A method, device, equipment and medium for processing building equipment operation status data

By combining the image data of building equipment and property log data, optimization processing and evaluation model construction are performed, which solves the problems of data accuracy and incomplete information acquisition in the existing technology, and achieves efficient and reliable analysis and management of the operating status of building equipment.

CN118520375BActive Publication Date: 2024-10-01INNOVATION & INNOVATION CENT OF STATE GRID ZHEJIANG ELECTRIC POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411001872.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-10-01
Estimated Expiration
2044-07-25

AI Technical Summary

Technical Problem

Existing building equipment operating status data processing methods lack analysis of property log data, resulting in reduced data accuracy and incomplete information acquisition, affecting the decision-making and management efficiency of smart buildings and increasing security risks.

Method used

By acquiring building equipment operating data including equipment image data and property log data, image dimensions are optimized and adjusted and log data merged to build an equipment operating status evaluation model to improve data accuracy and management efficiency.

Benefits of technology

It realizes real-time, efficient and reliable analysis of building equipment operating status data, improves fault perception and operation and maintenance support, and improves equipment management level and operational stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118520375B_ABST
    Figure CN118520375B_ABST
Patent Text Reader

Abstract

The present invention provides a method, device, equipment and medium for processing building equipment operation status data, including obtaining target building equipment operation data to be processed, the target building equipment operation data to be processed includes equipment image data and equipment property log data; optimizing and adjusting the equipment image data based on the preset impact priority of the image dimension on the image; generating operation log data matching the adjusted equipment image data; merging the property log data and the operation log data to obtain data to be reconstructed; performing image reconstruction processing based on the data to be reconstructed to obtain target building equipment operation data. The present invention takes property log data into consideration, enriches the data source of building equipment operation status data, effectively improves the accuracy of equipment operation status assessment, provides strong support for equipment fault perception and operation and maintenance updates, facilitates better improvement of building equipment management level, and further provides reliable guarantee for normal and stable operation of buildings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of smart building data processing, and in particular to a method, device, computer equipment and storage medium for processing building equipment operating status data. Background Art

[0002] Smart buildings are a new type of building that uses advanced technologies such as the Internet of Things, big data, and artificial intelligence to intelligently manage and control the building equipment, energy, safety, and environment of public buildings such as office buildings, office buildings, and residential communities to improve the safety and comfort of buildings and meet the needs of energy conservation and emission reduction. Among them, building equipment has become a key focus in building property management because its operating status directly affects the operation and maintenance of buildings. In order to effectively manage and maintain building equipment and improve the operating efficiency and stability of building equipment, the property management department needs to reliably analyze the operating status data of each building equipment in order to promptly detect equipment failures, prevent equipment damage in advance, and improve the overall equipment operating efficiency.

[0003] The existing method for processing building equipment operation status data only obtains the equipment image data of real-time property monitoring. On the one hand, due to factors such as sensor size, pixel size, lens quality, etc., the accuracy of equipment image data is often not high. On the other hand, the existing building equipment operation status data has a single data source and ignores the property log data of the equipment, resulting in incomplete information acquisition. Incomplete information acquisition will greatly reduce the accuracy of building equipment operation status data, which will lead to wrong decisions, inefficient management, waste of resources and certain security risks in smart buildings, reducing the use value of data processing results. Summary of the invention

[0004] The purpose of the present invention is to provide a method for processing building equipment operating status data, which can not only adjust the image data of building equipment to improve its accuracy, but also take property log data into consideration, enriching the data source of building equipment operating status data, effectively improving the accuracy of equipment operating status assessment, and providing strong support for equipment fault perception and operation and maintenance updates, so as to better improve the level of building equipment management, and thus provide reliable guarantee for the normal and stable operation of the building.

[0005] In order to achieve the above objectives, it is necessary to provide a building equipment operating status data processing method, device, computer equipment and storage medium in response to the above technical problems.

[0006] In a first aspect, an embodiment of the present invention provides a method for processing building equipment operation status data, the method comprising the following steps:

[0007] Acquire the target building equipment operation data to be processed, wherein the target building equipment operation data to be processed includes equipment image data and property log data corresponding to the equipment;

[0008] Optimizing and adjusting the device image data based on a preset impact priority of the image dimension on the image;

[0009] generating operation log data matching the adjusted device image data;

[0010] Merging the property log data and the operation log data to obtain data to be reconstructed;

[0011] Image reconstruction processing is performed based on the data to be reconstructed to obtain corresponding target building equipment operation data.

[0012] Furthermore, the optimizing and adjusting the device image data based on the priority of the impact of the image dimension on the image includes:

[0013] Performing feature extraction on the device image data to obtain at least one type of latent feature reflecting the image dimension;

[0014] Based on each of the latent features, a corresponding single-dimensional feature space is constructed in sequence, and a corresponding image adjustment method is determined according to a preset priority relationship between a weight of each single-dimensional feature space and an image adjustment method;

[0015] The device image data is adjusted in the determined image adjustment manner.

[0016] Furthermore, the types of the latent features include at least color features, texture features and shape features; then,

[0017] The step of sequentially constructing corresponding single-dimensional feature spaces based on the respective implicit features includes:

[0018] Extracting the number of pixels within a predetermined color gamut in the device image data to obtain the corresponding weight of each hue, wherein the predetermined color gamut at least includes the image color block of the device;

[0019] Using each of the weight values ​​as coordinate points, constructing a corresponding color single-dimensional feature space; and,

[0020] Extracting device texture features from the device image data, wherein the device texture features include a gray level co-occurrence matrix and a gray level difference matrix;

[0021] Based on the linear discriminant analysis dimensionality reduction technology, the feature subset constructed by the gray level co-occurrence matrix and the gray level difference matrix is ​​processed to obtain coordinate points for constructing the corresponding texture single-dimensional feature space; and,

[0022] Edge detection is performed on the device image data, and the gradients of the device edge pixels in the horizontal and vertical directions are used as shape feature coordinate points to construct a corresponding shape single-dimensional feature space.

[0023] Further, the property log data includes electronic log data and text log data;

[0024] The electronic log data at least includes electronic log data at the fire-fighting end, electronic log data at the third-party software end, and electronic log data at the target property management system end.

[0025] Furthermore, the property log data and the operation log data are combined and processed to obtain data to be reconstructed, including:

[0026] Respectively extracting the attribute characteristics and corresponding attribute values ​​of each log in the property log data, and the attribute characteristics and corresponding attribute values ​​of each log in the operation log data;

[0027] Comparing the attribute values ​​corresponding to the same attribute features in sequence;

[0028] When the comparison is normal, determining each of the attribute features and the corresponding attribute value one by one; and,

[0029] When comparing anomalies, based on the data rollback mechanism, the abnormal attribute values ​​corresponding to the abnormal attribute features are screened and analyzed, and the analysis results are compared and analyzed with the historical information data of the abnormal attribute features to generate corresponding prediction information;

[0030] The abnormal attribute value corresponding to the abnormal attribute feature is corrected using the prediction information until the comparison is normal.

[0031] Furthermore, the target building equipment operation data to be processed is obtained based on the property monitoring data and the user shared data stored in the blockchain; the user shared data is actively uploaded by the user, or uploaded by the user in response to a data collection request issued by the property on the blockchain network.

[0032] Furthermore, the method further comprises the following steps:

[0033] Performing information extraction and processing on the target building equipment operation data to obtain the operation status data to be analyzed; the operation status data to be analyzed includes basic operation data and operation energy consumption data; the basic operation data includes operation environment data, operation time, status monitoring data and location data;

[0034] Inputting the basic operation data into a pre-built operation energy consumption estimation model for prediction analysis to obtain a corresponding operation energy consumption estimation value;

[0035] According to the energy consumption estimation deviation between the operation energy consumption estimation value and the operation energy consumption data, the state monitoring data is corrected to obtain corresponding corrected operation state data;

[0036] The corrected operating status data is input into a pre-built equipment status assessment model to obtain a corresponding equipment status assessment result.

[0037] Furthermore, the operation energy consumption estimation model is a Transformer network model; and the steps of constructing the operation energy consumption estimation model include:

[0038] Acquire historical operation data of target building equipment of multiple buildings; the target building equipment historical operation data includes historical basic operation time series data and corresponding historical operation energy consumption time series data;

[0039] The historical basic operation time series data in the historical operation data of the target building equipment are annotated with the corresponding historical operation energy consumption time series data to construct an equipment energy consumption estimation data set;

[0040] According to the device energy consumption estimation data set, the preset Transformer network model is optimized and trained to obtain the operation energy consumption estimation model.

[0041] Furthermore, the step of correcting the status monitoring data according to the energy consumption estimation deviation between the operation energy consumption estimation value and the operation energy consumption data to obtain corresponding corrected operation status data includes:

[0042] Determining whether the energy consumption estimation deviation is less than a preset deviation threshold;

[0043] If so, directly remove disturbances from the state monitoring data according to the energy consumption estimation deviation to obtain state monitoring correction data, and update the basic operation data according to the state monitoring correction data to obtain the corrected operation state data;

[0044] If not, the state monitoring data is disturbed and removed according to the energy consumption estimation deviation. After obtaining the state monitoring correction data, an updated operating energy consumption estimation value is obtained according to the basic operating data updated by the state monitoring correction data, and a new round of iteration is performed according to the energy consumption estimation deviation corresponding to the updated operating energy consumption estimation value until the energy consumption estimation deviation reaches the preset deviation threshold, thereby obtaining the corrected operating state data.

[0045] Furthermore, the step of performing disturbance removal processing on the state monitoring data according to the energy consumption estimation deviation to obtain state monitoring correction data includes:

[0046] According to the energy consumption estimation deviation, a corresponding data monitoring disturbance is obtained;

[0047] According to the data monitoring disturbance, the state monitoring data is disturbed to obtain the state monitoring correction data; the state monitoring correction data is expressed as:

[0048]

[0049] In the formula,

[0050]

[0051] in, and Respectively represent the status monitoring data of the nth iteration and the n+1th iteration; represents the data monitoring disturbance of the nth iteration; represents the error correction factor; Represents the energy consumption estimation deviation of the nth iteration.

[0052] Furthermore, the steps of constructing the equipment status assessment model include:

[0053] Sending an initial evaluation model and a shared operation data set to multiple participating learning building terminals simultaneously through a target building terminal; the target building terminal is a data processing terminal corresponding to the target building equipment; the participating learning building terminal has equipment operation data of the same type as the target building equipment;

[0054] When each participating building terminal receives the initial evaluation model and the shared operation data set, the initial evaluation model is trained according to the local operation data set to obtain the corresponding local evaluation model, and then the accuracy of the local evaluation model is evaluated according to the shared operation data set to obtain the corresponding model accuracy, and the local evaluation model and the model accuracy are sent to the target building terminal;

[0055] When the target building terminal receives the local evaluation models and model accuracy of each participating building terminal, it obtains the corresponding model aggregation weight according to each model accuracy, and after weighted aggregation of the local evaluation models according to the model aggregation weight to obtain the global evaluation model, it determines whether the global evaluation model reaches the preset convergence condition. If so, the global evaluation model is used as the device status evaluation model. Otherwise, the global evaluation model is sent to each participating building terminal and the next round of learning and training is started.

[0056] Furthermore, each participating learning building terminal trains the initial evaluation model according to the local operation data set to obtain the corresponding local evaluation model, including:

[0057] According to the operation energy consumption data in the local operation data set, a corresponding equipment carbon emission monitoring data set is obtained;

[0058] The initial evaluation model is trained according to the local operation data set, the equipment carbon emission monitoring data set and a preset loss function to construct the local evaluation model; the preset loss function is calculated based on multi-classification cross entropy loss and carbon emission prediction loss.

[0059] Furthermore, the preset loss function is expressed as:

[0060]

[0061] In the formula,

[0062]

[0063]

[0064] in, Indicates the equipment status prediction loss; and Respectively represent multi-classification cross entropy loss and carbon emission prediction loss; Represents the true state characteristic function of the mth sample data; Indicates the probability prediction value that the mth sample data belongs to category k; Represents the weight of multi-classification cross entropy loss; and They respectively represent the actual carbon emissions and predicted carbon emissions corresponding to the mth sample data; M represents the total number of samples; K represents the total number of categories.

[0065] Furthermore, the step of training the initial evaluation model according to the local operation data set, the equipment carbon emission monitoring data set and the preset loss function to construct the local evaluation model includes:

[0066] Inputting the local operation data set into the initial evaluation model to perform equipment state prediction, and obtaining a corresponding state prediction result set; the state prediction result set includes the equipment state and the corresponding state level;

[0067] Obtaining the multi-classification cross entropy loss according to the state prediction result set;

[0068] According to the state prediction result set and the pre-built state carbon emission prediction model, a corresponding state carbon emission prediction set is obtained, and according to the state carbon emission prediction set and the equipment carbon emission monitoring data set, the carbon emission prediction loss is obtained;

[0069] Taking a weighted average of the multi-classification cross entropy loss and the carbon emission prediction loss to obtain a corresponding equipment state prediction loss;

[0070] The model parameters of the initial assessment model are updated according to the device state prediction loss.

