A secondary charging control method and charging device for a polysilicon ingot casting furnace

By real-time monitoring of the melt temperature and thermal field status, combined with fuzzy control and dynamic programming, the secondary feeding amount and speed of the polycrystalline silicon ingot furnace are automatically adjusted, solving the problem of inaccurate feeding in the existing technology and achieving efficient melting and high performance. Production of quality polysilicon.

CN118600550BActive Publication Date: 2024-10-15TIANJIN XURI DONGSHENG PRECISION MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411081909.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-10-15
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

The existing secondary charging method for polycrystalline silicon ingot furnaces relies on human judgment or fixed procedures, and cannot automatically adjust the feeding amount and speed according to real-time melt temperature changes, resulting in inaccurate feeding and affecting melting efficiency and product quality.

Method used

The temperature sensor is used to monitor the melt temperature and thermal field status in real time, the real-time dynamic programming method is used to automatically calculate and adjust the secondary feeding amount, the fuzzy control algorithm and dynamic control model are used to dynamically adjust the feeding speed, and the vacuum pressure sensor is used to monitor the vacuum degree inside the silo , to achieve intelligent and precise control of the feeding process.

Benefits of technology

It improves the temperature control accuracy, optimizes the melting process of silicon material, improves melting efficiency and thermal field stability, reduces human intervention and operating errors, and forms high-quality polysilicon materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118600550B_ABST
    Figure CN118600550B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of crucible feeding, and in particular to a secondary feeding control method and a feeding device for a polysilicon ingot furnace. The present invention monitors the melt temperature and the thermal field state in real time through a temperature sensor, thereby ensuring the dynamic adjustment of the feeding amount and the feeding speed and the precise matching of the melt temperature, improving the accuracy of temperature control, and being conducive to the formation of high-quality polysilicon materials. The present invention utilizes a real-time dynamic programming method to automatically calculate and adjust the secondary feeding amount, thereby realizing the intelligence of the feeding process, reducing human intervention, and reducing operating errors.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of crucible charging, and in particular to a secondary charging control method and a charging device for a polysilicon ingot casting furnace. Background Art

[0002] At present, cast polysilicon is the most widely used solar energy material. Polysilicon ingots use irregularly shaped block-shaped native polysilicon materials. There will be gaps between the silicon blocks. In addition, impurities in the silicon raw materials will evaporate and be eliminated during the ingot casting process. Therefore, even if the crucible is filled with silicon material before the ingot casting, the volume of the polysilicon ingot will decrease after the ingot casting is completed, and secondary feeding will be required.

[0003] However, the secondary charging methods of the existing polysilicon furnace mainly include:

[0004] 1. Manual feeding

[0005] This is the most traditional secondary feeding method. The operator manually opens the feeding port at a certain stage of the ingot casting process based on experience or preset procedures to add additional silicon material to the crucible. This method completely relies on the operator's experience and judgment. The accuracy of the feeding amount and timing is limited by human intuition and reaction speed, which may lead to over- or under-feeding, affecting melting efficiency and product quality.

[0006] 2. Pre-programmed feeding

[0007] In this way, the feeding process is controlled by a pre-set program, and the feeding amount and feeding time point are programmed based on previous experience or experimental data. Although more consistent than manual feeding, this method still cannot respond to temperature changes or other dynamic factors in the melting process in real time, such as changes in melting rate or thermal field distribution, which may also cause inaccurate feeding amount.

[0008] In summary, the determination of the secondary feeding amount and feeding speed in the above two feeding methods often relies on fixed procedures or the judgment of the operator, and cannot be automatically adjusted according to the real-time melt temperature changes, which can easily cause inaccurate feeding and affect melting efficiency and product quality.

