Train networking system and method with high reliability topology structure

By adopting the ladder topology and WTB cable backup in the train networking system, the problem of only being able to tolerate a single point of failure in the existing technology is solved, highly reliable train networking communication is achieved, and stability and safety are improved. Reduced hardware costs.

CN118337559BActive Publication Date: 2024-10-29CHANGSHA UNIVERSITY
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410595888.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-14
Publication Date
2024-10-29
Estimated Expiration
2044-05-14

AI Technical Summary

Technical Problem

The existing train network control system with dual-homing redundant structure can only tolerate a single point of failure, which will affect the normal operation of the train under certain operating conditions, causing delays in temporary train replacement and affecting traffic operations.

Method used

The train networking system adopts a high-reliability topology structure. A first switch and a second switch are set up in each carriage to form a communication network with a ladder topology, and WTB cables are used between the central control units at the head and tail of the train. Data backup and communication, software control disabling and enabling of switch backplane ports, and adding a master-slave redundant central control unit to improve network stability.

Benefits of technology

It improves the safety and stability of train network communication, can tolerate two-point failures, avoid network storms, ensure the reliability of train operation control, and reduce hardware costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118337559B_ABST
    Figure CN118337559B_ABST
Patent Text Reader

Abstract

The present invention provides a train networking system and method with a high-reliability topology structure, including: a first switch and a second switch arranged in each carriage, the first switch is connected to the second switch; a terminal is connected between the first switch and the second switch; the connected carriages are connected via the first switch and the second switch, the first switch and the second switch of each train form a communication ring network, and two central control units with master-slave redundancy are connected via a WTB bus. The beneficial effects of the present invention are: achieving seamless switching from a ring network topology to a ladder topology, improving the reliability of network communication; by adding WTB communication between the two central control units with master-slave redundancy, solving the communication problem between the master and slave central control units after the Ethernet ring network is cut off, improving the availability of the train network control system; by allocating corresponding network communication strategies, solving the train operation control problem.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of train networking communication technology, and in particular to a train networking system and method with a high-reliability topology structure. Background Art

[0002] The train network control system is likened to the "brain" of the train. It is mainly composed of central control units, input and output units, human-machine interaction units, and switching relay units. It is responsible for the whole vehicle operation and key equipment control, monitoring and fault diagnosis, and supporting intelligent operation and maintenance. To ensure the reliability of the train operation control function, the topology of the train network control system usually needs to adopt a dual-home redundant structure. There are two mainstream topologies such as Figure 1 shown. Figure 1 (A) is a bilinear topology network (or a network based on link aggregation mode). Figure 1 (B) is a ring topology network, and any single point failure (single switch failure or single communication link failure) will not affect the normal communication of the train.

[0003] The current dual-home redundant train network control system can only tolerate single-point failures, which can affect the normal operation of trains under certain conditions. For example, when a train is leaving the depot, even if only a single-point failure occurs, the general depot does not allow the train to run with the failure, and a temporary replacement of the train is required. Temporary replacement of the train will cause train delays and affect the entire route operation. Summary of the invention

[0004] The main purpose of the embodiments of the present invention is to provide a train networking system and method with a high-reliability topology structure, thereby improving the security and stability of train networking communications.

[0005] One aspect of the present invention provides a train networking system with a high-reliability topology structure, comprising:

[0006] A first switch and a second switch are arranged in each carriage, and the first switches and the second switches in adjacent carriages are respectively connected to form a communication ring network;

[0007] The first switch in each carriage is connected to the second switch, and together with the communication ring network, forms a communication network with a ladder topology structure;

[0008] A terminal is connected between the first switch and the second switch.

[0009] According to the train networking system with a high-reliability topology structure, the first switch and the second switch of each carriage are arranged in a switch chassis, the first switch and the second switch are board switches, and the first switch and the second switch are connected for communication via Ethernet through a backplane communication port.

[0010] According to the train networking system with a high-reliability topology structure, the terminal is connected to the first switch and the second switch using Ethernet via dual network ports.

[0011] According to the train networking system with a high-reliability topology structure, the terminals arranged in the head car and the tail car of the train are central control units, which are connected by WTB cables. The central control unit is used to perform data processing and network control on the entire train.

[0012] According to the train networking system with a high-reliability topology structure, the central control unit includes one or more master devices and slave devices, the slave devices and the master devices are redundant devices, and the master devices and the slave devices perform data backup via Ethernet and WTB bus.

[0013] Another aspect of an embodiment of the present invention provides a train networking method with a high-reliability topology structure, which is used in a train networking system. The train networking system includes a central control unit, a first switch, a second switch and a terminal, including:

[0014] Collecting status data of the central control unit, the first switch, the second switch and the terminal;

[0015] Determine the fault detection results of the central control unit, the first switch, the second switch and the terminal of the train according to the status data, wherein the fault detection results include normal communication, single point fault and two point fault;

[0016] When the fault detection result is the two-point fault, communication control is performed according to the positions of the two-point fault to close the communication ring network.

