Tower crane control method, device, electronic equipment and storage medium
By obtaining the starting and end position information of the tower crane, determining the movement path and screening the target tower crane, the problem of coordinated control of multiple tower cranes is solved, and the operating efficiency and safety of the construction site are improved.
Patent Information
- Application Number
- CN202410874327.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-02
AI Technical Summary
It is difficult to realize coordinated control of multiple tower cranes with existing technology, resulting in low efficiency and insufficient safety when multiple tower cranes work together at the construction site.
By obtaining the start and end position information of the hoisting task, the candidate tower crane motion path in the work area is determined, and based on the multi-tower crane control requirements, target tower cranes that do not collide are selected, and target control instructions are generated to collaboratively complete the hoisting task.
It improves the efficiency of hoisting tasks, reduces the number of tower crane operators, and ensures the safety and efficiency of collaborative operations of multiple tower cranes.
Smart Images

Figure CN118419784B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tower crane control, and in particular to a tower crane control method, device, electronic equipment and storage medium. Background Art
[0002] At the construction site, the efficient and safe use of tower cranes is related to the efficiency of the construction and the safety of personnel and equipment. The planning of tower crane hoisting objects is the core issue to achieve efficient and automated tower crane operation.
[0003] In the related art, tower crane path planning technology usually adopts heuristic space search algorithms, such as A* algorithm for path planning, which can realize global optimal path planning under the condition of setting cost estimation function. The rationality of the solution results of this type of heuristic algorithm is determined by the heuristic function or cost estimation function used. In the actual hoisting process of the tower crane, the hoisting wire rope, hook, and hoisting objects of the tower crane will be affected by the inertia of motion, the deflection of the tower structure, wind load, and the moment of the crane arm, which will cause deflection and shaking. The tower crane driver will carry out specific hoisting path planning and a series of tower crane operations based on his experience to ensure safe and stable operation.
[0004] This type of tower crane algorithm planning mainly carries out task planning from the perspective of a single tower crane. However, in a construction project, there are sometimes multiple tower cranes operating. The collaborative operation of multiple tower cranes is a common scenario, but there are currently few related multi-tower crane collaborative control solutions. Summary of the invention
[0005] The purpose of the embodiments of the present invention is to provide a tower crane control method, device, electronic device and storage medium to solve the technical problem in the related art that multiple tower cranes cannot be collaboratively controlled simultaneously.
[0006] In a first aspect, an embodiment of the present invention provides a tower crane control method, which is applied to a ground control terminal, wherein the ground control terminal is communicatively connected with multiple tower cranes on a construction site, and the tower crane control method comprises the following steps:
[0007] Obtaining the starting position information of the hoisting object in the hoisting task and the ending position information of placing the hoisting object;
[0008] According to the starting position information and the ending position information, determining a plurality of initial tower cranes including the starting position information and the ending position information in the working area;
[0009] An initial tower crane whose working area is smaller than the target area is taken as a candidate tower crane, and a tower crane hoisting object motion coordinate system is established by taking the projection point of the center of rotation motion of any candidate tower crane on the horizontal plane as the origin of the coordinate system, taking the first direction as the positive direction of the y-axis of the coordinate system, and taking the second direction as the positive direction of the x-axis of the coordinate system;
[0010] The point cloud data of the construction site, the starting position information and the end position information are converted into the tower crane hoisting object motion coordinate system to obtain a target coordinate system;
[0011] Under the condition that the candidate tower cranes do not collide with obstacles in the construction site, determine the motion path of the object end of each candidate tower crane in the target coordinate system, from the starting coordinate corresponding to the starting position information to the terminal coordinate corresponding to the terminal position information, to obtain a set of motion paths of the candidate tower cranes;
[0012] Based on the multi-tower crane control requirements of the hoisting task, and according to the motion path set, determining a target tower crane that matches the hoisting task;
[0013] A target control instruction is generated according to the target motion path corresponding to the target tower crane, and the target control instruction is sent to the target tower crane to control the target tower crane to collaboratively complete the hoisting task.
[0014] In some embodiments, when the candidate tower crane does not collide with an obstacle in the construction site, the step of determining the motion path of the object end of each candidate tower crane in the target coordinate system from the starting coordinate corresponding to the starting position information to the terminal coordinate corresponding to the terminal position information to obtain the motion path set of the candidate tower cranes includes:
[0015] Under the circumstance that the candidate tower cranes do not collide with obstacles in the construction site, a heuristic spatial search algorithm is used to calculate the optimal motion path of the hanging object end of each candidate tower crane in the target coordinate system from the starting coordinate corresponding to the starting position information to the terminal coordinate corresponding to the terminal position information, so as to obtain a set of motion paths of the candidate tower cranes.
[0016] In some embodiments, the step of determining a target tower crane matching the hoisting task based on the multi-tower crane control requirements of the hoisting task and according to the motion path set includes:
[0017] Based on the multi-tower crane control requirement of the hoisting task, determining a first number of tower cranes that need to be collaboratively controlled;
[0018] According to the working state information of each of the candidate tower cranes and the motion path set, a first number of candidate tower cranes where no collision event will occur between the tower cranes are determined as target tower cranes matching the lifting task.
[0019] In some embodiments, the step of determining a first number of candidate tower cranes where no collision event will occur between tower cranes as target tower cranes matching the lifting task according to the working status information of each candidate tower crane and the set of motion paths includes:
[0020] When the working status information of each candidate tower crane is the status information of not starting working, traversing the candidate tower crane combination consisting of the first number of candidate tower cranes among all the candidate tower cranes;
[0021] The candidate tower crane combination in which no collision event will occur between tower cranes and in which the sum of the motion paths of all tower cranes is the shortest is determined as the target tower crane combination, and the tower cranes in the target tower crane combination are determined as target tower cranes matching the lifting task.
[0022] In some embodiments, the step of determining a first number of candidate tower cranes where no collision event will occur between tower cranes as target tower cranes matching the lifting task according to the working status information of each candidate tower crane and the set of motion paths includes:
[0023] In the case that there is a second number of first candidate tower cranes whose working status information is status information of starting the hoisting task, determining that the first candidate tower cranes are target tower cranes matching the hoisting task, and no collision event will occur between the first candidate tower cranes;
[0024] Traversing a candidate tower crane combination consisting of a third number of candidate tower cranes among the candidate tower cranes whose working status information is that the work is not started, where the third number is the difference between the first number and the second number;
[0025] A candidate tower crane combination in which no collision event will occur between each tower crane in the candidate tower crane combination and each of the first candidate tower cranes and in which the sum of the motion paths of all tower cranes is the shortest is determined as a target tower crane combination, and a second candidate tower crane in the target tower crane combination is also determined as a target tower crane matching the lifting task.
