Concrete shear wall with prefabricated steel frame and formwork and construction method

Through the design of prefabricated steel frames and formwork, the complex and time-consuming problems of shear wall construction are solved, and the individual stress and formwork of the steel frames are realized, which significantly shortens the construction cycle.

CN118517094BActive Publication Date: 2024-11-12HUAQIAO UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410977390.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-12
Estimated Expiration
2044-07-22

AI Technical Summary

Technical Problem

In construction projects, the construction of shear walls is complex and time-consuming, mainly due to the large number of steel bar binding points and the need to support formwork on site, resulting in the extended construction period.

Method used

A concrete shear wall using prefabricated steel frames and formwork, including edge member steel cages, main body steel cages, connecting plates and pressed steel plates, forms an integral steel cage through welding, and uses connecting plates and steel plate ribs to achieve self-pouring of the formwork. Eliminate the steps of tying and supporting templates on site.

Benefits of technology

The independent stress and rapid installation of the formwork of the steel frame are achieved, reducing the on-site construction process and significantly shortening the construction cycle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118517094B_ABST
    Figure CN118517094B_ABST
Patent Text Reader

Abstract

The present invention provides a concrete shear wall and construction method of a prefabricated steel skeleton and formwork. All the connection points of the longitudinal bars, distribution bars, stirrups and tension bars of the steel skeleton are welded, so that the entire steel cage becomes a whole, can be stressed independently, and improve the overall strength. The connection port on the connecting plate and the steel plate ribs on the corrugated steel plate are arranged so that the corrugated steel plate can be directly inserted into the connecting plate outside the steel skeleton, surround the steel skeleton and use it as a casting formwork, which is convenient and fast, and does not require other support and fixation. The steel skeleton and formwork of the concrete shear wall are prefabricated into a whole in the form of factory prefabrication, and can be directly cast after being hoisted in place on site, eliminating the two complicated processes of on-site steel bar tying and formwork support, greatly reducing the on-site construction process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building engineering, and in particular to a concrete shear wall with a prefabricated steel frame and template and a construction method. Background Art

[0002] Shear walls are often subjected to complex stress conditions under the combined effects of bending and shearing in building structures, so they need to be strengthened. Usually, edge restraint components such as hidden columns or end columns are used. The longitudinal reinforcement is intensified and stirrups are configured in this area to improve the seismic resistance of the shear wall. This results in a large number of steel bar binding points and very complicated construction. After the steel bar skeleton is tied, it is necessary to support the formwork on site and pour concrete, which leads to a huge workload for on-site construction and seriously affects the construction period. Therefore, it is necessary to propose a reinforced concrete shear wall that does not require on-site steel bar binding and formwork support to reduce the workload on the construction site and speed up the construction. Summary of the invention

[0003] In view of this, the object of the present invention is to provide a concrete shear wall with a prefabricated steel frame and formwork and a construction method to solve the above problems.

[0004] The present invention adopts the following scheme:

[0005] The present application provides a concrete shear wall with a prefabricated steel frame and formwork, comprising a steel frame, wherein the steel frame comprises two edge member steel cages, a main steel cage connected between the two edge member steel cages, a plurality of connecting plates arranged at intervals along the longitudinal direction on the outside of the steel cages, a corrugated steel plate connected to the connecting plate, and concrete filled in the corrugated steel plate;

[0006] The edge member steel cage comprises a plurality of first longitudinal bars uniformly distributed in a direction, and a plurality of stirrups welded on the longitudinal bars at longitudinal intervals; the main steel cage comprises a plurality of second longitudinal bars arranged between two edge member steel cages, a plurality of distribution bars welded to the main steel cage and the second longitudinal bars hooped in the longitudinal direction, and a plurality of tension bars uniformly distributed and welded on both sides of the distribution bars and between the two edge member steel cages; a connecting port is provided on the connecting plate, and a steel plate rib adapted to the connecting port is provided on the corrugated steel plate.

[0007] Furthermore, the edge member steel cage includes four pairs of the first longitudinal bars which are spaced apart and distributed; the stirrups are welded to two pairs of the first longitudinal bars which are spaced apart.

