A method for installing a load-bearing overhead insulated cable
By constructing a three-dimensional model and cable installation reference path, the problem of low installation efficiency and poor rationality of overhead insulated cables is solved, accurate and reliable cable installation path planning is achieved, labor costs are reduced and installation efficiency is improved.
Patent Information
- Application Number
- CN202410411036.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-04-08
AI Technical Summary
In the existing technology, the installation efficiency of overhead insulated cables is low, consumes a lot of labor costs, and there are deviations in the rationality of installation, which affects the economics and future planning of cable installation.
By constructing a three-dimensional model of the cable installation area, the cable installation reference path is set, and based on the model, the cable installation feasibility analysis is performed, the cable installation points are determined, and the cable path is optimized and adjusted to improve installation accuracy and efficiency.
It achieves accurate, reliable, economical and reasonable logical support for cable installation, reduces labor costs, improves the rationality and efficiency of the installation path, and is suitable for future cable installation planning.
Smart Images

Figure CN118399256B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of cable installation engineering, and in particular to an installation method for a load-bearing overhead insulated cable. Background Art
[0002] Overhead insulated cable is a special cable product composed of compressed copper and aluminum (alloy) conductors, equipped with an inner shielding layer, weather-resistant insulation materials and an outer shielding layer. This cable not only has the characteristics of power cables for transmitting electric energy, but also has strong mechanical properties, which enables it to show smaller laying spacing, higher safety and reliability, and better resistance to atmospheric aging compared to bare wires.
[0003] Overhead insulated cables are suitable for overhead transmission lines, especially for 10kV transmission lines in power grid construction and transformation, and are recommended as the preferred product for line maintenance and safety. In addition, overhead insulated cables with soft copper wire cores are suitable for transformer downleads, and load-bearing overhead insulated cables are one type of overhead insulated cables.
[0004] However, during the installation of such cables, workers often conduct on-site surveys and decide on the installation locations of each cable section based on their own installation experience and on-site survey data. This method is inefficient and consumes a lot of labor costs. In addition, there are certain deviations in the rationality of the installation of each cable section, which is not conducive to future cable installation planning, and the cable installation cannot achieve the most economical. Summary of the invention
[0005] In view of the above-mentioned shortcomings of the prior art, the present invention provides a method for installing a load-bearing overhead insulated cable, which solves the technical problems raised in the above-mentioned background technology.
[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions:
[0007] A method for installing a load-bearing overhead insulated cable, comprising:
[0008] Setting a cable installation area, selecting a cable access position in the cable installation area, and determining a cable installation reference path in the cable installation area based on the cable access position;
[0009] Acquire the cable installation area, construct a three-dimensional model of the cable installation area within the range limited by the cable installation area, mark the cable installation reference path in the three-dimensional model of the cable installation area, set the cable installation path analysis accuracy, determine the cable installation analysis points on the cable installation reference path based on the cable installation path analysis accuracy, and perform cable installation feasibility analysis on each cable installation analysis point;
[0010] The cable installation feasibility analysis logic of the cable installation analysis point is expressed as:
[0011]
[0012] Where: g(q) is the cable installation feasibility determination value at the cable installation analysis point q; h q h is the altitude of the cable installation analysis point q; q+1 h is the altitude of the cable installation analysis point q+1; min h q Yuh q+1 The smallest set of altitudes; ρ v is the density of the vth type of obstacles in the area where the installation analysis point q is located in the three-dimensional model of the cable installation area; ρ v+1 is the density of the v+1th type of obstacle in the area where the installation analysis point q is located in the three-dimensional model of the cable installation area; ρ v+2 is the density of the v+2th type of obstacles in the area where the installation analysis point q is located in the three-dimensional model of the cable installation area; ω 1 ,ω 2 ,ω 3 is the weight; c is the total number of obstacle types in the area where the installation analysis point q is located in the three-dimensional model of the cable installation area; ρ max is v , v+1 , v+2 The maximum value; ρ min is v , v+1 , v+2 The minimum value in
[0013] Among them, when g(q)∈[0.9,1.1], it means that the installation analysis point q can be used as a cable installation point. Otherwise, it means that the installation analysis point q cannot be used as a cable installation point. The closer the value of g(q) is to 1, the more suitable the installation analysis point q is as a cable installation point. Otherwise, it means that the installation analysis point q is less suitable as a cable installation point.