[0026] In a second aspect, an embodiment of the present invention provides a tower crane control device, which is applied to a ground control terminal, wherein the ground control terminal is communicatively connected with multiple tower cranes on a construction site, and the tower crane control device includes:
[0027] An acquisition module is used to acquire the starting position information of the hoisting object in the hoisting task, and the end position information of placing the hoisting object;
[0028] The first determination module is used to determine, based on the starting position information and the ending position information, a plurality of initial tower cranes whose working areas include the starting position information and the ending position information; an initial tower crane whose working area is smaller than the target area is taken as a candidate tower crane, and a tower crane hoist motion coordinate system is established with the projection point of the center of rotation motion of any candidate tower crane on the horizontal plane as the origin of the coordinate system, the first direction as the positive direction of the y-axis of the coordinate system, and the second direction as the positive direction of the x-axis of the coordinate system; the point cloud data of the construction site, the starting position information and the ending position information are converted into the tower crane hoist motion coordinate system to obtain a target coordinate system; and in the case where the candidate tower crane does not collide with an obstacle in the construction site, a motion path of the hoist end of each candidate tower crane in the target coordinate system from the starting coordinate corresponding to the starting position information to the ending coordinate corresponding to the ending position information is determined to obtain a motion path set of the candidate tower cranes;
[0029] A second determination module is used to determine a target tower crane matching the hoisting task based on the multi-tower crane control requirements of the hoisting task and according to the motion path set;
[0030] The control module is used to generate a target control instruction according to the target motion path corresponding to the target tower crane, and send the target control instruction to the target tower crane to control the target tower crane to collaboratively complete the hoisting task.
[0031] In a third aspect, an embodiment of the present invention provides an electronic device, comprising a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of any one of the tower crane control methods described above when executing the computer program.
[0032] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in any one of the tower crane control methods described above are implemented.
[0033] The embodiment of the present invention provides a tower crane control method, device, electronic device and storage medium. The method obtains the starting position information and the ending position information of the hoisting object in the hoisting task, and determines the combination of the motion paths of the candidate tower cranes including the starting position information and the ending position information in the working area on the construction site. Therefore, based on the multi-tower crane control requirements and the motion path set of the hoisting task, multiple target tower cranes matching the hoisting task can be screened out from multiple candidate tower cranes, and then target control instructions can be generated according to the target motion paths corresponding to the multiple target tower cranes, so as to control the corresponding multiple target tower cranes to collaboratively complete the hoisting task, thereby effectively improving the work efficiency of the hoisting task and reducing the number of tower crane operators. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a flow chart of a tower crane control method provided by an embodiment of the present invention;
[0035] Figure 2 It is a flow chart of a method for determining a set of motion paths of a tower crane provided by an embodiment of the present invention;
[0036] Figure 3 It is a flow chart of a method for determining a target tower crane provided by an embodiment of the present invention;
[0037] Figure 4 It is a schematic flow chart of another method for determining a target tower crane provided by an embodiment of the present invention;
[0038] Figure 5 It is a structural schematic diagram of a tower crane control device provided by an embodiment of the present invention;
[0039] Figure 6 is a structural schematic diagram of an electronic device provided by an embodiment of the present invention;
[0040] Figure 7 This is another structural schematic diagram of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] It should be understood that the various steps described in the method embodiments of the present disclosure may be performed in different orders and / or in parallel. In addition, the method embodiments may include additional steps and / or omit the steps shown. The scope of the present disclosure is not limited in this respect.
[0043] The term "including" and its variations used herein are open inclusions, i.e., "including but not limited to". The term "based on" means "based at least in part on". The term "one embodiment" means "at least one embodiment"; the term "another embodiment" means "at least one additional embodiment"; the term "some embodiments" means "at least some embodiments". The relevant definitions of other terms will be given in the following description.
[0044] At the construction site, the efficient and safe use of tower cranes is related to the efficiency of the construction and the safety of personnel and equipment. The planning of tower crane hoisting objects is the core issue to achieve efficient and automated tower crane operation.
[0045] In the related art, tower crane path planning technology usually adopts heuristic space search algorithms, such as A* algorithm for path planning, which can realize global optimal path planning under the condition of setting cost estimation function. The rationality of the solution results of this type of heuristic algorithm is determined by the heuristic function or cost estimation function used. In the actual hoisting process of the tower crane, the hoisting wire rope, hook, and hoisting objects of the tower crane will be affected by the inertia of motion, the deflection of the tower structure, wind load, and the moment of the crane arm, which will cause deflection and shaking. The tower crane driver will carry out specific hoisting path planning and a series of tower crane operations based on his experience to ensure safe and stable operation.
[0046] This type of tower crane algorithm planning mainly carries out task planning from the perspective of a single tower crane. However, in a construction project, there are sometimes multiple tower cranes operating. The collaborative operation of multiple tower cranes is a common scenario, but there are currently few related multi-tower crane collaborative control solutions.
[0047] In order to solve the technical problems existing in the related art, an embodiment of the present invention provides a tower crane control method, which can be applied to a ground control terminal, and the ground control terminal is connected to multiple tower cranes on the construction site. Specifically, the ground control terminal provided in this embodiment can be a mobile terminal such as a mobile phone, a tablet, etc., or a PC terminal, which is not specifically limited here.
[0048] Optionally, the tower crane provided in this embodiment may be provided with a tower crane control system for controlling the tower crane, and the tower crane control system is connected to the ground control terminal in communication to receive control instructions sent by the ground control terminal and perform hoisting tasks. In addition, the ground control terminal provided in this embodiment may be a tower crane cockpit composed of a somatosensory seat simulation, and the tower crane provided in this embodiment may be equipped with inertial navigation, inclinometer and other detection elements, and the detected tower crane status data is sent to the ground control terminal, so that the ground control terminal uses these tower crane status data to control the somatosensory seat movements to restore the tower crane cockpit's forward pitch, backward pitch, left tilt, right tilt and other shaking states, thereby bringing an immersive experience to the tower crane operator.
[0049] The tower crane provided in this embodiment can be connected to multiple ground control terminals, and the ground control terminal can also be connected to multiple tower cranes, not limited to the construction site. Specifically, the ground control terminal can be connected to any registered tower crane at any location where the network conditions meet the requirements.
[0050] In this embodiment, the data interaction between the ground control terminal and the tower crane provided in this embodiment can be: a tower crane on a construction site is ready to access the network communication server, and the PLC control system on the tower crane side pre-stores the number of the tower crane, such as 1001, the IP address of the network communication server, and the port number of the related service. First, the tower crane sends a registration application to the device discovery service of the server. The device discovery service of the server receives the registration application, checks the status and verifies the legality, and records the device number of the discovered tower crane in the database. It is considered that the device has been registered, and the registration application result will be returned to the applying tower crane.
