Automatic design method for communication channel and pump room in longitudinal section of rail transit line

Through the secondary development of AutoCAD software, the automated design of rail transit lines, section longitudinal cross-section communication channels and pump rooms is realized, which solves the problems of low efficiency and poor accuracy of existing design methods, and significantly improves design efficiency and quality.

CN118350161BActive Publication Date: 2024-10-29FOSHAN RAIL TRANSIT DESIGN & RES INST CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410402878.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2024-10-29
Estimated Expiration
2044-04-03

AI Technical Summary

Technical Problem

The design method of the communication channels and wastewater pump rooms in the existing rail transit lines and section longitudinal sections requires a lot of manual calculations and manual operations, resulting in low production efficiency, poor accuracy and long time consumption.

Method used

Through the secondary development of AutoCAD software, automated design methods include obtaining data, reading and storing information, calculating and drawing the outline, marking and burial depth of communication channels and pump rooms, realizing automated design of communication channels and pump rooms.

Benefits of technology

Production efficiency and design quality have been greatly improved. Manual operation steps have been converted to automatic computer completion, and some design tasks have been shortened from 15 working days to 2 seconds.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118350161B_ABST
    Figure CN118350161B_ABST
Patent Text Reader

Abstract

The invention provides a method for automatically designing a communication channel and a pump room of a longitudinal section of a rail transit line section, the method comprising the following steps: acquiring data; reading and storing the form and mileage information of the communication channel and the pump room; acquiring a mileage positioning base point P1; calculating the vertex coordinates of the communication channel and the pump room outline according to the base point P1, creating polylines and arcs, and drawing the communication channel and the pump room; calculating the vertex coordinates of elevation symbols, creating polylines and elevation texts, and drawing elevation annotations; calculating the vertex coordinates of mileage annotations, creating polylines and mileage texts, and drawing mileage annotations; calculating the tunnel burial depth and the vertex coordinates of the annotations, creating corresponding burial depth annotations, and drawing the tunnel burial depth annotations; by writing the method of the invention into an AutoCAD secondary development program, the longitudinal communication channel and the wastewater pump room can be automatically designed on a computer, and the drawing and annotation can be automatically performed, so that a large number of steps that require manual calculation and operation are converted into computer automatic operation, thereby greatly improving production efficiency and design quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of rail transit tunnel line design, and in particular to an automatic design method for a communication channel and a pump room of a longitudinal section diagram of a rail transit line section. Background Art

[0002] At present, when rail transit industry designers design the communication channel and wastewater pump house in the line and section longitudinal section diagram, they first need to manually calculate and record the form and mileage information of the communication channel and wastewater pump house one by one, and locate them in the line and section longitudinal section diagram. Then they manually measure the buried depth and track surface elevation of the communication channel and wastewater pump house, and finally draw the outline of the communication channel and wastewater pump house, name labeling, mileage labeling, section tunnel buried depth labeling, track surface elevation labeling, etc.

[0003] The existing design methods of the communication passages and wastewater pump houses in the longitudinal section diagrams of rail transit lines and sections have the following disadvantages:

[0004] The existing method requires manual calculation and recording of the form and mileage information of the communication channels and wastewater pump houses one by one according to the line plane longitudinal section design plan and specifications, and positioning them in the line and section longitudinal section diagrams. The above operation requires a lot of manual calculations and has low production efficiency.

[0005] The existing method requires manual measurement of the buried depth and track elevation of the connecting channel and the sewage pump house, and finally drawing the connecting channel and the sewage pump house, mileage marking, interval tunnel buried depth marking, and track elevation marking one by one. The above work content requires a lot of manual operations such as drawing auxiliary lines, selecting objects, measuring lengths, editing texts, and adjusting styles, which has the disadvantages of long time consumption, poor accuracy, and low production efficiency.

[0006] Therefore, there is an urgent need to develop a new design method for rail transit lines, section longitudinal sections, connecting channels and wastewater pump houses. Through secondary development of AutoCAD software, a large amount of repetitive work can be transferred from manual to automatic computer completion to improve production efficiency and improve design accuracy and quality. Summary of the invention

[0007] In view of the above problems, the purpose of the present invention is to solve the problems of long time consumption, poor precision, low efficiency, etc. in the existing design methods of the communication channel and the wastewater pump room between the rail transit line and the section longitudinal section. In order to solve the above problems, the present invention provides a method for automatically designing the communication channel and the pump room of the section longitudinal section of the rail transit line, which has good feasibility, specifically:

[0008] The automatic design method of the communication channel and pump room of the longitudinal section of the rail transit line section includes the following steps:

[0009] S1. Obtain data from the design plan of rail transit lines and sections;

[0010] S2. Read and store the form and mileage information of the communication channel and the sewage pump room;

[0011] S3, obtain the mileage positioning base point P1 of the rail transit line, the longitudinal section connection channel and the sewage pump room;

[0012] S4. Calculate the coordinates of the vertices of the communication channel and the wastewater pump room outline according to the base point P1, create polylines and arcs, and draw the communication channel and the wastewater pump room;

[0013] S5. Calculate the vertex coordinates of the elevation symbol, create polylines and elevation text, and draw the elevation markings of the rail surface of the communication channel and the sewage pump room;

[0014] S6. Calculate the vertex coordinates of the mileage marking, create polylines and mileage text, and draw the mileage markings of the communication channel and the wastewater pump room;

[0015] S7. Calculate the tunnel burial depth and mark vertex coordinates, create corresponding burial depth markings, and draw the interval tunnel burial depth markings in the line and interval longitudinal section drawings.

[0016] Further preferably, the step S1 specifically includes:

[0017] Read the dwg, dws, dwt, and dxf format files of the line and section longitudinal section design plan in the AutoCAD secondary development program. The data in the line and section longitudinal section design plan include line mileage data, longitudinal section slope change point data, longitudinal section slope data, ground line data, and station data.

[0018] Further preferably, the step S2 comprises:

[0019] The communication channel and wastewater pump room data are automatically read in the line and section longitudinal sections, wherein the communication channel and wastewater pump room data include the form and mileage information of the communication channel and the wastewater pump room, and the read data are saved in a table form.

[0020] Further preferably, the step S3 comprises:

[0021] The mileage positioning base point P1 of the connecting channel and the sewage pump room is located from the line and section longitudinal section diagram. The mileage positioning base point P1 is the track surface point corresponding to the center line mileage of the connecting channel and the sewage pump room. The center line mileage is obtained from the line mileage data in the line and section longitudinal section diagram.

