By analyzing and updating the acquisition frequency of construction projects, combining AI and BIM technology, the traceability problem caused by insufficient image acquisition frequency during construction is solved, and the reliability and efficiency of traceability are improved.

CN118555374BInactive Publication Date: 2024-11-22CHINA CONSTRUCTION INDUSTRIAL & ENERGY ENGINEERING GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411018457.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the construction process, since the frequency of image acquisition of Hawkeye platform is manually determined, the faster construction projects fail to enter data in time, resulting in partial missing during traceability, which may lead to failure in traceability.

Method used

By analyzing the abnormal event types and acquisition frequency, updating the acquisition frequency, and combining AI algorithms with BIM models to achieve the formation of project twin space, constructing panoramic images and virtual BIM models to determine the optimal acquisition frequency to reduce the probability of traceability anomalies.

Benefits of technology

The personalized acquisition settings of different project objects at different stages are realized, which reduces the probability of traceability abnormalities in the entire process, improves the rationality of image acquisition frequency, and reduces the errors and unified quantification irrationality caused by manual judgment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118555374B_ABST
    Figure CN118555374B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of digital construction, and specifically to a digital construction analysis system and method using BIM technology, including a construction project data acquisition module, a data classification module, an acquisition frequency update module, a data storage module and a real-time response module; the construction project data acquisition module is used to acquire a construction project that uses BIM technology to implement full-process monitoring; the data classification module is used to determine the project object with abnormal markings and classify the abnormal events recorded by the project object; the acquisition frequency update module is used to update the panoramic image acquisition frequency set for various project objects on an Hawkeye platform; the data storage module is used to associate the acquisition frequency with the corresponding project object and the construction project where the project object is located and record and store it in a first database and a second database; the real-time response module is used to acquire real-time project objects and estimate the optimal acquisition frequency required by the real-time project objects based on the Hawkeye platform based on the first database and the second database.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of digital construction technology, and in particular to a digital construction analysis system and method using BIM technology. Background Art

[0002] With the advent of the digital age, people have higher and higher requirements for the traditional construction industry: how to realize construction projects more efficiently, how to control the cost of construction projects more accurately, and how to manage construction projects more effectively. Therefore, BIM, as a digital tool in the construction industry, has gradually been used by the majority of construction practitioners; BIM uses digital means to simulate, analyze and manage construction projects in an all-round way, thereby improving the efficiency and quality of construction projects. BIM is not just a simple technology, it is also an innovation of ideas and methods, and a representative application of digital tools in the construction industry; based on digital construction analysis, BIM is now combined with the Hawkeye platform to achieve 360-degree, all-round synchronous comparison in the construction scene, and establish a digital archive for the construction project that can be traced throughout the entire process;

[0003] Based on this, users can effectively trace the history and visualize the construction status at different stages; however, due to the different construction projects in the entire construction process The cycle, proportion and other factors are different, the frequency of image acquisition and input of the Eagle Eye platform is often determined manually or set at a unified frequency. As a result, when tracing back after the construction is completed, some projects with faster construction have not yet entered data in time, resulting in partial missing data, which may lead to the possibility of tracing failure. Summary of the invention

[0004] The purpose of the present invention is to provide a digital construction analysis system and method using BIM technology to solve the problems raised in the above background technology.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a digital construction analysis method using BIM technology, comprising the following analysis steps:

[0006] Step S100: Acquire the construction projects for which the BIM technology is applied to implement the whole process monitoring, extract the projects with abnormal marks after the completion and acceptance of the construction projects and whose abnormal time points cannot be determined based on the Hawkeye platform as the target construction projects, and the remaining projects as the control construction projects; and determine the project objects with abnormal marks, traverse all the target construction projects and classify the abnormal events recorded by the project objects based on the different types of project objects;

[0007] Step S200: analyzing whether the abnormal event types recorded by the same type of project objects are unique, and updating the panoramic image acquisition frequency set for each type of project objects on the Hawkeye platform based on the analysis results;

[0008] Step S300: associate the updated collection frequency with the corresponding project object and the construction project where the project object is located and store it in the first database; and associate the collection frequency of each project object in the construction project with the corresponding construction project record and store it in the second database;

[0009] Step S400: Acquire real-time project objects for construction projects that apply BIM technology in real time, and estimate the optimal acquisition frequency required by the real-time project objects based on the Hawkeye platform based on the first database and the second database.

