A method for preventing impact by coupling energy-absorbing grouting and internal fracturing and pressure relief in coal roadway walls
Through the coupling anti-impact method of energy absorption grouting and internal cracking and pressure relief of coal tunnels, the problems of support difficulty and impact mine pressure risk in deep coal mine tunnels are solved, and the stability and safety of tunnels are improved, and the impact is reduced. Risk and support costs.
Patent Information
- Application Number
- CN202411029246.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-07-30
AI Technical Summary
In the mining of deep coal mines, the tunnel support is difficult, high cost and poor effect, and the impact mine pressure risk still exists, especially in the fact that it fails to effectively reduce the risk of tunnel surface crushing and high stress areas.
The anti-impact method is adopted to couple energy-absorbing grouting and internal crack-induced pressure relief and anti-impact method. By drilling grouting holes, grouting reinforcement, drilling water-pressure-induced cracking guide holes and water-pressure-induced cracking, forming a pressure relief zone. Combining energy-absorbing materials and hydraulic fracturing, it jointly reduces the stress and crushing risks of the tunnel.
Effectively reduce the risk of impact ore pressure, improve the stability and safety of the tunnel, reduce the difficulty and cost of support, avoid excessive pressure relief and damage to the support structure, reduce the synergy of reinforcement and pressure relief The impact risk of the tunnel.
Smart Images

Figure CN118548066B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of deep coal mine dynamic disaster prevention and control, and in particular to a method for preventing impacts by coupling energy-absorbing grouting in the side of a coal tunnel with internal fracturing and pressure relief. Background Art
[0002] With the continuous increase in the depth of coal mining, the stress on the side of the tunnel increases. At the same time, the surrounding rock of the coal tunnel is weak, loose, and broken, and its strength is far less than that of the rock tunnel. The tunnel pressure is strong, and dynamic disasters such as impact mine pressure occur from time to time. The support of the tunnel is difficult, costly, and ineffective, which seriously threatens the life safety of underground workers and reduces the efficiency of coal mining. It is a technical problem that needs to be solved urgently in my country's deep coal mining.
[0003] At present, the prevention and control methods of rock burst are mainly divided into three categories: support, modification and pressure relief. Among them, the support of the tunnel mainly uses anchor cables, anchor nets, anchor rods, telescopic brackets, etc. to play the role of suspension, combination, and extrusion reinforcement, strengthen the integrity of the broken coal body, and improve the bearing capacity of the surrounding rock; the modification of the tunnel mainly uses various high-performance materials to fill the broken tunnel, improve the strength of the surrounding rock and increase the integrity of the surrounding rock; the most widely used pressure relief holes and deep hole blasting for tunnels are used to reduce the high stress of the tunnel and transfer the stress concentration area to the deep part of the surrounding rock.
[0004] For related technologies, please refer to the Chinese patent with publication number CN113790066A, which discloses a pressure relief support system and method for high-stress broken rock tunnels. The combination of grouting anchors, resin anchors, metal mesh, etc. has a good support effect on broken rock under high stress, effectively reducing the shrinkage deformation of the tunnel and extending the service life of the tunnel. For related technologies, please refer to the Chinese patent with publication number CN115169672A, which discloses a method for optimizing the timing of pressure relief in deep mine mining tunnels. The tunnel pressure relief stage is divided into coal body pressure relief during excavation period, coal body pressure relief during mining period and rock body pressure relief during mining period, and the best pressure relief plan and pressure relief timing are obtained to avoid excessive or insufficient pressure relief. For related technologies, reference may be made to Chinese patent publication number CN112780339A, which discloses a method for the combined arrangement of pressure relief holes in deep and extra-thick coal seam tunnels. A comprehensive index of impact hazard is evaluated from the aspects of geological factors and mining technical factors. The maximum value of the comprehensive index of impact hazard is taken to comprehensively evaluate the impact hazard in the mining area. Then, large-diameter pressure relief holes are constructed at the head of the excavation, and large-diameter pressure relief holes are constructed symmetrically on both sides of the coal seam, thereby solving the problem of large pressure relief engineering workload and low pressure relief efficiency in existing pressure relief methods.
