A safe and stable bridge-type lifting device for electric power construction hook

By introducing a hydraulic braking mechanism and safety cable into the hook bridge hoisting device, automatic speed change control of the hook is realized, which solves the problem of hook overshooting and improves construction safety.

CN118561159BActive Publication Date: 2024-10-15DONGA POWER SUPPLY CO STATE GRID SHANDONG ELECTRIC POWER CO
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411037165.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-10-15
Estimated Expiration
2044-07-31

AI Technical Summary

Technical Problem

The existing hook bridge lifting device cannot automatically change the speed according to the position of the hook, causing the hook to easily overshoot, causing the suspension cable to wear or break, posing safety risks.

Method used

A hook bridge-type lifting device including a variable-speed lifting mechanism is designed. The automatic variable-speed control of the hook is realized through a hydraulic braking mechanism to ensure that the hook automatically reduces its speed when approaching the top, avoids overshooting, and locks the hook on the side of the hook. Add safety cable to prevent falling off.

Benefits of technology

It effectively reduces the phenomenon of the hook falling off at the top, improves the safety and stability of the hook, avoids the driver's manual observation deviation, and enhances the safety of power construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118561159B_ABST
    Figure CN118561159B_ABST
Patent Text Reader

Abstract

The invention discloses a safe and stable electric power construction hook bridge lifting device, comprising a lifting beam frame mechanism, on which a lifting trolley for moving and lifting electric power construction materials is installed, a lifting hole is opened in the middle of the top of the lifting trolley, and a variable speed lifting mechanism is fixedly installed outside the lifting hole. The invention discloses a safe and stable electric power construction hook bridge lifting device, wherein the variable speed lifting mechanism is installed on the lifting trolley, and relies on the same power source to realize the lifting of heavy objects and to control the lifting speed by variable speed. The hook is first raised and lowered at a uniform speed, and after the hook rises to a certain height, hydraulic braking can be automatically performed to reduce the running speed of the hook, and the higher the rising height, the greater the braking torque, and the hook can stop moving before contacting the top beam frame through variable speed control, thereby effectively reducing the phenomenon of the hook hitting the top and falling off, and is safer and more stable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electric power construction hoisting, and in particular to a safe and stable electric power construction hook bridge hoisting device. Background Art

[0002] In the construction of power engineering, since the integrated transformer box, power pile foundation column, power distribution equipment and other equipment are large and heavy, a hook bridge crane is needed to lift them during assembly to assist in the installation of power equipment. At present, the hook bridge crane is mainly composed of a cross arm structure, a lifting trolley and a hook. The hook is installed on the trolley through pulleys and cables, and the lifting and installation of power equipment is achieved by winding the cable. The existing hook bridge crane has the following problems in actual application:

[0003] During the lifting process, the lifting hook is raised and lowered by winding the lifting cable, which is usually driven by a motor, a gear set and a winding shaft, and moves at a constant speed. The lifting operation is started or stopped by the lifting personnel in the driver's cab. In actual work, the driver judges the position of the hook from a distance, and the deviation is large. When the hook rises and approaches the top beam, the hook may hit the top due to inertia, which may easily cause wear or breakage of the lifting cable and cause the hook to fall off, thus causing a safety accident. The lifting device cannot automatically change or slow down the hook according to the position of the hook during the rise. Summary of the invention

[0004] The purpose of the present invention is to provide a safe and stable electric power construction hook bridge lifting device to solve the problem that the existing lifting device proposed in the above background technology cannot automatically change or reduce the speed of the hook according to the position of the hook during ascent, and there is a problem of the hook hitting the top.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a safe and stable electric power construction hook bridge lifting device, comprising a lifting beam frame mechanism, on which a lifting trolley for moving and lifting electric power construction materials is installed, a lifting hole is opened in the middle of the top of the lifting trolley, a variable speed lifting mechanism is fixedly installed on the outside of the lifting hole, a lifting cable is wound around and connected to the variable speed lifting mechanism, a hook assembly is installed on the bottom end of the lifting cable through the lifting hole, a safety cable is fixedly installed on one side of the hook assembly, and the safety cable is wound around the variable speed lifting mechanism.