[0022] Further preferably, the step S4 comprises:

[0023] S4.1. Define the bottom corner points P2 and P3 of the communication channel and the wastewater pump room;

[0024] When the form in step S2 is a communication channel, the bottom corner point P2 coordinates X P2 , Y P2 Calculate according to the following formula:

[0025] X P2 =X P1 -W / 2

[0026] Y P2 =Y P1 -ΔH1

[0027] Among them, W is the width of the communication channel and the sewage pump room, X P1 , Y P1 is the coordinate of the mileage positioning base point P1, ΔH1 is the difference between the elevation of the mileage positioning base point P1 and the elevation of the bottom of the communication channel;

[0028] The bottom corner point P3 coordinates X P3 , Y P3 Calculate according to the following formula:

[0029] X P3 =X P1 +W / 2

[0030] Y P3 =Y P1 -ΔH1

[0031] When the form described in step S2 is a communication channel and a sewage pump room, the bottom corner point P2 coordinates X P2 , Y P2 Calculate according to the following formula:

[0032] X P2 =X P1 -W / 2

[0033] Y P2 =Y P1 -ΔH2

[0034] Among them, ΔH2 is the difference between the elevation of the mileage positioning base point P1 and the elevation of the bottom of the pump room;

[0035] The bottom corner point P3 coordinates X P3 , Y P3 Calculate according to the following formula:

[0036] X P3 =X P1 +W / 2

[0037] Y P3 =Y P1-ΔH2

[0038] S4.2. Define the communication channel in the line and section longitudinal section diagram and the upper vertex P4, upper vertex P5, and upper vertex P6 of the wastewater pump house;

[0039] The coordinates of the upper vertex P4 are X P4 , Y P4 Calculate according to the following formula:

[0040] X P4 =X P2

[0041] Y P4 =Y P2 +ΔH3-W / 2

[0042] Among them, ΔH3 is the difference between the elevation of the top of the communication channel and the sewage pump house and the elevation of the mileage positioning base point P1;

[0043] The upper vertex P5 coordinate X P5 , Y P5 Calculate according to the following formula:

[0044] X P5 =X P3

[0045] Y P5 =Y P3 +ΔH3-W / 2

[0046] The upper vertex P6 coordinates X P6 , Y P6 Calculate according to the following formula:

[0047] X P6 =X P1

[0048] Y P6 =Y P1 +ΔH3;

[0049] S4.3, draw the polyline PL1 and the arc ARC1;

[0050] The polyline PL1 is connected by the upper vertex P4, the bottom corner point P2, the bottom corner point P3, and the upper vertex P5 in sequence, and the arc ARC1 is connected by the upper vertex P4, the upper vertex P6, and the upper vertex P5 in sequence;

[0051] S4.4. Adjust the properties of the polyline PL1 and arc ARC1, including line type, width, and color.

[0052] Further preferably, the step S5 comprises:

[0053] S5.1. Define the elevation marking vertices P7, P8, and P9 of the rail surface corresponding to the connecting channel and the wastewater pump house in the line and section longitudinal section diagram; the coordinates X of the marked vertex P7 P7 , Y P7 , mark the coordinate X of vertex P8 P8 , Y P8 , mark the coordinate X of vertex P9 P9 , Y P9 The coordinates of the mileage positioning base point P1 are calculated according to the following formula:

[0054] X P7 =X P1 -2

[0055] Y P7 =Y P1 +2

[0056] X P8 =X P1 +2

[0057] Y P8 =Y P1 +2

[0058] X P9 =X P1 +L1+1

[0059] Y P9 =Y P1 +2;

[0060] Among them, L1 is the length of the horizontal leader line of the elevation mark;

[0061] S5.2, draw an elevation symbol and adjust the attributes; the elevation symbol is enclosed by a polyline PL2, and the polyline PL2 is sequentially connected by a marked vertex P8, a mileage positioning base point P1, a marked vertex P7, and a marked vertex P9; the adjusted attributes include the adjustment of line type, width, and color;

[0062] S5.3. Add elevation and adjust properties. The elevation is represented by a single line of text, the text direction is horizontal, and the lower right corner of the text is aligned with the marked vertex P9. The adjusted properties include the adjustment of font, character height, and color.

[0063] Further preferably, the step S6 comprises:

[0064] S6.1. Define the connection channel and wastewater pump house mileage marking lead vertex P10 and lead vertex P11 in the line and section longitudinal section drawings;

[0065] The lead vertex P10 coordinate X P10 , Y P10 Calculate according to the following formula:

[0066] X P10 =X P1

[0067] Y P10 =Y P1 +L2

[0068] Wherein, L2 is the length of the first lead section marked in the mileage in step S6;

[0069] The lead vertex P11 coordinate X P11 , Y P11 Calculate according to the following formula:

[0070] X P11 =X P10 +L3

[0071] Y P11 =Y P10

[0072] Wherein, L3 is the length of the second lead section marked in step S6;

[0073] S6.2, draw a polyline PL3, and adjust the attributes; the polyline PL3 is a marking leader, which is connected by the point mileage positioning base point P1, the leader vertex P10, and the leader vertex P11 in sequence, and the adjustment attributes include the adjustment of line type, width, and color;

[0074] S6.3. Add the mileage of the communication channel and the wastewater pump house, and adjust the attributes; the mileage of the communication channel and the wastewater pump house is represented by two lines of single-line text, the text direction is horizontal, the bottom midpoint of the mileage description text is aligned with the midpoint of the lead vertex P10 and the lead vertex P11, and the top midpoint of the line mileage text is aligned with the midpoint of the lead vertex P10 and the lead vertex P11. The text content is obtained according to the communication channel and wastewater pump house data described in step S2;

[0075] The attribute adjustment includes the adjustment of font, character height and color.

[0076] Further preferably, the step S7 comprises:

[0077] S7.1, define points P12 and P13;

[0078] The coordinates of point P12 are X P12 , Y P12 Calculate according to the following formula:

[0079] X P12 =X P1

[0080] Y P12 =Y P1 +ΔH4

[0081] Among them, ΔH4 is the difference between the elevation of the top of the section tunnel and the elevation of the mileage positioning base point P1, that is, the height from the track surface of the section tunnel to the top of the tunnel; the point P12 is the marking base point of the buried depth of the section tunnel, and the point P13 is the ground point corresponding to the mileage of the connecting channel and the wastewater pump house in the longitudinal section diagram of the line and the section;

[0082] S7.2. Insert the interval tunnel depth marking in the line and interval longitudinal section diagram; the interval tunnel depth marking is an aligned marking, with points P12 and P13 as marking base points;

[0083] S7.3. Set the annotation style of the alignment annotation, which includes color, font height, and arrow size.