[0014] The cable installation feasibility analysis result of the cable installation analysis point is obtained. When the analysis result of the cable installation analysis point is that it cannot be used as a cable installation point, based on the cable installation feasibility analysis logic of the cable installation analysis point, cable installation points are searched around the cable installation analysis point that cannot be used as a cable installation point.
[0015] Furthermore, when setting the cable installation area, no less than four groups of position information are uploaded synchronously, and the uploaded position information is interconnected to form a closed area, which is the set cable installation area. When selecting the cable access position in the cable installation area, the system end user manually selects the cable access position, and the selected cable access positions are two groups, and at least one group of cable access positions falls on the boundary of the cable installation area. The cable installation reference path is a line segment within the cable installation area on a straight line determined based on the two groups of cable access positions;
[0016] When the uploaded location information is connected to each other to form a closed area, the straight-line distance between each group of location information is synchronously identified, and the location information with the shortest straight-line distance between adjacent location information is used as the interconnected location information.
[0017] Furthermore, the information contained in the three-dimensional model of the cable installation area includes: the altitude of each position coordinate in the cable installation area, the buildings, structures and plants at each position coordinate in the cable installation area, when the cable installation reference path is marked in the three-dimensional model of the cable installation area, a line of any color different from the color of the three-dimensional model of the cable installation area is covered on the top surface of the three-dimensional model of the cable installation area, and the analysis accuracy of the cable installation path obeys the accuracy limitation logic;
[0018] When the cable installation reference path covers the top surface of the three-dimensional model of the cable installation area, both ends are infinitely extended until both ends of the cable installation reference path are connected to the top surface edge of the three-dimensional model of the cable installation area.
[0019] Furthermore, the precision limitation logic is expressed as:
[0020]
[0021] Where: M is the cable installation path analysis accuracy; m is the set of peaks determined based on altitude in the three-dimensional model of the cable installation area; Pe i is the altitude of the peaks in group i; Va max is the altitude of the highest valley; n is the set of valleys determined based on altitude in the three-dimensional model of the cable installation area; Va j is the altitude of the jth valley; Pe min is the altitude of the lowest peak; d Rp The length of the cable installation reference path covered on the top surface of the three-dimensional model of the cable installation area;
[0022] Among them, when the value of cable installation path analysis accuracy M is used to determine the cable installation analysis point, the value of M is rounded down by truncation method. The cable installation analysis point is: the cable installation reference path covering the top surface of the three-dimensional model of the cable installation area is evenly divided into dRp / M′ groups of line segments are formed, and the endpoints of each group of line segments are represented by M′ which is rounded down.
[0023] Furthermore, based on the cable installation feasibility analysis logic, the feasibility analysis of the installation analysis points on the cable installation reference path is performed sequentially. In the cable installation feasibility analysis logic of the cable installation analysis points, the installation analysis points q and q+1 are two consecutive groups of installation analysis points on the cable installation reference path, and ρ v , v+1 , v+2 They represent the building coverage density, structure coverage density, and plant coverage density in the area where the cable installation analysis point is located, and the weight ω used in the cable installation feasibility analysis logic 1 ,ω 2 ,ω 3 The sum is 1, and ω 1 >ω 2 >ω 3 .
[0024] Furthermore, the area where the cable installation analysis points are located is a circular area with the installation analysis points as the center and a radius defined by half of the distance between two adjacent groups of installation analysis points.
[0025] Furthermore, based on the cable installation feasibility analysis logic of the cable installation analysis point, the operation of searching for cable installation points in the vicinity that cannot be used as cable installation points is as follows:
[0026] The area where the cable installation analysis points that cannot be used as cable installation points are located is obtained, and the outline of the area where the cable installation analysis points are located is equally divided based on M′ to obtain a number of groups of arc segments, and the two end points of each group of arc segments are used as new cable installation analysis points. A circular area is drawn with the new cable installation analysis point as the center of the circle, so that the circular areas drawn on the two end points of a group of arc segments are equal in size and intersect, and there is only one group of intersection points;
[0027] The circular areas drawn with the new cable installation analysis point as the center are recorded as cable installation analysis areas. Installation feasibility analysis is performed on each group of cable installation analysis areas to obtain the cable installation feasibility judgment value of each cable installation analysis area. Based on the cable installation feasibility judgment value of each cable installation analysis area, feasible cable installation points are found.