[0006] Preferably, the variable speed lifting mechanism includes a base frame and a side frame fixedly mounted on the base frame, a gear box is fixedly mounted on one side of the top end of the base frame, a winding shaft is rotatably connected between the gear box and the side frame, the lifting cable is arranged on the winding shaft, a gear mechanism for driving the winding shaft to move is fixedly mounted inside the gear box, a power mechanism is fixedly mounted on the front end of the gear box, a hydraulic brake mechanism is fixedly mounted in the middle of the power mechanism, and a box cover is fixedly mounted on the top end of the gear box.

[0007] Preferably, the gear mechanism comprises a worm and a worm wheel meshingly connected to the surface of the worm, and one side of the worm wheel is fixedly mounted on the winding shaft.

[0008] Preferably, the power mechanism includes a lifting motor and a driving shaft fixedly mounted on the output end of the lifting motor, a brake ring is fixedly disposed on the middle portion of the driving shaft, and one end of the driving shaft is fixedly disposed on the worm.

[0009] Preferably, the hydraulic braking mechanism includes a brake base and brake arms rotatably arranged on both sides of the brake base, locking parts are fixedly arranged on the inner sides of the two brake arms, the two locking parts are arranged opposite to each other on both sides of the brake ring, brake frames are fixedly arranged on the top ends of the two brake arms, oblique grooves are opened in the middle parts of the two brake frames, pulling rods are slidably arranged on the inner sides of the two oblique grooves, and a hydraulic pulling assembly is fixedly arranged between the two pulling rods.

[0010] Preferably, the hydraulic pulling assembly includes a hydraulic brake box and a limit frame fixedly arranged on both sides of the inner wall of the hydraulic brake box, a hydraulic plug B is slidably arranged on the inner sides of the two limit frames, a first piston rod is fixedly arranged on one side of the two hydraulic plugs B, one end of the two first piston rods is rotatably connected to a brake pulling arm, one end of the two brake pulling arms is rotatably connected to the middle parts of the two pulling rods, a sealing sleeve B is fixedly arranged at the connection between the first piston rod and the hydraulic brake box, a return pipe is fixedly connected to the middle part of the top of the hydraulic brake box, and branch hydraulic pipes are fixedly connected to the two sides of the back side of the hydraulic brake box. A tee is fixedly connected between the branch hydraulic pipes, one end of the tee is fixedly connected with a flow delivery pipe, a hydraulic storage tank is fixedly installed on one side of the inner wall of the gear box, a transmission screw is rotatably arranged in the middle of the hydraulic storage tank, a screw sleeve is transmission-connected in the middle of the transmission screw, a hydraulic plug A is fixedly arranged on the outside of the screw sleeve, one end of the transmission screw is fixedly connected with a concentric shaft, one end of the concentric shaft passes through the hydraulic storage tank and is fixedly arranged on the worm gear, a sealing sleeve A is fixedly arranged at the connection between the concentric shaft and the hydraulic storage tank, one end of the flow delivery pipe and one end of the return pipe are respectively fixedly connected to the two sides of the hydraulic storage tank.

[0011] Preferably, the hook assembly includes a hook frame and a movable pulley group fixedly installed inside the hook frame, a connecting piece is fixedly provided at the bottom end of the hook frame, an anti-drop hook is rotatably connected to the bottom end of the connecting piece, an anti-drop buckle is fixedly provided on one side of the hook frame, and the bottom end of the safety cable is fixedly provided on the anti-drop buckle.

[0012] Preferably, one end of the winding shaft away from the gear box passes through the side frame and is fixedly provided with a safety reel, and the safety cable is wound around the safety reel.

[0013] Preferably, the lifting beam frame mechanism includes two main box beam frames, two auxiliary box beam frames are fixedly arranged between the two main box beam frames, and guide rails are fixedly arranged at the top ends of the two main box beam frames.

[0014] Preferably, the lifting crane comprises a lifting frame and anti-slip brackets fixedly arranged on both sides of the bottom of the lifting frame, moving wheels are rotatably arranged on the inner sides of the two anti-slip brackets, a wheel axle is fixedly arranged between the two moving wheels arranged opposite to each other, a driven bevel gear is fixedly arranged in the middle of the wheel axle, servo motors are fixedly installed on both sides of the top of the lifting frame, a driving bevel gear is fixedly installed on the output end of the servo motor, one side of the driving bevel gear is meshed and connected with one side of the driven bevel gear, and the moving wheel is arranged on the inner side of the guide rail.