[0071] Furthermore, the steps of constructing the state carbon emission prediction model include:

[0072] Obtain a historical status carbon emission data set of target building equipment; the historical status carbon emission data set includes equipment status, status level and energy consumption carbon emission;

[0073] According to the equipment state and the state level, the energy consumption carbon emission is fitted and modeled to obtain the state carbon emission prediction model.

[0074] Furthermore, the method further comprises:

[0075] According to the equipment status evaluation result and the preset strategy database, a corresponding equipment operation and maintenance strategy is obtained; the preset strategy database includes a mapping relationship between equipment status and operation and maintenance strategy.

[0076] Furthermore, the step of constructing the preset strategy database includes:

[0077] Acquire historical maintenance records of the equipment, and analyze the historical maintenance records of the equipment to generate a first state policy rule set;

[0078] Based on the analytic hierarchy process, a second state strategy rule set is generated;

[0079] The first state policy rule set and the second state policy rule set are merged to obtain the preset policy database.

[0080] Furthermore, the step of obtaining a corresponding equipment operation and maintenance strategy according to the equipment status evaluation result and a preset strategy database includes:

[0081] Generate a corresponding strategy reasoning network according to the preset strategy database and RETE algorithm;

[0082] The device status assessment result is input into the strategy reasoning network for strategy reasoning screening to obtain the device operation and maintenance strategy.

[0083] In a second aspect, an embodiment of the present invention provides a device for processing building equipment operation status data, the device comprising:

[0084] A data acquisition module, used to acquire the target building equipment operation data to be processed, wherein the target building equipment operation data to be processed includes equipment image data and property log data corresponding to the equipment;

[0085] An optimization and adjustment module, used for optimizing and adjusting the device image data based on a preset impact priority of the image dimension on the image;

[0086] A log generation module, used to generate operation log data matching the adjusted device image data;

[0087] A merging module, used for merging the property log data and the operation log data to obtain data to be reconstructed;

[0088] The reconstruction module is used to perform image reconstruction processing based on the data to be reconstructed to obtain corresponding target building equipment operation data.

[0089] Furthermore, the optimization and adjustment module includes:

[0090] A feature extraction unit, used to extract features from the device image data to obtain at least one type of latent features reflecting the image dimension;

[0091] A feature space unit, used to construct corresponding single-dimensional feature spaces in sequence based on each of the latent features, and determine the corresponding image adjustment method according to a preset priority relationship between the weight of each single-dimensional feature space and the image adjustment method;

[0092] An adjustment unit is used to adjust the device image data according to the determined image adjustment method.

[0093] Furthermore, the types of the latent features include at least color features, texture features and shape features; then,

[0094] The feature space unit is configured as:

[0095] Extracting the number of pixels within a predetermined color gamut in the device image data to obtain the corresponding weight of each hue, wherein the predetermined color gamut at least includes the image color block of the device;

[0096] Using each of the weight values ​​as coordinate points, constructing a corresponding color single-dimensional feature space; and,

[0097] Extracting device texture features from the device image data, wherein the device texture features include a gray level co-occurrence matrix and a gray level difference matrix;

[0098] Based on the linear discriminant analysis dimensionality reduction technology, the feature subset constructed by the gray level co-occurrence matrix and the gray level difference matrix is ​​processed to obtain coordinate points for constructing the corresponding texture single-dimensional feature space; and,

[0099] Edge detection is performed on the device image data, and the gradients of the device edge pixels in the horizontal and vertical directions are used as shape feature coordinate points to construct a corresponding shape single-dimensional feature space.

[0100] Further, the property log data includes electronic log data and text log data;

[0101] The electronic log data at least includes electronic log data at the fire-fighting end, electronic log data at the third-party software end, and electronic log data at the target property management system end.

[0102] Furthermore, the merging module includes:

[0103] An attribute extraction unit, used to extract attribute features and corresponding attribute values ​​of each log in the property log data, and attribute features and corresponding attribute values ​​of each log in the operation log data;

[0104] A comparison unit, used to sequentially compare the attribute values ​​corresponding to the same attribute features;

[0105] A comparison processing unit, used for determining each of the attribute features and the corresponding attribute value one by one when the comparison is normal; and

[0106] When comparing anomalies, based on the data rollback mechanism, the abnormal attribute values ​​corresponding to the abnormal attribute features are screened and analyzed, and the analysis results are compared with the historical information data of the abnormal attribute features to generate corresponding prediction information;

[0107] The correction unit is used to correct the abnormal attribute value corresponding to the abnormal attribute feature by using the prediction information until the comparison is normal.

[0108] Furthermore, the target building equipment operation data to be processed is obtained based on the property monitoring data and the user shared data stored in the blockchain; the user shared data is actively uploaded by the user, or uploaded by the user in response to a data collection request issued by the property on the blockchain network.

[0109] Furthermore, the device also includes:

[0110] An information extraction module is used to extract information from the target building equipment operation data to obtain the operation status data to be analyzed; the operation status data to be analyzed includes basic operation data and operation energy consumption data; the basic operation data includes operation environment data, operation time, status monitoring data and location data;

[0111] An energy consumption estimation module is used to input the basic operation data into a pre-built operation energy consumption estimation model for prediction analysis to obtain a corresponding operation energy consumption estimation value;

[0112] A data correction module, used to correct the state monitoring data according to the energy consumption estimation deviation between the operation energy consumption estimation value and the operation energy consumption data, so as to obtain corresponding corrected operation state data;

[0113] The status assessment module is used to input the corrected operating status data into a pre-built equipment status assessment model to obtain a corresponding equipment status assessment result.

[0114] Furthermore, the operation energy consumption estimation model is a Transformer network model; the energy consumption estimation module includes:

[0115] A historical data acquisition unit, used to acquire historical operation data of target building equipment of multiple buildings; the target building equipment historical operation data includes historical basic operation time series data and corresponding historical operation energy consumption time series data;

[0116] A training set construction unit, used to annotate the historical basic operation time series data in the target building equipment historical operation data with the corresponding historical operation energy consumption time series data, so as to construct an equipment energy consumption estimation data set;

[0117] The first model training unit is used to optimize and train the preset Transformer network model according to the device energy consumption estimation data set to obtain the operation energy consumption estimation model.

[0118] Furthermore, the data correction module includes:

[0119] A state data correction unit, used for removing disturbances from the state monitoring data according to the energy consumption estimation deviation to obtain state monitoring correction data;

[0120] An error detection unit, used to determine whether the energy consumption estimation deviation is less than a preset deviation threshold;

[0121] A first correction unit, configured to directly update the basic operation data according to the state monitoring correction data to obtain the corrected operation state data when the energy consumption estimation deviation is less than the preset deviation threshold;

[0122] A second correction unit is used to update the basic operating data according to the status monitoring correction data when the energy consumption estimation deviation is greater than or equal to the preset deviation threshold, and obtain an operating energy consumption estimation update value based on the updated basic operating data, and perform a new round of iteration according to the energy consumption estimation deviation corresponding to the operating energy consumption estimation update value, until the energy consumption estimation deviation reaches the preset deviation threshold, so as to obtain the corrected operating status data.

[0123] Furthermore, the state data correction unit includes:

[0124] A disturbance calculation subunit, used for obtaining a corresponding data monitoring disturbance according to the energy consumption estimation deviation;

[0125] The disturbance removal subunit is used to remove the disturbance of the state monitoring data according to the data monitoring disturbance to obtain the state monitoring correction data; the state monitoring correction data is expressed as:

[0126]

[0127] In the formula,

[0128]

[0129] in, and Respectively represent the status monitoring data of the nth iteration and the n+1th iteration; represents the data monitoring disturbance of the nth iteration; represents the error correction factor; Represents the energy consumption estimation deviation of the nth iteration.

[0130] Furthermore, the status assessment module includes:

[0131] A model sending unit, used to send an initial evaluation model and a shared operation data set to multiple participating learning building terminals simultaneously through a target building terminal; the target building terminal is a data processing terminal corresponding to the target building equipment; the participating learning building terminal has equipment operation data of the same type as the target building equipment;

[0132] A local training unit is used for, when each participating building terminal receives the initial evaluation model and the shared operation data set, training the initial evaluation model according to the local operation data set, obtaining the corresponding local evaluation model, performing accuracy evaluation on the local evaluation model according to the shared operation data set, obtaining the corresponding model accuracy, and sending the local evaluation model and the model accuracy to the target building terminal;

[0133] The model aggregation unit is used to obtain the corresponding model aggregation weight according to each model accuracy when the target building terminal receives the local evaluation model and model accuracy of each participating building terminal, and after weighted aggregation of the local evaluation model according to the model aggregation weight to obtain a global evaluation model, determine whether the global evaluation model reaches the preset convergence condition. If so, the global evaluation model is used as the device status evaluation model. Otherwise, the global evaluation model is sent to each participating building terminal and the next round of learning and training is started.

[0134] Furthermore, the local training unit includes:

[0135] A carbon emission data acquisition unit, configured to acquire a corresponding equipment carbon emission monitoring data set according to the operation energy consumption data in the local operation data set;

[0136] The second model training unit is used to train the initial evaluation model according to the local operation data set, the equipment carbon emission monitoring data set and a preset loss function to construct the local evaluation model; the preset loss function is calculated based on multi-classification cross entropy loss and carbon emission prediction loss.

[0137] Furthermore, the preset loss function is expressed as:

[0138]

[0139] In the formula,

[0140]

[0141]

[0142] in, Indicates the equipment status prediction loss; and Respectively represent multi-classification cross entropy loss and carbon emission prediction loss; Represents the true state characteristic function of the mth sample data; Indicates the probability prediction value that the mth sample data belongs to category k; Represents the weight of multi-classification cross entropy loss; and They respectively represent the actual carbon emissions and predicted carbon emissions corresponding to the mth sample data; M represents the total number of samples; K represents the total number of categories.

[0143] Furthermore, the second model training unit includes:

[0144] A state prediction subunit, used for inputting the local operation data set into the initial evaluation model to perform equipment state prediction, and obtain a corresponding state prediction result set; the state prediction result set includes the equipment state and the corresponding state level;

[0145] A first loss calculation subunit, configured to obtain the multi-classification cross entropy loss according to the state prediction result set;

[0146] A second loss calculation subunit is used to obtain a corresponding state carbon emission prediction set according to the state prediction result set and a pre-constructed state carbon emission prediction model, and obtain the carbon emission prediction loss according to the state carbon emission prediction set and the equipment carbon emission monitoring data set;

[0147] A comprehensive loss calculation subunit, used for performing weighted averaging on the multi-classification cross entropy loss and the carbon emission prediction loss to obtain a corresponding equipment state prediction loss;

[0148] The model update acquisition subunit is used to update the model parameters of the initial evaluation model according to the device state prediction loss.

[0149] Furthermore, the second loss calculation subunit includes:

[0150] A historical carbon emission acquisition subunit is used to acquire a historical status carbon emission data set of target building equipment; the historical status carbon emission data set includes equipment status, status level and energy consumption carbon emission;

[0151] The data fitting subunit is used to fit and model the energy consumption carbon emission according to the equipment state and the state level to obtain the state carbon emission prediction model.

[0152] Furthermore, the device also includes:

[0153] The strategy acquisition module is used to obtain the corresponding equipment operation and maintenance strategy according to the equipment status evaluation result and the preset strategy database; the preset strategy database includes the mapping relationship between the equipment status and the operation and maintenance strategy.

[0154] Furthermore, the strategy acquisition module includes:

[0155] A first rule set generating unit, configured to obtain a historical maintenance record of the device, analyze the historical maintenance record of the device, and generate a first state policy rule set;

[0156] A second rule set generating unit, used for generating a second state strategy rule set based on the hierarchical analysis method;

[0157] The database generating unit is used to merge the first state policy rule set and the second state policy rule set to obtain the preset policy database.

[0158] Furthermore, the strategy acquisition module includes:

[0159] An inference network construction unit, used to generate a corresponding strategy inference network according to the preset strategy database and the RETE algorithm;

[0160] The operation and maintenance strategy generating unit is used to input the equipment status evaluation result into the strategy reasoning network for strategy reasoning screening to obtain the equipment operation and maintenance strategy.

[0161] In a third aspect, an embodiment of the present invention further provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above method when executing the computer program.