[0028] Furthermore, after obtaining the cable installation feasibility determination value of each cable installation analysis area, the cable installation analysis areas corresponding to the cable installation feasibility determination values in the range of [0.9, 1.1] are further screened, and the cable installation feasibility determination values corresponding to each screened cable installation analysis area are further compared to obtain a group of cable installation feasibility determination values closest to 1, and the cable installation analysis points corresponding to the cable installation analysis areas of the group of cable installation feasibility determination values are used as cable installation points;
[0029] Among them, when all new cable installation analysis points cannot be used as cable installation points, on a circular area drawn with the new cable installation analysis point as the center and the corresponding cable installation feasibility judgment value closest to 1, the circular area contour is divided into equal parts again based on M′, and the cable installation analysis points and the areas where the analysis points are located are determined again by the arc segments obtained by equal division. The cable installation analysis points and the areas where the analysis points are located are used to search for cable installation points, and so on, until a group of cable installation points is found.
[0030] Furthermore, the cable installation points found around the cable installation analysis points that cannot be used as cable installation points replace the cable installation analysis points that cannot be used as cable installation points in the cable installation reference path.
[0031] Furthermore, all the cable installation analysis points that can be used as cable installation points determined based on the cable installation feasibility analysis logic of the cable installation analysis points are adjacently connected to each other to form a cable installation path.
[0032] Compared with the known public technology, the technical solution provided by the present invention has the following advantages:
[0033] Beneficial effects:
[0034] The present invention provides a method for installing a load-bearing overhead insulated cable. During the execution of the method, a three-dimensional model of the cable installation area is constructed by determining the cable installation area, and a cable installation reference path is set on the model based on the three-dimensional model of the cable installation area. Then, each cable installation point in the cable installation reference path is determined based on the information contained in the three-dimensional model of the cable installation area, so as to finally achieve the purpose of determining the cable installation path, and provide accurate, reliable, economical and reasonable installation logic support for the installation of the cable.
[0035] During the execution of this method, based on the information contained in the three-dimensional model of the cable installation area, the cable installation reference path can be used as the basic path, and the cable installation points can be continuously analyzed, optimized and adjusted. Finally, the cable installation path is determined based on the cable installation points, ensuring more accurate cable installation and facilitating further installation planning of cables in the future. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0037] Figure 1 A schematic diagram of a process for installing a load-bearing overhead insulated cable;
[0038] Figure 2 It is a schematic diagram of the three-dimensional model of the cable installation area in the present invention;
[0039] Figure 3 A schematic diagram of a reference path for cable installation in the present invention;
[0040] Figure 4 This is a schematic diagram of the cable installation path in the present invention;
[0041] The numbers in the figure represent: 1. Top surface of the three-dimensional model of the cable installation area; 2. Cable installation reference path; a. Cable installation analysis point one; b. Cable installation analysis point two. DETAILED DESCRIPTION
[0042] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] The present invention will be further described below in conjunction with the embodiments.
