An AI-based emergency command method and system for steel box basket arch bridge construction
Through AI-based construction emergency command methods and systems, the construction information of steel box basket arch bridges is monitored and analyzed, and the welding and tensioning sequence is adjusted, the problems of line shape and stability changes during the construction process are solved, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202410526245.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-04-29
AI Technical Summary
During the construction of the existing steel box basket arch bridge, due to structural changes and unreasonable construction plans, the bridge line shape and stability are affected, making it difficult to achieve precise construction, which reduces construction efficiency.
Using AI-based construction emergency command methods and systems, by monitoring construction information, building line and stability analysis models, timely correcting unstable factors, adjusting welding ambient temperature, welding sequence and tensioning sequence, and conducting emergency command.
It improves the efficiency of the steel box basket arch bridge construction process, ensures structural stability, reduces construction risks and equipment investment, and improves the rationality and safety of construction.
Smart Images

Figure CN118468382B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of bridge engineering, and in particular to an AI-based emergency command method and system for steel box basket arch bridge construction. Background Art
[0002] During the construction process of a steel basket arch bridge, the structural line type (i.e., the actual shape and position of the structure) and stability (the ability of the structure to resist instability) will also change due to changes in factors such as the structural geometry, construction sequence, construction load, support conditions, and initial defects. The stability of a steel basket arch bridge directly affects the safety of the bridge. By studying the relationship between line type and stability, we can better understand the problems that may arise during the construction of a steel basket arch bridge, predict and prevent instability, and thus ensure the structural safety during construction and use.
[0003] The invention patent with application number: CN201210221915.6 discloses a method for hoisting and constructing the arch rib segment of a steel box basket arch bridge, including the following steps: setting two groups of front and rear lifting points on the arch rib segment, and connecting them with two groups of front and rear transversely adjustable hoists respectively; lifting the arch rib segment through the two groups of front and rear transversely adjustable hoists, and adjusting its longitudinal inclination to the designed position before the arch rib segment leaves the ground or the deck; continuing to lift the arch rib segment through the two groups of front and rear transversely adjustable hoists, and adjusting the transverse inclination of the arch rib segment to the designed position in the air. In the above invention, the hook and the hoist are subjected to uniform force and small changes in the entire hoisting process, and the arch rib segment will not swing laterally during the lifting process, which reduces the construction risk and reduces the investment in equipment; the longitudinal and transverse inclination angles can be adjusted in the air, which is conducive to improving construction efficiency.
[0004] However, the premise for the above-mentioned existing technologies to achieve precise construction is that the construction plan is appropriate, and the construction process may introduce factors that affect the line shape and stability of the steel box basket arch bridge at any time. Construction based on a preset construction plan is not reasonable, which can easily reduce construction efficiency.
[0005] In view of this, there is an urgent need for an AI-based emergency command method and system for steel box basket arch bridge construction to at least solve the above-mentioned deficiencies. Summary of the invention
[0006] One of the purposes of the present invention is to provide an AI-based emergency command method and system for the construction of a steel box basket arch bridge, monitor the construction information during the construction of the steel box basket arch bridge, and at the same time, build a linear and stability analysis model. The construction information is input into the linear and stability analysis model to determine the stability analysis result, and emergency command is carried out based on the stability analysis result to correct unstable factors in a timely manner, thereby improving the construction efficiency of the steel box basket arch bridge construction process.
[0007] An AI-based emergency command method for steel box basket arch bridge construction provided by an embodiment of the present invention includes:
[0008] Step 1: Monitor the construction information during the construction of the steel box basket arch bridge;
[0009] Step 2: Based on AI technology, obtain the linearity and stability analysis model;
[0010] Step 3: Determine the stability analysis results based on the construction information, line type and stability analysis model;
[0011] Step 4: Conduct emergency command based on the stability analysis results.
[0012] Preferably, step 1: monitoring the construction information during the construction of the steel box basket arch bridge includes:
[0013] Monitor the welding temperature information of the arch rib segments of the steel box basket arch bridge;
[0014] Get a video of the construction process;
[0015] Determine the welding sequence information and the hanger tensioning sequence information based on the construction process video;
[0016] The welding temperature information, welding sequence information and hanger tensioning sequence information are taken together as construction information.
[0017] Preferably, step 2: based on AI technology, obtaining a linearity and stability analysis model includes:
[0018] Through welding simulation technology, the arch rib segment welding is simulated under different sunshine environments to obtain the first influencing law data, which are: the temperature, strain and stress of each point of the arch rib segment welding joint when the arch rib segment is welded under different sunshine environments;
[0019] Through the welding process simulation technology, the arch rib segment welding is simulated in different welding sequences to obtain the second influence law data, which are: the temperature field, strain field and stress field of the arch rib segment welding joint in different welding sequences;
[0020] Through the preset finite element analysis platform, the construction process of the steel box basket arch bridge is simulated to obtain the third influence law data, which is the influence data of the tensioning sequence of different hangers and tie rods on the arch rib linear shape;
[0021] Based on AI technology, the linearity and stability analysis model is obtained according to the first influencing law data, the second influencing law data and the third influencing law data.