[0162] In a fourth aspect, an embodiment of the present invention further provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program implements the steps of the above method when executed by a processor.

[0163] The present invention provides a method, device, computer device and storage medium for processing building equipment operation status data, and the beneficial effects are at least one of the following:

[0164] (1) It makes up for the technical defect of the existing technology that the accuracy of building equipment operation data is reduced due to the lack of analysis of property log data. On the one hand, smart buildings collect the operation data of building equipment, and on the other hand, take into account the property log data corresponding to the equipment, enriching the source of data and improving the accuracy of data from two dimensions, making information acquisition more comprehensive, effectively improving the accuracy of building equipment operation status data, optimizing the decision-making, management efficiency, resource utilization and equipment safety management of smart buildings, and improving the use value of data processing results;

[0165] (2) Optimizing and analyzing image data based on image dimensions and performing corresponding adjustments can effectively improve the accuracy of image data and prevent data deviation caused by distortion, blurring, etc. of building equipment image data, ensuring that subsequent smart buildings can receive accurate data information and achieve fixed-point control of equipment;

[0166] (3) It realizes real-time, efficient and reliable analysis and processing of building equipment operating status data, effectively improves the accuracy of equipment status assessment, provides strong support for equipment fault perception and operation and maintenance updates, facilitates better improvement of building equipment management level, and thus provides reliable guarantee for the normal and stable operation of the building. BRIEF DESCRIPTION OF THE DRAWINGS

[0167] Figure 1 is a flow chart of a method for processing building equipment operating status data in an embodiment of the present invention;

[0168] Figure 2 is another detailed flow chart of the method for processing building equipment operation status data in an embodiment of the present invention;

[0169] Figure 3 is another detailed flow chart of the method for processing building equipment operation status data in an embodiment of the present invention;

[0170] Figure 4is a structural schematic diagram of a building equipment operation status data analysis device in an embodiment of the present invention;

[0171] Figure 5 is another structural schematic diagram of a building equipment operation status data analysis device in an embodiment of the present invention;

[0172] Figure 6 is another structural schematic diagram of a building equipment operation status data analysis device according to an embodiment of the present invention;

[0173] Figure 7 It is a diagram of the internal structure of a computer device in an embodiment of the present invention. DETAILED DESCRIPTION

[0174] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. The purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0175] In the description of this application, the terms "first", "second", "third", etc. are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", "third", etc. may explicitly or implicitly include one or more of the feature. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0176] In the description of the present application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be a connection between the two elements. The terms "vertical", "horizontal", "left", "right", "upper", "lower" and similar expressions used herein are only for illustrative purposes, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0177] In the description of this application, it should be noted that, unless otherwise defined, all technical and scientific terms used in the present invention have the same meaning as those commonly understood by those skilled in the art. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood by specific circumstances.

[0178] In one embodiment, Figure 1 As shown, a method for processing building equipment operation status data is provided, comprising steps S1 to S5:

[0179] S1. Acquire the target building equipment operation data to be processed, wherein the target building equipment operation data to be processed includes equipment image data and property log data corresponding to the equipment;

[0180] S2. Optimizing and adjusting the device image data based on a preset impact priority of the image dimension on the image;

[0181] S3, generating operation log data matching the adjusted device image data;

[0182] S4, merging the property log data and the operation log data to obtain data to be reconstructed;

[0183] S5. Perform image reconstruction processing based on the data to be reconstructed to obtain corresponding target building equipment operation data.

[0184] It should be noted in advance that in smart buildings, building equipment is an indispensable and important part of modern buildings. They cover many aspects of buildings, including but not limited to heating, ventilation, air conditioning, lighting, elevators, security monitoring, etc. Property personnel will regularly patrol and record building equipment, generate manual reports, and post them at the corresponding safety equipment locations. Property terminals that use third-party property software for monitoring will also regularly patrol and record building equipment. In addition, firefighters will also regularly patrol building equipment (such as fire hydrants and fire cabinets) and record the patrol results at firefighting terminals. Power terminals will also regularly patrol building equipment (such as household lines, household lines, main distribution boxes, trunk lines, and distribution boxes) and record the patrol results at power terminals. Heating personnel will also regularly patrol building equipment (such as water valves, elevator shafts, and water tanks) and record the patrol results at heating terminals. The above data are collectively referred to as property log data.

[0185] With the advancement of technology and the increasing demand for safety, the frequency of obtaining property logs is also increasing. For example, according to relevant safety regulations issued by the state, fire protection facilities in public entertainment venues need to be inspected every 2 hours to ensure that all fire protection facilities are in normal working condition. It can be seen that property log data can accurately reflect the real-time operating status of building equipment. When obtaining building equipment operation data, if this data source is ignored, it will lead to incomplete information acquisition, greatly reducing the accuracy of building equipment operation status data.

[0186] In the embodiment of the present invention, the property log data is taken into consideration. Preferably, the property log data includes electronic log data and text log data; the electronic log data at least includes electronic log data on the fire-fighting end, electronic log data on the third-party software end, and electronic log data on the target property management system end. Of course, the actual property log data may also include the above-mentioned log data on fire-fighting, heating, electricity, etc., which is determined by the actual use requirements and is not specifically limited in the embodiment of the present invention.

[0187] Considering that some property log data is obtained from manual handwritten records, in this embodiment, text extraction is required first. Extracting text information usually involves a series of steps, which depends on the specific goals and application scenarios. Preferably, natural language processing (NLP) technology, such as TF-IDF (term frequency-inverse document frequency), TextRank and other algorithms can be used to extract keywords in the text; for text with a fixed format or pattern, regular expressions (Regex) can be used to extract information; this can be achieved by using word embeddings (such as Word2Vec, GloVe), BERT and other deep learning models, which can capture the semantic relationship between words; or using specialized NLP APIs or tools (such as Google Cloud NLP, IBM Watson, NLTK, spaCy, etc.) can simplify the process of text information extraction.

[0188] In addition to considering the property log information, the embodiment of the present invention also optimizes the image data. Specifically, the device image data is optimized and adjusted, including:

[0189] Feature extraction is performed on the device image data to obtain at least one type of implicit feature reflecting the image dimension; based on each of the implicit features, a corresponding single-dimensional feature space is sequentially constructed, and according to a preset priority relationship between the weight of each single-dimensional feature space and the image adjustment method, a corresponding image adjustment method is determined; and the device image data is adjusted according to the determined image adjustment method.

[0190] In the above embodiment, the types of implicit features include at least color features, texture features and shape features. Of course, spatial relationship features can also be used to describe the relative spatial position or direction relationship between multiple targets in the image, local features (including but not limited to scale-invariant feature transform SIFT and accelerated robust features SURF, etc.), deep learning features, etc., which are determined by the actual image type and will not be elaborated here.

[0191] In the above embodiment, the corresponding single-dimensional feature space is sequentially constructed based on each of the implicit features, specifically including:

[0192] Extracting the number of pixels within a predetermined color gamut in the device image data to obtain the corresponding weight of each hue, wherein the predetermined color gamut at least includes the image color block of the device;

[0193] Using each of the weight values ​​as coordinate points, constructing a corresponding color single-dimensional feature space; and,

[0194] Extracting device texture features from the device image data, wherein the device texture features include a gray level co-occurrence matrix and a gray level difference matrix;

[0195] Based on the linear discriminant analysis dimensionality reduction technology, the feature subset constructed by the gray level co-occurrence matrix and the gray level difference matrix is ​​processed to obtain coordinate points for constructing the corresponding texture single-dimensional feature space; and,

[0196] Edge detection is performed on the device image data, and the gradients of the device edge pixels in the horizontal and vertical directions are used as shape feature coordinate points to construct a corresponding shape single-dimensional feature space.

[0197] The construction of the feature space, in this embodiment, is preferably achieved by the following steps:

[0198] 1. Feature extraction: including various types of features such as color, texture, shape, spatial relationship, etc.

[0199] 2. Feature mapping: Mapping the extracted feature vectors into a high-dimensional feature space can be achieved through various mathematical transformations, such as linear transformation, nonlinear transformation, etc. In some cases, it may be necessary to use specific mapping functions or models, such as kernel functions, neural networks, etc.

[0200] 3. Feature transformation: including feature scaling (such as normalization, standardization), feature encoding (such as one-hot encoding, label encoding), feature dimensionality reduction (such as PCA, LDA) and other links.

[0201] 4. Feature space selection and optimization: Use optimization algorithms or model selection techniques to optimize the feature space, including but not limited to adjusting the parameters of the mapping function, selecting the best feature combination, and using cross-validation and other techniques to evaluate the performance of the feature space.

[0202] After the image data is optimized and adjusted, operation log data matching it is generated and combined with the above-mentioned property log data to realize data accuracy analysis of image dimension and text dimension, that is, the property log data and the operation log data are merged and processed to obtain the data to be reconstructed, and image reconstruction is performed based on the data to be reconstructed to obtain the corresponding target building equipment operation data, which can accurately reflect the operation status information of the building equipment.

[0203] Preferably, in the above embodiment, the property log data and the operation log data are combined to obtain the data to be reconstructed, including:

[0204] Respectively extracting the attribute characteristics and corresponding attribute values ​​of each log in the property log data, and the attribute characteristics and corresponding attribute values ​​of each log in the operation log data;

[0205] Compare the attribute values ​​corresponding to the same attribute features in sequence;

[0206] When the comparison is normal, determining each of the attribute features and the corresponding attribute value one by one; and,

[0207] When comparing anomalies, based on the data rollback mechanism, the abnormal attribute values ​​corresponding to the abnormal attribute features are screened and analyzed, and the analysis results are compared and analyzed with the historical information data of the abnormal attribute features to generate corresponding prediction information;

[0208] The abnormal attribute value corresponding to the abnormal attribute feature is corrected using the prediction information until the comparison is normal.

[0209] The attribute characteristics of the log include at least the log level, log content, timestamp, source, log type and log size. The embodiments of the present invention emphasize the log content, which is the core part of the log and records the specific information generated by the system or application during operation. The content may include operation records, exception stacks, user request details, etc. For example, for fire protection facilities in building equipment, the property log may include maintenance records and other content, while the operation log generated by image reconstruction may not include this content. Therefore, by merging the two, accurate building equipment operation data can be obtained, thereby greatly improving the accuracy of data acquisition.

[0210] In practical applications, the target building equipment operation data to be processed can in principle be directly obtained by using the property monitoring data collected by the smart building monitoring system. However, considering that the data collected by deploying sensors and the like is easily affected by the external environment and may lead to data loss or inaccuracy, in order to ensure the comprehensiveness and effectiveness of data collection, in this embodiment, while obtaining the property monitoring data, group intelligence collaborative sensing technology is also used to obtain building user monitoring data to enrich data resources; specifically, the target building equipment operation data to be processed is obtained based on the property monitoring data and the user shared data stored in the blockchain; wherein the property monitoring data can be understood as time series data within a certain period of time; the user shared data can be understood as being obtained by querying the building equipment management blockchain network composed of relevant nodes such as building users and properties, and is actively uploaded by each building user based on the mobile terminal device they carry, or uploaded in response to the collection data request issued by the property node on the building equipment management blockchain network. The operating status of the target building equipment at a certain point in time transmitted, that is, including the basic operating data of the time period; it should be noted that in order to ensure that the property monitoring data and the user shared data are consistent in the time dimension, when actually obtaining the user shared data, it is necessary to obtain all relevant operating data of the target building equipment stored on the blockchain network within the same time period of the property monitoring data, and then supplement, correct or improve the data of the corresponding time point in the property monitoring data based on the basic operating data of the time period at different time points provided by different users, so as to obtain the final operating status data to be analyzed; for example, the property monitoring data at a certain point in time is inconsistent with the user shared data at the same time point. Considering that the data on the blockchain network are all consensus-certified and the reliability of the user shared data can be guaranteed, the user shared data can be used to update the property detection data at that time point. If a certain data in the property monitoring data at a certain point in time is missing, the user shared data at that time point can also be used to fill it in.

[0211] Furthermore, the data processing method for the operating status of building equipment provided by the present invention is also based on the fact that the data resources used in the existing building equipment operating status data analysis are single and the data is inaccurate due to interference from external factors, which will lead to the application status that the data analysis structure is not comprehensive and accurate enough. It proposes a data processing method that estimates the operating energy consumption by using the operating energy consumption estimation model constructed based on the equipment operating data and energy consumption data training and the collected target building equipment operating data, and then performs interference removal and correction on the target building equipment operating data according to the energy consumption estimation deviation, and then combines the pre-constructed equipment status evaluation model to perform status evaluation on the target building equipment. It can realize real-time, efficient and reliable analysis and processing of the building equipment operating status data, effectively improve the accuracy of the equipment status evaluation, and provide strong data support for the fault perception, maintenance and repair, update and upgrade of the building equipment, and the designation of long-term operation and maintenance strategies, so as to facilitate the property management department to better improve the building equipment management level and provide reliable guarantee for the normal and stable operation of the building. The following embodiments will explain the data processing method for the operating status of building equipment in detail.