[0051] After the tower crane is registered, the PLC on the tower crane side will establish a TCP connection with the server to send the tower crane status to the server's status synchronization service in real time. After receiving the tower crane's message, the status synchronization service searches for the registered tower crane number in the database to confirm whether the tower crane number has been registered. The status synchronization service stores the relevant data of the registered tower crane in the database at a certain period. The data to be stored can be selected in the data dictionary.
[0052] Through the ground control terminal, select the tower crane to be controlled in the tower crane list, obtain the corresponding tower crane number, and submit a connection application to the server's connection management service. The connection management service checks whether the tower crane applied for connection is in normal state and confirms whether the communication with the server is normal. The connection management service searches for paired tower crane equipment and the ground control terminal to confirm that the target tower crane is not connected by other ground control terminals.
[0053] When the connection application returns successfully, the ground control end will establish a TCP connection with the server. The ground control end can send control commands to the server's command forwarding service in real time, so that the command forwarding service can verify the received control command message and forward it to the corresponding tower crane PLC to complete the remote control of the tower crane.
[0054] After the ground control end selects a tower crane, it will continue to send messages to the server before exiting. In addition to the target tower crane number and the status of the control command, the message also contains a life count value and a check code: the life count value increases by 1 each time it is sent, and the check code is calculated based on the verification algorithm for the valid data of the message. After the tower crane PLC receives the control command message forwarded by the server, it will determine whether the received data is valid.
[0055] If no valid new message is received within 100ms, the PLC on the tower crane side will think that there is a problem and prohibit the tower crane actuator from moving, waiting for communication to be restored. After the tower crane receives the control command, it will add the number of the ground control end in the returned TCP message.
[0056] After the server receives the message, on the one hand, the status synchronization service will update the database as required, and on the other hand, the command forwarding service will forward the status data to the ground control terminal according to the number of the ground control terminal. The server's connection maintenance service searches the list of registered tower crane equipment at a certain period, obtains its login time, update time and other information, and monitors in real time whether the tower crane equipment is offline or has other problems. The connection maintenance service also searches for paired tower crane equipment and ground control terminals at a certain period, checks the connection status, and promptly notifies other services, tower crane equipment and ground control terminals when abnormal connection disconnection, connection timeout, system security abnormality and other states occur, and takes measures to disconnect the connection.
[0057] In the scenario of the above embodiment, this embodiment provides a tower crane control method. For details, see Figure 1 , Figure 1 1 is a flow chart of a tower crane control method provided by an embodiment of the present invention, the method comprising steps 101 to 104;
[0058] Step 101, obtaining the starting position information of the hoisting object in the hoisting task and the ending position information of placing the hoisting object.
[0059] In this embodiment, the lifting task provided in this embodiment specifies the lifting object that requires the tower crane to lift the lifting object from its starting position to the end position. Therefore, by obtaining the lifting task, the starting position information of the lifting object and the end position information of placing the lifting object can be determined.
[0060] The starting position information and the ending position information provided in this embodiment may be specific positioning information or relative distance information to a reference object. The reference object may be any building or any tower crane, and is not specifically limited here.
[0061] Step 102: Determine, based on the starting position information and the ending position information, a set of motion paths of candidate tower cranes whose working areas include the starting position information and the ending position information.
[0062] In this embodiment, a communication connection is established between the ground control terminal provided in this embodiment and multiple tower cranes on the construction site, that is, multiple tower cranes are currently available for control by the ground control terminal to perform corresponding hoisting tasks. After the communication connection with multiple tower cranes, the corresponding working parameter information of each tower crane can be obtained, wherein the working parameter information may include the working area that the corresponding tower crane can cover.
[0063] After determining the working area corresponding to each tower crane, the tower cranes whose working area includes the starting position information and the ending position information can be determined, and these tower cranes are used as candidate tower cranes. Specifically, the candidate tower cranes provided in this embodiment are several tower cranes among the multiple tower cranes that are connected to the ground control end in communication, and the candidate tower cranes are all tower cranes that can complete the hoisting task.
[0064] After determining the candidate tower cranes that can complete the lifting task, this embodiment can determine the motion path corresponding to lifting the hoisted object from the starting position to the end position based on the position information and posture information of each candidate tower crane, and then use the motion path of each candidate tower crane as a motion path set of the candidate tower cranes.
[0065] In some embodiments, in order to improve the work efficiency of candidate tower cranes in completing hoisting tasks, the step of determining a set of motion paths of candidate tower cranes whose working areas include the starting position information and the ending position information based on the starting position information and the ending position information provided in this embodiment can specifically be: determining, based on the starting position information and the ending position information, multiple initial tower cranes whose working areas include the starting position information and the ending position information; taking an initial tower crane whose working area is smaller than the target area as a candidate tower crane, and determining a set of motion paths of the candidate tower cranes.
[0066] Among them, the target area provided in this embodiment can be determined by the ground terminal operator based on the working range of each initial tower crane and the starting position information and the end position information of the hoisted object, so as to filter out the initial tower cranes with a larger working range, that is, the ones that are far away from the hoisted object, so as to facilitate the use of the initial tower cranes with a smaller working range and closer to the hoisted object to perform the hoisting work, so as to improve the working efficiency of the tower cranes.
[0067] In addition, according to the working range of each initial tower crane, the average value range of the working range of all tower cranes can be used as the target range, so that the initial tower cranes with working ranges lower than the average value range can be used as candidate tower cranes, and tower cranes with smaller working ranges can be used as candidate tower cranes, so as to facilitate the selection of target tower cranes from these candidate tower cranes for hoisting tasks, thereby improving the working efficiency of tower cranes in completing hoisting tasks.
[0068] As an alternative embodiment, see Figure 2 , Figure 2is a flow chart of a method for determining a set of tower crane motion paths provided by an embodiment of the present invention. Figure 2 As shown, the method for determining a set of tower crane motion paths provided in this embodiment includes steps 201 to 203;
[0069] Step 201, establish a tower crane hoist motion coordinate system with the projection point of the center of rotation motion of any candidate tower crane on the horizontal plane as the origin of the coordinate system, the first direction as the positive direction of the y-axis of the coordinate system, and the second direction as the positive direction of the x-axis of the coordinate system.
[0070] In this embodiment, the first direction provided in this embodiment may be the due north direction, and the second direction may be the due east direction. As long as the first direction and the second direction are perpendicular to each other, no specific limitation is made here.
[0071] Specifically, this embodiment can take the projection point of the center of rotation motion of any candidate tower crane on the positive or negative zero horizontal plane of the construction site as the origin of the coordinate system, denoted as o, and then establish a Cartesian coordinate system with due north as the positive direction of the y-axis of the coordinate system and due east as the positive direction of the x-axis of the coordinate system, thereby obtaining the tower crane hoisting motion coordinate system.
