A method for installing a water conservancy project pipeline

Through automatic alignment and cleaning mechanisms, safety hazards and low efficiency during pipeline installation in water conservancy projects are solved, and efficient and safe pipeline installation and sealing improvement are achieved.

CN118361587BInactive Publication Date: 2024-12-17济南市水利工程服务中心
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410788899.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-12-17
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In water conservancy projects, there are safety hazards and low efficiency problems during pipeline installation, especially during high-level flips and dust cleaning, which increases workers' labor intensity and reduces installation efficiency.

Method used

A water conservancy engineering pipeline installation method is adopted, and the threaded rod is driven by the fixing table and the driving motor. The gear and tooth meshing mechanism are used to realize automatic alignment and cleaning of the pipeline to ensure the alignment and sealing of the flange holes, and at the same time, the piston cylinder and Cleaning rings for spray cleaning of dust and impurities.

Benefits of technology

It improves the efficiency and sealing of pipeline installation, reduces maintenance costs, avoids safety hazards caused by manual flips, and simplifies the installation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118361587B_ABST
    Figure CN118361587B_ABST
Patent Text Reader

Abstract

The invention discloses a method for installing a pipeline for a water conservancy project, and relates to the technical field of pipeline installation. The method comprises two installation frames and a pipeline, wherein flanges are arranged on the surface of the pipeline, a fixing plate is fixedly connected between the two installation frames, a driving motor is arranged on the upper surface of the fixing plate, an output shaft of the driving motor is fixedly connected with a rotating shaft 1, threaded rods 1 are rotatably connected on the surfaces of the two installation frames, a pulley transmission mechanism is arranged between the two threaded rods 1 and the rotating shaft 1; two sections of threaded grooves arranged oppositely are arranged on the surface of the threaded rods 1; the method for installing the pipeline for a water conservancy project can clean dust and impurities on the connection surfaces of the two pipelines before they are spliced ​​and installed, and can ensure that the connection surfaces of the pipelines can be tightly fitted during subsequent installation, thereby improving the sealing of the pipelines after installation; and can mechanically align the bolt holes on the flanges of the two pipelines, thereby avoiding the potential safety hazards when the pipelines are manually turned over to align the flange holes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pipeline installation, in particular to a method for installing a water conservancy project pipeline. Background Art

[0002] A water conservancy project is a project built to control and allocate natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits. It is also called a water project.

[0003] In water conservancy projects, for the convenience of use, it is often necessary to install and connect two water conservancy pipes. During installation, the two pipes are connected by flanges. After the flanges on the two pipes are tightened by bolts, the two pipes are fixedly installed.

[0004] For example, an auxiliary pipe joint positioning mechanism for water conservancy projects with publication number CN214618153U can increase the stability of the fixation of the pipe joint, making it convenient for people to control the position of the pipe joint for docking, and can also facilitate people to disassemble and store the entire device, making it convenient for people to carry it, bringing better usage prospects.

[0005] However, during the installation of water conservancy pipelines, the flanges at both ends of the pipelines are first welded in advance, and then the pipelines are hoisted on the support frame through the auxiliary pipeline joint positioning mechanism similar to the above-mentioned, and then the two adjacent flanges are connected. This results in the pipelines having to be manually rotated to align the bolt holes between the two adjacent flanges during flange connection, and it is not convenient to flip the pipelines at high places, which not only poses a safety hazard, but also affects the efficiency of pipeline installation.

[0006] In order to improve the sealing performance of the two pipes after connection, the dust and impurities attached to the connection surfaces of the two pipes need to be manually cleaned before the water pipes are installed to ensure that the pipe connection surfaces can fit tightly. However, the manual cleaning process of the water pipe connection ends is inconvenient, which increases the labor intensity of the workers and reduces the efficiency of the pipe installation. Summary of the invention

[0007] The purpose of the present invention is to provide a method for installing a water conservancy project pipeline, which solves the problems raised in the above-mentioned background technology.