[0010] Furthermore, step S100 includes the following specific processes:

[0011] The Hawkeye platform records 360° panoramic images of the construction site, transmits pixel data to the server synchronously, and uses the AI ​​algorithm to convert point cloud data into reference according to the planned shooting points and paths, and then matches the BIM model coordinates of the construction project object to achieve the formation of the project twin space, and construct a panoramic image corresponding to the real site and compare it with the virtual BIM model; based on the Hawkeye platform, the real-life display of the construction project can be realized in any time and space;

[0012] When there are abnormal marks, managers need to trace the real-life images at different image entry times based on the Eagle Eye platform; failure to determine the abnormal time point means that the traceability based on the abnormal marks does not locate the image entry time corresponding to the abnormal cause in the real-life images at each stage of the existing records;

[0013] This indicates that there are problems with the panoramic image acquisition frequency set when applying the Hawkeye platform in such construction projects, and it fails to fully cover the overall stages that reflect the progress differences in the construction progress;

[0014] Project object refers to the name of the project that includes different construction purposes in the construction project; different project objects indicate different types;

[0015] An abnormal event refers to an event in which the total construction time and the number of panoramic image acquisitions of the project object where the abnormal mark is located are recorded on the Hawkeye platform in the corresponding target construction project;

[0016] Each project object contains at least one panoramic image acquisition uploaded to the Eagle Eye platform; the number of panoramic image acquisitions recorded on the Eagle Eye platform for the project object where the abnormal mark is located is greater than or equal to two.

[0017] There may be multiple types of project objects in a target construction project, and one type of project object may also be recorded in different target construction projects; therefore, preliminary classification can be performed to simply and quickly determine data records related to project objects with abnormal markings.

[0018] Furthermore, step S200 includes the following specific steps:

[0019] Step S210: The abnormal event type refers to the target construction project type corresponding to the abnormal event. Different types of target construction projects have different recorded project information.

[0020] When the type of abnormal event recorded by the same type of project object is unique, mark the project object as the first project object; obtain the number of panoramic image acquisitions C and the total construction time T in the abnormal event recorded by the first project object, calculate the image acquisition frequency P1 corresponding to the abnormal event of the first project object, P1=T / C; extract the minimum value P of the image acquisition frequency recorded by the first project object 1min ;

[0021] Step S220: Obtain the project objects in the target construction project where the first project object is located, which have abnormal marks and can be determined as the abnormal time point based on the Hawkeye platform, as reliable project objects, and extract the maximum value P of the image acquisition frequency recorded by all reliable project objects 2max When P 2max <P 1min When P 2max As the first project object, the updated panoramic image acquisition frequency is set on the Hawkeye platform; when P 2max ≥P 1min , extract the reference construction project of the same type as the target construction project where the first project object is located as the first reference construction project, obtain the image acquisition frequency set P0 of the first reference construction project recording the same first project object, and the image acquisition frequency set P of the first project object in the target construction project, when P0∩P=∅ and exists, the minimum value in the set P0 is less than the minimum value in the set P, then obtain the minimum value P in the image acquisition frequency set P0 0min As the first project object, the updated panoramic image acquisition frequency is set on the Hawkeye platform; when P0∩P≠∅ or P0∩P=∅ and there is no minimum value in the set P0 that is less than the minimum value in the set P, an early warning signal is transmitted to the Hawkeye platform to remind the management personnel that the frequency setting problem is abnormal;

[0022] Step S230: When the type of abnormal event recorded by the same type of project object is not unique, mark the project object as the second project object; extract the number of abnormal event records D of each type of target construction project where the second project object is located within the monitoring period, and calculate the corresponding influence coefficient k, k=(∑D) / (∑p), ∑D represents the sum of the number of abnormal event records of the second project object within n monitoring periods, and ∑p represents the sum of the image acquisition frequency of the second project object within n monitoring periods;

[0023] Step S240: Based on the influence coefficient k of each type of target construction project, analyze the abnormal discrete index of the second project object, set the discrete index threshold, compare the abnormal discrete index with the discrete index threshold, and output the updated panoramic image acquisition frequency of the second project object set on the Hawkeye platform.

[0024] Further, step S240 includes the following specific steps:

[0025] Step S241: Obtain the average value k0 of the impact coefficients of all target construction projects of the second project object and the number of target construction project categories M included, using the formula:

[0026] V={[∑(k-k0) 2 ] / M} 1 / 2 ;

[0027] Calculate the abnormal dispersion index V of the second project object, and set the abnormal dispersion index threshold V0; the smaller V is, the more similar the influence coefficients of the second project object on the records of different types of target construction projects are. When V≤V0, go to step S220, and replace the analysis content of step S220 with the first project object as the implementation subject with the second project object as the main body for analysis;

[0028] Step S242: when V>V0, the engineering information of each target construction project recorded in the second project object is obtained, and the engineering information refers to all information input before the construction project is implemented based on the BIM model; the engineering information is classified according to engineering attributes, and each type of engineering information is vectorized, and a modulus operation is performed on all the converted vectors of the same type of engineering information, and the average value is taken as the input amount of the corresponding type of engineering information;

[0029] Step S243: Based on the input amount u of various types of engineering information and the influence coefficient k of the corresponding second project object in the target construction project record, a data pair (u, k) is formed, and a functional relationship K is constructed, K=a1*u1+a2*u2+....+a m *u m +ε; Substitute the data pairs of all target construction projects recorded in the second project object to obtain the corresponding reference coefficients a1, a2, ..., a m and error term ε; u1, u2, ..., u m It represents the input quantity of engineering information of categories 1, 2, ..., and m;

[0030] Step S244: Obtain the influence coefficient of the second project object and the image acquisition frequency corresponding to the influence coefficient, set the abnormal event record count threshold D0, adjust the image acquisition frequency until the estimated abnormal event record count based on the influence coefficient is less than or equal to the abnormal event record count threshold D0, and use the adjusted image acquisition frequency as the second project object to set the updated panoramic image acquisition frequency on the Hawkeye platform.

