Multi-stage planning method and system for integrated energy stations considering electricity-hydrogen coordinated transmission
Through the multi-stage planning method of energy stations, power generation equipment and energy storage equipment are optimized, which solves the problem of insufficient wind and light abandonment and cross-season storage, and realizes the efficient absorption of new energy and complementary advantages of regional resources, and improves the comprehensive Operational reliability of energy stations.
Patent Information
- Application Number
- CN202410813858.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-06-24
AI Technical Summary
The existing comprehensive energy stations have wind and light abandonment phenomena and insufficient cross-season storage, lack of effective hydrogen energy equipment planning methods and inter-regional energy interaction collaborative planning methods, and cannot fully utilize regional resources to achieve new energy consumption and cross-season storage.
A multi-stage planning method for comprehensive energy stations considering the coordinated transmission of electricity and hydrogen is proposed. By establishing a multi-stage expansion model of integrated energy stations, multi-stage expansion model of transmission lines and multi-stage expansion model of hydrogen transmission pipelines, electric load, thermal load and hydrogen are carried out. Load balancing is used to optimize the number of new power generation equipment, energy storage equipment, transmission lines and hydrogen transmission pipelines to minimize total cost.
It has achieved regional coordinated optimization, improved the consumption rate and cross-season storage capacity of new energy, solved the problem of wind and light abandonment, and improved the operating reliability and resource utilization efficiency of comprehensive energy stations.
Smart Images

Figure CN118381020B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of integrated energy planning, and specifically, relates to a multi-stage planning method and system for an integrated energy station taking into account the coordinated transmission of electricity and hydrogen. Background Art
[0002] The integrated energy station includes photovoltaic, onshore wind turbines, offshore wind turbines, thermal power units, nuclear power units, batteries, pumped storage equipment, fuel cells, electrolyzers, electric air conditioners, transmission lines, and hydrogen pipelines. Among them, photovoltaic, onshore wind turbines, offshore wind turbines, thermal power units, nuclear power units, and fuel cells are used as power generation equipment to generate electricity, batteries and pumped storage equipment are used as energy storage equipment for real-time balance of electric power, electrolyzers and electric air conditioners are used as electric loads to consume electricity, and transmission lines and hydrogen pipelines are used as interactive equipment for electricity and hydrogen energy to achieve the interaction of electricity and hydrogen energy between interconnected integrated energy stations. Hydrogen energy, as a form of long-term energy storage, can achieve long-term storage of energy. Under the condition of high proportion of new energy penetration, electrolytic hydrogen production equipment can be connected to the integrated energy station to consume new energy while achieving long-term storage of energy, so as to serve as energy storage when the power is unbalanced.
[0003] In the existing technology, the existing integrated energy stations have the problem of wind and solar power abandonment and insufficient cross-season storage. On the one hand, the planning and design methods for the access of hydrogen energy equipment to integrated energy stations need further research, and on the other hand, the methods for energy interaction and coordinated planning for regionally interconnected integrated energy stations also need to be proposed. In addition, for regionally interconnected integrated energy stations, there is still a lack of modeling and simulation methods for the integration of hydrogen pipeline transportation and storage, so it is impossible to fully utilize regional resources to achieve complementary advantages, and it is impossible to achieve cross-seasonal storage of energy while promoting the consumption of new energy. Summary of the invention
[0004] In order to solve the deficiencies in the prior art, the present invention provides a multi-stage planning method and system for an integrated energy station taking into account the coordinated transmission of electricity and hydrogen, so as to realize the multi-stage expansion planning of interconnected integrated energy stations and simulate the actual operating conditions of transmission lines and hydrogen pipelines.
[0005] The present invention adopts the following technical solution.
[0006] The present invention proposes a multi-stage planning method for an integrated energy station considering the coordinated transmission of electricity and hydrogen. The integrated energy station includes power generation equipment, energy storage equipment, electric loads, transmission lines and hydrogen transmission pipelines, wherein the energy storage equipment includes electric energy storage equipment and hydrogen storage equipment; including:
[0007] Collecting the operating parameters of the integrated energy station;
[0008] Establish a multi-stage expansion model for an integrated energy station, a multi-stage expansion model for a power transmission line, and a multi-stage expansion model for a hydrogen transmission pipeline, and balance the electricity load, cooling and heating load, and hydrogen load of each stage of the integrated energy station; update the multi-stage expansion model for the hydrogen transmission pipeline and the multi-stage expansion model for an integrated energy station based on the electricity load balance, cooling and heating load balance, and hydrogen load balance;
[0009] Based on the multi-stage expansion model of transmission lines, the updated multi-stage expansion model of integrated energy stations and the updated multi-stage expansion model of hydrogen pipelines, with the minimization of the total cost of the integrated energy station in all stages as the optimization goal, the new capacity of power generation equipment and energy storage equipment in the integrated energy station, and the new number of transmission lines and hydrogen pipelines at each stage are determined.
[0010] The multi-stage expansion model of the integrated energy station includes the equipment installed capacity expansion model, the equipment installed capacity constraint model and the joint constraints of the integrated energy station;
[0011] Among them, the joint constraints include: spinning reserve constraints, renewable energy penetration constraints, renewable energy unit operation constraints, thermal power unit operation constraints, nuclear power unit operation constraints, nuclear electrolyzer and fuel cell operation constraints, electric air conditioning operation constraints, electric energy storage equipment operation constraints and hydrogen storage equipment operation constraints.