[0008] To achieve the above object, the present invention provides a method for installing a water conservancy project pipeline, comprising the following steps:

[0009] Before the pipeline is installed, the two pipelines to be installed and connected are respectively placed into the openings on both sides of the two fixing platforms, and the turning handle is turned to drive the second threaded rod to rotate, so that the first rotating plate is deflected in the direction close to the center of the fixing ring until the three abutting blocks abut against the outer wall of the pipeline. Under the action of the friction force of the rubber cushion layer, the pipeline can be fixed before installation;

[0010] The contact surface is cleaned before the pipeline is installed. After the two pipelines are fixed, the drive motor is turned on to drive the two threaded rods 1 and the rotating shaft 2 to rotate synchronously, so that the two pipelines can move toward each other;

[0011] At the same time, the piston cylinder will move as a piston, so that the cleaning ring will start to spray air toward the connecting surfaces of the two pipes, thereby cleaning the dust and impurities on the connecting surfaces of the two pipes;

[0012] The flanges are aligned and installed. As the two pipes continue to move toward each other, when the abutment block contacts the slider, the piston cylinder and the cleaning ring move away from the sides of the two pipes under the hinged action of the hinged plate, so as to no longer block the moving path of the pipes.

[0013] As threaded rod 1 continues to rotate, the two fixed platforms will drive the two pipes to move to a position where they fit together, and under the meshing action of gear 1, gear 2 and the teeth, the connecting ring on the right will drive the fixed pipe to rotate synchronously until the bolt holes on the two flanges are aligned, and the two pipes can be installed by fixing the bolts.

[0014] Optionally, it comprises two installation frames and a pipe, the surface of the pipe is provided with a flange, a fixing plate is fixedly connected between the two installation frames, a driving motor is provided on the upper surface of the fixing plate, the output shaft of the driving motor is fixedly connected with a rotating shaft 1, the surfaces of the two installation frames are rotatably connected with a threaded rod 1, and a pulley transmission mechanism is provided between the two threaded rods 1 and the rotating shaft 1;

[0015] The surface of the threaded rod 1 is provided with two oppositely arranged thread grooves, the surface of the threaded rod 1 is threadedly connected with two symmetrically arranged moving blocks 1, and the upper surface of the moving block 1 is fixedly connected with a fixing platform;

[0016] The fixing platform is provided with a fixing component for fixing the pipeline before installation;

[0017] A cleaning component is provided in the middle of the two fixing tables, which is used to clean the installation contact surface of the pipeline when the two fixing tables are moved toward each other for installation;

[0018] The installation frame is provided with an avoidance component and a calibration component, which are transmission-connected with the cleaning component, so that after the cleaning component has finished working, the cleaning component can be moved to the side of the pipe before the installation contact surfaces of the two pipes are fitted.

[0019] Optionally, the fixing component includes a connecting ring rotatably connected to the surface of the fixing platform with a fixed axis, the surface of the connecting ring is rotatably connected to a fixing ring, the surface of the connecting ring is hinged with a rotating plate 1, the outer surface of the rotating plate 1 is slidably connected to a limiting block, the surface of the fixing ring is hinged with a hinge rod, the fixing ring is hinged to the limiting block through the hinge rod, the surface of the fixing ring is provided with an arc-shaped opening for the limiting block to slide, the side of the rotating plate 1 is fixedly connected to an abutment block, and the surface of the abutment block is provided with a rubber pad layer;

[0020] The surface of the connecting ring is fixedly connected to a connecting block 1, the upper surface of the connecting block 1 is fixedly connected to a connecting block 2, the surface of the connecting ring is rotatably connected to a fixed block, the surface of the fixed block is rotatably connected to a threaded rod 2, one end of the threaded rod 2 is fixedly connected to a turning handle, and the other end of the threaded rod 2 passes through the connecting block 2 and is threadedly connected thereto.