[0005] Regarding the above-mentioned related technologies, the existing methods and patents mainly optimize the roadway surface integrity or the high stress area of the roadway, which reduces the impact risk of the roadway to a certain extent, but the effect is single. For example, grouting modification often only reinforces the broken surrounding rock, does not reduce the high stress value in the elastic-plastic zone, and the impact risk is still very high. Large-diameter pressure relief holes and deep hole blasting reduce the high stress value in the deep part, but do not reinforce the broken area, resulting in serious surface crushing of the roadway and increased support difficulty. Summary of the invention
[0006] In order to better relieve pressure and resolve danger, the present application provides a method for preventing impact by coupling energy-absorbing grouting in the side of a coal tunnel with internal fracturing and pressure relief.
[0007] The present application provides a method for preventing impact by coupling energy absorption grouting and internal fracturing and pressure relief in the side of a coal roadway, which adopts the following technical solutions:
[0008] A method for preventing impact by coupling energy absorption grouting and internal fracturing and pressure relief at the side of a coal roadway, comprising:
[0009] Step S1: drilling grouting holes: using a drilling rig to drill grouting holes at both sides of the tunnel, so that the cracks formed by drilling the grouting holes are interconnected to form a primary pressure relief zone, release the residual stress in the crushing zone at both sides of the tunnel, and perform the primary pressure relief on the tunnel confining pressure;
[0010] Step S2: Grouting reinforcement of the broken area of the tunnel: After the drilling of the grouting holes in the side part is completed and the coal body structure is restored to stability, grouting reinforcement is performed in the grouting holes formed in step S1 to form a reinforcement area;
[0011] Step S3: drilling a hydraulic fracturing pilot hole: after the grouting reinforcement of the shallow broken area of the tunnel side is completed and the structure is restored to stability, the grouting hole drilled in step S1 is further enlarged and the hole depth is increased to form a hydraulic fracturing pilot hole that connects to the grouting hole;
[0012] Step S4: hydraulic fracturing: hydraulic fracturing is performed on the rock mass through the hydraulic fracturing guide hole formed in step S3 to form a pressure relief zone outside the reinforcement zone.
[0013] Optionally, in step S1, a drilling rig is used to drill grouting holes at both sides of the tunnel. The diameter of the drilled grouting holes is 42 mm and the depth is twice the width of the tunnel.
[0014] Optionally, step S1 uses a drilling rig to drill grouting holes on both sides of the tunnel, drills two upper and lower grouting holes along the height direction of the tunnel, and arranges them in a row every 3 meters along the depth direction of the tunnel. The upper row of grouting holes is inclined upward by 30 degrees, and the hole mouth is 550mm away from the top plate. The lower row of grouting holes is inclined upward by 5 degrees, and the hole mouth is 1700mm away from the bottom plate.
[0015] Optionally, anchor rods and anchor cables are used for support at both sides of the tunnel. The sides and top plate of the tunnel are supported by anchor rods and anchor cables. The anchor rods and anchor cables are arranged in rows in the tunnel in an alternating manner along the length direction. The spacing between adjacent anchor rods and anchor cables in the length direction of the tunnel is 800mm, the spacing between anchor cables in the same row in the width direction of the tunnel is 1600mm, and the spacing between anchor rods in the same row in the width direction of the tunnel is 800mm.
[0016] Optionally, in step S2, grouting reinforcement is performed into the grouting holes, the grouting holes drilled in step S1 are used as grouting paths, hot melt asphalt or rubber slurry is pumped into the grouting holes, and the grouting pressure is not less than 5 MPa.
[0017] Optionally, the hydraulic fracturing guide hole in step S3 is further enlarged based on the grouting hole drilled in step S1, so that the new hydraulic fracturing guide hole has a depth of 20m and a hole diameter of 50mm.
[0018] Optionally, the water fracturing pressure during the water fracturing in step S4 is not less than 20 MPa.
[0019] In summary, the present application includes at least one of the following beneficial technical effects:
[0020] The construction sequence of reinforcement first and then pressure relief is adopted to avoid the problem of excessive pressure relief and damage to the integrity of the support structure. The actual stress conditions inside the coal body are fully considered, and the risk of rock burst is reduced from both pressure relief and reinforcement aspects.
