment coefficient.
[0100] In one embodiment, if Figure 5 As shown, in step S40, the first adaptive environmental compliance system is input into a preset two-way learning data model, and a second adaptive environmental compliance system is generated based on the two-way learning data model, which specifically includes:
[0101] S41: Input the first adaptive environmental compliance system into a preset two-way learning data model, and generate two-way simulation information of the park based on the two-way learning data model.
[0102] In this embodiment, the park bidirectional simulation information refers to the simulation indicator data of the industrial park under the condition that no accidents occur.
[0103] Specifically, the two-way learning data model refers to a model that simulates the operation of the industrial park through the established environmental compliance values, and simulates the overall operation of the industrial park through the production conditions of each enterprise in the industrial park when all enterprises comply with the regulations. Therefore, after the first adaptive environmental compliance system is input into the two-way learning data model, based on the two-way simulation function of the two-way learning data model, the two-way simulation index data of the industrial park under the simulation without any accidents is obtained, that is, the two-way simulation information of the industrial park.
[0104] S42: According to the two-way simulation information of the park, the first adaptive environmental protection compliance system is adjusted to generate a second adaptive environmental protection compliance system.
[0105] Specifically, the two-way learning data model can simulate the simulated index data of the industrial park under the condition that no accidents occur, as well as the simulated index data of the industrial park under various conditions, and the simulated index data of the industrial park under each condition corresponds to a two-way threshold, which refers to the difference threshold of the simulated index data in two directions of the industrial park. Therefore, according to the two-way threshold corresponding to the condition that no accidents occur, the two-way simulation information of the park is calculated and analyzed to obtain the difference of the simulated index data in two directions in the two-way simulation information of the park, and the difference is compared with the corresponding two-way threshold. If the difference is less than the two-way threshold, the first adaptive environmental compliance system is adjusted according to the difference to generate the second adaptive environmental compliance system; if the difference is greater than the two-way threshold, the first adaptive environmental compliance system is adjusted according to the two-way threshold to generate the second adaptive environmental compliance system.
[0106] In one embodiment, if Figure 6 As shown, in step S50, based on the second adaptive environmental compliance system, corresponding adaptive environmental compliance evaluation rules are generated, specifically including:
[0107] S51: Based on the second adaptive environmental compliance system, generate adaptive development evaluation indicators for the park.
[0108] In this embodiment, the park adaptive development evaluation index refers to the index used to evaluate the compliance of the industrial park in the second adaptive environmental protection compliance system.
[0109] Specifically, based on the second adaptive environmental compliance system, relevant indicator types for evaluating the environmental compliance of industrial parks, namely, the park adaptive development evaluation indicators, are extracted from the second adaptive environmental compliance system.
[0110] S52: Determine the corresponding park environmental protection hazard object information based on the park type and park industry environmental protection data.
[0111] In this embodiment, the park environmental protection potential hazard object information refers to indicators and objects with environmental protection potential hazards in the park.
[0112] Specifically, the generated second adaptive environmental compliance system and the corresponding evaluation indicators are not a set of systems for a short period of time. The stable environmental operation of the industrial park is a long-term one. Therefore, the environmental hazards of the industrial park are an important basis for judging whether the industrial park can stably operate in an environmentally friendly manner and whether the second adaptive environmental compliance system is suitable for the industrial park. The geographical location, deep groundwater detection data, vegetation ecological detection data, and animal monitoring data of the industrial park are obtained from the industrial environmental protection data of the industrial park, and the deep groundwater detection data, vegetation ecological detection data, and animal monitoring data are analyzed separately. That is, the ratio of the average deep groundwater detection data, vegetation ecological detection data, and animal monitoring data of the geographical location of the industrial park (obtained through the monitoring report issued by the local government department or environmental protection department) to the acquired deep groundwater detection data, vegetation ecological detection data, and animal monitoring data is queried to obtain the environmental hazard score of the industrial park. The factors whose environmental hazard score is greater than the preset hazard threshold of the environmental hazard subjective assignment table are determined as the environmental hazard object information of the park.
[0113] S53: Adjust the adaptive development evaluation indicators according to the information of environmental hazard objects to obtain adaptive environmental compliance evaluation rules.