[0084] A rail transit line section longitudinal section diagram communication channel and pump room automatic design system for implementing the above method of claim 1 is also provided, the system comprising:

[0085] Data input module, used to open the line and section profiles in dwg, dws, dwt, dxf formats, read and store the data in the line and section profiles, as well as the communication channel and wastewater pump room data;

[0086] Automatic drawing module, used to automatically draw communication channels and wastewater pump rooms;

[0087] The automatic drawing module comprises:

[0088] A control unit is used to determine the form of the communication channel and the wastewater pump room; if it is a communication channel form, the communication channel automatic drawing unit is executed; if it is a communication channel and wastewater pump room form, the communication channel and wastewater pump room drawing unit is executed;

[0089] The automatic drawing unit of the communication channel is used to automatically calculate and draw the contour of the communication channel on the longitudinal section of the line and section after execution;

[0090] The connecting channel and wastewater pump house drawing unit is used to automatically calculate and draw the outline of the connecting channel and wastewater pump house on the line and section longitudinal sections after execution;

[0091] Automatic labeling module, used to automatically label communication channels and wastewater pump rooms;

[0092] The automatic marking module comprises:

[0093] Elevation marking unit, automatically calculates and marks the elevation of the communication channel and wastewater pump room;

[0094] Mileage marking unit, automatically calculates and marks the mileage of communication channels and wastewater pump rooms;

[0095] The section tunnel burial depth marking unit automatically calculates and marks the section tunnel burial depth.

[0096] A computer storage medium is also provided, which contains one or more program instructions, and the one or more program instructions are used for the rail transit line section longitudinal section connection channel and the wastewater pump room to execute any of the methods described above.

[0097] Compared with the prior art, the present invention has the following beneficial effects:

[0098] The present invention realizes the automated design of communication channels and wastewater pump houses in longitudinal section drawings of rail transit lines and sections. By programming the method of the present invention into an AutoCAD secondary development program, longitudinal communication channels and wastewater pump houses can be automatically designed on a computer, and automatically drawn and labeled. A large number of steps that require manual calculation and operation are converted into automatic computer operation, thereby greatly improving production efficiency and design quality.

[0099] The connecting passages and wastewater pump houses of the 32 longitudinal sections of a certain rail transit line would take about 15 working days to calculate and draw manually if the existing production method is used. However, the automatic design can be completed in only 2 seconds if the present invention is used, thereby improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0100] Figure 1 is a flow chart of the method of the present invention;

[0101] Figure 2 It is a schematic diagram of the communication channel and the wastewater pump room information in the line and section longitudinal section diagram of the embodiment of the present invention;

[0102] Figure 3 It is a schematic diagram of the drawing principle of the communication channel in the line and section longitudinal section diagram of the embodiment of the present invention;

[0103] Figure 4 It is a schematic diagram of the drawing of the communication channel and wastewater pump house in the line and section longitudinal section diagram of the embodiment of the present invention;

[0104] Figure 5 It is a schematic diagram of the connection channel and wastewater pump house in the line and section longitudinal section diagram of the embodiment of the present invention;

[0105] Figure 6 is a schematic diagram of the structure of Embodiment 2 of the present invention;

[0106] Figure 7 It is a schematic diagram of the communication channel in the line and section longitudinal section diagram of an embodiment of the present invention;

[0107] Figure 8 It is a schematic diagram of a communication channel and wastewater pump room in the line and section longitudinal section diagram of an embodiment of the present invention. DETAILED DESCRIPTION

[0108] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0109] The preferred embodiments of the present invention are further described in detail below with reference to the accompanying drawings.

[0110] Embodiment 1:

[0111] A method for automatically designing a communication channel and a pump room in a longitudinal section of a rail transit line section includes the following steps:

[0112] S1. Obtain data from the design plan of rail transit lines and sections;

[0113] S2. Read and store the form and mileage information of the communication channel and the sewage pump room;

[0114] S3, obtain the mileage positioning base point P1 of the rail transit line, the longitudinal section connection channel and the sewage pump room;

[0115] S4. Calculate the coordinates of the vertices of the communication channel and the wastewater pump room outline according to the base point P1, create polylines and arcs, and draw the communication channel and the wastewater pump room;

[0116] S5. Calculate the vertex coordinates of the elevation symbol, create polylines and elevation text, and draw the elevation markings of the rail surface of the communication channel and the sewage pump room;

[0117] S6. Calculate the vertex coordinates of the mileage marking, create polylines and mileage text, and draw the mileage markings of the communication channel and the wastewater pump room;

[0118] S7. Calculate the tunnel burial depth and mark vertex coordinates, create corresponding burial depth markings, and draw the interval tunnel burial depth markings in the line and interval longitudinal section drawings.

[0119] Step S1 specifically includes:

[0120] Read the dwg, dws, dwt, and dxf format files of the line and section longitudinal section design plan in the AutoCAD secondary development program. The data in the line and section longitudinal section design plan include line mileage data, longitudinal section slope change point data, longitudinal section slope data, ground line data, and station data.

[0121] Step S2 includes:

[0122] The communication channel and wastewater pump room data are automatically read in the line and section longitudinal sections, wherein the communication channel and wastewater pump room data include the form and mileage information of the communication channel and the pump room, and the read data are saved in a table form.

[0123] Step S3 includes:

[0124] The mileage positioning base point P1 of the connecting channel and the sewage pump room is located from the line and section longitudinal section diagram. The mileage positioning base point P1 is the track surface point corresponding to the center line mileage of the connecting channel and the sewage pump room. The center line mileage is obtained from the line mileage data in the line and section longitudinal section diagram.

[0125] The step S4 comprises:

[0126] S4.1. Define the bottom corner points P2 and P3 of the communication channel and the wastewater pump room;

[0127] When the form in step S2 is a communication channel, the bottom corner point P2 coordinates X P2 , Y P2 Calculate according to the following formula:

[0128] X P2 =X P1 -W / 2

[0129] Y P2 =Y P1 -ΔH1

[0130] Among them, W is the width of the communication channel and the sewage pump room, X P1 , Y P1 is the coordinate of the mileage positioning base point P1, ΔH1 is the difference between the elevation of the mileage positioning base point P1 and the elevation of the bottom of the communication channel;

[0131] The bottom corner point P3 coordinates X P3 , Y P3 Calculate according to the following formula:

[0132] X P3 =X P1 +W / 2

[0133] Y P3 =Y P1 -ΔH1

[0134] When the form described in step S2 is a communication channel and a sewage pump room, the bottom corner point P2 coordinates X P2 , Y P2 Calculate according to the following formula:

[0135] X P2 =X P1 -W / 2

[0136] Y P2 =Y P1 -ΔH2

[0137] Among them, ΔH2 is the difference between the elevation of the mileage positioning base point P1 and the elevation of the bottom of the pump room;

[0138] The bottom corner point P3 coordinates X P3 , Y P3 Calculate according to the following formula:

[0139] X P3 =X P1 +W / 2

[0140] Y P3 =Y P1 -ΔH2

[0141] S4.2. Define the communication channel in the line and section longitudinal section diagram and the upper vertex P4, upper vertex P5, and upper vertex P6 of the wastewater pump house;

[0142] The coordinates of the upper vertex P4 are X P4 , Y P4 Calculate according to the following formula:

[0143] X P4 =X P2

[0144] Y P4 =Y P2 +ΔH3-W / 2

[0145] Among them, ΔH3 is the difference between the elevation of the top of the communication channel and the sewage pump house and the elevation of the mileage positioning base point P1;

[0146] The upper vertex P5 coordinate X P5 , Y P5 Calculate according to the following formula:

[0147] X P5 =X P3

[0148] Y P5 =Y P3 +ΔH3-W / 2

[0149] The upper vertex P6 coordinates X P6 , Y P6 Calculate according to the following formula:

[0150] X P6 =X P1

[0151] Y P6 =Y P1 +ΔH3;

[0152] S4.3, draw the polyline PL1 and the arc ARC1;

[0153] The polyline PL1 is connected by the upper vertex P4, the bottom corner point P2, the bottom corner point P3, and the upper vertex P5 in sequence, and the arc ARC1 is connected by the upper vertex P4, the upper vertex P6, and the upper vertex P5 in sequence;

[0154] S4.4. Adjust the properties of the polyline PL1 and arc ARC1, including line type, width, and color.

[0155] Step S5 includes:

[0156] S5.1. Define the elevation marking vertices P7, P8, and P9 of the rail surface corresponding to the connecting channel and the wastewater pump house in the line and section longitudinal section diagram; the coordinates X of the marked vertex P7 P7 , Y P7 , mark the coordinate X of vertex P8 P8 , Y P8 , mark the coordinate X of vertex P9 P9 , Y P9 The coordinates of the mileage positioning base point P1 are calculated according to the following formula:

[0157] X P7 =X P1 -2

[0158] Y P7 =Y P1 +2

[0159] X P8 =X P1 +2

[0160] Y P8 =Y P1 +2

[0161] X P9 =X P1 +L1+1

[0162] Y P9 =Y P1 +2;

[0163] Among them, L1 is the length of the horizontal leader line of the elevation mark;

[0164] S5.2, draw an elevation symbol and adjust the attributes; the elevation symbol is enclosed by a polyline PL2, and the polyline PL2 is sequentially connected by a marked vertex P8, a mileage positioning base point P1, a marked vertex P7, and a marked vertex P9; the adjusted attributes include the adjustment of line type, width, and color;

[0165] S5.3. Add elevation and adjust properties. The elevation is represented by a single line of text, the text direction is horizontal, and the lower right corner of the text is aligned with the marked vertex P9. The adjusted properties include the adjustment of font, character height, and color.

[0166] Step S6 includes:

[0167] S6.1. Define the connection channel and wastewater pump house mileage marking lead vertex P10 and lead vertex P11 in the line and section longitudinal section drawings;

[0168] The lead vertex P10 coordinate X P10 , Y P10 Calculate according to the following formula:

[0169] X P10 =X P1

[0170] Y P10 =Y P1 +L2

[0171] Wherein, L2 is the length of the first lead section marked in the mileage in step S6;

[0172] The lead vertex P11 coordinate X P11 , Y P11 Calculate according to the following formula:

[0173] X P11 =X P10 +L3

[0174] Y P11 =Y P10

[0175] Wherein, L3 is the length of the second lead section marked in step S6;

[0176] S6.2, draw a polyline PL3, and adjust the attributes; the polyline PL3 is a marking leader, which is connected by the point mileage positioning base point P1, the leader vertex P10, and the leader vertex P11 in sequence, and the adjustment attributes include the adjustment of line type, width, and color;

[0177] S6.3. Add the mileage of the communication channel and the wastewater pump house, and adjust the attributes; the mileage of the communication channel and the wastewater pump house is represented by two lines of single-line text, the text direction is horizontal, the bottom midpoint of the mileage description text is aligned with the midpoint of the lead vertex P10 and the lead vertex P11, and the top midpoint of the line mileage text is aligned with the midpoint of the lead vertex P10 and the lead vertex P11. The text content is obtained according to the communication channel and wastewater pump house data described in step S2;

[0178] The attribute adjustment includes the adjustment of font, character height and color.

[0179] Step S7 includes:

[0180] S7.1, define points P12 and P13;

[0181] The coordinates of point P12 are X P12 , Y P12 Calculate according to the following formula:

[0182] X P12 =X P1

[0183] Y P12 =Y P1 +ΔH4

[0184] Among them, ΔH4 is the difference between the elevation of the top of the section tunnel and the elevation of the mileage positioning base point P1, that is, the height from the track surface of the section tunnel to the top of the tunnel; the point P12 is the marking base point of the buried depth of the section tunnel, and the point P13 is the ground point corresponding to the mileage of the connecting channel and the wastewater pump house in the longitudinal section diagram of the line and the section;

[0185] S7.2. Insert the interval tunnel depth marking in the line and interval longitudinal section diagram; the interval tunnel depth marking is an aligned marking, with points P12 and P13 as marking base points;

[0186] S7.3. Set the annotation style of the alignment annotation, which includes color, font height, and arrow size.

[0187] This embodiment provides a rail transit line section longitudinal section diagram communication channel and pump room automatic design system, the system includes:

[0188] Data input module, used to open the line and section profiles in dwg, dws, dwt, dxf formats, read and store the data in the line and section profiles, as well as the communication channel and wastewater pump room data;

[0189] Automatic drawing module, used to automatically draw communication channels and wastewater pump rooms;

[0190] The automatic drawing module comprises:

[0191] A control unit is used to determine the form of the communication channel and the wastewater pump room; if it is a communication channel form, the communication channel automatic drawing unit is executed; if it is a communication channel and wastewater pump room form, the communication channel and wastewater pump room drawing unit is executed;

[0192] The automatic drawing unit of the communication channel is used to automatically calculate and draw the contour of the communication channel on the longitudinal section of the line and section after execution;

[0193] The connecting channel and wastewater pump house drawing unit is used to automatically calculate and draw the outline of the connecting channel and wastewater pump house on the line and section longitudinal sections after execution;

[0194] Automatic labeling module, used to automatically label communication channels and wastewater pump rooms;

[0195] The automatic marking module comprises:

[0196] Elevation marking unit, automatically calculates and marks the elevation of the communication channel and wastewater pump room;

[0197] Mileage marking unit, automatically calculates and marks the mileage of communication channels and wastewater pump rooms;

[0198] The section tunnel burial depth marking unit automatically calculates and marks the section tunnel burial depth.

[0199] This embodiment provides a computer storage medium, which includes one or more program instructions, and the one or more program instructions are used for the rail transit line section longitudinal section connection channel and the sewage pump room to execute the above method.

[0200] Embodiment 2:

[0201] Automatic design method for communication channels and pump rooms in longitudinal sections of rail transit lines, see Figure 1 , the method comprises the following steps:

[0202] S1. Read the data in the line and section longitudinal section diagram.

