Intelligent decision-making method and system for process parameters of mineral processing system
By building a variety of prediction models and using artificial bee colony optimization algorithms, the problem of relying on manual experience in the setting of process parameters of the mineral processing system has been solved, the efficiency and prediction accuracy of mineral processing have been improved, the optimal setting of process parameters has been achieved, and the efficiency of mineral processing has been improved. System recovery and stability.
Patent Information
- Application Number
- CN202410962734.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-18
AI Technical Summary
The existing process parameter settings of the mineral processing system rely on manual experience, resulting in low mineral processing efficiency, unstable recovery efficiency, and substandard overflow fineness and crushing ratio indicators.
A variety of prediction models (such as neural network regression, vector support vector regression, multiple linear regression) are used to build a fusion prediction model, combined with artificial bee colony optimization algorithm, to optimize process parameters to improve mineral processing efficiency and meet the requirements of overflow fineness, crushing ratio and crushing Granular constraints.
The mineral processing efficiency and prediction accuracy of the mineral processing system have been improved. Through the combination of multi-model fusion and optimization algorithms, the optimal setting of process parameters has been achieved, and the recovery rate and efficiency stability have been improved.
Smart Images

Figure CN118536677B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of intelligent metallurgy, and in particular to a method and system for predicting the ore dressing efficiency and intelligent decision-making of process parameters of an ore dressing system. Background Art
[0002] In the existing mineral processing systems, the process parameters are mostly set manually based on experience. The process parameters set in this way have low mineral processing efficiency, and are prone to unstable recovery efficiency, overflow fineness, crushing ratio index, and crushing particle size that do not meet the standards. Summary of the invention
[0003] The present invention provides a method and system for predicting the ore dressing efficiency and intelligent decision-making of process parameters of an ore dressing system, which are used to solve the technical problem that the ore dressing efficiency of the ore dressing system is low due to the process parameter setting method.
[0004] In order to solve the above technical problems, the technical solution proposed by the present invention is:
[0005] A method for predicting the ore dressing efficiency of an ore dressing system, comprising:
[0006] A plurality of different types of prediction models are selected, and a fusion prediction model is constructed with mineral properties and process parameters of the ore dressing system as input and ore dressing efficiency indicators as output, and the ore dressing efficiency of the ore dressing system is predicted based on the fusion prediction model.
[0007] Preferably, the mineral properties include any combination of main useful minerals, main gangue minerals, coarse-grained distribution, mineral distribution characteristics, sulfide oxidation conditions, and ore grade;
[0008] and / or
[0009] The process parameters of the ore dressing system include one or any combination of process parameters of the crushing / pre-selection system, process parameters of the grinding system and process parameters of the separation system;
[0010] and / or
[0011] The mineral processing efficiency index includes one or a combination of any of the following: recovery rate, overflow fineness, crushing ratio index, and crushing particle size.
[0012] Preferably, the fusion prediction model includes multiple different types of regression prediction modules and a fusion module; the multiple regression prediction modules all take mineral properties and process parameters of the mineral processing system as input, and take mineral processing efficiency indicators as output; the outputs of the multiple regression prediction modules are all connected to the input of the fusion module, and the fusion module is used to fuse the prediction results output by different types of regression prediction modules to obtain the final prediction result and output it.
[0013] Preferably, the regression prediction module includes any combination of a neural network regression module, a vector support vector regression module, and a multivariate linear regression module;
[0014] and / or
[0015] The fusion module is a weighted fusion module, and the weights of the multiple regression prediction modules are equal.
[0016] An intelligent decision-making method for process parameters of a mineral processing system, comprising:
[0017] Set constraints and build an optimization model based on the fusion prediction model; the optimization model
[0018] The input of the fusion prediction model is used as an optimization variable, and the optimal output of the fusion prediction model is used as a goal;
[0019] The optimal solution of the optimization model is solved, and minerals with corresponding properties are selected according to the process parameters corresponding to the optimal solution.
[0020] Preferably, the process parameters of the ore dressing system include process parameters of a crushing / pre-selection system, process parameters of a grinding system and process parameters of a separation system;
[0021] The process parameters of the crushing / pre-selection system include: crushing particle size, crushing ratio index, and crushing particle size;
[0022] The process parameters of the grinding system include overflow concentration, grinding work index, and overflow fineness; the process parameters of the separation system include: concentrate grade, tailings grade, and mineral processing recovery rate;
[0023] and / or
[0024] The optimization target of the optimization model is the mineral processing efficiency index, which includes recovery rate, overflow fineness, crushing ratio index, and crushing particle size;
[0025] The optimization goal is to maximize the recovery rate;
[0026] The constraints are that the overflow fineness, the crushing ratio index, and the crushing particle size are all within a preset range.