[0012] The operating constraints of hydrogen storage equipment are:
[0013] ,
[0014] ,
[0015] ,
[0016] In the formula, , The stages Central Region Internal hydrogen storage equipment at all times The amount of hydrogen charged and discharged; For stage Central Region The electrolytic cell in the Input electrical power; For stage Central Region The internal fuel cell is Output electrical power; , are the conversion efficiencies of the electrolyzer and fuel cell, respectively; LHV is the lower calorific value of hydrogen; For stage Central Region Inner Moment The hydrogen load; For stage Central Region The upper limit of the charging and discharging rate of the internal hydrogen storage equipment; is the stage index, For the stage set, is the region index, For the regional set, t is the time index, is the time collection;
[0017] ,
[0018] ,
[0019] ,
[0020] In the formula, For stage Central Region Internal hydrogen storage equipment at all times Storage capacity; For stage Central Region The storage capacity of the internal hydrogen storage device at the end of the zth typical week; For stage Central Region The capacity of the internal hydrogen storage equipment; The charging and discharging efficiency of hydrogen storage equipment; is the unit time interval; is the typical week index; is the end of the zth typical week.
[0021] The multi-stage expansion model of transmission lines includes the multi-stage quantity expansion model of transmission lines and the operation constraints of transmission lines.
[0022] The multi-stage expansion model of hydrogen pipeline includes the multi-stage quantity expansion model of hydrogen pipeline and the operation constraints of hydrogen pipeline;
[0023] The operating constraints of hydrogen pipelines include: constraints on the number of hydrogen pipelines, constraints on the amount of hydrogen, constraints on the power consumption of hydrogen transmission, and constraints on the hydrogen inventory in the pipeline.
[0024] The power consumption constraints for hydrogen transmission are as follows:
[0025] ,
[0026] In the formula, For stage Zhongcong area To the region The hydrogen pipeline is at Power consumption for hydrogen charging and discharging; , They are respectively the power consumption coefficient related to the transport distance and the power consumption coefficient unrelated to the transport distance; For Region To the region The conveying distance between , The stages Zhongcong area To the region The hydrogen pipeline is at The inflow and outflow of
[0027] The hydrogen quantity constraints are as follows:
[0028] ,
[0029] ,
[0030] ,
[0031] In the formula, For stage Zhongcong area To the region The hydrogen pipeline is at The net amount of hydrogen injected; is the maximum flow rate of a single hydrogen pipeline; For stage Zhongcong area To the region The number of hydrogen pipelines.
[0032] The multi-stage expansion model of the hydrogen pipeline is updated based on the balance of electricity load, heat load and hydrogen load, including:
[0033] The power consumption of hydrogen charging and discharging under the balance of electrical load is used to determine the injection and outflow of the hydrogen pipeline based on the power consumption constraint of hydrogen transmission; based on the hydrogen volume constraint, the net hydrogen injection volume is determined according to the injection and outflow volumes;
[0034] According to the balance of cold and hot loads, the output heat power of the combined heat and power of the fuel cell group and the hydrogen load required for the heat load other than the heating power of the electric air conditioner, and the hydrogen load required for the cold load other than the cooling power of the electric air conditioner are determined respectively;
[0035] Based on the hydrogen load balance, the corresponding relationship between the hydrogen load and the hydrogen release amount is determined according to the net hydrogen injection amount and the hydrogen load required for the cold and hot loads;
[0036] According to the corresponding relationship between hydrogen load and hydrogen release amount, the multi-stage expansion model of the integrated energy station is updated.
[0037] The electrical load balance satisfies the following relationship:
[0038] ,
[0039] In the formula,
[0040] , The stages Central Region Equipment in renewable energy units and thermal power units At the moment Output electrical power; It is a collection of equipment for thermal power units; A collection of equipment for renewable energy units; , The stages Central Region The core generator group and fuel cell are in operation at all times Output electrical power; , The stages Central Region Internal energy storage device At the moment Discharge power and charging power; Assemble for energy storage equipment; For stage Zhongcong area To the region At the moment The lines transmit electrical power; For stage Central and external regions At the moment Input electrical power; For stage Central Region The electrolytic cell in the Input electrical power; , For stage Central Region The electric air conditioner in the room is Heating power consumption and cooling power consumption; For stage Zhongcong area To the region The pipeline at the time Power consumption for hydrogen charging and discharging; For stage Central Region Inner Moment The net electrical load; t is the time index, is the time set, For regional sets.
[0041] The hydrogen load balance is performed according to the following relationship:
[0042] ,
[0043] In the formula, For stage Central Region The hydrogen storage tank inside is at The amount of hydrogen released; For stage Central Region The fuel cell group in the cogeneration is Hydrogen consumption; For stage Zhongcong area To the region The pipeline at the time The net amount of hydrogen injected; For stage Central Region Inner Moment The cooling and heating loads also require hydrogen loads; Index for regions; t is the time index, is the time set, For regional sets.
[0044] According to the corresponding relationship between hydrogen load and hydrogen release volume, the multi-stage expansion model of the integrated energy station is updated, including:
[0045] According to the corresponding relationship between hydrogen load and hydrogen release amount, based on the operation constraints of hydrogen storage equipment, the output power of the fuel cell in the next stage is updated;
[0046] The updated output electric power of the fuel cell is used to obtain the updated installed capacity of the equipment in the next stage based on the renewable energy penetration constraint, while satisfying the spinning reserve constraint and the fuel cell operation constraint. Based on the multi-stage expansion model of the integrated energy station, when updating the installed capacity of the equipment in the next stage, the installed capacity of the equipment in the remaining stages is simultaneously updated through conversion between the stages.
[0047] The total cost of an integrated energy station at all stages includes investment cost, maintenance cost and operation cost;
[0048] The optimization goal of the integrated energy station is to minimize the total cost of all stages, satisfying the following relationship:
[0049] ,
[0050] In the formula, is the total cost of all stages; , , Respectively The investment cost, maintenance cost and operation cost of the stage system; is the discount rate.