[0021] Optionally, the cleaning component includes a limit frame fixedly installed between the two installation frames, the surfaces of the two limit frames are slidably connected to the moving block 2, the ends of the two moving blocks 2 are commonly fixedly installed with a piston cylinder, the inner wall of the piston cylinder is slidably connected to the piston plate, the surface of the piston plate is fixedly connected to the piston rod, and the end of the piston rod is fixedly connected to the moving frame;

[0022] The lower surface of the piston cylinder is fixedly connected to a support plate 1, the surface of the support plate 1 is fixedly connected to a rotating shaft 2, the surface of the rotating shaft 2 is fixedly connected to a bevel gear 1, and the surface of the threaded rod 1 is fixedly connected to a bevel gear 2 meshing with the bevel gear 1;

[0023] The upper surface of the second rotating shaft is fixedly connected with a second rotating plate, the surface of the second rotating plate is fixedly connected with a moving column, and the moving column extends into the moving frame and is slidably connected therewith.

[0024] Optionally, the surface of the piston cylinder is fixedly connected with an air inlet pipe and an air outlet pipe, the surfaces of the air inlet pipe and the air outlet pipe are respectively provided with two one-way valves, the end of the air outlet pipe is fixedly connected with a cleaning ring, and the surface of the cleaning ring is evenly provided with multiple air outlets.

[0025] Optionally, the avoidance component includes a slide groove provided on the surface of the installation frame, the inner wall of the slide groove is slidably connected with a slider, the surface of the moving block 1 is fixedly connected with a stop block, and a return spring is provided between the slider and the inner wall of the slide groove;

[0026] The end of the sliding block extending out of the sliding slot is hingedly connected with a hinge plate, and the end of the hinge plate is hingedly connected to the moving block.

[0027] Optionally, the calibration component includes a gear 1 fixedly connected to the surface of the threaded rod 1, a support plate 2 is fixedly connected to the upper surface of the mounting frame, a mounting ring is provided on the surface of the support plate 2, and the support plate 2 is connected to a gear 2 meshing with the gear 1 by rotating on a fixed axis through the mounting ring;

[0028] The outer surface of the connecting ring is fixedly connected with teeth meshing with the second gear.

[0029] Optionally, a support frame is fixedly connected to the upper surface of the installation frame, a support block is provided at the end of the support frame, and a positioning block is fixedly connected to the surface of the installation frame.

[0030] Compared with the prior art, the present invention has the following beneficial effects:

[0031] 1. The present invention starts a driving motor to drive the threaded rod 1 to rotate, so that the two pipes move toward each other. Under the meshing action of the bevel gear 1 and the bevel gear 2, the piston cylinder will also perform piston movement, so that the external air can be evenly sprayed from multiple air outlets opened on both sides of the cleaning ring surface to the side of the two pipes welded with flanges, so that dust and impurities on the connection surface of the two pipes can be cleaned before the two pipes are spliced ​​and installed, so as to ensure that the pipe connection surface can be tightly fitted during subsequent installation, thereby improving the sealing of the pipe after installation, extending its service life in water conservancy projects, and also reducing the maintenance cost of the pipe.

[0032] 2. According to the present invention, when the two pipes move toward each other to a position where they are about to fit together, the avoidance component will cause the piston cylinder and the cleaning ring above to move to the side away from the pipe so as to no longer block the moving path of the pipe. Therefore, after the installation surface of the pipe is cleaned, the two pipes can continue to move to a position where they fit together for subsequent installation, thereby improving the efficiency of pipe installation in water conservancy projects.

[0033] 3. After the driving motor is turned on, as the threaded rod 1 continues to rotate, when the installation surfaces of the two pipes are fitted together, the meshing action of gear 1, gear 2 and the teeth will cause the connecting ring on the right to drive the pipe on the right to rotate, thereby mechanically aligning the bolt holes on the two flanges. Compared with the traditional manual alignment method of turning over the pipe, this avoids the safety hazards caused by manual turning over, and also further improves the efficiency of pipe installation in water conservancy projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 is a flowchart of the use of the present invention;

[0035] Figure 2 is an axonometric view of the structure of the present invention;

[0036] Figure 3 For the present invention Figure 2 The enlarged view of point A in the middle;

[0037] Figure 4 It is a cross-sectional view of the installation frame structure in the present invention;

[0038] Figure 5 For the present invention Figure 4 The enlarged view of point B in the middle;

[0039] Figure 6 is a schematic diagram of the connecting ring structure in the present invention;

[0040] Figure 7 It is a cross-sectional view of the slide groove structure in the present invention.

