A seismic and anti-corrosion building foundation
By using reinforced concrete prefabricated blocks and prestressing technology in the building foundation, combined with sinking cast parts and steel bases, an integral earthquake-resistant and anti-corrosion structure was formed, which solved the problem of poor seismic effect in the existing technology, and achieved the Effective response to earthquakes and landslides and stable improvement of foundations.
Patent Information
- Application Number
- CN202410985623.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-07-23
AI Technical Summary
The existing building foundation has average seismic effect, especially in the soil foundation position, and the existing structure can only be used for light-weight buildings, which cannot effectively alleviate aftershocks caused by earthquakes and prevent foundation deformation or cracks.
Reinforced concrete prefabricated blocks are used as the corner position, transition position and cross position of the ground beam, and through the integral reinforced concrete structure and pre-applied prestress, combined with sinking cast parts, steel bases and pads, forming an integral earthquake resistance The foundation for building anti-corrosion houses can withstand the deformation and cracks of the foundation for building them.
It significantly improves the seismic resistance of the building foundation, can effectively resist foundation deformation and cracks during earthquakes or landslides, and enhances the transfer stability and corrosion resistance of building loads.
Smart Images

Figure CN118517012B_ABST
Abstract
Description
Technical Field
[0001] The invention specifically relates to an earthquake-resistant and anti-corrosion building foundation, and belongs to the technical field of building foundations. Background Art
[0002] When constructing a building, it is necessary to establish a building foundation in advance. The building foundation bears the load transmitted by the building and transfers the load to the soil layer. Therefore, the building foundation plays a vital role in the reliability of the building. The existing building foundation is basically composed of pile foundation and ground beam casting. The seismic effect of this type of building foundation is general. In order to improve the seismic effect, higher-grade cement is generally used to increase the concrete casting thickness and steel bar specifications; but for the foundation position with general soil, the seismic effect of the above-mentioned seismic resistance method is general; therefore, it is necessary to improve the supporting structure of the building foundation. For example, Chinese patent publication number: CN114775670A discloses a new type of seismic and anti-corrosion building foundation. The structure adopts a first spring, a shock absorber and a buffer mechanism to play a role in preliminary buffering of vibration, and through the first spring, the second spring, and the shock absorber, it can play a role in secondary buffering of vibration. The principle of the structure is to buffer the vibration through the spring and the shock absorber. When an earthquake occurs, the structure can only alleviate the vibration intensity, but will produce multiple aftershocks, and the structure can only be applied to light-weight building. Summary of the invention
[0003] In order to solve the above problems, the present invention proposes an earthquake-resistant and anti-corrosion building foundation, which adopts prefabricated reinforced concrete blocks as the corner positions, transition positions and intersection positions of the ground beam, so that the ground beam can be cast as a whole, and through the overall reinforced concrete structure and pre-applied prestress, it can resist deformation or cracks in the building foundation.
[0004] The earthquake-resistant and anti-corrosion building foundation of the present invention comprises:
[0005] A sunken cast part, wherein the sunken cast part comprises a pile hole group opened on the foundation, each pile hole group is composed of two pile holes; a steel cage is embedded in the pile hole, an anchor rod is embedded in the center of the pile hole, and a threaded section is arranged on the top of the anchor rod; a concrete pile foundation is cast in the pile hole;
[0006] A steel base, a steel base is installed on the pile hole group, the steel base includes a plate seat, the bottom surfaces of both sides of the plate seat are integrally formed with a pressure seat; the pressure seat protrudes outside the plate seat; the pressure seat is provided with an embedding hole on the outside of the plate seat that is embedded with a steel cage, a through hole is provided at the center of the plate seat and the pressure seat, the through hole is embedded with an anchor rod, and a pressure block is integrally formed between the plate seat and the pressure seat;
[0007] A reinforced concrete prefabricated block, wherein the reinforced concrete prefabricated block is a dovetail or concave structure, and the reinforced concrete prefabricated block is embedded or clamped with a plate seat; a limit nut is screwed on the top of the anchor rod and pressed against the top of the reinforced concrete prefabricated block; a steel bar overlap is cast on the reinforced concrete prefabricated block; connecting steel bars are tied between the steel bar overlaps of adjacent reinforced concrete prefabricated blocks; a plurality of cushion steel bars are welded at intervals on the connecting steel bars or the steel bar overlap;
[0008] A cushion block is arranged between two pile holes of each pile hole group at intervals, and the cushion block is made of an upper horizontal plate, a vertical plate and a lower horizontal plate in one piece; the cushion block is a Z-shaped structure, a plurality of ground nails are welded at intervals on the bottom surface of the upper horizontal plate, the bottom surface of the lower horizontal plate is pressed tightly to the top of the foundation, the ground nails are embedded in the foundation, and the pressing block is pressed on the top surface of the lower horizontal plate;
[0009] The concrete foundation is cast and covered on the outside of the sunken casting parts, the reinforced concrete prefabricated blocks, the steel base and the pads.