[0051] The present invention also proposes a multi-stage planning system for an integrated energy station considering the coordinated transmission of electricity and hydrogen, comprising: a collection module, a planning model building module, and a multi-stage planning module;
[0052] A collection module is used to collect the operating parameters of the integrated energy station;
[0053] The planning model building module is used to establish a multi-stage expansion model for an integrated energy station, a multi-stage expansion model for a power transmission line, and a multi-stage expansion model for a hydrogen transmission pipeline, and to balance the electric load, cold and hot load, and hydrogen load of each stage of the integrated energy station; based on the electric load balance, heat load balance, and hydrogen load balance, the multi-stage expansion model for the hydrogen transmission pipeline and the multi-stage expansion model for the integrated energy station are updated;
[0054] The multi-stage planning module is used to determine the additional capacity of power generation equipment and energy storage equipment in the integrated energy station, the additional number of transmission lines and hydrogen pipelines at each stage based on the multi-stage expansion model of transmission lines, the updated multi-stage expansion model of integrated energy stations and the updated multi-stage expansion model of hydrogen pipelines, with the minimum total cost of the integrated energy station in all stages as the optimization goal.
[0055] The beneficial effects of the present invention are that, compared with the prior art, at least the integrated energy stations that take into account regional interconnection can achieve coordinated optimization among regions and make full use of the natural endowments and economic advantages of the regions. Further consideration of hydrogen energy participating in the planning and operation of integrated energy stations can realize the consumption of new energy while realizing the cross-seasonal storage of energy.
[0056] Determining the electric power that can respond to the power consumption of hydrogen charging and discharging under the balance of electric load is more in line with the actual operation and dispatch of the integrated energy station. The power consumption of hydrogen charging and discharging under the balance of electric load is determined based on the power consumption constraint of hydrogen transmission. When new energy is abundant, it is conducive to calling new energy to respond to the power consumption of hydrogen transmission, thereby improving the absorption rate of new energy in the integrated energy station. The stored hydrogen energy can convert hydrogen into electricity in the season of high electricity demand to achieve cross-season storage. In addition, based on the hydrogen volume constraint, the net hydrogen injection amount is determined according to the power consumption of hydrogen charging and discharging, providing more accurate parameters for subsequent hydrogen load balance.
[0057] By updating the multi-stage expansion model of the integrated energy station, the installed capacity of equipment was optimized, ensuring the full mobilization of renewable energy, and solving the problem of wind and solar power abandonment after a high proportion of new energy access. At the same time, through this multi-stage optimization process, the integration of hydrogen energy storage and various equipment in the integrated energy station was achieved, fully leveraging the cross-season storage advantages of hydrogen and improving the operational reliability of the integrated energy station. BRIEF DESCRIPTION OF THE DRAWINGS
[0058] Figure 1 It is a flow chart of the multi-stage planning method of the integrated energy station considering the coordinated transmission of electricity and hydrogen proposed in the present invention;
[0059] Figure 2 It is a schematic diagram of a multi-stage expansion model of an integrated energy station constructed in an embodiment of the present invention. DETAILED DESCRIPTION
[0060] In order to make the purpose, technical scheme and advantages of the present invention clearer, the technical scheme of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The embodiments described in this application are only embodiments of a part of the present invention, rather than all embodiments. Based on the spirit of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the protection scope of the present invention.
[0061] The present invention proposes a multi-stage planning method for an integrated energy station considering the coordinated transmission of electricity and hydrogen, comprising:
[0062] Collecting the operating parameters of the integrated energy station;
[0063] Establish a multi-stage expansion model for an integrated energy station, a multi-stage expansion model for a power transmission line, and a multi-stage expansion model for a hydrogen transmission pipeline, and balance the electrical load, thermal load, and hydrogen load of each stage of the integrated energy station; update the multi-stage expansion model for a hydrogen transmission pipeline and a multi-stage expansion model for an integrated energy station based on the electrical load balance, thermal load balance, and hydrogen load balance;
[0064] Based on the multi-stage expansion model of transmission lines, the updated multi-stage expansion model of integrated energy stations and the updated multi-stage expansion model of hydrogen pipelines, with the minimization of the total cost of the integrated energy station in all stages as the optimization goal, the new capacity of power generation equipment and energy storage equipment in the integrated energy station, and the new number of transmission lines and hydrogen pipelines at each stage are determined.
[0065] Specifically, Figure 1 As shown, including:
[0066] Step 1: Collect the operating parameters of the integrated energy station at the current stage.
[0067] Specifically, the operating parameters of the integrated energy station at the current stage are all parameters used to establish a multi-stage expansion model of the integrated energy station, a multi-stage expansion model of the transmission line, and a multi-stage expansion model of the hydrogen pipeline.
[0068] Step 2: Establish a multi-stage expansion model for the integrated energy station.
[0069] Specifically, the multi-stage expansion model of the integrated energy station includes an equipment installed capacity expansion model, an equipment installed capacity constraint model and joint constraints of the integrated energy station.
[0070] The equipment installed capacity expansion model is used to represent the total installed capacity of different types of equipment in each region in each stage; the equipment installed capacity expansion model is as follows:
[0071] (1)
[0072] In the formula,
[0073] , The stages Central Region Internal unit type Devices in Total installed capacity and newly installed capacity, including: is the stage index, For the stage set, is the region index, For the regional set, For device index, For unit type A collection of devices;
[0074] is the index of the unit type; Represents renewable energy units, including photovoltaic, onshore wind power and offshore wind turbines; tpu Thermal power units, including coal-fired units and gas-fired units of different unit capacities; es Energy storage equipment, including electrical energy storage and pumped hydro; NU For nuclear power plants, fc For fuel cells, elz For electrolytic cell, eac For electric air conditioning.
[0075] , The stages Central Region Internal Type The total installed capacity and newly installed capacity of the equipment.
[0076] The equipment installed capacity constraint model is used to set upper and lower limits for the total installed capacity and newly installed capacity of different types of equipment in each region at each stage; the equipment installed capacity constraint model satisfies the following relationship:
[0077] (2)
[0078] In the formula,
[0079] , The stages Central Region Equipment in renewable energy units Total installed capacity and newly added installed capacity;
[0080] For Region The maximum total installed capacity of renewable energy units within the country; A collection of equipment for renewable energy units.