[0021] It has the synergistic coupling effect of grouting reinforcement in the shallow fractured area of the coal seam and hydraulic fracturing pressure relief in the high stress area at the elastic-plastic interface inside the coal body. Different pressure relief and reinforcement combination measures are made for different areas of the roadway according to the actual fracture and stress conditions of the surrounding rock of the roadway, which greatly improves the stability and safety of the roadway;
[0022] While grouting and reinforcing the broken area of the tunnel side ensures the integrity of the coal body, the hydraulic fracturing method is used to adjust the high stress in the elastic-plastic interface area inside the coal body, driving the high stress to transfer to the deep part of the tunnel, reducing the impact risk of the tunnel. In addition, the deformation effect of the energy-absorbing material and the pressure relief area formed by hydraulic fracturing provide a larger compensation space for the deformation and energy release of the coal body, reducing the threat of dynamic disasters such as impact mine pressure during deep coal mining;
[0023] The broken area of the coal seam is reinforced by grouting with energy-absorbing materials, which improves the integrity and deformation resistance of the broken coal body. The high stress in the elastic-plastic interface area deeper in the coal body is released and transferred through hydraulic fracturing, which changes the high stress state of the surrounding rock stress field, reduces the high stress peak, reduces the high stress range, and transfers the stress concentration area to the deep part of the surrounding rock, reducing the impact risk of the tunnel. In addition, the grouting hole and the hydraulic fracturing guide hole share the same hole, which reduces the difficulty of drilling. At the same time, the construction sequence of reinforcement first and then pressure relief avoids the problems of excessive pressure relief and damage to the integrity of the support structure. According to the actual stress situation of the tunnel, the risk of impact mine pressure is reduced from both reinforcement and pressure relief. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 Schematic diagram of the mechanical model of the tunnel side.
[0025] Figure 2 The figure is a flow chart of a method for preventing impacts by coupling energy-absorbing grouting in the side of a coal roadway with internal fracturing and pressure relief.
[0026] Figure 3 This is a schematic diagram of the grouting holes in the embodiment of the present application.
[0027] Figure 4 This is a schematic diagram of the reinforcement area formed by grouting the broken area in the embodiment of the present application.
[0028] Figure 5 This is a schematic diagram of the hydraulic fracturing guide hole in the embodiment of the present application.
[0029] Figure 6 This is a schematic diagram of the pressure relief zone formed by hydraulic fracturing in the embodiment of the present application.
[0030] Figure 7 This is a schematic diagram of the hydraulic fracturing operation in the embodiment of the present application.
[0031] Explanation of the reference numerals in the accompanying drawings: 1. grouting hole; 2. crack; 3. anchor cable; 4. anchor rod; 5. reinforcement area; 6. hydraulic fracturing guide hole; 7. fracturing area; 8. packer; 9. hose; 10. flow meter and pressure control system; 11. pressure pump; 12. data recording system; 13. pressure relief area. DETAILED DESCRIPTION
[0032] The present application is further described in detail below in conjunction with all the accompanying drawings.
[0033] The embodiment of the present application discloses a method for preventing impact by coupling energy-absorbing grouting in the side of a coal roadway with internal fracturing and pressure relief.
[0034] from Figure 1The mechanical model of the tunnel side shown in the figure shows that there are obvious divisions on both sides of the tunnel, namely the crushed zone closest to the tunnel surface, the deeper plastic zone, and the deepest elastic zone. The crushed zone has the smallest stress, but the coal body is the most crushed and has the worst integrity. The stress in the plastic zone is large, the stress in the elastic-plastic interface zone is the largest, and the stress in the elastic zone gradually decreases to the original rock stress, with the best integrity.
[0035] Reference Figure 2 A method for preventing impact by coupling energy absorption grouting and internal fracturing pressure relief at the side of a coal roadway, comprising the following steps:
[0036] Step S1: Drilling grouting holes 1: Use a drilling rig to drill grouting holes 1 at both sides of the tunnel, so that the cracks 2 formed by drilling the grouting holes 1 are interconnected to form a primary pressure relief zone 13, release the residual stress in the crushing zone at both sides of the tunnel, and perform the primary pressure relief on the tunnel confining pressure.
[0037] Step S2: Grouting reinforcement of the broken area of the tunnel: After the drilling of the grouting hole 1 in the side part is completed and the coal body structure is restored to stability, grouting reinforcement is performed in the grouting hole 1 formed in step S1 to form a reinforcement area 5.