[0017] According to the train networking method of the high-reliability topology structure, the method further includes:

[0018] When the fault detection result is at least one of normal communication and single point failure, the backplane communication interface between the first switch and the second switch in the same carriage is closed.

[0019] The train networking method according to the high-reliability topology structure includes:

[0020] The communication status between the first switch and the second switch and the adjacent carriage is detected, and if a fault occurs in both, the backplane communication interface is started.

[0021] According to the train networking method of the high-reliability topology structure, the method further includes:

[0022] The communication status between the master device and the slave device is detected. If a communication failure occurs in either the master device or the slave device, the central control unit without communication failure is used as the master device to perform data processing and network control. If the central control unit does not detect a communication failure in the first switch or the second switch of the train, the communication connection of the WTB cable is disconnected.

[0023] According to the train networking method of the high-reliability topology structure, the method further includes:

[0024] If the fault detection result is a two-point fault, the WTB cable is started, wherein the two-point fault is used to indicate a break in the communication ring network;

[0025] The master device collects Ethernet data before two faults, determines the fault location based on the Ethernet data, and regenerates the communication strategy after eliminating the fault location and sends it to the slave device.

[0026] The beneficial effects of the present invention are as follows: two switches in the same carriage are connected to form a new topology architecture; the disabling and enabling control of the switch backplane port is realized through software control to avoid the formation of multiple physical loops and improve the stability of the network; by adding WTB communication between the two central control units of master-slave redundancy, the communication problem between the master and slave central control units after the Ethernet ring network is broken into two parts is solved; the master and slave central control units add software processing modules and allocate corresponding network communication strategies to solve the problem of the central control unit controlling the operation of the entire train after the Ethernet ring network is broken into two parts. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0028] Figure 1 It is a topological network diagram of the prior art.

[0029] Figure 2 It is a schematic diagram of a train networking system with a high reliability topology structure according to an embodiment of the present invention.

[0030] Figure 3 It is a schematic diagram of the switch chassis structure of an embodiment of the present invention.

[0031] Figure 4 It is a schematic diagram of the networking topology structure of the WTB cable according to an embodiment of the present invention.

[0032] Figure 5 It is a schematic diagram of a train networking method with a high-reliability topology structure according to an embodiment of the present invention.

[0033] Figure 6It is a schematic diagram of a scenario in which a single point failure and two points of failure exist simultaneously in some embodiments of the present invention.

[0034] Figure 7 It is a flow chart of enabling and disabling the backplane of the 2# carriage switch board in an embodiment of the present invention.

[0035] Figure 8 It is a schematic diagram of the WTB communication workflow of the 1# car central control unit of an embodiment of the present invention. DETAILED DESCRIPTION

[0036] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions. In the subsequent description, the use of suffixes such as "module", "component" or "unit" used to represent elements is only for the purpose of facilitating the description of the present invention, and has no specific meaning in itself. Therefore, "module", "component" or "unit" can be used in a mixed manner. "First", "second" and the like are only used for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features or implicitly indicating the order of the indicated technical features. In this subsequent description, the continuous numbering of the method steps is for the convenience of review and understanding. In combination with the overall technical solution of the present invention and the logical relationship between the various steps, adjusting the implementation order between the steps will not affect the technical effect achieved by the technical solution of the present invention. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0037] refer to Figure 2 , Figure 2 Schematic diagram of a high-reliability topology train networking system according to an embodiment of the present invention. It includes: a first switch and a second switch arranged in each carriage (1# to N#), such as Figure 2 The first switch (1-N) and the second switch (1-N) in the embodiment of the present invention are connected to each other, and a terminal is connected between the first switch and the second switch. Figure 2 Terminals (1 to N) in the train; the connected carriages are connected via a first switch (such as the first switch (1) to the first switch (N)) and a second switch (such as the second switch (1) to the second switch (N)), and all the first switches and second switches of each train form a communication ring network. Figure 2The first switch (1) and the second switch (1) are connected via a curve (dashed line), the first switch (1) and the second switch (1) are respectively connected to the terminal (1), and the connection between the first switch (1) and the second switch (1), and the connection between the first switch (1) and the second switch (1) and the terminal (1) are both connected using Ethernet communication.

[0038] In some embodiments, the terminal is connected to the first switch and the second switch through a dual network port using Ethernet. For a train backbone network topology consisting of N carriages, Figure 2 As shown in the figure, two switches are deployed in each carriage, which are connected in sequence to form a large ring network. The terminal devices are connected to the two switches through dual network ports.