[0081] The joint constraints of the integrated energy station include spinning reserve constraints, renewable energy penetration constraints, renewable energy unit operation constraints, thermal power unit operation constraints, nuclear power unit operation constraints, nuclear electrolyzer and fuel cell operation constraints, electric air conditioning operation constraints, electric energy storage equipment operation constraints, and hydrogen storage equipment operation constraints.
[0082] 1) The spinning reserve constraints of the integrated energy station are:
[0083] (3)
[0084] In the formula,
[0085] , The stages Central Region Equipment in thermal power units , Energy Storage Equipment At the moment the spinning reserve capacity provided; , The stages Central Region The core generator group and fuel cell are in operation at all times the spinning reserve capacity provided; , are the spinning reserve factors of load and renewable energy, respectively. t is the time index, For time collection.
[0086] (4)
[0087] In the formula, For stage Central Region Equipment in thermal power units At the moment Online capacity; For equipment in thermal power units climbing rate.
[0088] (5)
[0089] In the formula, For stage Central Region The core motor group is at time Online capacity; is the ramp rate of the nuclear power unit.
[0090] (6)
[0091] In the formula, For stage Central Region Internal energy storage device Capacity; For stage Central Region Internal energy storage device At the moment Storage capacity; For energy storage devices The charge and discharge efficiency.
[0092] (7)
[0093] In the formula, For stage Central Region The capacity of the fuel cell unit for combined heat and power generation.
[0094] 2) The renewable energy penetration constraints of the integrated energy station are:
[0095] (8)
[0096] In the formula, ξ s For stage penetration of renewable energy.
[0097] The operating constraints of renewable energy units in integrated energy stations are:
[0098] (9)
[0099] In the formula, For Region Internal renewable energy units At the moment The power generation capacity factor; For stage Central Region Internal renewable energy units capacity.
[0100] 3) The operation constraints of thermal power units in integrated energy stations are:
[0101] (10)
[0102] In the formula, , The stages Central Region Equipment in thermal power units At the moment Startup capacity and shutdown capacity.
[0103] (11)
[0104] (12)
[0105] In the formula, For thermal power units The lower limit of the startup time.
[0106] (13)
[0107] In the formula, For thermal power units The minimum downtime limit.
[0108] (14)
[0109] In the formula, , Thermal power units The lower and upper limits of the output power ratio.
[0110] (15)
[0111] In the formula, For thermal power units climbing rate.
[0112] 4) The operating constraints of nuclear power units in integrated energy stations are:
[0113] (16)
[0114] In the formula, , The stages Central Region The core generator group and fuel cell are in operation at all times the spinning reserve capacity provided;
[0115] (17)
[0116] In the formula, , The stages Central Region The core motor group is at time The startup capacity and shutdown capacity of For stage Central Region The core motor group is at time online capacity.
[0117] (18)
[0118] (19)
[0119] In the formula, , are the minimum startup and shutdown times of nuclear power units, For stage Central Region The capacity of the core generator group.
[0120] (20)
[0121] (twenty one)
[0122] (twenty two)
[0123] In the formula, , are the minimum and maximum output power ratios of nuclear power units, respectively; is the ramp rate of the nuclear power unit; is the annual utilization hours of nuclear power units.
[0124] 5) The operating constraints of nuclear electrolyzers and fuel cells in integrated energy stations are:
[0125] (twenty three)
[0126] (twenty four)
[0127] (25)
[0128] In the formula, is the thermal-to-electric ratio of the fuel cell.
[0129] 6) The operating constraints of the electric air conditioner in the integrated energy station are:
[0130] (26)
[0131] (27)
[0132] In the formula, For stage Central Region The capacity of the internal electric air conditioner;
[0133] (28)
[0134] (29)
[0135] In the formula, , They are the heating coefficient and cooling coefficient of the electric air conditioner respectively.
[0136] 7) The operation constraints of the electric energy storage equipment in the integrated energy station are:
[0137] (30)
[0138] (31)
[0139] (32)
[0140] (33)
[0141] In the formula, For electrical energy storage devices The maximum charge and discharge duration, is the unit time interval, is a positive integer, is the total scheduling time length.
[0142] 8) The operating constraints of the hydrogen storage equipment in the integrated energy station are:
[0143] (34)
[0144] (35)
[0145] (36)
[0146] In the formula, , The stages Central Region Internal hydrogen storage equipment at all times The amount of hydrogen charged and discharged; , are the conversion efficiencies of the electrolyzer and fuel cell, respectively; LHV is the lower calorific value of hydrogen; For stage Central Region The upper limit of the charging and discharging rate of the internal hydrogen storage equipment;
[0147] (37)
[0148] (38)
[0149] (39)
[0150] In the formula, For stage Central Region Internal hydrogen storage equipment at all times Storage capacity; For stage Central Region The storage capacity of the internal hydrogen storage device at the end of the zth typical week; For stage Central Region The capacity of the internal hydrogen storage equipment; The charging and discharging efficiency of hydrogen storage equipment; is the time interval; is the typical week index; is the end of the zth typical week.
[0151] Step 3, establishing a multi-stage expansion model of transmission lines;
[0152] The multi-stage expansion model of transmission lines includes the multi-stage quantity expansion model of transmission lines and the operation constraints of transmission lines;
[0153] Among them, the multi-stage quantity expansion model of transmission lines is as follows:
[0154] (40)
[0155] (41)
[0156] In the formula, For stage Zhongcong area To the region The number of transmission lines between For stage Zhongcong area To the region The number of new transmission lines between.
[0157] Transmission line operation constraints are as follows:
[0158] (42)
[0159] (43)
[0160] (44)
[0161] (45)
[0162] (46)
[0163] (47)
[0164] (48)
[0165] In the formula, is the maximum transmission power of a single transmission line, For stage From external regions to regions Maximum transmission power; For stage The total annual electricity input from external areas to the integrated energy station in the study area.
[0166] Step 4, establishing a multi-stage expansion model of the hydrogen pipeline;
[0167] The multi-stage expansion model of hydrogen pipeline includes the multi-stage quantity expansion model of hydrogen pipeline and the operation constraints of hydrogen pipeline.