[0044] Embodiment 1:
[0045] A method for installing a load-bearing overhead insulated cable according to this embodiment is as follows: Figure 1 As shown, including:
[0046] Setting a cable installation area, selecting a cable access position in the cable installation area, and determining a cable installation reference path in the cable installation area based on the cable access position;
[0047] Acquire the cable installation area, construct a three-dimensional model of the cable installation area within the range limited by the cable installation area, mark the cable installation reference path in the three-dimensional model of the cable installation area, set the cable installation path analysis accuracy, determine the cable installation analysis points on the cable installation reference path based on the cable installation path analysis accuracy, and perform cable installation feasibility analysis on each cable installation analysis point;
[0048] The cable installation feasibility analysis logic of the cable installation analysis point is expressed as:
[0049]
[0050] Where: g(q) is the cable installation feasibility determination value at the cable installation analysis point q; h q h is the altitude of the cable installation analysis point q; q+1 h is the altitude of the cable installation analysis point q+1; min h q Yuh q+1 The smallest set of altitudes; ρ v is the density of the vth type of obstacles in the area where the installation analysis point q is located in the three-dimensional model of the cable installation area; ρ v+1 is the density of the v+1th type of obstacle in the area where the installation analysis point q is located in the three-dimensional model of the cable installation area; ρ v+2 is the density of the v+2th type of obstacles in the area where the installation analysis point q is located in the three-dimensional model of the cable installation area; ω 1 ,ω 2 ,ω 3 is the weight; c is the total number of obstacle types in the area where the installation analysis point q is located in the three-dimensional model of the cable installation area; ρ max is v , v+1 , v+2 The maximum value; ρ min is v , v+1 , v+2 The minimum value in
[0051] Among them, when g(q)∈[0.9,1.1], it means that the installation analysis point q can be used as a cable installation point. Otherwise, it means that the installation analysis point q cannot be used as a cable installation point. The closer the value of g(q) is to 1, the more suitable the installation analysis point q is as a cable installation point. Otherwise, it means that the installation analysis point q is less suitable as a cable installation point.
[0052] Obtain a cable installation feasibility analysis result of the cable installation analysis point. When the analysis result of the cable installation analysis point is that it cannot be used as a cable installation point, find a cable installation point around the cable installation analysis point that cannot be used as a cable installation point based on the cable installation feasibility analysis logic of the cable installation analysis point.
[0053] The information contained in the three-dimensional model of the cable installation area includes: the altitude of each position coordinate in the cable installation area, the buildings, structures and plants at each position coordinate in the cable installation area, and when the cable installation reference path is marked in the three-dimensional model of the cable installation area, a line of any color different from the color of the three-dimensional model of the cable installation area is covered on the top surface of the three-dimensional model of the cable installation area. The accuracy of the cable installation path analysis is subject to the accuracy limitation logic;
[0054] Wherein, when the cable installation reference path covers the top surface of the three-dimensional model of the cable installation area, both ends are infinitely extended until both ends of the cable installation reference path are connected to the edge of the top surface of the three-dimensional model of the cable installation area;
[0055] The precision limitation logic is expressed as:
[0056]
[0057] Where: M is the cable installation path analysis accuracy; m is the set of peaks determined based on altitude in the three-dimensional model of the cable installation area; Pe i is the altitude of the peaks in group i; Va max is the altitude of the highest valley; n is the set of valleys determined based on altitude in the three-dimensional model of the cable installation area; Va j is the altitude of the jth valley; Pe min is the altitude of the lowest peak; d Rp The length of the cable installation reference path covered on the top surface of the three-dimensional model of the cable installation area;
[0058] Among them, when the value of cable installation path analysis accuracy M is used to determine the cable installation analysis point, the value of M is rounded down by truncation method. The cable installation analysis point is: the cable installation reference path covering the top surface of the three-dimensional model of the cable installation area is evenly divided into d Rp / M′ groups of line segments are formed, and the endpoints of each group of line segments are represented by M′ which is rounded down.
[0059] In this embodiment, through the execution of the above method, a refined method for obtaining the cable installation path is provided, which effectively reduces the labor cost incurred in the cable installation path planning process, improves the rationality, efficiency and economy of the cable installation path, and effectively maintains the subsequent planning conditions of the cable, ensuring that the cable installation path can be determined and applied more quickly.
[0060] On the other hand, refer to Figure 2 As shown in the figure, the three-dimensional model of the cable installation area constructed in the method is further shown. Figure 3 The cable installation reference path 2 is further shown as a mark covering the top surface 1 of the three-dimensional model of the cable installation area. Figure 4As indicated by the middle arrow, the cable installation reference path 2 marked and covered on the top surface 1 of the three-dimensional model of the cable installation area is converted into a cable installation analysis point, and then the entire process of determining the cable installation path is determined based on the cable installation analysis point.