[0072] Step 202: convert the point cloud data of the construction site, the starting position information and the end position information into the tower crane hoist motion coordinate system to obtain a target coordinate system.
[0073] In this embodiment, the point cloud data of the construction site environment can be collected in real time by using a laser radar deployed at the construction site, and then all the point cloud data can be converted into the tower crane hoist motion coordinate system. Specifically, the point cloud data collected at any time can be clustered and segmented into several point cloud sets using an octree-based point cloud Euclidean clustering algorithm, and a bounding box (axis-aligned bounding box) is constructed for each point cloud set. The bounding box uses a bounding box aligned with the coordinate axis. Optionally, a laser radar can be deployed on the tower crane boom, aimed at the position of the hook, and real-time point cloud data of the hoisted object can be collected. Considering the possible self-rotation of the hoisted object during the hoisting process, a bounding sphere can be constructed for the hoisted object.
[0074] Step 203, when the candidate tower crane does not collide with an obstacle in the construction site, determine the motion path of the hanging object end of each candidate tower crane in the target coordinate system, from the starting coordinate corresponding to the starting position information to the terminal coordinate corresponding to the terminal position information, to obtain a motion path set of the candidate tower cranes.
[0075] In this embodiment, the hoisting end provided in this embodiment is the hook at the end of the tower crane, and the hook is used to load the hoisting object so as to lift the hoisting object to the terminal position specified in the hoisting task to complete the hoisting task.
[0076] By constructing a bounding box to simulate obstacles and a bounding sphere to simulate the shaking range of the hoisted object during the lifting process, it is possible to plan a path in the target coordinate system in which the hoisted object will not collide with the bounding box. That is, all movement paths of the candidate tower crane in the target coordinate system without colliding with obstacles at the construction site are determined, thereby obtaining a set of movement paths of the candidate tower crane.
[0077] Specifically, this embodiment can adopt a state space search algorithm to exhaustively enumerate multiple motion paths of the hoisted object end of each candidate tower crane in the target coordinate system, from the starting coordinate corresponding to the starting position information to the terminal coordinate corresponding to the terminal position information; then, filter out the motion paths that will intersect with the obstacles simulated by the bounding box from the multiple motion paths, thereby obtaining the motion paths that will not intersect with the obstacles simulated by the bounding box, thereby obtaining a set of motion paths of the candidate tower cranes when there is no collision event with the obstacles in the construction site.
[0078] In some embodiments, in order to further improve the working efficiency of the tower crane, the present embodiment provides the step of determining the motion path of the hanging object end of each candidate tower crane in the target coordinate system, from the starting coordinate corresponding to the starting position information to the terminal coordinate corresponding to the terminal position information, when the candidate tower crane does not collide with the obstacles in the construction site, and obtaining the motion path set of the candidate tower cranes. Specifically, it can be: when the candidate tower crane does not collide with the obstacles in the construction site, a heuristic space search algorithm is used to calculate the optimal motion path of the hanging object end of each candidate tower crane in the target coordinate system, from the starting coordinate corresponding to the starting position information to the terminal coordinate corresponding to the terminal position information, and obtain the motion path set of the candidate tower cranes.
[0079] Among them, the heuristic space search algorithm A* (A-Star) is the most effective direct search method for solving the shortest path in a static road network, and is also one of the effective algorithms for solving many search problems. The heuristic space search algorithm contains a function for calculating the minimum cost between two points and a heuristic function for optimizing the search path. In this way, the optimal solution based on the heuristic value can be selected from the entire solution space, reducing the search complexity, thereby improving the calculation efficiency of determining the movement path of the tower crane, and enabling the tower crane to use the optimal movement path to lift the hoisted object, effectively improving the work efficiency of the tower crane.
[0080] Step 103: Based on the multi-tower crane control requirements of the hoisting task and according to the motion path set, a target tower crane matching the hoisting task is determined.
[0081] In this embodiment, the hoisting task provided by this embodiment may also include control requirements, such as a specified tower crane control requirement, a multi-tower crane coordinated control requirement, etc. In the case where the control requirement of the hoisting task is determined to be a multi-tower crane control requirement, this embodiment may determine a target tower crane that matches the hoisting task based on a set of motion paths of candidate tower cranes, and then coordinately control these target tower cranes to complete the hoisting task.
[0082] Specifically, the multi-tower crane control requirement includes a first number of tower cranes that need to be collaboratively controlled. Therefore, the multi-tower crane control requirement based on the hoisting task provided in this embodiment may include the step of determining the target tower crane that matches the hoisting task according to the motion path set. The step may be as follows: based on the multi-tower crane control requirement of the hoisting task, determine the first number of tower cranes that need to be collaboratively controlled; based on the working status information of each of the candidate tower cranes and the motion path set, determine a first number of candidate tower cranes that will not cause collision incidents between the tower cranes as target tower cranes that match the hoisting task.
[0083] Since the candidate tower cranes are all tower cranes that can complete the lifting task, and these candidate tower cranes will not collide with obstacles in the construction site environment, and in order to ensure the safety of the coordinated control between multiple tower cranes, it is also necessary to determine that there will be no collision between the multiple tower cranes. Therefore, this embodiment also needs to screen out a first number of candidate tower cranes that will not cause collisions among the multiple candidate tower cranes, and determine these first number of candidate tower cranes as target tower cranes. In this way, the safety of the coordinated control between multiple tower cranes can be effectively improved.
[0084] In some embodiments, the hoisting task provided by this embodiment may be a task that has not yet been executed, or a task that a tower crane is currently executing. For example, when a tower crane operator is executing a tower crane task, he or she may want to add other tower cranes to coordinate with the current tower crane to handle the current hoisting task. Therefore, in different task states of the hoisting task, the method of determining the target tower crane that matches the hoisting task in this embodiment is different, specifically:
[0085] In one implementation, when the lifting task is a task that has not started execution, refer to Figure 3 , Figure 3 FIG. 1 is a flow chart of a method for determining a target tower crane provided by an embodiment of the present invention. Figure 3 As shown, it includes step 301 to step 302;
[0086] Step 301: When the working status information of each candidate tower crane is the status information of not starting working, traverse the candidate tower crane combination consisting of the first number of candidate tower cranes among all the candidate tower cranes.
[0087] When determining that the hoisting task is a task that has not been started, this embodiment needs to select a first number of candidate tower cranes from multiple candidate tower cranes as target tower cranes, and when selecting from multiple candidate tower cranes, it is necessary to first confirm whether each candidate tower crane is in a normal state and whether it can be remotely controlled. Specifically, this embodiment can communicate with each candidate tower crane through the ground control terminal and obtain the working status information of each candidate tower crane to determine whether the current working status information of the candidate tower crane is all status information of not starting work. If so, the candidate tower crane combination composed of the first number of candidate tower cranes can be traversed among all the candidate tower cranes.