[0010] During construction, the lines are laid out and the pile hole positions are determined in advance, and then the pile holes are drilled by an engineering drill to establish the pile holes; then, the steel cage is embedded into the inner side of the pile hole, and the anchor rod is knocked into the inner side of the pile hole; then, concrete is poured into the pile hole and vibrated to compact it. After the concrete is poured to the set height, a concrete pile foundation is obtained, and then a cushion block is installed between the two pile holes of the pile hole group. During installation, the ground nails of the cushion block are knocked into the inner side of the foundation, and the lower cross plate of the cushion block is pressed against the foundation, and the top surface of the cushion block is made to be in the same plane; then, before the concrete pile foundation is solidified, the steel base is assembled, and the two ends of the steel base are pressed against the top surfaces of the two concrete pile foundations, and the anchor nails on the bottom surface of the steel base are embedded in the concrete pile foundation, and the longitudinal steel bars of the steel cage are inserted into the pressing seat, and then the steel base is knocked so that the pressing block on the bottom surface of the plate seat is pressed against the top surface of the lower cross plate of the cushion block; then, wait for the concrete to solidify. After the concrete pile foundation is cured and solidified, the construction of the sunken casting parts and the steel base is completed; then the reinforced concrete precast blocks are assembled, the inner groove of the reinforced concrete precast blocks is pressed together with the plate seat of the steel base, and the bottom surface of the reinforced concrete precast blocks is pressed together with the top surface of the pressing seat. During installation, the anchor rod is passed through the reinforced concrete precast blocks and screwed into the limit nuts so that the limit nuts are pressed tightly against the top of the reinforced concrete precast blocks to complete the construction of the reinforced concrete precast blocks; then, the connecting steel bars are tied. When tying, the connecting steel bars are first tied to the overlapping parts of the steel bars in advance, and then the connecting steel bars are tied together to form a steel mesh group; then, cushion steel bars are welded on the connecting steel bars or the overlapping parts of the steel bars to form a casting gap between the steel mesh group and the foundation, so that concrete can fill the gap between the bottom surface of the steel mesh group and the foundation; the connecting steel bars are tied together; finally, the concrete foundation is poured.
[0011] Furthermore, a plurality of rivets are welded to the outside of the anchor rod; the anchor rod is embedded into the inner side of the foundation from the bottom surface of the pile hole, so that the anchor rod can be centered, which can facilitate the installation accuracy of the steel base and the reinforced concrete prefabricated block; the rivets on the outside of the anchor rod can be cast as one with the concrete pile foundation.
[0012] Furthermore, the connecting steel bars are composed of a row of transverse steel bars and a row of longitudinal steel bars which are vertically staggered and tied together; the transverse steel bars and the longitudinal steel bars are both frame-type structures with one end being hollow.
[0013] Furthermore, a row of reducing cylinders are fixed on one side of the adjacent reinforced concrete prefabricated blocks away from each other, and a prestressed steel wire is passed through the two opposite reducing cylinders, and the two ends of the prestressed steel wire are inserted into locking heads. After the prestress is applied to the two ends of the prestressed steel wire, the locking heads are knocked into the reducing cylinders, and the locking heads press the prestressed steel wire. During construction, the prestressed steel wire is passed through the reducing cylinders of the adjacent reinforced concrete prefabricated blocks, and then tension is applied to the two ends of the prestressed steel wire by hydraulic drawing equipment to generate prestress, and the locking heads are knocked into the reducing cylinders. The prestressed steel wire is pressed by the locking heads and the reducing cylinders to prevent the hydraulic drawing equipment from being separated from the prestressed steel wire, causing the prestressed steel wire to shrink. After the locking heads are engaged, the hydraulic drawing equipment can be separated from the prestressed steel wire; at this time, the prestress is applied to the adjacent reinforced concrete prefabricated blocks; thereby establishing prestress in the ground beam.