[0009] Therefore, there is a need for a secondary charging control method and a charging device for a polysilicon ingot furnace that can solve the above-mentioned problems. Summary of the invention

[0010] The present invention provides a secondary feeding control method and a feeding device for a polysilicon ingot furnace. The present invention monitors the melt temperature and the thermal field state in real time through a temperature sensor, ensures the dynamic adjustment of the feeding amount and the feeding speed and the accurate matching of the melt temperature, improves the accuracy of temperature control, and is conducive to the formation of high-quality polysilicon materials. The present invention utilizes a real-time dynamic programming method to automatically calculate and adjust the secondary feeding amount, realizes the intelligence of the feeding process, reduces human intervention, and reduces operating errors.

[0011] The technical solution adopted by the present invention to solve the above technical problems is:

[0012] A method for controlling secondary charging of a polysilicon ingot casting furnace comprises the following steps:

[0013] Step S1: starting the ingot casting furnace, preheating it to an initial temperature, adding silicon material into a crucible in the ingot casting furnace, and obtaining the melt temperature T in the crucible and the thermal field state in the crucible through a temperature sensor;

[0014] Step S2: according to the melt temperature T in the crucible, the secondary feeding amount is calculated by a real-time dynamic programming method, and the secondary feeding amount is set by a control system;

[0015] Step S3: According to the melt temperature T in the crucible, a rapid melting time window and a thermal field stabilization time window are defined. In each time window, the secondary feeding speed of the secondary feeding device is dynamically adjusted by controlling the electric gate valve of the secondary feeding device.

[0016] Furthermore, the temperature sensors in step S1 are arranged on the furnace top, the furnace inner wall and the furnace bottom wall of the crucible, and the temperature sensors are either thermocouples or thermal resistors.

[0017] Furthermore, the real-time dynamic programming method in step S2 includes:

[0018] Step S2-1: defining three fuzzy sets in the feeding control system by using a fuzzy control algorithm, the fuzzy sets including "low temperature", "suitable temperature" and "high temperature", each set covering a different range of the melt temperature in the crucible, and there are overlapping areas between the fuzzy sets to reflect the continuity and fuzziness of the melt temperature change;

[0019] Step S2-2: defining a membership function for each fuzzy set to quantify the degree of membership of the melt temperature in the crucible in the set;

[0020] Step S2-3: Calculate the membership degree of the melt temperature T in step S1 in the fuzzy sets of "low temperature", "suitable temperature" and "high temperature";

[0021] Step S2-4: according to the preset ideal temperature range of the melt, the temperature thresholds α1, α2, and α3 are set by the control system, and each temperature threshold corresponds to a feed amount;

[0022] Step S2-5: Formulate fuzzy rules. When the “low temperature” set membership of the melt temperature T in the crucible is greater than the set temperature threshold α1, control the secondary feeding device to increase the feeding amount; when the “suitable temperature” set membership of the melt temperature T in the crucible is greater than the set temperature threshold α2, the feeding amount of the secondary feeding device remains unchanged; when the “high temperature” set membership of the melt temperature T in the crucible is greater than the preset threshold α3, control the secondary feeding device to reduce the feeding amount;

[0023] Step S2-6: Perform fuzzy reasoning to determine the fuzzy output value of the secondary feed amount according to the membership degree calculated in step S2-3 and the fuzzy rule established in step S2-5;

[0024] Step S2-7: Defuzzify the fuzzy output value of the secondary feeding amount by using the centroid method to obtain the feeding amount value;

[0025] Step S2-8: Convert the obtained feeding amount value into an executable control signal, output the control signal to the electric gate valve, and realize secondary feeding by controlling the opening of the electric gate valve.

[0026] Furthermore, after the secondary feeding is achieved by controlling the opening of the electric gate valve in step S2-8, the melt temperature T in the crucible is continuously obtained through the temperature sensor, the temperature change of the melt is monitored in real time, and the collected real-time temperature data is fed back to the fuzzy control algorithm.