[0027] Preferably, the regression prediction module includes a neural network regression module, a vector support vector regression module, and a multivariate linear regression module; the objective function of the optimization model is:
[0028]
[0029] The constraints of the optimization model are:
[0030]
[0031]
[0032]
[0033] in, is the output value of the neural network regression module, is the output value of the vector support vector regression module, is the output value of the multiple linear regression module; , , They are the overflow fineness predicted by the neural network regression module, the vector support vector regression module, and the multivariate linear regression module; , , They are the crushing ratio index predicted by the neural network regression module, the vector support vector regression module, and the multivariate linear regression module; , , They are the crushing particle sizes predicted by the neural network regression module, the vector support vector regression module, and the multivariate linear regression module; , , , , , They are the minimum and maximum constraints of overflow fineness, crushing ratio index, and crushing particle size. It is the input parameter of the three regression prediction modules.
[0034] Preferably, the optimal solution of the optimization model is solved by an artificial bee colony optimization algorithm, which uses the objective function as its fitness function and mineral properties and process parameters of the bee colony as food source coordinates of the bee colony.
[0035] Preferably, solving the optimal solution of the optimization model by an artificial bee colony optimization algorithm specifically includes:
[0036] S1. Determine the dimensions of the bee colony according to the mineral processing efficiency index, set the size of the population and the maximum number of iterations, and the bee colony includes employed bees, follower bees and scout bees;
[0037] S2, initialize the bee colony coordinates, use the initialized coordinates as the current food source, and calculate the fitness of the current food source of the bee colony;
[0038] S3. The employed bees search for candidate solutions in the neighborhood of the current food source, calculate the fitness of the candidate solutions, and determine whether the fitness of the candidate solutions is greater than the fitness of the current food source. If not, the coordinates of the current food source are maintained unchanged. If greater, the coordinates of the candidate solutions are iterated to become the coordinates of the new food source.
[0039] S4, the follower bee searches for a candidate solution in the neighborhood of the current food source with a search probability, calculates the fitness of the candidate solution, and determines whether the fitness of the candidate solution is greater than the fitness of the current food source coordinates. If it is not greater than the fitness of the current food source, the current food source coordinates are maintained unchanged. If it is greater, the coordinates of the candidate solution are iterated to become new food source coordinates.
[0040] S5, the scout bee is used to compare the duration period of the currently used food source coordinates with the preset period. When the currently used food source coordinates are not updated within the preset period, the scout bee randomly searches for a candidate solution from the global solution domain. If the candidate solution is not greater than the fitness of the current food source coordinates, the current food source coordinates are maintained unchanged. If the candidate solution is greater than the fitness of the current food source coordinates, the candidate solution coordinates are iterated to become the new food source coordinates.
[0041] S6. Update pheromones, and adjust the search direction and distance of employed bees and follower bees according to the updated pheromones, and adjust the search probability of follower bees;
[0042] S7, evaluating the overall performance of the current bee colony, determining whether the overall performance of the current bee colony is lower than the target performance, increasing the number of bees in the bee colony when the overall performance of the current bee colony is lower than the target performance, and reducing the number of bees in the bee colony when the overall performance of the current bee colony is higher than the target performance;
[0043] S8. Determine whether the current bee colony has reached the maximum number of iterations. If not, return to S3; otherwise, output the current food source coordinates as the optimal solution.