[0014] Furthermore, the exterior of the locking head is a conical structure that is engaged with the reducing cylinder, and the locking head is composed of two cavity seats pressed together, and the center of the cavity seat is a semi-cylindrical groove that is pressed together with the prestressed steel wire; during installation, prestress is applied to both ends of the prestressed steel wire, and the two cavity seats are pressed together to the exterior of the prestressed steel wire, and the two cavity seats are aligned with the reducing cylinder, and the two cavity seats are knocked into the reducing cylinder, so that the reducing cylinder can be used to limit the contraction of the two cavity seats, so as to achieve the locking of the prestressed steel wire. At this time, the prestress at both ends of the prestressed steel wire is removed. Since the prestressed steel wire is locked, the prestress of the prestressed steel wire is locked between the reinforced concrete prefabricated blocks by the two locking heads; it can prevent the foundation of the building from cracking due to local deformation caused by vibration.
[0015] Furthermore, the foundation is provided with a casting trough between the two pile holes, a concrete cushion layer is cast in the casting trough, and the pad is fixed to the concrete cushion layer before the concrete cushion layer hardens; the ground nails are embedded in the concrete cushion layer, and the bottom surface of the lower cross plate is pressed onto the surface of the concrete cushion layer; during construction, a casting trough is first opened between the two pile holes, and concrete is directly poured into the casting trough, or a steel mesh is placed in advance and then concrete is poured, and the top surface of the concrete is leveled with the foundation to form a concrete cushion layer; before the concrete cushion layer is solidified, the pad is first attached to the top surface of the concrete cushion layer, and the ground nails are embedded into the inner side of the concrete cushion layer, and then the pad is knocked so that the pad is on the contour surface, and the contour surface is flush with the top surface of the pressure seat, and the pad construction is completed after the concrete cushion layer is solidified.
[0016] Furthermore, a rubber plate is embedded in the bottom inner side of the pile hole, a conical sleeve is integrally formed at the center of the rubber plate, the anchor rod is embedded in the conical sleeve, the top surface of the rubber plate is filled with epoxy asphalt filler, the bottom of the steel cage is embedded in the inside of the epoxy asphalt filler, the steel structure is covered with concrete, and the steel cage and anchor rod protruding from the bottom of the concrete are protected by the rubber plate and the conical sleeve, so that the internal steel structure has good anti-corrosion ability.
[0017] Furthermore, the concrete foundation includes an integrally cast ground beam and a concrete platform, and at least two reinforced concrete prefabricated blocks are arranged in each ground beam; the top surface of the ground beam protrudes from the top surface of the concrete platform, and during construction, the reinforced concrete prefabricated blocks, the steel bar lap joints, the connecting steel bars tied to the steel bar lap joints, and the prestressed steel wires are all cast into the inner side of the ground beam; the remaining connecting steel bars are cast into the inner side of the concrete platform; thereby, the concrete foundation and the steel bar structure inside the concrete foundation are cast into one.
[0018] Compared with the prior art, the earthquake-resistant and anti-corrosion building foundation of the present invention adopts reinforced concrete prefabricated blocks as the corner positions, transition positions and intersection positions of the ground beam, so that the ground beam can be cast as one piece. The reinforced concrete prefabricated blocks are prefabricated and maintained in the factory and have standard earthquake-resistant strength. The reinforced concrete prefabricated blocks are anchored, and the anchor rods are cast through the pile foundation, and the pile foundation, the steel base and the reinforced concrete prefabricated blocks are assembled into one piece through the limit nuts, so that the building load can be quickly transmitted to the foundation. Then, the steel lap joint on the reinforced concrete prefabricated blocks is used to assemble the steel structure of the ground beam and the steel structure of the concrete platform into one piece, so that the internal steel structure of the building foundation forms a whole, and prestress is applied by prestressed steel wire in the length direction of the ground beam, and the prestress is transmitted through the concrete platform. When the foundation is cracked due to landslide or earthquake, the overall reinforced concrete structure and the prestress applied in advance can resist the vibration that causes the building foundation to deform or crack, and the earthquake-resistant effect of the entire building foundation is good. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the installation structure of the sunken casting and the steel base of the present invention.
[0020] Figure 2 It is a schematic diagram of the overall structure of the steel base of the present invention.