[0015] Compared with the prior art, the present invention has the following beneficial effects:

[0016] The hook bridge type lifting device is equipped with a variable speed lifting mechanism on the lifting crane. Relying on the same power source, it can not only lift heavy objects, but also control the lifting speed by variable speed. During the lifting process, the hook first rises and falls at a uniform speed. After the hook rises to a certain height, it can automatically perform hydraulic braking to reduce the running speed of the hook. The higher the lifting height, the greater the braking torque. Through variable speed control, the hook can stop moving before contacting the top beam, thereby effectively reducing the phenomenon of the hook hitting the top and falling off, avoiding the problem of blind spots or deviations in vision caused by manual observation by the driver, and being safer and more stable.

[0017] A set of safety cables is added to the side of the hook. The safety cables move synchronously with the lifting cables. The safety cables are idle during normal operation. When the lifting cables fall off, they can hold the hook to prevent it from falling and injuring the workers below. At the same time, pulling the hook from the side is helpful to reduce the swing amplitude of heavy objects during lifting and improve the safety and stability of power construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of the lifting device of the present invention;

[0019] Figure 2 It is a structural schematic diagram of the lifting frame of the present invention;

[0020] Figure 3 It is a structural schematic diagram of the variable speed hoisting mechanism of the present invention;

[0021] Figure 4 It is a structural schematic diagram of the driving mechanism of the present invention;

[0022] Figure 5 It is a structural schematic diagram of the braking mechanism of the present invention;

[0023] Figure 6 It is a structural schematic diagram of the hydraulic transmission mechanism of the present invention;

[0024] Figure 7 It is a front cross-sectional view of the hydraulic transmission mechanism of the present invention;

[0025] Figure 8 It is a structural schematic diagram of the lifting beam frame mechanism of the present invention;

[0026] Fig. 9 It is a structural schematic diagram of the hook assembly of the present invention;

[0027] Fig.10 It is a side cross-sectional view of the lifting frame of the present invention.

[0028] In the figure: 1, main box beam frame; 2, auxiliary box beam frame; 3, lifting frame; 4, guide rail; 5, lifting cable; 6, hook assembly; 61, hook frame; 62, movable pulley block; 63, anti-drop buckle; 64, connecting piece; 65, anti-drop hook; 7, safety cable; 8, variable speed lifting mechanism; 81, base frame; 82, side frame; 83, gear box; 84, reel; 85, box cover; 86, hydraulic brake box; 87, lifting motor; 88, brake arm; 89, worm gear; 810, hydraulic storage tank; 811, return pipe; 812, delivery pipe; 813, three-way pipe; 814, brake ring; 815, drive shaft; 8 16. Worm; 817. Locking piece; 818. Brake base; 819. Brake frame; 820. Oblique groove; 821. Brake pull arm; 822. Pull rod; 823. First piston rod; 824. Concentric shaft; 825. Sealing sleeve A; 826. Hydraulic plug A; 827. Screw sleeve; 828. Transmission screw; 829. Limiting frame; 830. Branch hydraulic pipe; 831. Sealing sleeve B; 832. Hydraulic plug B; 833. Safety reel; 9. Lifting hole; 10. Servo motor; 11. Anti-drop bracket; 12. Moving wheel; 13. Wheel axle; 14. Driven helical gear; 15. Driving helical gear. DETAILED DESCRIPTION

[0029] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0030] See also Figure 1-10 The present invention provides a safe and stable electric power construction hook bridge lifting device, including a lifting beam frame mechanism, a lifting trolley for moving and lifting electric power construction materials is installed on the lifting beam frame mechanism, a lifting hole 9 is opened in the middle of the top of the lifting trolley, a variable speed lifting mechanism 8 is fixedly installed outside the lifting hole 9, a lifting cable 5 is wound and connected to the variable speed lifting mechanism 8, a hook assembly 6 is installed at the bottom end of the lifting cable 5 through the lifting hole 9, a safety cable 7 is fixedly installed on one side of the hook assembly 6, and the safety cable 7 is wound on the variable speed lifting mechanism 8;

[0031] When in use, the crane crane can be controlled by the operator in the crane cab, automatically moving in a straight line left and right along the guide rail 4, and driving the lifting cable 5 to be retracted and released through the variable speed lifting mechanism 8, thereby realizing the rising or falling of the hook assembly 6, and realizing the lifting of power equipment or infrastructure during power construction.