[0022] Preferably, the welding process simulation technology is used to simulate the welding of arch rib segments in different welding sequences to obtain the second influencing law data, including:
[0023] Create the first 3D geometry model of the arch rib segment joint;
[0024] Based on a preset material property setting rule, setting a first material property for the first three-dimensional geometric model;
[0025] After the first material property is set, the welding conditions are obtained;
[0026] According to the welding conditions, set the boundary conditions during the welding process;
[0027] Get the target welding sequence;
[0028] Simulating the welding process in a first three-dimensional geometric model according to a target welding sequence;
[0029] Conduct coupled heat transfer analysis, fluid dynamics analysis, and solid mechanics analysis in the simulated welding process to simulate the thermal effects, molten pool flow, and structural response during welding;
[0030] After the simulation of the welding process is completed, the second influence law data is obtained.
[0031] Preferably, the construction process of the steel box basket arch bridge is simulated through a preset finite element analysis platform to obtain the third influence law data, including:
[0032] Creating a second three-dimensional geometric model;
[0033] Setting a second material property for the second three-dimensional geometric model based on a preset material property setting rule;
[0034] After the second material property is set, the construction conditions are obtained;
[0035] According to the construction conditions, set the model constraints of the second 3D geometric model;
[0036] Obtaining the first target tensioning sequence;
[0037] Simulating the tensioning process in the second three-dimensional geometric model according to the first target tensioning sequence;
[0038] Perform nonlinear finite element analysis during the simulated tensioning process and, at the same time, load constraints on the second three-dimensional geometric model;
[0039] After the simulation of the tensioning process is completed, the third influence law data is obtained.
[0040] Preferably, obtaining the first target tensioning sequence includes:
[0041] Acquire the model structure characteristics of the suspension rod model in the second three-dimensional geometric model;
[0042] Determine the measurement difficulty of the boom model based on the structural characteristics of the model;
[0043] Eliminate the boom models whose measurement difficulty is greater than or equal to a preset measurement difficulty threshold, and use the remaining boom models as target models;
[0044] Determine the tension characteristics according to the target model;
[0045] Based on the records of the manual tensioning process, the tensioning scheme determination model is trained;
[0046] The tensioning characteristics are input into the tensioning scheme determination model to obtain the first target tensioning sequence.
[0047] Preferably, step 3: determining the stability analysis result according to the construction information and the line type and the stability analysis model includes:
[0048] Determine the welding environment temperature analysis results, welding sequence analysis results and tensioning sequence analysis results based on the construction information and the linear and stability analysis model;
[0049] The welding environment temperature analysis results, welding sequence analysis results and tensioning sequence analysis results are taken together as stability analysis results.
[0050] Preferably, step 4: conducting emergency command according to the stability analysis result includes:
[0051] Analyze the stability analysis results and try to obtain emergency command items;
[0052] If the acquisition attempt is successful, determine the instability type of the emergency command item;
[0053] Determine emergency command strategies based on the type of instability;
[0054] Conduct corresponding emergency command according to the emergency command strategy;
[0055] Among them, the emergency command strategy is determined according to the type of instability, including:
[0056] If the instability type is the welding environment temperature factor, the optimal welding environment temperature is determined based on the construction information and the linear and stability analysis model;
[0057] If the instability type is a welding sequence factor, the optimal welding sequence is determined based on the construction information and the linear and stability analysis model;
[0058] If the instability type is the tensioning sequence factor, the optimal tensioning sequence is determined based on the construction information and the linear and stability analysis model;
[0059] The optimal welding environment temperature and / or the optimal welding sequence and / or the optimal tensioning sequence are used as emergency command strategies.
[0060] Preferably, the optimal tensioning sequence is determined based on the construction information and the linear and stability analysis model, including:
[0061] Construct an impact matrix based on the third impact law data and construction information;
[0062] Get the tension target;
[0063] Based on the forward iteration method and the reverse iteration method, the cable adjustment scheme is determined according to the tensioning target and the influence matrix;
[0064] Determine the optimal tensioning sequence according to the cable adjustment scheme;
[0065] Among them, according to the third impact law data and construction information, the impact matrix is constructed, including:
[0066] parsing the third influence law data to determine the unit stiffness matrix of each model unit of the second three-dimensional geometric model;
[0067] Based on a preset splicing rule, according to the relative positions of the unit model units in the second three-dimensional geometric model, the unit stiffness matrices are spliced to obtain a global stiffness matrix;
[0068] Determine structural response information based on the third influence law data and construction information;
[0069] The influence matrix is determined based on the global stiffness matrix and structural response information.
[0070] Preferably, based on the forward iteration method and the inverted iteration method, according to the tensioning target and the influence matrix, a cable adjustment scheme is determined, including:
[0071] Based on the forward iteration method, the first transition matrix is determined according to the tension target and the influence matrix;
[0072] Optimize the first transition matrix according to the flip-chip method to obtain the second transition matrix;
[0073] A library is determined based on the second transition matrix and a preset adjustment scheme to determine the adjustment scheme.