[0031] Furthermore, step S400 includes the following specific steps:

[0032] Step S410: obtaining the engineering information of the construction project where the real-time project object is located, matching the first database and the second database to see whether there are data records identical to the real-time project object and the engineering information, and if there are data records, extracting the updated panoramic image acquisition frequency of the corresponding recorded project object as the optimal acquisition frequency of the real-time project object;

[0033] Step S420: When there is no data record, the engineering information of the construction project where the real-time project object is located is vector-converted and modulo-taken, and the mean value is input into the function relationship K to obtain the corresponding estimated impact coefficient, obtain the real-time image acquisition frequency set by the real-time project object input Hawkeye platform, and calculate the estimated number of real-time abnormal events;

[0034] Step S430: When the estimated number of real-time abnormal events is less than or equal to the threshold value D0 of the number of abnormal event records, the real-time image acquisition frequency is retained as the optimal acquisition frequency of the real-time project object; when the estimated number of real-time abnormal events is greater than the threshold value D0 of the number of abnormal event records, the real-time image acquisition frequency set by the input Hawkeye platform is adjusted until the image acquisition frequency when the estimated number of real-time abnormal events is less than or equal to the threshold value D0 of the number of abnormal event records is calculated as the optimal acquisition frequency of the real-time project object. The purpose of analyzing different image acquisition frequencies is to maximize the traceability effectiveness based on panoramic images when abnormalities occur, and to reduce the probability that abnormal markers cannot be effectively and timely located.

[0035] A digital construction analysis system using BIM technology, comprising a construction engineering data acquisition module, a data classification module, a collection frequency update module, a data storage module and a real-time response module;

[0036] The construction project data acquisition module is used to acquire construction projects that use BIM technology to implement full-process monitoring. The projects that have abnormal marks after the completion and acceptance of the construction projects and whose abnormal time points cannot be determined based on the Hawkeye platform are extracted as target construction projects, and the remaining projects are taken as control construction projects.

[0037] The data classification module is used to determine the project objects marked as abnormal, traverse all target construction projects and classify the abnormal events recorded by the project objects based on the different types of project objects;

[0038] The acquisition frequency update module is used to update the panoramic image acquisition frequency set by various project objects on the Hawkeye platform;

[0039] The data storage module is used to associate the collection frequency with the corresponding project object and the construction project where the project object is located and store it in the first database and the second database;

[0040] The real-time response module is used to obtain real-time project objects of construction projects implemented by real-time application of BIM technology, and estimate the optimal collection frequency required by the real-time project objects based on the Hawkeye platform based on the first database and the second database.

[0041] Further, the acquisition frequency update module includes a type category judgment unit, a first project object analysis unit and a second project object analysis unit;

[0042] The type category judgment unit is used to identify whether the abnormal event types recorded by the same type of project objects are unique;

[0043] The first project object analysis unit is used to mark the project object as the first project object when the abnormal event type recorded in the same type of project object is unique; and analyze the image acquisition frequency of the first project object to determine the updated panoramic image acquisition frequency;

[0044] The second project object analysis unit is used to analyze and record the engineering information of different target construction projects to determine an updated panoramic image acquisition frequency.

[0045] The second project object analysis unit includes an abnormal dispersion index calculation unit, a threshold analysis unit, a functional relationship construction unit and a frequency adjustment update unit;

[0046] The abnormal dispersion index calculation unit is used to obtain the average value of the influence coefficients of all target construction projects of the second project object and the number of target construction project categories included, and calculate the abnormal dispersion index;

[0047] The threshold analysis unit is used to set a discrete index threshold based on the abnormal discrete index and analyze the size relationship;

[0048] The functional relationship building unit is used to build a functional relationship based on the input quantity and influence coefficient after the engineering information is converted;

[0049] The frequency adjustment and update unit is used to obtain the influence coefficient of the second project object and the image acquisition frequency corresponding to the influence coefficient, set the threshold of the number of abnormal event records, and adjust the image acquisition frequency until the estimated number of abnormal event records calculated based on the influence coefficient is less than or equal to the threshold of the number of abnormal event records. The adjusted image acquisition frequency is used as the second project object to set the updated panoramic image acquisition frequency on the Hawkeye platform.

[0050] Further, the real-time response module includes a real-time data matching unit, a real-time data substitution unit and an optimal acquisition frequency output unit;

[0051] The real-time data matching unit is used to obtain the engineering information of the construction project where the real-time project object is located, and to match whether there are data records identical to the real-time project object and the engineering information in the first database, the second database and the reference construction project;

[0052] The real-time data substitution unit is used to substitute the engineering information after vector transformation and averaging into the functional relationship when the matching is unsuccessful;

[0053] The optimal acquisition frequency output unit is used to determine and adjust the image acquisition frequency to the optimal acquisition frequency based on the function output result combined with the abnormal event record number threshold.