[0038] Step S3: Drilling hydraulic fracturing guide hole 6: When the grouting reinforcement of the shallow broken area of the tunnel wall is completed and the structure is restored to stability, the grouting hole 1 drilled in step S1 is further expanded and the hole depth is increased to form a hydraulic fracturing guide hole 6 that connects to the grouting hole 1.
[0039] Step S4: hydraulic fracturing: The hydraulic fracturing guide hole 6 formed in step S3 is used to hydraulically fracture the rock mass, thereby forming a pressure relief area 13 outside the reinforcement area 5 .
[0040] It can be seen that the anti-impact method of coupling energy-absorbing grouting and internal fracturing and pressure relief on the sides of the coal roadway provided in this embodiment fully considers the crushing conditions and stress distribution of the two sides of the roadway. While reinforcing the crushing areas on both sides, it releases the high stress in the elastic-plastic boundary area and transfers the peak stress value of the surrounding rock to the deep part of the coal roadway, thereby reducing the impact risk and reducing the difficulty and cost of support.
[0041] The following is combined with Figure 1-Figure 7 The present embodiment specifically describes a method for preventing impacts by coupling energy-absorbing grouting in the side of a coal roadway with internal fracturing and pressure relief.
[0042] Step S1: Drilling grouting holes 1: Use a drilling rig to drill grouting holes 1 at both sides of the tunnel, so that the cracks 2 formed by drilling the grouting holes 1 are interconnected to form a primary pressure relief zone 13, release the residual stress in the crushing zone at both sides of the tunnel, and perform the primary pressure relief on the tunnel confining pressure.
[0043] Reference Figure 3After the tunnel was excavated, the shallow coal bodies on both sides of the tunnel were extremely broken. Two rows of grouting holes 1 were drilled on both sides of the tunnel using a 7655-type pneumatic drill. Two upper and lower grouting holes 1 were drilled along the height direction of the tunnel, and one row was arranged every 3m along the depth direction of the tunnel. The diameter of the drilled grouting holes 1 was 42mm, and the hole depth was about twice the width of the tunnel. The upper row of grouting holes 1 was 550mm away from the top plate and tilted 30 degrees upward horizontally. The lower row of grouting holes 1 was 1700mm away from the bottom plate and tilted 5 degrees upward horizontally. The cracks 2 formed by drilling the grouting holes 1 were interconnected to form a certain range of primary pressure relief area 13, which released the residual stress in the broken areas on both sides of the tunnel and performed the initial pressure relief on the tunnel confining pressure.
[0044] Reference Figure 3 In the process of drilling the grouting hole 1, the two sides of the tunnel are supported by anchor rods 4 and anchor cables 3. The sides and top plate of the tunnel are supported by anchor rods 4 and anchor cables 3. The anchor rods 4 and anchor cables 3 are arranged in rows in the tunnel in an alternating manner along the length direction. The spacing between adjacent anchor rods 4 and anchor cables 3 in the length direction of the tunnel is 800mm, the spacing between anchor cables 3 in the same row in the width direction of the tunnel is 1600mm, and the spacing between anchor rods 4 in the same row in the width direction of the tunnel is 800mm.
[0045] Step S2: Grouting reinforcement of the broken area of the tunnel: After the drilling of the grouting hole 1 in the side part is completed and the coal body structure is restored to stability, grouting reinforcement is performed in the grouting hole 1 formed in step S1 to form a reinforcement area 5.
[0046] Reference Figure 3 and Figure 4 After the drilling of the grouting hole 1 in the sidewall is completed and the coal body structure is restored to stability, step S2 is performed. The grouting hole 1 drilled in step S1 is used as the grouting path, and a grouting pump is used to perform grouting reinforcement to form a reinforcement area 5. The grouting material is hot-melt asphalt or rubber, and the grouting pressure is not less than 5MPa, so that the asphalt or rubber grouting slurry can fully flow in the crack 2 and finally solidify. The coal body in the broken area is bonded to each other under the action of the grouting slurry to improve the strength and integrity of the coal body in the shallow broken area of the roadway, avoid excessive crushing of the pressure relief area 13, reduce the risk of coal body impact and the difficulty of roadway support, and at the same time, the filled asphalt or rubber grouting slurry itself has the function of deformation energy absorption, which provides a certain compensation space for coal body deformation.