[0008] Furthermore, the connecting plate is adapted to the outer shape of the steel cage, and its hoop is welded to the outside of the steel cage.

[0009] Furthermore, the connecting plate includes a first connecting portion arranged longitudinally, and a second connecting portion connected to the first connecting portion and protruding outwardly in a horizontal direction; the connecting port is opened on the second connecting portion.

[0010] Furthermore, the connection port is triangular, one vertex of which faces outward and is provided with a slot.

[0011] Furthermore, the corrugated steel plates include two first corrugated steel plates and two second corrugated steel plates, and the inner sides of the first corrugated steel plates and the second corrugated steel plates are provided with continuous steel plate ribs along the vertical direction.

[0012] Furthermore, both sides of the second corrugated steel plate are provided with full-length locking edges.

[0013] Furthermore, the top longitudinal reinforcement of the steel cage is higher than the upper end of the corrugated steel plate and is bent inwards to form a connecting section.

[0014] The present invention also provides a construction method of the concrete shear wall, comprising the following steps:

[0015] S1: prefabricated steel frame, connection plate, and corrugated steel plate;

[0016] In the prefabrication plant, the first longitudinal reinforcement and stirrups are welded separately to prefabricate the edge component reinforcement cage, and the second longitudinal reinforcement, distribution reinforcement and tension reinforcement are welded to prefabricate the main reinforcement cage; then the main reinforcement cage and the edge component reinforcement cage are assembled and welded to form an integral reinforcement skeleton;

[0017] Cut the connecting plate and process the connecting port on the connecting plate;

[0018] The steel plate is rolled into a corrugated steel plate having steel plate ribs;

[0019] S2: Multiple connecting plates are hooped at intervals along the longitudinal direction and welded to the steel frame, and then the corrugated steel plate is hoisted, and the steel plate ribs are passed through the corresponding connecting ports from top to bottom or from bottom to top in sequence to complete the installation of the corrugated steel plate;

[0020] S3: Pour concrete on the inner side of the corrugated steel sheet.

[0021] By adopting the above technical solution, the present invention can achieve the following technical effects:

[0022] All the connection points of the longitudinal bars, distribution bars, stirrups and tension bars of the steel skeleton are welded, making the entire steel cage a whole that can be stressed independently and improve the overall strength.

[0023] The connection ports on the connecting plate and the steel plate ribs on the corrugated steel plate enable the corrugated steel plate to be directly inserted into the connecting plate outside the steel frame, surrounding the steel frame and used as a casting template, which is convenient and quick without the need for other support and fixation.

[0024] The steel frame and formwork of the concrete shear wall are prefabricated in the factory as a whole. After being hoisted into place on site, they can be directly poured, eliminating the two complicated processes of on-site steel bar tying and formwork support, greatly reducing the on-site construction process. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of a steel cage of an edge member of a concrete shear wall with a prefabricated steel skeleton and formwork according to an embodiment of the present invention;

[0026] Figure 2 It is an overall schematic diagram of a steel frame of a concrete shear wall with a prefabricated steel frame and formwork according to an embodiment of the present invention;

[0027] Figure 3 It is a schematic diagram of a peripheral connection plate of a steel frame of a concrete shear wall with a prefabricated steel frame and formwork according to an embodiment of the present invention;

[0028] Figure 4 It is a detailed schematic diagram of a connection plate of a concrete shear wall with a prefabricated steel frame and formwork according to an embodiment of the present invention;

[0029] Figure 5 This is a schematic diagram of a concrete shear wall with a prefabricated steel frame and formwork after welding of a steel frame and a connecting plate according to an embodiment of the present invention;

[0030] Figure 6 It is a schematic diagram of a profiled steel plate of a concrete shear wall with a prefabricated steel frame and formwork according to an embodiment of the present invention;

[0031] Figure 7 It is a detailed schematic diagram of a first corrugated steel plate of a prefabricated steel reinforcement skeleton and a template according to an embodiment of the present invention;

[0032] Figure 8 It is a schematic diagram of the assembly process of a corrugated steel plate and a steel frame of a prefabricated steel frame and template according to an embodiment of the present invention;

[0033] Fig. 9 This is a schematic diagram of a prefabricated steel frame and a corrugated steel plate of a template after the steel frame is assembled;

[0034] Fig.10 It is a schematic diagram of a connection section in an upper and lower shear wall of a prefabricated steel frame and formwork according to an embodiment of the present invention.