[0032] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 and Figure 7 Further, the variable speed lifting mechanism 8 includes a base frame 81 and a side frame 82 fixedly arranged on the base frame 81, a gear box 83 is fixedly arranged on one side of the top of the base frame 81, a winding shaft 84 is rotatably connected between the gear box 83 and the side frame 82, the lifting cable 5 is arranged on the winding shaft 84, a gear mechanism for driving the winding shaft 84 to move is fixedly installed inside the gear box 83, a power mechanism is fixedly installed on the front of the gear box 83, a hydraulic brake mechanism is fixedly installed in the middle of the power mechanism, and a box cover 85 is fixedly arranged on the top of the gear box 83;

[0033] The gear mechanism includes a worm 816 and a worm wheel 89 meshingly connected to the surface of the worm 816, one side of the worm wheel 89 is fixedly mounted on the reel 84, the power mechanism includes a lifting motor 87 and a drive shaft 815 fixedly mounted on the output end of the lifting motor 87, a brake ring 814 is fixedly arranged in the middle of the drive shaft 815, and one end of the drive shaft 815 is fixedly arranged on the worm 816;

[0034] The hydraulic brake mechanism includes a brake base 818 and brake arms 88 rotatably arranged on both sides of the brake base 818, the inner sides of the two brake arms 88 are fixedly provided with locking members 817, the two locking members 817 are arranged opposite to the two sides of the brake ring 814, the tops of the two brake arms 88 are fixedly provided with brake frames 819, the middle parts of the two brake frames 819 are provided with oblique grooves 820, the inner sides of the two oblique grooves 820 are slidably provided with pulling rods 822, and a hydraulic pulling assembly is fixedly provided between the two pulling rods 822;

[0035] The hydraulic pulling assembly includes a hydraulic brake box 86 and a limit frame 829 fixedly arranged on both sides of the inner wall of the hydraulic brake box 86, a hydraulic plug B832 is slidably arranged on the inner side of the two limit frames 829, a first piston rod 823 is fixedly arranged on one side of the two hydraulic plugs B832, one end of the two first piston rods 823 is rotatably connected to a brake arm 821, one end of the two brake arms 821 is rotatably connected to the middle of the two pulling rods 822, a sealing sleeve B831 is fixedly arranged at the connection between the first piston rod 823 and the hydraulic brake box 86, a return pipe 811 is fixedly connected to the middle of the top of the hydraulic brake box 86, and branch hydraulic pipes 830 are fixedly connected to both sides of the back of the hydraulic brake box 86. The two branch hydraulic pipes 830 A three-way pipe 813 is fixedly connected between them, one end of the three-way pipe 813 is fixedly connected to a flow delivery pipe 812, a hydraulic storage tank 810 is fixedly installed on one side of the inner wall of the gear box 83, a transmission screw 828 is rotatably arranged in the middle of the hydraulic storage tank 810, a screw sleeve 827 is transmission-connected in the middle of the transmission screw 828, a hydraulic plug A826 is fixedly arranged on the outer side of the screw sleeve 827, one end of the transmission screw 828 is fixedly connected to a concentric shaft 824, one end of the concentric shaft 824 passes through the hydraulic storage tank 810 and is fixedly arranged on the worm gear 89, a sealing sleeve A825 is fixedly arranged at the connection between the concentric shaft 824 and the hydraulic storage tank 810, one end of the flow delivery pipe 812 and one end of the return pipe 811 are respectively fixedly connected to the two sides of the hydraulic storage tank 810;

