A method for detecting assembly accuracy of double-deck car frame of passenger elevator
By simulating shaft detection and adjustment, the problem of assembly accuracy detection of passenger elevator double-decker car frames is solved, precise assembly and correction is achieved, the safety and stability of the elevator is improved, the operation process is simplified and the cost is reduced.
Patent Information
- Application Number
- CN202410899045.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-07-05
AI Technical Summary
The existing technology is difficult to effectively detect and adjust the assembly accuracy of passenger elevator double-decker car frames, resulting in metrological accuracy errors and safety hazards during installation, and lacks national and industry mandatory standards for double-decker car frames.
The simulated shaft is used to assemble and test the finished product of the double-layer car frame parts. Through measuring and adjusting the measuring tool, we ensure that the perpendicularity, parallelism and gap values of each moving structure are in line with the technical requirements, and the overall inspection of the double-layer car frame is realized. with correction.
Improve the machining accuracy of the double-layer car frame, reduce the metrological accuracy error caused by installation, reduce safety hazards in elevator operation, improve the fixing accuracy and stability of the rope head plate, simplify the operation process, and reduce the implementation cost. .
Smart Images

Figure CN118419728B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of precision detection, and in particular to a method for detecting the assembly precision of a double-deck car frame of a passenger elevator. Background Art
[0002] Elevator is the general term for vertical transportation tools and fixed lifting equipment in buildings. Different types of elevators are set up according to the height, purpose and passenger flow (or logistics flow) of the building. In terms of purpose, it mainly consists of passenger elevators, cargo elevators, medical elevators, miscellaneous elevators, sightseeing elevators, vehicle elevators, ship elevators, construction elevators, etc. Passenger elevators are special elevators for transporting passengers. They require complete safety facilities and certain interior decoration. They are the most widely used elevators at present. With the popularization of high-rise buildings (structures), the market application prospects of passenger elevators are extremely broad.
[0003] The function of an elevator is to lift vertically in a building. Its working principle is that the two ends of the traction rope are connected to the car and the counterweight respectively, and are wound around the traction wheel and the guide wheel; the traction motor drives the traction wheel to rotate after the speed is changed by the reducer, and the traction force generated by the friction between the traction rope and the traction wheel is used to realize the lifting and lowering movement of the car and the counterweight to achieve the purpose of transportation. Therefore, the elevator is mainly composed of a traction machine (winch), a guide system, a counterweight device, a safety device, an electric traction system, a signal control system, a hall door and a car. The various functional parts of the elevator are installed in the shaft and the machine room of the building respectively. Usually, a wire rope friction transmission is used. The wire rope is passed around the traction wheel, and the two ends are connected to the car and the counterweight (counterweight) respectively. The motor drives the traction wheel to lift the car. As a vertical lifting equipment for buildings, elevators have strict requirements for safety and reliability, high transportation efficiency, accurate leveling and comfortable riding.
[0004] Passenger elevators are electric motor-powered vertical lifts equipped with a box-type cabin (car), serving as fixed lifting equipment for specified floors. They are characterized by having a car running between at least two vertical rigid guide rails, with a car size and structure that facilitates passengers to enter and exit or load and unload goods, and must be extremely safe while taking into account comfort.
[0005] The car frame (hanger) is the load-bearing mechanism of the car. The load of the car (including its own weight and load) is transmitted to the traction wire rope by the car frame. When the safety clamp is activated or the bottom hits the buffer, it must also withstand the reaction force caused by this; therefore, the car frame must have sufficient strength, rigidity and impact load resistance.
[0006] In terms of function, the car frame is composed of upper beams, lower beams (bottom beams), columns (side beams) and pull rods (pull rods), and its function is to fix and suspend the car; guide shoes are fixed at both ends of the upper and lower beams to guide the car to move up and down along the guide rails and maintain the car in a horizontal position in the preset shaft of the building; a safety clamp is installed on the lower beam, and when the elevator falls due to overspeed, the safety clamp can clamp the car on the guide rail driven by the speed limiter; at the same time, the upper beam is also equipped with a fixed rope suspension plate or a car top anti-rope pulley to suspend the car.
[0007] Structurally, the car frame is a rectangular frame structure consisting of an upper beam, a lower beam (bottom beam), and columns (side beams); the upper beam is located at the top of the car frame, the lower beam (bottom beam) is located at the bottom of the car frame, and the columns (side beams) are located on both sides of the car frame; their function is to bear the entire weight of the car body and to stabilize vertical operation. The pull rods (pull bars) are located around the car frame and are used in pairs. Their function is to adjust the level of the car floor and prevent the floor from tilting. Therefore, safety performance is extremely important for the car frame. Therefore, for the components of the car body, sufficient strength, rigidity, impact load resistance, and fatigue resistance are key factors that must be considered. The technical requirements of the car frame need to be met through materials, structures, processing technology, installation technology, etc.
[0008] At present, traditional single-shaft single-layer car elevators are widely used. The carrying efficiency of single-shaft and single-layer car cannot meet the needs of super-high-rise buildings and commercial buildings with large passenger flow. How to improve the carrying efficiency can only be achieved by increasing the number of elevator shafts. Although this solves the problem of carrying efficiency, as the number of elevator shafts increases, it not only occupies the usable area of the building, but also increases the construction cost and subsequent maintenance costs of the owner.
[0009] In terms of structural function, the double-layer car frame is a superposition on the basis of the traditional single-shaft single-layer car, which can meet the carrying requirements of the passengers on the upper and lower floors adjacent to each other, and increase the carrying capacity of the elevator without the need for an intelligent control system. Therefore, it can meet the needs of commercial, office, and residential buildings with large passenger flow, and has low requirements for intelligent control systems. It can be modified and used in the single shaft of existing buildings, so it has broad market application prospects. However, the double-layer car frame is not a simple superposition on the single-layer car frame, but requires the redesign and production of the car frame structure, materials, processing and assembly, etc., and the processing and assembly accuracy requirements of the double-sided car frame are much higher than those of the single-layer car frame. Therefore, in the elevator manufacturing industry, there are not many companies that can produce and process double-layer car frames. The reason is that the assembly of double-layer car frames is difficult.
[0010] At present, the double-deck car frame used in passenger (passenger) elevators is mainly composed of upper beams, middle beams, lower beams, columns and other device components. The structure is different from that of the single-deck car frame in that the height is doubled (the height of the column is doubled), and a middle beam is added in the middle of the vertical direction (the middle of the column). Instead, it is significantly different in load-bearing, transmission, and safety structure. A lever structure and a spring shock-absorbing structure are used to ensure the safety, comfort, and stability of the double-deck car frame when it reciprocates at high speed in the elevator shaft.
[0011] From the structural point of view, the double-deck car frame for passenger elevators consists of a group of 2 upper beams, a group of 2 lower beams, a group of 2 middle cross beams, and 4 groups of 8 columns, forming a 2-layer rectangular frame structure. Among them:
[0012] The upper beam is composed of a cable rod, a cable rod spring, a lifting ring, a connecting plate, an upper beam plate, a rope head plate, a fixing plate, a wedge block, etc., and is arranged symmetrically along the length of the upper beam. Its structure and function are mainly: the upper cable rod passes through the lifting wire rope, and the wire rope has two ends, one end is passed through the upper part of the steel cable sleeve in the middle of the car upper beam, and the middle is wound on the traction wheel and the traction machine wheel, and the other end is passed through the upper part of the counterweight rope head. When passing through the winding wire rope, it is necessary to ensure the pre-tightening amount of each wire rope to ensure that the wire rope does not shake when the elevator is in working state; at the same time, the upper beam rope head spring can supplement the buffering rebound effect of the wire rope. When the elevator enters the working state, the upper spring can supplement the shock absorption effect of the elevator to ensure the comfort of passengers and the stability of the car during operation. Therefore, when assembling the upper beam, in addition to the shape (shape) position (position) accuracy of each structural component, the pre-tightening accuracy of the wire rope is also a difficult point in the assembly of the upper beam.
[0013] The lower beam is composed of the lower beam plate, tension spring, lever, connecting plate, rope head plate, steel locking rod, fixed plate, pull rod, linkage arm, steel cable sleeve, side plate, lever pull plate, etc. Its structure and function are mainly: first fix the middle rope head plate and connecting plate and the lower beam group, then pass through the levers at both ends of the lower beam, and then lock it after adjusting the middle pull rod. Wedge block adjustment is required to ensure the center of the linkage arm and the lever pull plate. If the center is offset, the speed limiter will jump and escape during the operation of the elevator, causing the elevator to slide down quickly, the speed limiter cannot work effectively, and the safety clamp cannot be opened. This is a major safety hazard in the operation of the elevator and a difficult point in the assembly of the lower beam.
[0014] The 8 columns are welded in groups of 2 with a horizontal bar in the middle. There are 4 groups in total, 2 groups on the upper and lower layers. Since the height of the double-layer car frame is twice that of the ordinary single-layer car frame, when the elevator is reciprocating at high speed, the car column is too high and it is easy to shake. Only by increasing the rigidity and strength of the column can the shaking of the car frame be reduced and the comfort of passengers be improved. Therefore, the installation of the column is also a key link in the operation skills of the double-layer car frame assembly.