[0212] In one embodiment, Figure 2 As shown, a method for processing building equipment operation status data is provided, which also includes steps S6 to S9:

[0213] S6. Extract information from the target building equipment operation data to obtain the operation status data to be analyzed; wherein the operation status data to be analyzed can be understood as the operation status data and related operation energy consumption data of the air-conditioning equipment, thermal equipment, fresh air equipment, elevator equipment or communication equipment installed and operated in the building obtained by eliminating abnormal data and extracting key information from the target building equipment operation data, which can be directly used for status analysis; the operation status data to be analyzed includes basic operation data and operation energy consumption data; wherein the basic operation data includes operation environment data (temperature, The operating status data may include temperature, humidity, operating speed, etc., and the corresponding operating energy consumption data may include power consumption data, etc. The operating status data of the fresh air equipment may include fresh air temperature and humidity, supply air temperature and humidity, return air temperature and humidity, carbon dioxide concentration, supply and exhaust air pressure and fresh air volume, etc., and the corresponding operating energy consumption data may include power consumption, etc.

[0214] S7. Input the basic operating data into a pre-constructed operating energy consumption estimation model for predictive analysis to obtain a corresponding operating energy consumption estimation value; wherein, the operating energy consumption estimation model can, in principle, adopt a machine learning model that can directly predict the operating energy consumption of the target building equipment based on the basic operating data obtained as above, but in order to ensure the efficiency and accuracy of the operating energy consumption estimation, this embodiment preferably adopts the Transformer network model to construct the operating energy consumption estimation model.

[0215] Specifically, the steps of constructing the operation energy consumption estimation model include:

[0216] Obtain historical operation data of target building equipment of multiple buildings; the target building equipment historical operation data includes historical basic operation time series data and corresponding historical operation energy consumption time series data; wherein, the historical basic operation time series data and the corresponding historical operation energy consumption time series data only need to be consistent with the specific content of the target building equipment operation data described above, and will not be repeated here.

[0217] The historical basic operation time series data in the historical operation data of the target building equipment are annotated with the corresponding historical operation energy consumption time series data to construct an equipment energy consumption estimation data set.

[0218] According to the equipment energy consumption estimation data set, the preset Transformer network model is optimized and trained to obtain the operation energy consumption estimation model; wherein, the specific network structure of the preset Transformer network model can be selected according to the actual application requirements, and is not specifically limited here; at the same time, the process of optimizing and training the preset Transformer network model according to the equipment energy consumption estimation data set can be understood as a process of fitting and optimizing the historical basic operation time series data and the corresponding historical operation energy consumption time series data, and finally obtaining an operation energy consumption estimation model that meets certain convergence conditions. The specific training steps can be implemented by referring to the existing Transformer network model training method, which will not be repeated here.

[0219] It should be noted that if the actual target building equipment involves multiple aspects of operating energy consumption, for example, thermal equipment involves both electricity consumption and water consumption, then there may be multiple corresponding operating energy consumption estimation models, but the training method of each energy consumption estimation model can be implemented by referring to the above method steps; after obtaining the estimated operating energy consumption of the target building equipment based on the operating energy consumption estimation model, the estimated operating energy consumption value can be compared with the actually obtained operating energy consumption data according to the following method, and by continuously correcting the estimated operating energy consumption value, the status monitoring data is continuously iterated and corrected to remove interference factors in the actual status detection data, thereby improving the effectiveness of the monitoring data, and evaluating and analyzing the status of the target building equipment based on the corrected operating status data finally obtained.

[0220] S8. According to the energy consumption estimation deviation between the operating energy consumption estimation value and the operating energy consumption data, the status monitoring data is corrected to obtain corresponding corrected operating status data; wherein, the corrected operating status data can be understood as the status detection data in the basic operating status data corrected based on the operating energy consumption estimation deviation.

[0221] Specifically, the step of correcting the status monitoring data according to the energy consumption estimation deviation between the operating energy consumption estimation value and the operating energy consumption data to obtain corresponding corrected operating status data includes:

[0222] Determine whether the energy consumption estimation deviation is less than a preset deviation threshold; wherein, the energy consumption estimation deviation can be understood as the absolute error between the operating energy consumption estimation value and the operating energy consumption data; the preset deviation threshold can be selected according to the actual application requirements and is not specifically limited here; it should be noted that in actual applications, if the operating energy consumption of the target building equipment includes many aspects, the energy consumption estimation deviation used here can be calculated by taking a weighted average of the deviation values ​​of multiple operating energy consumption estimates, and then compared with the preset deviation threshold, which will not be described in detail here.

[0223] If so, the state monitoring data is directly disturbed and removed according to the energy consumption estimation deviation to obtain state monitoring correction data, and the basic operation data is updated according to the state monitoring correction data to obtain the corrected operation state data.

[0224] If not, the state monitoring data is disturbed and removed according to the energy consumption estimation deviation. After obtaining the state monitoring correction data, an updated operating energy consumption estimation value is obtained according to the basic operating data updated by the state monitoring correction data, and a new round of iteration is performed according to the energy consumption estimation deviation corresponding to the updated operating energy consumption estimation value until the energy consumption estimation deviation reaches the preset deviation threshold, thereby obtaining the corrected operating state data.

[0225] Specifically, the step of removing disturbance from the state monitoring data according to the energy consumption estimation deviation to obtain state monitoring correction data includes:

[0226] According to the energy consumption estimation deviation, a corresponding data monitoring disturbance is obtained;

[0227] According to the data monitoring disturbance, the state monitoring data is disturbed to obtain the state monitoring correction data; the state monitoring correction data is expressed as:

[0228]

[0229] In the formula,

[0230]

[0231] in, and Respectively represent the status monitoring data of the nth iteration and the n+1th iteration; represents the data monitoring disturbance of the nth iteration; Represents the error correction coefficient, which is a constant that can be set according to actual application requirements; Represents the energy consumption estimation deviation of the nth iteration.

[0232] Through the above-mentioned method of removing interference and correcting the status monitoring data, the basic operating data when the operating energy consumption estimate is infinitely close to the operating energy consumption data can be obtained. Since the operating status data of the building equipment is correlated with the corresponding energy consumption data, when the operating energy consumption estimation error is eliminated, the corresponding basic operating data can be guaranteed to be infinitely close to the real data that should be obtained when there is no external interference during the collection process, which can effectively improve the reliability of the building equipment operating status data analysis.

[0233] S9. Input the corrected operating status data into a pre-built equipment status assessment model to obtain a corresponding equipment status assessment result; wherein the equipment status assessment model can be understood as a machine learning model that can effectively identify the corresponding equipment status based on the above operating status data, such as a BP neural network model or a variational autoencoder, etc., which is not specifically limited at this time.

[0234] The construction principle of the equipment status assessment model in this embodiment can only use the historical operating status data of the target building equipment as the training set for training and learning. However, considering the limited amount of data of a single target building equipment, it is difficult to ensure that a status assessment model with strong generalization ability is obtained. In order to ensure the actual application effect of the equipment status assessment model, this embodiment preferably constructs the equipment status assessment model by performing federated learning training based on the historical operating status data of the same type of equipment in multiple buildings.

[0235] Specifically, the steps of constructing the equipment status assessment model include:

[0236] An initial evaluation model and a shared operation data set are simultaneously sent to multiple participating learning building terminals through a target building terminal; the target building terminal is a data processing terminal corresponding to the target building equipment; the participating learning building terminal has equipment operation data of the same type as the target building equipment; wherein, the initial evaluation model can be a selected basic network model to be trained (such as a neural network model, etc.), or a model obtained by pre-training a basic network model by the target building terminal based on a shared operation data set in order to improve the efficiency of model construction, which is not specifically limited here.

[0237] When each participating learning building terminal receives the initial evaluation model and the shared operation data set, the initial evaluation model is trained according to the local operation data set to obtain the corresponding local evaluation model, and then the accuracy of the local evaluation model is evaluated according to the shared operation data set to obtain the corresponding model accuracy, and the local evaluation model and the model accuracy are sent to the target building terminal; wherein the local operation data set can be understood as the historical operation data of the building equipment of the same type as the target building equipment on the corresponding building collected for each participating learning building terminal.

[0238] Considering the actual application, the reliability of the local evaluation model trained by each participating building terminal will directly affect the status evaluation performance of the final equipment status evaluation model. In order to improve the accuracy and reliability of each local evaluation model, this embodiment preferably introduces a model loss function based on the carbon emission deviation of the equipment operation energy consumption to improve the comprehensiveness and rationality of the model prediction loss evaluation, thereby providing effective guarantee for the optimization and adjustment of the model parameters. Specifically, each participating building terminal trains the initial evaluation model according to the local operation data set, and the steps of obtaining the corresponding local evaluation model include:

[0239] According to the operating energy consumption data in the local operating data set, the corresponding equipment carbon emission monitoring data set is obtained; wherein, the operating energy consumption data will vary depending on the specific target building equipment being analyzed, for example, including one or more of the energy consumption such as electricity consumption, water consumption and heat consumption, which are not specifically limited this time; at the same time, various energy consumption data corresponding to the target building equipment can be converted into corresponding carbon emissions according to the conversion relationship between the existing energy consumption and carbon emissions, and the carbon emissions corresponding to various energy consumptions can be summarized to obtain the corresponding equipment carbon emission monitoring data; that is, the corresponding sample equipment carbon emission monitoring data corresponding to the operating energy consumption data corresponding to each sample data in the local operating data set can be summarized to obtain the equipment carbon emission monitoring data set corresponding to the local operating data set for subsequent analysis.

[0240] The initial evaluation model is trained according to the local operation data set, the equipment carbon emission monitoring data set and the preset loss function to construct the local evaluation model; wherein, the preset loss function may adopt the existing classification loss function in principle, but considering that the equipment state is related to energy consumption and energy consumption directly affects carbon emissions, this embodiment preferably designs a loss function that simultaneously considers multi-classification cross entropy loss and carbon emission prediction loss, so as to more comprehensively and accurately evaluate the loss value of the model training process; that is, the preset loss function is calculated based on the multi-classification cross entropy loss and the carbon emission prediction loss, and can be expressed as:

[0241]

[0242] In the formula,

[0243]

[0244]

[0245] in, Indicates the equipment status prediction loss; and Respectively represent multi-classification cross entropy loss and carbon emission prediction loss; Represents the true state characteristic function of the mth sample data; Indicates the probability prediction value that the mth sample data belongs to category k; Represents the weight of multi-classification cross entropy loss, which can be set based on experience or other methods; and They respectively represent the actual carbon emissions and predicted carbon emissions corresponding to the mth sample data; M represents the total number of samples; K represents the total number of categories.

[0246] Based on the model loss function constructed above, each participating building terminal can use the corresponding local operation data set and the equipment carbon emission monitoring data set to train and update the initial evaluation model until the preset iteration termination condition is met, thereby obtaining the corresponding local evaluation model; specifically, the steps of training the initial evaluation model according to the local operation data set, the equipment carbon emission monitoring data set and the preset loss function and constructing the local evaluation model include:

[0247] The local operation data set is input into the initial evaluation model to predict the equipment state, and a corresponding state prediction result set is obtained; the state prediction result set includes the equipment state and the corresponding state level, wherein the equipment state includes the normal state and various abnormal states (abnormal states due to different reasons). Considering that in actual applications, even if the equipment is currently in a normal operating state, there may be hidden dangers of future failures, and the degree of abnormality under different abnormal states is also divided into strong and weak. This implementation obtains the corresponding state level based on the corresponding probability value size of various state classifications in the actual state prediction results. For example, if the corresponding probability value identified as a normal state reaches more than 90%, the state level corresponding to the normal state can be set to the highest level (level 3), if it is more than 80%, it is a medium level (level 2), if it is more than 70%, it is a low level (level 1), etc.; similarly, when classified into various abnormal states, the state level corresponding to the corresponding abnormal state can also be obtained by the same probability value mapping method, which will not be repeated here.

[0248] According to the state prediction result set, the multi-classification cross entropy loss is obtained; wherein the multi-classification cross entropy loss can be calculated based on the local running data set and the state prediction result set. The parameters required by the corresponding calculation formula are substituted into the calculation, which will not be described in detail here.