[0203] Specifically, the data is read directly in the line longitudinal section design plan dwg, dws, dwt, dxf format files by writing an AutoCAD secondary development program. The data in the line and section longitudinal section drawings include but are not limited to line mileage data, longitudinal section slope change point data, longitudinal section slope data, ground line data, and station data.

[0204] When step S1 is implemented, it is realized by writing an AutoCAD secondary development program, and the geological survey longitudinal section file data can be selected and read in AutoCAD by manually selecting a file or inputting a file path. The programming language includes but is not limited to C++, C# and other languages.

[0205] S2. Automatically read and store the communication channel, sewage pump room form and mileage information.

[0206] Specifically, in step S2, the data in the line and section longitudinal section diagrams are automatically read by writing an AutoCAD secondary development program to automatically read the communication channel and sewage pump room data that have been automatically calculated and generated, including but not limited to the form and mileage information of the communication channel and sewage pump room, and the read data is saved in a table form, see Figure 2 .

[0207] When step S2 is implemented, firstly, the line and section longitudinal section diagram is opened, and the data of the communication channel and the sewage pump room are read by writing an AutoCAD secondary development program. The programming language includes but is not limited to C++, C# and other languages.

[0208] S3. Obtain the mileage positioning base point P1 between the rail transit line and the longitudinal section connecting channel of the section and the sewage pump room.

[0209] Specifically, step S3 locates the base point P1 according to the mileage of the communication channel and the sewage pump house. The mileage positioning base point P1 refers to the track surface point corresponding to the centerline mileage of the communication channel and the sewage pump house in the line and section longitudinal section diagram, and the centerline mileage can be obtained from the line mileage data in the line and section longitudinal section diagram.

[0210] When the above step S3 is implemented specifically, it is realized by writing an AutoCAD secondary development program, and the programming language includes but is not limited to C++ and C#. After the program is run, the operation described in step S3 can be automatically completed in dwg, dws, dwt, and dxf format files.

[0211] S4. Calculate the vertex coordinates of the connecting channel and the wastewater pump house according to the base point P1, create polylines and arcs, and automatically draw the connecting channel and the wastewater pump house in the line and section longitudinal section diagram. Figure 3 , Figure 4 .

[0212] Furthermore, the specific steps of step S4 are as follows:

[0213] S4.1. Define the connecting channel in the line and section longitudinal section diagram and the bottom corner points P2 and P3 of the wastewater pump room.

[0214] Specifically, when the form in step S4 is a communication channel, the bottom corner point P2 coordinates X P2 , Y P2 Calculate according to the following formula:

[0215] X P2 =X P1 -W / 2

[0216] Y P2 =Y P1 -ΔH1

[0217] Among them, W is the width of the communication channel and the sewage pump room, X P1 , Y P1 is the coordinate of the mileage positioning base point P1, and ΔH1 is the difference between the elevation of the mileage positioning base point P1 and the elevation of the bottom of the connecting channel.

[0218] The bottom corner point P3 coordinates X P3 , Y P3 Calculate according to the following formula:

[0219] X P3 =X P1 +W / 2

[0220] Y P3 =Y P1 -ΔH1

[0221] Specifically, when the form described in step S4 is a communication channel and a wastewater pump room, the bottom corner point P2 coordinates X P2 , Y P2 Calculate according to the following formula:

[0222] X P2 =X P1 -W / 2

[0223] Y P2 =Y P1 -ΔH2

[0224] Among them, ΔH2 is the difference between the elevation of the mileage positioning base point P1 and the elevation of the bottom of the sewage pump room.

[0225] The bottom corner point P3 coordinates X P3 , Y P3 Calculate according to the following formula:

[0226] X P3 =X P1 +W / 2

[0227] Y Pt =Y P1 -ΔH2

[0228] S4.2. Define the connecting passages between the line and the section longitudinal section and the upper vertices P4, P5, and P6 of the wastewater pump house.

[0229] Specifically, the coordinates of the upper vertex P4 are P4 , Y P4 Calculate according to the following formula:

[0230] X P4 =X P2

[0231] Y P4 =Y P2+ΔH3-W / 2

[0232] Among them, ΔH3 is the difference between the elevation of the connecting channel and the top of the sewage pump house and the elevation of the mileage positioning base point P1.

[0233] The upper vertex P5 coordinate X P5 , Y P5 Calculate according to the following formula:

[0234] X P5 =X P3

[0235] Y P5 =Y Pt +ΔH t -W / 2

[0236] The upper vertex P6 coordinates X P6 , Y P6 Calculate according to the following formula:

[0237] X P6 =X P1

[0238] Y P6 =Y P1 +ΔH3

[0239] S4.3. Draw the polyline PL1 and the arc ARC1.

[0240] Specifically, the polyline PL1 is connected by the upper vertex P4, the bottom corner point P2, the bottom corner points P3 and P5 in sequence, and the arc ARC1 is connected by the upper vertices P4, P6 and P5 in sequence.

[0241] S4.4. Adjust the properties of polyline PL1 and arc ARC1, including but not limited to line type, width, and color, to comply with the drawing standards for professional engineering design drawings of rail transit lines and sections.

[0242] When the above step S4 is implemented, it is realized by writing an AutoCAD secondary development program. The parameters W, ΔH1, ΔH2, and ΔH3 can be preset in the program according to the actual rail transit section structure size, or they can be determined by manual parameter input. In addition, the properties and formats of the layers and primitives described in step S4.3 must be preset in the program according to the drawing standards for professional engineering design drawings of rail transit lines and sections. Programming languages ​​include but are not limited to C++ and C#. After the program is run, the calculations and operations described in step S5 can be automatically completed in dwg, dws, dwt, and dxf format files.

[0243] S5. Calculate the vertex coordinates of the elevation symbol, create polylines and elevation text, and automatically draw the connection channels in the line and section longitudinal section drawings and the rail surface elevation markings of the sewage pump room. Figure 5 .

[0244] Furthermore, the specific steps of step S5 are as follows:

[0245] S5.1. Define the elevation marking vertices P7, P8, and P9 of the rail surface corresponding to the connecting channel and the wastewater pump house in the line and section longitudinal section drawings.

[0246] Specifically, mark vertex P7, mark vertex P8, and mark vertex P9 as X. P7 , Y P7 , X P8 , Y P8 , X P9 , Y P9 The coordinates of the mileage positioning base point P1 are calculated according to the following formula:

[0247] X P7 =X P1 -2

[0248] Y P7 =Y P1 +2

[0249] X P8 =X P1 +2

[0250] Y P8 =Y P1 +2

[0251] X P9 =X P1 +L1+1

[0252] Y P9 =Y P1 +2

[0253] Among them, L1 is the length of the horizontal leader line of the elevation mark.

[0254] S5.2. Draw elevation symbols and adjust their attributes.

