A scraper conveyor for electroplating sludge treatment
By designing a deformed scraper and adjustment mechanism, combining ultra-high molecular polyethylene material and rubber scraper, the scraper in electroplating sludge treatment overcomes the high energy consumption and high cost problems caused by sludge resistance, and achieves more efficient sludge Convey and lower cost of use.
Patent Information
- Application Number
- CN202410961616.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-18
AI Technical Summary
During the existing electroplating sludge treatment process, the scraper needs to overcome the sludge resistance when moving from the upper layer to the lower layer, resulting in an increase in the power consumption of the motor and a decrease in service life, and an increase in the cost of use.
A scraper conveyor for electroplating sludge treatment is designed, using two rotating shafts and sprockets to be connected by a synchronized chain side by side. The scraper is deformed under the chain drive to reduce the opening angle, and the adjustment mechanism adjusts the starting position of the chain to adapt to the Different resistances, sensors sense resistance and adjust the scraper shape, using ultra-high molecular polyethylene material and rubber scrapers to reduce wear.
It effectively reduces the resistance of the scraper when passing through the sludge, reduces the power consumption and usage cost of the motor, improves the conveying efficiency and the wear resistance of the scraper, and reduces the accumulation of sludge and subsequent resistance.
Smart Images

Figure CN118495043B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of electroplating sludge treatment related equipment, in particular to a scraper conveyor for electroplating sludge treatment. Background Art
[0002] Electroplating sludge refers to the precipitate with heavy metal hydroxides such as copper and chromium as the main components produced in the wastewater treatment process of the electroplating industry. Since the heavy metal components in the electroplating sludge are stable and easy to migrate, it is a hazardous waste and easily pollutes the environment. Therefore, the electroplating sludge needs to be treated before it is discharged.
[0003] During the electroplating sludge treatment process, the electroplating sludge needs to be transported, so a conveying device is needed. In the related technology, the reference document with authorization announcement number CN209554126U discloses a sludge scraper conveyor. During the use of the sludge scraper conveyor, when the sludge enters the transfer box, it will fall to the bottom, the motor drives the chain to rotate, and the scraper scrapes the sludge into the discharge port for discharge.
[0004] Although the above-mentioned sludge scraper conveyor improves the efficiency of sludge transportation to a certain extent, it is found in the actual transportation process that the scraper needs to overcome the resistance of the sludge when moving from the upper layer to the lower layer in order to pass through the sludge, which easily leads to increased power consumption of the motor, reduced service life, and increased use cost. Summary of the invention
[0005] Based on this, it is necessary to provide a scraper conveyor for electroplating sludge treatment to address the problems of high energy consumption and high cost in the current electroplating sludge transportation process.
[0006] The above purpose is achieved through the following technical solutions:
[0007] A scraper conveyor for treating electroplating sludge, the scraper conveyor for treating electroplating sludge comprising a casing, the casing being provided with a mud inlet, two rotating shafts being inserted in parallel in the casing, the rotating shafts being able to rotate on themselves, two sprockets being symmetrically and fixedly sleeved on each of the rotating shafts, the spacing between the two sprockets on one of the rotating shafts being greater than the spacing between the two sprockets on the other rotating shaft, and the rotating shafts corresponding to the two sprockets with a smaller spacing being arranged close to the mud inlet, the sprockets on the two rotating shafts being connected by two sets of parallel and synchronous chains, a plurality of V-shaped scrapers being arranged between the two sets of chains, the tip of the scraper being directed toward the mud inlet when the chain moves toward the mud inlet, and the scraper being able to deform under the drive of the two sets of chains to reduce the opening angle.
[0008] Furthermore, the scraper conveyor for electroplating sludge treatment also includes an adjusting mechanism, which is configured to adjust the starting position of the two groups of chains when they approach each other, so that the greater the resistance of the scraper to the sludge, the farther the starting position of the two groups of chains when they approach each other is set away from the mud inlet.