[0021] Figure 3 It is a schematic diagram of the installation structure of the anchor rod, steel base and reinforced concrete prefabricated block of the present invention.
[0022] Figure 4 It is a schematic diagram of the installation structure of the anchor rod, steel base, reinforced concrete prefabricated block and connecting steel bars of the present invention.
[0023] Figure 5 For the present invention Figure 4 Schematic diagram of the local enlarged structure at point A in the middle.
[0024] Figure 6 It is a schematic diagram of the installation structure of the sunken casting, steel base, reinforced concrete prefabricated block, connecting steel bars and cushion steel bars of the present invention.
[0025] Figure 7 For the present invention Figure 6 Schematic diagram of the local enlarged structure at point B in the middle.
[0026] Figure 8 It is a schematic diagram of the overall structure of the cushion block of the present invention.
[0027] Fig. 9 It is a schematic diagram of the installation structure of the reducing cylinder, prestressed steel wire and cavity seat of the present invention.
[0028] Fig.10 It is a schematic diagram of the installation structure of two adjacent reinforced concrete prefabricated blocks, connecting steel bars and prestressed steel wires of the present invention.
[0029] Fig.11 It is a schematic diagram of the overall structure of the concrete foundation of the present invention.
[0030] Figure numerals: 1. steel cage, 2. anchor rod, 3. concrete pile foundation, 4. steel base, 5. plate seat, 6. pressure seat, 7. embedded hole, 8. through hole, 9. pressure block, 10. reinforced concrete precast block, 11. limit nut, 12. steel bar lap joint, 13. connecting steel bar, 14. cushion steel bar, 15. cushion block, 16. upper cross plate, 17. vertical plate, 18. lower cross plate, 19. ground nail, 20. concrete foundation, 21. pull nail, 22. transverse steel bar, 23. longitudinal steel bar, 24. reducing cylinder, 25. prestressed steel wire, 26. cavity seat, 27. semi-cylindrical groove, 28. concrete cushion, 29. rubber plate, 30. conical sleeve, 31. ground beam, 32. concrete platform. DETAILED DESCRIPTION
[0031] Example:
[0032] like Figures 1 to 11 The earthquake-resistant and anti-corrosion building foundation shown includes:
[0033] A sunken cast part, wherein the sunken cast part comprises a pile hole group opened on the foundation, each pile hole group is composed of two pile holes; a steel cage 1 is embedded in the pile hole, an anchor rod 2 is embedded in the center of the pile hole, and a threaded section is arranged on the top of the anchor rod 2; a concrete pile foundation 3 is cast in the pile hole;
[0034] A steel base 4 is installed on the pile hole group, and the steel base 4 includes a plate seat 5, and the bottom surfaces of both sides of the plate seat 5 are integrally formed with a pressure seat 6; the pressure seat 6 protrudes from the outside of the plate seat 5; the pressure seat 6 is provided with an embedding hole 7 on the outside of the plate seat 5 that is embedded with the steel cage 1, and a through hole 8 is provided at the center of the plate seat 5 and the pressure seat 6, and the through hole 8 is embedded with the anchor rod 2, and a pressure block 9 is integrally formed between the plate seat 5 and the pressure seat 6;
[0035] A reinforced concrete prefabricated block 10, wherein the reinforced concrete prefabricated block 10 is a dovetail or concave structure, and the reinforced concrete prefabricated block 10 is embedded or clamped with the plate seat 5; a limit nut 11 is screwed on the top of the anchor rod 2 and is pressed against the top of the reinforced concrete prefabricated block 10; a steel bar overlap portion 12 is cast on the reinforced concrete prefabricated block 10; connecting steel bars 13 are tied between the steel bar overlap portions 12 of adjacent reinforced concrete prefabricated blocks 10; a plurality of cushion steel bars 14 are welded at intervals on the connecting steel bars 13 or the steel bar overlap portions 12;
[0036] The cushion block 15 is arranged between two pile holes of each pile hole group at intervals, and the cushion block 15 is made of an upper horizontal plate 16, a vertical plate 17 and a lower horizontal plate 18 in one piece; the cushion block 15 is a Z-shaped structure, and a plurality of ground nails 19 are welded at intervals on the bottom surface of the upper horizontal plate 16, and the bottom surface of the lower horizontal plate 18 is pressed tightly to the top of the foundation, and the ground nails 19 are embedded in the foundation, and the pressing block 9 is pressed on the top surface of the lower horizontal plate 18;
[0037] The concrete foundation 20 is cast and covered on the outside of the sunken casting part, the reinforced concrete prefabricated block 10 , the steel base 4 and the pad 15 .