[0255] Specifically, the elevation symbol is enclosed by a polyline PL2, and the polyline PL2 is created by connecting the marked vertex P8, the mileage positioning base point P1, the marked vertex P7, and the marked vertex P9 in sequence.

[0256] The property adjustments include but are not limited to adjustments to line type, width, and color to comply with the drawing standards for professional engineering design drawings of rail transit lines and sections.

[0257] S5.3. Add elevation and adjust properties.

[0258] Specifically, the elevation is represented by a single line of text, the text direction is horizontal, and the lower right corner of the text is aligned with point P9.

[0259] The property adjustments include but are not limited to font, character height, and color to comply with the drawing standards for professional engineering design drawings of rail transit lines and sections.

[0260] When the above step S5 is specifically implemented, it is realized by writing an AutoCAD secondary development program, and the properties and formats of the layers and primitives described in step S5 are preset in the program according to the drawing standards of the rail transit line and section professional engineering design drawings. The programming language includes but is not limited to C++ and C# languages. After the program is run, the calculation and operation described in step S5 can be automatically completed in the dwg, dws, dwt, and dxf format files.

[0261] S6. Calculate the vertex coordinates of the mileage marking, create polylines and mileage text, and automatically draw the connecting channels and mileage markings of the wastewater pump house in the line and section longitudinal section drawings. Figure 5 .

[0262] Furthermore, the specific steps of step S6 are as follows:

[0263] S6.1. Define the connection channel and the sewage pump room lead vertex P10 and lead vertex P11 in the line and section longitudinal section. Specifically, the coordinates of the lead vertex P10 are X P10 , Y P10 Calculate according to the following formula:

[0264] X P10 =X P1

[0265] Y P10 =Y P1 +L2

[0266] Wherein, L2 is the length of the first lead section of the mileage mark described in S6.

[0267] Specifically, the coordinates of the lead vertex P11 are P11 , Y P11 Calculate according to the following formula:

[0268] X P11 =X P10 +L3

[0269] Y P11 =Y P10

[0270] Wherein, L3 is the length of the second lead section marked in the mileage in step S6.

[0271] S6.2. Draw the polyline PL3 and adjust the properties.

[0272] Specifically, the polyline PL3 is a marking leader line, which is sequentially connected by the mileage positioning base point P1, the leader vertex P10, and the leader vertex P11.

[0273] The property adjustments include but are not limited to adjustments to line type, width, and color to comply with the drawing standards for professional engineering design drawings of rail transit lines and sections.

[0274] S6.3. Add communication channels and wastewater pump room mileage, and adjust properties.

[0275] Specifically, the mileage of the communication channel and the wastewater pump house is represented by two single-line texts, the text direction is horizontal, the bottom midpoint of the mileage description text is aligned with the midpoint of the lead line vertex P10 and the lead line vertex P11, and the top midpoint of the line mileage text is aligned with the midpoint of the lead line vertex P10 and the lead line vertex P11. The text content is obtained according to the communication channel and wastewater pump house data described in step S2.

[0276] The property adjustments include but are not limited to font, character height, and color to comply with the drawing standards for professional engineering design drawings of rail transit lines and sections.

[0277] When the above step S6 is implemented, it is realized by writing an AutoCAD secondary development program, and the programming language includes but is not limited to C++ and C#. After the program is run, the calculation and operation described in step S6 can be automatically completed in dwg, dws, dwt, and dxf format files.

[0278] S7, calculate the tunnel depth and mark the vertex coordinates, create the corresponding depth mark, automatically calculate and draw the interval tunnel depth mark in the line and interval longitudinal section diagram, see Figure 5 .

[0279] Furthermore, the specific steps of step S7 are as follows:

[0280] S7.1. Define points P12 and P13.

[0281] Specifically, the coordinates of point P12 are P12 , Y P12 Calculate according to the following formula:

[0282] X P12 =X P1

[0283] Y P12 =Y P1 +ΔH4

[0284] Among them, ΔH4 is the difference between the elevation of the top of the section tunnel and the elevation of the mileage positioning base point P1, that is, the height from the track surface of the section tunnel to the top of the tunnel.

[0285] Specifically, the point P12 is the marking base point for marking the buried depth of the section tunnel, and the point P13 is the ground point corresponding to the mileage of the connecting channel and the wastewater pump house in the longitudinal section diagram of the line and section.

[0286] S7.2. Insert the section tunnel depth markings in the line and section longitudinal section drawings.

[0287] Specifically, the buried depth of the interval tunnel is marked as aligned, with points P12 and P13 as marking base points.

[0288] S7.3. Set the annotation style of the aligned annotation, including but not limited to color, font height, arrow size and other attributes, to comply with the drawing standards for professional engineering design drawings of rail transit lines and sections.

[0289] When the above step S5 is specifically implemented, it is realized by writing an AutoCAD secondary development program, and the properties and formats of the layers and primitives described in step S5 are preset in the program according to the drawing standards of the rail transit line and section professional engineering design drawings. The programming language includes but is not limited to C++ and C# languages. After the program is run, the calculation and operation described in step S5 can be automatically completed in the dwg, dws, dwt, and dxf format files.

[0290] Furthermore, the X-axis, Y-axis and corresponding coordinate calculations described in the present invention all adopt a Cartesian plane rectangular coordinate system.

[0291] The above technical solution is realized by writing an AutoCAD secondary development program, which can automatically complete the design of the communication channel and wastewater pump room in the line and section longitudinal section drawings in dwg, dws, dwt, and dxf format files.

[0292] The present invention realizes the automated design of communication channels and wastewater pump houses in longitudinal section drawings of rail transit lines and sections. By programming the method of the present invention into an AutoCAD secondary development program, longitudinal communication channels and wastewater pump houses can be automatically designed on a computer, and automatically drawn and labeled. A large number of steps that require manual calculation and operation are converted into automatic computer operation, thereby greatly improving production efficiency and design quality.

[0293] The connecting passages and wastewater pump houses of the 32 longitudinal sections of a certain rail transit line would take about 15 working days to calculate and draw manually if the existing production method is used. However, the automatic design can be completed in only 2 seconds if the present invention is used, thereby improving production efficiency.

[0294] Embodiment 3:

[0295] Corresponding to Embodiments 1 and 2, Embodiment 3 of the present invention proposes an automatic design system for a longitudinal section diagram of a rail transit line and a pump room, see Figure 6 , the system comprising:

[0296] The data input module 210 is used to open the line and section longitudinal sections and planes in dwg, dws, dwt, and dxf formats, read and store the data in the line and section longitudinal section drawings and the communication channel and wastewater pump room data.

[0297] Furthermore, the data in the line and section longitudinal section diagrams include but are not limited to line mileage data, longitudinal section slope change point data, longitudinal section slope data, ground line data, and station data. The communication channel and sewage pump room data include but are not limited to the form and mileage information of the communication channel and sewage pump room.