[0044] Preferably, step S6 comprises:
[0045] For each food source , initialize a pheromone strength , indicating that the food source quality;
[0046] After each iteration, the fitness of the food source Update pheromone strength:
[0047]
[0048] in, is the pheromone evaporation coefficient, is the amount of pheromone that increases according to the quality of the food source, and is proportional to;
[0049] The search probability of the follower bee is calculated according to the pheromone intensity:
[0050]
[0051] in and is the parameter that controls the effect of pheromone intensity and fitness, SN is the total number of food sources, Indicates pheromone strength A weight adjustment of is a power exponent used to adjust the degree of influence of pheromone intensity; It is The fitness value of a food source, Represents a solution The fitness function value of
[0052] When employed bees and follower bees conduct neighborhood search near a food source, the search direction and distance are adjusted according to the pheromone intensity;
[0053] and / or
[0054] The step S7 comprises:
[0055] Setting the evaluation function Evaluate the overall performance of the swarm after each iteration;
[0056] Among them, the evaluation function for:
[0057]
[0058] in, and are two different weight coefficients respectively; Indicates the number of iterations; represents the optimal food position, Indicates the dispersion of the solution;
[0059] Setting Adaptive Parameters , Represent the number parameters of employed bees, follower bees and scout bees respectively;
[0060] After each iteration, the number of parameters of the current cycle of the swarm and Update the number parameters of employed bees, follower bees and scout bees for the next cycle with the value of:
[0061]
[0062]
[0063]
[0064] in, represents the number of iterations, It is a function that adjusts the quantity according to the evaluation result, which is used to increase the quantity parameter when the current overall performance is lower than the target performance, and to reduce the quantity parameter when the current overall performance is higher than the target performance;
[0065] According to the new quantity parameters Update the number of bees:
[0066]
[0067]
[0068]
[0069] in, is the total number of bee colonies; , , Represents the number of employed bees, follower bees, and scout bees.
[0070] A computer system comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the steps of the above method are implemented when the processor executes the computer program.
[0071] The present invention has the following beneficial effects:
[0072] 1. The present invention selects multiple different types of prediction models, takes mineral properties and process parameters of the mineral processing system as input, and takes mineral processing efficiency indicators as output to construct a fusion prediction model. Through multi-model fusion prediction, the prediction accuracy can be greatly improved. Then, the input of the fusion prediction model is used as the optimization variable, and the output of the fusion prediction model is optimized as the goal to construct an optimization model; the optimal solution of the optimization model is solved, and minerals with corresponding properties are selected according to the process parameters corresponding to the optimal solution, which can greatly improve the mineral processing efficiency of the mineral processing system.
[0073] 2. In the preferred embodiment, the present invention uses neural network regression (NNR), vector support vector regression (VSVR), multivariate linear regression (MLR) and other methods to construct three different reasoning prediction models, and predicts the mineral processing efficiency by combining the advantages of these models, with higher prediction accuracy.
[0074] 3. In the preferred embodiment, the present invention constructs an optimization model based on the average value of the outputs of the three models NNR, VSVR and MLR, with the goal of maximizing the recovery rate and satisfying the constraints of overflow fineness, crushing ratio index and crushing particle size, and then adopts an improved bee colony optimization algorithm (ABC) to solve the optimal solution of the optimization model. The bee colony optimization algorithm combines the information sharing mechanism with the improvement strategy of the adaptive bee ratio, which can enhance the global search ability and convergence speed of the algorithm, while maintaining the diversity of solutions, and can improve the quality and speed of solving complex problems.
[0075] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0076] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0077] Figure 1 A flow chart of a method for intelligent decision-making of process parameters of a mineral processing system provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0078] The embodiments of the present invention are described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.
[0079] In this embodiment, a method for predicting the ore dressing efficiency of an ore dressing system is provided, comprising:
[0080] 1. Data collection and preprocessing
[0081] 1) Data Collection
[0082] The present invention relates to the steps of collecting historical mineral processing data from multiple metal mines, which include original mineral properties (main useful minerals, main gangue minerals, coarse-grained distribution, mineral distribution characteristics, sulfide oxidation conditions, and raw ore grade), crushing / pre-selection system (input crushing particle size, crushing ratio index, crushing particle size), grinding system (overflow concentration, grinding work index, overflow fineness), separation system (concentrate grade, tailings grade, mineral processing recovery rate), etc. These data may come from different mines and different mining and dressing periods, so there are differences in data consistency and availability.
[0083] 2) Data Integration
[0084] In order to ensure the consistency and availability of data, the present invention formats and standardizes the data from different mines to facilitate subsequent analysis and application.
[0085] 3) Data preprocessing
[0086] The integrated data is cleaned, including removing duplicate records, processing missing values, correcting errors and outliers, etc., to improve data quality.
[0087] 4) Data Standardization
[0088] After data preprocessing, the data is converted into a unified format to ensure that data from different data sources can be compared and analyzed under the same standard.