[0061] Embodiment 2:
[0062] In terms of specific implementation, based on Example 1, this example refers to Figure 1 The installation method of a load-bearing overhead insulated cable in Example 1 is further described in detail:
[0063] When setting the cable installation area, no less than four groups of location information are uploaded synchronously, and the uploaded location information is interconnected to form a closed area, which is the set cable installation area. When selecting the cable access position in the cable installation area, the system end user manually selects the cable access position, and the selected cable access position is two groups, and at least one group of cable access positions falls on the boundary of the cable installation area. The cable installation reference path is a line segment within the cable installation area on a straight line determined based on the two groups of cable access positions;
[0064] When the uploaded location information is connected to each other to form a closed area, the straight-line distance between each group of location information is synchronously identified, and the location information with the shortest straight-line distance between adjacent location information is used as the interconnected location information.
[0065] Through the above settings, the setting logic of the cable installation area and the cable installation reference path is further limited.
[0066] like Figure 1 As shown, based on the cable installation feasibility analysis logic, the feasibility analysis of the installation analysis points on the cable installation reference path is performed sequentially. In the cable installation feasibility analysis logic of the cable installation analysis points, the installation analysis points q and q+1 are two consecutive groups of installation analysis points on the cable installation reference path, ρ v , v+1 , v+2 They represent the building coverage density, structure coverage density, and plant coverage density in the area where the cable installation analysis point is located, and the weight ω used in the cable installation feasibility analysis logic 1 ,ω 2 ,ω 3 The sum is 1, and ω 1 >ω 2 >ω 3 ;
[0067] The area where the cable installation analysis points are located is a circular area with the installation analysis points as the center and half of the distance between two adjacent groups of installation analysis points as the radius.
[0068] Through the expression operation of the cable installation feasibility analysis logic set as the cable installation analysis point, further parameter settings are provided to ensure the stable operation of the cable installation feasibility analysis logic of the cable installation analysis point and to analyze the cable installation feasibility of the cable installation analysis point.
[0069] Embodiment three:
[0070] In terms of specific implementation, based on Example 1, this example refers to Figure 1 The installation method of a load-bearing overhead insulated cable in Example 1 is further described in detail:
[0071] Based on the cable installation feasibility analysis logic of the cable installation analysis point, the operation of finding cable installation points in the vicinity that cannot be used as cable installation points is as follows:
[0072] The area where the cable installation analysis points that cannot be used as cable installation points are located is obtained, and the outline of the area where the cable installation analysis points are located is equally divided based on M′ to obtain a number of groups of arc segments, and the two end points of each group of arc segments are used as new cable installation analysis points. A circular area is drawn with the new cable installation analysis point as the center of the circle, so that the circular areas drawn on the two end points of a group of arc segments are equal in size and intersect, and there is only one group of intersection points;
[0073] The circular areas drawn with the new cable installation analysis point as the center are all recorded as cable installation analysis areas, installation feasibility analysis is performed on each group of cable installation analysis areas, a cable installation feasibility determination value of each cable installation analysis area is obtained, and a feasible cable installation point is found based on the cable installation feasibility determination value of each cable installation analysis area;
[0074] After obtaining the cable installation feasibility determination value of each cable installation analysis area, further screen the cable installation analysis areas corresponding to the cable installation feasibility determination values in the range of [0.9, 1.1], further compare the cable installation feasibility determination values corresponding to each screened cable installation analysis area, obtain a group of cable installation feasibility determination values closest to 1, and use the cable installation analysis points corresponding to the cable installation analysis areas of this group of cable installation feasibility determination values as cable installation points;
[0075] Among them, when all new cable installation analysis points cannot be used as cable installation points, on a circular area drawn with the new cable installation analysis point as the center and the corresponding cable installation feasibility judgment value closest to 1, the circular area contour is divided into equal parts again based on M′, and the cable installation analysis points and the areas where the analysis points are located are determined again by the arc segments obtained by equal division. The cable installation analysis points and the areas where the analysis points are located are used to search for cable installation points, and so on, until a group of cable installation points is found.
[0076] Through the above settings, the specific operation steps when searching for cable installation points around cable installation analysis points that cannot be used as cable installation points are further limited, providing a guarantee for the final setting of the cable installation path.
[0077] like Figure 1 As shown, the cable installation points found around the cable installation analysis points that cannot be used as cable installation points replace the cable installation analysis points that cannot be used as cable installation points in the cable installation reference path;
[0078] All the cable installation analysis points that can be used as cable installation points determined based on the cable installation feasibility analysis logic of the cable installation analysis points are adjacently connected to each other to form a cable installation path.