[0041] In the figure: 1, mounting frame; 2, fixing table; 5, pipeline; 6, flange; 7, cleaning ring; 8, air outlet; 9, air outlet pipe; 11, support block; 12, threaded rod 1; 13, rotating shaft 1; 14, driving motor; 15, support frame; 16, piston cylinder; 17, piston rod; 18, moving column; 19, rotating plate 2; 20, rotating shaft 2; 21, bevel gear 1; 22, supporting plate 1; 23, moving frame; 24, moving block 2; 25 , limit frame; 26, bevel gear two; 27, moving block one; 28, connecting ring; 29, teeth; 30, stop block; 31, slide groove; 32, slider; 33, gear one; 34, return spring; 35, support plate two; 36, gear two; 37, hinged plate; 38, arc opening; 39, rotating plate one; 40, limit block; 41, fixing ring; 42, threaded rod two; 43, fixing block; 44, positioning block; 45, connecting block one. DETAILED DESCRIPTION

[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0043] For examples, see Figures 1 to 7 The present invention provides a method for installing a water conservancy project pipeline as follows:

[0044] Put the two pipes 5 to be installed and connected into the openings on both sides of the two fixing platforms 2 respectively, turn the handle to drive the second threaded rod 42 to rotate, so that the first rotating plate 39 deflects in the direction close to the center of the fixing ring 41 until the three abutting blocks abut against the outer wall of the pipe 5. Under the action of the friction force of the rubber cushion layer, the pipe 5 can be fixed before installation;

[0045] When the two pipes 5 are fixed, the driving motor 14 is turned on to drive the two threaded rods 12 and the rotating shaft 20 to rotate synchronously, so that the two pipes 5 can move toward each other.

[0046] At the same time, the piston cylinder 16 will perform piston movement, and the cleaning ring 7 will start to spray air toward the connection surface of the two pipes 5, so as to clean the dust and impurities on the connection surface of the two pipes 5;

[0047] As the two pipes 5 continue to move toward each other, when the abutment block 30 abuts against the slider 32, the piston cylinder 16 and the cleaning ring 7 move away from the two pipes 5 under the hinged action of the hinged plate 37, so as to no longer block the moving path of the pipes 5;

[0048] As the threaded rod 12 continues to rotate, the two fixing platforms 2 will drive the two pipes 5 to move to a position where they fit together, and under the meshing action of gear 1 33, gear 2 36 and teeth 29, the connecting ring 28 on the right will drive the fixed pipe 5 to rotate synchronously until the bolt holes on the two flanges 6 are aligned, and the installation of the two pipes 5 can be completed by fixing the bolts.

[0049] Furthermore, a flange 6 is provided on the surface of the pipe 5, a fixing plate is fixedly connected between the two installation frames 1, a driving motor 14 is provided on the upper surface of the fixing plate, an output shaft of the driving motor 14 is fixedly connected to a rotating shaft 13, a threaded rod 12 is rotatably connected to the surfaces of the two installation frames 1, and a pulley transmission mechanism is provided between the two threaded rods 12 and the rotating shaft 13;

[0050] The surface of the threaded rod 12 is provided with two oppositely arranged thread grooves, the surface of the threaded rod 12 is threadedly connected with two symmetrically arranged moving blocks 27, and the upper surface of the moving block 27 is fixedly connected with the fixing platform 2;

[0051] The fixing component is arranged on the fixing platform 2, and the fixing component includes a connecting ring 28 which is rotatably connected to the surface of the fixing platform 2 via a fixed axis, a fixing ring 41 is rotatably connected to the surface of the connecting ring 28 via a fixed axis, a rotating plate 39 is hingedly connected to the surface of the connecting ring 28, and a limiting block 40 is slidably connected to the outer surface of the rotating plate 39, a hinged rod is hingedly connected to the surface of the fixing ring 41, and the fixing ring 41 is hingedly connected to the limiting block 40 via the hinged rod, an arc-shaped opening 38 for sliding of the limiting block 40 is provided on the surface of the fixing ring 41, and an abutting block is fixedly connected to the side of the rotating plate 39, and a rubber cushion layer is provided on the surface of the abutting block;

[0052] The surface of the connecting ring 28 is fixedly connected to a connecting block 1 45, the upper surface of the connecting block 1 45 is fixedly connected to a connecting block 2, the surface of the connecting ring 28 is rotatably connected to a fixing block 43, the surface of the fixing block 43 is rotatably connected to a threaded rod 2 42, one end of the threaded rod 2 42 is fixedly connected to a turning handle, and the other end of the threaded rod 2 42 passes through the connecting block 2 and is threadedly connected thereto.