[0009] Furthermore, the adjustment mechanism includes two limit sleeves, which are symmetrically inserted into the casing, each of which includes two limit sleeves, and the two limit sleeves of the same limit sleeve are arranged in parallel along a conveying direction perpendicular to the chain, and are arranged corresponding to the two groups of chains, the two limit sleeves of one limit sleeve are respectively slidably connected to the upper and lower layers of one group of chains, and the two limit sleeves of the other limit sleeve are respectively slidably connected to the upper and lower layers of the other group of chains, the spacing between the two limit sleeves of different limit sleeves of the same layer is equal to the spacing between the two sprockets on the rotating shaft set away from the mud inlet, and the two limit sleeves can move synchronously along the conveying direction of the chain to change the starting position of the two groups of chains when they approach each other.
[0010] Furthermore, the adjustment mechanism also includes a driving member 1, and the driving member 1 is configured to provide a driving force for the limiting sleeve to move along the conveying direction of the chain.
[0011] Furthermore, the scraper conveyor for electroplating sludge treatment also includes a sensor, and the sensor is configured to sense the resistance of the scraper to the sludge.
[0012] Furthermore, the scraper includes a first split plate and a second split plate which are hinged to each other, the first split plate is hinged to one group of the chains, and the second split plate is hinged to the other group of the chains.
[0013] Furthermore, the scraper conveyor for electroplating sludge treatment also includes a second driving member, and the second driving member is configured to provide a driving force for the self-rotation of one of the rotating shafts.
[0014] Furthermore, a rubber scraper strip is provided at the bottom of the scraper.
[0015] Furthermore, the casing is an integrated semi-enclosed structure.
[0016] Furthermore, the material of the scraper includes ultra-high molecular weight polyethylene.
[0017] The beneficial effects of the present invention are:
[0018] When the scraper conveyor for electroplating sludge treatment provided by the present invention is used, the electroplating sludge is first put into the casing through the mud inlet, and then one of the rotating shafts is driven to rotate. During the rotation of the rotating shaft, the rotating shaft drives two sprockets thereon to rotate, and the sprocket drives another rotating shaft and two sprockets thereon to follow through the chain; during the chain transmission process, the chain synchronously drives the scraper to move. When the chain drives the scraper to move in the direction close to the mud inlet, the two groups of chains approach each other, causing the scraper to deform and the opening angle to decrease, and then when the scraper is inserted When electroplating sludge is being removed, the electroplating sludge can move to both sides along the sides of the scraper. On the one hand, it can reduce the contact between the electroplating sludge and the scraper, reduce the resistance encountered by the scraper when passing through the electroplating sludge, reduce motor energy consumption, and reduce the cost of use. On the other hand, it can reduce the accumulation of electroplating sludge above and reduce the resistance encountered by the subsequent scraper when inserting into the electroplating sludge. When the chain drives the scraper to move away from the mud inlet, the two groups of chains move away from each other, causing the scraper to deform and the opening angle to increase, so that the electroplating sludge can be scraped and transported normally.
[0019] Furthermore, by setting an adjustment mechanism, when the scraper encounters greater resistance from the electroplating sludge, the starting position of the two groups of chains will be set farther away from the mud inlet when they approach each other, so that the scraper can be inserted into the electroplating sludge at a smaller opening angle, thereby further reducing the resistance encountered by the scraper when passing through the electroplating sludge. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 A schematic diagram of the three-dimensional structure of a scraper conveyor for electroplating sludge treatment provided by one embodiment of the present invention;
[0021] Figure 2 A front view schematic diagram of a scraper conveyor for electroplating sludge treatment provided by one embodiment of the present invention;
[0022] Figure 3 for Figure 2 Schematic diagram of the three-dimensional structure in the AA section;
[0023] Figure 4 for Figure 2 Middle BB section view;
[0024] Figure 5 for Figure 2 Middle CC section view;
[0025] Figure 6 for Figure 5 The schematic diagram of the local enlarged structure at D in the middle;
[0026] Figure 7 A schematic diagram of the three-dimensional structure of a scraper conveyor for electroplating sludge treatment without a casing provided in one embodiment of the present invention;
[0027] Figure 8 for Figure 7 Schematic diagram of the local enlarged structure at point E in the middle.