[0038] During construction, the pile hole position is set out in advance and determined, and then the pile hole position is drilled by an engineering drill to establish the pile hole; then, the steel cage 1 is embedded into the inner side of the pile hole, and the anchor rod 2 is knocked into the inner side of the pile hole, and then concrete is poured into the pile hole and vibrated to compact it. After the concrete is poured to a set height, a concrete pile foundation 3 is obtained, and then a cushion block 15 is installed between the two pile holes of the pile hole group. During installation, the ground nails 19 of the cushion block 15 are knocked into the inner side of the foundation, and the cushion block 15 is The lower horizontal plate 18 is pressed against the foundation, and the top surface of the cushion block 15 is in the same plane; then, before the concrete pile foundation 3 is solidified, the steel base 4 is assembled, and the two ends of the steel base 4 are pressed against the top surfaces of the two concrete pile foundations 3, and the anchor nails on the bottom surface of the steel base 4 are embedded in the concrete pile foundation 3, and the longitudinal steel bars of the steel cage 1 are inserted into the pressing seat 6, and then the steel base 4 is knocked to press the pressing block 9 on the bottom surface of the plate seat 5 with the top surface of the lower horizontal plate 18 of the cushion block 15; then, wait for the concrete pile foundation 3 to solidify. After curing and solidification, the construction of the sunken casting and the steel base 4 is completed; then the reinforced concrete prefabricated block 10 is assembled, the inner groove of the reinforced concrete prefabricated block 10 is pressed with the plate seat 5 of the steel base 4, and the bottom surface of the reinforced concrete prefabricated block 10 is pressed to the top surface of the pressing seat 6. During installation, the anchor rod 2 is passed through the reinforced concrete prefabricated block 10, and the limiting nut 11 is screwed into the limiting nut 11, so that the limiting nut 11 is pressed against the top of the reinforced concrete prefabricated block 10 to complete the construction of the reinforced concrete prefabricated block 10; then, the connecting steel bars 13 are tied. When tying, the connecting steel bars 13 are first tied to the steel bar lap joint 12 in advance, and then the connecting steel bars 13 are tied to each other to form a steel mesh group; then, the cushion steel bars 14 are welded on the connecting steel bars 13 or the steel bar lap joint 12, so that the steel mesh group and the foundation form a casting gap, so that the concrete can fill the gap between the bottom surface of the steel mesh group and the foundation; the connecting steel bars 13 are tied; finally, the concrete foundation 20 is cast.
[0039] A plurality of rivets 21 are welded to the outside of the anchor rod 2; the anchor rod 2 is embedded into the inner side of the foundation from the bottom surface of the pile hole, so that the anchor rod 2 can be centered, which can facilitate the installation accuracy of the steel base 4 and the reinforced concrete prefabricated block 10; the rivets 21 on the outside of the anchor rod 2 can be cast as one with the concrete pile foundation 3.
[0040] The connecting steel bars 13 are composed of a row of transverse steel bars 22 and a row of longitudinal steel bars 23 which are vertically staggered and tied together; the transverse steel bars 22 and the longitudinal steel bars 23 are both frame-shaped structures with one end being hollow.
[0041] A row of reducing cylinders 24 are fixed on one side of the adjacent reinforced concrete prefabricated blocks 10 away from each other, and a prestressed steel wire 25 is passed through the two opposite reducing cylinders 24. The two ends of the prestressed steel wire 25 are inserted into the locks. After the prestress is applied to the two ends of the prestressed steel wire 25, the locks are knocked into the reducing cylinders 24, and the locks press the prestressed steel wire 25. During construction, the prestressed steel wire 25 is passed through the reducing cylinders 24 of the adjacent reinforced concrete prefabricated blocks 10, and then tension is applied to the two ends of the prestressed steel wire 25 by the hydraulic drawing equipment to generate prestress, and the locks are knocked into the reducing cylinders 24. The prestressed steel wire 25 is pressed by the locks and the reducing cylinders 24 to prevent the hydraulic drawing equipment from being separated from the prestressed steel wire 25, causing the prestressed steel wire 25 to retract. After the locking heads are engaged, the hydraulic drawing equipment can be separated from the prestressed steel wire 25; at this time, the prestress is applied to the adjacent reinforced concrete prefabricated blocks 10; thereby establishing prestress in the ground beam.