[0074] Preferably, optimizing the first transition matrix according to the flip-chip method to obtain the second transition matrix includes:
[0075] Obtain the optimization experience record of manual optimization of cable adjustment scheme based on the inversion method;
[0076] Determine the optimization results of the optimization experience record;
[0077] Analyze the optimization results and obtain the optimization features, which include optimization efficiency, optimization quality and optimization process similarity;
[0078] Based on the preset evaluation template and optimization characteristics, determine the target optimization experience record;
[0079] The flip-chip optimization model is trained according to the target optimization experience record, and the first transition matrix is input into the flip-chip optimization model to obtain the second transition matrix.
[0080] An AI-based steel box basket arch bridge construction emergency command system provided in an embodiment of the present invention includes:
[0081] The construction information monitoring subsystem is used to monitor the construction information of the steel box basket arch bridge during construction;
[0082] Linearity and stability analysis model acquisition subsystem, used to obtain linearity and stability analysis models based on AI technology;
[0083] The stability analysis result determination subsystem is used to determine the stability analysis result according to the construction information, the line type and the stability analysis model;
[0084] The emergency command subsystem is used to conduct emergency command based on the results of stability analysis.
[0085] The beneficial effects of the present invention are:
[0086] The present invention monitors the construction information of the steel box basket arch bridge during construction, and at the same time, constructs a linear and stability analysis model. The construction information is input into the linear and stability analysis model to determine the stability analysis result, and emergency command is carried out based on the stability analysis result to correct unstable factors in time, thereby improving the construction efficiency of the steel box basket arch bridge during construction.
[0087] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures specifically pointed out in the present application documents.
[0088] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0089] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0090] Figure 1 It is a schematic diagram of an AI-based emergency command method for steel box basket arch bridge construction in an embodiment of the present invention;
[0091] Figure 2 It is a schematic diagram of an AI-based emergency command system for steel box basket arch bridge construction in an embodiment of the present invention. DETAILED DESCRIPTION
[0092] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0093] The embodiment of the present invention provides an AI-based emergency command method for steel box basket arch bridge construction, such as Figure 1 As shown, including:
[0094] Step 1: monitoring the construction information of the steel box basket arch bridge during construction; the construction information is: the information related to the construction recorded during the construction of the steel box basket arch bridge, such as: the temperature of the welded arch rib segment, the welding sequence of the arch rib segment, and the tensioning sequence of the hanger, etc.;
[0095] Step 2: Based on AI technology, obtain the linear shape and stability analysis model; wherein the linear shape and stability analysis model is: an AI model for predicting and evaluating the geometric shape (linear shape) and structural stability of the steel box basket arch bridge during construction and after completion;
[0096] Step 3: Determine the stability analysis results based on the construction information and the line type and stability analysis model; the stability analysis results are: the influence of different types of construction information on the shape and stability of the steel box basket arch bridge;
[0097] Step 4: Conduct emergency command based on the stability analysis results. Conducting emergency command based on the stability analysis results refers to determining the type of construction information that affects the line type and stability and determining the emergency command strategy to adjust the construction plan.
[0098] The working principle and beneficial effects of the above technical solution are:
[0099] This application monitors the construction information of the steel box basket arch bridge during construction, and at the same time, constructs a line type and stability analysis model. The construction information is input into the line type and stability analysis model to determine the stability analysis results, and emergency command is carried out based on the stability analysis results to correct unstable factors in a timely manner, thereby improving the construction efficiency of the steel box basket arch bridge during construction.
[0100] In one embodiment, step 1: monitoring the construction information during the construction of the steel box basket arch bridge includes:
[0101] Monitor the welding temperature information of the arch rib segment of the steel box basket arch bridge; wherein the welding temperature information is: the temperature data when welding the arch rib segment joint;
[0102] Obtain a video of the construction process; wherein the video of the construction process is: a video of the construction process of the steel box basket arch bridge;
[0103] According to the construction process video, the welding sequence information and the suspension rod tensioning sequence information are determined; wherein the welding sequence information is information recording the sequence of welding operations; the suspension rod tensioning sequence information is information recording the sequence of tensioning the suspension rod and the tie rod;
[0104] The welding temperature information, welding sequence information and hanger tensioning sequence information are taken together as construction information.
[0105] The working principle and beneficial effects of the above technical solution are:
[0106] The present application monitors the welding temperature information of the arch rib segments of the steel box basket arch bridge. At the same time, it analyzes the construction process video to obtain the welding sequence information and the hanger tensioning sequence information. The welding temperature information, welding sequence information and hanger tensioning sequence information are used together as construction information, thereby improving the comprehensiveness of the construction information acquisition.
[0107] In one embodiment, step 2: obtaining a linearity and stability analysis model based on AI technology includes:
[0108] Through welding simulation technology, the arch rib segment welding is simulated under different sunshine environments to obtain the first influencing law data, which are: the temperature, strain and stress of each point of the arch rib segment welding joint when the arch rib segment is welded under different sunshine environments;
[0109] Through the welding process simulation technology, the arch rib segment welding is simulated in different welding sequences to obtain the second influence law data, which are: the temperature field, strain field and stress field of the arch rib segment welding joint in different welding sequences;
[0110] Through the preset finite element analysis platform, the construction process of the steel box basket arch bridge is simulated to obtain the third influence law data, which is the influence data of the tensioning sequence of different hangers and tie rods on the arch rib linear shape;
[0111] Based on AI technology, the linearity and stability analysis model is obtained according to the first influencing law data, the second influencing law data and the third influencing law data.