[0015] As for the double-decker car frame, since there are two cars in the vertical direction, the rocking of the car will be greater than that of the single-decker car frame when the elevator is reciprocating at high speed, and the comfort of the passengers will be affected to a certain extent; therefore, a set of compensation devices (composed of two spring shock-absorbing structures) is added to the lower part of the lower beam of the double-decker car frame, which can effectively reduce the rocking of the elevator during high-speed reciprocating operation; the middle crossbeam is two equal-length right-angled U-shaped beams, whose function is to carry the upper car and fix it firmly. In order to reduce the rocking of the upper car frame, a shock-absorbing structure composed of two springs is also set on the top of the upper car.
[0016] The utility model "A vertical test device for the preparation accuracy of passenger elevator car frames" with patent number ZL202221853935.0 is a finished product inspection device for passenger (passenger) elevators. It adopts a "completely integrated" structure and sets relevant structural parts around the shaft frame. It is used for the processing and assembly accuracy inspection of the finished products of TP and TJ series machine room single and machine roomless car frames before leaving the factory, to prevent the operation collision and blockage of the column (vertical beam) structural parts during on-site installation. However, since the double-layer car frame is not two independent single-layer car frames vertically stacked, it cannot meet the requirements of the double-layer car frame's component assembly and finished product inspection and verification operations.
[0017] The utility model with patent number ZL202221853938.4, "A simulated shaft device for testing passenger elevator motion structure components", is also a finished product testing equipment for passenger (passenger) elevators. It adopts a "split integrated" structure and consists of two relatively independent parts, the top support transmission mechanism and the rectangular shaft. The rectangular shaft simulates the motion trajectories of the car frame and the counterweight frame respectively. It is suitable for the parts processing and finished product assembly accuracy inspection under the linkage working conditions of the TP and TJ series car frames with single and no machine rooms and counterweight devices. The car frame and counterweight frame must be linked for detection. However, the counterweight frame corresponding to the double-layer car frame is different in structure and installation method from the single-layer car frame. The processing and assembly of double-layer car frame parts do not involve the counterweight frame, so it does not conform to the simulated shaft provided by the utility model.
[0018] In summary, there are no national or industry mandatory standards for the preparation, processing and offline assembly of double-layer car frame parts. Usually, the standards of single-layer car frames are referred to, or the internal technical documents of leading enterprises in the elevator manufacturing industry are used as the technical basis for the processing and assembly of double-layer car frames. Although it can meet the market demand for double-layer car frames, there are still some shortcomings, namely:
[0019] 1) The pre-tightening operation of the upper beam wire rope is difficult: there is a lack of effective methods for pre-tightening the wire rope with the traction wheel and traction machine wheel after passing through the steel cable sleeve. Most of them refer to the process parameters when assembling a single-layer car frame, which is not very targeted, and the operation process is complicated, which requires high skills and experience of the operators.
[0020] 2) The adjustment of the center degree of the lower beam is difficult: the process of using wedges to adjust the center degree of the linkage arm and the center pull plate is cumbersome and labor-intensive, and the one-time adjustment rate is low. It requires multiple adjustments and measurements, and the operation process is complicated, requiring high skills and experience from the operators.
[0021] 3) The installation and adjustment of the car frame spring shock absorber is difficult: Since there are multiple spring shock absorbers on the car frame, each set of devices has independent functions and needs to be used in conjunction, and the spring itself does not belong to a rigid structure and connection, and the randomness of shock absorption is relatively large, so the installation accuracy is more stringent to ensure that the dial indicator for shock absorption is effective and avoid vibration during elevator operation at the source, which requires high skills and experience of the operating personnel.
[0022] 4) Inconvenience in finished product inspection (assembly accuracy verification): Finished product inspection assembles the parts involved in the double-layer car frame into shape, installs them in a simulated building elevator shaft, and inspects their operating status under finished product working conditions. This is a comprehensive inspection of the accuracy of parts preparation and finished product assembly. Inspect the installation accuracy of guide shoes and safety clamps, as well as the geometric accuracy and position deviation of the frame structure of the double-layer car frame. In addition to conducting simulated shaft inspections on parts processed for the first time or finished products assembled for the first time, random inspections are conducted on each batch of double-layer car frames to check the measurement accuracy errors caused by the processing and assembly of each moving structural part, and abnormal conditions occur during the installation and commissioning of parts or components in the building after leaving the factory. Summary of the invention
[0023] In order to improve the detection of geometric accuracy and position deviation of assembled double-deck car frames, and to address the technical problem of metrological accuracy errors caused by processing and assembly between various moving structural parts, the present application provides an assembly accuracy detection method for double-deck car frames of passenger elevators.
[0024] The present application provides a passenger elevator double-deck car frame assembly accuracy detection method using the following technical solutions:
[0025] A method for detecting the assembly accuracy of a double-deck car frame of a passenger elevator comprises the following steps:
[0026] S101, Operation preparation: The parts required for the assembly of the double-deck car frame are transported to the assembly workshop area; the simulated well is inspected and debugged, and the contact parts of the columns and guide rails for assembly are cleaned;
[0027] S102, overall installation of the lower beam: the assembled and pre-tightened lower beam is installed as a whole on the simulated well, and the safety clamps on both sides are aligned and fitted to the simulated well guide rails;
[0028] S103, middle crossbeam assembly: Orient and install two equal-length middle crossbeams on the two side columns in the simulated well. After pre-tightening the connectors, use measuring tools to measure the verticality of the middle crossbeam and the column, with a deviation of ≤1°, and the parallelism with the lower beam, with a deviation of ≤1°. After the measured deviation meets the technical requirements, tighten again.
[0029] S104, lower column assembly: install the two columns on the guide rails on both sides of the simulated well in a synchronous installation process, with left and right symmetry, and connect the bottom of the column to the lower beam and pre-tighten it; use a measuring tool to measure the verticality of the column and the lower beam, with a deviation value of ≤1°, and the parallelism of the column and the simulated well rail, with a deviation value of ≤1°; tighten twice after the measured deviation value meets the technical requirements;
[0030] S105, middle crossbeam assembly: Orient and install the two middle crossbeams of equal length on the two side columns in the simulated well. After pre-tightening the connectors, use a measuring tool to measure the verticality of the middle crossbeam and the column, with a deviation of ≤1°, and the parallelism with the lower beam, with a deviation of ≤1°. After the measured deviation meets the technical requirements, tighten again;
[0031] S106, upper column assembly: install the two columns on the guide rails on both sides of the simulated well in a synchronous installation process, with left and right symmetry, and connect the bottom of the column to the top of the middle beam and pre-tighten; use a measuring tool to measure the verticality of the column and the middle beam, with a deviation value of ≤1°, and the parallelism of the column and the simulated well rail, with a deviation value of ≤1°; tighten twice after the measured deviation value meets the technical requirements;
[0032] S107, guide shoe installation: 10 sets of guide shoes are sequentially installed at the workstations on both sides of the double-layer car frame. During installation, the straightness deviation of the guide shoes in the vertical direction on the same side needs to be corrected, and the deviation value is ≤0.20mm; S108, finished product inspection: Based on the center line of the double-layer car frame column and the center line of the simulated well guide rail, the shape and position accuracy of the guide rail and the guide shoe is measured to determine the processing and assembly accuracy of each component of the double-layer car frame; the installation accuracy is determined by measuring the gap value at the contact point between the well guide rail and the guide shoe. The main parameters are as follows:
[0033] D: guide shoe groove width;
[0034] F: rail width;
[0035] L1: Clearance between the guide shoe groove and the left side of the guide rail;
[0036] L2: Clearance between the guide shoe groove and the right side of the guide rail;
[0037] H: Clearance between the end face of the guide rail and the stopper of the column;
[0038] According to the motion accuracy judgment standard:
[0039] 1. Accuracy value S = (D-F) / 2 = 1.5-2.0mm, and the error value between L1 and L2 is ≤ 1 / 4S;
[0040] 2. Horizontal clearance value H = 2.5 ~ 4.0mm;
[0041] 3. The deviation direction and equivalent of multiple sets of guide shoes on the same side should be consistent;
[0042] S109, kinematic structure correction adjustment and judgment: adjust the guide shoe installation position according to the measured deviation values of S, L1, L2 and H, and judge whether the accuracy standard is a qualified product;
[0043] S110, overall disassembly and removal off-line: After offline finished product assembly and precision testing and verification of the same batch, each component is marked with product serial numbers, etc., and then disassembled and dismantled, qualified products are packed and stored, and unqualified products are re-disposed of; the work site is completed and cleaned up.
[0044] Optionally, the steps for installing the components of the lower beam as a whole are as follows:
[0045] a. Assembly of rope head structural parts: assemble the rope head plate, side plate and steel cable rod according to technical requirements; when assembling the steel lock rod, the spring should face upwards and the steel cable sleeve should face downwards;
[0046] b. Assembly of the lower beam frame structure: connect the rope head plate, the connecting plate and the two lower beams and pre-tighten them to form a frame structure of equal length;
[0047] c. Lower beam frame assembly accuracy test: that is, measure the deviation of the middle opening size and diagonal size when the two lower beams and the connecting plate are installed. The deviation must meet the technical requirements and the deviation value is ≤0.20mm;
[0048] d. Assembly of lever assembly: install the steel cable sleeve on the lever in a directional manner;
[0049] e. Internal assembly of the lower beam frame: Directly install the lever assembly and the pull rod assembly in the circular holes at both ends of the lower beam frame structure, and ensure that the lever and the pull rod assembly are vertically connected;
[0050] f. Synchronous pre-tightening of the lever and the pull rod: After the lever is initially positioned, the pull rod is immediately adjusted and initially locked. When locking, the center position of the linkage arm and the lever pull plate is measured synchronously. The deviation must meet the technical requirements and the deviation value is ≤0.30mm;
[0051] g. Secondary tightening of the lower beam frame: using a special wrench to tighten the bolts at each connection point of the lower beam structure for a second time;
[0052] h. Spring preload adjustment: adjust the preload force of the test tension spring. During debugging, manually pull the steel cable sleeve and visually check the synchronization of the safety clamps at both ends of the lower beam to ensure that the two safety clamps can lock the guide rail at the same time when the safety clamps are working;
[0053] i. Adjustment of the wire rope sleeve: adjust the wedge pre-installed in the middle of the wire rope sleeve, manually check whether the wedge and the wire rope sleeve are in good agreement, and ensure that the wire rope can be inserted smoothly; after the lower wire rope and the compensation device are installed, tighten the wire rope clamp, and visually check the stability of the wedge wire rope after being stressed, and ensure that each steel locking sleeve can be evenly stressed.