[0028] in:
[0029] 1. Casing; 11. Transport part; 111. Mud outlet; 112. Chute; 12. Mud inlet; 121. Mud inlet; 13. Installation part; 131. Limit rod;
[0030] 2. rotating shaft; 21. sprocket; 22. chain; 221. convex rod;
[0031] 3. Scraper; 301. First dividing plate; 302. Second dividing plate; 31. Sleeve rod;
[0032] 4. Adjusting mechanism; 41. Limiting sleeve; 411. Closing plate; 42. Mounting block; 43. Driving cylinder. DETAILED DESCRIPTION
[0033] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below through embodiments and in conjunction with the accompanying drawings. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0034] The serial numbers assigned to the components herein, such as "first", "second", etc., are only used to distinguish the objects described and do not have any order or technical meaning. The "connection" and "coupling" mentioned in this application, unless otherwise specified, include direct and indirect connections (couplings). In the description of the present invention, it should be understood that the orientation or position relationship indicated by the terms "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", etc. are based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation to the present invention.
[0035] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0036] like Figures 1 to 8 As shown, a scraper conveyor for electroplating sludge treatment provided by an embodiment of the present invention is used for conveying electroplating sludge; in this embodiment, the scraper conveyor for electroplating sludge treatment is configured to include a casing 1, a mud inlet 121 is arranged on the casing 1, two rotating shafts 2 are inserted in parallel in the casing 1, the rotating shafts 2 can rotate, and two sprockets 21 are symmetrically and fixedly sleeved on each rotating shaft 2, wherein the spacing between the two sprockets 21 on one rotating shaft 2 is greater than the spacing between the two sprockets 21 on the other rotating shaft 2, and the rotating shafts 2 corresponding to the two sprockets 21 with a smaller spacing are arranged close to the mud inlet 121, the sprockets 21 on the two rotating shafts 2 are connected by two sets of parallel and synchronous chains 22, and a plurality of V-shaped scrapers 3 are arranged between the two sets of chains 22, and when the chain 22 moves toward the mud inlet 121, the tip of the scraper 3 faces the mud inlet 121, and the scraper 3 can be deformed under the drive of the two sets of chains 22 to reduce the opening angle.
[0037] Specifically in this embodiment, Figure 1 As shown, the casing 1 is configured as a symmetrical structure, and has a transport portion 11, a mud inlet portion 12 and an installation portion 13, wherein the transport portion 11 is configured as a box structure with an opening at the rear end, and a mud outlet 111 is provided at the bottom of the transport portion 11, near the front end, and the mud outlet 111 is configured to discharge electroplating sludge; the mud inlet portion 12 is configured as an inverted prism-shaped shell structure, and the top is open, and the mud inlet 121 is formed at the top open portion of the mud inlet portion 12, and the mud inlet portion 12 is configured to be installed at its front end side wall surface and The rear end of the transport portion 11 is fixedly connected and interconnected; the mounting portion 13 is configured to have a C-shaped base shell portion and two mounting cylinder portions, the two mounting cylinder portions are symmetrically arranged on the left and right side walls of the base shell portion, the axis of the mounting cylinder portion is extended in the horizontal direction, and the end surface of the mounting cylinder portion away from the base shell portion is open, and the mounting portion 13 is configured when installed so that the opening of the base shell portion is arranged toward the mud inlet portion 12, and the opening of the base shell portion and the rear end side wall surface of the mud inlet portion 12 are fixedly connected and interconnected.