[0036] When in use, when the lifting cable 5 is reeled in and lifted, the crane control personnel control the lifting motor 87 to rotate forward through the electric control equipment in the driver's cab, and the lifting motor 87 drives the driving shaft 815 to move, and the driving shaft 815 simultaneously drives the brake ring 814 and the worm 816 to rotate in the same direction, and the worm 816 drives the worm wheel 89 to move, and the worm wheel 89 drives the reeling shaft 84 to rotate on the one hand, so as to reel in the lifting cable 5 and complete the lifting operation, and on the other hand drives the transmission screw 828 to rotate through the concentric shaft 824, and the transmission screw 82 The hydraulic plug A826 is driven by the screw sleeve 827 to slowly move to the right side of the hydraulic tank 810. Under the pressure of the hydraulic plug A826, the liquid on the right side of the hydraulic tank 810 will continue to enter the delivery pipe 812, and finally flow into the two branch hydraulic pipes 830 through the three-way pipe 813, and flow into the hydraulic brake box 86 from both sides. Under the gradual pressure of the liquid on both sides of the hydraulic brake box 86, the two hydraulic plugs B832 will be pushed to move to the middle of the hydraulic brake box 86, thereby pulling the first piston rod 8 23 slides toward the inner side of the hydraulic brake box 86. Under the pulling of the two first piston rods 823, the two brake arms 821 will approach each other, thereby pulling the pulling rod 822 to move. While the pulling rod 822 slides on the inner side of the oblique groove 820, it squeezes the brake frame 819 to approach each other. The brake frame 819 pulls the two brake arms 88 to rotate on the brake base 818, so that the two locking members 817 approach the brake ring 814. When the hook assembly 6 is about three meters away from the lifting beam frame mechanism, the locking member 817 begins to When the hook assembly 6 contacts the brake ring 814 and continues to lift, the locking member 817 will gradually increase the friction between the locking member 817 and the brake ring 814, thereby achieving deceleration and braking of the drive shaft 815 through the brake ring 814, until the locking member 817 locks the brake ring 814, and the hook assembly 6 stops moving upward. During the entire upward movement process, the hook assembly 6 first rises at a uniform speed, and then changes to a decelerated movement when approaching the lifting beam frame mechanism, thereby reducing the running speed of the hook assembly 6 approaching the lifting beam frame mechanism, preventing the hook assembly 6 from hitting the top;

[0037] When the lifting cable 5 is lowered and the hook assembly 6 moves downward, the electronic control device in the driver's cab controls the lifting motor 87 to rotate in the opposite direction. The lifting motor 87 drives the drive shaft 815 to move, and drives the worm wheel 89 to move through the worm 816. The worm wheel 89 simultaneously drives the winding shaft 84 and the concentric shaft 824 to reverse, and the winding shaft 84 lowers the lifting cable 5. At this time, under the gravity of the hook assembly 6, the hook assembly 6 moves downward, and the concentric shaft 824 drives the transmission screw 828 to rotate. The transmission screw 828 drives the hydraulic plug A826 to move slowly to the left side of the hydraulic storage tank 810 through the screw sleeve 827. Under the squeezing of the hydraulic plug A826, the liquid on the left side of the hydraulic storage tank 810 will continue to enter the return pipe 811, and finally enter the middle part of the hydraulic brake box 86. Relying on the hydraulic pressure The hydraulic plug B832 is squeezed from the middle of the hydraulic brake box 86 to both sides. At this time, the liquid on both sides of the hydraulic brake box 86 will enter the three-way pipe 813 through the branch hydraulic pipe 830, and finally flow back to the right side of the hydraulic storage tank 810 through the flow pipe 812. During this process, the hydraulic plug B832 pushes the first piston rod 823 to slide to the outside of the hydraulic brake box 86. Under the push of the two first piston rods 823, the two brake pulling arms 821 will move away from each other, thereby pushing the pulling rod 822, and then making the two extrusion brake frames 819 move away from each other, so that the two locking parts 817 gradually release the brake ring 814. After the brake ring 814 is completely released, the brake arm 88 can continue to rotate outward without contacting the brake ring 814, and the hook assembly 6 can move up and down at a uniform speed.

[0038] See also Figure 1 and Fig. 9 Further, the hook assembly 6 includes a hook frame 61 and a movable pulley block 62 fixedly installed inside the hook frame 61, a connecting piece 64 is fixedly provided at the bottom end of the hook frame 61, and an anti-drop hook 65 is rotatably connected to the bottom end of the connecting piece 64, an anti-drop buckle 63 is fixedly provided on one side of the hook frame 61, and the bottom end of the safety cable 7 is fixedly provided on the anti-drop buckle 63, and an end of the winding shaft 84 away from the gear box 83 passes through the side frame 82 and is fixedly provided with a safety reel 833, and the safety cable 7 is wound around the safety reel 833;

[0039] When in use, the lifting cable 5 is wound around the movable pulley set 62, and the anti-drop hook 65 is driven to move through the lifting and lowering of the hook frame 61. An anti-drop buckle 63 is added to the side of the hook frame 61. When the winding shaft 84 rotates, it will drive the first piston rod 823 to rotate synchronously, thereby realizing the winding and lowering of the safety cable 7. The safety cable 7 on the hook frame 61 further prevents the hook from falling off, thereby providing safety for the operation of the crane.