[0112] The working principle and beneficial effects of the above technical solution are:
[0113] This application introduces welding simulation technology to simulate the welding of arch rib segments under different sunlight environments, and determines the first influencing law data (temperature, strain and stress at each point of the arch rib segment welding joint when welding the arch rib segments under different sunlight environments); introduces welding process simulation technology to perform arch rib segment welding under different welding sequences, and determines the second influencing law data (temperature field, strain field and stress field of the arch rib segment welding joint under different welding sequences); simulates the tensioning of hangers and tie rods in different sequences on a preset finite element analysis platform, and determines the third influencing law data (influence data of the arch rib linear shape), and uses AI technology to learn the first influencing law data, the second influencing law data and the third influencing law data to obtain the linear shape and stability analysis model, and the acquisition process of the linear shape and stability analysis model is more reasonable.
[0114] In one embodiment, the welding process simulation technology is used to simulate the welding of arch rib segments in different welding sequences to obtain the second influencing law data, including:
[0115] Creating a first three-dimensional geometric model of the arch rib segment joint; wherein the first three-dimensional geometric model is: a three-dimensional geometric model of the arch rib segment joint, including the shape and size of the arch rib segment and the design of the welding groove, etc.;
[0116] Based on a preset material property setting rule, a first material property is set for the first three-dimensional geometric model; wherein the preset material property setting rule is manually preset; the first material property is: a material parameter set for the first three-dimensional geometric model, such as: elastic modulus, yield strength, and thermal expansion coefficient;
[0117] After the first material property is set, the welding conditions are obtained; wherein the welding conditions are: the welding method actually used during the construction process;
[0118] According to the welding conditions, boundary conditions in the welding process are set; wherein the boundary conditions are: fixed points, constraint points or force points of the first three-dimensional geometric model in the simulated welding process determined according to the welding conditions;
[0119] Obtain a target welding sequence; wherein the target welding sequence is: a welding sequence that needs to be simulated;
[0120] Simulating the welding process in a first three-dimensional geometric model according to a target welding sequence;
[0121] In the simulated welding process, coupled heat transfer analysis, fluid dynamics analysis and solid mechanics analysis are carried out to simulate the thermal effect, molten pool flow and structural response in the welding process; wherein, coupled heat transfer analysis is to analyze the transfer of heat energy in the simulated welding process, including phenomena such as heat conduction, heat convection and heat radiation; fluid dynamics analysis is to analyze the flow behavior of liquid metal in the molten pool, the shape of the molten pool, the size of the molten pool and the flow behavior of the molten pool in the simulated welding process; structural response is to analyze the mechanical behavior and physical performance of the arch rib segment in the simulated welding process;
[0122] After the simulation of the welding process is completed, the second influence law data is obtained.
[0123] The working principle and beneficial effects of the above technical solution are:
[0124] This application introduces welding process simulation technology to create a first three-dimensional geometric model. The welding method actually used in the construction process is obtained, and the boundary conditions of the first three-dimensional geometric model are determined according to the welding method. The welding sequence required for simulation is introduced to simulate the welding process. During the simulation process, coupled heat transfer analysis, fluid dynamics analysis, and solid mechanics analysis are performed, and the regular data obtained by the analysis is obtained as the second influencing regular data, thereby improving the accuracy of the second influencing regular data.
[0125] In one embodiment, a preset finite element analysis platform is used to simulate the construction process of a steel box basket arch bridge to obtain the third influence law data, including:
[0126] Creating a second three-dimensional geometric model; wherein the second three-dimensional geometric model is: a three-dimensional model of arch ribs, hangers, tie rods and other structural details of the steel box basket arch bridge established in a preset finite element analysis platform;
[0127] Based on a preset material property setting rule, a second material property is set for the second three-dimensional geometric model; wherein the second material property is: a material parameter set for the second three-dimensional geometric model, such as: elastic modulus, Poisson's ratio, and yield strength;
[0128] After the second material property is set, the construction conditions are obtained; the construction conditions are: conditions related to the tensioning operation of the hanger and tie rods during the actual construction process, such as: what kind of tensioning equipment;
[0129] According to the construction conditions, model constraints of the second three-dimensional geometric model are set; wherein the model constraints are: restrictions on the boundaries and degrees of freedom of the second three-dimensional geometric model determined according to the construction conditions;
[0130] Obtaining a first target tensioning sequence; wherein the first target tensioning sequence is: a tensioning sequence to be simulated;
[0131] Simulating the tensioning process in the second three-dimensional geometric model according to the first target tensioning sequence;
[0132] During the tension simulation process, nonlinear finite element analysis is performed, and at the same time, load constraints of the second three-dimensional geometric model are applied; wherein, nonlinear finite element analysis is: using finite element analysis methods to solve problems such as material nonlinearity, geometric nonlinearity or contact nonlinearity; load constraints are: the force or moment applied to the model, as well as the method and time of applying these loads;
[0133] After the simulation of the tensioning process is completed, the third influence law data is obtained.