[0249] According to the state prediction result set and the pre-constructed state carbon emission prediction model, the corresponding state carbon emission prediction set is obtained, and according to the state carbon emission prediction set and the equipment carbon emission monitoring data set, the carbon emission prediction loss is obtained; wherein, in principle, the state carbon emission prediction model only needs to adopt a model that can obtain the equipment carbon emission prediction value under the corresponding state according to the equipment state and state level, but considering that the actual equipment operation carbon emission is correlated with the equipment state and state level, in order to ensure the efficiency and accuracy of the state carbon emission prediction, this embodiment preferably adopts the method of fitting training with energy consumption carbon emission as the dependent variable and equipment state and corresponding state level as the independent variable; specifically, the steps of constructing the state carbon emission prediction model include:

[0250] Obtain a historical status carbon emission data set of the target building equipment; the historical status carbon emission data set includes equipment status, status level and energy consumption carbon emission; wherein the equipment status, status level and energy consumption carbon emission can be obtained based on relevant monitoring data of the target building equipment in different states collected and stored historically, and the specific acquisition method is not limited here.

[0251] According to the equipment state and the state level, the energy consumption carbon emission is fitted and modeled to obtain the state carbon emission prediction model.

[0252] In practical applications, the state prediction result set is input into the state carbon emission prediction model constructed by the above method to obtain the corresponding state carbon emission prediction set. , respectively calculate the deviation ratios of the state carbon emission prediction data in the state carbon emission prediction set corresponding to each state prediction result and the equipment carbon emission monitoring data in the corresponding equipment carbon emission monitoring data set, and then average the deviation ratios of all state carbon emission predictions to obtain the corresponding carbon emission prediction loss. This embodiment establishes an energy consumption carbon emission prediction model based on the consideration that there is a correlation between the actual equipment operation carbon emissions and the equipment state and state level. It can effectively ensure the efficiency and scientificity of the construction of the energy consumption carbon emission prediction model, while also ensuring the efficiency and accuracy of the carbon emission prediction loss calculation, thereby providing a reliable basis for the optimization and update of the model parameters of the initial evaluation model.

[0253] Taking a weighted average of the multi-classification cross entropy loss and the carbon emission prediction loss to obtain a corresponding equipment state prediction loss;

[0254] According to the device state prediction loss, the model parameters of the initial evaluation model are updated; wherein, the process of updating and adjusting the model parameters based on the device state prediction loss value obtained in each round of iteration can be implemented by referring to the existing model parameter update training method, which will not be repeated here.

[0255] This embodiment designs a model prediction loss calculation function based on the combination of multi-classification cross entropy loss and carbon emission prediction loss, which can capture the prediction loss of the model more comprehensively and reliably, effectively improve the comprehensiveness and rationality of the model prediction loss evaluation, and provide effective guarantees for the optimization and adjustment of model parameters. At the same time, it can also effectively improve the accuracy and robustness of each local evaluation model, thereby effectively ensuring the performance of the equipment status evaluation model.

[0256] When the target building terminal receives the local evaluation models and model accuracy of each participating building terminal, the corresponding model aggregation weight is obtained according to each model accuracy, and the local evaluation models are weighted and aggregated according to the model aggregation weight to obtain a global evaluation model, and then it is determined whether the global evaluation model has reached the preset convergence condition. If so, the global evaluation model is used as the device state evaluation model. Otherwise, the global evaluation model is sent to each participating building terminal and the next round of learning and training is started; wherein, the process of obtaining the corresponding model aggregation weight according to each model accuracy can be understood as assigning a larger weight value to each participating building terminal according to the principle that the higher the model accuracy, the larger the weight value. A weighted value is assigned to the local evaluation model trained with the learning building terminal. For example, there are 4 building terminals participating in federated learning, and the corresponding model accuracy rates are 84%, 73%, 90% and 95% respectively. The corresponding model aggregation weight can be set according to the ratio of the accuracy rates of each model. After obtaining the model aggregation weight corresponding to each local evaluation model, all local evaluation models can be directly weighted averaged to obtain the corresponding global evaluation model. Of course, the evaluation model trained by the target building terminal itself can also be added when calculating the global evaluation model, that is, the evaluation models trained by the target building terminal and all participating building terminals are weightedly aggregated to obtain the global evaluation model.

[0257] The above-mentioned preset convergence condition can be any one of the conditions of reaching a preset number of iterative learning times or the accuracy of the global aggregation model reaching a preset accuracy threshold. That is, the global evaluation model obtained when the preset convergence condition of the federated learning iterative training is met is the equipment status evaluation model finally trained, and the equipment status evaluation can be directly performed based on the corrected operating status data to obtain the corresponding equipment status evaluation result; the method of constructing an equipment status evaluation model by conducting federated learning training based on the historical operating status data of the same type of equipment in multiple buildings can effectively enrich the model training data by utilizing the data resources of multiple different buildings, effectively improve the generalization ability and application performance of the model, and thus provide reliable guarantee for the accuracy of equipment status evaluation.

[0258] The present embodiment provides a technical solution for performing image optimization adjustment and log information-based reconstruction processing on the target building equipment operation data to be processed, including equipment image data and property log data corresponding to the equipment, to obtain the target building equipment operation data, then performing information extraction processing on the target building equipment operation data to obtain basic operation data and operation energy consumption data including operation environment data, operation duration, status monitoring data and location data as operation status data to be analyzed, inputting the basic operation data into a pre-built operation energy consumption estimation model for predictive analysis to obtain the corresponding operation energy consumption estimation value, and correcting the status monitoring data according to the energy consumption estimation deviation between the operation energy consumption estimation value and the operation energy consumption data to obtain the corresponding corrected operation status data, and inputting the corrected operation status data into a pre-built equipment status evaluation model to obtain the corresponding equipment status evaluation result. The solution can realize real-time, efficient and reliable analysis and processing of building equipment operation status data, effectively improve the accuracy of equipment status evaluation, and can timely and accurately perceive building equipment failures, providing strong support for improving the operation efficiency and stability of building equipment.

[0259] In addition, in order to facilitate the building property management department to better improve the building equipment management level and formulate reasonable and reliable operation and maintenance strategies in a timely manner according to the equipment status evaluation results, this embodiment preferably provides an intelligent equipment operation and maintenance strategy generation method by presetting a preset strategy database including operation and maintenance strategies corresponding to various equipment status evaluation results; specifically, Figure 3 As shown, the method further includes step S10:

[0260] S10. Obtain the corresponding equipment operation and maintenance strategy based on the equipment status evaluation results and the preset strategy database; wherein the preset strategy database can be understood as a mapping relationship library storing different equipment statuses and corresponding operation and maintenance strategies. The reliability of the database construction will directly affect the rationality of the equipment operation strategy acquisition, and plays a vital role in the long-term stable operation of building equipment.

[0261] In order to ensure the scientificity and comprehensiveness of the preset strategy database as much as possible, this embodiment preferably adopts a method of combining historical equipment maintenance record analysis with expert experience analysis to construct the preset strategy database; specifically, the steps of constructing the preset strategy database include:

[0262] Obtain historical equipment maintenance records, analyze the equipment historical maintenance records, and generate a first state policy rule set; wherein, the equipment historical maintenance records can be understood as operation and maintenance ledgers of each building equipment stored in text or table form, which can come from the ledger data of one building, or can be the comprehensive data of equipment operation and maintenance ledgers corresponding to multiple buildings, including equipment name, equipment status, status level, basic operating data under the equipment status, operating energy consumption data, and all corresponding operation and maintenance strategies and other information.

[0263] The first state policy rule set in this embodiment can be understood as a set of state policy rules consisting of multiple device states and corresponding operation and maintenance policies, in which one device state may have multiple corresponding operation and maintenance policies, that is, it is allowed that one device state corresponds to multiple state policy rules, or multiple state policy rules have an association relationship that can jointly determine the operation and maintenance policy that a certain device state ultimately needs to adopt; correspondingly, the generation of the first state policy rule set can preferably be obtained by natural language analysis and processing of the historical maintenance records of the equipment, for example, by pre-setting text search keywords corresponding to the device name, device state, state level, basic operation data, operation energy consumption data, and operation and maintenance strategy, and then based on the text search keywords, based on the named entity recognition technology in natural language processing, extract the key data information in the state policy rule set, and after generating the corresponding state policy rules according to the corresponding association relationship of each group of key data information, all the obtained state policy rules are summarized to obtain the required first state policy rule set; it should be noted that the named entity recognition technology can be implemented using an existing text feature extraction model (for example, a bidirectional long short-term memory network model, etc.), which is not specifically limited this time.

[0264] Based on the analytic hierarchy process, a second state policy rule set is generated; wherein, the second state policy rule set can be understood as using the analytic hierarchy process to establish a state policy decision hierarchy model under different device states and different state levels, and sequentially executing the steps of constructing a judgment matrix, hierarchical single sorting, hierarchical total sorting and consistency verification to obtain another set of state policy rules consisting of multiple device states and corresponding operation and maintenance policies; correspondingly, the state policy decision hierarchy model includes a target layer that selects the optimal operation and maintenance policy under different device states and different state levels as the decision purpose, a criterion layer that takes the difficulty of policy execution, the efficiency of policy execution and the impact of policy execution as decision factors, and a solution layer that obtains candidate operation and maintenance policy solutions under different device states and different state levels by classifying and sorting the collected relevant expert knowledge. It should be noted that the specific process of obtaining the second state policy rule set based on the state policy decision hierarchy model can be implemented by referring to the calculation process corresponding to each step of the existing analytic hierarchy process, and will not be described in detail here.

[0265] The first state policy rule set and the second state policy rule set are merged to obtain the preset policy database; wherein, the state policy rules in the second state policy rule set and the first state policy rule set may have the same rules or may be completely different. The specific fusion can be understood as taking the union of the state policy rules corresponding to different device states and state levels in the two state policy rule sets to obtain the operation and maintenance strategy under the corresponding device state and state level in the preset policy database.

[0266] This embodiment of the invention constructs a method for a preset policy database by integrating the status policy rules obtained by natural language processing of the historical maintenance records of the equipment with the status policy rules obtained by the hierarchical analysis method based on expert experience. This method can effectively ensure the scientific nature and comprehensiveness of the design of the status policy database, thereby improving the reliability of obtaining equipment operation and maintenance strategies based on equipment status assessment results, and providing reliable support for the long-term stable operation of building equipment.

[0267] In principle, the preset strategy database obtained based on the above construction can directly adopt the data traversal matching method to obtain the required equipment operation and maintenance strategy. However, considering that the state strategy rules in the preset strategy database in actual applications may be adjusted or expanded due to the accumulation of operation and maintenance experience, in order to ensure the flexibility and efficiency of obtaining equipment operation and maintenance strategies based on the prediction strategy database, this embodiment preferably adopts the RETE algorithm, intelligently creates a strategy reasoning network based on the preset strategy database, and uses the strategy reasoning network to feedback the optimal equipment operation and maintenance strategy in real time based on the received equipment state evaluation results; specifically, the step of obtaining the corresponding equipment operation and maintenance strategy based on the equipment state evaluation results and the preset strategy database includes:

[0268] According to the preset strategy database and RETE algorithm, a corresponding strategy reasoning network is generated; wherein, RETE algorithm is an efficient pattern matching algorithm, which can generate a network through rule conditions, and each rule corresponds to a node in the network. Correspondingly, the strategy reasoning network is the network generated by the RETE algorithm based on all state strategy rules in the preset strategy database; the specific construction process of the strategy reasoning network can refer to the existing implementation process of generating a reasoning network based on a set of rules based on the RETE algorithm, which will not be described in detail here.

[0269] The device status assessment result is input into the policy reasoning network for policy reasoning screening to obtain the device operation and maintenance strategy; wherein, the acquisition of the device operation and maintenance strategy can refer to the existing matching process using the RETE reasoning network, which will not be described in detail here.

[0270] This embodiment uses the RETE algorithm in combination with the preset policy database to intelligently create a policy reasoning network, which is used to match the optimal equipment operation and maintenance strategy in real time according to the received equipment status evaluation results. It can not only meet the needs of flexible adjustment of the preset policy database, but also ensure the efficiency and accuracy of obtaining equipment operation and maintenance strategies based on the preset policy database, providing a reliable guiding basis for the formulation of subsequent building equipment operation and maintenance strategies.