[0089] 5) Data Verification
[0090] The cleaned and standardized data were checked for consistency and completeness to ensure the quality of the data cleaning step.
[0091] Data preprocessing solves the problem of consistency and availability of historical mineral processing data collected from different metal mines. These data cover the original mineral properties, crushing / pre-concentration system, grinding system and separation system parameters.
[0092] 2. Build a fusion prediction model:
[0093] Using advanced regression analysis technology, the inference results of key process parameters in the mineral processing process are optimized to provide guidance for subsequent intelligent decision-making of parameters.
[0094] 1) Determination of input parameters
[0095] The present invention first determines the input parameters of the prediction model, including mineral properties (main useful minerals, main gangue minerals, coarse-grained distribution, mineral distribution characteristics, sulfide oxidation conditions, and ore grade) as well as parameters such as the crushing / pre-selection system (crushing particle size), the grinding system (overflow concentration, grinding work index), and the separation system (concentrate grade, tailings grade).
[0096] 2) Step 2: Definition of output indicators
[0097] Determine the output indicators of the prediction model, including recovery rate, overflow fineness, crushing ratio index, crushing particle size, etc. These indicators are the key to evaluating mineral processing efficiency.
[0098] 3) Step 3: Construction of prediction model
[0099] A plurality of different types of prediction models are selected, and a fusion prediction model is constructed with mineral properties and process parameters of the ore dressing system as input and ore dressing efficiency indicators as output, and the ore dressing efficiency of the ore dressing system is predicted based on the fusion prediction model.
[0100] The fusion prediction model includes multiple different types of regression prediction modules and a fusion module; the multiple regression prediction modules all take mineral properties and process parameters of the mineral processing system as input and take mineral processing efficiency indicators as output; the outputs of the multiple regression prediction modules are all connected to the input of the fusion module, and the fusion module is used to fuse the prediction results output by different types of regression prediction modules to obtain the final prediction result and output it. The fusion module is a weighted fusion module, and the weights of the multiple regression prediction modules are equal.
[0101] In the preferred solution, three different regression prediction modules are constructed using methods such as neural network regression (NNR, Neural Network Regression), vector support vector regression (VSVR, Vector Support Vector Regression), and multivariate linear regression (MLR, Multivariate Linear Regression).
[0102] By combining the advantages of three different regression prediction modules, the inference results are optimized. Specifically, NNR can handle nonlinear complex relationships, VSVR provides excellent generalization capabilities, and MLR is suitable for processing linear relationships.
[0103] In addition, if Figure 1 As shown, in this embodiment, a method for intelligent decision-making of process parameters of a mineral processing system is also provided, including:
[0104] 1) Build an optimization model
[0105] Constraints are set and an optimization model is constructed based on the fusion prediction model; the optimization model uses the input of the fusion prediction model as an optimization variable and takes the optimal output of the fusion prediction model as a goal.
[0106] Specifically, the objective function of the optimization model is based on the average value of the recovery rate, overflow fineness, crushing ratio index, and crushing particle size output by the three models (NNR, VSVR, and MLR), with the goal of maximizing the recovery rate, and needs to meet the constraints of overflow fineness, crushing ratio index, and crushing particle size.
[0107] The following is the mathematical model of the objective function:
[0108] set up , , are the recoveries predicted by the NNR, VSVR, and MLR models, respectively;
[0109] , , are the predicted overflow fineness respectively;
[0110] , , are the predicted crushing ratio indicators respectively;
[0111] , , are the predicted crushing particle sizes, respectively.
[0112] The objective function is:
[0113]
[0114] The constraints are:
[0115]
[0116]
[0117]
[0118] in , , , , , They are the minimum and maximum constraints of overflow fineness, crushing ratio index, and crushing particle size. It is the input parameter of the three regression prediction modules.
[0119] 2) Find the optimal solution
[0120] The optimal solution of the optimization model is solved, and minerals with corresponding properties are selected according to the process parameters corresponding to the optimal solution.
[0121] In this embodiment, an artificial bee colony optimization method is used to find the optimal solution.
[0122] Artificial Bee Colony Optimization (ABC) is an efficient bionic intelligent optimization technology inspired by the foraging behavior of bees in nature. It is widely used to solve a variety of complex problems. The optimization principle is based on the natural foraging mechanism of bees. In the ABC algorithm, bees are divided into three main roles:
[0123] Hired bees: These are the bees responsible for exploring and discovering food sources. They not only assess the value of a food source, but also pass that information to their companions with a certain probability, thus guiding the entire colony to gather towards high-quality food sources.