[0039] In some embodiments, the first switch and the second switch of each carriage are arranged in a switch chassis, the first switch and the second switch are card switches, and the first switch and the second switch are connected for communication via Ethernet through a backplane communication port.

[0040] For example, Figure 3 The switch chassis structure diagram shown in the figure shows that the two switches in each carriage are in the form of boards and are deployed in the same chassis. The two switch boards are connected through a backplane, such as Figure 3 It should be further explained that to connect two switch boards through the backplane, only the circuit diagram of the chassis backplane needs to be changed and an Ethernet channel needs to be added to the PCB board without any additional hardware cost.

[0041] It is understandable that after the switch adds the backplane communication connection, if the backplane communication function is always enabled during normal operation, it will cause multiple physical "loops" in the entire train network control system, and it is very likely to cause network storms and other hazards during operation. Therefore, when the system communication is normal, the backplane communication function needs to be disabled.

[0042] In some embodiments, reference Figure 4 The schematic diagram of the networking topology of the WTB cable is shown, in which the terminals installed in the front and rear carriages of the train are central control units, which are connected by WTB cables and are used to perform data processing and network control on the entire train.

[0043] In some embodiments, the master device and the slave device perform data backup via Ethernet and WTB bus.

[0044] In some embodiments, the central control unit includes one of a master device and a slave device, and the slave device and the master device are redundant devices.

[0045] Figure 5Schematic diagram of a train networking method with a high reliability topology structure according to an embodiment of the present invention. It includes but is not limited to steps S100 to S300:

[0046] S100, collecting status data of the central control unit, the first switch, the second switch and the terminal;

[0047] S200, determining fault detection results of the central control unit, the first switch, the second switch and the terminal of the train according to the status data, wherein the fault detection results include normal communication, single point fault and two point fault;

[0048] S300, when the fault detection result is a two-point fault, communication control is performed according to the locations of the two-point faults to close the communication ring network.

[0049] In some embodiments, reference Figure 6 , Figure 6 1 is a schematic diagram of a scenario in which a single-point failure and a two-point failure exist simultaneously in some embodiments of the present invention, including (A) a central control unit includes a master device and a slave device, and the slave device and the master device are redundant devices (not shown), (B) two switches in the same car fail at the same time, and (C) a communication failure between two adjacent cars causes a ring network communication failure.

[0050] In some embodiments, by building Figure 2 The shown topology can tolerate two-point failure scenarios, which is not possible with prior art topologies. Figure 6 (A) Scenario indicates that two points of the switch and the communication link in different carriages are simultaneously faulty. After starting the backplane communication ports of the two switches in carriage 2, the communication between all terminal devices is still reachable. Figure 6 The curved lines in (A) indicate accessible paths), which also shows that the entire train communication network can still work normally.

[0051] However, this topology also has some scenarios that cannot tolerate two-point failures, namely: Figure 6 (B, C) shows a two-point failure scenario. To solve this problem, the "bypass" technology can be used, that is, a bypass function is added to the switch port. When a switch failure occurs, the switch is directly set to the bypass state through hardware, and the data can automatically skip the switch. However, this method requires a large increase in hardware costs and requires the modification of existing switches, which is not conducive to engineering implementation. Therefore, the embodiment of the present invention proposes the following Figure 4 The figure shows the network topology diagram of the WTB cable.

[0052] It is understandable that Figure 2The difference is that a WTB communication cable is added between the terminal of the 1# car and the terminal of the N# car. Since the maximum WTB communication distance can support 860 meters, based on 25 meters per car, it can support the networking scale of more than 30 cars, which is far greater than the current network scale of trains. Therefore, only one WTB cable needs to be added, and no relay equipment is needed in the middle.

[0053] It should be further explained that the two terminal devices connected by the WTB cable should be central control units. Because in the train network control system, the central control unit is responsible for data processing and control of the entire vehicle. And the two central control units are redundant, one is the master device and the other is the slave device. Only the master device can send control instructions. When the master device fails, the slave device is upgraded to the master device.

[0054] Another thing that needs further explanation is that according to the reliability calculation method adopted in "GB / T 28029.10 Rail Transit Electronic Equipment Train Communication Network (TCN) Part 3-4: Ethernet Grouping Network (ECN)", Figure 2 The reliability of the network topology shown has been improved from the previous 8.79×106 to 3.06×107. Figure 4 The topology shown is intended to further increase the network topology's tolerance to two-point failures.

[0055] In some embodiments, Figure 7 This is a flowchart of enabling and disabling the backplane of the switch board card in the 2# carriage according to an embodiment of the present invention. Taking a switch board card in the 2# carriage as an example, the workflow of enabling and disabling the backplane communication function is described. Figure 4 As shown (assuming that the backplane communication port of the switch board is BP1 port). The backplane communication port (BP1 port) is disabled by default. At the same time, the switch board continuously judges the communication status. First, judge whether the communication with the adjacent switch board in the 1# car is normal. If the communication is not normal, continue to judge whether the communication between another switch in the car and the adjacent switch board in the 3# car is normal. If the communication is also not normal, enable the BP1 port and notify the other switch board in the car to enable the BP1 port as well.