[0040] See also Figure 1 and Figure 8, further, the lifting beam frame mechanism includes two main box beam frames 1, two auxiliary box beam frames 2 are fixedly arranged between the two main box beam frames 1, and guide rails 4 are fixedly arranged at the top ends of the two main box beam frames 1;

[0041] When in use, the lifting beam frame mechanism is formed by welding a box-type main box beam frame 1 and an auxiliary box beam frame 2. The box beam frame has high structural strength, which is beneficial to improving the load-bearing capacity of the lifting device.

[0042] See also Figure 1 , Figure 2 , Figure 8 and Fig.10 , further, the crane comprises a crane frame 3 and anti-slip brackets 11 fixedly arranged on both sides of the bottom of the crane frame 3, moving wheels 12 are rotatably arranged on the inner sides of the two anti-slip brackets 11, a wheel axle 13 is fixedly arranged between the two moving wheels 12 arranged opposite to each other, a driven bevel gear 14 is fixedly arranged in the middle of the wheel axle 13, servo motors 10 are fixedly installed on both sides of the top of the crane frame 3, a driving bevel gear 15 is fixedly installed on the output end of the servo motor 10, one side of the driving bevel gear 15 is meshed and connected with one side of the driven bevel gear 14, and the moving wheel 12 is arranged on the inner side of the guide rail 4;

[0043] When in use, the lifting frame 3 can make a linear motion left and right along the guide rail 4, which is controlled by the crane driver to control the servo motor 10 to work. The servo motor 10 drives the driving bevel gear 15 to rotate, and the driving bevel gear 15 drives the driven bevel gear 14 to move, thereby rotating the wheel axle 13, and the moving wheels 12 on both sides of the driving wheel axle 13 rotate on the inner side of the guide rail 4. The four-wheel drive movement has more power and stronger operation stability.

[0044] When the embodiment of the present application is in use: the hook assembly 6 rises at a uniform speed during the entire lifting process, and when it is about three meters close to the main box girder frame 1, the locking member 817 will gradually increase the friction between it and the brake ring 814, thereby achieving deceleration and braking of the drive shaft 815 through the brake ring 814, until the locking member 817 locks the brake ring 814, and the hook assembly 6 stops moving up, achieving variable deceleration of the hook assembly 6, ensuring that the hook assembly 6 has completely stopped before it touches the top, without the need for manual control by the driver, and linking with the winding shaft 84, thereby avoiding the hook assembly 6 from hitting the top, thereby preventing the hook assembly 6 from falling off and improving the operation safety. When the hook assembly 6 is in the uniform speed operation stage, the locking member 817 will gradually approach the brake ring 814, but will not touch it, thereby achieving braking and not affecting the normal operation of the lifting.