[0054] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention classifies and analyzes various project objects in the construction project, determines the project objects that may cause traceability anomalies due to image acquisition frequency when the Eagle Eye platform is used for traceability, updates the image acquisition frequency of the project objects, and specifically determines the reasonable acquisition frequency of each type of project objects based on data analysis; thereby realizing personalized acquisition settings for different project objects at different stages in the construction project, so as to reduce the probability of traceability anomalies in the entire process; at the same time, the acquisition frequency analysis of real-time project objects or newly added project objects based on the functional relationship model improves the rationality of image acquisition frequencies in project objects in different construction projects, and reduces the errors caused by manual judgment and the irrationality of unified quantification. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0056] Figure 1 It is a structural schematic diagram of a digital construction analysis system using BIM technology according to the present invention. DETAILED DESCRIPTION

[0057] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0058] See also Figure 1,The present invention provides a technical solution: a digital construction analysis system using BIM technology, including a construction engineering data acquisition module, a data classification module, a collection frequency update module, a data storage module and a real-time response module;

[0059] The construction project data acquisition module is used to acquire construction projects that use BIM technology to implement full-process monitoring. The projects that have abnormal marks after the completion and acceptance of the construction projects and whose abnormal time points cannot be determined based on the Hawkeye platform are extracted as target construction projects, and the remaining projects are taken as control construction projects.

[0060] The data classification module is used to determine the project objects marked as abnormal, traverse all target construction projects and classify the abnormal events recorded by the project objects based on the different types of project objects;

[0061] The acquisition frequency update module is used to update the panoramic image acquisition frequency set by various project objects on the Hawkeye platform;

[0062] The data storage module is used to associate the collection frequency with the corresponding project object and the construction project where the project object is located and store it in the first database and the second database;

[0063] The real-time response module is used to obtain real-time project objects of construction projects implemented by real-time application of BIM technology, and estimate the optimal collection frequency required by the real-time project objects based on the Hawkeye platform based on the first database and the second database.

[0064] The acquisition frequency update module includes a type category judgment unit, a first project object analysis unit and a second project object analysis unit;

[0065] The type category judgment unit is used to identify whether the abnormal event types recorded by the same type of project objects are unique;

[0066] The first project object analysis unit is used to mark the project object as the first project object when the abnormal event type recorded in the same type of project object is unique; and analyze the image acquisition frequency of the first project object to determine the updated panoramic image acquisition frequency;

[0067] The second project object analysis unit is used to analyze and record the engineering information of different target construction projects to determine an updated panoramic image acquisition frequency.

[0068] The second project object analysis unit includes an abnormal dispersion index calculation unit, a threshold analysis unit, a functional relationship construction unit and a frequency adjustment update unit;

[0069] The abnormal dispersion index calculation unit is used to obtain the average value of the influence coefficients of all target construction projects of the second project object and the number of target construction project categories included, and calculate the abnormal dispersion index;

[0070] The threshold analysis unit is used to set a discrete index threshold based on the abnormal discrete index and analyze the size relationship;

[0071] The functional relationship building unit is used to build a functional relationship based on the input quantity and influence coefficient after the engineering information is converted;

[0072] The frequency adjustment and update unit is used to obtain the influence coefficient of the second project object and the image acquisition frequency corresponding to the influence coefficient, set the threshold of the number of abnormal event records, and adjust the image acquisition frequency until the estimated number of abnormal event records calculated based on the influence coefficient is less than or equal to the threshold of the number of abnormal event records. The adjusted image acquisition frequency is used as the second project object to set the updated panoramic image acquisition frequency on the Hawkeye platform.

[0073] The real-time response module includes a real-time data matching unit, a real-time data substitution unit and an optimal acquisition frequency output unit;

[0074] The real-time data matching unit is used to obtain the engineering information of the construction project where the real-time project object is located, and to match whether there are data records identical to the real-time project object and the engineering information in the first database, the second database and the reference construction project;

[0075] The real-time data substitution unit is used to substitute the engineering information after vector transformation and averaging into the functional relationship when the matching is unsuccessful;

[0076] The optimal acquisition frequency output unit is used to determine and adjust the image acquisition frequency to the optimal acquisition frequency based on the function output result combined with the abnormal event record number threshold.

[0077] A digital construction analysis method using BIM technology includes the following analysis steps:

[0078] Step S100: Acquire the construction projects for which the BIM technology is applied to implement the whole process monitoring, extract the projects with abnormal marks after the completion and acceptance of the construction projects and whose abnormal time points cannot be determined based on the Hawkeye platform as the target construction projects, and the remaining projects as the control construction projects; and determine the project objects with abnormal marks, traverse all the target construction projects and classify the abnormal events recorded by the project objects based on the different types of project objects;

[0079] Step S200: analyzing whether the abnormal event types recorded by the same type of project objects are unique, and updating the panoramic image acquisition frequency set for each type of project objects on the Hawkeye platform based on the analysis results;

[0080] Step S300: associate the updated collection frequency with the corresponding project object and the construction project where the project object is located and store it in the first database; and associate the collection frequency of each project object in the construction project with the corresponding construction project record and store it in the second database;

[0081] Step S400: Acquire real-time project objects for construction projects that apply BIM technology in real time, and estimate the optimal acquisition frequency required by the real-time project objects based on the Hawkeye platform based on the first database and the second database.