[0035] Icons: edge member reinforcement cage 1, main body reinforcement cage 2, first longitudinal reinforcement 11, third connecting section 111, stirrups 12, second longitudinal reinforcement 21, fourth connecting section 211, distribution reinforcement 22, tension reinforcement 23, first connecting part 31, second connecting part 32, first welding section 311, second welding section 321, first connecting section 312, second connecting section 322, first connecting port 313, second connecting port 323, corrugated steel sheet 4, first corrugated steel sheet 41, second corrugated steel sheet 42, first steel plate rib 411, second steel plate rib 421, snap-fit ​​edge 422, connecting plate 3. DETAILED DESCRIPTION

[0036] Example

[0037] Combination Figures 1 to 10 As shown, this embodiment provides a concrete shear wall of a prefabricated steel frame and formwork, comprising a steel frame, wherein the steel frame comprises two edge member steel cages 1, a main steel cage 2 connected between the two edge member steel cages 1, a plurality of connecting plates 3 arranged at intervals along the longitudinal direction on the outside of the steel cages, a corrugated steel plate 4 connected to the connecting plate 3, and concrete filled in the corrugated steel plate 4;

[0038] The edge member steel cage 1 includes a plurality of first longitudinal bars 11 uniformly distributed in a direction, and a plurality of stirrups 12 welded on the longitudinal bars at intervals in the longitudinal direction; the main steel cage 2 includes a plurality of second longitudinal bars 21 arranged between the two edge member steel cages 1, a plurality of distribution bars 22 welded to the main steel cage 2 and the second longitudinal bars 21 in the longitudinal direction, and a plurality of tension bars 23 uniformly distributed and welded between the two edge member steel cages 1 and welded on both sides of the distribution bars 22; a connection port is provided on the connecting plate 3, and a steel plate rib adapted to the connection port is provided on the corrugated steel plate 4.

[0039] All the connection points of the longitudinal bars, distribution bars 22, stirrups 12 and tension bars 23 of the steel skeleton are welded, so that the entire steel cage becomes a whole, can be stressed independently, and improve the overall strength. The connection port on the connecting plate 3 and the steel plate ribs on the corrugated steel plate 4 are set so that the corrugated steel plate 4 can be directly inserted into the connecting plate 3 outside the steel skeleton, surround the steel skeleton and use it as a casting template, which is convenient and fast, and no other support and fixation is required. The steel skeleton and template of the concrete shear wall are prefabricated into a whole in the form of factory prefabrication, and can be directly cast after being hoisted in place on site, eliminating the two complicated processes of on-site tying of steel bars and supporting templates, greatly reducing the on-site construction process.

[0040] Specifically, in this embodiment, Figure 1 and Figure 2As shown, the edge member steel cage 1 includes four pairs of the first longitudinal bars 11 arranged at intervals; the stirrups 12 are welded to the two pairs of the first longitudinal bars 11 arranged at intervals. The main steel cage 2 includes a plurality of second longitudinal bars 21 arranged between the two edge member steel cages 1, a plurality of distribution bars 22 welded to the main steel cage 2 and the second longitudinal bars 21 along the longitudinal direction, and a plurality of tension bars 23 welded to both sides of the distribution bars 22 and evenly distributed between the two edge member steel cages 1; the connection points of all the longitudinal bars, distribution bars 22, stirrups 12 and tension bars 23 of the steel skeleton are welded, so that the entire steel cage becomes a whole, can be stressed independently, and improve the overall strength.