[0168] Among them, the multi-stage quantity expansion model of the hydrogen pipeline is:
[0169] (53)
[0170] (54)
[0171] In the formula, For stage Zhongcong area To the region The number of hydrogen pipelines; For stage Zhongcong area To the region The number of new hydrogen pipelines added.
[0172] Hydrogen pipeline operation constraints include:
[0173] 1) Constraints on the number of hydrogen pipelines
[0174] (55)
[0175] (56)
[0176] (57)
[0177] 2) Hydrogen quantity restriction
[0178] (58)
[0179] (59)
[0180] (60)
[0181] In the formula, , The stages Zhongcong area To the region The hydrogen pipeline is at The inflow and outflow of is the maximum flow rate of a single hydrogen pipeline; is the total scheduling duration, here it is 4 typical weeks; For stage Zhongcong area To the region The hydrogen pipeline is at The net amount of hydrogen injected.
[0182] 3) Power consumption constraints for hydrogen transmission
[0183] (61)
[0184] In the formula, For stage Zhongcong area To the region The hydrogen pipeline is at Power consumption for hydrogen charging and discharging; , They are respectively the power consumption coefficient related to the transport distance and the power consumption coefficient unrelated to the transport distance; For Region To the region The conveying distance between them.
[0185] 4) Constraints on hydrogen inventory in pipelines
[0186] (62)
[0187] (63)
[0188] (64)
[0189] In the formula, , The stages Zhongcong area To the region The hydrogen pipeline is at , the amount of pipeline memory at the initial moment; The moment when hydrogen delivery is started; For stage Zhongcong area To the region The hydrogen pipeline is opened at the time of hydrogen delivery The net amount of hydrogen injected; For stage Zhongcong area To the region The hydrogen pipeline is opened at the time of hydrogen delivery The net amount of hydrogen injected; is the unit time interval; It is the storage capacity per unit length of a single hydrogen pipeline; For stage Zhongcong area To the region The amount of hydrogen stored in the pipeline at the end of the zth typical week; is the typical week index; is the end of the zth typical week.
[0190] Step 5, perform electric load balance, cold and hot load balance, and hydrogen load balance for the integrated energy station at each stage; based on the electric load balance, cold and hot load balance, and hydrogen load balance, update the multi-stage expansion model of the hydrogen transmission pipeline and the multi-stage expansion model of the integrated energy station.
[0191] Specifically, step 5 includes:
[0192] Step 5.1, based on the power consumption of hydrogen charging and discharging under electrical load balance, determine the injection and outflow of the hydrogen pipeline based on the power consumption constraint of hydrogen transmission; based on the hydrogen volume constraint, determine the net hydrogen injection amount according to the injection and outflow amounts.
[0193] The electrical load balance satisfies the following relationship:
[0194] (3)
[0195] In the formula,
[0196] , The stages Central Region Equipment in renewable energy units and thermal power units At the moment Output electrical power; It is a collection of equipment for thermal power units; A collection of equipment for renewable energy units; , The stages Central Region The core generator group and fuel cell are in operation at all times Output electrical power; , The stages Central Region Internal energy storage device At the moment Discharge power and charging power; Assemble for energy storage equipment; For stage Zhongcong area To the region At the moment The lines transmit electrical power; For stage Central and external regions At the moment Input electrical power; For stage Central Region The electrolytic cell in the Input electrical power; , For stage Central Region The electric air conditioner in the room is Heating power consumption and cooling power consumption; For stage Zhongcong area To the region The pipeline at the time Power consumption for hydrogen charging and discharging; For stage Central Region Inner Moment The net electrical load; t is the time index, is the time set, For regional sets.
[0197] Determining the electric power that can respond to the electric power consumption of hydrogen charging and discharging under the balance of electric load is more in line with the actual operation and dispatch of the integrated energy station. The electric power consumption of hydrogen charging and discharging under the balance of electric load is determined based on the electric power consumption constraint of hydrogen transmission. When there is a shortage of electric power consumption of hydrogen charging and discharging, it is beneficial to call on new energy to respond to the electric power consumption of hydrogen transmission, thereby improving the absorption rate of new energy in the integrated energy station. When the electric power consumption of hydrogen charging and discharging is surplus, cross-season storage is achieved. In addition, the injection and outflow of the hydrogen transmission pipeline are determined based on the electric power consumption constraint of hydrogen transmission; based on the hydrogen volume constraint, the net hydrogen injection volume is determined according to the injection volume and outflow volume; and more accurate parameters are provided for subsequent hydrogen load balancing.
[0198] Step 5.2, based on the balance of cooling and heating loads, determine the hydrogen load required for the heat load other than the output heat power of the fuel cell group cogeneration and the heating power of the electric air conditioner, and the hydrogen load required for the cooling load other than the cooling power of the electric air conditioner.
[0199] The heat load balance satisfies the following relationship:
[0200] (4)
[0201] In the formula, For stage Central Region The fuel cell group generates heat and power at all times Output thermal power; For stage Central Region The electric air conditioner in the room is Heating power; For stage Central Region Inner Moment heat load.
[0202] (5)
[0203] In the formula, For stage Central Region The electric air conditioner in the room is Refrigeration power; For stage Central Region Inner Moment of cooling load.
[0204] Accurately determine the hydrogen load required for the cold and hot loads, and provide more accurate parameters for subsequent hydrogen load balancing.
[0205] Step 5.3, based on the hydrogen load balance, determine the corresponding relationship between the hydrogen load and the hydrogen release amount according to the net hydrogen injection amount and the hydrogen load required for the cold and hot loads; based on the corresponding relationship between the hydrogen load and the hydrogen release amount, update the multi-stage expansion model of the integrated energy station.