[0134] The working principle and beneficial effects of the above technical solution are:
[0135] This application introduces a finite element analysis platform and creates a second three-dimensional geometric model in the platform. The construction conditions related to the tensioning operation of the hangers and tie rods in the actual construction process are introduced, and the model constraints of the second three-dimensional geometric model are set according to the construction conditions. The tensioning sequence to be simulated is obtained, and the tensioning is simulated according to the first target tensioning sequence, and the linear data under different tensioning sequences, including displacement, stress and strain, are obtained. The third influence law data is obtained according to the simulation results, which improves the suitability of the third influence law data acquisition.
[0136] In one embodiment, obtaining a first target tensioning sequence includes:
[0137] Acquire the model structure feature of the hanger model in the second three-dimensional geometric model; wherein the model structure feature is: a characteristic representation of the structural information of the model to be tensioned in the second three-dimensional geometric model in the completed bridge model;
[0138] Determine the measurement difficulty of the boom model based on the structural characteristics of the model; the measurement difficulty refers to the difficulty of measuring the geometric parameters of the boom (such as length and angle) during construction;
[0139] Eliminate the boom models whose measurement difficulty is greater than or equal to a preset measurement difficulty threshold, and use the remaining boom models as target models; wherein the preset measurement difficulty threshold is manually preset;
[0140] Determine the tensioning characteristics according to the target model; wherein the tensioning characteristics are: the material properties and prestress level of the entity corresponding to the target model, and the capabilities and limitations of the tensioning equipment, etc.;
[0141] Based on the records of manual tensioning process, the tensioning scheme determination model is trained; the manual tensioning process records are: various data recorded when the hanger is manually tensioned in actual bridge construction, such as tensioning force, tensioning sequence and construction time, etc.; the tensioning scheme determination model is: an AI model for determining the tensioning scheme obtained by machine learning the records of manual tensioning process;
[0142] The tensioning characteristics are input into the tensioning scheme determination model to obtain the first target tensioning sequence.
[0143] The working principle and beneficial effects of the above technical solution are:
[0144] This application introduces the model structure features, determines the measurement difficulty of the hanger model, selects the hanger that is relatively easy to measure as the control target of the tensioning sequence, and improves the convenience of subsequent construction. Determine the material properties of the control target, the prestressing level, and the capabilities and limitations of the tensioning equipment; in addition, introduces a tensioning scheme determination model based on manual tensioning process record training, inputs the tensioning features into the tensioning scheme determination model, obtains the first target tensioning sequence, and improves the suitability of obtaining the first target tensioning sequence.
[0145] In one embodiment, step 3: determining stability analysis results according to the construction information and the line type and stability analysis model includes:
[0146] According to the construction information and the linear and stability analysis model, the welding environment temperature analysis result, the welding sequence analysis result and the tensioning sequence analysis result are determined; wherein the welding environment temperature analysis result is: the analysis result of analyzing whether the welding environment temperature in the construction information is suitable; the welding sequence analysis result is: the analysis result of analyzing whether the welding sequence in the construction information is suitable; the tensioning sequence analysis result is: the analysis result of analyzing whether the tensioning sequence in the construction information is suitable;
[0147] The welding environment temperature analysis results, welding sequence analysis results and tensioning sequence analysis results are taken together as stability analysis results.
[0148] The working principle and beneficial effects of the above technical solution are:
[0149] This application determines the welding environment temperature analysis results, welding sequence analysis results and tensioning sequence analysis results respectively according to the construction information and the linear and stability analysis model, thereby improving the comprehensiveness of the analysis.
[0150] In one embodiment, step 4: conducting emergency command according to the stability analysis result includes:
[0151] Analyze the stability analysis results and try to obtain emergency command items; emergency command items are key items or factors that require immediate attention and action during construction to prevent structural instability or accidents, such as welding temperature, welding sequence, and tensioning sequence;
[0152] If the attempt is successful, determine the instability type of the emergency command item; wherein the instability type is: the type of factor causing the instability, such as: welding environment temperature factor, welding sequence factor and tensioning sequence factor;
[0153] Determine the emergency command strategy according to the instability type; wherein the emergency command strategy is: a construction plan for solving the instability problem determined based on the instability analysis results;
[0154] Conduct corresponding emergency command according to the emergency command strategy;
[0155] Among them, the emergency command strategy is determined according to the type of instability, including:
[0156] If the instability type is the welding environment temperature factor, the optimal welding environment temperature is determined according to the construction information and the linear and stability analysis model; when determining the optimal welding environment temperature according to the construction information and the linear and stability analysis model, the construction information is parsed to obtain the current sunshine environment, and the optimal welding environment temperature is determined according to the current sunshine environment and the linear and stability analysis model;
[0157] If the instability type is a welding sequence factor, an optimal welding sequence is determined according to the construction information and the line type and stability analysis model; wherein, when determining the optimal welding sequence according to the construction information and the line type and stability analysis model, the construction information is parsed to determine the welding operations that have been performed, and the optimal welding sequence is determined according to the welding operations that have been performed and the line type and stability analysis model;
[0158] If the instability type is the tensioning sequence factor, the optimal tensioning sequence is determined based on the construction information and the linear and stability analysis model;
[0159] The optimal welding environment temperature and / or the optimal welding sequence and / or the optimal tensioning sequence are used as emergency command strategies.