[0088] If there is a candidate tower crane whose current working status information is the working status information, the working candidate tower crane can be deleted from the candidate tower crane list corresponding to multiple candidate tower cranes, so as to traverse all candidate tower crane combinations among the remaining candidate tower cranes that have not started working.
[0089] Step 302: determine a candidate tower crane combination in which no collision event will occur between tower cranes and in which the sum of the movement paths of all tower cranes is the shortest as a target tower crane combination, and determine the tower cranes in the target tower crane combination as target tower cranes matching the lifting task.
[0090] After traversing all candidate tower crane combinations from multiple candidate tower cranes that have not started working, in order to ensure the safety and work efficiency of subsequent collaborative control of multiple tower cranes, this embodiment can determine the candidate tower crane combination in which no collision incidents will occur between the tower cranes and the sum of the motion paths of all tower cranes is the shortest as the target tower crane combination, and then determine the tower cranes in the target tower crane combination as the target tower cranes that match the current lifting task.
[0091] In this embodiment, by determining that no collision will occur between tower cranes in the candidate tower crane combination, the safety of the tower cranes during subsequent collaborative control of multiple tower cranes can be effectively guaranteed. At the same time, by determining that the sum of the motion paths of all tower cranes in the candidate tower crane combination is the shortest, the work efficiency of subsequent collaborative control of multiple tower cranes can be effectively improved.
[0092] In another embodiment, when the lifting task is a task that a tower crane is currently performing, refer to Figure 4 , Figure 4 FIG. 1 is a flow chart of another method for determining a target tower crane provided by an embodiment of the present invention. Figure 4 As shown, it includes steps 401 to 403;
[0093] Step 401: when there are a second number of first candidate tower cranes whose working status information is status information of starting the hoisting task, determine that the first candidate tower cranes are target tower cranes matching the hoisting task, and no collision event will occur between the first candidate tower cranes.
[0094] In this embodiment, when the hoisting task is a task that a tower crane is currently performing, it can be determined that there are a second number of first candidate tower cranes that are normally performing the hoisting task, and no collision incidents will occur between these first candidate tower cranes. At this time, the second number of first candidate tower cranes are directly determined as target tower cranes that match the hoisting task.
[0095] Step 402: traverse a candidate tower crane combination consisting of a third number of candidate tower cranes among the candidate tower cranes whose working status information is the status information of not starting working.
[0096] Similarly, this embodiment needs to traverse a candidate tower crane combination consisting of a third number of candidate tower cranes among multiple candidate tower cranes that have not started working, wherein the third number is the difference between the first number and the second number.
[0097] Step 403: determine the candidate tower crane combination in which no collision event will occur between each tower crane in the candidate tower crane combination and each of the first candidate tower cranes and in which the sum of the movement paths of all tower cranes is the shortest as the target tower crane combination, and similarly determine the second candidate tower crane in the target tower crane combination as the target tower crane matching the lifting task.
[0098] After traversing all candidate tower crane combinations from multiple candidate tower cranes that have not started working, in order to ensure the safety and work efficiency of subsequent collaborative control of multiple tower cranes, this embodiment can determine the candidate tower crane combination in which no collision incident will occur between each tower crane in the candidate tower crane combination and each of the first candidate tower cranes, and the candidate tower crane combination with the shortest sum of the motion paths of all tower cranes, as the target tower crane combination, and then similarly determine the second candidate tower crane in the target tower crane combination as the target tower crane that matches the current lifting task.
[0099] In this embodiment, by determining that no collision will occur between each tower crane in the candidate tower crane combination and each first candidate tower crane, the safety of the tower cranes during subsequent collaborative control of multiple tower cranes can be effectively guaranteed. At the same time, determining that the sum of the motion paths of all tower cranes is the shortest can effectively improve the work efficiency of subsequent collaborative control of multiple tower cranes.
[0100] Step 104: Generate a target control instruction according to the target motion path corresponding to the target tower crane, and send the target control instruction to the target tower crane to control the target tower crane to collaboratively complete the hoisting task.
[0101] After determining the target tower crane that matches the current lifting task, the corresponding target control instruction can be generated according to the motion path corresponding to the target tower crane, that is, the target motion path. The target control instruction can be a series of tower crane operation action sequences {a0, a1, ..., an}, and each item in the tower crane operation action sequence corresponds to an action of the tower crane, for example, a0 can be forward, a1 can be stop forward, a2 can be left shift, etc. In this way, different target tower cranes can be controlled respectively through multiple tower crane operation action sequences, thereby achieving the purpose of multi-tower crane coordinated control.
[0102] Furthermore, each item in the tower crane operation action sequence provided in this embodiment may also include control information such as time information, numerical information, rate information, etc. For example, a0 may be advancing 5m at a rate of 0.1m / s, a1 may be stopping and staying for 2s, a2 may be moving left 3m at a rate of 0.15m / s, and so on. As long as it is information used to control the tower crane operation action, no specific limitation is made here.
[0103] In summary, an embodiment of the present invention provides a tower crane control method, which is applied to a ground control terminal, and the ground control terminal is connected to multiple tower cranes on a construction site, including obtaining the starting position information and the end position information of the hoisting object in the hoisting task, determining the motion path set of the candidate tower cranes including the starting position information and the end position information in the working area, and based on the multi-tower crane control requirements of the hoisting task, determining the target tower crane matching the hoisting task according to the motion path set, generating a target control instruction according to the target motion path of the target tower crane, and sending the target control instruction to the target tower crane to control the target tower crane to collaboratively complete the hoisting task. The present invention can determine multiple target tower cranes matching the hoisting task based on the hoisting task and the motion paths of the candidate tower cranes, and control the target tower cranes to work collaboratively, so as to achieve the purpose of collaboratively completing the hoisting task by multiple tower cranes, improve work efficiency, and reduce the number of operators.
[0104] According to the method described in the above embodiment, this embodiment will be further described from the perspective of a tower crane control device. The tower crane control device can be implemented as an independent entity or integrated in an electronic device such as a terminal. The terminal may include a mobile phone, a tablet computer, etc.
[0105] In order to solve the same technical problem, this embodiment also provides a tower crane control device, which is applied to a ground control terminal, and the ground control terminal is connected to multiple tower cranes on the construction site. Figure 5 , Figure 5 is a structural schematic diagram of a tower crane control device provided by an embodiment of the present invention, such as Figure 5As shown, the tower crane control device 500 provided in the embodiment of the present invention includes: an acquisition module 501, a first determination module 502, a second determination module 503 and a control module 504;
[0106] The acquisition module 501 is used to acquire the starting position information of the hoisting object in the hoisting task and the ending position information of the hoisting object.