[0042] The outside of the lock is a conical structure that is embedded with the reducing cylinder 24. The lock is composed of two cavity seats 26 pressed together. The center of the cavity seat 26 is a semi-cylindrical groove 27 pressed together with the prestressed steel wire 25. During installation, prestress is applied to both ends of the prestressed steel wire 25, and the two cavity seats 26 are pressed onto the outside of the prestressed steel wire 25. The two cavity seats 26 are aligned with the reducing cylinder 24, and the two cavity seats 26 are knocked into the reducing cylinder 24, so that the reducing cylinder 24 can be used to limit the contraction of the two cavity seats 26, so as to bite the prestressed steel wire 25. At this time, the prestress at both ends of the prestressed steel wire 25 is removed. Since the prestressed steel wire 25 is locked, the prestress of the prestressed steel wire 25 is locked between the reinforced concrete prefabricated blocks 10 by the two locks. This can prevent the foundation of the building from cracking due to local deformation caused by vibration.
[0043] The foundation is provided with a casting trough between the two pile holes, in which a concrete cushion layer 28 is cast, and the pad 15 is fixed to the concrete cushion layer 28 before the concrete cushion layer 28 hardens; the ground nails 19 are embedded in the concrete cushion layer 28, and the bottom surface of the lower cross plate 18 is pressed onto the surface of the concrete cushion layer 28; during construction, a casting trough is first opened between the two pile holes, and concrete is directly poured into the casting trough, or a steel mesh is placed in advance and then poured into the concrete, and the top surface of the concrete is leveled with the foundation to form a concrete cushion layer 28, and before the concrete cushion layer 28 solidifies, the pad 15 is first attached to the top surface of the concrete cushion layer 28, and the ground nails 19 are embedded in the inner side of the concrete cushion layer 28, and then the pad 15 is knocked to make the pad 15 on the contour surface, and the contour surface is flush with the top surface of the pressure seat 6, and after waiting for the concrete cushion layer 28 to solidify, the construction of the pad 15 is completed.
[0044] A rubber sheet 29 is embedded in the bottom of the inner side of the pile hole, and a conical sleeve 30 is integrally formed at the center of the rubber sheet 29. The anchor rod 2 is embedded in the conical sleeve 30. The top surface of the rubber sheet 29 is filled with epoxy asphalt filler. The bottom of the steel cage 1 is embedded in the inner side of the epoxy asphalt filler. The steel structure is covered with concrete. The steel cage 1 and the anchor rod 2 protruding from the bottom of the concrete are protected by the rubber sheet 29 and the conical sleeve 30, so that the internal steel structure has good anti-corrosion ability.
[0045] The concrete foundation 20 includes an integrally cast ground beam 31 and a concrete platform 32, and at least two reinforced concrete prefabricated blocks 10 are arranged in each of the ground beams 31; the top surface of the ground beam 31 protrudes from the top surface of the concrete platform 32. During construction, the reinforced concrete prefabricated blocks 10, the steel bar lap joint 12, the connecting steel bars 13 tied to the steel bar lap joint 12, and the prestressed steel wires 25 are all cast into the inner side of the ground beam 31; the remaining connecting steel bars 13 are cast into the inner side of the concrete platform 32; thereby, the concrete foundation 20 and the steel bar structure inside the concrete foundation 20 are cast into one body.
[0046] The above embodiments are only preferred implementations of the present invention, so any equivalent changes or modifications made according to the structures, features and principles described in the scope of application of the present invention are included in the scope of application of the present invention.