[0124] Follower bees: These bees rely on information provided by hired bees to select food sources. They search near the selected food source, assessing and comparing the value of the food to determine if it is worth keeping.
[0125] Scout bees: When a food source is abandoned by employed bees, scout bees step in and randomly explore the search space to discover new potential food sources.
[0126] Through the collaborative work of these three types, the ABC algorithm simulates the intelligent behavior of the bee colony and effectively navigates in the search space to find the optimal solution. The advantages of this method lie in its simplicity, efficiency, and adaptability to a variety of optimization problems. It provides a novel and fruitful way to solve complex optimization challenges in the real world.
[0127] In this embodiment, an artificial bee colony optimization method is used to find the optimal solution, including:
[0128] S1. Setting parameters
[0129] Determine the dimensions of the bee colony based on the crushing / pre-selection system (crushing particle size), grinding system (overflow concentration, grinding work index), and separation system (concentrate grade, tailings grade) , set the size of the population , the maximum number of iterations.
[0130] S2. Initialize the position of the population
[0131] Each solution can be expressed as a dimensional vector. Each individual in the population Location It can be initialized by the following formula:
[0132]
[0133] in:
[0134] It is The food source is Dimensional location.
[0135] and They are The upper and lower limits of the dimension.
[0136] is a random number in the range [0,1].
[0137] S3. Calculate the objective function value
[0138] For each bee's position , calculate the objective function value .
[0139] S4. Bee colony searches for nectar sources
[0140] a) Hired bees:
[0141] Objective Function ,in is a point in the solution space, is the dimension of the optimization target.
[0142] The task of hired bees is to Find a new candidate solution in the neighborhood of . This new solution is generated by:
[0143]
[0144] in:
[0145] It is a new solution In the The value of the dimension.
[0146] is the current solution In the The value of the dimension.
[0147] and are two points randomly selected from the solution space in The value of the dimension.
[0148] is a A randomly generated number within the , used to control the step size of the neighborhood search.
[0149] The hired bees will Fitness To decide whether to replace the original food source .
[0150] b) Follow the Bee:
[0151] The mathematical model of the follower bee is responsible for selecting and using the food source information discovered by the employed bees to search for new solutions. The following is a description of the mathematical model of the follower bee:
[0152] The probability of following the bee to choose a food source Adaptability to the food source It is directly proportional and can be calculated by the following formula:
[0153]
[0154] in:
[0155] It is The probability that a food source is selected.
[0156] It is The fitness value of a food source.
[0157] is the total number of food sources.
[0158] Once a follower bee selects a food source, it will generate a new candidate solution in the neighborhood of the food source. , this process is similar to hiring bees, using the following formula:
[0159]
[0160] It is a new solution In the The value of the dimension.
[0161] Current food source In the The value of the dimension.
[0162] and are two points randomly selected from the food source at The value of the dimension.
[0163] is a A randomly generated number within the , used to control the step size of the neighborhood search.
[0164] Follow the bee will follow the new interpretation The fitness of the new solution determines whether to replace the original food source. If the fitness of the new solution is higher, the new solution will replace the original solution and become the new food source.
[0165] c) Scout Bee:
[0166] The role of scout bees is to explore new potential solutions when food sources are abandoned. The mathematical model of scout bees is relatively simple because their main task is to randomly search for new food sources in the solution space. The following is a description of the mathematical model of scout bees:
[0167] When a food source If it has not been updated for a certain number of cycles (i.e. no other bee chooses it as a better solution), it will be considered an abandoned food source. At this point, the scout bees will step in and randomly generate a new food source. to replace it. This new food source is randomly selected from the entire solution space and can be expressed as:
[0168]
[0169] in:
[0170] is the location of the newly generated food source.
[0171] and are the lower and upper bounds of the solution space respectively.
[0172] is a random number in the range [0,1].
[0173] This process ensures that the algorithm can continue to explore new areas and avoid excessive aggregation near the local optimal solution, thereby increasing the possibility of finding the global optimal solution.