[0027] Furthermore, in step S3, a rapid melting time window and a thermal field stabilization time window are defined according to the melt temperature T in the crucible, and in each time window, the secondary feeding speed of the secondary feeding device is dynamically adjusted by controlling the electric gate valve of the secondary feeding device, including:

[0028] Step S3-1: Based on the melt temperature T acquired by the temperature sensor, the melt temperature T is compared with a preset melting start temperature threshold T_start to determine the time point t_start at which the melting process starts;

[0029] Step S3-2: Set the start time t_start of the rapid melting time window, and according to the preset melting efficiency requirement and the total amount of silicon material, preset the duration Δt_melt of the rapid melting time window, and define the rapid melting time window as [t_start, t_start+Δt_melt]:

[0030] Step S3-3: within the rapid melting time window, dynamically adjusting the secondary feeding speed v_feed_melt of the secondary feeding device in the rapid melting stage of the melt according to the melt temperature T and the preset melting efficiency requirement, so as to accelerate the melting process of the silicon material;

[0031] Step S3-4: After the rapid melting time window of the melt ends, define the thermal field stabilization time window as [t_stable_start, t_stable_end];

[0032] Step S3-5: within the thermal field stabilization time window, dynamically adjusting the secondary feeding speed v_feed_stable of the secondary feeding device in the melt thermal field stabilization stage according to the melt temperature T and the thermal field state in the crucible;

[0033] Step S3-6: monitor the vacuum degree inside the silo in the secondary feeding device through a vacuum pressure sensor, adjust the division of the rapid melting time window and the thermal field stabilization time window and the feeding strategy, and ensure the stability of the melt state during the secondary feeding process.

[0034] Furthermore, in step S3-4, t_stable_start=t_start+Δt_melt, wherein t_stable_start represents the starting time point of the thermal field stabilization time window, t_stable_end represents the ending time point of the thermal field stabilization time window, and Δt_melt represents the duration of the rapid melting time window.

[0035] Furthermore, the dynamic adjustment of the secondary feeding speed v_feed_melt of the secondary feeding device in the rapid melting stage of the melt in step S3-3 and the dynamic adjustment of the secondary feeding speed v_feed_stable of the secondary feeding device in the stable thermal field stage of the melt in step S3-5 are both dynamically adjusted using a dynamic control model established based on the melt temperature T in the crucible and the thermal field state.

[0036] Furthermore, in step S3-6, the vacuum degree inside the silo in the secondary feeding device is monitored by a vacuum pressure sensor, and the division of the rapid melting time window and the thermal field stabilization time window and the feeding strategy are adjusted, including:

[0037] Step S3-6-1: Continuously monitor the vacuum degree in the silo through the vacuum pressure sensor, transmit the data to the control system, and the data analysis module processes the vacuum degree data in real time to evaluate the stability of the internal environment of the silo;

[0038] Step S3-6-2: During the rapid melting stage of the melt, when the melt temperature T reaches a preset ideal melting temperature range and the vacuum degree in the silo is within a preset ideal range, the rapid melting time window is shortened to accelerate the melting of the silicon material;

[0039] Step S3-6-3: In the melt thermal field stabilization stage, when the melt temperature T reaches the preset ideal melting temperature range and the vacuum degree in the silo is within the preset ideal range, adjust the opening of the electric gate valve to control the secondary feeding speed v_feed_stable to maintain the uniformity and stability of the thermal field.

[0040] Furthermore, the method for establishing the dynamic control model includes:

[0041] a. Data collection and preprocessing

[0042] Collect historical data on melt temperature T, temperature gradient, secondary feeding speed, secondary feeding amount, and melting efficiency during the secondary feeding process;

[0043] b. Data preprocessing

[0044] Clean the data, remove outliers and missing values, ensure the accuracy and completeness of the data, and prepare the data set for modeling;

[0045] c. Feature extraction

[0046] Extract features related to the secondary feeding speed from the collected data set, and screen out the features that have the greatest impact on the secondary feeding speed through principal component analysis;