[0054] Optionally, the steps for installing the components of the upper beam are as follows:
[0055] a. Assembling the upper beam frame structure: connect and pre-tighten the two upper beams, connecting plates and fixing plates according to the technical requirements to form a frame structure of equal length;
[0056] b. Upper beam frame assembly accuracy test: that is, measure the deviation of the middle opening size and diagonal size when the two lower beams and the connecting plate and the fixing plate are installed. The deviation must meet the technical requirements and the deviation value is ≤0.20mm;
[0057] c. Assembly of rope head structural parts: Assemble the rope head plate, steel cable rod and steel cable rod spring according to technical requirements; when assembling the steel lock rod, the spring must be under the rope head plate and pre-tightened with double nuts at the end;
[0058] d. Wedge installation: Install wedges one by one on the inner side of the two upper beams and on the steel cable rods above the rope head plate, and the wedges must be in the same oblique direction, usually on the right side of the upper beam;
[0059] e. The upper beam assembly is installed in the simulated well: four lifting rings are installed in the four threaded holes on the upper plane of the upper beam. The upper beam structure assembly is lifted as a whole and installed on the top of the upper column using the lifting machinery at the top of the simulated well. After correcting the position deviation, the upper beam is pre-tightened with fasteners on both sides of the upper column.
[0060] f. Upper beam correction: Use measuring tools to measure the parallelism between the upper beam and the middle crossbeam, the deviation value is ≤1°, and the verticality with the upper columns on both sides, the deviation value is ≤1°;
[0061] g. Secondary tightening of the upper beam frame: that is, use a special wrench to perform secondary tightening of the bolts at each connection point of the upper beam structural parts.
[0062] Optionally, the judgment accuracy standard is as follows: if the product is adjusted and calibrated, it is judged as a qualified product; similarly, if the batch of products still does not meet the judgment standard after adjustment and calibration, it is an unqualified product.
[0063] Optionally, the sampling method after adjustment and correction is as follows: if the first set and any three sets in the batch are qualified, it can be determined that the batch is all qualified products; if the first set is unqualified or any set or more in the same batch is unqualified, double sampling will be carried out. If there is still at least one set that is unqualified, the batch needs to be tested one by one or determined to be unqualified.
[0064] Optionally, step S108 and step S109 are repeated at least twice for precision detection and correction of the columns and guide shoes on both sides of the double-deck car frame.
[0065] Optionally, at least five groups of data of the deviation values of S, L1, L2 and H measured in step S109 are detected.
[0066] Optionally, the movement accuracy error of both sides of the double-layer car frame is no more than 0.5mm, and the swing amplitude is no more than 0.2mm / m.
[0067] In summary, the present application includes at least one of the following beneficial technical effects:
[0068] 1. The process design is reasonable and the process is concise and compact, which can meet the finished product inspection of double-deck car frames of various models of passenger elevators;
[0069] 2. By simulating the elevator shaft and using conventional tools, the finished product comprehensive inspection and verification of the motion accuracy and shape and position accuracy of the double-layer car frame is achieved, which effectively guarantees the processing accuracy of the double-layer car frame and reduces the occurrence of measurement accuracy errors caused by installation;
[0070] 3. Simulate the actual working conditions of the elevator shaft in the building, complete the vertical and horizontal straightness deviation value measurement of the guide shoes on both sides of the double-deck car frame, and the detection and adjustment operations are convenient, labor-saving and time-saving, safe and reliable;
[0071] 4. Based on the virtual double-layer car frame column centerline and the simulated well guide rail centerline, the gap value between the well guide rail and the guide shoe is measured, and the shape and position accuracy of the guide rail and the guide shoe is measured to determine the processing and assembly accuracy of each component of the double-layer car frame. The model is accurate, the calculation is fast, and the accuracy is high;
[0072] 5. The installation accuracy of the lower beam rope head plate, lever and pull rod structural components is guaranteed, which reduces the failure of the speed limiter rope jumping and escaping from the rope groove of the speed limiter rope wheel caused by position offset from the source, especially reduces the potential accident of the elevator sliding down quickly, the speed limiter cannot work, and the safety clamp cannot be opened;
[0073] 6. The steel cable rod, steel cable sleeve and wedge block are integrated in an orderly manner. On the basis of ensuring the operation accuracy, the potential safety hazards in the operation of the passenger elevator are eliminated, the accuracy and stability of the rope head plate are improved, and the daily elevator failures are reduced;
[0074] 7. Low requirements on operator skills and experience, effectively reducing control implementation costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0075] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0076] Figure 1 It is a process flow chart of the finished product assembly and verification operation of the double-layer car frame in this application.
[0077] Figure 2 This application shows a schematic diagram of the double-deck car structure.
[0078] Figure 3 This application shows a top view of the double-deck car structure.
[0079] Figure 4 This application shows the front view of the lower beam structure of the double-deck car.
[0080] Figure 5 This application shows a top view of the lower beam structure of a double-deck car.
[0081] Figure 6 This application shows a schematic diagram of the lower beam structure of a double-deck car.
[0082] Figure 7 This application shows a schematic diagram of the upper beam structure of a double-deck car.
[0083] Figure 8 This is a schematic diagram of a simulated hoistway structure for displaying the finished assembly of a double-layer car frame in this application.
[0084] Fig. 9 This application shows a top view of a simulated shaft structure for assembling a finished double-layer car frame.
[0085] Fig.10 This is a bottom view of a simulated hoistway structure for displaying the finished assembly of a double-layer car frame in this application.
[0086] Fig.11 This application shows a schematic diagram of the finished product inspection working condition of a double-layer car frame in a simulated shaft.
[0087] Fig.12 This is a schematic diagram of the local structure of the gap between the contact area between the hoistway guide rail and the guide shoe of this application.
[0088] Figure numerals: 1, support plate; 2, reinforcement plate; 3, upper lifting rope head; 4, upper beam; 5, column; 6, connecting plate; 7, upper rope head plate; 8, upper pull rod fixing plate; 9, middle cross beam; 10, lower pull rod fixing plate; 11, lower beam; 12, lower rope head; 13, lower rope head plate; 14, lower beam connecting plate; 15, tension spring; 16, lever; 16-1, lower beam rope head plate; 17, lower beam cable rod; 18, lower beam fixing plate; 19, linkage arm; 20, cable sleeve; 21, side plate; 22, lever Pull plate; 23. Pull rod; 24. Upper beam cable rod; 25. Cable rod spring; 26. Lifting ring; 27. Upper beam connecting plate; 29. Upper beam rope head plate; 30. Upper beam fixing plate; 31. Wedge block; 32. Working platform; 321. Lifting hoist; 322. Top main beam; 323. Horizontal connecting beam; 324. Longitudinal connecting beam; 33. Double-layer car frame; 34. Simulated elevator shaft; 35. Climbing ladder; 36. Guide shoe; 37. Guide rail column; 38. Guide rail; 39. Column stop; 40. Column base. DETAILED DESCRIPTION
[0089] The following is combined with Figure 1 To Attachment Fig.12 This application is described in further detail.
[0090] The embodiment of the present application discloses a method for detecting the assembly accuracy of a double-deck car frame of a passenger elevator.
[0091] Embodiment (I)
[0092] The double-deck car frame of the passenger elevator with the model of CF40DD was prepared and processed. The width of this double-deck car frame is 2570mm and the height is 9021mm. The implementation standard is ISO 2768-mk, which requires the motion accuracy error value on both sides of the car frame to be no more than 0.50mm and the swing amplitude to be no more than 0.2mm / m. The technical improvement of the assembly process of the parts of the double-deck car frame of the passenger elevator is composed of the following processes: operation preparation → assembly of the lower beam 11 → assembly of the lower column 5 → assembly of the middle cross beam 9 → assembly of the upper column 5 → assembly of the upper beam 4 → installation of the guide shoe 36 → finished product inspection → motion structure correction adjustment and judgment → overall disassembly and removal of the offline process, which realizes the overall inspection and correction of the double-deck car frame.
[0093] 1) Operation preparation: Assemble the required parts of the double-deck car frame and transport them to the assembly work platform 32; inspect and debug the simulated elevator shaft 34, clean the contact parts of the columns 5 and guide rails 38 for assembly; conduct safety and technical briefings for operators, production quality progress briefings, and prepare and inspect conventional tools (such as wrenches, hammers, feeler gauges, vernier calipers, etc.).