[0271] The embodiment of the present application obtains the target building equipment operation data by performing image optimization adjustment and log information-based reconstruction processing on the target building equipment operation data to be processed, including the equipment image data and the property log data corresponding to the equipment, and then performs information extraction processing on the target building equipment operation data to obtain basic operation data and operation energy consumption data including operation environment data, operation duration, status monitoring data and location data as operation status data to be analyzed. The basic operation data is input into a pre-constructed operation energy consumption estimation model for predictive analysis to obtain the corresponding operation energy consumption estimation value, and the status monitoring data is corrected according to the energy consumption estimation deviation between the operation energy consumption estimation value and the operation energy consumption data to obtain the corresponding corrected operation status data. And input the corrected operating status data into the pre-built equipment status assessment model to obtain the corresponding equipment status assessment results, and then obtain the corresponding equipment operation and maintenance strategy plan based on the equipment status assessment results and the preset strategy database including the mapping relationship between equipment status and operation and maintenance strategy. It can realize real-time, efficient and reliable analysis and processing of building equipment operating status data, effectively improve the accuracy of equipment status assessment, timely and accurately perceive building equipment failures, improve the operating efficiency and stability of building equipment, and at the same time provide strong technical support for equipment maintenance, repair, update and upgrade, and long-term operation and maintenance strategy formulation, so that property management departments can better improve the level of building equipment management, and thus provide reliable guarantee for the normal and stable operation of buildings.

[0272] It should be noted that although the steps in the above flowchart are shown in sequence according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders.

[0273] In one embodiment, Figure 4 As shown, a building equipment operation status data processing device is provided, and the device includes:

[0274] Data acquisition module 1, used to acquire the target building equipment operation data to be processed, wherein the target building equipment operation data to be processed includes equipment image data and property log data corresponding to the equipment;

[0275] Optimization and adjustment module 2, used for optimizing and adjusting the device image data based on the preset impact priority of the image dimension on the image;

[0276] A log generation module 3, used to generate operation log data matching the adjusted device image data;

[0277] A merging module 4 is used to merge the property log data and the operation log data to obtain data to be reconstructed;

[0278] The reconstruction module 5 is used to perform image reconstruction processing based on the data to be reconstructed to obtain corresponding target building equipment operation data.

[0279] Furthermore, in the above embodiment, the optimization and adjustment module 2 includes:

[0280] A feature extraction unit, used to extract features from the device image data to obtain at least one type of latent features reflecting the image dimension;

[0281] A feature space unit, used to construct corresponding single-dimensional feature spaces in sequence based on each of the latent features, and determine the corresponding image adjustment method according to a preset priority relationship between the weight of each single-dimensional feature space and the image adjustment method;

[0282] An adjustment unit is used to adjust the device image data according to the determined image adjustment method.

[0283] Furthermore, in the above embodiment, the types of the latent features include at least color features, texture features and shape features; then,

[0284] The feature space unit is configured as:

[0285] Extracting the number of pixels within a predetermined color gamut in the device image data to obtain the corresponding weight of each hue, wherein the predetermined color gamut at least includes the image color block of the device;

[0286] Using each of the weight values ​​as coordinate points, constructing a corresponding color single-dimensional feature space; and,

[0287] Extracting device texture features from the device image data, wherein the device texture features include a gray level co-occurrence matrix and a gray level difference matrix;

[0288] Based on the linear discriminant analysis dimensionality reduction technology, the feature subset constructed by the gray level co-occurrence matrix and the gray level difference matrix is ​​processed to obtain coordinate points for constructing the corresponding texture single-dimensional feature space; and,

[0289] Edge detection is performed on the device image data, and the gradients of the device edge pixels in the horizontal and vertical directions are used as shape feature coordinate points to construct a corresponding shape single-dimensional feature space.

[0290] Further, in the above embodiment, the property log data includes electronic log data and text log data;

[0291] The electronic log data at least includes electronic log data at the fire-fighting end, electronic log data at the third-party software end, and electronic log data at the target property management system end.

[0292] Furthermore, in the above embodiment, the merging module 4 includes:

[0293] An attribute extraction unit, used to extract attribute features and corresponding attribute values ​​of each log in the property log data, and attribute features and corresponding attribute values ​​of each log in the operation log data;

[0294] A comparison unit, used to sequentially compare the attribute values ​​corresponding to the same attribute features;

[0295] A comparison processing unit, used for determining each of the attribute features and the corresponding attribute value one by one when the comparison is normal; and

[0296] When comparing anomalies, based on the data rollback mechanism, the abnormal attribute values ​​corresponding to the abnormal attribute features are screened and analyzed, and the analysis results are compared with the historical information data of the abnormal attribute features to generate corresponding prediction information;

[0297] The correction unit is used to correct the abnormal attribute value corresponding to the abnormal attribute feature by using the prediction information until the comparison is normal.

[0298] Furthermore, in the above embodiment, the target building equipment operation data to be processed is preferably obtained based on property monitoring data and user shared data stored in the blockchain; the user shared data is actively uploaded by the user, or uploaded by the user in response to a data collection request issued by the property on the blockchain network.

[0299] In one embodiment, Figure 5 As shown, a building equipment operation status data analysis device is provided, and the device also includes:

[0300] The information extraction module 6 is used to extract information from the target building equipment operation data to obtain the operation status data to be analyzed; the operation status data to be analyzed includes basic operation data and operation energy consumption data; the basic operation data includes operation environment data, operation time, status monitoring data and location data.

[0301] The energy consumption estimation module 7 is used to input the basic operation data into a pre-built operation energy consumption estimation model for prediction analysis to obtain a corresponding operation energy consumption estimation value; wherein the operation energy consumption estimation model is a Transformer network model; the energy consumption estimation module 7 includes:

[0302] A historical data acquisition unit, used to acquire historical operation data of target building equipment of multiple buildings; the target building equipment historical operation data includes historical basic operation time series data and corresponding historical operation energy consumption time series data;

[0303] A training set construction unit, used to annotate the historical basic operation time series data in the target building equipment historical operation data with the corresponding historical operation energy consumption time series data, so as to construct an equipment energy consumption estimation data set;

[0304] The first model training unit is used to optimize and train the preset Transformer network model according to the device energy consumption estimation data set to obtain the operation energy consumption estimation model.

[0305] A data correction module 8 is used to correct the state monitoring data according to the energy consumption estimation deviation between the operation energy consumption estimation value and the operation energy consumption data to obtain corresponding corrected operation state data; in this embodiment, preferably, the data correction module 8 includes:

[0306] A state data correction unit is used to remove disturbances from the state monitoring data according to the energy consumption estimation deviation to obtain state monitoring correction data; specifically, the state data correction unit includes:

[0307] A disturbance calculation subunit, used for obtaining a corresponding data monitoring disturbance according to the energy consumption estimation deviation;

[0308] The disturbance removal subunit is used to remove the disturbance of the state monitoring data according to the data monitoring disturbance to obtain the state monitoring correction data; the state monitoring correction data is expressed as:

[0309]

[0310] In the formula,

[0311]

[0312] in, and Respectively represent the status monitoring data of the nth iteration and the n+1th iteration; represents the data monitoring disturbance of the nth iteration; represents the error correction factor; Represents the energy consumption estimation deviation of the nth iteration.

[0313] An error detection unit, used to determine whether the energy consumption estimation deviation is less than a preset deviation threshold;

[0314] A first correction unit, configured to directly update the basic operation data according to the state monitoring correction data to obtain the corrected operation state data when the energy consumption estimation deviation is less than the preset deviation threshold;

[0315] A second correction unit is used to update the basic operating data according to the status monitoring correction data when the energy consumption estimation deviation is greater than or equal to the preset deviation threshold, and obtain an operating energy consumption estimation update value based on the updated basic operating data, and perform a new round of iteration according to the energy consumption estimation deviation corresponding to the operating energy consumption estimation update value, until the energy consumption estimation deviation reaches the preset deviation threshold, so as to obtain the corrected operating status data.

[0316] The state evaluation module 9 is used to input the modified operation state data into a pre-built equipment state evaluation model to obtain a corresponding equipment state evaluation result. In this embodiment, the state evaluation module 9 preferably includes:

[0317] A model sending unit is used to send an initial evaluation model and a shared operation data set to multiple participating learning building terminals simultaneously through a target building terminal; the target building terminal is a data processing terminal corresponding to the target building equipment; the participating learning building terminal has equipment operation data of the same type as the target building equipment.

[0318] A local training unit is used for, when each participating building terminal receives the initial evaluation model and the shared operation data set, training the initial evaluation model according to the local operation data set, obtaining the corresponding local evaluation model, and then evaluating the accuracy of the local evaluation model according to the shared operation data set to obtain the corresponding model accuracy, and sending the local evaluation model and the model accuracy to the target building terminal; in this embodiment, preferably, the local training unit includes:

[0319] A carbon emission data acquisition unit, configured to acquire a corresponding equipment carbon emission monitoring data set according to the operation energy consumption data in the local operation data set;

[0320] The second model training unit is used to train the initial evaluation model according to the local operation data set, the equipment carbon emission monitoring data set and a preset loss function to construct the local evaluation model; the preset loss function is calculated according to the multi-classification cross entropy loss and the carbon emission prediction loss, and preferably the preset loss function is expressed as:

[0321]

[0322] In the formula,

[0323]

[0324]

[0325] in, Indicates the equipment status prediction loss; and Respectively represent multi-classification cross entropy loss and carbon emission prediction loss; Represents the true state characteristic function of the mth sample data; Indicates the probability prediction value that the mth sample data belongs to category k; Represents the weight of multi-classification cross entropy loss; and represents the actual carbon emissions and predicted carbon emissions corresponding to the mth sample data respectively; M represents the total number of samples; K represents the total number of categories. In this embodiment, preferably, the second model training unit includes:

[0326] The state prediction subunit is used to input the local operation data set into the initial evaluation model to predict the equipment state and obtain a corresponding state prediction result set; the state prediction result set includes the equipment state and the corresponding state level.

[0327] The first loss calculation subunit is used to obtain the multi-classification cross entropy loss according to the state prediction result set.

[0328] The second loss calculation subunit is used to obtain a corresponding state carbon emission prediction set according to the state prediction result set and the pre-built state carbon emission prediction model, and obtain the carbon emission prediction loss according to the state carbon emission prediction set and the equipment carbon emission monitoring data set. In this embodiment, preferably, the second loss calculation subunit includes:

[0329] A historical carbon emission acquisition subunit is used to acquire a historical status carbon emission data set of target building equipment; the historical status carbon emission data set includes equipment status, status level and energy consumption carbon emission;

[0330] The data fitting subunit is used to fit and model the energy consumption carbon emission according to the equipment state and the state level to obtain the state carbon emission prediction model.

[0331] The comprehensive loss calculation subunit is used to perform weighted average of the multi-classification cross entropy loss and the carbon emission prediction loss to obtain the corresponding equipment state prediction loss.

[0332] The model update acquisition subunit is used to update the model parameters of the initial evaluation model according to the device state prediction loss.

[0333] The model aggregation unit is used to obtain the corresponding model aggregation weight according to each model accuracy when the target building terminal receives the local evaluation model and model accuracy of each participating building terminal, and after weighted aggregation of the local evaluation model according to the model aggregation weight to obtain a global evaluation model, determine whether the global evaluation model reaches the preset convergence condition. If so, the global evaluation model is used as the device status evaluation model. Otherwise, the global evaluation model is sent to each participating building terminal and the next round of learning and training is started.

[0334] The present embodiment provides a building equipment operation status data analysis device which first acquires the target building equipment operation data, pre-processes the target building equipment operation data, obtains basic operation data and operation energy consumption data including operation environment data, operation duration, status monitoring data and location data as operation status data to be analyzed, then inputs the basic operation data into a pre-built operation energy consumption estimation model for predictive analysis to obtain a corresponding operation energy consumption estimate, and corrects the status monitoring data according to the energy consumption estimation deviation between the operation energy consumption estimate and the operation energy consumption data to obtain corresponding corrected operation status data, and inputs the corrected operation status data into a pre-built equipment status evaluation model to obtain a corresponding equipment status evaluation result. The device can realize real-time, efficient and reliable analysis and processing of building equipment operation status data, effectively improve the accuracy of equipment status evaluation, and can timely and accurately perceive building equipment failures, providing strong support for improving the operation efficiency and stability of building equipment.

[0335] In one embodiment, Figure 6 As shown, a building equipment operation status data analysis device is provided, and the device also includes:

[0336] The strategy acquisition module 10 is used to obtain the corresponding equipment operation and maintenance strategy according to the equipment status evaluation result and the preset strategy database; the preset strategy database includes the mapping relationship between equipment status and operation and maintenance strategy.

[0337] In this embodiment, the strategy acquisition module 10 preferably includes:

[0338] A first rule set generating unit, configured to obtain a historical maintenance record of the device, analyze the historical maintenance record of the device, and generate a first state policy rule set;

[0339] A second rule set generating unit, used for generating a second state strategy rule set based on the hierarchical analysis method;

[0340] The database generating unit is used to merge the first state policy rule set and the second state policy rule set to obtain the preset policy database.

[0341] In this embodiment, the strategy acquisition module preferably includes:

[0342] An inference network construction unit, used to generate a corresponding strategy inference network according to the preset strategy database and the RETE algorithm;

[0343] The operation and maintenance strategy generating unit is used to input the equipment status evaluation result into the strategy reasoning network for strategy reasoning screening to obtain the equipment operation and maintenance strategy.