[0298] The automatic drawing module 220 is used to automatically draw the communication channel and the wastewater pump room.

[0299] Furthermore, the automatic drawing module includes:

[0300] The control unit determines the communication channel and the wastewater pump room form according to the data of the data input module 210. If it is a communication channel form, the communication channel automatic drawing unit is executed. If it is a communication channel and wastewater pump room form, the communication channel and wastewater pump room drawing unit is executed.

[0301] The automatic drawing unit of the connecting channel automatically calculates and draws the outline of the connecting channel on the longitudinal section of the line and section after execution, and automatically adjusts the attributes including but not limited to line type, width, color, etc.

[0302] The connecting channel and wastewater pump house drawing unit automatically calculates and draws the outline of the connecting channel and wastewater pump house on the longitudinal section of the line and section after execution, and automatically adjusts the attributes including but not limited to line type, width, color, etc.

[0303] The automatic marking module 230 is used to automatically mark the communication channel and the wastewater pump room.

[0304] Furthermore, the automatic marking module includes:

[0305] The elevation marking unit automatically calculates and marks the elevation of the communication channel and the sewage pump room, and adjusts the attributes including but not limited to line type, width, font, character height, color, etc.

[0306] The mileage marking unit automatically calculates and marks the mileage of the communication channel and the sewage pump room, and adjusts the attributes including but not limited to line type, width, font, character height, color, etc.

[0307] The interval tunnel depth marking unit automatically calculates and marks the interval tunnel depth, and adjusts the attributes including but not limited to line type, width, font, character height, color, etc.

[0308] The functions and implementation methods performed by each module in the automatic design system of the longitudinal section of a rail transit line and a pump room provided in Example 3 of the present invention have been introduced in detail in the above-mentioned Examples 1 and 2, so they will not be elaborated here.

[0309] Embodiment 4:

[0310] This embodiment includes the following steps:

[0311] A. Run the exe format executable file in the AutoCAD secondary development program of this embodiment.

[0312] B. Open the longitudinal sections of the lines and sections.

[0313] Specifically, the longitudinal section is in dwg, dws, dwt, or dxf format. After opening the file, the AutoCAD secondary development program of this embodiment automatically reads the data in the line and section longitudinal section diagram. The data in the line and section longitudinal section diagram includes but is not limited to line mileage data, longitudinal section slope change point data, longitudinal section slope data, ground line data, and station data.

[0314] C. Open the data in the line and section longitudinal section diagrams.

[0315] Specifically, the plane is in dwg, dws, dwt, or dxf format. After opening the file, the AutoCAD secondary development program of this embodiment automatically reads the calculated and generated communication channel and wastewater pump room data, including but not limited to the form and mileage information of the communication channel and wastewater pump room, and saves the read data in a table format.

[0316] D. Click the button of the AutoCAD secondary development program panel in this embodiment in the data of the line and section longitudinal section diagram, and the program automatically draws the longitudinal section communication channel and the wastewater pump room in the line and section longitudinal section, and automatically marks them, see Figure 7 , Figure 8 , complete the automatic design of communication channels and wastewater pump rooms in the line and section longitudinal section drawings.

[0317] This embodiment converts the work that needs to be completed manually into automatic work by computer, realizes data-based precise design, and improves the overall design work efficiency and design quality level.

[0318] The above contents are further detailed descriptions of the present invention in combination with specific preferred embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as falling within the protection scope of the present invention.

Claims

1. A method for automatically designing communication channels and pump rooms in longitudinal sections of rail transit lines, characterized in that: The following steps are involved: S1. Obtain data from the design plan of rail transit lines and sections; S2. Read and store the form and mileage information of the communication channel and the sewage pump room; S3, obtain the mileage positioning base point P1 of the rail transit line, the longitudinal section connection channel and the sewage pump room; S4. Calculate the coordinates of the vertices of the communication channel and the wastewater pump room outline according to the base point P1, create polylines and arcs, and draw the communication channel and the wastewater pump room; The step S4 comprises: S4.

1. Define the bottom corner points P2 and P3 of the communication channel and the wastewater pump room; When the form in step S2 is a communication channel, the bottom corner point P2 coordinates X P2 , Y P2 Calculate according to the following formula: X P2 =X P1 -W / 2 Y P2 =Y P1 -ΔH1 Among them, W is the width of the communication channel and the sewage pump room, X P1 , Y P1 is the coordinate of the mileage positioning base point P1, ΔH1 is the difference between the elevation of the mileage positioning base point P1 and the elevation of the bottom of the connecting channel; The bottom corner point P3 coordinates X P3 , Y P3 Calculate according to the following formula: X P3 =X P1 +W / 2 Y P3 =Y P1 -ΔH1 When the form described in step S2 is a communication channel and a sewage pump room, the bottom corner point P2 coordinates X P2 , Y P2 Calculate according to the following formula: X P2 =X P1 -W / 2 Y P2 =Y P1 -ΔH2 Among them, ΔH2 is the difference between the elevation of the mileage positioning base point P1 and the elevation of the bottom of the pump room; The bottom corner point P3 coordinates X P3 , Y P3 Calculate according to the following formula: X P3 =X P1 +W / 2 Y P3 =Y P1 -ΔH2 S4.

2. Define the communication channel and the upper vertex P4, upper vertex P5 and upper vertex P6 of the wastewater pump house in the line and section longitudinal section diagram; The coordinates of the upper vertex P4 are X P4 , Y P4 Calculate according to the following formula: X P4 =X P2 Y P4 =Y P2 +ΔH3-W / 2 Among them, ΔH3 is the difference between the elevation of the top of the communication channel and the sewage pump house and the elevation of the mileage positioning base point P1; The upper vertex P5 coordinates X P5 , Y P5 Calculate according to the following formula: X P5 =X P3 Y P5 =Y P3 +ΔH3-W / 2 The upper vertex P6 coordinates X P6 , Y P6 Calculate according to the following formula: X P6 =X P1 Y P6 =Y P1 +ΔH3; S4.3, draw the polyline PL1 and the arc ARC1; The polyline PL1 is connected by the upper vertex P4, the bottom corner point P2, the bottom corner point P3, and the upper vertex P5 in sequence, and the arc ARC1 is connected by the upper vertex P4, the upper vertex P6, and the upper vertex P5 in sequence; S4.4, adjusting the properties of the polyline PL1 and the arc ARC1, including line type, width, and color; S5. Calculate the vertex coordinates of the elevation symbol, create polylines and elevation text, and draw the elevation markings of the rail surface of the communication channel and the sewage pump room; S6. Calculate the vertex coordinates of the mileage marking, create polylines and mileage text, and draw the mileage markings of the communication channel and the wastewater pump room; S7. Calculate the tunnel burial depth and mark vertex coordinates, create corresponding burial depth markings, and draw the interval tunnel burial depth markings in the line and interval longitudinal section drawings.