[0047] d. Model selection and training

[0048] Select a machine learning model based on the nature of the problem and the characteristics of the data. The machine learning model uses any model of linear regression, support vector machine, neural network or random forest;

[0049] e. Data partitioning

[0050] Divide the data set into a training set and a test set, with the ratio of training set to test set being 70%:30% or 80%:20%;

[0051] f. Model training

[0052] Train the model using the training set data and adjust the model parameters to minimize the prediction error;

[0053] g. Model Validation

[0054] The k-fold cross-validation method was used to evaluate the generalization ability of the model;

[0055] h. Model testing and analysis

[0056] Model testing: Use the test set data to evaluate the prediction performance of the model and calculate the prediction error, root mean square error, and mean absolute error indicators;

[0057] Result analysis: Analyze the matching degree between the model prediction results and the actual secondary feeding speed, and evaluate the accuracy and reliability of the model;

[0058] i. Model deployment and real-time control

[0059] Model deployment: deploy the dynamic control model into the control system;

[0060] Real-time data collection: During the operation of the crucible, the melt temperature T and thermal field state are monitored and collected in real time through the temperature sensor;

[0061] Dynamic adjustment: Input the real-time data collected by the temperature sensor into the trained model, and dynamically adjust the feeding speed of the secondary feeding device according to the secondary feeding speed recommendation output by the model;

[0062] Closed-loop control: The adjusted feeding speed is fed back to the control system, and the control system realizes the dynamic secondary feeding speed adjustment of the melt by controlling the opening of the electric gate valve to form a closed-loop control.

[0063] A secondary feeding device for a polysilicon crucible, comprising an upper cover connected to a silo, and a plurality of supporting columns fixedly connected to the bottom of the silo;

[0064] The bottom discharge end of the silo is connected to an electric gate valve, and a blanking tee is connected to the bottom of the electric gate valve;

[0065] The discharge end of the blanking tee is connected to the upper furnace cover of the crucible body;

[0066] The silo is connected with an electric vacuum ball valve and a vacuum pressure sensor.

[0067] The advantages of the present invention are:

[0068] The present invention provides a secondary charging control method and a secondary charging device for a polycrystalline silicon ingot casting furnace, which have the following advantages:

[0069] 1. Accurate temperature control: The present invention uses a temperature sensor to monitor the melt temperature and thermal field state in real time, ensuring the dynamic adjustment of the feeding amount and feeding speed and the accurate matching of the melt temperature, improving the accuracy of temperature control, and facilitating the formation of high-quality polysilicon materials. The present invention uses a real-time dynamic programming method to automatically calculate and adjust the secondary feeding amount, realizing the intelligent feeding process, reducing human intervention, and reducing operating errors.

[0070] 2. Efficient melting and thermal field stability: The present invention optimizes the melting process of silicon material by defining a rapid melting time window and a thermal field stabilization time window, while ensuring the uniformity of the melt in the thermal field stabilization stage, thereby improving the melting efficiency and the stability of the thermal field.

[0071] 3. Vacuum degree monitoring and optimization: The present invention introduces a vacuum pressure sensor to monitor the vacuum degree inside the silo, and combines the melt temperature to control the rapid melting and thermal field stabilization stages, effectively controlling the melting environment and further improving the melting quality and efficiency.

[0072] 4. Dynamic control model: The present invention collects historical data and uses machine learning models for training to establish a dynamic control model of secondary feeding speed related to melt temperature and thermal field state, realizes intelligent decision-making based on real-time data, and improves the response speed and adaptability of the control system.

[0073] 5. Optimization of the secondary feeding device: The secondary feeding device designed in the present invention realizes precise feeding control through the electric gate valve and the blanking three-way piece, as well as the matching vacuum pressure sensor and electric vacuum ball valve, while ensuring the cleanliness and vacuum environment inside the silo, which is beneficial to improving the efficiency and safety of the entire feeding process. BRIEF DESCRIPTION OF THE DRAWINGS

[0074] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0075] Figure 1 It is a schematic flow chart of a secondary charging control method of a polysilicon ingot furnace according to the present invention;

[0076] Figure 2 A schematic structural diagram of a secondary charging control device for a polysilicon ingot casting furnace provided by the present invention.