[0047] Step S3: Drilling hydraulic fracturing guide hole 6: When the grouting reinforcement of the shallow broken area of the tunnel wall is completed and the structure is restored to stability, the grouting hole 1 drilled in step S1 is further expanded and the hole depth is increased to form a hydraulic fracturing guide hole 6 that connects to the grouting hole 1.
[0048] Reference Figure 3 and Figure 5When the grouting reinforcement of the shallow broken area of the roadway is completed and the structure is restored to stability, the grouting hole 1 drilled in step S1 is further expanded and the hole depth is increased to form a hydraulic fracturing guide hole 6. The diameter of the hydraulic fracturing guide hole 6 is expanded to 50 mm and the hole depth is expanded to 20 m. During the hole expansion process, the deep intact coal rock mass is disturbed, and the high stress in the elastic-plastic interface area is initially released.
[0049] Step S4: hydraulic fracturing: The hydraulic fracturing guide hole 6 formed in step S3 is used to hydraulically fracture the rock mass, thereby forming a pressure relief area 13 outside the reinforcement area 5 .
[0050] Reference Figure 3 and Figure 6 After the high stress in the coal body is initially released and the structure is restored to stability, directional hydraulic fracturing is performed, and the complete coal rock body is cut to form countless small cracks 2. The cracks 2 are interconnected, expanding the range of the pressure relief zone 13, and the high stress value in the elastic-plastic junction area in the coal rock body is further released, and the high stress area is further transferred to the deep part. When the coal body is deformed under load, the deep crushing area first provides compensation space for the coal body deformation, and the asphalt or rubber material filled in the crushing reinforcement area 5 further provides deformation energy absorption by relying on its own characteristics.
[0051] Reference Figure 7 During the hydraulic fracturing process, the water outlet is connected to the flow meter and pressure control system 10 with a hose 9 to facilitate the control of the water outlet pressure. The flow meter and pressure control system 10 are then connected to the pressure pump 11 and the data recording system 12 in turn. Since there are certain differences in the strength of the coal body in various places in the hole, the fracturing time is mainly determined by the data recording system 12, the flow meter and the pressure control system 10, combined with the construction experience of the on-site construction personnel. The cracks continue to extend forward, causing the coal seam to break and form countless small hydraulic fracturing induced cracks. The cracks between the hydraulic fracturing guide holes 6 are interconnected, and the high stress of the coal body in the elastic-plastic boundary area is fully released. The high stress area is transferred to a deeper part, which plays a role in pre-control of the impact mine pressure and reduces the impact risk of the tunnel.
[0052] Among them, a fracturing area 7 is arranged every 3300mm, and both sides of the fracturing area 7 are sealed by sealing. After the sealing is completed, the pressure pump 11 is used to pre-cut the seams, and the pressure value is not less than 30MPa to shorten the total fracturing time. After the pre-cutting is completed, the pressure value is reduced to 20MPa, so that the fracturing fluid can induce the extension of the fracture 2 at a gentle speed to prevent excessive local pressure from causing the coal rock mass to collapse.
[0053] The implementation principle of the anti-impact method of coupling energy-absorbing grouting and internal fracturing and pressure relief in the side of a coal roadway in an embodiment of the present application is as follows: after the roadway is excavated, the coal body in the broken area of the side of the roadway is reinforced by grouting to ensure the integrity and stability of the coal body in the broken area, and the pressure relief zone 13 completes the high stress transfer in the elastic-plastic boundary area of the roadway side before the surrounding rock is deformed. When impact mine pressure occurs, the energy-absorbing material filled in the reinforcement zone 5 and the pressure relief zone 13 provide a certain compensation space for the deformation of the roadway to cope with the potential risk of impact mine pressure.