[0041] The connecting plate 3 is adapted to the shape of the steel cage, and is welded to the outside of the steel cage. The connecting plate 3 includes a first connecting portion 31 arranged longitudinally, and a second connecting portion 32 connected to the first connecting portion 31 and protruding outward in the horizontal direction; the connecting port is opened on the second connecting portion 32. Specifically, Figure 3 and Figure 4 As shown, the first connection part 31 includes two first welding sections 311 and two second welding sections 321 arranged opposite to each other, which are used for welding with the steel skeleton; the second connection part 32 includes two first connection sections 312 arranged opposite to each other and welded to the bottom of the first welding section 311, and two second connection sections 322 arranged opposite to each other and welded to the bottom of the second welding section 321; the first connection section 312 is provided with a first first connection port 313, and the second connection section 322 is provided with a plurality of second connection ports 323 at intervals.

[0042] In this embodiment, if Figure 4 As shown, the connection port is a triangle, one of the top angles of which is facing outward and is provided with a slot. The shape of the steel plate rib is also a triangle that matches the connection port. The steel plate rib can be formed by a bending process or connected to the corrugated steel plate 4 by welding. Figure 6 and Figure 7As shown, the corrugated steel sheet 4 includes two first corrugated steel sheets 41 for width, and two second corrugated steel sheets 42 for length direction. The inner sides of the first corrugated steel sheet 41 and the second corrugated steel sheet 42 are provided with first steel sheet ribs 411 and second steel sheet ribs 421 along the vertical direction, so that the steel sheet ribs on the corrugated steel sheet 4 can pass through the corresponding connection ports from top to bottom or from bottom to top in sequence, completing the installation of the corrugated steel sheet 4 and forming a casting template, which is convenient and fast, and does not require other support and fixation. The two sides of the second corrugated steel sheet 42 are provided with full-length snap-fit ​​edges 422, so that the two second corrugated steel sheets 42 can wrap the two first corrugated steel sheets 41 inside, preventing concrete from flowing out of the gaps at the connection of the corrugated steel sheets 4 during the casting process. The top longitudinal reinforcement of the steel cage is higher than the upper end of the corrugated steel plate 4, forming a third connecting section 111 and a fourth connecting section 211. The third connecting section 111 and the fourth connecting section 211 are longitudinal reinforcements bent toward the inside of the shear wall at the upper surface of the corrugated steel plate 4, so that the top of the longitudinal reinforcement of the lower shear wall can extend into the steel cage at the bottom of the upper shear wall. The assembled steel skeleton and corrugated steel plate 4 of the upper shear wall are hoisted onto the assembled steel skeleton and corrugated steel plate 4 of the lower part, thus completing the assembly of the prefabricated steel skeleton and formwork of the upper and lower shear walls. Finally, the concrete of the two shear walls is poured from top to bottom, and the pouring and connection of the shear wall of this embodiment is completed after the concrete strength reaches the requirement. It should be noted that the corrugated steel plate 4 only serves as a casting formwork and does not bear load during the use stage of the shear wall.

[0043] The following specifically describes the construction steps of the concrete shear wall with prefabricated steel frame and formwork;

[0044] S1: prefabricated steel frame, connecting plate 3, and corrugated steel plate 4;

[0045] First, the first longitudinal reinforcement 11 and the stirrup 12 are welded in the prefabrication plant to form an edge member reinforcement cage 1, and the second longitudinal reinforcement 21, the distribution reinforcement 22 and the tension reinforcement 23 are welded to form a main reinforcement cage 2; then the main reinforcement cage 2 and the edge member reinforcement cage 1 are assembled and welded to form an integral reinforcement skeleton;

[0046] Cut the connecting plate and process the connecting port on the connecting plate;

[0047] The steel plate is rolled into a corrugated steel plate having steel plate ribs;

[0048] S2: Multiple connecting plates 3 are hooped at intervals along the longitudinal direction and welded to the steel skeleton, and then the corrugated steel plate 4 is hoisted, and the steel plate ribs are passed through the corresponding connecting ports from top to bottom or from bottom to top in sequence to complete the installation of the corrugated steel plate 4;

[0049] S3: pouring concrete in the corrugated steel plate 4.