2. The method for automatically designing communication channels and pump rooms in longitudinal sections of rail transit lines according to claim 1, characterized in that: The step S1 specifically includes: Read the dwg, dws, dwt, and dxf format files of the line and section longitudinal section design scheme in the AutoOAD secondary development program. The data in the line and section longitudinal section design scheme include line mileage data, longitudinal section slope change point data, longitudinal section slope data, ground line data, and station data.

3. The method for automatically designing communication channels and pump rooms in longitudinal sections of rail transit lines according to claim 1, characterized in that: The step S2 comprises: The communication channel and wastewater pump room data are automatically read in the line and section longitudinal sections, wherein the communication channel and wastewater pump room data include the form and mileage information of the communication channel and the wastewater pump room, and the read data are saved in a table form.

4. The method for automatically designing communication channels and pump rooms in longitudinal sections of rail transit lines according to claim 1, characterized in that: The step S3 comprises: The mileage positioning base point P1 of the connecting channel and the sewage pump room is located from the line and section longitudinal section diagram. The mileage positioning base point P1 is the track surface point corresponding to the center line mileage of the connecting channel and the sewage pump room. The center line mileage is obtained from the line mileage data in the line and section longitudinal section diagram.

5. The method for automatically designing communication channels and pump rooms in longitudinal sections of rail transit lines according to claim 1, characterized in that: The step S5 comprises: S5.

1. Define the elevation marking vertices P7, P8 and P9 of the rail surface corresponding to the connecting channel and the wastewater pump house in the line and section longitudinal section diagram; the coordinates X of the marked vertex P7 P7 , Y P7 , mark the coordinate X of vertex P8 P8 , Y P8 , mark the coordinate X of vertex P9 P9 , Y P9 The coordinates of the mileage positioning base point P1 are calculated according to the following formula: X P7 =X P1 -2 AND P7 =And P1 +2 X P8 =X P1 +2 AND P8 =And P1 +2 X P9 =X P1 +L1+1 AND P9 =And P1 +2; Among them, L1 is the length of the horizontal leader line of the elevation mark; S5.2, draw an elevation symbol and adjust the attributes; the elevation symbol is enclosed by a polyline PL2, and the polyline PL2 is sequentially connected by a marked vertex P8, a mileage positioning base point P1, a marked vertex P7, and a marked vertex P9; the adjusted attributes include the adjustment of line type, width, and color; S5.

3. Add elevation and adjust properties. The elevation is represented by a single line of text, the text direction is horizontal, and the lower right corner of the text is aligned with the marked vertex P9. The adjusted properties include the adjustment of font, character height, and color.

6. The method for automatically designing communication channels and pump rooms in longitudinal sections of rail transit lines according to claim 5, characterized in that: The step S6 comprises: S6.

1. Define the connection channel and wastewater pump house mileage marking lead vertex P10 and lead vertex P11 in the line and section longitudinal section drawings; The lead vertex P10 coordinate X P10 , Y P10 Calculate according to the following formula: X P10 =X P1 AND P10 =And P1 +L2 Wherein, L2 is the length of the first lead section marked in the mileage in step S6; The lead vertex P11 coordinate X P11 , Y P11 Calculate according to the following formula: X P11 =X P10 +L3 AND P11 =And P10 Wherein, L3 is the length of the second lead section marked in step S6; S6.2, draw a polyline PL3, and adjust the attributes; the polyline PL3 is a labeling leader, which is connected by the point mileage positioning base point P1, the leader vertex P10, and the leader vertex P11 in sequence. The adjusted attributes include the adjustment of line type, width, and color: S6.

3. Add the mileage of the communication channel and the wastewater pump house, and adjust the attributes; the mileage of the communication channel and the wastewater pump house is represented by two lines of single-line text, the text direction is horizontal, the bottom midpoint of the mileage description text is aligned with the midpoint of the lead vertex P10 and the lead vertex P11, and the top midpoint of the line mileage text is aligned with the midpoint of the lead vertex P10 and the lead vertex P11. The text content is obtained according to the communication channel and wastewater pump house data described in step S2; The attribute adjustment includes the adjustment of font, font height and color.

7. The method for automatically designing communication channels and pump rooms in longitudinal sections of rail transit lines according to claim 6, characterized in that: The step S7 comprises: S7.1, define points P12 and P13; The coordinates of point P12 are X P12 , Y P12 Calculate according to the following formula: X P12 =X P1 AND P12 =And P1 +ΔH4 Among them, ΔH4 is the difference between the elevation of the top of the section tunnel and the elevation of the mileage positioning base point P1, that is, the height from the track surface of the section tunnel to the top of the tunnel; the point P12 is the marking base point of the buried depth of the section tunnel, and the point P13 is the ground point corresponding to the mileage of the connecting channel and the wastewater pump house in the longitudinal section diagram of the line and the section; S7.

2. Insert the interval tunnel depth marking in the line and interval longitudinal section diagram; the interval tunnel depth marking is an aligned marking, with points P12 and P13 as marking base points; S7.

3. Set the annotation style of the alignment annotation, which includes color, font height, and arrow size.

8. A rail transit line section longitudinal section diagram communication channel and pump room automatic design system implementing the method described in any one of claims 1 to 7, characterized in that: The system comprises: Data input module, used to open the line and section profiles in dwg, dws, dwt, dxf formats, read and store the data in the line and section profiles, as well as the communication channel and wastewater pump room data; Automatic drawing module, used to automatically draw communication channels and wastewater pump rooms; The automatic drawing module comprises: A control unit is used to determine the form of the communication channel and the wastewater pump room; if it is a communication channel form, the communication channel automatic drawing unit is executed; if it is a communication channel and wastewater pump room form, the communication channel and wastewater pump room drawing unit is executed; The automatic drawing unit of the communication channel is used to automatically calculate and draw the contour of the communication channel on the longitudinal section of the line and section after execution; The connecting channel and wastewater pump house drawing unit is used to automatically calculate and draw the outline of the connecting channel and wastewater pump house on the line and section longitudinal sections after execution; Automatic labeling module, used to automatically label communication channels and wastewater pump rooms; The automatic marking module comprises: Elevation marking unit, automatically calculates and marks the elevation of the communication channel and wastewater pump room; Mileage marking unit, automatically calculates and marks the mileage of communication channels and wastewater pump rooms; The section tunnel burial depth marking unit automatically calculates and marks the section tunnel burial depth.

9. A computer storage medium, characterized in that The computer storage medium contains one or more program instructions, and the one or more program instructions are used for the rail transit line section longitudinal section connection channel and the sewage pump room to execute the method described in any one of claims 1-7.

Citation Information

Patent Citations

  • Subway shield interval contact channel pre-assembly method based on BIM (Building Information Modeling)

    CN115114716A

  • Subway design drawing rechecking method and system based on lines and storage medium

    CN115392017A