[0174] S5. Swarm Information Sharing
[0175] Aiming at the limitations of traditional bee colony optimization algorithm in dealing with multi-peak, high-dimensional and dynamic optimization, this paper proposes an improved strategy combining information sharing mechanism with adaptive bee ratio. This strategy aims to enhance the global search capability and convergence speed of the algorithm while maintaining the diversity of solutions to improve the quality of solution.
[0176] The pheromone model is introduced to improve the information sharing mechanism between employed bees and follower bees. Pheromones not only serve as an indicator of the quality of food sources, but also guide bees to search for and use good food sources more efficiently. The sharing mechanism is as follows:
[0177] a)Pheromone initialization:
[0178] -For each food source , initialize a pheromone strength , indicating the quality of the food source.
[0179] b)Pheromone update rules:
[0180] After each iteration, the fitness of the food source Update pheromone strength:
[0181]
[0182] in, is the pheromone evaporation coefficient, is the amount of pheromone that increases according to the quality of the food source, usually with Directly proportional.
[0183] c) Pheromone-dependent search following bees:
[0184] The probability that a follower bee chooses a food source depends not only on the fitness of the food source but also on the pheromone intensity:
[0185]
[0186] in and is the parameter that controls the effect of pheromone intensity and fitness, and SN is the total number of food sources. Indicates pheromone strength A weight adjustment of ; here, is a base value representing the pheromone concentration or quality index of a particular element (such as a food source in a swarm optimization algorithm), while is a power exponent used to adjust the degree of influence of pheromone intensity; It is The fitness value of a food source, Represents a solution The fitness function value of , which measures the fitness of the solution.
[0187] d) Pheromone-guided neighborhood search:
[0188] When employed bees and follower bees conduct neighborhood searches near food sources, pheromone intensity can be considered to adjust the search direction and distance.
[0189] S6. Adaptive adjustment of the number of bees
[0190] S61, Proportion of Adaptive Bees
[0191] The algorithm can adaptively adjust the number of bees according to the dynamic changes in the search process to maintain the flexibility and efficiency of the algorithm. This helps the algorithm maintain a balance between exploration and development, improves global search capabilities and convergence speed, and the mathematical model for adaptively adjusting the number of bees can be implemented in the following ways:
[0192] a) Evaluation function:
[0193] Define an evaluation function , used in each iteration Then evaluate the overall performance of the bee colony.
[0194] Adaptive evaluation function , which aims to improve the global search capability and convergence of the bee colony optimization algorithm (ABC) when dealing with complex optimization problems. This evaluation function comprehensively considers the fitness trend of the optimal solution in the bee colony and the dispersion of the solution to achieve the goal of enhancing the global search capability in the early stage of the algorithm and improving the convergence speed in the later stage.
[0195] It consists of two parts: optimal solution fitness trend Dispersion of settlements .in, Iteration time is the fitness of the optimal solution in the swarm, and is the standard deviation of the swarm solution at the same time point. These two indicators measure the convergence and global search capabilities of the algorithm respectively.
[0196] Construction of the evaluation function:
[0197] Evaluation Function The specific form is:
[0198]
[0199] in, and is a weight coefficient used to balance the importance of convergence and global search ability. If the fitness of the optimal solution improves, then increases, reflecting the improved convergence of the algorithm. On the contrary, if the dispersion of the solution Increases, indicating that the global search capability is enhanced. and By adjusting the value of , we can adjust the behavior of the algorithm according to different optimization scenarios.
[0200] b) Bee population adjustment rules:
[0201] According to the result of the evaluation function, the number of employed bees, follower bees and scout bees is dynamically adjusted. For example, if This indicates that the diversity of the bee colony is insufficient and the number of scout bees can be increased.
[0202] c) Adaptive parameters:
[0203] Setting Adaptive Parameters , representing the number of employed bees, follower bees and scout bees respectively.
[0204] d) Update formula:
[0205] After each iteration, the number of parameters of the current cycle of the swarm and Update the number parameters of employed bees, follower bees and scout bees for the next cycle with the value of:
[0206]
[0207]
[0208]
[0209] in, is a function that adjusts the quantity based on the evaluation result.
[0210] In the Artificial Bee Colony Optimization (ABC) algorithm, the Adjust function is used to dynamically adjust the proportion of bees based on the evaluation results. This function can increase or decrease the number of employed bees, follower bees, and scout bees based on the current performance of the algorithm and the expected goals.