[0344] The embodiment of the present invention first obtains the target building equipment operation data, performs information extraction processing on the target building equipment operation data, obtains basic operation data and operation energy consumption data including operation environment data, operation duration, state monitoring data and location data as operation status data to be analyzed, then inputs the basic operation data into a pre-built operation energy consumption estimation model for prediction analysis to obtain corresponding operation energy consumption estimation values, and corrects the state monitoring data according to the energy consumption estimation deviation between the operation energy consumption estimation value and the operation energy consumption data to obtain corresponding corrected operation status data, and inputs the corrected operation status data into a pre-built equipment status evaluation model to obtain corresponding equipment status data. After obtaining the status assessment result, the building equipment operation status data analysis device that obtains the corresponding equipment operation and maintenance strategy is based on the equipment status assessment result and the preset strategy database including the mapping relationship between equipment status and operation and maintenance strategy. It can realize real-time, efficient and reliable analysis and processing of building equipment operation status data, effectively improve the accuracy of equipment status assessment, timely and accurately perceive building equipment failures, improve the operating efficiency and stability of building equipment, and provide strong technical support for equipment maintenance, repair, update and upgrade, and long-term operation and maintenance strategy formulation, which is convenient for property management departments to better improve the level of building equipment management, and then provide reliable guarantee for the normal and stable operation of buildings.

[0345] For the specific definition of the building equipment operation status data analysis device, please refer to the definition of the building equipment operation status data processing method mentioned above, and the corresponding technical effects can also be obtained equivalently, which will not be repeated here. Each module in the above-mentioned building equipment operation status data analysis device can be implemented in whole or in part by software, hardware and their combination. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the corresponding operations of each of the above modules.

[0346] Figure 7 FIG. 1 shows an internal structure diagram of a computer device in an embodiment, and the computer device may specifically be a terminal or a server. Figure 7As shown, the computer device includes a processor, a memory, a network interface, a display, a camera and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for processing building equipment operating status data is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a key, trackball or touchpad set on the computer device housing, or an external keyboard, touchpad or mouse, etc.

[0347] It can be understood by those skilled in the art that Figure 7 The structure shown in the figure is only a block diagram of a part of the structure related to the present application scheme, and does not constitute a limitation on the computer device to which the present application scheme is applied. The specific computing device may include more or fewer components than shown in the figure, or combine certain components, or have the same component arrangement.

[0348] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the steps of the above method are implemented when the processor executes the computer program.

[0349] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the above method are implemented.

[0350] In summary, the method, device, computer device and storage medium for processing building equipment operation status data provided by the present invention have the following beneficial effects:

[0351] (1) It makes up for the technical defect of the existing technology that the accuracy of building equipment operation data is reduced due to the lack of analysis of property log data. On the one hand, smart buildings collect the operation data of building equipment, and on the other hand, take into account the property log data corresponding to the equipment, enriching the source of data and improving the accuracy of data from two dimensions, making information acquisition more comprehensive, effectively improving the accuracy of building equipment operation status data, optimizing the decision-making, management efficiency, resource utilization and equipment safety management of smart buildings, and improving the use value of data processing results;

[0352] (2) Optimizing and analyzing image data based on image dimensions and performing corresponding adjustments can effectively improve the accuracy of image data and prevent data deviation caused by distortion, blurring, etc. of building equipment image data, ensuring that subsequent smart buildings can receive accurate data information and achieve fixed-point control of equipment;

[0353] (3) It realizes real-time, efficient and reliable analysis and processing of building equipment operating status data, effectively improves the accuracy of equipment status assessment, provides strong support for equipment fault perception and operation and maintenance updates, facilitates better improvement of building equipment management level, and thus provides reliable guarantee for the normal and stable operation of the building.

[0354] Each embodiment in this specification is described in a progressive manner, and the same or similar parts of each embodiment can be directly referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment. It should be noted that the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to make the description concise, all possible combinations of the technical features in the above-mentioned embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0355] The above-mentioned embodiments only express several preferred implementation modes of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in the technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention, and these improvements and substitutions should also be regarded as the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be based on the protection scope of the claims.

Claims

1. A method for processing building equipment operation status data, characterized in that: include: Acquire the target building equipment operation data to be processed, wherein the target building equipment operation data to be processed includes equipment image data and property log data corresponding to the equipment; Optimizing and adjusting the device image data based on a preset impact priority of the image dimension on the image; generating operation log data matching the adjusted device image data; Merging the property log data and the operation log data to obtain data to be reconstructed; Performing image reconstruction processing based on the data to be reconstructed to obtain corresponding target building equipment operation data; The optimizing and adjusting the device image data based on the priority of the impact of the image dimension on the image includes: Performing feature extraction on the device image data to obtain at least one type of latent feature reflecting the image dimension; Based on each of the latent features, a corresponding single-dimensional feature space is constructed in sequence, and a corresponding image adjustment method is determined according to a preset priority relationship between a weight of each single-dimensional feature space and an image adjustment method; Adjusting the device image data in the determined image adjustment manner; The types of the latent features include at least color features, texture features and shape features; then, The step of sequentially constructing corresponding single-dimensional feature spaces based on the respective implicit features includes: Extracting the number of pixels within a predetermined color gamut in the device image data to obtain the corresponding weight of each hue, wherein the predetermined color gamut at least includes the image color block of the device; Using each of the weight values ​​as coordinate points, constructing a corresponding color single-dimensional feature space; and, Extracting device texture features from the device image data, wherein the device texture features include a gray level co-occurrence matrix and a gray level difference matrix; Based on the linear discriminant analysis dimensionality reduction technology, the feature subset constructed by the gray level co-occurrence matrix and the gray level difference matrix is ​​processed to obtain coordinate points for constructing the corresponding texture single-dimensional feature space; and, Edge detection is performed on the device image data, and the gradients of the device edge pixels in the horizontal and vertical directions are used as shape feature coordinate points to construct a corresponding shape single-dimensional feature space.

2. The method for processing building equipment operation status data according to claim 1, characterized in that: The property log data includes electronic log data and text log data; The electronic log data at least includes electronic log data at the fire-fighting end, electronic log data at the third-party software end, and electronic log data at the target property management system end.

3. The method for processing building equipment operation status data according to claim 1, characterized in that: The merging of the property log data and the operation log data to obtain the data to be reconstructed includes: Respectively extracting the attribute characteristics and corresponding attribute values ​​of each log in the property log data, and the attribute characteristics and corresponding attribute values ​​of each log in the operation log data; Compare the attribute values ​​corresponding to the same attribute features in sequence; When the comparison is normal, determining each of the attribute features and the corresponding attribute value one by one; and, When comparing anomalies, based on the data rollback mechanism, the abnormal attribute values ​​corresponding to the abnormal attribute features are screened and analyzed, and the analysis results are compared and analyzed with the historical information data of the abnormal attribute features to generate corresponding prediction information; The abnormal attribute value corresponding to the abnormal attribute feature is corrected using the prediction information until the comparison is normal.

4. The method for processing building equipment operation status data according to claim 1, characterized in that: The target building equipment operation data to be processed is obtained based on property monitoring data and user shared data stored in the blockchain; The user shared data is uploaded by the user actively, or by the user in response to a data collection request issued by the property on the blockchain network.

5. The method for processing building equipment operation status data according to claim 1, characterized in that: The method further comprises the following steps: Performing information extraction and processing on the target building equipment operation data to obtain the operation status data to be analyzed; the operation status data to be analyzed includes basic operation data and operation energy consumption data; the basic operation data includes operation environment data, operation time, status monitoring data and location data; Inputting the basic operation data into a pre-built operation energy consumption estimation model for prediction analysis to obtain a corresponding operation energy consumption estimation value; According to the energy consumption estimation deviation between the operation energy consumption estimation value and the operation energy consumption data, the state monitoring data is corrected to obtain corresponding corrected operation state data; The corrected operating status data is input into a pre-built equipment status assessment model to obtain a corresponding equipment status assessment result.

6. The method for processing building equipment operation status data according to claim 5, characterized in that: The operation energy consumption estimation model is a Transformer network model; the steps of constructing the operation energy consumption estimation model include: Acquire historical operation data of target building equipment of multiple buildings; the target building equipment historical operation data includes historical basic operation time series data and corresponding historical operation energy consumption time series data; The historical basic operation time series data in the historical operation data of the target building equipment are annotated with the corresponding historical operation energy consumption time series data to construct an equipment energy consumption estimation data set; According to the device energy consumption estimation data set, the preset Transformer network model is optimized and trained to obtain the operation energy consumption estimation model.

7. The method for processing building equipment operation status data according to claim 5, characterized in that: The step of correcting the state monitoring data according to the energy consumption estimation deviation between the operation energy consumption estimation value and the operation energy consumption data to obtain corresponding corrected operation state data comprises: Remove disturbance from the state monitoring data according to the energy consumption estimation deviation to obtain state monitoring correction data; Determining whether the energy consumption estimation deviation is less than a preset deviation threshold; When the energy consumption estimation deviation is less than the preset deviation threshold, directly updating the basic operation data according to the state monitoring correction data to obtain the corrected operation state data; When the energy consumption estimation deviation is greater than or equal to the preset deviation threshold, the basic operating data is updated according to the status monitoring correction data, and the operating energy consumption estimation update value is obtained based on the updated basic operating data, and a new round of iteration is performed based on the energy consumption estimation deviation corresponding to the operating energy consumption estimation update value, until the energy consumption estimation deviation reaches the preset deviation threshold, so as to obtain the corrected operating status data.

8. The method for processing building equipment operation status data according to claim 7, characterized in that: The step of removing disturbance from the state monitoring data according to the energy consumption estimation deviation to obtain state monitoring correction data comprises: According to the energy consumption estimation deviation, a corresponding data monitoring disturbance is obtained; According to the data monitoring disturbance, the state monitoring data is disturbed to obtain the state monitoring correction data; the state monitoring correction data is expressed as: In the formula, in, and Respectively represent the status monitoring data of the nth iteration and the n+1th iteration; represents the data monitoring disturbance of the nth iteration; represents the error correction factor; Represents the energy consumption estimation deviation of the nth iteration.

9. The method for processing building equipment operation status data according to claim 5, characterized in that: The steps of constructing the equipment status assessment model include: Sending an initial evaluation model and a shared operation data set to multiple participating learning building terminals simultaneously through a target building terminal; the target building terminal is a data processing terminal corresponding to the target building equipment; the participating learning building terminal has equipment operation data of the same type as the target building equipment; When each participating building terminal receives the initial evaluation model and the shared operation data set, the initial evaluation model is trained according to the local operation data set to obtain the corresponding local evaluation model, and then the accuracy of the local evaluation model is evaluated according to the shared operation data set to obtain the corresponding model accuracy, and the local evaluation model and the model accuracy are sent to the target building terminal; When the target building terminal receives the local evaluation models and model accuracy of each participating building terminal, it obtains the corresponding model aggregation weight according to each model accuracy, and after weighted aggregation of the local evaluation models according to the model aggregation weight to obtain the global evaluation model, it determines whether the global evaluation model reaches the preset convergence condition. If so, the global evaluation model is used as the device status evaluation model. Otherwise, the global evaluation model is sent to each participating building terminal and the next round of learning and training is started.

10. The method for processing building equipment operation status data according to claim 9, characterized in that: Each participating learning building terminal trains the initial evaluation model according to the local operation data set to obtain the corresponding local evaluation model, including: According to the operation energy consumption data in the local operation data set, a corresponding equipment carbon emission monitoring data set is obtained; The initial evaluation model is trained according to the local operation data set, the equipment carbon emission monitoring data set and a preset loss function to construct the local evaluation model; the preset loss function is calculated based on multi-classification cross entropy loss and carbon emission prediction loss.

11. The method for processing building equipment operation status data according to claim 10, characterized in that: The preset loss function is expressed as: In the formula, in, Indicates the equipment status prediction loss; and Respectively represent multi-classification cross entropy loss and carbon emission prediction loss; Represents the true state characteristic function of the mth sample data; Indicates the probability prediction value that the mth sample data belongs to category k; Represents the weight of multi-classification cross entropy loss; and They respectively represent the actual carbon emissions and predicted carbon emissions corresponding to the mth sample data; M represents the total number of samples; K represents the total number of categories.