[0079] Through the above settings, the final generation logic of the cable installation path is further limited, ensuring that this embodiment can stably output the final cable installation path based on a method of an embodiment.
[0080] In summary, during the execution of the method in the above embodiment, a three-dimensional model of the cable installation area is constructed by determining the cable installation area, and further based on the three-dimensional model of the cable installation area, a cable installation reference path is set on the model, and then each cable installation point in the cable installation reference path is judged based on the information contained in the three-dimensional model of the cable installation area, so as to finally achieve the purpose of determining the cable installation path, and provide accurate, reliable, economical and reasonable installation logic support for the installation of the cable; and during the execution of the method, based on the information contained in the three-dimensional model of the cable installation area, the cable installation reference path can be used as the basic path, and the cable installation points can be continuously analyzed, optimized and adjusted, and finally the cable installation path is determined based on the cable installation points, so as to ensure more accurate cable installation and facilitate further installation planning of cables in the future.
[0081] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for installing a load-bearing overhead insulated cable, It is characterized in that include: Setting a cable installation area, selecting a cable access position in the cable installation area, and determining a cable installation reference path in the cable installation area based on the cable access position; Acquire the cable installation area, construct a three-dimensional model of the cable installation area within the range limited by the cable installation area, mark the cable installation reference path in the three-dimensional model of the cable installation area, set the cable installation path analysis accuracy, determine the cable installation analysis points on the cable installation reference path based on the cable installation path analysis accuracy, and perform cable installation feasibility analysis on each cable installation analysis point; The cable installation feasibility analysis logic of the cable installation analysis point is expressed as: ; Where: is the cable installation feasibility determination value of the cable installation analysis point q; The altitude of the analysis point q for the cable installation; The altitude of the cable installation analysis point q+1; for At The smallest group of elevations; is the density of the vth type of obstacles in the area where the installation analysis point q is located in the three-dimensional model of the cable installation area; is the density of the v+1th type of obstacle in the area where the installation analysis point q is located in the three-dimensional model of the cable installation area; is the density of the v+2th type of obstacles in the area where the installation analysis point q is located in the three-dimensional model of the cable installation area; , , is the weight; is the total number of obstacle types in the area where the installation analysis point q is located in the three-dimensional model of the cable installation area; for , , The maximum value; for , , The minimum value; in, ∈[0.9,1.1] indicates that the installation analysis point q can be used as a cable installation point. Otherwise, it indicates that the installation analysis point q cannot be used as a cable installation point. The closer the value is to 1, the more suitable the installation analysis point q is as the cable installation point. Conversely, the less suitable the installation analysis point q is as the cable installation point. Obtain a cable installation feasibility analysis result of the cable installation analysis point. When the analysis result of the cable installation analysis point is that it cannot be used as a cable installation point, find a cable installation point around the cable installation analysis point that cannot be used as a cable installation point based on the cable installation feasibility analysis logic of the cable installation analysis point. The information contained in the three-dimensional model of the cable installation area includes: the altitude of each position coordinate in the cable installation area, the buildings, structures and plants at each position coordinate in the cable installation area, when the cable installation reference path is marked in the three-dimensional model of the cable installation area, a line of any color different from the color of the three-dimensional model of the cable installation area is covered on the top surface of the three-dimensional model of the cable installation area, and the analysis accuracy of the cable installation path is subject to the accuracy limitation logic; Wherein, when the cable installation reference path covers the top surface of the three-dimensional model of the cable installation area, both ends are infinitely extended until both ends of the cable installation reference path are connected to the edge of the top surface of the three-dimensional model of the cable installation area; The precision limitation logic is expressed as: ; Where: Analyze the accuracy of cable installation path; It is a collection of peaks determined based on elevation in the three-dimensional model of the cable installation area; is the altitude of the peaks in group i; is the elevation of the highest valley; A collection of valleys determined based on elevation in a three-dimensional model of the cable installation area; is the altitude of the jth group of valleys; is the elevation of the lowest peak; The length of the cable installation reference path covered on the top surface of the three-dimensional model of the cable installation area; Among them, the cable installation path analysis accuracy When the value of is used to determine the cable installation analysis point, The value is rounded down by truncation. The cable installation analysis point is: the cable installation reference path covering the top surface of the 3D model of the cable installation area is evenly divided. After grouping the line segments, the endpoints of each group of line segments are Indicates the rounded down .