Claims
1. An earthquake-resistant and anti-corrosion building foundation, characterized by: include A sunken cast part, wherein the sunken cast part comprises a pile hole group opened on the foundation, each pile hole group is composed of two pile holes; a steel cage is embedded in the pile hole, an anchor rod is embedded in the center of the pile hole, and a threaded section is arranged on the top of the anchor rod; a concrete pile foundation is cast in the pile hole; A steel base, a steel base is installed on the pile hole group, the steel base includes a plate seat, the bottom surfaces of both sides of the plate seat are integrally formed with a pressure seat; the pressure seat protrudes outside the plate seat; the pressure seat is provided with an embedding hole on the outside of the plate seat that is embedded with a steel cage, a through hole is provided at the center of the plate seat and the pressure seat, the through hole is embedded with an anchor rod, and a pressure block is integrally formed between the plate seat and the pressure seat; A reinforced concrete prefabricated block, wherein the reinforced concrete prefabricated block is a dovetail or concave structure, and the reinforced concrete prefabricated block is embedded or clamped with a plate seat; a limit nut is screwed on the top of the anchor rod and pressed against the top of the reinforced concrete prefabricated block; a steel bar overlap is cast on the reinforced concrete prefabricated block; connecting steel bars are tied between the steel bar overlaps of adjacent reinforced concrete prefabricated blocks; a plurality of cushion steel bars are welded at intervals on the connecting steel bars or the steel bar overlap; A cushion block is arranged between two pile holes of each pile hole group at intervals, and the cushion block is made of an upper horizontal plate, a vertical plate and a lower horizontal plate in one piece; the cushion block is a Z-shaped structure, a plurality of ground nails are welded at intervals on the bottom surface of the upper horizontal plate, the bottom surface of the lower horizontal plate is pressed tightly to the top of the foundation, the ground nails are embedded in the foundation, and the pressing block is pressed on the top surface of the lower horizontal plate; Concrete foundation, the concrete foundation is cast and covered on the outside of the sunken casting, reinforced concrete prefabricated blocks, steel base and pads; A row of reducing cylinders are fixed on one side of the adjacent reinforced concrete prefabricated blocks away from each other, a prestressed steel wire is passed through two of the reducing cylinders facing each other, both ends of the prestressed steel wire are passed through locking heads, after prestress is applied to both ends of the prestressed steel wire, the locking heads are knocked into the reducing cylinders, and the locking heads press the prestressed steel wire; The concrete foundation comprises a ground beam and a concrete platform cast in one piece, each ground beam is provided with at least two reinforced concrete prefabricated blocks; the top surface of the ground beam protrudes from the top surface of the concrete platform; Before the concrete pile foundation solidifies, assemble the steel base, press the two ends of the steel base to the top surfaces of the two concrete pile foundations, embed the anchor nails on the bottom surface of the steel base into the concrete pile foundation, and insert the longitudinal steel bars of the steel cage into the pressure seat. Then, knock the steel base to press the pressure block on the bottom surface of the plate seat with the top surface of the lower cross plate of the pad. Then, wait for the concrete pile foundation to cure and solidify, and complete the construction of the sunken casting and the steel base.
2. The earthquake-resistant and anti-corrosion building foundation according to claim 1 is characterized in that: A plurality of rivets are welded on the outside of the anchor rod; the anchor rod is embedded into the inner side of the foundation from the bottom surface of the pile hole.
3. The earthquake-resistant and anti-corrosion building foundation according to claim 1 is characterized in that: The connecting steel bars are formed by a row of transverse steel bars and a row of longitudinal steel bars which are vertically staggered and tied together; the transverse steel bars and the longitudinal steel bars are both frame-shaped structures with one end being hollow.
4. The earthquake-resistant and anti-corrosion building foundation according to claim 1 is characterized in that: The exterior of the lock head is a conical structure that fits with the reducing cylinder. The lock head is composed of two cavity seats pressed together. The center of the cavity seat is a semi-cylindrical groove that is pressed together with the prestressed steel wire.
5. The earthquake-resistant and anti-corrosion building foundation according to claim 1 is characterized in that: The foundation is provided with a casting groove between two pile holes, a concrete cushion layer is cast in the casting groove, and the cushion block is fixed to the concrete cushion layer before the concrete cushion layer hardens; the ground nails are embedded in the concrete cushion layer, and the bottom surface of the lower cross plate is pressed onto the surface of the concrete cushion layer.
6. The earthquake-resistant and anti-corrosion building foundation according to claim 1, characterized in that: A rubber plate is embedded in the bottom of the inner side of the pile hole, a conical sleeve is integrally formed at the center of the rubber plate, the anchor rod is embedded in the conical sleeve, the top surface of the rubber plate is filled with epoxy asphalt filler, and the bottom of the steel cage is embedded in the inside of the epoxy asphalt filler.
Citation Information
Patent Citations
Novel anti-seismic and anti-corrosion house building foundation
CN114775670A
Construction method of composite foundation
CN111270662A
Prefabricated prestressed concrete foundation, container module building and module building system
CN113250226A
Foundation structure system of low-rise building
CN209368859U
Multilayer building foundation based on anchor rod static pressure pile technology
CN209741891U