[0107] The first determining module 502 is configured to determine, based on the starting position information and the ending position information, a set of movement paths of candidate tower cranes whose working areas include the starting position information and the ending position information.
[0108] In this embodiment, the first determination module 502 provided in this embodiment is specifically used to: determine, based on the starting position information and the ending position information, multiple initial tower cranes whose working areas include the starting position information and the ending position information; take the initial tower cranes whose working areas are smaller than the target area as candidate tower cranes, and determine a set of motion paths of the candidate tower cranes.
[0109] In one embodiment, the first determination module 502 provided in this embodiment is also specifically used to: establish a tower crane hoist motion coordinate system with the projection point of the center of the rotation motion of any candidate tower crane on the horizontal plane as the origin of the coordinate system, with the first direction as the positive direction of the y-axis of the coordinate system, and with the second direction as the positive direction of the x-axis of the coordinate system; convert the point cloud data of the construction site, the starting position information and the end position information into the tower crane hoist motion coordinate system to obtain a target coordinate system; and determine the motion path of the hoist end of each candidate tower crane in the target coordinate system from the starting coordinate corresponding to the starting position information to the end coordinate corresponding to the end position information, in the case that the candidate tower crane does not collide with obstacles in the construction site, to obtain a motion path set of the candidate tower cranes.
[0110] Optionally, the first determination module 502 provided in this embodiment is also specifically used for: when the candidate tower crane does not collide with an obstacle in the construction site, using a heuristic space search algorithm to calculate the optimal motion path of the hanging object end of each candidate tower crane in the target coordinate system, from the starting coordinate corresponding to the starting position information to the terminal coordinate corresponding to the terminal position information, to obtain a set of motion paths of the candidate tower cranes.
[0111] The second determination module 503 is used to determine a target tower crane matching the hoisting task based on the multi-tower crane control requirements of the hoisting task and according to the motion path set.
[0112] In this embodiment, the second determination module 503 provided in this embodiment is specifically used to: determine the first number of tower cranes that need to be collaboratively controlled based on the multi-tower crane control requirements of the hoisting task; and determine the first number of candidate tower cranes that will not cause collision incidents between tower cranes as target tower cranes that match the hoisting task based on the working status information of each candidate tower crane and the motion path set.
[0113] In some implementation manners, the second determination module 503 provided in this embodiment is further specifically used for: when the working status information of each candidate tower crane is the status information of not starting working, traversing the candidate tower crane combination consisting of the first number of candidate tower cranes among all the candidate tower cranes;
[0114] The candidate tower crane combination in which no collision event will occur between tower cranes and in which the sum of the motion paths of all tower cranes is the shortest is determined as the target tower crane combination, and the tower cranes in the target tower crane combination are determined as target tower cranes matching the lifting task.
[0115] In some other implementations, the second determination module 503 provided in this embodiment is also specifically used for: in the case where there are a second number of first candidate tower cranes whose working status information is status information for starting the lifting task, determining that the first candidate tower cranes are target tower cranes matching the lifting task, and no collision events will occur between the first candidate tower cranes; traversing a candidate tower crane combination consisting of a third number of candidate tower cranes among the candidate tower cranes whose working status information is status information for not starting work, the third number being the difference between the first number and the second number; determining as the target tower crane combination a candidate tower crane combination in which no collision events will occur between each tower crane in the candidate tower crane combination and each of the first candidate tower cranes, and in which the sum of the motion paths of all the tower cranes is the shortest, and similarly determining the second candidate tower crane in the target tower crane combination as the target tower crane matching the lifting task.
[0116] The control module 504 is used to generate a target control instruction according to the target motion path corresponding to the target tower crane, and send the target control instruction to the target tower crane to control the target tower crane to collaboratively complete the hoisting task.
[0117] During specific implementation, the above modules and / or units can be implemented as independent entities, or can be arbitrarily combined to be implemented as the same or several entities. The specific implementation of the above modules and / or units can refer to the previous method embodiments. The specific beneficial effects that can be achieved can also refer to the beneficial effects in the previous method embodiments, which will not be repeated here.
[0118] Also, see Figure 6 , Figure 61 is a schematic diagram of a structure of an electronic device provided by an embodiment of the present invention, and the electronic device may be a mobile terminal such as a smart phone, a tablet computer, or the like. Figure 6 As shown, the electronic device 600 includes a processor 601 and a memory 602. The processor 601 is electrically connected to the memory 602.
[0119] The processor 601 is the control center of the electronic device 600. It uses various interfaces and lines to connect various parts of the entire electronic device. It executes various functions of the electronic device 600 and processes data by running or loading applications stored in the memory 602 and calling data stored in the memory 602, thereby monitoring the electronic device 600 as a whole.
[0120] In this embodiment, the processor 601 in the electronic device 600 will load the instructions corresponding to the processes of one or more applications into the memory 602 according to the following steps, and the processor 601 will run the application stored in the memory 602, thereby implementing any step in the tower crane control method provided in the above embodiment.
[0121] The electronic device 600 can implement the steps in any embodiment of the tower crane control method provided in the embodiments of the present invention, and therefore can achieve the beneficial effects that can be achieved by any tower crane control method provided in the embodiments of the present invention. Please refer to the previous embodiments for details and will not be repeated here.
[0122] See also Figure 7 , Figure 7 is another structural schematic diagram of an electronic device provided by an embodiment of the present invention, such as Figure 7 As shown, Figure 7 The specific structural block diagram of the electronic device provided in the embodiment of the present invention is shown, and the electronic device can be used to implement the tower crane control method provided in the above embodiment. The electronic device 700 can be a mobile terminal such as a smart phone or a laptop computer.
[0123] The RF circuit 710 is used to receive and send electromagnetic waves, realize the mutual conversion between electromagnetic waves and electrical signals, and thus communicate with a communication network or other devices. The RF circuit 710 may include various existing circuit elements for performing these functions, such as antennas, radio frequency transceivers, digital signal processors, encryption / decryption chips, user identity module (SIM) cards, memories, etc. The RF circuit 710 can communicate with various networks such as the Internet, corporate intranets, wireless networks, or communicate with other devices through wireless networks. The above-mentioned wireless networks may include cellular telephone networks, wireless local area networks, or metropolitan area networks. The wireless networks described above may use a variety of communication standards, protocols and technologies, including but not limited to Global System for Mobile Communication (GSM), Enhanced Data GSM Environment (EDGE), Wideband Code Division Multiple Access (WCDMA), Code Division Access (CDMA), Time Division Multiple Access (TDMA), Wireless Fidelity (Wi-Fi) (such as Institute of Electrical and Electronics Engineers standards IEEE 802.11a, IEEE 802.11b, IEEE802.11g and / or IEEE802.11n), Voice over Internet Protocol (VoIP), Worldwide Interoperability for Microwave Access (Wi-Max), other protocols for email, instant messaging and short messages, and any other suitable communication protocols, even those that have not yet been developed.