[0053] A support frame 15 is fixedly connected to the upper surface of the installation frame 1 , a support block 11 is disposed at the end of the support frame 15 , and a positioning block 44 is fixedly connected to the surface of the installation frame 1 .

[0054] When this embodiment is used, Figure 2 As shown, the two pipes 5 to be installed and connected are respectively placed from the openings on both sides of the two fixing platforms 2 until the flange 6 at the end of the pipe 5 is flush with the positioning block 44 on one side thereof, and then the turning handle at the end of the threaded rod 42 is turned to drive the threaded rod 42 to start rotating.

[0055] like Figure 6 As shown, as the threaded rod 2 42 is driven to rotate, the connecting block 2 will move away from the fixing block 43 , so that the fixing ring 41 can rotate relative to the connecting ring 28 .

[0056] As the connecting ring 28 rotates, under the hinged action of the hinged rod, the limiting block 40 will be relatively deflected with the fixing ring 41 in the arc-shaped opening 38 .

[0057] During the above process, with the rotation of the fixing ring 41 and the deflection of the limit block 40, the rotating plate 39 will deflect along the axis of the hinge rod toward the center of the fixing ring 41 until the abutment blocks on the sides of the three rotating plates 39 abut against the outer wall of the pipe 5. Since a rubber pad is provided on the outer surface of the abutment block, the pipe 5 can be fixed under the action of the friction force of the rubber pad, thereby avoiding shaking of the pipe 5 during the subsequent splicing and installation process, and providing convenience for the subsequent installation of the pipe 5.

[0058] Embodiment 2, based on the above embodiment,

[0059] Further, the cleaning component is arranged in the middle position of the two fixed tables 2, the avoidance component is arranged in the installation frame 1, the calibration component is also arranged in the installation frame 1, the cleaning component includes a limit frame 25 fixedly installed between the two installation frames 1, the surfaces of the two limit frames 25 are slidably connected with the moving blocks 24, the ends of the two moving blocks 24 are commonly fixedly installed with the piston cylinder 16, the inner wall of the piston cylinder 16 is slidably connected with the piston plate, the surface of the piston plate is fixedly connected with the piston rod 17, and the end of the piston rod 17 is fixedly connected with the moving frame 23;

[0060] The lower surface of the piston cylinder 16 is fixedly connected to a support plate 1 22, the surface of the support plate 1 22 is fixedly connected to a rotating shaft 20, the surface of the rotating shaft 20 is fixedly connected to a bevel gear 1 21, and the surface of the threaded rod 12 is fixedly connected to a bevel gear 26 meshing with the bevel gear 1 21;

[0061] The upper surface of the second rotating shaft 20 is fixedly connected with the second rotating plate 19 , and the surface of the second rotating plate 19 is fixedly connected with the moving column 18 . The moving column 18 extends into the moving frame 23 and is slidably connected thereto.

[0062] The surface of the piston cylinder 16 is fixedly connected with an air inlet pipe and an air outlet pipe 9, and two one-way valves are respectively arranged on the surface of the air inlet pipe and the air outlet pipe 9. The end of the air outlet pipe 9 is fixedly connected with a cleaning ring 7, and a plurality of air outlets 8 are evenly arranged on the surface of the cleaning ring 7.

[0063] The avoidance component includes a slide groove 31 provided on the surface of the installation frame 1, a slider 32 is slidably connected to the inner wall of the slide groove 31, a stop block 30 is fixedly connected to the surface of the moving block 27, and a return spring 34 is provided between the slider 32 and the inner wall of the slide groove 31;

[0064] The end of the slide block 32 extending out of the slide slot 31 is hinged with a hinge plate 37 , and the end of the hinge plate 37 is hinged to the second moving block 24 .