[0045] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A safe and stable electric power construction hook bridge lifting device, including a lifting beam frame mechanism, characterized in that: A crane trolley for moving and lifting power construction materials is installed on the lifting beam frame mechanism, a lifting hole (9) is opened in the middle of the top of the crane trolley, a variable speed lifting mechanism (8) is fixedly installed outside the lifting hole (9), a lifting cable (5) is wound and connected to the variable speed lifting mechanism (8), a hook assembly (6) is installed at the bottom end of the lifting cable (5) through the lifting hole (9), a safety cable (7) is fixedly installed on one side of the hook assembly (6), and the safety cable (7) is wound and installed on the variable speed lifting mechanism (8); The variable speed lifting mechanism (8) comprises a base frame (81) and a side frame (82) fixedly mounted on the base frame (81); a gear box (83) is fixedly mounted on one side of the top end of the base frame (81); a winding shaft (84) is rotatably connected between the gear box (83) and the side frame (82); the lifting cable (5) is mounted on the winding shaft (84); a gear mechanism for driving the winding shaft (84) to move is fixedly mounted inside the gear box (83); a power mechanism is fixedly mounted on the front of the gear box (83); a hydraulic brake mechanism is fixedly mounted in the middle of the power mechanism; and a box cover (85) is fixedly mounted on the top end of the gear box (83); The gear mechanism comprises a worm (816) and a worm wheel (89) meshingly connected to the surface of the worm (816), and one side of the worm wheel (89) is fixedly mounted on the winding shaft (84); The power mechanism comprises a lifting motor (87) and a driving shaft (815) fixedly mounted on the output end of the lifting motor (87); a brake ring (814) is fixedly mounted in the middle of the driving shaft (815); and one end of the driving shaft (815) is fixedly mounted on a worm (816); The hydraulic brake mechanism comprises a brake base (818) and brake arms (88) rotatably arranged on both sides of the brake base (818), the inner sides of the two brake arms (88) are fixedly provided with locking members (817), the two locking members (817) are arranged opposite to the two sides of the brake ring (814), the top ends of the two brake arms (88) are fixedly provided with brake frames (819), the middle parts of the two brake frames (819) are provided with oblique grooves (820), the inner sides of the two oblique grooves (820) are slidably provided with pulling rods (822), and a hydraulic pulling assembly is fixedly provided between the two pulling rods (822); The hydraulic pulling assembly comprises a hydraulic brake box (86) and a limit frame (829) fixedly arranged on both sides of the inner wall of the hydraulic brake box (86), the inner sides of the two limit frames (829) are slidably provided with a hydraulic plug B (832), one side of the two hydraulic plugs B (832) are fixedly provided with a first piston rod (823), one end of the two first piston rods (823) are rotatably connected to a brake arm (821), one end of the two brake arms (821) are respectively rotatably connected to the middle of the two pulling rods (822), a sealing sleeve B (831) is fixedly arranged at the connection between the first piston rod (823) and the hydraulic brake box (86), the middle part of the top of the hydraulic brake box (86) is fixedly connected to a return pipe (811), the two sides of the back of the hydraulic brake box (86) are fixedly connected to branch hydraulic pipes (830), and the two branch hydraulic pipes (830) are fixedly connected to each other. A three-way pipe (813) is fixedly connected to the gear box (83), one end of the three-way pipe (813) is fixedly connected to a flow delivery pipe (812), a hydraulic storage tank (810) is fixedly installed on one side of the inner wall of the gear box (83), a transmission screw (828) is rotatably arranged in the middle of the hydraulic storage tank (810), a screw sleeve (827) is transmission-connected in the middle of the transmission screw (828), and a hydraulic plug A (827) is fixedly arranged on the outer side of the screw sleeve (827). 6), one end of the transmission screw (828) is fixedly connected to a coaxial shaft (824), one end of the coaxial shaft (824) passes through the hydraulic storage tank (810) and is fixedly arranged on the worm gear (89), a sealing sleeve A (825) is fixedly arranged at the connection between the coaxial shaft (824) and the hydraulic storage tank (810), and one end of the flow delivery pipe (812) and one end of the return pipe (811) are respectively fixedly connected to two sides of the hydraulic storage tank (810).

2. A safe and stable electric power construction hook bridge lifting device according to claim 1, characterized in that: The hook assembly (6) comprises a hook frame (61) and a movable pulley block (62) fixedly mounted inside the hook frame (61); a connecting piece (64) is fixedly mounted at the bottom end of the hook frame (61); an anti-drop hook (65) is rotatably connected to the bottom end of the connecting piece (64); an anti-drop buckle (63) is fixedly mounted on one side of the hook frame (61); and the bottom end of the safety cable (7) is fixedly mounted on the anti-drop buckle (63).

3. A safe and stable electric power construction hook bridge lifting device according to claim 2, characterized in that: One end of the reel (84) away from the gear box (83) passes through the side frame (82) and is fixedly provided with a safety reel (833), and the safety cable (7) is wound around the safety reel (833).

4. A safe and stable electric power construction hook bridge lifting device according to claim 1, characterized in that: The lifting beam frame mechanism comprises two main box beam frames (1), two auxiliary box beam frames (2) are fixedly arranged between the two main box beam frames (1), and guide rails (4) are fixedly arranged at the top ends of the two main box beam frames (1).

5. A safe and stable electric power construction hook bridge lifting device according to claim 4, characterized in that: The overhead crane comprises a crane frame (3) and anti-slip brackets (11) fixedly arranged on both sides of the bottom of the crane frame (3); moving wheels (12) are rotatably arranged on the inner sides of the two anti-slip brackets (11); a wheel axle (13) is fixedly arranged between the two moving wheels (12) arranged opposite to each other; a driven bevel gear (14) is fixedly arranged in the middle of the wheel axle (13); servo motors (10) are fixedly installed on both sides of the top of the crane frame (3); a driving bevel gear (15) is fixedly installed at the output end of the servo motor (10); one side of the driving bevel gear (15) is meshingly connected with one side of the driven bevel gear (14); and the moving wheels (12) are arranged on the inner side of the guide rail (4).

Citation Information

Cited By

  • Precise transmission and intelligent control method of hoisting crown block

    CN120817534A