[0206] The hydrogen load balance is performed according to the following relationship:
[0207] (6)
[0208] In the formula, For stage Central Region The hydrogen storage tank inside is at The amount of hydrogen released; For stage Central Region The fuel cell group in the cogeneration is Hydrogen consumption; For stage Zhongcong area To the region The pipeline at the time The net amount of hydrogen injected; For stage Central Region Inner Moment The cooling and heating loads also require hydrogen loads; Index for the region.
[0209] According to the corresponding relationship between hydrogen load and hydrogen release volume, the multi-stage expansion model of the integrated energy station is updated, including:
[0210] According to the corresponding relationship between hydrogen load and hydrogen release amount, based on the operation constraints of hydrogen storage equipment, the output power of the fuel cell in the next stage is updated;
[0211] The updated output electric power of the fuel cell is used to obtain the updated installed capacity of the equipment in the next stage based on the renewable energy penetration constraint, while satisfying the spinning reserve constraint and the fuel cell operation constraint. Based on the multi-stage expansion model of the integrated energy station, when updating the installed capacity of the equipment in the next stage, the installed capacity of the equipment in the remaining stages is simultaneously updated through conversion between the stages.
[0212] Through the access of hydrogen energy storage, the consumption of renewable energy is promoted, the full mobilization of renewable energy is ensured, and the problem of wind and solar power abandonment after large-scale new energy access is solved. At the same time, through this optimization and updating process, the integration of hydrogen energy storage and various equipment in the integrated energy station is realized, giving full play to the cross-season storage advantages of hydrogen and improving the operational reliability of the integrated energy station.
[0213] Step 6: Based on the multi-stage expansion model of transmission lines, the updated multi-stage expansion model of integrated energy stations, and the updated multi-stage expansion model of hydrogen pipelines, with the minimum total cost of the integrated energy station in all stages as the optimization goal, determine the additional capacity of power generation equipment and energy storage equipment in the integrated energy station, and the additional number of transmission lines and hydrogen pipelines at each stage.
[0214] The optimization goals are as follows:
[0215] ,
[0216] In the formula, is the total cost of all stages; , , Respectively The investment cost, maintenance cost and operation cost of the stage system; Preferably, the total number of stages is 4.
[0217] ,
[0218] ,
[0219] ,
[0220] In the formula,
[0221] For type Equipment life span; They are of type The life of the equipment; For stage The type is Equipment Unit investment cost; For stage The type is Unit investment cost of equipment; For stage The type is Equipment Unit maintenance cost; For stage The type is Unit maintenance cost of equipment; , For stage Central Region The inner type is Equipment capacity and additional capacity; , For stage Central Region The inner type is The capacity of the equipment and the additional capacity; , For stage Zhongcong area To the region Type The number of devices and the number of new ones;
[0222] is the probability of occurrence of a typical scenario; Index the years within each stage;
[0223] , Thermal power units variable operating costs and start-up costs; For stage carbon tax; For thermal power units Carbon emissions per unit of power.
[0224] The present invention also proposes a multi-stage planning system for an integrated energy station considering the coordinated transmission of electricity and hydrogen, which is characterized by comprising: a collection module, a planning model building module, and a multi-stage planning module;
[0225] A collection module is used to collect the operating parameters of the integrated energy station;
[0226] The planning model building module is used to establish a multi-stage expansion model for an integrated energy station, a multi-stage expansion model for a power transmission line, and a multi-stage expansion model for a hydrogen transmission pipeline, and to balance the electric load, cold and hot load, and hydrogen load of each stage of the integrated energy station; based on the electric load balance, heat load balance, and hydrogen load balance, the multi-stage expansion model for the hydrogen transmission pipeline and the multi-stage expansion model for the integrated energy station are updated;
[0227] The multi-stage planning module is used to determine the additional capacity of power generation equipment and energy storage equipment in the integrated energy station, the additional number of transmission lines and hydrogen pipelines at each stage based on the multi-stage expansion model of transmission lines, the updated multi-stage expansion model of integrated energy stations and the updated multi-stage expansion model of hydrogen pipelines, with the minimum total cost of the integrated energy station in all stages as the optimization goal.
[0228] The present invention establishes a multi-stage expansion model of a comprehensive energy station, such as Figure 2As shown, the model includes photovoltaic, onshore wind turbines, offshore wind turbines, thermal power units, nuclear power units, batteries, pumped storage equipment, fuel cells, electrolyzers and electric air conditioners. Secondly, a multi-stage expansion model of transmission lines was established to simulate the power transmission of interconnected integrated energy stations. Then, a multi-stage expansion model of hydrogen pipelines was established to model the characteristics of hydrogen pipelines that take into account both transportation and storage to simulate their actual operating conditions. Finally, with the goal of minimizing the total system cost of all stages, combined with the multi-stage expansion model of the integrated energy station, the multi-stage expansion model of the transmission line and the multi-stage expansion model of the hydrogen pipeline, a multi-stage expansion planning framework for interconnected integrated energy stations considering the coordinated transmission of electricity and hydrogen was established to realize the multi-stage expansion planning simulation of the interconnected integrated energy station. Compared with the existing achievements, the multi-stage expansion planning framework for interconnected integrated energy stations considering the coordinated transmission of electricity and hydrogen in the present invention effectively realizes the multi-stage expansion planning of interconnected integrated energy stations and simulates the actual operation of transmission lines and hydrogen pipelines.
[0229] The present disclosure may be a system, a method and / or a computer program product. The computer program product may include a computer-readable storage medium carrying computer-readable program instructions for causing a processor to implement various aspects of the present disclosure.
[0230] A computer-readable storage medium may be a tangible device that can hold and store instructions used by an instruction execution device. A computer-readable storage medium may be, for example, but not limited to, an electrical storage device, a magnetic storage device, an optical storage device, an electromagnetic storage device, a semiconductor storage device, or any suitable combination of the above. More specific examples (a non-exhaustive list) of computer-readable storage media include: a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a static random access memory (SRAM), a portable compact disk read-only memory (CD-ROM), a digital versatile disk (DVD), a memory stick, a floppy disk, a mechanical encoding device, such as a punch card or a raised structure in a groove on which instructions are stored, and any suitable combination of the above. The computer-readable storage medium used herein is not to be interpreted as a transient signal itself, such as a radio wave or other freely propagating electromagnetic wave, an electromagnetic wave propagating through a waveguide or other transmission medium (e.g., a light pulse through a fiber optic cable), or an electrical signal transmitted through a wire.