[0094] 2) Lower beam assembly:
[0095] a. Assembling the rope head structural parts: assemble the rope head plate, the side plate 21 and the steel cable rod according to the technical requirements; when assembling the steel lock rod, the spring must be facing upward and the steel cable sleeve 20 must be facing downward;
[0096] b. Assembling the frame structure of the lower beam 11: connect the rope head plate, the connecting plate 6 and the two lower beams 11 and pre-tighten and fix them to form a frame structure of equal length;
[0097] c. Assembly accuracy test of the lower beam 11 frame: when the two lower beams 11 and the connecting plate 6 are installed, the deviation value of the middle opening size is measured = 0.15mm, and the deviation value of the diagonal size is measured = 0.20mm. The deviations meet the technical requirements of ≤0.20mm;
[0098] d. Assembling the lever 16 assembly: Orient the steel cable sleeve 20 and install it on the lever 16;
[0099] e. Internal assembly of the lower beam 11 frame: Directly install the lever 16 assembly and the pull rod 23 assembly in the round holes at both ends of the lower beam 11 frame structure, and ensure that the lever 16 and the pull rod 23 assembly are in a vertical connection state;
[0100] f. Lever 16 and pull rod 23 are pre-tightened synchronously: After the lever 16 is initially positioned, the pull rod 23 is immediately adjusted and preliminarily locked. When locking, the center position of the linkage arm 19 and the pull plate of the lever 16 is measured synchronously, and the deviation value = 0.20mm, which meets the deviation value ≤ 0.30mm;
[0101] g. Secondary tightening of the lower beam 11 frame: using a special wrench to perform secondary tightening of the bolts at each connection position of the lower beam 11 structural member;
[0102] h. Spring preload adjustment: that is, adjust the preload force (tension force) of the test tension spring 15. During debugging, manually pull the steel cable sleeve 20 and visually check the synchronization of the safety clamps at both ends of the lower beam 11 to ensure that the two safety clamps can lock the guide rail 38 at the same time when the safety clamps are working;
[0103] i. Adjustment of the steel cable sleeve 20: Adjust the wedge block 31 pre-installed in the middle of the steel cable sleeve 20, manually visually check whether the wedge block 31 and the steel cable sleeve 20 are in good agreement, and ensure that the steel wire rope can be smoothly inserted; after the lower steel wire rope and the compensation device are installed, tighten the steel wire rope clamp, visually check the stability of the steel wire rope under stress on the wedge block 31, and ensure that each steel lock sleeve can be evenly stressed;
[0104] 1. Overall installation of the lower beam 11: The lower beam 11 after assembly, forming and pre-tightening adjustment is installed as a whole on the simulated well, and the safety clamps on both sides need to be oriented and fitted with the simulated well guide rails 38.
[0105] 3) Assembly of lower column 5: install two columns 5 on the guide rails 38 on both sides of the simulated shaft in a synchronous installation process in a symmetrical manner, and connect the bottom of the column 5 to the lower beam 11 and pre-tighten it; use a measuring tool to measure the verticality deviation value between the column 5 and the lower beam 11 = 0.7°, and the parallelism deviation value between the column 5 and the simulated shaft guide rail 38 = 0.4°, and the deviation values both meet the technical requirement of ≤1°; tighten the structure of the lower column 5 for the second time.
[0106] 4) Assembly of the middle crossbeam 9: Orient and install two equal-length middle crossbeams 9 on the two side columns 5 in the simulated well. After pre-tightening the connecting parts, use a measuring tool to measure the verticality deviation value between the middle crossbeam 9 and the column 5 = 0.9° (deviation value ≤ 1°), and the parallelism deviation value with the lower beam 11 = 0.6°. The deviation values all meet the technical requirement of ≤ 1°; the middle crossbeam 9 structure is tightened twice.
[0107] 5) Assembly of upper column 5: install two columns 5 on the guide rails 38 on both sides of the simulated shaft in a synchronous installation process in a symmetrical manner, and connect the bottom of the column 5 to the top of the middle beam 9 and pre-tighten it; use a measuring tool to measure the verticality deviation value between the column 5 and the middle beam 9 = 0.3°, and the parallelism deviation value between the column 5 and the simulated shaft guide rail 38 = 0.3°. The deviation values both meet the technical requirement of ≤1°; the upper column 5 structure is tightened twice.
[0108] 6) Assembly of upper beam 4:
[0109] a. Assembling the upper beam 4 frame structure: connect the two upper beams 4, the connecting plate 6 and the fixing plate according to the technical requirements and pre-tighten and fix them to form a frame structure of equal length;
[0110] b. Upper beam 4 frame assembly accuracy test: that is, measuring the middle opening size deviation value = 0.10mm and diagonal size deviation value = 0.12mm when the two lower beams 11 and the connecting plate 6 and the fixing plate are installed. The deviations meet the technical requirements of ≤0.20mm;
[0111] c. Assembling the rope head structural parts: assemble the rope head plate, the steel cable rod and the steel cable rod spring 25 according to the technical requirements; when assembling the steel lock rod, the spring must be under the rope head plate and the double nuts at the end must be pre-tightened;
[0112] d. Wedge installation: Install wedges one by one on the inner side of the two upper beams 4 and on the steel cable rods above the rope head plate, and the wedges must be in the same oblique direction, usually on the right side of the upper beam 4;
[0113] e. The upper beam 4 assembly is installed in the simulated well: four lifting rings 26 are oriented and installed in the four threaded holes on the upper plane of the upper beam 4. The lifting machinery (electric hoist) at the top of the simulated well is used to lift the upper beam 4 structural assembly as a whole and install it on the top of the upper column 5. After correcting the position deviation, the upper beam 4 is pre-tightened with the upper columns 5 on both sides using fasteners;
[0114] f. Calibration of upper beam 4: Use measuring tools to measure the parallelism deviation between the upper beam 4 and the middle cross beam 9 = 0.3°, and the verticality deviation between the upper columns 5 on both sides = 0.2°. The deviation values meet the technical requirements of ≤1°;
[0115] g. Secondary tightening of the upper beam 4 frame: that is, use a special wrench to perform secondary tightening of the bolts at each connection position of the upper beam 4 structural parts.
[0116] 6) Installation of guide shoes 36: 10 groups (5 groups on one side) of guide shoes 36 shall be installed in sequence and in accordance with the technical requirements at the workstations on both sides of the double-deck car frame. During installation, the straightness deviation of the guide shoes 36 in the vertical direction on the same side shall be corrected, and the deviation value shall be ≤0.20mm (subsequent actual measurement and correction and adjustment).
[0117] 7) Finished product inspection: Based on the virtual center line of the double-layer car frame column 5 and the center line of the simulated hoistway guide rail 38, the shape and position accuracy of the guide rail 38 and the guide shoe 36 are measured to determine the processing and assembly accuracy of each component of the double-layer car frame. Since the center line is a theoretical virtual line and cannot be measured at the work site, the installation accuracy is determined by measuring the gap value at the contact point between the hoistway guide rail 38 and the guide shoe 36. The main parameters of each measurement are as follows:
[0118] D: Guide shoe 36 slot width = 28mm;
[0119] F: guide rail 38 width = 25 mm;
[0120] L1: clearance between the guide shoe 36 groove and the left side of the guide rail 38 = 0.10, 0.20, 0.20, 0.30, 0.20 mm;
[0121] L2: Clearance between the guide shoe 36 groove and the right side of the guide rail 38 = 0.50, 0.40, 0.40, 0.35, 0.40 mm;
[0122] H: Clearance between the end surface of the guide rail 38 and the stopper of the column 5 = 2.4, 2.0, 2.7, 3.0, 2.5 mm;
[0123] Calculate the motion accuracy error S = (D-F) / 2 = (28-25) / 2 = 1.50 mm
[0124] 1 / 4S = 1.50mm / 4 = 0.375
[0125] According to the motion accuracy (contact accuracy) judgment standard:
[0126] ①Precision value S = (D-F) / 2 = 1.5-2.0mm, and the error value of L1 and L2 ≤ 1 / 4S;
[0127] ②Horizontal clearance value H = 2.5 ~ 4.0mm;
[0128] ③ The deviation directions and equivalents of the five groups of guide shoes 36 on the same side should be consistent.
[0129] Actual measurement: S = 1.50mm, compliant; 5 L1s are compliant; L2 = 0.35mm compliant, the other 4 are out of tolerance;
[0130] Among H, 2 places were out of tolerance (smaller), and 3 places were in compliance;
[0131] 8) Correction and determination of motion structure: According to the measured deviation values of S, L1, L2 and H, the installation position of the guide shoe 36 is adjusted. The H value is reduced by the shim method to meet the technical requirement of H=2.5~4.0mm. The L1 and L2 error values are adjusted by the displacement method to adjust the left and right horizontal positions of the guide shoe 36, and it is necessary to ensure that the clearance values of the guide shoe 36 at 5 vertical positions on either side of L1 or L2 are the same. Since the relevant parameters meet the technical requirements, it is determined to be qualified.
[0132] 9) Repeat step 7) to measure the motion accuracy of the guide shoe 36 and the guide rail 38 of the column 5 on the other side of the double-deck car frame, that is:
[0133] D: Guide shoe 36 slot width = 28mm
[0134] F: Guide rail 38 width = 25mm
[0135] L1: Clearance between guide shoe 36 groove and left side of guide rail 38 = 0.40, 0.30, 0.40, 0.25, 0.30 mm
[0136] L2: Clearance between guide shoe 36 groove and right side of guide rail 38 = 0.20, 0.40, 0.30, 0.50, 0.40 mm
[0137] H: Clearance between the end face of the guide rail 38 and the stopper of the column 5 = 3.0, 2.4, 2.7, 3.2, 3.0 mm Calculated motion accuracy error S = (D-F) / 2 = (28-25) / 2 = 1.50 mm
[0138] 1 / 4S = 1.50mm / 4 = 0.375
[0139] Actual measurement: S = 1.50mm, compliant; 3 compliant and 2 out of tolerance in L1; 2 compliant and 3 out of tolerance in L2;
[0140] Among H, 1 is out of tolerance (small), and 4 are in compliance;
[0141] 10) Repeat step 8) kinematic structure correction adjustment and judgment: adjust the guide shoe 36 installation position according to the measured deviation values of S, L1, L2 and H. The H value adopts the method of reducing the shim to meet the technical requirement of H=2.5~4.0mm. The L1 and L2 error values adopt the displacement method to adjust the left and right horizontal positions of the guide shoe 36. It is necessary to ensure that the side with the same gap value as in step 8) is the reference, and the gap value of the other side is adjusted to meet the technical requirements. Because the relevant parameters meet the technical requirements, it is judged to be qualified.