[0160] The working principle and beneficial effects of the above technical solution are:
[0161] This application obtains emergency command items in the stability analysis results, determines the instability type of the emergency command item (the type of factor causing the instability), and determines the emergency command strategy according to the different instability types.
[0162] When the instability type is the welding environment temperature factor, the construction information is analyzed to obtain the current sunlight environment, and the optimal welding environment temperature is determined according to the current sunlight environment and the linear and stability analysis model; when the instability type is the welding sequence factor, the construction information is analyzed to determine the welding operations that have been performed, and the optimal welding sequence is determined according to the welding operations that have been performed and the linear and stability analysis model; when the instability type is the tensioning sequence factor, the optimal tensioning sequence is determined according to the construction information and the linear and stability analysis model, and the optimal welding environment temperature and / or the optimal welding sequence and / or the optimal tensioning sequence are summarized as the emergency command strategy, thereby improving the suitability of the formulation of the emergency command strategy.
[0163] Finally, corresponding emergency command is carried out according to the emergency command strategy, which improves the rationality and timeliness of emergency command.
[0164] In one embodiment, the optimal tensioning sequence is determined according to the construction information and the line type and stability analysis model, including:
[0165] According to the third influence law data and construction information, an influence matrix is constructed; wherein the influence matrix is: a matrix that quantifies the influence of the tensioning operation on the structural response of the steel box basket arch bridge;
[0166] Obtain the tension target; wherein the tension target is: the structural response state that the steel box basket arch bridge needs to achieve;
[0167] Based on the forward iteration method and the inverted method, the cable adjustment scheme is determined according to the tensioning target and the influence matrix; the forward iteration method is a cable adjustment method that achieves the tensioning target by the method of stepwise approximation; the inverted method is a cable adjustment method that reversely determines the operation steps required to achieve the tensioning target through the tensioning target; the cable adjustment scheme is: the tensioning sequence of the hanger;
[0168] Determine the optimal tensioning sequence according to the cable adjustment scheme;
[0169] Among them, according to the third impact law data and construction information, the impact matrix is constructed, including:
[0170] Analyze the third influence law data to determine the unit stiffness matrix of each model unit of the second three-dimensional geometric model; wherein the unit stiffness matrix is a matrix that describes the stiffness characteristics of a single finite element (such as a hanger unit and a tie rod unit);
[0171] Based on the preset splicing rules, according to the relative positions of the unit model units in the second three-dimensional geometric model, the unit stiffness matrices are spliced to obtain the global stiffness matrix; wherein the global stiffness matrix is: a matrix obtained by assembling (splicing) all the unit stiffness matrices according to their relative positions in the structure;
[0172] Determine the structural response information according to the third influencing law data and the construction information; wherein, when determining the structural response information according to the third influencing law data and the construction information, the third influencing law data corresponding to the construction information in the third influencing law data is parsed to determine the structural response information;
[0173] According to the global stiffness matrix and the structural response information, the influence matrix is determined, where the rows of the influence matrix correspond to the response points of the structure and the columns correspond to the positions of the applied forces.
[0174] The working principle and beneficial effects of the above technical solution are:
[0175] This application constructs an influence matrix that quantifies the influence of tensioning operation on the structural response of a steel box basket arch bridge based on the third influence law data and construction information; when constructing, the third influence law data is parsed to determine the unit stiffness matrix of each model unit of the second three-dimensional geometric model, and the unit stiffness matrix is spliced to obtain the global stiffness matrix. In addition, the third influence law data corresponding to the construction information in the third influence law data is parsed to determine the structural response information, and the influence matrix is determined based on the global stiffness matrix and the structural response information.
[0176] After obtaining the influence matrix, the forward iteration method and the inverted iteration method are introduced to determine the cable adjustment plan based on the tensioning target and the influence matrix. Based on the cable adjustment plan, the optimal tensioning sequence is determined, which improves the cable adjustment accuracy and speed.
[0177] In one embodiment, based on the forward iteration method and the reverse iteration method, according to the tensioning target and the influence matrix, a cable adjustment scheme is determined, including:
[0178] Based on the forward iteration method, the first transition matrix is determined according to the tension target and the influence matrix; when determining the first transition matrix, the state response matrix of the matrix structure of the tension target corresponding to the influence matrix is determined, the influence matrix and a matrix to be solved are multiplied to obtain the state response matrix, and the matrix to be solved is solved to obtain the first transition matrix;
[0179] The first transition matrix is optimized according to the inversion method to obtain the second transition matrix; wherein the second transition matrix is: a matrix for guiding the adjustment of cable force in actual construction after the first transition matrix is optimized by the inversion method, and combines the calculation results of the forward iteration method and the optimization strategy of the inversion method;
[0180] The cable adjustment scheme is determined according to the second transition matrix and a preset cable adjustment scheme determination library, wherein the preset cable adjustment scheme determination library is manually preset.