[0231] The computer-readable program instructions described herein can be downloaded from a computer-readable storage medium to each computing / processing device, or downloaded to an external computer or external storage device via a network, such as the Internet, a local area network, a wide area network, and / or a wireless network. The network can include copper transmission cables, optical fiber transmissions, wireless transmissions, routers, firewalls, switches, gateway computers, and / or edge servers. The network adapter card or network interface in each computing / processing device receives the computer-readable program instructions from the network and forwards the computer-readable program instructions for storage in the computer-readable storage medium in each computing / processing device.
[0232] The computer program instructions for performing the operations of the present disclosure may be assembly instructions, instruction set architecture (ISA) instructions, machine instructions, machine-dependent instructions, microcode, firmware instructions, state setting data, or source code or object code written in any combination of one or more programming languages, including object-oriented programming languages, such as Smalltalk, C++, etc., and conventional procedural programming languages, such as "C" language or similar programming languages. The computer-readable program instructions may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer, partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., using an Internet service provider to connect through the Internet). In some embodiments, by using the state information of the computer-readable program instructions to personalize an electronic circuit, such as a programmable logic circuit, a field programmable gate array (FPGA), or a programmable logic array (PLA), the electronic circuit may execute the computer-readable program instructions, thereby implementing various aspects of the present disclosure.
[0233] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents, and any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A multi-stage planning method for an integrated energy station considering the coordinated transmission of electricity and hydrogen, wherein the integrated energy station includes power generation equipment, energy storage equipment, electric loads, transmission lines, and hydrogen transmission pipelines, wherein the energy storage equipment includes electric energy storage equipment and hydrogen storage equipment; characterized in that: include: Collecting the operating parameters of the integrated energy station; Establish multi-stage expansion models of integrated energy stations, multi-stage expansion models of power transmission lines and multi-stage expansion models of hydrogen transmission pipelines, and balance the electricity load, cold and hot load and hydrogen load of integrated energy stations at each stage. The multi-stage expansion model of integrated energy stations includes equipment installed capacity expansion model, equipment installed capacity constraint model and joint constraints of integrated energy stations; the multi-stage expansion model of power transmission lines includes multi-stage quantity expansion model of transmission lines and transmission line operation constraints; the multi-stage expansion model of hydrogen transmission pipelines includes multi-stage quantity expansion model of hydrogen transmission pipelines and hydrogen transmission pipeline operation constraints; The equipment installed capacity expansion model is as follows: In the formula, , The stages Central Region Internal unit type Devices in Total installed capacity and newly installed capacity, including: is the stage index, For the stage set, is the region index, For the regional set, For device index, For unit type A collection of devices; is the index of the unit type; Represents renewable energy units, including photovoltaic, onshore wind power and offshore wind turbines; tpu Thermal power units, including coal-fired units and gas-fired units of different unit capacities; es Energy storage equipment, including electrical energy storage and pumped hydro; NU For nuclear power plants, fc For fuel cells, elz For electrolytic cell, eac For electric air conditioning; , The stages Central Region Internal Type The total installed capacity and newly added installed capacity of the equipment in the project; The multi-stage quantity expansion model of transmission lines is as follows: In the formula, For stage Zhongcong area To the region The number of transmission lines between For stage Zhongcong area To the region the number of new transmission lines between The multi-stage quantity expansion model of the hydrogen pipeline is as follows: In the formula, For stage Zhongcong area To the region The number of hydrogen pipelines; For stage Zhongcong area To the region The number of new hydrogen pipelines added; The multi-stage expansion model of the hydrogen transmission pipeline and the multi-stage expansion model of the integrated energy station are updated based on the balance of electrical load, balance of cold and heat loads, and balance of hydrogen loads, including: determining the injection amount and outflow amount of the hydrogen transmission pipeline based on the power consumption constraint of hydrogen transmission and the power consumption of hydrogen filling and discharging under the balance of electrical loads; determining the net injection amount of hydrogen based on the injection amount and outflow amount based on the constraint of hydrogen volume; determining the output thermal power of the combined heat and power of the fuel cell group and the hydrogen load required for the heat load other than the heating power of the electric air conditioner, and the hydrogen load required for the cold load other than the cooling power of the electric air conditioner based on the balance of cold and heat loads; determining the corresponding relationship between the hydrogen load and the hydrogen discharge amount based on the hydrogen load balance and the hydrogen load required for the cold and heat loads; According to the correspondence between the hydrogen load and the amount of hydrogen released, the multi-stage expansion model of the integrated energy station is updated; wherein, according to the correspondence between the hydrogen load and the amount of hydrogen released, the multi-stage expansion model of the integrated energy station is updated, including: according to the correspondence between the hydrogen load and the amount of hydrogen released, based on the operation constraints of the hydrogen storage device, the output electric power of the fuel cell in the next stage is updated; the output electric power of the updated fuel cell is obtained, and under the condition that the rotating reserve constraint and the fuel cell operation constraint are simultaneously satisfied, the updated equipment installed capacity of the next stage is obtained based on the renewable energy penetration constraint; and based on the multi-stage expansion model of the integrated energy station, when updating the equipment installed capacity of the next stage, the equipment installed capacity of the remaining stages is simultaneously updated through the conversion between the stages; Based on the multi-stage expansion model of transmission lines, the updated multi-stage expansion model of integrated energy stations and the updated multi-stage expansion model of hydrogen pipelines, with the minimization of the total cost of the integrated energy station in all stages as the optimization goal, the new capacity of power generation equipment and energy storage equipment in the integrated energy station, and the new number of transmission lines and hydrogen pipelines at each stage are determined.