[0056] In some embodiments, Figure 8 This is a schematic diagram of the WTB communication workflow of the 1# car central control unit in an embodiment of the present invention. The WTB communication shown is only for the scenario where two faults occur simultaneously in the same car. Generally speaking, such a scenario is difficult to occur. Therefore, the WTB communication function should be prohibited during normal operation and should be enabled only when such a fault occurs. Therefore, the following software processing logic should be added to the central control unit (1# car terminal and 8# car terminal). Taking the 1# car central control unit as an example, its workflow is as follows: Figure 7As shown (assuming that the central control unit of car 1# is the master device, if it is a slave device, only the "control strategy sending" process needs to be skipped). The central control unit disables WTB communication by default and continuously monitors whether the Ethernet communication with another redundant central control unit is normal. If an Ethernet communication abnormality is detected, the WTB communication function is enabled, and the location of the faulty car is diagnosed based on the Ethernet data. The central control unit of car 1# adopts the Ethernet data before the faulty car, and the data after the faulty car adopts the data of the central control unit of car N# received from WTB (the central control unit of car 8# needs to send the status data related to the control car through WTB). Then, the central control unit of car 1# sends the control strategy for the car equipment after the faulty car to the central control unit of car N# through WTB.

[0057] It should be further explained that at this time, the central control unit of car 8# is no longer a slave device, but is upgraded to a "weak master", that is, the control strategy for the car equipment after the faulty car is forwarded by the central control unit of car 8# to each terminal device.

[0058] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0059] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0060] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

[0061] The above is a specific description of the preferred implementation of the present invention, but the present invention is not limited to the described embodiments. Those skilled in the art may make various equivalent modifications or substitutions without violating the spirit of the present invention. These equivalent modifications or substitutions are all included in the scope defined by the claims of this application.

Claims

1. A train networking system with a high-reliability topology structure, characterized in that: include: A first switch and a second switch are arranged in each carriage, and the first switches and the second switches in adjacent carriages are respectively connected to form a communication ring network; The first switch in each carriage is connected to the second switch, and together with the communication ring network, forms a communication network with a ladder topology structure; A terminal is connected between the first switch and the second switch; The first switch and the second switch of each carriage are arranged in a switch chassis, the first switch and the second switch are board switches, and the first switch and the second switch are connected for communication via Ethernet via a backplane communication port; when the communication of the communication network is normal, the communication function of the backplane communication port is disabled; The terminal is connected to the first switch and the second switch via dual network ports using Ethernet; The terminals arranged in the head carriage and the tail carriage of the train are central control units, which are connected by WTB cables and are used for data processing and network control of the entire train; The central control unit includes one or more of a master device and a slave device, the slave device and the master device are redundant devices, and the master device and the slave device perform data backup via Ethernet and WTB bus; The communication function of the WTB bus is prohibited from being used when the communication network is operating normally, and is enabled after two faults occur in the communication network.

2. A train networking method with a high-reliability topology structure, used in the train networking system with a high-reliability topology structure according to claim 1, wherein the train networking system comprises a central control unit, a first switch, a second switch and a terminal, characterized in that: Collecting status data of the central control unit, the first switch, the second switch and the terminal; Determine the fault detection results of the central control unit, the first switch, the second switch and the terminal of the train according to the status data, wherein the fault detection results include normal communication, single point fault and two point fault; When the fault detection result is the two-point fault, communication control is performed according to the positions of the two-point fault to close the communication ring network; When the fault detection result is at least one of normal communication and single point failure, closing the backplane communication interface between the first switch and the second switch in the same carriage; The communication status between the first switch and the adjacent carriage is detected through one of the first switch and the second switch, and if both fail, the backplane communication interface is started; The communication status between the master device and the slave device is detected. If a communication failure occurs in either the master device or the slave device, the central control unit without communication failure is used as the master device to perform data processing and network control. If the central control unit does not detect a communication failure in the first switch or the second switch of the train, the communication connection of the WTB cable is disconnected.

3. The train networking method of the high-reliability topology structure according to claim 2 is characterized in that: The method further comprises: If the fault detection result is a two-point fault, the WTB cable is started, wherein the two-point fault is used to indicate a break in the communication ring network; The master device collects Ethernet data before two faults, determines the fault location based on the Ethernet data, and regenerates the communication strategy after eliminating the fault location and sends it to the slave device.

Citation Information

Patent Citations

  • Novel communication network topology for motor train unit based on TCN (Train Communication Network) and industrial Ethernet

    CN105262651A