2. A method for installing a load-bearing overhead insulated cable according to claim 1, It is characterized in that When setting the cable installation area, no less than four groups of position information are uploaded synchronously, and the uploaded position information is interconnected to form a closed area, which is the set cable installation area. When selecting cable access positions in the cable installation area, the cable access positions are manually selected by the system end user, and the selected cable access positions are two groups, and at least one group of cable access positions falls on the boundary of the cable installation area. The cable installation reference path is a line segment within the cable installation area on a straight line determined based on the two groups of cable access positions; When the uploaded location information is connected to each other to form a closed area, the straight-line distance between each group of location information is synchronously identified, and the location information with the shortest straight-line distance between adjacent location information is used as the interconnected location information.
3. A method for installing a load-bearing overhead insulated cable according to claim 2, It is characterized in that Based on the cable installation feasibility analysis logic, the installation analysis points on the cable installation reference path are sequentially subjected to feasibility analysis. In the cable installation feasibility analysis logic of the cable installation analysis points, the installation analysis points q and q+1 are two consecutive groups of installation analysis points on the cable installation reference path. , , Respectively represent the building coverage density, structure coverage density, and plant coverage density in the area where the cable installation analysis point is located, and the weights used in the cable installation feasibility analysis logic , , The sum is 1, and > > .
4. A method for installing a load-bearing overhead insulated cable according to claim 3, It is characterized in that The area where the cable installation analysis points are located is a circular area with the installation analysis points as the center and half of the distance between two adjacent groups of installation analysis points as the radius.
5. A method for installing a load-bearing overhead insulated cable according to claim 4, It is characterized in that Based on the cable installation feasibility analysis logic of the cable installation analysis point, the operation of finding cable installation points in the vicinity that cannot be used as cable installation points is as follows: Get the area where the cable installation analysis point that cannot be used as a cable installation point is located, and the outline of the area where the cable installation analysis point is located is based on Divide the arc segments equally to obtain several groups of arc segments, take the two end points of each group of arc segments as new cable installation analysis points, and draw circular areas with the new cable installation analysis points as the center of the circle, so that the circular areas drawn on the two end points of a group of arc segments are equal in size and intersect, and there is only one group of intersection points; The circular areas drawn with the new cable installation analysis point as the center are recorded as cable installation analysis areas. Installation feasibility analysis is performed on each group of cable installation analysis areas to obtain the cable installation feasibility judgment value of each cable installation analysis area. Based on the cable installation feasibility judgment value of each cable installation analysis area, feasible cable installation points are found.
6. A method for installing a load-bearing overhead insulated cable according to claim 5, It is characterized in that After obtaining the cable installation feasibility determination value of each cable installation analysis area, further screen the cable installation analysis areas corresponding to the cable installation feasibility determination values in the range of [0.9, 1.1], further compare the cable installation feasibility determination values corresponding to each screened cable installation analysis area, obtain a group of cable installation feasibility determination values closest to 1, and use the cable installation analysis points corresponding to the cable installation analysis areas of this group of cable installation feasibility determination values as cable installation points; Among them, when all new cable installation analysis points cannot be used as cable installation points, on a group of circular areas drawn with the new cable installation analysis points as the center and the corresponding cable installation feasibility judgment value closest to 1, the circular area contour is again based on The cable installation analysis points and the areas where the analysis points are located are determined again by the arc segments obtained by the equal division. The cable installation analysis points and the areas where the analysis points are located are used to search for the cable installation points, and so on, until a group of cable installation points are found.
7. A method for installing a load-bearing overhead insulated cable according to claim 6, It is characterized in that The cable installation points found around the cable installation analysis points that cannot be used as cable installation points replace the cable installation analysis points that cannot be used as cable installation points in the cable installation reference path.
8. A method for installing a load-bearing overhead insulated cable according to claim 1, It is characterized in that All the cable installation analysis points that can be used as cable installation points determined based on the cable installation feasibility analysis logic of the cable installation analysis points are adjacently connected to each other to form a cable installation path.