[0114] Specifically, the subjective value table of development potential includes deep groundwater scores, vegetation ecology scores, and animal monitoring scores, etc. Each score corresponds to a different indicator type in the second adaptive environmental compliance system. For example, the deep groundwater score corresponds to the pollutant content indicator of the discharge and the water resource utilization rate indicator, and the vegetation ecology score corresponds to the vegetation rate indicator and the plant survival rate indicator, etc. Therefore, each score represented by the environmental hazard object information is compared with the corresponding full score in the subjective value table of environmental hazards, and the corresponding indicator value in the current park environmental compliance system is adjusted according to the ratio to obtain the adaptive environmental compliance evaluation rules.
[0115] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0116] In one embodiment, a system for adjusting environmental compliance of an industrial park based on big data is provided, and the system for adjusting environmental compliance of an industrial park based on big data corresponds one-to-one to the method for adjusting environmental compliance of an industrial park based on big data in the above embodiment. Figure 7 As shown in the figure, the environmental protection compliance adjustment system for industrial parks based on big data includes a data acquisition module, an adaptability judgment module, a first system module, a second system module and a rule generation module. The detailed description of each functional module is as follows:
[0117] The data acquisition module is used to obtain the current park's environmental protection compliance system and the park's industrial environmental protection data;
[0118] The adaptability judgment module is used to judge the adaptability of the current park's environmental protection compliance system based on the current park's environmental protection compliance system and the park's industrial environmental protection data, and obtain a comprehensive adaptability evaluation result;
[0119] The first system module is used to adjust the current environmental protection compliance system of the park based on the comprehensive adaptability evaluation results to obtain the first adaptability environmental protection compliance system;
[0120] A second system module is used to input the first adaptive environmental protection compliance system into a preset two-way learning data model, and generate a second adaptive environmental protection compliance system based on the two-way learning data model and the first adaptive environmental protection compliance system;
[0121] A rule generation module is used to generate corresponding adaptive environmental compliance evaluation rules based on the second adaptive environmental compliance system.
[0122] Optionally, the adaptability judgment module includes:
[0123] The system judgment submodule is used to determine the park type, obtain the system evaluation frequency and system update frequency from the current park environmental protection compliance system, judge whether the system evaluation frequency and system update frequency correspond to the park type, and obtain the frequency adaptability judgment result;
[0124] The adaptability judgment submodule is used to obtain the system implementation frequency, employee evaluation level and surrounding community evaluation level from the industrial environmental protection data of the park, and obtain the comprehensive adaptability evaluation results based on the frequency adaptability judgment results, system implementation frequency, employee evaluation level and surrounding community evaluation level.
[0125] Optional, first institutional modules include:
[0126] The high-requirement coefficient submodule is used to obtain the high-requirement compliance adjustment coefficient according to the park type and comprehensive adaptability evaluation results;
[0127] The first system submodule is used to adjust the current environmental protection compliance system of the park based on the high-requirement compliance evaluation coefficient to obtain the first adaptive environmental protection compliance system.
[0128] Optional, high-demand coefficient submodules include:
[0129] The benchmark object unit is used to determine the corresponding park environmental protection compliance benchmark object information according to the park type;
[0130] A high-demand object unit is used to obtain high-demand compliance object information based on the comprehensive adaptability evaluation results and environmental compliance benchmark information;
[0131] The high requirement coefficient unit is used to obtain the high requirement compliance adjustment coefficient according to the high requirement compliance object information and the preset high requirement evaluation model.
[0132] Optional, second institutional modules include:
[0133] A two-way simulation submodule, used for inputting the first adaptive environmental compliance system into a preset two-way learning data model, and generating park two-way simulation information based on the two-way learning data model;
[0134] The second system submodule is used to adjust the first adaptive environmental protection compliance system and generate the second adaptive environmental protection compliance system according to the two-way simulation information of the park.