[0142] 11) Overall disassembly and removal off the line: After the offline finished product assembly and precision inspection and verification of the same batch, each component is marked with the product serial number, etc., and then disassembled and dismantled. Qualified products are packed and stored, and unqualified products are re-disposed of; the work site is completed and cleaned up.
[0143] Embodiment (two)
[0144] The double-deck car frame of the passenger elevator with the model of CF40TT was prepared and processed. The width of this double-deck car frame is 2680mm and the height is 9052mm. The implementation standard is ISO 2768-mk, which requires the motion accuracy error value on both sides of the car frame to be no more than 0.50mm and the swing amplitude to be no more than 0.2mm / m. The technical improvement of the assembly process of the parts of the double-deck car frame of the passenger elevator is composed of the following processes: operation preparation → assembly of the lower beam 11 → assembly of the lower column 5 → assembly of the middle cross beam 9 → assembly of the upper column 5 → assembly of the upper beam 4 → installation of the guide shoe 36 → finished product inspection → motion structure correction adjustment and judgment → overall disassembly and removal of the offline process, which realizes the overall inspection and correction of the double-deck car frame.
[0145] 1) Operation preparation: According to the operation instructions and production plan, the warehouse collects the parts required for the assembly of the double-deck car frame and transports them to the assembly workshop area; inspects and debugs the simulated shaft, cleans the contact parts of the column 5 and the guide rail 38 for assembly; the operating personnel are briefed on safety and technology, production quality progress, and conventional tools (such as wrenches, hammers, feeler gauges, vernier calipers, etc.) are prepared and inspected.
[0146] 2) Assembly of lower beam 11:
[0147] a. Assembling the rope head structural parts: assemble the rope head plate, the side plate 21 and the steel cable rod according to the technical requirements; when assembling the steel lock rod, the spring must be facing upward and the steel cable sleeve 20 must be facing downward;
[0148] b. Assembling the frame structure of the lower beam 11: connect the rope head plate, the connecting plate 6 and the two lower beams 11 and pre-tighten and fix them to form a frame structure of equal length;
[0149] c. Assembly accuracy test of the lower beam 11 frame: when the two lower beams 11 and the connecting plate 6 are installed, the deviation value of the middle opening size is measured = 0.15mm, and the deviation value of the diagonal size is measured = 0.15mm. The deviations meet the technical requirements of ≤0.20mm;
[0150] d. Assembling the lever 16 assembly: Orient the steel cable sleeve 20 and install it on the lever 16;
[0151] e. Internal assembly of the lower beam 11 frame: Directly install the lever 16 assembly and the pull rod 23 assembly in the round holes at both ends of the lower beam 11 frame structure, and ensure that the lever 16 and the pull rod 23 assembly are in a vertical connection state;
[0152] f. Lever 16 and pull rod 23 are pre-tightened synchronously: After the lever 16 is initially positioned, the pull rod 23 is immediately adjusted and preliminarily locked. When locking, the center position of the linkage arm 19 and the pull plate of the lever 16 is synchronously measured, and the deviation value = 0.15mm, which meets the deviation value ≤ 0.30mm;
[0153] g. Secondary tightening of the lower beam 11 frame: using a special wrench to perform secondary tightening of the bolts at each connection position of the lower beam 11 structural member;
[0154] h. Spring preload adjustment: that is, adjust the preload force (tension force) of the test tension spring 15. During debugging, manually pull the steel cable sleeve 20 and visually check the synchronization of the safety clamps at both ends of the lower beam 11 to ensure that the two safety clamps can lock the guide rail 38 at the same time when the safety clamps are working;
[0155] i. Adjustment of the steel cable sleeve 20: Adjust the wedge block 31 pre-installed in the middle of the steel cable sleeve 20, manually visually check whether the wedge block 31 and the steel cable sleeve 20 are in good agreement, and ensure that the steel wire rope can be smoothly inserted; after the lower steel wire rope and the compensation device are installed, tighten the steel wire rope clamp, visually check the stability of the steel wire rope under stress on the wedge block 31, and ensure that each steel lock sleeve can be evenly stressed;
[0156] 1. Overall installation of the lower beam 11: The lower beam 11 after assembly, forming and pre-tightening adjustment is installed as a whole on the simulated well, and the safety clamps on both sides need to be oriented and fitted with the simulated well guide rails 38.
[0157] 3) Assembly of lower column 5: install two columns 5 on the guide rails 38 on both sides of the simulated shaft in a synchronous installation process in a symmetrical manner, and connect the bottom of the column 5 to the lower beam 11 and pre-tighten it; use a measuring tool to measure the verticality deviation value between the column 5 and the lower beam 11 = 0.5°, and the parallelism deviation value between the column 5 and the simulated shaft guide rail 38 = 0.6°, and the deviation values both meet the technical requirement of ≤1°; tighten the structure of the lower column 5 twice.
[0158] 4) Assembly of the middle crossbeam 9: Orient and install two equal-length middle crossbeams 9 on the two side columns 5 in the simulated well. After pre-tightening the connecting parts, use a measuring tool to measure the verticality deviation value of the middle crossbeam 9 and the column 5 = 0.4° (deviation value ≤ 1°), and the parallelism deviation value with the lower beam 11 = 0.5°. The deviation values both meet the technical requirement of ≤ 1°; the middle crossbeam 9 structure is tightened twice.
[0159] 5) Assembly of upper column 5: install two columns 5 on the guide rails 38 on both sides of the simulated shaft in a synchronous installation process in a symmetrical manner, and connect the bottom of the column 5 to the top of the middle beam 9 and pre-tighten it; use a measuring tool to measure the verticality deviation value between the column 5 and the middle beam 9 = 0.5°, and the parallelism deviation value between the column 5 and the simulated shaft guide rail 38 = 0.6°. The deviation values both meet the technical requirement of ≤1°; the upper column 5 structure is tightened twice.
[0160] 6) Assembly of upper beam 4:
[0161] a. Assembling the upper beam 4 frame structure: connect the two upper beams 4, the connecting plate 6 and the fixing plate according to the technical requirements and pre-tighten and fix them to form a frame structure of equal length;
[0162] b. Upper beam 4 frame assembly accuracy test: that is, measuring the middle opening size deviation value = 0.15mm and the diagonal size deviation value = 0.18mm when the two lower beams 11 and the connecting plate 6 and the fixing plate are installed. The deviations meet the technical requirements of ≤0.20mm;
[0163] c. Assembling the rope head structural parts: assemble the rope head plate, the steel cable rod and the steel cable rod spring 25 according to the technical requirements; when assembling the steel lock rod, the spring must be under the rope head plate and the double nuts at the end must be pre-tightened;
[0164] d. Wedge installation: Install wedges one by one on the inner side of the two upper beams 4 and on the steel cable rods above the rope head plate, and the wedges must be in the same oblique direction, usually on the right side of the upper beam 4;
[0165] e. The upper beam 4 assembly is installed in the simulated well: four lifting rings 26 are oriented and installed in the four threaded holes on the upper plane of the upper beam 4. The lifting machinery (electric hoist) at the top of the simulated well is used to lift the upper beam 4 structural assembly as a whole and install it on the top of the upper column 5. After correcting the position deviation, the upper beam 4 is pre-tightened with the upper columns 5 on both sides using fasteners;
[0166] f. Upper beam 4 calibration: Use measuring tools to measure the parallelism deviation between the upper beam 4 and the middle cross beam 9 = 0.4°, and the verticality deviation between the upper columns 5 on both sides = 0.5°. The deviation values meet the technical requirements of ≤1°;
[0167] g. Secondary tightening of the upper beam 4 frame: that is, use a special wrench to perform secondary tightening of the bolts at each connection position of the upper beam 4 structural parts.
[0168] 6) Installation of guide shoes 36: 10 groups (5 groups on one side) of guide shoes 36 shall be installed in sequence and in accordance with the technical requirements at the workstations on both sides of the double-deck car frame. During installation, the straightness deviation of the guide shoes 36 in the vertical direction on the same side shall be corrected, and the deviation value shall be ≤0.20mm (subsequent actual measurement and correction and adjustment).