[0181] The working principle and beneficial effects of the above technical solution are:
[0182] This application introduces a forward iteration method to determine the first transition matrix from the current state to the tensioning target. The inverted method is introduced to optimize the first transition matrix and determine the second transition matrix to guide the cable force adjustment in actual construction. The database matching result of the library is determined based on the second transition matrix and the preset cable adjustment scheme, and the successfully matched cable adjustment scheme is determined, which further improves the cable adjustment accuracy.
[0183] In one embodiment, optimizing the first transition matrix according to the flip-chip method to obtain the second transition matrix includes:
[0184] Obtaining optimization experience records of manually optimizing cable adjustment schemes based on the inversion method; wherein the optimization experience records are: process records of bridge engineers optimizing cable adjustment schemes using the inversion method in previous bridge construction projects;
[0185] Determine the optimization result of the optimization experience record; wherein the optimization result is: the implementation result corresponding to the optimization experience record;
[0186] Analyze the optimization results and obtain the optimization features, which include optimization efficiency, optimization quality and optimization process similarity. The optimization efficiency is the number of cable adjustments. The optimization quality is the difference between the tensioning sequence and force value of the hanger obtained after optimization and the expected target. The greater the difference, the worse the optimization quality. The optimization process similarity is the similarity between the bridge project in the optimization experience record and the bridge project of the present invention.
[0187] Based on the preset evaluation template and the optimization characteristics, the target optimization experience record is determined; wherein the preset evaluation template is used for selecting the template whose evaluation degree meets the evaluation requirements by comparing the optimization characteristics;
[0188] The inverted optimization model is trained according to the target optimization experience record, and the first transition matrix is input into the inverted optimization model to obtain the second transition matrix. The inverted optimization model is an intelligent AI model that uses the inverted method to determine the optimization scheme of the cable adjustment scheme of the bridge project.
[0189] The working principle and beneficial effects of the above technical solution are:
[0190] This application introduces the optimization experience records of bridge engineers using the inversion method to optimize the cable adjustment scheme in previous bridge construction projects, and selects the target optimization experience records according to the optimization characteristics of the optimization experience records. The inversion optimization model is trained using the target optimization experience records, and the first transition matrix representing the current optimization scheme is input into the inversion optimization model to obtain the second transition matrix representing the cable adjustment scheme after optimization based on the inversion method. The determination process of the second transition matrix is more accurate.
[0191] The embodiment of the present invention provides an AI-based steel box basket arch bridge construction emergency command system, such as Figure 2 As shown, including:
[0192] Construction information monitoring subsystem 1, used to monitor the construction information during the construction of the steel box basket arch bridge;
[0193] Linearity and stability analysis model acquisition subsystem 2, used to acquire the linearity and stability analysis model based on AI technology;
[0194] The stability analysis result determination subsystem 3 is used to determine the stability analysis result according to the construction information and the line type and the stability analysis model;
[0195] The emergency command subsystem 4 is used to carry out emergency command according to the stability analysis results.
[0196] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. An AI-based emergency command method for steel box basket arch bridge construction, characterized in that: include: Step 1: Monitor the construction information during the construction of the steel box basket arch bridge; Step 2: Based on AI technology, obtain the linearity and stability analysis model; Step 3: Determine the stability analysis results based on the construction information, line type and stability analysis model; Step 4: Conduct emergency command based on the stability analysis results; The step 2: based on AI technology, obtaining a linearity and stability analysis model, including: Through welding simulation technology, the arch rib segment welding is simulated under different sunshine environments to obtain the first influencing law data, which are: the temperature, strain and stress of each point of the arch rib segment welding joint when the arch rib segment is welded under different sunshine environments; Through the welding process simulation technology, the arch rib segment welding is simulated in different welding sequences to obtain the second influence law data, which are: the temperature field, strain field and stress field of the arch rib segment welding joint in different welding sequences; Through the preset finite element analysis platform, the construction process of the steel box basket arch bridge is simulated to obtain the third influence law data, which is the influence data of the tensioning sequence of different hangers and tie rods on the arch rib linear shape; Based on AI technology, the linearity and stability analysis model is obtained according to the first influencing law data, the second influencing law data and the third influencing law data.
2. The AI-based emergency command method for steel box basket arch bridge construction as claimed in claim 1, characterized in that: Step 1: Monitor the construction information of the steel box basket arch bridge during construction, including: Monitor the welding temperature information of the arch rib segments of the steel box basket arch bridge; Get a video of the construction process; Determine the welding sequence information and the hanger tensioning sequence information based on the construction process video; The welding temperature information, welding sequence information and hanger tensioning sequence information are taken together as construction information.
3. The AI-based emergency command method for steel box basket arch bridge construction as claimed in claim 1, characterized in that: Through the welding process simulation technology, the arch rib segment welding is simulated in different welding sequences to obtain the second influence law data, including: Create the first 3D geometry model of the arch rib segment joint; Based on a preset material property setting rule, setting a first material property for the first three-dimensional geometric model; After the first material property is set, the welding conditions are obtained; According to the welding conditions, set the boundary conditions during the welding process; Get the target welding sequence; Simulating the welding process in a first three-dimensional geometric model according to a target welding sequence; Conduct coupled heat transfer analysis, fluid dynamics analysis, and solid mechanics analysis in the simulated welding process to simulate the thermal effects, molten pool flow, and structural response during welding; After the simulation of the welding process is completed, the second influence law data is obtained.