[0065] The calibration component includes a gear 1 33 fixedly connected to the surface of the threaded rod 12, a support plate 2 35 fixedly connected to the upper surface of the mounting frame 1, a mounting ring is provided on the surface of the support plate 2 35, and the support plate 2 35 is connected to a gear 2 36 meshing with the gear 1 33 by rotating on a fixed axis through the mounting ring;

[0066] The outer surface of the connecting ring 28 is fixedly connected with teeth 29 that mesh with the second gear 36 .

[0067] When this embodiment is used, Figure 1 to Figure 5 As shown, after the two pipes 5 are fixed on the fixed platform 2, the driving motor 14 is turned on, and under the action of the pulley transmission mechanism, the two threaded rods 12 are driven to start rotating. Since the surface of the threaded rod 12 is provided with two oppositely arranged threaded grooves, the rotation of the threaded rod 12 will drive the two moving blocks 27 to move towards each other, thereby causing the two fixed platforms 2 to move towards each other, so that the two pipes 5 can move towards each other.

[0068] like Figure 5 As shown, as the moving block 27 moves, the stop block 30 will also slide in the slide groove 31 until the stop block 30 slides to a position where it abuts against the sliding block 32.

[0069] In the above process, as the threaded rod 12 rotates, the bevel gear 1 21 and the bevel gear 2 26 mesh with each other, and the rotating shaft 20 will rotate synchronously. Figure 3 As shown, with the rotation of the rotating shaft 20, the rotating plate 219 will rotate, so that the moving column 18 can perform a circular motion around the axis of the rotating shaft 21. Since the moving frame 23 slidably connected to the outer surface of the moving column 18 is limited by the piston rod, the circular motion of the moving column 18 will drive the moving frame 23 to move back and forth, so that the piston rod 17 can drive the piston plate to perform a piston motion in the piston cylinder 16, so that the outside air can be sucked in through the air inlet pipe and evenly sprayed out from the multiple air outlets 8 opened on both sides of the surface of the cleaning ring 7, so that the side of the two pipes 5 that are moving towards each other and are welded with the flange 6 can be cleaned, so that the dust and impurities on the connection surface of the two pipes 5 can be cleaned before the two pipes 5 are spliced ​​and installed, thereby ensuring that the connection surface of the pipe 5 can be tightly fitted during the subsequent splicing and installation, thereby improving the sealing performance of the pipe 5 after the splicing and installation is completed, extending its service life in water conservancy projects, and also reducing maintenance costs.

[0070] When the stopper 30 slides in the chute 31 to the position where it contacts the slider 32, the dust and impurities on the mounting surfaces of the two pipes 5 can be cleaned. Figure 5 and Figure 7As shown, the slider 32 will be pushed to move synchronously, and the reset spring 34 will also be compressed. As the slider 32 moves, under the hinged action of the hinged plate 37, the moving block 24 will move away from the bevel gear 26, so that the piston cylinder 16 and the cleaning ring 7 above will move away from the bevel gear 26, and the bevel gear 1 21 will be disengaged from the bevel gear 26.

[0071] That is, as the two pipes 5 continue to move toward each other, Figure 2 As shown, the cleaning ring 7 will move away from the bevel gear 26 and no longer block the moving path of the pipe 5. At this time, as the threaded rod 12 continues to rotate, the two fixed platforms 2 will drive the two pipes 5 to move to a position where they fit together, and as shown in FIG. Figure 4 and Figure 5 As shown, at this time, the two moving blocks 1 27 will also move to the position closest to each other and will be fully engaged with the thread groove on the surface of the threaded rod 12. At the same time, the teeth 29 on the connecting ring 28 will also move to the position engaged with the gear 2 36.