[0077] in:

[0078] 1. Silo; 2. Upper cover; 3. Vacuum pressure sensor;

[0079] 4. Support column; 5. Electric gate valve; 6. Blanking tee;

[0080] 7. Electric vacuum ball valve. DETAILED DESCRIPTION

[0081] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0082] Embodiment 1: Figure 1 The figure is a schematic flow chart of a method for controlling secondary charging of a polysilicon ingot furnace according to the present invention. Figure 2 A schematic diagram of the structure of a secondary charging control device for a polysilicon ingot furnace provided by the present invention is shown in FIG. Figure 1 A secondary charging control method for a polysilicon ingot furnace is shown, comprising the following steps:

[0083] Step S1: start the ingot casting furnace, preheat it to the initial temperature, add silicon material into the crucible in the ingot casting furnace, and obtain the melt temperature T in the crucible and the thermal field state in the crucible through the temperature sensor, wherein the temperature sensor is arranged on the furnace top, the furnace inner wall and the furnace bottom wall of the crucible, and the temperature sensor adopts a thermocouple with a protective sleeve;

[0084] Step S2: according to the melt temperature T in the crucible, the secondary feed amount is calculated by a real-time dynamic programming method, and the secondary feed amount is set by a control system, specifically, including:

[0085] Step S2-1: three fuzzy sets are defined in the feeding control system by a fuzzy control algorithm. The fuzzy sets include "low temperature", "suitable temperature" and "high temperature". Each set covers a different range of the melt temperature in the crucible. There are overlapping areas between the fuzzy sets to reflect the continuity and fuzziness of the melt temperature change. Furthermore, the temperature range of the fuzzy set is defined as:

[0086] Low Temperature: This set covers the temperature range at the lower end of the ideal melt temperature range, for example, from 1420°C to 1435°C. It represents the situation where the melt temperature is low and it may be necessary to increase the secondary feed amount to accelerate the melting process.

[0087] Medium Temperature: The temperature range covered by this set is in the middle of the ideal melt temperature range, for example, from 1430°C to 1445°C. It represents that the melt temperature is in a relatively ideal state, and the secondary feed amount should remain stable to maintain the uniformity of the thermal field.

[0088] High Temperature: This set covers a temperature range at the higher end of the ideal melt temperature range, for example, from 1440°C to 1455°C. It represents a higher melt temperature and may require a reduction in secondary feed to avoid the impact of excessive temperature on melt quality.

[0089] There are overlapping areas between fuzzy sets, which means that within a certain temperature range, the melt temperature may belong to two or more fuzzy sets at the same time. This design is to reflect the continuity and uncertainty of temperature change, because in actual operation, the change of melt temperature is often gradual rather than sudden.

[0090] For example, if the melt temperature is 1435°C, it will belong to both the "low temperature" and "suitable temperature" fuzzy sets. In this case, the temperature value of 1435°C will have a certain degree of membership, corresponding to the "low temperature" and "suitable temperature" sets. The size of the degree of membership reflects the closeness of the melt temperature to each set.

[0091] In the present invention, the fuzzy control algorithm quantifies the membership of the melt temperature in different temperature intervals by defining three fuzzy sets, which are "low temperature" (covering 1420°C to 1435°C), "suitable temperature" (covering 1430°C to 1445°C) and "high temperature" (covering 1440°C to 1455°C). In particular, there are overlapping areas between adjacent fuzzy sets, such as the "low temperature" and "suitable temperature" sets overlap between 1430°C and 1435°C to reflect the continuity of temperature changes. When the melt temperature is in the overlapping area, it will have memberships belonging to both sets at the same time, and the calculation of these memberships is based on the shape and parameters of the triangular or trapezoidal membership functions, which are used to guide the dynamic adjustment of the secondary feed amount.