[0135] Optionally, the rule generation module includes:
[0136] An indicator generation submodule is used to generate an adaptive development evaluation indicator of the park based on the second adaptive environmental protection compliance system;
[0137] The hidden danger object submodule is used to determine the corresponding park environmental protection hidden danger object information according to the park type and park industry environmental protection data;
[0138] The rule generation submodule is used to adjust the adaptive development evaluation indicators according to the information of environmental hazard objects and obtain adaptive environmental compliance evaluation rules.
[0139] For the specific limitations of the industrial park environmental compliance adjustment system based on big data, please refer to the limitations of the industrial park environmental compliance adjustment method based on big data above, which will not be repeated here. Each module in the above-mentioned industrial park environmental compliance adjustment system based on big data can be implemented in whole or in part through software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0140] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 8As shown. The computer device includes a processor, a memory, a network interface and a database connected via a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store the current park environmental protection compliance system, park industry environmental protection data, comprehensive adaptability evaluation results, the first adaptability environmental protection compliance system, the adaptability environmental protection compliance evaluation rules and the second adaptability environmental protection compliance system. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, it realizes a method for adjusting environmental protection compliance of industrial parks based on big data.
[0141] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program:
[0142] Obtain the current park's environmental compliance system and industrial environmental data;
[0143] According to the current park environmental protection compliance system and the park industry environmental protection data, judge the adaptability of the current park environmental protection compliance system and obtain comprehensive adaptability evaluation results;
[0144] Based on the comprehensive adaptability evaluation results, the park's current environmental protection compliance system is adjusted to obtain the first adaptability environmental protection compliance system;
[0145] Inputting the first adaptive environmental compliance system into a preset two-way learning data model, and generating a second adaptive environmental compliance system based on the two-way learning data model and the first adaptive environmental compliance system;
[0146] Based on the second adaptive environmental compliance system, corresponding adaptive environmental compliance evaluation rules are generated.
[0147] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:
[0148] Obtain the current park's environmental compliance system and industrial environmental data;
[0149] According to the current park environmental protection compliance system and the park industry environmental protection data, judge the adaptability of the current park environmental protection compliance system and obtain comprehensive adaptability evaluation results;
[0150] Based on the comprehensive adaptability evaluation results, the park's current environmental protection compliance system is adjusted to obtain the first adaptability environmental protection compliance system;
[0151] Inputting the first adaptive environmental compliance system into a preset two-way learning data model, and generating a second adaptive environmental compliance system based on the two-way learning data model and the first adaptive environmental compliance system;
[0152] Based on the second adaptive environmental compliance system, corresponding adaptive environmental compliance evaluation rules are generated.
[0153] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be implemented by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.
[0154] Those skilled in the art will clearly understand that for the sake of convenience and brevity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the system can be divided into different functional units or modules to complete all or part of the functions described above.
[0155] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A method for adjusting environmental compliance in industrial parks based on big data. It is characterized in that The environmental protection compliance adjustment method of the industrial park based on big data includes: Obtain the current park's environmental compliance system and industrial environmental data; According to the current park environmental protection compliance system and the park industry environmental protection data, the adaptability of the current park environmental protection compliance system is judged to obtain a comprehensive adaptability evaluation result, which specifically includes: Determine the park type, obtain the system evaluation frequency and the system update frequency from the current park environmental protection compliance system, judge whether the system evaluation frequency and the system update frequency correspond to the park type, and obtain a frequency adaptability judgment result; Obtaining the system execution frequency, employee evaluation level and surrounding community evaluation level from the industrial environmental protection data of the park, and obtaining a comprehensive adaptability evaluation result based on the frequency adaptability judgment result, the system execution frequency, the employee evaluation level and the surrounding community evaluation level; Adjusting the current environmental protection compliance system of the park based on the comprehensive adaptability evaluation result to obtain a first adaptable environmental protection compliance system; Inputting the first adaptive environmental compliance system into a preset two-way learning data model, and generating a second adaptive environmental compliance system based on the two-way learning data model and the first adaptive environmental compliance system; Based on the second adaptive environmental compliance system, corresponding adaptive environmental compliance evaluation rules are generated.