[0050] It should be noted that when there are multiple layers of concrete shear walls, before step S3, the upper assembled steel frame and corrugated steel plate 4 are first hoisted onto the lower assembled steel frame and corrugated steel plate 4 to complete the assembly of the upper and lower shear wall prefabricated steel frame and corrugated steel plate 4, and finally proceed to step S3 for concrete pouring.

[0051] It should be understood that the above are only preferred implementations of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention.

[0052] The above description of the drawings used in the implementation manner only illustrates certain embodiments of the present invention and should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

Claims

1. A concrete shear wall with a prefabricated steel frame and formwork, comprising a steel frame, characterized in that: The steel frame includes two edge member steel cages, a main steel cage connected between the two edge member steel cages, a plurality of connection plates arranged at intervals along the longitudinal direction on the outside of the steel cages, a corrugated steel plate connected to the connection plates, and concrete filled in the corrugated steel plate; The edge member steel cage comprises a plurality of first longitudinal bars evenly distributed in a square shape, and a plurality of stirrups welded on the longitudinal bars at longitudinal intervals; the main steel cage comprises a plurality of second longitudinal bars arranged between two edge member steel cages, a plurality of distribution bars welded to the main steel cage and the second longitudinal bars along the longitudinal hoop, and a plurality of tension bars evenly distributed and welded on both sides of the distribution bars and between the two edge member steel cages; a connecting port is provided on the connecting plate, and a steel plate rib adapted to the connecting port is provided on the corrugated steel plate.

2. The concrete shear wall with prefabricated steel frame and formwork according to claim 1, characterized in that: The edge member steel cage includes four pairs of the first longitudinal bars which are spaced apart and distributed; the stirrups are welded to two pairs of the first longitudinal bars which are spaced apart.

3. The concrete shear wall with prefabricated steel frame and formwork according to claim 1, characterized in that: The connecting plate is adapted to the outer shape of the steel cage, and its hoop is welded to the outside of the steel cage.

4. The concrete shear wall with prefabricated steel frame and formwork according to claim 3 is characterized in that: The connecting plate includes a first connecting portion which is longitudinally arranged, and a second connecting portion which is connected to the first connecting portion and protrudes outwardly in a horizontal direction; the connecting port is opened on the second connecting portion.

5. The concrete shear wall with prefabricated steel frame and formwork according to claim 4, characterized in that: The connection port is triangular in shape, one vertex of which faces outward and is provided with a slot.

6. The concrete shear wall with prefabricated steel frame and formwork according to claim 4, characterized in that: The corrugated steel plates include two first corrugated steel plates and two second corrugated steel plates, and the inner sides of the first corrugated steel plates and the second corrugated steel plates are provided with continuous steel plate ribs along the vertical direction.

7. The concrete shear wall with prefabricated steel frame and formwork according to claim 6, characterized in that: The second corrugated steel plate is provided with full-length engaging edges on both sides.

8. The concrete shear wall with prefabricated steel frame and formwork according to claim 1, characterized in that: The top longitudinal reinforcement of the steel cage is higher than the upper end of the corrugated steel plate and is bent inwards to form a connecting section.

9. A method for constructing a concrete shear wall according to any one of claims 1 to 8, characterized in that: The following steps are involved: S1: prefabricated steel frame, connection plate, and corrugated steel plate; In the prefabrication plant, the first longitudinal reinforcement and stirrups are welded separately to prefabricate the edge component reinforcement cage, and the second longitudinal reinforcement, distribution reinforcement and tension reinforcement are welded to prefabricate the main reinforcement cage; then the main reinforcement cage and the edge component reinforcement cage are assembled and welded to form an integral reinforcement skeleton; Cut the connecting plate and process the connecting port on the connecting plate; Rolling the steel plate into a corrugated steel plate having steel plate ribs; S2: Multiple connecting plates are hooped at intervals along the longitudinal direction and welded to the steel skeleton, and then the corrugated steel plate is hoisted, and the steel plate ribs are passed through the corresponding connecting ports from top to bottom or from bottom to top in sequence to complete the installation of the corrugated steel plate; S3: Pour concrete on the inner side of the corrugated steel sheet.