[0082] Step S100 includes the following specific processes:

[0083] The Hawkeye platform records 360° panoramic images of the construction site, transmits pixel data to the server synchronously, and uses the AI ​​algorithm to convert point cloud data into reference according to the planned shooting points and paths, and then matches the BIM model coordinates of the construction project object to achieve the formation of the project twin space, and construct a panoramic image corresponding to the real site and compare it with the virtual BIM model; based on the Hawkeye platform, the real-life display of the construction project can be realized in any time and space;

[0084] When there are abnormal marks, managers need to trace the real-life images at different image entry times based on the Eagle Eye platform; failure to determine the abnormal time point means that the traceability based on the abnormal marks does not locate the image entry time corresponding to the abnormal cause in the real-life images at each stage of the existing records;

[0085] This indicates that there are problems with the panoramic image acquisition frequency set when applying the Hawkeye platform in such construction projects, and it fails to fully cover the overall stages that reflect the progress differences in the construction progress;

[0086] Project object refers to the name of the project that includes different construction purposes in the construction project; different project objects indicate different types;

[0087] An abnormal event refers to an event in which the total construction time and the number of panoramic image acquisitions of the project object where the abnormal mark is located are recorded on the Hawkeye platform in the corresponding target construction project;

[0088] Each project object contains at least one panoramic image acquisition uploaded to the Eagle Eye platform; the number of panoramic image acquisitions recorded on the Eagle Eye platform for the project object where the abnormal mark is located is greater than or equal to two.

[0089] There may be multiple types of project objects in a target construction project, and one type of project object may also be recorded in different target construction projects; therefore, preliminary classification can be performed to simply and quickly determine data records related to project objects with abnormal markings.

[0090] Step S200 includes the following specific steps:

[0091] Step S210: The abnormal event type refers to the target construction project type corresponding to the abnormal event. Different types of target construction projects have different recorded project information.

[0092] When the type of abnormal event recorded by the same type of project object is unique, mark the project object as the first project object; obtain the number of panoramic image acquisitions C and the total construction time T in the abnormal event recorded by the first project object, calculate the image acquisition frequency P1 corresponding to the abnormal event of the first project object, P1=T / C; extract the minimum value P of the image acquisition frequency recorded by the first project object 1min ;

[0093] Step S220: Obtain the project objects in the target construction project where the first project object is located, which have abnormal marks and can be determined as the abnormal time point based on the Hawkeye platform, as reliable project objects, and extract the maximum value P of the image acquisition frequency recorded by all reliable project objects 2max When P 2max <P 1min When P 2max As the first project object, the updated panoramic image acquisition frequency is set on the Hawkeye platform; when P 2max ≥P 1min , extract the reference construction project of the same type as the target construction project where the first project object is located as the first reference construction project, obtain the image acquisition frequency set P0 of the first reference construction project recording the same first project object, and the image acquisition frequency set P of the first project object in the target construction project, when P0∩P=∅ and exists, the minimum value in the set P0 is less than the minimum value in the set P, then obtain the minimum value P in the image acquisition frequency set P0 0min As the first project object, the updated panoramic image acquisition frequency is set on the Hawkeye platform; when P0∩P≠∅ or P0∩P=∅ and there is no minimum value in the set P0 that is less than the minimum value in the set P, an early warning signal is transmitted to the Hawkeye platform to remind the management personnel that the frequency setting problem is abnormal;

[0094] P 2max <P 1min This indicates that the generation of abnormal marks may be caused by too large an interval frequency; the collection frequency of project object records without abnormal marks in the same construction project can be used as the updated frequency for verification; 2max ≥P 1min This means that it is no longer possible to simply extract the data on the frequency of collection of records for the same construction project, and further analysis of other data associated with the project object is required;

[0095] Step S230: When the type of abnormal event recorded by the same type of project object is not unique, mark the project object as the second project object; extract the number of abnormal event records D of each type of target construction project where the second project object is located within the monitoring period, and calculate the corresponding influence coefficient k, k=(∑D) / (∑p), ∑D represents the sum of the number of abnormal event records of the second project object within n monitoring periods, and ∑p represents the sum of the image acquisition frequency of the second project object within n monitoring periods;

[0096] Step S240: Based on the influence coefficient k of each type of target construction project, analyze the abnormal discrete index of the second project object, set the discrete index threshold, compare the abnormal discrete index with the discrete index threshold, and output the updated panoramic image acquisition frequency of the second project object set on the Hawkeye platform.