[0072] Then, as the threaded rod 12 continues to rotate, since the moving block 27 is meshed with the thread groove on the surface of the threaded rod 12, the rotation of the threaded rod 12 will not drive the moving block 27 to move, and under the meshing action of the gear 1 33, the gear 2 36 and the tooth 29, the connecting ring 28 on the right side will start to rotate, so that the pipe 5 fixed on the connecting ring 28 can be rotated until the bolt holes on the two flanges 6 are aligned, and then the driving motor 14 is turned off. At this time, the splicing and installation of the two pipes 5 can be completed by fixing the bolts, and the flanges 6 on the surfaces of the two pipes 5 can be aligned without manually turning over the pipes 5, thereby avoiding the safety hazards caused by manual turning over, and also improving the efficiency of the installation of water conservancy project pipes.

[0073] After the two pipes 5 are spliced ​​and installed, the handle is first rotated in the opposite direction to drive the threaded rod 2 42 to rotate in the opposite direction, so that the three rotating plates 1 39 can be deflected in the opposite direction to enable the abutment block to be separated from the pipe 5. At this time, the two spliced ​​pipes 5 can be moved out from either side of the two fixed platforms 2.

[0074] After the pipe 5 is moved out, the driving motor 14 is turned on to rotate in the opposite direction, so that the threaded groove on the surface of the threaded rod 12 can be meshed with the moving block 27 again. At this time, the moving block 27 and the fixed platform 2 can be reset. At the same time, the stop block 30 will also be reset synchronously with the moving block 27. Under the action of the elastic potential energy of the reset spring 34, the moving block 24 and the piston cylinder 16 can be reset to complete the reset of the device.