[0169] 7) Finished product inspection: Based on the virtual center line of the double-layer car frame column 5 and the center line of the simulated hoistway guide rail 38, the shape and position accuracy of the guide rail 38 and the guide shoe 36 are measured to determine the processing and assembly accuracy of each component of the double-layer car frame. Since the center line is a theoretical virtual line and cannot be measured at the work site, the installation accuracy is determined by measuring the gap value at the contact point between the hoistway guide rail 38 and the guide shoe 36. The main parameters of each measurement are as follows:
[0170] D: Guide shoe 36 slot width = 28mm
[0171] F: Guide rail 38 width = 25mm
[0172] L1: Clearance between guide shoe 36 groove and left side of guide rail 38 = 0.30, 0.35, 0.30, 0.40, 0.25 mm
[0173] L2: Clearance between the guide shoe 36 groove and the right side of the guide rail 38 = 0.50, 0.45, 0.50, 0.30, 0.40 mm
[0174] H: Clearance between the end face of the guide rail 38 and the stopper of the column 5 = 3.5, 3.0, 3.5, 3.0, 3.7 mm Calculated motion accuracy error S = (D-F) / 2 = (28-25) / 2 = 1.50 mm
[0175] 1 / 4S = 1.50mm / 4 = 0.375
[0176] According to the motion accuracy (contact accuracy) judgment standard:
[0177] ①Precision value S = (D-F) / 2 = 1.5~2.0mm, and the error value between L1 and L2 ≤ 1 / 4S
[0178] ②Horizontal clearance value H = 2.5 ~ 4.0 mm
[0179] ③ The deviation directions and equivalents of the five groups of guide shoes 36 on the same side should be consistent.
[0180] Actual measurement: S = 1.50mm, compliant; 4 locations in L1 are compliant, 1 location is out of tolerance; L2 = 0.30mm, compliant, the remaining 4 locations are out of tolerance;
[0181] All 5 of H are in compliance;
[0182] 8) Correction and determination of motion structure: According to the measured deviation values of S, L1, L2 and H, the installation position of the guide shoe 36 is adjusted. The H value is reduced by the shim method to meet the technical requirement of H=2.5~4.0mm. The L1 and L2 error values are adjusted by the displacement method to adjust the left and right horizontal positions of the guide shoe 36, and it is necessary to ensure that the clearance values of the guide shoe 36 at 5 vertical positions on either side of L1 or L2 are the same. Since the relevant parameters meet the technical requirements, it is determined to be qualified.
[0183] 9) Repeat step 7) to measure the motion accuracy of the guide shoe 36 and the guide rail 38 of the column 5 on the other side of the double-deck car frame, that is:
[0184] D: Guide shoe 36 slot width = 28mm
[0185] F: Guide rail 38 width = 25mm
[0186] L1: Clearance between guide shoe 36 groove and left side of guide rail 38 = 0.40, 0.50, 0.40, 0.40, 0.35 mm
[0187] L2: Clearance between the guide shoe 36 groove and the right side of the guide rail 38 = 0.40, 0.35, 0.50, 0.40, 0.50 mm
[0188] H: Clearance between the end face of the guide rail 38 and the stopper of the column 5 = 2.5, 3.0, 2.4, 3.0, 2.0 mm Calculated motion accuracy error S = (D-F) / 2 = (28-25) / 2 = 1.50 mm
[0189] 1 / 4S = 1.50mm / 4 = 0.375
[0190] Actual measurement: S = 1.50mm, compliant; 1 compliant and 4 out of tolerance in L1; 1 compliant and 4 out of tolerance in L2;
[0191] Among H, 2 places were out of tolerance (smaller), and 3 places were in compliance;
[0192] 10) Repeat step 8) kinematic structure correction adjustment and judgment: adjust the guide shoe 36 installation position according to the measured deviation values of S, L1, L2 and H. The H value adopts the method of reducing the shim to meet the technical requirement of H=2.5~4.0mm. The L1 and L2 error values adopt the displacement method to adjust the left and right horizontal positions of the guide shoe 36. It is necessary to ensure that the side with the same gap value as in step 8) is the reference, and the gap value of the other side is adjusted to meet the technical requirements. Because the relevant parameters meet the technical requirements, it is judged to be qualified.
[0193] 11) Overall disassembly and removal off the line: After the offline finished product assembly and precision inspection and verification of the same batch, each component is marked with the product serial number, etc., and then disassembled and dismantled. Qualified products are packed and stored, and unqualified products are re-disposed of; the work site is completed and cleaned up.
[0194] Embodiment (three)
[0195] The double-deck car frame of the passenger elevator with the model CF40TS was prepared and processed. The width of this double-deck car frame is 2630mm and the height is 9080mm. The implementation standard is ISO 2768-mk, which requires the motion accuracy error value on both sides of the car frame to be no more than 0.50mm and the swing amplitude to be no more than 0.2mm / m. The technical improvement of the assembly process of the parts of the double-deck car frame of the passenger elevator is composed of the following processes: operation preparation → assembly of the lower beam 11 → assembly of the lower column 5 → assembly of the middle cross beam 9 → assembly of the upper column 5 → assembly of the upper beam 4 → installation of the guide shoe 36 → finished product inspection → motion structure correction adjustment and judgment → overall disassembly and removal of the offline process, which realizes the overall inspection and correction of the double-deck car frame.
[0196] 1) Operation preparation: According to the operation instructions and production plan, the warehouse collects the parts required for the assembly of the double-deck car frame and transports them to the assembly workshop area; inspects and debugs the simulated shaft, cleans the contact parts of the column 5 and the guide rail 38 for assembly; the operating personnel are briefed on safety and technology, production quality progress, and conventional tools (such as wrenches, hammers, feeler gauges, vernier calipers, etc.) are prepared and inspected.
[0197] 2) Assembly of lower beam 11:
[0198] a. Assembling the rope head structural parts: assemble the rope head plate, the side plate 21 and the steel cable rod according to the technical requirements; when assembling the steel lock rod, the spring must be facing upward and the steel cable sleeve 20 must be facing downward;
[0199] b. Assembling the frame structure of the lower beam 11: connect the rope head plate, the connecting plate 6 and the two lower beams 11 and pre-tighten and fix them to form a frame structure of equal length;
[0200] c. Assembly accuracy test of the lower beam 11 frame: When the two lower beams 11 and the connecting plate 6 are installed, the middle opening size deviation value is measured = 0.10mm, and the diagonal size deviation value is 0.25mm (out of tolerance). After correction, the actual opening size deviation value is measured = 0.15mm, and the diagonal size deviation value is 0.18mm. The deviations meet the technical requirements of ≤ 0.20mm;
[0201] d. Assembling the lever 16 assembly: Orient the steel cable sleeve 20 and install it on the lever 16;
[0202] e. Internal assembly of the lower beam 11 frame: Directly install the lever 16 assembly and the pull rod 23 assembly in the round holes at both ends of the lower beam 11 frame structure, and ensure that the lever 16 and the pull rod 23 assembly are in a vertical connection state;
[0203] f. Lever 16 and pull rod 23 are pre-tightened synchronously: After the lever 16 is initially positioned, the pull rod 23 is immediately adjusted and preliminarily locked. When locking, the center position of the linkage arm 19 and the pull plate of the lever 16 is synchronously measured, and the deviation value = 0.25mm, which meets the deviation value ≤ 0.30mm;
[0204] g. Secondary tightening of the lower beam 11 frame: using a special wrench to perform secondary tightening of the bolts at each connection position of the lower beam 11 structural member;
[0205] h. Spring preload adjustment: that is, adjust the preload force (tension force) of the test tension spring 15. During debugging, manually pull the steel cable sleeve 20 and visually check the synchronization of the safety clamps at both ends of the lower beam 11 to ensure that the two safety clamps can lock the guide rail 38 at the same time when the safety clamps are working;
[0206] i. Adjustment of the steel cable sleeve 20: Adjust the wedge block 31 pre-installed in the middle of the steel cable sleeve 20, manually visually check whether the wedge block 31 and the steel cable sleeve 20 are in good agreement, and ensure that the steel wire rope can be smoothly inserted; after the lower steel wire rope and the compensation device are installed, tighten the steel wire rope clamp, visually check the stability of the steel wire rope under stress on the wedge block 31, and ensure that each steel lock sleeve can be evenly stressed;
[0207] 1. Overall installation of the lower beam 11: The lower beam 11 after assembly, forming and pre-tightening adjustment is installed as a whole on the simulated well, and the safety clamps on both sides need to be oriented and fitted with the simulated well guide rails 38.
[0208] 3) Assembly of lower column 5: install two columns 5 on the guide rails 38 on both sides of the simulated shaft in a synchronous installation process in a symmetrical manner, and connect the bottom of the column 5 to the lower beam 11 and pre-tighten it; use a measuring tool to measure the verticality deviation value between the column 5 and the lower beam 11 = 0.4°, and the parallelism deviation value between the column 5 and the simulated shaft guide rail 38 = 0.3°. The deviation values both meet the technical requirement of ≤1°; tighten the structure of the lower column 5 for the second time.
[0209] 4) Assembly of the middle crossbeam 9: Orient and install two equal-length middle crossbeams 9 on the two side columns 5 in the simulated well. After pre-tightening the connecting parts, use a measuring tool to measure the verticality deviation value between the middle crossbeam 9 and the column 5 = 0.3° (deviation value ≤ 1°), and the parallelism deviation value with the lower beam 11 = 0.3°. The deviation values both meet the technical requirement of ≤ 1°; the middle crossbeam 9 structure is tightened twice.
[0210] 5) Assembly of upper column 5: install two columns 5 on the guide rails 38 on both sides of the simulated shaft in a synchronous installation process, symmetrically on both sides, and connect the bottom of the column 5 to the top of the middle beam 9 and pre-tighten; use a measuring tool to measure the verticality deviation value between the column 5 and the middle beam 9 = 0.4°, and the parallelism deviation value between the column 5 and the simulated shaft guide rail 38 = 0.5°. The deviation values both meet the technical requirement of ≤1°; the upper column 5 structure is tightened twice.