[0038] More specifically, Figure 4 As shown, the rotating shaft 2 corresponding to the two sprockets 21 with a smaller spacing is horizontally inserted in the mounting portion 13, and the upper end is coaxially and rotatably inserted in the mounting cylinder portion located above, and the lower end is coaxially and rotatably inserted in the mounting cylinder portion located below. The rotating shaft 2 corresponding to the two sprockets 21 with a larger spacing is horizontally inserted in the transport portion 11, and the upper end is rotatably inserted in the upper side wall of the transport portion 11, and the lower end is rotatably inserted in the lower side wall of the transport portion 11.
[0039] More specifically, Figure 3As shown, each set of chains 22 is configured as an annular structure, and is configured to be composed of multiple horizontal rings and multiple vertical rings. When installed, the horizontal rings and the vertical rings are configured to alternate along a preset loop and be connected end to end; Figure 4 As shown, the upper group of chains 22 is configured to have its left end transmission sleeve connected to the upper sprocket 21 of the rotating shaft 2 on the left, and its right end transmission sleeve connected to the upper sprocket 21 of the rotating shaft 2 on the right when in use; the lower group of chains 22 is configured to have its left end transmission sleeve connected to the lower sprocket 21 of the rotating shaft 2 on the left, and its right end transmission sleeve connected to the lower sprocket 21 of the rotating shaft 2 on the right when in use; the shape formed by the two groups of sprockets 21 is an isosceles trapezoid, with the small end facing the rotating shaft 2 corresponding to the two sprockets 21 with a smaller spacing, and the large end facing the rotating shaft 2 corresponding to the two sprockets 21 with a larger spacing.
[0040] More specifically, a plurality of scrapers 3 are arranged between two groups of chains 22 at equal intervals along the conveying direction of the chains 22 .
[0041] During use, the electroplating sludge is firstly put into the mud inlet 12 through the mud inlet 121, and then one of the rotating shafts 2 is driven to rotate. During the rotation of the rotating shaft 2, the rotating shaft 2 drives the two sprockets 21 thereon to rotate, so that the upper chain 22 moves toward the direction close to the mud inlet 121, and the lower chain 22 moves toward the direction close to the mud outlet 111. The sprocket 21 drives the other rotating shaft 2 and the two sprockets 21 thereon to follow through the chain 22; during the transmission of the chain 22, the chain 22 synchronously drives the scraper 3 to move. When the chain 22 drives the scraper 3 to move toward the direction close to the mud inlet 121, the two groups of chains 22 approach each other, causing the scraper 3 to deform and the opening angle to decrease. Furthermore, when the scraper 3 is inserted into the electroplating sludge, the electroplating sludge can move to both sides along the side of the scraper 3, thereby, on the one hand, reducing the contact between the electroplating sludge and the scraper 3, reducing the resistance encountered by the scraper 3 when passing through the electroplating sludge, reducing the energy consumption of the motor, and reducing the cost of use; on the other hand, it can reduce the accumulation of electroplating sludge above and reduce the resistance encountered by the subsequent scraper 3 when inserted into the electroplating sludge; when the chain 22 drives the scraper 3 to move away from the mud inlet 121, the two groups of chains 22 move away from each other, causing the scraper 3 to deform and the opening angle to increase, so that the electroplating sludge can be scraped and transported normally; with the movement of the chain 22, the electroplating sludge is discharged from the mud outlet 111 under the push of the scraper 3.
[0042] In some embodiments, the scraper conveyor for electroplating sludge treatment is configured to also include an adjusting mechanism 4, which is configured to be able to adjust the starting position of the two groups of chains 22 when they approach each other, so that the greater the resistance of the scraper 3 to the sludge, the farther the starting position of the two groups of chains 22 when they approach each other will be set away from the mud inlet 121.
[0043] During use, when the scraper 3 encounters greater resistance from the electroplating sludge, the adjustment mechanism 4 can be used to make the starting position of the two groups of chains 22 move closer to each other and be set farther away from the mud inlet 121, so that the scraper 3 can be inserted into the electroplating sludge at a smaller opening angle, thereby further reducing the resistance encountered by the scraper 3 when passing through the electroplating sludge.