[0211] Assumptions At iteration time The evaluation function value of , which combines the convergence and diversity of the swarm. The Adjust function will be based on To adjust the bee proportions :
[0212]
[0213] in:
[0214] It's in time proportion of bees.
[0215] is the learning rate, a small positive number that controls the magnitude of the adjustment.
[0216] is the target evaluation value, and the algorithm tries to reach this evaluation level.
[0217] When t=1, a is the initial proportion of bees.
[0218] if Lower than , which means that the performance of the bee colony is not as expected, and the Adjust function will increase the proportion of bees to enhance the search ability. On the contrary, if Higher than , then reduce the proportion of bees to promote the convergence of the algorithm.
[0219] e) Bee population update:
[0220] According to the new quantity parameters Update the number of bees:
[0221]
[0222]
[0223]
[0224] in, is the total number of bee colonies.
[0225] S7: Determine whether the maximum number of iterations has been reached, otherwise continue iterating to S4 to achieve the optimal output position.
[0226] S8. Based on the optimal position obtained by ABC optimization, generate the optimal key process parameters: crushing / pre-selection system (crushing particle size), grinding system (overflow concentration, grinding work index), separation system (concentrate grade, tailings grade) and other parameters.
[0227] In summary, the present invention constructs a key process result prediction model. The model first determines the input parameters, including mineral properties and key parameters of each beneficiation system. Then, output indicators such as recovery rate, overflow fineness, crushing ratio index, crushing particle size, etc. are defined, which are the key to evaluating beneficiation efficiency. Next, three different inference prediction models are constructed using methods such as neural network regression (NNR), vector support vector regression (VSVR), and multiple linear regression (MLR), and the inference results are optimized by combining the advantages of these models.
[0228] Furthermore, the present invention constructs an intelligent optimization mathematical model based on the average value of the outputs of the three models NNR, VSVR and MLR, with the goal of maximizing the recovery rate and satisfying the constraints of overflow fineness, crushing ratio index and crushing particle size.
[0229] Finally, the present invention adopts an improved bee colony optimization algorithm (ABC). This algorithm simulates the intelligent group search strategy of bees foraging behavior in nature, and quickly finds the optimal solution through information sharing between individual bees. This study proposes an improved strategy that combines information sharing mechanism with adaptive bee ratio, aiming to enhance the global search ability and convergence speed of the algorithm while maintaining the diversity of solutions to improve the quality of solving complex problems.
[0230] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An intelligent decision-making method for process parameters of a mineral processing system, characterized in that: include: Select multiple different types of prediction models, take mineral properties and process parameters of the mineral processing system as input, and use mineral processing efficiency indicators as output to build a fusion prediction model; Setting constraints and constructing an optimization model, wherein the optimization model uses the input of the fusion prediction model as an optimization variable and takes the optimal output of the fusion prediction model as a goal; Solving the optimal solution of the optimization model, and selecting minerals with corresponding properties according to the process parameters corresponding to the optimal solution; The optimization target of the optimization model is the mineral processing efficiency index, which includes recovery rate, overflow fineness, crushing ratio index, and crushing particle size; The fusion prediction model includes a plurality of different types of regression prediction modules and a fusion module; the regression prediction module includes a neural network regression module, a vector support vector regression module, and a multivariate linear regression module; the optimization goal of the optimization model is to maximize the recovery rate, and the objective function is: The constraints of the optimization model are: in, is the output value of the neural network regression module, is the output value of the vector support vector regression module, is the output value of the multiple linear regression module; , , They are the overflow fineness predicted by the neural network regression module, the vector support vector regression module, and the multivariate linear regression module; , , They are the crushing ratio index predicted by the neural network regression module, the vector support vector regression module, and the multivariate linear regression module; , , They are the crushing particle sizes predicted by the neural network regression module, the vector support vector regression module, and the multivariate linear regression module; , , , , , They are the minimum and maximum constraints of overflow fineness, crushing ratio index, and crushing particle size. It is the input parameter of the three regression prediction modules.
2. The method for intelligent decision-making of process parameters of a mineral processing system according to claim 1, characterized in that: The process parameters of the ore dressing system include the process parameters of the crushing / pre-selection system, the process parameters of the grinding system and the process parameters of the separation system; The process parameters of the crushing / pre-selection system include: crushing particle size, crushing ratio index, and crushing particle size; The process parameters of the grinding system include overflow concentration, grinding work index, and overflow fineness; the process parameters of the separation system include: concentrate grade, tailings grade, and mineral processing recovery rate.