[0211] 6) Assemble the upper beam 4 (see the attached Figure 3 ):
[0212] a. Assembling the upper beam 4 frame structure: connect the two upper beams 4, the connecting plate 6 and the fixing plate according to the technical requirements and pre-tighten and fix them to form a frame structure of equal length;
[0213] b. Upper beam 4 frame assembly accuracy test: that is, measuring the middle opening size deviation value = 0.20mm and the diagonal size deviation value = 0.20mm when the two lower beams 11 and the connecting plate 6 and the fixing plate are installed. The deviations meet the technical requirements of ≤ 0.20mm;
[0214] c. Assembling the rope head structural parts: assemble the rope head plate, the steel cable rod and the steel cable rod spring 25 according to the technical requirements; when assembling the steel lock rod, the spring must be under the rope head plate and the double nuts at the end must be pre-tightened;
[0215] d. Wedge installation: Install wedges one by one on the inner side of the two upper beams 4 and on the steel cable rods above the rope head plate, and the wedges must be in the same oblique direction, usually on the right side of the upper beam 4;
[0216] e. The upper beam 4 assembly is installed in the simulated well: four lifting rings 26 are oriented and installed in the four threaded holes on the upper plane of the upper beam 4. The lifting machinery (electric hoist) at the top of the simulated well is used to lift the upper beam 4 structural assembly as a whole and install it on the top of the upper column 5. After correcting the position deviation, the upper beam 4 is pre-tightened with the upper columns 5 on both sides using fasteners;
[0217] f. Calibration of upper beam 4: Use measuring tools to measure the parallelism deviation between the upper beam 4 and the middle cross beam 9 = 0.7°, and the verticality deviation between the upper columns 5 on both sides = 0.5°. The deviation values meet the technical requirements of ≤1°;
[0218] g. Secondary tightening of the upper beam 4 frame: that is, use a special wrench to perform secondary tightening of the bolts at each connection position of the upper beam 4 structural parts.
[0219] 6) Installation of guide shoes 36: 10 groups (5 groups on one side) of guide shoes 36 shall be installed in sequence and in accordance with the technical requirements at the workstations on both sides of the double-deck car frame. During installation, the straightness deviation of the guide shoes 36 in the vertical direction on the same side shall be corrected, and the deviation value shall be ≤0.20mm (subsequent actual measurement and correction and adjustment).
[0220] 7) Finished product inspection: Based on the virtual center line of the double-layer car frame column 5 and the center line of the simulated hoistway guide rail 38, the shape and position accuracy of the guide rail 38 and the guide shoe 36 are measured to determine the processing and assembly accuracy of each component of the double-layer car frame. Since the center line is a theoretical virtual line and cannot be measured at the work site, the installation accuracy is determined by measuring the gap value at the contact point between the hoistway guide rail 38 and the guide shoe 36. The main parameters of each measurement are as follows:
[0221] D: Guide shoe 36 slot width = 28mm
[0222] F: Guide rail 38 width = 25mm
[0223] L1: Clearance between guide shoe 36 groove and left side of guide rail 38 = 0.40, 0.50, 0.45, 0.30, 0.30 mm
[0224] L2: Clearance between guide shoe 36 groove and right side of guide rail 38 = 0.40, 0.45, 0.40, 0.55, 0.40 mm
[0225] H: Clearance between the end face of the guide rail 38 and the stopper of the column 5 = 2.7, 3.2, 3.2, 2.5, 2.1 mm Calculated motion accuracy error S = (D-F) / 2 = (28-25) / 2 = 1.50 mm
[0226] 1 / 4S = 1.50mm / 4 = 0.375
[0227] According to the motion accuracy (contact accuracy) judgment standard:
[0228] ①Precision value S=(D-F) / 2=1.5~2.0mm, and the error value between L1 and L2 ≤1 / 4S
[0229] ②Horizontal clearance value H = 2.5 ~ 4.0 mm
[0230] ③ The deviation directions and equivalents of the five groups of guide shoes 36 on the same side should be consistent.
[0231] Actual measurement: S = 1.50mm, compliant; 2 locations in L1 are compliant and 3 locations are out of tolerance; L2 = 5 locations are out of tolerance;
[0232] Among H, 1 location was out of tolerance, and 4 locations were in compliance;
[0233] 8) Correction and determination of motion structure: According to the measured deviation values of S, L1, L2 and H, the installation position of the guide shoe 36 is adjusted. The H value is reduced by the shim method to meet the technical requirement of H=2.5~4.0mm. The L1 and L2 error values are adjusted by the displacement method to adjust the left and right horizontal positions of the guide shoe 36, and it is necessary to ensure that the clearance values of the guide shoe 36 at 5 vertical positions on either side of L1 or L2 are the same. Since the relevant parameters meet the technical requirements, it is determined to be qualified.
[0234] 9) Repeat step 7) to measure the motion accuracy of the guide shoe 36 and the guide rail 38 of the column 5 on the other side of the double-deck car frame, that is:
[0235] D: Guide shoe 36 slot width = 28mm
[0236] F: Guide rail 38 width = 25mm
[0237] L1: Clearance between guide shoe 36 groove and left side of guide rail 38 = 0.40, 0.40, 0.30, 0.45, 0.30 mm
[0238] L2: Clearance between the guide shoe 36 groove and the right side of the guide rail 38 = 0.40, 0.50, 0.60, 0.55, 0.50 mm
[0239] H: Clearance between the end face of the guide rail 38 and the stopper of the column 5 = 2.5, 3.0, 2.4, 2.3, 2.2 mm Calculated motion accuracy error S = (D-F) / 2 = (28-25) / 2 = 1.50 mm
[0240] 1 / 4S = 1.50mm / 4 = 0.375
[0241] Actual measurement: S = 1.50mm, compliant; 2 places in L1 are compliant and 3 places are out of tolerance; L2 = 5 places are out of tolerance;
[0242] Among H, 2 places were out of tolerance (smaller), and 3 places were in compliance;
[0243] 10) Repeat step 8) kinematic structure correction adjustment and judgment: adjust the guide shoe 36 installation position according to the measured deviation values of S, L1, L2 and H. The H value adopts the method of reducing the shim to meet the technical requirement of H=2.5~4.0mm. The L1 and L2 error values adopt the displacement method to adjust the left and right horizontal positions of the guide shoe 36. It is necessary to ensure that the side with the same gap value as in step 8) is the reference, and the gap value of the other side is adjusted to meet the technical requirements. Because the relevant parameters meet the technical requirements, it is judged to be qualified.
[0244] 11) Overall disassembly and removal off the line: After the offline finished product assembly and precision inspection and verification of the same batch, each component is marked with the product serial number, etc., and then disassembled and dismantled. Qualified products are packed and stored, and unqualified products are re-disposed of; the work site is completed and cleaned up.
[0245] A method for detecting the assembly accuracy of a double-deck car frame for a passenger elevator is a technical improvement on the assembly process of the parts of the double-deck car frame for a passenger elevator. The method comprises the following steps: operation preparation → assembly of the lower beam 11 → assembly of the lower column 5 → assembly of the middle cross beam 9 → assembly of the upper column 5 → assembly of the upper beam 4 → installation of the guide shoe 36 → finished product inspection → motion structure correction adjustment and judgment → overall disassembly and removal of the offline assembly, thereby realizing the overall inspection and correction of the double-deck car frame. The process is concise and compact. By simulating the elevator shaft 34 and using conventional tools, the finished product comprehensive inspection and verification of the motion accuracy and shape and position accuracy of the double-deck car frame is realized, which effectively guarantees the processing and installation accuracy of the double-deck car frame and reduces the occurrence of abnormal situations during installation and commissioning. The steel cable rod, steel cable sleeve 20 and wedge block are integrated in an orderly manner. On the basis of ensuring the operation accuracy, the safety hazards in the operation of the passenger elevator are eliminated, the accuracy and stability of the rope head plate fixing are improved, and daily elevator failures are reduced. Simulate the actual working conditions of the elevator shaft in the building, complete the vertical and horizontal straightness deviation value measurement of the guide shoes 36 on both sides of the double-layer car frame, and the detection and adjustment operations are convenient, labor-saving, time-saving, safe and reliable. Based on the center line of the virtual double-layer car frame column 5 and the center line of the simulated shaft guide rail 38, by measuring the gap value of the contact part between the shaft guide rail 38 and the guide shoe 36, the shape and position accuracy of the guide rail 38 and the guide shoe 36 is measured to judge the processing and assembly accuracy of each component of the double-layer car frame. The model is accurate, the calculation is fast, and the accuracy is high. It can meet the finished product inspection of double-layer car frames of various models of passenger elevators and improve applicability and versatility. The implementation cost is low, and the skills and experience requirements of the operators are not high.
[0246] Unless otherwise defined, the technical terms or scientific terms used in this application shall have the usual meanings understood by persons with ordinary skills in the field to which this application belongs. The words "first", "second", "third" and similar words used in the specification and claims of this application do not indicate any order, quantity or importance, but are only used to distinguish different components. Words such as "one" or "one" and similar words do not indicate a quantity limit, but indicate the existence of at least one. Words such as "include" or "comprise" and similar words mean that the elements or objects appearing before "include" or "comprise" include the elements or objects listed after "include" or "comprise" and their equivalents, and do not exclude other elements or objects. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly. The above are all preferred embodiments of this application, and the protection scope of this application is not limited accordingly. Therefore, all equivalent changes made according to the structure, shape and principle of this application should be included in the protection scope of this application.