[0054] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A method for preventing impact by coupling energy absorption grouting and internal fracturing and pressure relief in the side of a coal roadway, characterized in that: include: Step S1: drilling grouting holes (1): using a drilling machine to drill grouting holes (1) at both sides of the tunnel, so that the cracks (2) formed by drilling the grouting holes (1) are interconnected to form a primary pressure relief zone (13), release the residual stress in the crushing zone at both sides of the tunnel, and perform the primary pressure relief on the tunnel confining pressure; Step S1: using a drilling machine to drill grouting holes (1) at both sides of the tunnel, drilling two upper and lower grouting holes (1) along the tunnel height direction, arranging them in a row every 3m along the tunnel depth direction, the upper row of grouting holes (1) is inclined upward by 30 degrees, and the hole mouth position is 550mm away from the top plate, and the lower row of grouting holes (1) is inclined upward by 5 degrees, and the hole mouth position is 1700mm away from the bottom plate; Step S2: Grouting reinforcement of the broken area of the tunnel: After the drilling of the grouting holes (1) in the side part is completed and the coal body structure is restored to stability, grouting reinforcement is performed in the grouting holes (1) formed in step S1 to form a reinforcement area (5); Step S3: drilling a hydraulic fracturing pilot hole (6): after the grouting reinforcement of the shallow broken area of the tunnel side is completed and the structure is restored to stability, the grouting hole (1) drilled in step S1 is further enlarged and the hole depth is increased to form a hydraulic fracturing pilot hole (6) that connects to the grouting hole (1); Step S4: hydraulic fracturing: The hydraulic fracturing guide hole (6) formed in step S3 is used to hydraulically fracture the rock mass, and a pressure relief zone (13) is formed outside the reinforcement zone (5). Since there are certain differences in the strength of the coal mass at different locations in the hole, the fracturing time is mainly determined based on the data recording system (12), the flow meter and the pressure control system (10) and the construction experience of the on-site construction personnel. The cracks continue to extend forward, causing the coal seam to break and form countless fine hydraulic fracturing induced cracks. The cracks between the hydraulic fracturing guide holes (6) are interconnected, and the coal mass in the elastic-plastic boundary area is High stress is fully released, and the high stress area is transferred to a deeper part, which plays a role in pre-control of impact mine pressure and reduces the impact risk of the tunnel; wherein, a fracturing area (7) is arranged every 3300mm, and both sides of the fracturing area (7) are sealed by sealing. After the sealing is completed, a pressure pump (11) is used to pre-cut the seam, and the pressure value is not less than 30MPa to shorten the total fracturing time. After the pre-cutting is completed, the pressure value is reduced to 20MPa, so that the fracturing fluid induces the extension of the fissure (2) at a gentle speed to prevent excessive local pressure from causing the coal rock mass to collapse.
2. A method for preventing impact by coupling energy absorption grouting and internal fracturing and pressure relief in the side of a coal roadway according to claim 1, characterized in that: Step S1: using a drilling machine to drill grouting holes (1) at both sides of the tunnel. The diameter of the drilled grouting holes (1) is 42 mm and the depth is twice the width of the tunnel.
3. The method for preventing impact by coupling energy absorption grouting and internal fracturing and pressure relief in the side of a coal roadway according to claim 1 is characterized in that: The two sides of the tunnel are supported by anchor rods (4) and anchor cables (3). The sides and roof of the tunnel are supported by anchor rods (4) and anchor cables (3). The anchor rods (4) and anchor cables (3) are arranged in rows in a staggered manner along the length direction of the tunnel. The spacing between adjacent anchor rods (4) and anchor cables (3) in the length direction of the tunnel is 800 mm. The spacing between anchor cables (3) in the same row in the width direction of the tunnel is 1600 mm. The spacing between anchor rods (4) in the same row in the width direction of the tunnel is 800 mm.
4. The method for preventing impact by coupling energy absorption grouting and internal fracturing and pressure relief in the side of a coal roadway according to claim 1 is characterized in that: In step S2, grouting reinforcement is performed in the grouting hole (1), the grouting hole (1) drilled in step S1 is used as the grouting path, and hot melt asphalt or rubber slurry is pumped into the grouting hole (1), and the grouting pressure is not less than 5MPa.
5. The method for preventing impact by coupling energy absorption grouting and internal fracturing and pressure relief in the side of a coal roadway according to claim 1 is characterized in that: The hydraulic fracturing guide hole (6) in step S3 is based on the grouting hole (1) drilled in step S1, and the drilling hole is further enlarged so that the new hydraulic fracturing guide hole (6) has a depth of 20m and a hole diameter of 50mm.
6. The method for preventing impact by coupling energy absorption grouting and internal fracturing and pressure relief in the side of a coal roadway according to claim 1 is characterized in that: The water fracturing pressure during the water fracturing in step S4 is not less than 20 MPa.