3. The method for intelligent decision-making of process parameters of a mineral processing system according to claim 2, characterized in that: The optimal solution of the optimization model is solved by an artificial bee colony optimization algorithm, which uses the objective function as its fitness function and uses mineral properties and process parameters of the bee colony as food source coordinates of the bee colony.
4. The method for intelligent decision-making of process parameters of a mineral processing system according to claim 3 is characterized in that: The optimal solution of the optimization model is solved by an artificial bee colony optimization algorithm, specifically including: S1. Determine the dimensions of the bee colony according to the mineral processing efficiency index, set the size of the population and the maximum number of iterations, and the bee colony includes employed bees, follower bees and scout bees; S2, initialize the bee colony coordinates, use the initialized coordinates as the current food source, and calculate the fitness of the current food source of the bee colony; S3. The employed bees search for candidate solutions in the neighborhood of the current food source, calculate the fitness of the candidate solutions, and determine whether the fitness of the candidate solutions is greater than the fitness of the current food source. If not, the coordinates of the current food source are maintained unchanged. If greater, the coordinates of the candidate solutions are iterated to become the coordinates of the new food source. S4, the follower bee searches for a candidate solution in the neighborhood of the current food source with a search probability, calculates the fitness of the candidate solution, and determines whether the fitness of the candidate solution is greater than the fitness of the current food source coordinates. If it is not greater than the fitness of the current food source, the current food source coordinates are maintained unchanged. If it is greater, the coordinates of the candidate solution are iterated to become new food source coordinates. S5, the scout bee is used to compare the duration period of the currently used food source coordinates with the preset period. When the currently used food source coordinates are not updated within the preset period, the scout bee randomly searches for a candidate solution from the global solution domain. If the candidate solution is not greater than the fitness of the current food source coordinates, the current food source coordinates are maintained unchanged. If the candidate solution is greater than the fitness of the current food source coordinates, the candidate solution coordinates are iterated to become the new food source coordinates. S6. Update pheromones, and adjust the search direction and distance of employed bees and follower bees according to the updated pheromones, and adjust the search probability of follower bees; S7, evaluating the overall performance of the current bee colony, determining whether the overall performance of the current bee colony is lower than the target performance, increasing the number of bees in the bee colony when the overall performance of the current bee colony is lower than the target performance, and reducing the number of bees in the bee colony when the overall performance of the current bee colony is higher than the target performance; S8. Determine whether the current bee colony has reached the maximum number of iterations. If not, return to S3; otherwise, output the current food source coordinates as the optimal solution.
5. The method for intelligent decision-making of process parameters of a mineral processing system according to claim 4 is characterized in that: The step S6 comprises: For each food source , initialize a pheromone strength , indicating that the food source quality; After each iteration, the fitness of the food source Update pheromone strength: in, is the pheromone evaporation coefficient, is the amount of pheromone that increases according to the quality of the food source, and is proportional to; The search probability of the follower bee is calculated according to the pheromone intensity: in and is the parameter that controls the effect of pheromone intensity and fitness, SN is the total number of food sources, Indicates pheromone strength A weight adjustment of is a power exponent used to adjust the degree of influence of pheromone intensity; It is The fitness value of a food source, Represents a solution The fitness function value of When employed bees and follower bees conduct neighborhood search near a food source, the search direction and distance are adjusted according to the pheromone intensity; and / or The step S7 comprises: Setting the evaluation function Evaluate the overall performance of the swarm after each iteration; Among them, the evaluation function for: in, and are two different weight coefficients respectively; Indicates the number of iterations; represents the optimal food position, Indicates the dispersion of the solution; Setting Adaptive Parameters , Represent the number parameters of employed bees, follower bees and scout bees respectively; After each iteration, the number of parameters of the current cycle of the swarm and Update the number parameters of employed bees, follower bees and scout bees for the next cycle with the value of: in, represents the number of iterations, It is a function that adjusts the quantity according to the evaluation result, which is used to increase the quantity parameter when the current overall performance is lower than the target performance, and to reduce the quantity parameter when the current overall performance is higher than the target performance; According to the new quantity parameters Update the number of bees: in, is the total number of bee colonies; , , Represents the number of employed bees, follower bees, and scout bees.
6. A computer system comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 5 are implemented.