[0044] In a further embodiment, the adjustment mechanism 4 is configured to include two limit sleeves, which are symmetrically inserted into the casing 1, and each limit sleeve includes two limit sleeves 41. The two limit sleeves 41 of the same limit sleeve are arranged side by side along a conveying direction perpendicular to the chain 22, and are arranged corresponding to the two groups of chains 22. The two limit sleeves 41 of one limit sleeve are respectively slidably connected to the upper and lower layers of one group of chains 22, and the two limit sleeves 41 of the other limit sleeve are respectively slidably connected to the upper and lower layers of the other group of chains 22. The spacing between the two limit sleeves 41 of different limit sleeves on the same layer is equal to the spacing between the two sprockets 21 on the rotating shaft 2 set away from the mud inlet 121. The two limit sleeves can move synchronously along the conveying direction of the chain 22 to change the starting position of the two groups of chains 22 when they approach each other.
[0045] Specifically in this embodiment, Figure 4 As shown, the limiting sleeve 41 is configured as a T-shaped structure and has a vertically connected horizontal sleeve portion and a connecting rod portion. The horizontal sleeve portion is configured to be slidably sleeved on the chain 22 during installation, and the connecting rod portion is configured to extend in a direction perpendicular to the upper side wall of the transport portion 11, as shown in FIG. Figure 7 As shown, the horizontal sleeve part is configured as a T-shaped block structure, and a T-shaped slot for the chain 22 to pass through is opened on the left side wall of the horizontal sleeve part; in order to prevent the chain 22 from escaping from the slot during movement, two L-shaped sealing plates 411 are symmetrically arranged on the left side wall of the horizontal sleeve part. When installed, the sealing plates 411 are configured to be detachably connected to the horizontal sleeve part by bolts and block part of the slot.
[0046] During use, if Figure 4 As shown, the setting of the limit sleeve 41 makes the two groups of chains 22 on the left form an isosceles trapezoidal structure and the two groups of chains 22 on the right form a rectangular structure with the limit sleeve 41 as the boundary. When the scraper 3 is subjected to greater resistance from the electroplating sludge, the limit sleeve 41 is driven to move to the right, and the isosceles trapezoidal structure formed by the two groups of chains 22 on the left becomes more slender, so that the two groups of chains 22 on the left are closer, and the scraper 3 can be deformed to have a smaller opening angle, so that when the scraper 3 is inserted into the electroplating sludge, the contact between the electroplating sludge and the scraper 3 can be further reduced, thereby reducing the resistance encountered by the scraper 3 when passing through the electroplating sludge.
[0047] In a further embodiment, the adjustment mechanism 4 is configured to further include a driving member 1, and the driving member 1 is configured to provide a driving force for the limiting set to move along the conveying direction of the chain 22 .
[0048] Specifically in this embodiment, the driving member 1 is configured to include two driving cylinders 43, such as Figure 3 As shown, the two driving cylinders 43 are respectively fixedly arranged on the left and right side walls of the transport part 11 during installation, and the output shafts of the driving cylinders 43 are arranged horizontally and toward the mud inlet part 12. A mounting block 42 is fixedly sleeved on the output shaft of each driving cylinder 43. The two limiting sleeves 41 of the same limiting sleeve group are arranged to be fixedly inserted into the mounting block 42 at one end of the connecting rod part away from the horizontal sleeve part during installation; in order to facilitate the connecting rod part to pass through the transport part 11 and be connected to the mounting block 42, as shown in FIG. Figure 3 As shown, two slide grooves 112 are provided through the left and right side walls of the transport portion 11 . The slide grooves 112 extend in the horizontal direction. The two slide grooves 112 on the same side are arranged in parallel in the vertical direction and are provided in one-to-one correspondence with the limiting sleeves 41 .
[0049] It can be understood that the driving cylinder 43 can be configured as any one of a hydraulic cylinder, a pneumatic cylinder or an electric cylinder.