[0097] Step S240 includes the following specific steps:

[0098] Step S241: Obtain the average value k0 of the impact coefficients of all target construction projects of the second project object and the number of target construction project categories M included, using the formula:

[0099] V={[∑(k-k0) 2 ] / M} 1 / 2 ;

[0100] Calculate the abnormal dispersion index V of the second project object, and set the abnormal dispersion index threshold V0; the smaller V is, the more similar the influence coefficients of the second project object on the records of different types of target construction projects are. When V≤V0, go to step S220, and replace the analysis content of step S220 with the first project object as the implementation subject with the second project object as the main body for analysis;

[0101] Step S242: when V>V0, obtain the engineering information of each target construction project recorded by the second project object, where the engineering information refers to all information input before the construction project is implemented based on the BIM model; classify the engineering information according to engineering attributes, perform vector transformation on each type of engineering information, perform modular operation on all transformed vectors of the same type of engineering information and take the average value as the input amount of the corresponding type of engineering information; when the classified engineering information is quantifiable data, normalize the data and take the average value, and the engineering attributes can be divided into mechanical attributes, data measurement attributes, material attributes, etc.;

[0102] Step S243: Based on the input amount u of various types of engineering information and the influence coefficient k of the corresponding second project object in the target construction project record, a data pair (u, k) is formed, and a functional relationship K is constructed, K=a1*u1+a2*u2+....+a m *u m+ε; Substitute the data pairs of all target construction projects recorded in the second project object to obtain the corresponding reference coefficients a1, a2, ..., a m and error term ε; u1, u2, ..., u m It represents the input quantity of engineering information of categories 1, 2, ..., and m;

[0103] For the classification of engineering information in different target construction projects, the intersection of all target construction projects is taken;

[0104] Step S244: Obtain the influence coefficient of the second project object and the image acquisition frequency corresponding to the influence coefficient, set the abnormal event record count threshold D0, adjust the image acquisition frequency until the estimated abnormal event record count based on the influence coefficient is less than or equal to the abnormal event record count threshold D0, and use the adjusted image acquisition frequency as the second project object to set the updated panoramic image acquisition frequency on the Hawkeye platform.

[0105] As shown in the examples:

[0106] The influence coefficient of the second project object is 0.6, the image acquisition frequency is once every 5 days, and the number of abnormal event records is 3 times; the abnormal event record number threshold D0 is set to 1, and the calculated update image acquisition frequency is 1.6.

[0107] Step S400 includes the following specific steps:

[0108] Step S410: obtaining the engineering information of the construction project where the real-time project object is located, matching the first database and the second database to see whether there are data records identical to the real-time project object and the engineering information, and if there are data records, extracting the updated panoramic image acquisition frequency of the corresponding recorded project object as the optimal acquisition frequency of the real-time project object;

[0109] Step S420: When there is no data record, the engineering information of the construction project where the real-time project object is located is vector-converted and modulo-taken, and the mean value is input into the function relationship K to obtain the corresponding estimated impact coefficient, obtain the real-time image acquisition frequency set by the real-time project object input Hawkeye platform, and calculate the estimated number of real-time abnormal events;

[0110] Step S430: When the estimated number of real-time abnormal events is less than or equal to the threshold value D0 of the number of abnormal event records, the real-time image acquisition frequency is retained as the optimal acquisition frequency of the real-time project object; when the estimated number of real-time abnormal events is greater than the threshold value D0 of the number of abnormal event records, the real-time image acquisition frequency set by the input Hawkeye platform is adjusted until the image acquisition frequency when the estimated number of real-time abnormal events is less than or equal to the threshold value D0 of the number of abnormal event records is calculated as the optimal acquisition frequency of the real-time project object. The purpose of analyzing different image acquisition frequencies is to maximize the traceability effectiveness based on panoramic images when abnormalities occur, and to reduce the probability that abnormal markers cannot be effectively and timely located.