12. The method for processing building equipment operation status data according to claim 10, characterized in that: The step of training the initial evaluation model according to the local operation data set, the equipment carbon emission monitoring data set and the preset loss function to construct the local evaluation model comprises: Inputting the local operation data set into the initial evaluation model to perform equipment state prediction, and obtaining a corresponding state prediction result set; the state prediction result set includes the equipment state and the corresponding state level; Obtaining the multi-classification cross entropy loss according to the state prediction result set; According to the state prediction result set and the pre-built state carbon emission prediction model, a corresponding state carbon emission prediction set is obtained, and according to the state carbon emission prediction set and the equipment carbon emission monitoring data set, the carbon emission prediction loss is obtained; Taking a weighted average of the multi-classification cross entropy loss and the carbon emission prediction loss to obtain a corresponding equipment state prediction loss; The model parameters of the initial assessment model are updated according to the device state prediction loss.

13. The method for processing building equipment operation status data according to claim 12, characterized in that: The steps of constructing the state carbon emission prediction model include: Obtain a historical status carbon emission data set of target building equipment; the historical status carbon emission data set includes equipment status, status level and energy consumption carbon emission; According to the equipment state and the state level, the energy consumption carbon emission is fitted and modeled to obtain the state carbon emission prediction model.

14. The method for processing building equipment operation status data according to claim 5, characterized in that: The method further comprises: According to the equipment status evaluation result and the preset strategy database, a corresponding equipment operation and maintenance strategy is obtained; the preset strategy database includes a mapping relationship between equipment status and operation and maintenance strategy.

15. The method for processing building equipment operation status data according to claim 14, characterized in that: The steps of constructing the preset strategy database include: Acquire historical maintenance records of the equipment, and analyze the historical maintenance records of the equipment to generate a first state policy rule set; Based on the analytic hierarchy process, a second state strategy rule set is generated; The first state policy rule set and the second state policy rule set are merged to obtain the preset policy database.

16. The method for processing building equipment operation status data according to claim 14, characterized in that: The step of obtaining a corresponding equipment operation and maintenance strategy according to the equipment status evaluation result and the preset strategy database comprises: Generate a corresponding strategy reasoning network according to the preset strategy database and RETE algorithm; The device status assessment result is input into the strategy reasoning network for strategy reasoning screening to obtain the device operation and maintenance strategy.

17. A building equipment operation status data processing device, characterized in that: The device comprises: A data acquisition module, used to acquire the target building equipment operation data to be processed, wherein the target building equipment operation data to be processed includes equipment image data and property log data corresponding to the equipment; An optimization and adjustment module, used for optimizing and adjusting the device image data based on a preset impact priority of the image dimension on the image; A log generation module, used to generate operation log data matching the adjusted device image data; A merging module, used for merging the property log data and the operation log data to obtain data to be reconstructed; A reconstruction module, used to perform image reconstruction processing based on the data to be reconstructed to obtain corresponding target building equipment operation data; Wherein, the optimization and adjustment module includes: A feature extraction unit, used to extract features from the device image data to obtain at least one type of latent features reflecting the image dimension; A feature space unit, used to construct corresponding single-dimensional feature spaces in sequence based on each of the latent features, and determine the corresponding image adjustment method according to a preset priority relationship between the weight of each single-dimensional feature space and the image adjustment method; An adjustment unit, configured to adjust the device image data according to the determined image adjustment method; The types of the implicit features include at least color features, texture features and shape features; then, The feature space unit is configured as: Extracting the number of pixels within a predetermined color gamut in the device image data to obtain the corresponding weight of each hue, wherein the predetermined color gamut at least includes the image color block of the device; Using each of the weight values ​​as coordinate points, constructing a corresponding color single-dimensional feature space; and, Extracting device texture features from the device image data, wherein the device texture features include a gray level co-occurrence matrix and a gray level difference matrix; Based on the linear discriminant analysis dimensionality reduction technology, the feature subset constructed by the gray level co-occurrence matrix and the gray level difference matrix is ​​processed to obtain coordinate points for constructing the corresponding texture single-dimensional feature space; and, Edge detection is performed on the device image data, and the gradients of the device edge pixels in the horizontal and vertical directions are used as shape feature coordinate points to construct a corresponding shape single-dimensional feature space.

18. The building equipment operation status data processing device according to claim 17, characterized in that: The property log data includes electronic log data and text log data; The electronic log data at least includes electronic log data at the fire-fighting end, electronic log data at the third-party software end, and electronic log data at the target property management system end.

19. The building equipment operation status data processing device according to claim 17, characterized in that: The merging module comprises: An attribute extraction unit, used to extract attribute features and corresponding attribute values ​​of each log in the property log data, and attribute features and corresponding attribute values ​​of each log in the operation log data; A comparison unit, used to sequentially compare the attribute values ​​corresponding to the same attribute features; A comparison processing unit, used for determining each of the attribute features and the corresponding attribute value one by one when the comparison is normal; and When comparing anomalies, based on the data rollback mechanism, the abnormal attribute values ​​corresponding to the abnormal attribute features are screened and analyzed, and the analysis results are compared with the historical information data of the abnormal attribute features to generate corresponding prediction information; The correction unit is used to correct the abnormal attribute value corresponding to the abnormal attribute feature by using the prediction information until the comparison is normal.

20. The building equipment operation status data processing device according to claim 17, characterized in that: The target building equipment operation data to be processed is obtained based on property monitoring data and user shared data stored in the blockchain; The user shared data is uploaded by the user actively, or by the user in response to a data collection request issued by the property on the blockchain network.

21. The building equipment operation status data processing device according to claim 17, characterized in that: The device also includes: An information extraction module is used to extract information from the target building equipment operation data to obtain the operation status data to be analyzed; the operation status data to be analyzed includes basic operation data and operation energy consumption data; the basic operation data includes operation environment data, operation time, status monitoring data and location data; An energy consumption estimation module is used to input the basic operation data into a pre-built operation energy consumption estimation model for prediction analysis to obtain a corresponding operation energy consumption estimation value; A data correction module, used to correct the state monitoring data according to the energy consumption estimation deviation between the operation energy consumption estimation value and the operation energy consumption data, so as to obtain corresponding corrected operation state data; The status assessment module is used to input the corrected operating status data into a pre-built equipment status assessment model to obtain a corresponding equipment status assessment result.

22. The building equipment operation status data processing device according to claim 21, characterized in that: The running energy consumption estimation model is a Transformer network model; the energy consumption estimation module includes: A historical data acquisition unit, used to acquire historical operation data of target building equipment of multiple buildings; the target building equipment historical operation data includes historical basic operation time series data and corresponding historical operation energy consumption time series data; A training set construction unit, used to annotate the historical basic operation time series data in the target building equipment historical operation data with the corresponding historical operation energy consumption time series data, so as to construct an equipment energy consumption estimation data set; The first model training unit is used to optimize and train the preset Transformer network model according to the device energy consumption estimation data set to obtain the operation energy consumption estimation model.

23. The building equipment operation status data processing device according to claim 21, characterized in that: The data correction module comprises: A state data correction unit, used for removing disturbances from the state monitoring data according to the energy consumption estimation deviation to obtain state monitoring correction data; An error detection unit, used to determine whether the energy consumption estimation deviation is less than a preset deviation threshold; A first correction unit, configured to directly update the basic operation data according to the state monitoring correction data to obtain the corrected operation state data when the energy consumption estimation deviation is less than the preset deviation threshold; A second correction unit is used to update the basic operating data according to the status monitoring correction data when the energy consumption estimation deviation is greater than or equal to the preset deviation threshold, and obtain an operating energy consumption estimation update value based on the updated basic operating data, and perform a new round of iteration according to the energy consumption estimation deviation corresponding to the operating energy consumption estimation update value, until the energy consumption estimation deviation reaches the preset deviation threshold, so as to obtain the corrected operating status data.

24. The building equipment operation status data processing device according to claim 23, characterized in that: The state data correction unit comprises: A disturbance calculation subunit, used for obtaining a corresponding data monitoring disturbance according to the energy consumption estimation deviation; The disturbance removal subunit is used to remove the disturbance of the state monitoring data according to the data monitoring disturbance to obtain the state monitoring correction data; the state monitoring correction data is expressed as: In the formula, in, and Respectively represent the status monitoring data of the nth iteration and the n+1th iteration; represents the data monitoring disturbance of the nth iteration; represents the error correction factor; Represents the energy consumption estimation deviation of the nth iteration.

25. The building equipment operation status data processing device according to claim 21, characterized in that: The status assessment module includes: A model sending unit, used to send an initial evaluation model and a shared operation data set to multiple participating learning building terminals simultaneously through a target building terminal; the target building terminal is a data processing terminal corresponding to the target building equipment; the participating learning building terminal has equipment operation data of the same type as the target building equipment; A local training unit is used for, when each participating building terminal receives the initial evaluation model and the shared operation data set, training the initial evaluation model according to the local operation data set, obtaining the corresponding local evaluation model, performing accuracy evaluation on the local evaluation model according to the shared operation data set, obtaining the corresponding model accuracy, and sending the local evaluation model and the model accuracy to the target building terminal; The model aggregation unit is used to obtain the corresponding model aggregation weight according to each model accuracy when the target building terminal receives the local evaluation model and model accuracy of each participating building terminal, and after weighted aggregation of the local evaluation model according to the model aggregation weight to obtain a global evaluation model, determine whether the global evaluation model reaches the preset convergence condition. If so, the global evaluation model is used as the device status evaluation model. Otherwise, the global evaluation model is sent to each participating building terminal and the next round of learning and training is started.

26. The building equipment operation status data processing device according to claim 25, characterized in that: The local training unit comprises: A carbon emission data acquisition unit, configured to acquire a corresponding equipment carbon emission monitoring data set according to the operation energy consumption data in the local operation data set; The second model training unit is used to train the initial evaluation model according to the local operation data set, the equipment carbon emission monitoring data set and a preset loss function to construct the local evaluation model; the preset loss function is calculated based on multi-classification cross entropy loss and carbon emission prediction loss.

27. The building equipment operation status data processing device according to claim 26, characterized in that: The preset loss function is expressed as: In the formula, in, Indicates the equipment status prediction loss; and Respectively represent multi-classification cross entropy loss and carbon emission prediction loss; Represents the true state characteristic function of the mth sample data; Indicates the probability prediction value that the mth sample data belongs to category k; Represents the weight of multi-classification cross entropy loss; and They respectively represent the actual carbon emissions and predicted carbon emissions corresponding to the mth sample data; M represents the total number of samples; K represents the total number of categories.

28. The building equipment operation status data processing device according to claim 26, characterized in that: The second model training unit comprises: A state prediction subunit, used for inputting the local operation data set into the initial evaluation model to perform equipment state prediction, and obtain a corresponding state prediction result set; the state prediction result set includes the equipment state and the corresponding state level; A first loss calculation subunit, configured to obtain the multi-classification cross entropy loss according to the state prediction result set; A second loss calculation subunit is used to obtain a corresponding state carbon emission prediction set according to the state prediction result set and a pre-constructed state carbon emission prediction model, and obtain the carbon emission prediction loss according to the state carbon emission prediction set and the equipment carbon emission monitoring data set; A comprehensive loss calculation subunit, used for performing weighted averaging on the multi-classification cross entropy loss and the carbon emission prediction loss to obtain a corresponding equipment state prediction loss; The model update acquisition subunit is used to update the model parameters of the initial evaluation model according to the device state prediction loss.

29. The building equipment operation status data processing device according to claim 28, characterized in that: The second loss calculation subunit includes: A historical carbon emission acquisition subunit is used to acquire a historical status carbon emission data set of target building equipment; the historical status carbon emission data set includes equipment status, status level and energy consumption carbon emission; The data fitting subunit is used to fit and model the energy consumption carbon emission according to the equipment state and the state level to obtain the state carbon emission prediction model.

30. The building equipment operation status data processing device according to claim 21, characterized in that: The device also includes: The strategy acquisition module is used to obtain the corresponding equipment operation and maintenance strategy according to the equipment status evaluation result and the preset strategy database; the preset strategy database includes the mapping relationship between the equipment status and the operation and maintenance strategy.

31. The building equipment operation status data processing device according to claim 30, characterized in that: The strategy acquisition module includes: A first rule set generating unit, configured to obtain a historical maintenance record of the device, analyze the historical maintenance record of the device, and generate a first state policy rule set; A second rule set generating unit, used for generating a second state strategy rule set based on the hierarchical analysis method; The database generating unit is used to merge the first state policy rule set and the second state policy rule set to obtain the preset policy database.

32. The building equipment operation status data processing device according to claim 30, characterized in that: The strategy acquisition module includes: An inference network construction unit, used to generate a corresponding strategy inference network according to the preset strategy database and the RETE algorithm; The operation and maintenance strategy generating unit is used to input the equipment status evaluation result into the strategy reasoning network for strategy reasoning screening to obtain the equipment operation and maintenance strategy.

33. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 16 are implemented.

34. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 16 are implemented.