[0050] In other embodiments, the scraper conveyor for electroplating sludge processing is configured to further include a sensor, and the sensor is configured to sense the resistance of the scraper 3 to the sludge.
[0051] Specifically in this embodiment, the sensor can be set as a pressure sensor, and there are multiple sensors, which are arranged one by one corresponding to the scraper 3. When installed, the pressure sensor is arranged on the plate surface of the scraper 3 facing the mud inlet 121, so that the resistance of the scraper 3 to the electroplating sludge can be sensed in time.
[0052] In other embodiments, Figure 8As shown, the scraper 3 is configured to include a first sub-plate 301 and a second sub-plate 302 that are hinged to each other, the first sub-plate 301 is hinged on one group of chains 22, and the second sub-plate 302 is hinged on the other group of chains 22; in order to facilitate the hinged connection between the first sub-plate 301, the second sub-plate 302 and the chain 22, the scraper conveyor for electroplating sludge treatment is configured to also include two sleeve rods 31, two insertion rods and four protruding rods 221, and the two sleeve rods 31 are configured to be hinged at one end of the first sub-plate 301 away from the tip and at the other end of the second sub-plate 302 away from the tip when installed. At one end away from the tip, two of the protruding rods 221 are set to be fixed and spaced apart on one of the horizontal rings of one group of chains 22 during installation, and the other two protruding rods 221 are set to be fixed and spaced apart on one of the horizontal rings of another group of chains 22 during installation. The two horizontal rings are set correspondingly, and the sleeve rod 31 is set to be inserted between the two protruding rods 221 on the same horizontal ring during installation, and the inserted rod passes through the sleeve rod 31 and the two protruding rods 221 in sequence, thereby connecting the sleeve rod 31 and the two protruding rods 221 on the same horizontal ring together.
[0053] It can be understood that the mutual hinged connection between the first sub-plate 301 and the second sub-plate 302 can refer to the hinged connection of a hinge.
[0054] In other embodiments, the scraper conveyor for electroplating sludge treatment is configured to further include a second driving member, and the second driving member is configured to provide a driving force for the self-rotation of one of the rotating shafts 2.
[0055] Specifically in this embodiment, the second driving member is configured to include a driving motor. When installed, the driving motor is configured to be coaxial with the motor shaft and fixedly connected to the end of the rotating shaft 2 to drive the rotating shaft 2 to rotate.
[0056] It can be understood that the sensor can also be set as a power sensor or a torque sensor. The power sensor is configured to sense the output power of the drive motor, and the torque sensor is configured to sense the output torque of the drive motor, thereby sensing the resistance of the scraper 3 to the electroplating sludge in disguised form; when the resistance of the scraper 3 to the electroplating sludge is greater, the output power of the drive motor sensed by the power sensor is greater, and the output torque of the drive motor sensed by the torque sensor is greater, thereby facilitating adjustment.
[0057] In other embodiments, in order to ensure the conveying effect of the scraper 3 on the electroplating sludge and reduce the wear between the scraper 3 and the casing 1, a rubber scraper strip is provided at the bottom of the scraper 3. The setting of the rubber scraper strip can avoid direct contact between the scraper 3 and the casing 1 and ensure contact with the casing 1.
[0058] In other embodiments, since the electroplating sludge is fluid and has a bad smell, it is easy to be thrown out during the transportation of the electroplating sludge, causing pollution and easily polluting the air. To solve this problem, the housing 1 can be set as an integrated semi-enclosed structure.
[0059] In some other embodiments, the material of the scraper 3 is set to include ultra-high molecular polyethylene.
[0060] Specifically, ultra-high molecular weight polyethylene has excellent wear resistance, which enables the scraper 3 made of ultra-high molecular weight polyethylene material to maintain good performance and not easy to wear during long-term use. Secondly, the ultra-high molecular weight polyethylene material is self-lubricating, which means that the scraper 3 does not require additional lubricant during operation, thereby reducing maintenance costs and complexity.