[0111] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0112] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A digital construction analysis method using BIM technology, It is characterized in that The analysis steps include: Step S100: Acquire the construction projects for which the BIM technology is used to implement full-process monitoring, extract the projects with abnormal marks after the completion and acceptance of the construction projects and for which the abnormal time point cannot be determined based on the Hawkeye platform as the target construction projects, and the remaining projects as the control construction projects; And determine the project objects marked with abnormalities, traverse all target construction projects and classify the abnormal events recorded by the project objects based on the different types of project objects; The step S100 includes the following specific processes: The Eagle Eye platform refers to recording a 360° panoramic image of the construction site, synchronously transmitting the pixel data to the server, and according to the planned shooting points and paths, combining the AI ​​algorithm with the point cloud data as a conversion reference, and then matching the BIM model coordinates of the construction project record project objects to realize the formation of the project twin space, and construct a panoramic image corresponding to the real site and a comparison of the virtual BIM model; based on the Eagle Eye platform, the real scene display of the construction project in any time and space can be realized; When there is an abnormal mark, the management personnel need to trace the real scene images at different image entry times based on the Eagle Eye platform; the failure to determine the abnormal time point refers to the image entry time corresponding to the abnormal cause when the real scene images at each stage of the existing records cannot locate the abnormal cause based on the traceability of the abnormal mark; The project object refers to the name of the project with different construction purposes in the construction project; different project objects indicate different types; The abnormal event refers to the event in which the total construction time and the number of panoramic image acquisitions of the project object where the abnormal mark is located are recorded on the Hawkeye platform in the corresponding target construction project; Each project object includes at least one panoramic image acquisition and upload to the Hawkeye platform; The number of panoramic image acquisitions recorded by the Hawkeye platform for the project object where the abnormal mark is located is greater than or equal to two; Step S200: analyzing whether the abnormal event types recorded by the same type of project objects are unique, and updating the panoramic image acquisition frequency set for each type of project objects on the Hawkeye platform based on the analysis results; The step S200 includes the following specific steps: Step S210: The abnormal event type refers to the target construction project type corresponding to the abnormal event. Different types of target construction projects have different recorded project information. When the type of abnormal event recorded by the same type of project object is unique, mark the project object as the first project object; obtain the number of panoramic image acquisitions C and the total construction time T in the abnormal event recorded by the first project object, and calculate the image acquisition frequency P corresponding to the abnormal event of the first project object 1 , P 1 =T / C; extract the minimum value P of the image acquisition frequency recorded by the first project object 1min ; Step S220: Obtain the project objects in the target construction project where the first project object is located, which have abnormal marks and can be determined as the abnormal time point based on the Hawkeye platform, as reliable project objects, and extract the maximum value P of the image acquisition frequency recorded by all reliable project objects 2max When P 2max <P 1min When P 2max As the first project object, the updated panoramic image acquisition frequency is set on the Hawkeye platform; when P 2max ≥P 1min , extract the reference construction project of the same type as the target construction project where the first project object is located as the first reference construction project, and obtain the image acquisition frequency set P of the first reference construction project recording the same first project object. 0 , and the first project object record image acquisition frequency set P in the target construction project, when P 0 ∩P = ∅ and there exists a set P 0 If the minimum value in is less than the minimum value in set P, then the image acquisition frequency set P is obtained. 0 The minimum value P in 0min As the first project object, the updated panoramic image acquisition frequency is set on the Hawkeye platform; when P 0 ∩P≠∅orP 0 ∩P=∅ and there is no set P 0 When the minimum value in the set is less than the minimum value in the set P, an early warning signal is transmitted to the Hawkeye platform to remind the management personnel that there is an abnormality in non-frequency setting issues; Step S230: When the type of abnormal event recorded by the same type of project object is not unique, mark the project object as a second project object; extract the number of abnormal event records D of each type of target construction project where the second project object is located within the monitoring period, and calculate the corresponding influence coefficient k, k=(∑D) / (∑p), ∑D represents the sum of the number of abnormal event records of the second project object within n monitoring periods, and ∑p represents the sum of the image acquisition frequency of the second project object within n monitoring periods; Step S240: Based on the influence coefficient k of each type of target construction project, analyze the abnormal discrete index of the second project object, set the discrete index threshold, compare the abnormal discrete index with the discrete index threshold, and output the updated panoramic image acquisition frequency of the second project object on the Hawkeye platform; The step S240 includes the following specific steps: Step S241: Obtain the average value k of the influence coefficients of all types of target construction projects recorded in the second project object 0 and the number of target construction project categories M included, using the formula: V={[∑(kk 0 ) 2 ] / M} 1 / 2 ; Calculate the abnormal dispersion index V of the second project object and set the abnormal dispersion index threshold V 0 ; When V≤V 0 When the first project object is the subject of the analysis, the process goes to step S220, and the analysis content in step S220 is replaced by the second project object as the subject of the analysis; Step S242: When V>V 0 When the second project object records the engineering information of each target construction project, the engineering information refers to all information input before the construction project is implemented based on the BIM model; the engineering information is classified according to engineering attributes, each type of engineering information is vectorized, and a module operation is performed on all the converted vectors of the same type of engineering information, and the average value is taken as the input amount of the corresponding type of engineering information; Step S243: Based on the input amount u of various types of engineering information and the influence coefficient k of the corresponding second project object in the target construction engineering record, a data pair (u, k) is formed, and a functional relationship K is constructed, K=a 1 *u 1 +a 2 *u 2 +....+a m *u m +ε; Substitute the data pairs of all target construction projects recorded in the second project object to obtain the corresponding reference coefficient a 1 、a 2 ,......,a m and error term ε;u 1 、u 2 ,...,u m It represents the input quantity of engineering information of categories 1, 2, ..., and m; Step S244: Obtain the influence coefficient of the second project object and the image acquisition frequency corresponding to the influence coefficient, and set the abnormal event record number threshold D 0 , adjust the image acquisition frequency until the estimated number of abnormal event records calculated based on the influence coefficient is less than or equal to the abnormal event record number threshold D 0 When the image acquisition frequency is adjusted, the updated panoramic image acquisition frequency is set as the second item object on the Hawkeye platform; Step S300: associate the updated collection frequency with the corresponding project object and the construction project where the project object is located and store them in the first database; and associating and recording each project object in the construction project with the collection frequency of the corresponding construction project record and storing them in the second database; Step S400: obtaining a real-time project object for the construction project implemented by applying BIM technology in real time, and estimating the optimal acquisition frequency required by the real-time project object based on the Hawkeye platform based on the first database and the second database; The step S400 includes the following specific steps: Step S410: obtaining the engineering information of the construction project where the real-time project object is located, matching the first database and the second database to see whether there are data records identical to the real-time project object and the engineering information, and if there are data records, extracting the updated panoramic image acquisition frequency of the corresponding recorded project object as the optimal acquisition frequency of the real-time project object; Step S420: When there is no data record, the engineering information of the construction project where the real-time project object is located is vector-converted and modulo-taken, and the mean value is input into the function relationship K to obtain the corresponding estimated impact coefficient, obtain the real-time image acquisition frequency set by the real-time project object input Hawkeye platform, and calculate the estimated number of real-time abnormal events; Step S430: When the estimated number of real-time abnormal events is less than or equal to the abnormal event record number threshold D 0 When, the real-time image acquisition frequency is retained as the optimal acquisition frequency of the real-time project object; When the estimated number of real-time abnormal events is greater than the threshold number of abnormal event records D 0 When the real-time image acquisition frequency set by the Hawkeye platform is adjusted, the estimated number of real-time abnormal events is calculated to be less than or equal to the threshold number of abnormal event records D. 0 The image acquisition frequency at this time is the optimal acquisition frequency for the real-time project object.