[0124] The memory 720 can be used to store software programs and modules, such as program instructions / modules corresponding to the tower crane control method in the above embodiment. The processor 780 executes various functional applications and controls the tower crane by running the software programs and modules stored in the memory 720.
[0125] The memory 720 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 720 may further include a memory remotely arranged relative to the processor 780, and these remote memories may be connected to the electronic device 700 via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0126] The input unit 730 can be used to receive input digital or character information, and generate keyboard, mouse, joystick, optical or trackball signal input related to user settings and function control. Specifically, the input unit 730 may include a touch-sensitive surface 731 and other input devices 732. The touch-sensitive surface 731, also known as a touch display screen or touch pad, can collect user touch operations on or near it (such as operations performed by users using fingers, styluses, or any other suitable objects or accessories on or near the touch-sensitive surface 731), and drive corresponding connection devices according to a pre-set program. Optionally, the touch-sensitive surface 731 may include a touch detection device and a touch controller. Among them, the touch detection device detects the user's touch direction, detects the signal brought by the touch operation, and transmits the signal to the touch controller; the touch controller receives the touch information from the touch detection device, converts it into touch point coordinates, and then sends it to the processor 780, and can receive and execute commands sent by the processor 780. In addition, the touch-sensitive surface 731 can be implemented in various types such as resistive, capacitive, infrared, and surface acoustic wave. In addition to the touch-sensitive surface 731, the input unit 730 may further include other input devices 732. Specifically, the other input devices 732 may include, but are not limited to, one or more of a physical keyboard, function keys (such as volume control keys, switch keys, etc.), a trackball, a mouse, a joystick, and the like.
[0127] The display unit 740 can be used to display information input by the user or information provided to the user and various graphical user interfaces of the electronic device 700, which can be composed of graphics, text, icons, videos and any combination thereof. The display unit 740 may include a display panel 741, and optionally, the display panel 741 may be configured in the form of LCD (Liquid Crystal Display), OLED (Organic Light-Emitting Diode), etc. Further, the touch-sensitive surface 731 may cover the display panel 741, and when the touch-sensitive surface 731 detects a touch operation on or near it, it is transmitted to the processor 780 to determine the type of the touch event, and then the processor 780 provides corresponding visual output on the display panel 741 according to the type of the touch event. Although in the figure, the touch-sensitive surface 731 and the display panel 741 are implemented as two independent components to implement input and output functions, in some embodiments, the touch-sensitive surface 731 and the display panel 741 can be integrated to implement input and output functions.
[0128] The electronic device 700 may also include at least one sensor 750, such as a light sensor, a motion sensor, and other sensors. Specifically, the light sensor may include an ambient light sensor and a proximity sensor, wherein the ambient light sensor may adjust the brightness of the display panel 741 according to the brightness of the ambient light, and the proximity sensor may generate an interrupt when the flip cover is closed or closed. As a type of motion sensor, the gravity acceleration sensor can detect the magnitude of acceleration in each direction (generally three axes), and can detect the magnitude and direction of gravity when stationary. It can be used for applications that identify the posture of the mobile phone (such as horizontal and vertical screen switching, related games, magnetometer posture calibration), vibration recognition related functions (such as pedometer, tapping), etc.; as for other sensors such as gyroscopes, barometers, hygrometers, thermometers, infrared sensors, etc. that can also be configured in the electronic device 700, they will not be repeated here.
[0129] The audio circuit 760, the speaker 761, and the microphone 762 can provide an audio interface between the user and the electronic device 700. The audio circuit 760 can transmit the electrical signal converted from the received audio data to the speaker 761, which is converted into a sound signal for output; on the other hand, the microphone 762 converts the collected sound signal into an electrical signal, which is received by the audio circuit 760 and converted into audio data, and then the audio data is output to the processor 780 for processing, and then sent to another terminal through the RF circuit 710, or the audio data is output to the memory 720 for further processing. The audio circuit 760 may also include an earplug jack to provide communication between an external headset and the electronic device 700.
[0130] The electronic device 700 can help the user receive requests, send information, etc. through the transmission module 770 (such as a Wi-Fi module), which provides the user with wireless broadband Internet access. Although the transmission module 770 is shown in the figure, it can be understood that it is not a necessary component of the electronic device 700 and can be omitted as needed without changing the essence of the invention.
[0131] The processor 780 is the control center of the electronic device 700. It uses various interfaces and lines to connect various parts of the entire mobile phone. By running or executing software programs and / or modules stored in the memory 720, and calling data stored in the memory 720, it executes various functions of the electronic device 700 and processes data, thereby monitoring the electronic device as a whole. Optionally, the processor 780 may include one or more processing cores; in some embodiments, the processor 780 may integrate an application processor and a modem processor, wherein the application processor mainly processes the operating system, user interface, and application programs, etc., and the modem processor mainly processes wireless communications. It can be understood that the above-mentioned modem processor may not be integrated into the processor 780.
[0132] The electronic device 700 also includes a power supply 790 (such as a battery) for supplying power to various components. In some embodiments, the power supply can be logically connected to the processor 780 through a power management system, so that the power management system can manage charging, discharging, and power consumption management. The power supply 790 can also include any components such as one or more DC or AC power supplies, recharging systems, power failure detection circuits, power converters or inverters, and power status indicators.
[0133] Although not shown, the electronic device 700 also includes a camera (such as a front camera, a rear camera), a Bluetooth module, etc., which will not be described in detail here. Specifically in this embodiment, the display unit of the electronic device is a touch screen display, and the mobile terminal also includes a memory, and one or more programs, wherein one or more programs are stored in the memory, and are configured to be executed by one or more processors to implement any step of the tower crane control method provided in the above embodiment.
[0134] In specific implementation, the above modules can be implemented as independent entities, or can be arbitrarily combined and implemented as the same or several entities. The specific implementation of the above modules can be found in the previous method embodiments, which will not be repeated here.
[0135] Those skilled in the art can understand that all or part of the steps in the various methods of the above embodiments can be completed by instructions, or by controlling related hardware through instructions, and the instructions can be stored in a computer-readable storage medium and loaded and executed by a processor. To this end, an embodiment of the present invention provides a storage medium, which stores multiple instructions, and when the instructions are executed by the processor, any step in the tower crane control method provided in the above embodiments can be implemented.
[0136] The storage medium may include: a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, etc.