Claims
1. A method for detecting the assembly accuracy of a double-deck car frame of a passenger elevator, characterized in that: The steps include: S101, work preparation: transport the parts required for assembling the double-deck car frame to the assembly workshop area; inspect and debug the simulated shaft, and clean the contact parts of the columns (5) and guide rails (38) for assembly; S102, lower beam overall installation: the lower beam (11) that has been assembled and pre-tightened is installed as a whole on the simulated well, and the safety clamps on both sides are oriented and fitted to the simulated well guide rails (38); S103, assembling the middle cross beam (9): directional-mounting two middle cross beams (9) of equal length on the two side columns (5) in the simulated well, pre-tightening the connector, using a measuring tool to measure the verticality of the middle cross beam (9) and the column (5), with a deviation value of ≤1°, and the parallelism with the lower beam (11), with a deviation value of ≤1°. After the measured deviation value meets the technical requirements, tightening is performed for the second time; S104, lower column assembly: two columns (5) are installed on the guide rails (38) on both sides of the simulated well in a synchronous installation process in a symmetrical manner, and the bottom of the column (5) is connected to the lower beam (11) and pre-tightened; a measuring tool is used to measure the verticality of the column (5) and the lower beam (11), and the deviation value is ≤1°, and the parallelism of the column (5) and the simulated well guide rail (38), and the deviation value is ≤1°; after the measured deviation value meets the technical requirements, secondary tightening is performed; S105, assembling the middle cross beam: directional-mounting two middle cross beams (9) of equal length on the two side columns (5) in the simulated well, pre-tightening the connector, using a measuring tool to measure the verticality of the middle cross beam (9) and the column (5), with a deviation value of ≤1°, and the parallelism with the lower beam (11), with a deviation value of ≤1°. After the measured deviation value meets the technical requirements, tightening is performed for the second time; S106, assembling the upper column (5): installing the two columns (5) on the guide rails (38) on both sides of the simulated well in a synchronous installation process in a symmetrical manner, and connecting and pre-tightening the bottom of the column (5) and the top of the middle beam (9); using a measuring tool to measure the verticality of the column (5) and the middle beam (9), the deviation value is ≤1°, and the parallelism of the column (5) and the simulated well guide rail (38), the deviation value is ≤1°; after the measured deviation value meets the technical requirements, tightening is performed for the second time; S107, guide shoe installation: 10 sets of guide shoes (36) are sequentially and directional installed at the workstations on both sides of the double-layer car frame. During installation, the straightness deviation of the guide shoes (36) in the vertical direction on the same side needs to be corrected, and the deviation value is ≤0.20mm; S108, finished product inspection: taking the center line of the double-layer car frame column (5) and the center line of the simulated shaft guide rail (38) as the reference, the shape and position accuracy of the guide rail (38) and the guide shoe (36) are measured to determine the processing and assembly accuracy of each component of the double-layer car frame; by measuring the gap value at the contact part of the shaft guide rail (38) and the guide shoe (36), the installation accuracy is determined. The main parameters are as follows: D: guide shoe groove width; F: rail width; L1: Clearance between the guide shoe groove and the left side of the guide rail; L2: Clearance between the guide shoe groove and the right side of the guide rail; H: Clearance between the end face of the guide rail and the stopper of the column; According to the motion accuracy judgment standard: Precision value S = (D-F) / 2 = 1.5-2.0 mm, and the error value between L1 and L2 is ≤ 1 / 4S; Horizontal clearance value H = 2.5 ~ 4.0mm; The deviation directions and equivalents of multiple sets of guide shoes (36) on the same side should be consistent; S109, kinematic structure correction adjustment and determination: adjust the guide shoe (36) installation position according to the measured deviation values of S, L1, L2 and H, and determine whether the accuracy standard is a qualified product; S110, overall disassembly and removal off-line: After offline finished product assembly and precision testing and verification of the same batch, each component is marked with a product serial number and then disassembled, qualified products are packed and stored, and unqualified products are disposed of again; the work site is completed and cleaned up.
2. A passenger elevator double-deck car frame assembly accuracy detection method according to claim 1, characterized in that: The steps for assembling the components of the lower beam (11) are as follows: a. Assembling the rope head structure: assemble the rope head plate, the side plate (21) and the steel cable rod according to the technical requirements; when assembling the steel lock rod, the spring faces upward and the steel cable sleeve (20) faces downward; b. Assembling the frame structure of the lower beam (11): connecting the rope head plate, the connecting plate (6) and the two lower beams (11) and pre-tightening and fixing them to form a frame structure of equal length; c. Lower beam (11) frame assembly accuracy test: i.e. measuring the deviation of the middle opening size and diagonal size when the two lower beams (11) and the connecting plate (6) are installed. The deviation must meet the technical requirements and the deviation value is ≤0.20mm; d. Assembling the lever (16) assembly: directional mounting the steel cable sleeve (20) on the lever (16); e. Assembling the lower beam (11) frame internally: directional installation of the lever (16) assembly and the pull rod (23) assembly in the circular holes at both ends of the lower beam (11) frame structure, ensuring that the lever (16) and the pull rod (23) assembly are in a vertically connected state; f. Pre-tighten the lever (16) and the pull rod (23) synchronously: after the lever (16) is initially positioned, adjust the pull rod (23) immediately and preliminarily lock it. When locking, measure the center position of the linkage arm (19) and the pull plate of the lever (16) synchronously. The deviation must meet the technical requirements and the deviation value is ≤0.30mm; g. Secondary tightening of the lower beam (11) frame: using a special wrench to perform secondary tightening of the bolts at each connection position of the lower beam (11) structural member; h. Spring preload adjustment: that is, adjust the preload force of the test tension spring (15). During debugging, manually pull the steel cable sleeve (20) and visually check the synchronization of the safety clamps at both ends of the lower beam (11) to ensure that the two safety clamps can simultaneously lock the guide rail (38) when the safety clamps are working; i. Adjustment of the steel cable sleeve (20): adjust a wedge (31) pre-installed in the middle of the steel cable sleeve (20), manually visually check whether the wedge (31) and the steel cable sleeve (20) are in good agreement, and ensure that the steel wire rope can be smoothly inserted; after the lower steel wire rope and the compensation device are installed, tighten the steel wire rope clamp, visually check the stability of the wedge (31) steel wire rope after being stressed, and ensure that each steel lock sleeve can be evenly stressed.
3. A passenger elevator double-deck car frame assembly accuracy detection method according to claim 1, characterized in that: The steps for installing the components of the upper beam (4) are as follows: a. Assembling the upper beam (4) frame structure: connecting two upper beams (4), a connecting plate (6), and a fixing plate according to technical requirements and pre-tightening and fixing them to form a frame structure of equal length; b. Upper beam (4) frame assembly accuracy test: i.e. measuring the deviation of the middle opening size and diagonal size when the two lower beams (11) and the connecting plate (6) and the fixing plate are installed. The deviation must meet the technical requirements and the deviation value is ≤ 0.20 mm; c. Assembling the rope head structural parts: assemble the rope head plate, the steel cable rod and the steel cable rod spring (25) according to the technical requirements; when assembling the steel lock rod, the spring must be under the rope head plate and the double nuts at the end must be pre-tightened; d. Installation of wedge blocks: Install wedge blocks (31) one by one on the inner sides of the two upper beams (4) and on the steel cable rods above the rope head plate, and the wedge blocks must be inclined in the same direction, usually on the right side of the upper beam (4); e. The upper beam (4) assembly is installed in the simulated well: four lifting rings (26) are oriented and installed in four threaded holes on the upper plane of the upper beam (4), and a lifting machine at the top of the simulated well is used to lift the upper beam (4) structure assembly as a whole and install it on the top of the upper side column (5). After correcting the position deviation, the upper beam (4) and the upper columns (5) on both sides are pre-tightened using fasteners; f. Calibration of the upper beam (4): Use a measuring tool to measure the parallelism of the upper beam (4) and the middle cross beam (9), the deviation value is ≤1°, and the verticality with the upper columns (5) on both sides, the deviation value is ≤1°; g. Secondary tightening of the upper beam (4) frame: that is, a special wrench is used to perform secondary tightening of the bolts at each connection position of the upper beam (4) structural member.
4. A passenger elevator double-deck car frame assembly accuracy detection method according to claim 1, characterized in that: The judgment accuracy standard is as follows: The product is judged as qualified after adjustment and correction; Similarly, if the batch of products still does not meet the judgment criteria after adjustment and correction, it will be regarded as unqualified products.
5. A passenger elevator double-deck car frame assembly accuracy detection method according to claim 4, characterized in that: The sampling inspection method after adjustment and correction is as follows: If the first set and any three sets in the batch are qualified, it can be determined that the batch is qualified products; If the first set is unqualified or any one or more sets in the same batch are unqualified, double sampling will be carried out. If there is still at least one set that is unqualified, the batch needs to be tested one by one or determined to be unqualified.
6. A passenger elevator double-deck car frame assembly accuracy detection method according to claim 1, characterized in that: The steps S108 and S109 are repeated at least twice for precision detection and calibration of the columns (5) and guide shoes (36) on both sides of the double-deck car frame (33).
7. A passenger elevator double-deck car frame assembly accuracy detection method according to claim 1, characterized in that: In the step S109, at least five groups of data of the deviation values of S, L1, L2 and H are measured.
8. A passenger elevator double-deck car frame assembly accuracy detection method according to claim 7, characterized in that: The movement accuracy error of both sides of the double-layer car frame (33) is no more than 0.5 mm, and the swing amplitude is no more than 0.2 mm / m.