2. The multi-stage planning method for integrated energy stations considering the coordinated transmission of electricity and hydrogen according to claim 1 is characterized in that: The joint constraints include: spinning reserve constraints, renewable energy penetration constraints, renewable energy unit operation constraints, thermal power unit operation constraints, nuclear power unit operation constraints, nuclear electrolyzer and fuel cell operation constraints, electric air conditioning operation constraints, electric energy storage equipment operation constraints, and hydrogen storage equipment operation constraints.
3. The multi-stage planning method for integrated energy stations considering the coordinated transmission of electricity and hydrogen according to claim 2 is characterized in that: The operating constraints of hydrogen storage equipment are: In the formula, , The stages Central Region Internal hydrogen storage equipment at all times The amount of hydrogen charged and discharged; For stage Central Region The electrolytic cell in the Input electrical power; For stage Central Region The internal fuel cell is Output electrical power; , are the conversion efficiencies of the electrolyzer and fuel cell, respectively; LHV is the lower calorific value of hydrogen; For stage Central Region Inner Moment The hydrogen load; For stage Central Region The upper limit of the charging and discharging rate of the internal hydrogen storage equipment; is the stage index, For the stage set, is the region index, For the regional set, t is the time index, is the time collection; In the formula, For stage Central Region Internal hydrogen storage equipment at all times Storage capacity; For stage Central Region The storage capacity of the internal hydrogen storage device at the end of the zth typical week; For stage Central Region The capacity of the internal hydrogen storage equipment; The charging and discharging efficiency of hydrogen storage equipment; is the unit time interval; is the typical week index; is the end of the zth typical week.
4. The multi-stage planning method for integrated energy stations considering the coordinated transmission of electricity and hydrogen according to claim 1 is characterized in that: The operating constraints of hydrogen pipelines include: constraints on the number of hydrogen pipelines, constraints on the amount of hydrogen, constraints on the power consumption of hydrogen transmission, and constraints on the hydrogen inventory in the pipeline.
5. The multi-stage planning method for integrated energy stations considering the coordinated transmission of electricity and hydrogen according to claim 4 is characterized in that: The power consumption constraints for hydrogen transmission are as follows: In the formula, For stage Zhongcong area To the region The hydrogen pipeline is at Power consumption for hydrogen charging and discharging; , They are respectively the power consumption coefficient related to the transport distance and the power consumption coefficient unrelated to the transport distance; For Region To the region The conveying distance between , The stages Zhongcong area To the region The hydrogen pipeline is at The inflow and outflow of The hydrogen quantity constraints are as follows: In the formula, For stage Zhongcong area To the region The hydrogen pipeline is at The net amount of hydrogen injected; is the maximum flow rate of a single hydrogen pipeline; For stage Zhongcong area To the region The number of hydrogen pipelines.
6. The multi-stage planning method for integrated energy stations considering the coordinated transmission of electricity and hydrogen according to claim 1 is characterized in that: The electrical load balance satisfies the following relationship: In the formula, , The stages Central Region Equipment in renewable energy units and thermal power units At the moment Output electrical power; It is a collection of equipment for thermal power units; A collection of equipment for renewable energy units; , The stages Central Region The core generator group and fuel cell are in operation at all times Output electrical power; , The stages Central Region Internal energy storage device At the moment Discharge power and charging power; Assemble for energy storage equipment; For stage Zhongcong area To the region At the moment The lines transmit electrical power; For stage Central and external regions At the moment Input electrical power; For stage Central Region The electrolytic cell in the Input electrical power; , For stage Central Region The electric air conditioner in the room is Heating power consumption and cooling power consumption; For stage Zhongcong area To the region The pipeline at the time Power consumption for hydrogen charging and discharging; For stage Central Region Inner Moment The net electrical load; t is the time index, is the time set, For regional sets.
7. The multi-stage planning method for integrated energy stations considering electricity-hydrogen coordinated transmission according to claim 1 is characterized in that: The hydrogen load balance is performed according to the following relationship: In the formula, For stage Central Region The hydrogen storage tank inside is at The amount of hydrogen released; For stage Central Region The fuel cell group in the cogeneration is Hydrogen consumption; For stage Zhongcong area To the region The pipeline at the time The net amount of hydrogen injected; For stage Central Region Inner Moment The cooling and heating loads also require hydrogen loads; Index for regions; t is the time index, is the time set, For regional sets.
8. The multi-stage planning method for integrated energy stations considering electricity-hydrogen coordinated transmission according to claim 1 is characterized in that: The total cost of an integrated energy station at all stages includes investment cost, maintenance cost and operation cost; The optimization goal of the integrated energy station is to minimize the total cost of all stages, satisfying the following relationship: In the formula, is the total cost of all stages; , , Respectively The investment cost, maintenance cost and operation cost of the stage system; is the discount rate.
9. A multi-stage planning system for an integrated energy station considering the coordinated transmission of electricity and hydrogen, adopting the multi-stage planning method for an integrated energy station considering the coordinated transmission of electricity and hydrogen as claimed in claim 1, characterized in that: include: Acquisition module, planning model building module, multi-stage planning module; A collection module is used to collect the operating parameters of the integrated energy station; The planning model building module is used to establish a multi-stage expansion model for the integrated energy station, a multi-stage expansion model for the power transmission line, and a multi-stage expansion model for the hydrogen transmission pipeline, and to balance the electric load, the cooling load, and the hydrogen load at each stage of the integrated energy station; Update the multi-stage expansion model of hydrogen pipeline and multi-stage expansion model of integrated energy station based on the balance of electricity load, heat load and hydrogen load; The multi-stage planning module is used to determine the additional capacity of power generation equipment and energy storage equipment in the integrated energy station, the additional number of transmission lines and hydrogen pipelines at each stage based on the multi-stage expansion model of transmission lines, the updated multi-stage expansion model of integrated energy stations and the updated multi-stage expansion model of hydrogen pipelines, with the minimum total cost of the integrated energy station in all stages as the optimization goal.