4. The AI-based emergency command method for steel box basket arch bridge construction as claimed in claim 1, characterized in that: Through the preset finite element analysis platform, the construction process of the steel box basket arch bridge is simulated to obtain the third influence law data, including: Creating a second three-dimensional geometric model; Setting a second material property for the second three-dimensional geometric model based on a preset material property setting rule; After the second material property is set, the construction conditions are obtained; According to the construction conditions, set the model constraints of the second 3D geometric model; Obtaining the first target tensioning sequence; Simulating the tensioning process in the second three-dimensional geometric model according to the first target tensioning sequence; Perform nonlinear finite element analysis during the simulated tensioning process and, at the same time, load constraints on the second three-dimensional geometric model; After the simulation of the tensioning process is completed, the third influence law data is obtained.
5. The AI-based emergency command method for steel box basket arch bridge construction as claimed in claim 1, characterized in that: Step 3: Determine the stability analysis results based on the construction information, line type and stability analysis model, including: Determine the welding environment temperature analysis results, welding sequence analysis results and tensioning sequence analysis results based on the construction information and the linear and stability analysis model; The welding environment temperature analysis results, welding sequence analysis results and tensioning sequence analysis results are taken together as stability analysis results.
6. The AI-based emergency command method for steel box basket arch bridge construction as claimed in claim 1, characterized in that: Step 4: Conduct emergency command based on the stability analysis results, including: Analyze the stability analysis results and try to obtain emergency command items; If the acquisition attempt is successful, determine the instability type of the emergency command item; Determine emergency command strategies based on the type of instability; Conduct corresponding emergency command according to the emergency command strategy; Among them, the emergency command strategy is determined according to the type of instability, including: If the instability type is the welding environment temperature factor, the optimal welding environment temperature is determined based on the construction information and the linear and stability analysis model; If the instability type is a welding sequence factor, the optimal welding sequence is determined based on the construction information and the linear and stability analysis model; If the instability type is the tensioning sequence factor, the optimal tensioning sequence is determined based on the construction information and the linear and stability analysis model; The optimal welding environment temperature and / or the optimal welding sequence and / or the optimal tensioning sequence are used as emergency command strategies.
7. The AI-based emergency command method for steel box basket arch bridge construction as claimed in claim 6, characterized in that: Determine the optimal tensioning sequence based on construction information, line type and stability analysis model, including: Construct an impact matrix based on the third impact law data and construction information; Get the tension target; Based on the forward iteration method and the reverse iteration method, the cable adjustment scheme is determined according to the tensioning target and the influence matrix; Determine the optimal tensioning sequence according to the cable adjustment scheme; Among them, according to the third impact law data and construction information, the impact matrix is constructed, including: parsing the third influence law data to determine the unit stiffness matrix of each model unit of the second three-dimensional geometric model; Based on a preset splicing rule, according to the relative positions of the unit model units in the second three-dimensional geometric model, the unit stiffness matrices are spliced to obtain a global stiffness matrix; Determine structural response information based on the third influence law data and construction information; The influence matrix is determined based on the global stiffness matrix and structural response information.
8. The AI-based emergency command method for steel box basket arch bridge construction as claimed in claim 7, characterized in that: Based on the forward iteration method and the inverted iteration method, the cable adjustment scheme is determined according to the tensioning target and the influence matrix, including: Based on the forward iteration method, the first transition matrix is determined according to the tension target and the influence matrix; Optimize the first transition matrix according to the flip-chip method to obtain the second transition matrix; A library is determined based on the second transition matrix and a preset adjustment scheme to determine the adjustment scheme.
9. An AI-based emergency command system for steel box basket arch bridge construction, characterized in that: include: The construction information monitoring subsystem is used to monitor the construction information of the steel box basket arch bridge during construction; Linearity and stability analysis model acquisition subsystem, used to obtain linearity and stability analysis models based on AI technology; The stability analysis result determination subsystem is used to determine the stability analysis result according to the construction information, the line type and the stability analysis model; Emergency command subsystem, used to conduct emergency command based on stability analysis results; The linearity and stability analysis model acquisition subsystem performs the following operations: Through welding simulation technology, the arch rib segment welding is simulated under different sunshine environments to obtain the first influencing law data, which are: the temperature, strain and stress of each point of the arch rib segment welding joint when the arch rib segment is welded under different sunshine environments; Through the welding process simulation technology, the arch rib segment welding is simulated in different welding sequences to obtain the second influence law data, which are: the temperature field, strain field and stress field of the arch rib segment welding joint in different welding sequences; Through the preset finite element analysis platform, the construction process of the steel box basket arch bridge is simulated to obtain the third influence law data, which is the influence data of the tensioning sequence of different hangers and tie rods on the arch rib linear shape; Based on AI technology, the linearity and stability analysis model is obtained according to the first influencing law data, the second influencing law data and the third influencing law data.