[0061] In other embodiments, in order to improve the transmission stability of the chain 22 on two sprockets 21 with a small spacing, as shown in FIG. Figure 1 As shown, two limit rods 131 are inserted in the mounting portion 13. The limit rods 131 are located outside the chain 22 and extend in the vertical direction. The distance between the two limit rods 131 is equal to the distance between the two sprocket wheels 21 with a smaller distance. During use, Figure 4 As shown, under the restriction of the two limiting rods 131 , the spacing between the two groups of chains 22 entering the interior of the mounting portion 13 is equal to the spacing between the two sprockets 21 with a smaller spacing, thereby avoiding the chain 22 from being offset on the sprocket 21 .
[0062] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0063] The above-described embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the attached claims.
Claims
1. A scraper conveyor for electroplating sludge treatment, characterized in that: The scraper conveyor for electroplating sludge treatment comprises a casing, a mud inlet is arranged on the casing, two rotating shafts are inserted in parallel in the casing, the rotating shafts can rotate on themselves, two sprockets are symmetrically and fixedly sleeved on each of the rotating shafts, the spacing between the two sprockets on one of the rotating shafts is greater than the spacing between the two sprockets on the other rotating shaft, and the rotating shafts corresponding to the two sprockets with a smaller spacing are arranged close to the mud inlet, the sprockets on the two rotating shafts are connected by two sets of parallel and synchronous chains, a plurality of V-shaped scrapers are arranged between the two sets of chains, the tip of the scraper faces the mud inlet when the chain moves toward the mud inlet, and the scraper can be deformed under the drive of the two sets of chains to reduce the opening angle; The scraper conveyor for electroplating sludge treatment also includes an adjustment mechanism, which is configured to adjust the starting position of the two groups of chains when they approach each other, so that the greater the resistance of the scraper to the sludge, the farther the starting position of the two groups of chains when they approach each other is set from the sludge inlet; The adjusting mechanism comprises two limit sets, the two limit sets are symmetrically inserted into the casing, each limit set comprises two limit sets, the two limit sets of the same limit set are arranged in parallel along a conveying direction perpendicular to the chain, and are arranged corresponding to the two groups of chains, the two limit sets of one limit set are respectively slidably sleeved on the upper and lower layers of one group of chains, and the two limit sets of another limit set are respectively slidably sleeved on the upper and lower layers of the other group of chains, the spacing between the two limit sets of different limit sets on the same layer is equal to the spacing between the two sprockets on the rotating shaft arranged away from the mud inlet, and the two limit sets can move synchronously along the conveying direction of the chain to change the starting positions of the two groups of chains when they approach each other; The scraper includes a first split plate and a second split plate which are hinged to each other, wherein the first split plate is hinged to one group of the chains, and the second split plate is hinged to the other group of the chains.
2. The scraper conveyor for electroplating sludge treatment according to claim 1, characterized in that: The adjustment mechanism further includes a driving member 1, and the driving member 1 is configured to provide a driving force for the limiting sleeve to move along the conveying direction of the chain.
3. The scraper conveyor for electroplating sludge treatment according to claim 1, characterized in that: The scraper conveyor for treating electroplating sludge further includes a sensor configured to sense resistance of the scraper against the sludge.
4. The scraper conveyor for electroplating sludge treatment according to claim 1, characterized in that: The scraper conveyor for electroplating sludge treatment also includes a second driving member, which is configured to provide a driving force for one of the rotating shafts to rotate.
5. The scraper conveyor for electroplating sludge treatment according to claim 1, characterized in that: A rubber scraper strip is arranged at the bottom of the scraper.
6. The scraper conveyor for electroplating sludge treatment according to claim 1, characterized in that: The casing is an integrated semi-enclosed structure.
7. The scraper conveyor for electroplating sludge treatment according to claim 1, characterized in that: The material of the scraper includes ultra-high molecular polyethylene.