[0137] Since the instructions stored in the storage medium can execute the steps in any embodiment of the tower crane control method provided in the embodiments of the present invention, the beneficial effects that can be achieved by any tower crane control method provided in the embodiments of the present invention can be achieved. Please refer to the previous embodiments for details and will not be repeated here.
[0138] The above is a detailed introduction to a tower crane control method, device, electronic device and storage medium provided by the embodiment of the present application. The principle and implementation method of the present application are described in detail using specific examples. The description of the above embodiments is only used to help understand the method and its core idea of the present application. At the same time, for those skilled in the art, according to the idea of the present application, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as limiting the present application. Moreover, for those of ordinary skill in the art, without departing from the principle of the present invention, several improvements and modifications can be made, and these improvements and modifications are also regarded as the protection scope of the present invention.
Claims
1. A tower crane control method, characterized in that: Applied to a ground control terminal, the ground control terminal is connected to multiple tower cranes on a construction site for communication, and the tower crane control method includes the following steps: Obtaining the starting position information of the hoisting object in the hoisting task and the ending position information of placing the hoisting object; According to the starting position information and the ending position information, determining a plurality of initial tower cranes including the starting position information and the ending position information in the working area; An initial tower crane whose working area is smaller than the target area is taken as a candidate tower crane, and a tower crane hoisting object motion coordinate system is established by taking the projection point of the center of rotation motion of any candidate tower crane on the horizontal plane as the origin of the coordinate system, taking the first direction as the positive direction of the y-axis of the coordinate system, and taking the second direction as the positive direction of the x-axis of the coordinate system; The point cloud data of the construction site, the starting position information and the end position information are converted into the tower crane hoisting object motion coordinate system to obtain a target coordinate system; Under the condition that the candidate tower cranes do not collide with obstacles in the construction site, determine the motion path of the object end of each candidate tower crane in the target coordinate system, from the starting coordinate corresponding to the starting position information to the terminal coordinate corresponding to the terminal position information, to obtain a set of motion paths of the candidate tower cranes; Based on the multi-tower crane control requirements of the hoisting task, and according to the motion path set, determining a target tower crane that matches the hoisting task; A target control instruction is generated according to the target motion path corresponding to the target tower crane, and the target control instruction is sent to the target tower crane to control the target tower crane to collaboratively complete the hoisting task.
2. The method according to claim 1, characterized in that The step of determining the motion path of the object end of each candidate tower crane moving from the starting coordinate corresponding to the starting position information to the terminal coordinate corresponding to the terminal position information in the target coordinate system when the candidate tower crane does not collide with the obstacle in the construction site, and obtaining the motion path set of the candidate tower cranes includes: Under the circumstance that the candidate tower cranes do not collide with obstacles in the construction site, a heuristic spatial search algorithm is used to calculate the optimal motion path of the hanging object end of each candidate tower crane in the target coordinate system from the starting coordinate corresponding to the starting position information to the terminal coordinate corresponding to the terminal position information, so as to obtain a set of motion paths of the candidate tower cranes.
3. The method according to claim 1, characterized in that The step of determining a target tower crane matching the hoisting task based on the multi-tower crane control requirements of the hoisting task and according to the motion path set comprises: Based on the multi-tower crane control requirement of the hoisting task, determining a first number of tower cranes that need to be collaboratively controlled; According to the working state information of each of the candidate tower cranes and the motion path set, a first number of candidate tower cranes where no collision event will occur between the tower cranes are determined as target tower cranes matching the lifting task.
4. The method according to claim 3, characterized in that The step of determining a first number of candidate tower cranes where no collision event will occur between tower cranes as target tower cranes matching the lifting task according to the working state information of each candidate tower crane and the set of motion paths comprises: When the working status information of each candidate tower crane is the status information of not starting working, traversing the candidate tower crane combination consisting of the first number of candidate tower cranes among all the candidate tower cranes; The candidate tower crane combination in which no collision event will occur between tower cranes and in which the sum of the motion paths of all tower cranes is the shortest is determined as the target tower crane combination, and the tower cranes in the target tower crane combination are determined as target tower cranes matching the lifting task.
5. The method according to claim 3, characterized in that The step of determining a first number of candidate tower cranes where no collision event will occur between tower cranes as target tower cranes matching the lifting task according to the working state information of each candidate tower crane and the set of motion paths comprises: In the case that there is a second number of first candidate tower cranes whose working status information is status information of starting the hoisting task, determining that the first candidate tower cranes are target tower cranes matching the hoisting task, and no collision event will occur between the first candidate tower cranes; Traversing a candidate tower crane combination consisting of a third number of candidate tower cranes among the candidate tower cranes whose working status information is that the work is not started, where the third number is the difference between the first number and the second number; A candidate tower crane combination in which no collision event will occur between each tower crane in the candidate tower crane combination and each of the first candidate tower cranes and in which the sum of the motion paths of all tower cranes is the shortest is determined as a target tower crane combination, and a second candidate tower crane in the target tower crane combination is also determined as a target tower crane matching the lifting task.
6. A tower crane control device, characterized in that: Applied to a ground control terminal, the ground control terminal is connected to multiple tower cranes on the construction site for communication, and the tower crane control device includes: An acquisition module is used to acquire the starting position information of the hoisting object in the hoisting task, and the end position information of placing the hoisting object; The first determination module is used to determine, based on the starting position information and the ending position information, a plurality of initial tower cranes whose working areas include the starting position information and the ending position information; an initial tower crane whose working area is smaller than the target area is taken as a candidate tower crane, and a tower crane hoist motion coordinate system is established with the projection point of the center of rotation motion of any candidate tower crane on the horizontal plane as the origin of the coordinate system, the first direction as the positive direction of the y-axis of the coordinate system, and the second direction as the positive direction of the x-axis of the coordinate system; the point cloud data of the construction site, the starting position information and the ending position information are converted into the tower crane hoist motion coordinate system to obtain a target coordinate system; and in the case where the candidate tower crane does not collide with an obstacle in the construction site, a motion path of the hoist end of each candidate tower crane in the target coordinate system from the starting coordinate corresponding to the starting position information to the ending coordinate corresponding to the ending position information is determined to obtain a motion path set of the candidate tower cranes; A second determination module is used to determine a target tower crane matching the hoisting task based on the multi-tower crane control requirements of the hoisting task and according to the motion path set; The control module is used to generate a target control instruction according to the target motion path corresponding to the target tower crane, and send the target control instruction to the target tower crane to control the target tower crane to collaboratively complete the hoisting task.
7. An electronic device, characterized in that: The electronic device comprises a processor, a memory, and a computer program stored in the memory and executable on the processor, and the processor implements the steps in the method according to any one of claims 1 to 5 when executing the computer program.
8. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the method according to any one of claims 1 to 5 are implemented.