[0075] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for installing a water conservancy project pipeline, characterized in that: The following steps are involved: S1: Fixing the pipeline before installation, insert the two pipelines (5) into the top of the installation frame (1) from the openings on both sides of the two fixing platforms (2), rotate the second threaded rod (42) to deflect the first rotating plate (39) in the direction close to the center of the fixing ring (41) until the three abutment blocks abut against the outer wall of the pipeline (5); S2: cleaning the contact surface before installing the pipeline. After the two pipelines (5) are fixed, turning on the drive motor (14) to drive the two threaded rods (12) and the rotating shaft (20) to rotate synchronously, that is, the two pipelines (5) move towards each other; The piston cylinder (16) performs piston movement, so that the cleaning ring (7) starts to spray air toward the connection surface of the two pipes (5), thereby cleaning the dust and impurities on the connection surface of the two pipes (5); The surface of the pipe (5) is provided with a flange (6), a fixing plate is fixedly connected between the two installation frames (1), a driving motor (14) is provided on the upper surface of the fixing plate, the output shaft of the driving motor (14) is fixedly connected to a rotating shaft (13), the surfaces of the two installation frames (1) are connected to a threaded rod (12) for rotation, a pulley transmission mechanism is provided between the two threaded rods (12) and the rotating shaft (13), the surface of the threaded rod (12) is provided with two sections of threaded grooves arranged opposite to each other, the surface of the threaded rod (12) is threadedly connected to two symmetrically arranged moving blocks (27), and the upper surface of the moving block (27) is fixedly connected to a fixing platform (2). The fixing platform (2) is provided with a fixing component for fixing the pipeline (5) before installation. A cleaning component is provided at the middle position of the two fixing platforms (2) for cleaning the installation contact surface of the pipeline (5) when the two fixing platforms (2) are moved towards each other for installation. An avoidance component is provided in the installation frame (1) and is in transmission connection with the cleaning component so that after the cleaning component has finished working, the cleaning component moves to the side of the pipeline (5) before the installation contact surfaces of the two pipelines (5) are in contact with each other. A calibration component is provided in the installation frame (1) for aligning the flanges (6) on the surfaces of the two pipelines (5) after the two pipelines (5) are in contact with each other. The fixing component includes a fixed axis rotating shaft. A connecting ring (28) is connected to the surface of the fixing platform (2); the surface of the connecting ring (28) is connected to a fixing ring (41) for fixed axis rotation; the surface of the connecting ring (28) is hingedly connected to a rotating plate (39); the outer surface of the rotating plate (39) is slidably connected to a limit block (40); the surface of the fixing ring (41) is hingedly connected to a hinge rod; the fixing ring (41) is hingedly connected to the limit block (40) via the hinge rod; the surface of the fixing ring (41) is provided with an arc-shaped opening (38) for the limit block (40) to slide; the side of the rotating plate (39) is fixedly connected to an abutment block; the surface of the abutment block is provided with a rubber cushion layer; the surface of the connecting ring (28) is fixedly connected to a connecting block (45). The upper surface of the connecting block 1 (45) is fixedly connected to the connecting block 2, the surface of the connecting ring (28) is fixedly connected to the fixing block (43), the surface of the fixing block (43) is fixedly connected to the threaded rod 2 (42), one end of the threaded rod 2 (42) is fixedly connected to the handle, the other end of the threaded rod 2 (42) passes through the connecting block 2 and is threadedly connected thereto, the cleaning component comprises a limit frame (25) fixedly installed between the two installation frames (1), the surfaces of the two limit frames (25) are slidably connected to the moving blocks 2 (24), the ends of the two moving blocks 2 (24) are fixedly installed with a piston cylinder (16), and the inner wall of the piston cylinder (16) is slidably connected to the piston plate,The surface of the piston plate is fixedly connected to a piston rod (17), the end of the piston rod (17) is fixedly connected to a moving frame (23), the lower surface of the piston cylinder (16) is fixedly connected to a support plate 1 (22), the surface of the support plate 1 (22) is fixedly connected to a rotating shaft 2 (20), the surface of the rotating shaft 2 (20) is fixedly connected to a bevel gear 1 (21), the surface of the threaded rod 1 (12) is fixedly connected to a bevel gear 2 (26) meshing with the bevel gear 1 (21), the upper surface of the rotating shaft 2 (20) is fixedly connected to a rotating plate 2 (19), the surface of the rotating plate 2 (19) is fixedly connected to a moving column (18), the moving column (18) extends into the moving frame (23) and is slidably connected thereto; S3: Aligning and installing the flanges. As the two pipes (5) continue to move toward each other, when the stopper (30) contacts the slider (32), the piston cylinder (16) and the cleaning ring (7) move to the side away from the two pipes (5) so as to no longer block the moving path of the pipes (5); As the threaded rod 1 (12) rotates, the two fixing platforms (2) drive the two pipes (5) to move to a mutually fitting position, and the right connecting ring (28) drives the fixed pipes (5) to rotate synchronously until the bolt holes on the two flanges (6) are aligned, and the two pipes (5) can be installed by fixing the bolts; The avoidance component comprises a slide groove (31) provided on the surface of the installation frame (1); a slider (32) is slidably connected to the inner wall of the slide groove (31); a stop block (30) is fixedly connected to the surface of the moving block 1 (27); a return spring (34) is provided between the slider (32) and the inner wall of the slide groove (31); the end of the slider (32) extending out of the slide groove (31) is hingedly connected to a hinge plate (37); and the end of the hinge plate (37) is hingedly connected to the moving block 2 (24).

2. A method for installing a water conservancy project pipeline according to claim 1, characterized in that: The surface of the piston cylinder (16) is fixedly connected to an air inlet pipe and an air outlet pipe (9), and two one-way valves are respectively provided on the surfaces of the air inlet pipe and the air outlet pipe (9). The end of the air outlet pipe (9) is fixedly connected to a cleaning ring (7), and a plurality of air outlets (8) are evenly provided on the surface of the cleaning ring (7).

3. A method for installing a water conservancy project pipeline according to claim 2, characterized in that: The calibration component comprises a gear 1 (33) fixedly connected to the surface of the threaded rod 1 (12); a support plate 2 (35) is fixedly connected to the upper surface of the mounting frame (1); a mounting ring is provided on the surface of the support plate 2 (35); the support plate 2 (35) is rotatably connected to a gear 2 (36) meshing with the gear 1 (33) via the mounting ring; and teeth (29) meshing with the gear 2 (36) are fixedly connected to the outer surface of the connecting ring (28).

4. A method for installing a water conservancy project pipeline according to claim 3, characterized in that: A support frame (15) is fixedly connected to the upper surface of the installation frame (1), a support block (11) is provided at the end of the support frame (15), and a positioning block (44) is fixedly connected to the surface of the installation frame (1).