2. According to the big data-based industrial park environmental protection compliance adjustment method of claim 1, It is characterized in that The adjusting the current environmental protection compliance system of the park based on the comprehensive adaptability evaluation result to obtain a first adaptable environmental protection compliance system specifically includes: Obtaining a high-requirement compliance adjustment coefficient according to the park type and the comprehensive adaptability evaluation result; Based on the high-requirement compliance adjustment coefficient, the current environmental protection compliance system of the park is adjusted to obtain a first adaptive environmental protection compliance system.
3. According to the big data-based industrial park environmental protection compliance adjustment method of claim 2, It is characterized in that The obtaining of the high-requirement compliance adjustment coefficient according to the park type and the comprehensive adaptability evaluation result specifically includes: According to the park type, determine the corresponding park environmental protection compliance benchmark object information; Based on the comprehensive adaptability evaluation results and the park environmental protection compliance benchmark object information, obtain high-requirement compliance object information; According to the high-requirement compliance object information and a preset high-requirement evaluation model, a high-requirement compliance adjustment coefficient is obtained.
4. According to the big data-based industrial park environmental protection compliance adjustment method of claim 1, It is characterized in that The step of inputting the first adaptive environmental compliance system into a preset two-way learning data model and generating a second adaptive environmental compliance system based on the two-way learning data model specifically includes: Inputting the first adaptive environmental compliance system into a preset two-way learning data model, and generating park two-way simulation information based on the two-way learning data model; According to the park's two-way simulation information, the first adaptive environmental compliance system is adjusted to generate a second adaptive environmental compliance system.
5. According to the big data-based industrial park environmental protection compliance adjustment method of claim 1, It is characterized in that The generating of corresponding adaptive environmental compliance evaluation rules based on the second adaptive environmental compliance system specifically includes: Based on the second adaptive environmental compliance system, generate adaptive development evaluation indicators for the park; Determine the corresponding park environmental protection potential hazard object information according to the park type and the park industry environmental protection data; The adaptive development evaluation index is adjusted according to the environmental hazard object information to obtain adaptive environmental compliance evaluation rules.
6. An industrial park environmental protection compliance adjustment system based on big data, It is characterized in that The industrial park environmental protection compliance adjustment system based on big data includes: The data acquisition module is used to obtain the current park's environmental protection compliance system and the park's industrial environmental protection data; The adaptability judgment module is used to judge the adaptability of the current park environmental protection compliance system according to the current park environmental protection compliance system and the park industry environmental protection data, and obtain a comprehensive adaptability evaluation result. The adaptability judgment module includes: A system judgment submodule is used to determine the park type, obtain the system evaluation frequency and the system update frequency from the current park environmental protection compliance system, judge whether the system evaluation frequency and the system update frequency correspond to the park type, and obtain a frequency adaptability judgment result; An adaptability judgment submodule is used to obtain the system execution frequency, employee evaluation level and surrounding community evaluation level from the industrial environmental protection data of the park, and obtain a comprehensive adaptability evaluation result based on the frequency adaptability judgment result, the system execution frequency, the employee evaluation level and the surrounding community evaluation level; A first system module, used to adjust the current environmental protection compliance system of the park based on the comprehensive adaptability evaluation result to obtain a first adaptable environmental protection compliance system; A second system module, used for inputting the first adaptive environmental compliance system into a preset two-way learning data model, and generating a second adaptive environmental compliance system based on the two-way learning data model and the first adaptive environmental compliance system; A rule generation module is used to generate corresponding adaptive environmental compliance evaluation rules based on the second adaptive environmental compliance system.
7. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the steps of the industrial park environmental protection compliance adjustment method based on big data are implemented as described in any one of claims 1 to 5.
8. A computer-readable storage medium storing a computer program. It is characterized in that When the computer program is executed by the processor, the steps of the industrial park environmental protection compliance adjustment method based on big data as described in any one of claims 1 to 5 are implemented.
Citation Information
Patent Citations
Overseas industrial park industry discrimination method based on double dimensions of development subject and resident country
CN111898891A
Industrial optimization index system construction method and system based on environment model
CN113128952A
Comprehensive evaluation method for enterprises in chemical industry park
CN113592313A
Data processing method and device for industrial park value evaluation, equipment and medium
CN114092127A
Comprehensive evaluation method and device for ecological environment condition, electronic equipment and storage medium
CN115169969A