2. A digital construction analysis system using BIM technology, such as using a digital construction analysis method using BIM technology as claimed in claim 1, It is characterized in that It includes a construction engineering data acquisition module, a data classification module, a collection frequency update module, a data storage module and a real-time response module; The construction project data acquisition module is used to acquire construction projects that use BIM technology to implement full-process monitoring, extracting projects that have abnormal marks after completion and acceptance and whose abnormal time points cannot be determined based on the Hawkeye platform as target construction projects, and the remaining projects as control construction projects; The data classification module is used to determine the project objects marked as abnormal, traverse all target construction projects and classify the abnormal events recorded by the project objects based on the different types of project objects; The acquisition frequency update module is used to update the panoramic image acquisition frequency set by various project objects on the Hawkeye platform; The data storage module is used to associate the acquisition frequency with the corresponding project object and the construction project where the project object is located and store it in the first database and the second database; The real-time response module is used to obtain real-time project objects implemented in construction projects that apply BIM technology in real time, and estimate the optimal collection frequency required by the real-time project objects based on the Hawkeye platform based on the first database and the second database.

3. A digital construction analysis system using BIM technology according to claim 2, Features: The acquisition frequency update module includes a type category judgment unit, a first project object analysis unit and a second project object analysis unit; The type category determination unit is used to determine whether the abnormal event types recorded by the same type of project objects are unique; The first project object analysis unit is used to mark the project object as the first project object when the abnormal event type recorded in the same type of project objects is unique; and analyzing the image acquisition frequency of the first project object to determine an updated panoramic image acquisition frequency; The second project object analysis unit is used to analyze and record the engineering information of different target construction projects to determine an updated panoramic image acquisition frequency.

4. A digital construction analysis system using BIM technology according to claim 3, Features: The second project object analysis unit includes an abnormal discrete index calculation unit, a threshold analysis unit, a functional relationship construction unit and a frequency adjustment update unit; The abnormal dispersion index calculation unit is used to obtain the average value of the influence coefficients of all types of target construction projects recorded in the second project object and the number of target construction project categories included, and calculate the abnormal dispersion index; The threshold analysis unit is used to set a discrete index threshold based on the abnormal discrete index and analyze the size relationship; The functional relationship constructing unit is used to construct a functional relationship based on the input quantity and the influence coefficient after the engineering information is converted; The frequency adjustment and update unit is used to obtain the influence coefficient of the second project object and the image acquisition frequency corresponding to the influence coefficient, set a threshold value for the number of abnormal event records, and adjust the image acquisition frequency until the estimated number of abnormal event records calculated based on the influence coefficient is less than or equal to the threshold value for the number of abnormal event records. The adjusted image acquisition frequency is used as the second project object to set the updated panoramic image acquisition frequency on the Hawkeye platform.

5. According to claim 4, a digital construction analysis system using BIM technology, Features: The real-time response module includes a real-time data matching unit, a real-time data substitution unit and an optimal acquisition frequency output unit; The real-time data matching unit is used to obtain the engineering information of the construction project where the real-time project object is located, and to match whether there is a data record identical to the real-time project object and the engineering information in the first database, the second database and the construction project; The real-time data substitution unit is used to substitute the engineering information that has been vector-converted and averaged into the functional relationship when the matching is unsuccessful; The optimal acquisition frequency output unit is used to determine and adjust the image acquisition frequency to the optimal acquisition frequency based on the function output result combined with the abnormal event record number threshold.