[0092] Step S2-2: define a membership function for each fuzzy set to quantify the degree of membership of the melt temperature in the crucible in the set; the membership function adopts a triangular function, and the choice of shape depends on the characteristics of the temperature change and the requirements of the control strategy. The triangular membership function is suitable for the case where the temperature interval is clear. The function is distributed in a triangle within the interval, the membership at the vertex is 1, and the membership at the edge of the interval is 0. Specifically, the present invention can convert the fuzzy set into a quantifiable mathematical form through the membership function. Through the membership function, the control system can make a continuous rather than binary response to the melt temperature, which improves the control accuracy and the responsiveness of the system; the design of the membership function allows the control system to adapt to the continuous change of temperature, even if the temperature is at the boundary of two fuzzy sets, it can make an appropriate response, avoiding the control incoherence caused by the hard boundary, thereby optimizing the feeding control strategy. The smooth transition of the triangular and trapezoidal membership functions at the boundary of the set avoids sudden changes in the control strategy, makes the adjustment of the feeding amount smoother, and reduces the disturbance to the melt and the thermal field. Improve control accuracy: The use of membership function enables the control system to dynamically adjust the feeding amount according to the real-time changes in the melt temperature, which improves the control accuracy and helps to maintain the melt temperature within the ideal range, thereby improving the quality of polysilicon ingots. The secondary feeding strategy can be optimized to make it more in line with the law of melt temperature changes, thereby improving ingot casting efficiency and reducing energy consumption.

[0093] In summary, defining the membership function in step S2-3 is a crucial step in the fuzzy control algorithm, which improves the performance of the control system and the overall efficiency of the polysilicon ingot casting process through continuous control, adaptability and optimization strategies.

[0094] Step S2-3: Calculate the membership degree of the melt temperature T in step S1 in the fuzzy sets of "low temperature", "suitable temperature" and "high temperature";

[0095] Step S2-4: According to the preset ideal temperature range of the melt, the temperature thresholds α1, α2, and α3 are set through the control system. Specifically, during the polysilicon ingot casting process, multiple temperature thresholds are set according to the ideal temperature range of the melt and are set in the software interface of the control system or the electric control box. These temperature thresholds are part of the control strategy and are used to guide the dynamic adjustment of the secondary feed amount. Specifically, the steps for setting the temperature thresholds are as follows:

[0096] a. Login to the control system: First, the operator needs to log in to the user interface of the crucible control system to access the parameter setting menu: In the main menu, find the option of parameter setting or process control, and enter the setting interface of temperature control or secondary feeding control.

[0097] b. Setting temperature threshold: In the temperature control setting, there is an input box or slider for setting the temperature threshold. Multiple thresholds can be set, and each threshold corresponds to a different feeding strategy or action.

[0098] c. Enter the temperature threshold: According to the ideal temperature range of the melt and process requirements, enter the specific values ​​of each temperature threshold. For example, set the "low temperature" threshold to 1420°C, the "suitable temperature" threshold to 1430°C, and the "high temperature" threshold to 1440°C.

[0099] d. Save settings: After entering all thresholds, save the settings to ensure that the new temperature thresholds take effect.

[0100] e. Testing and verification: Before actual operation, a test run is required to verify whether the set temperature threshold is appropriate and whether the expected melt temperature control effect can be achieved (when setting the temperature threshold, the accuracy of the temperature sensor and the stability of the control system response should be considered, and the gap between the thresholds should not be too small to avoid frequent feeding adjustments and affect the smoothness of control).

[0101] f. Recording and analysis: Keep records of each set temperature threshold and the corresponding melt temperature change to facilitate subsequent process optimization and data analysis.

[0102] By setting the temperature threshold on the control system interface, the secondary feed amount can be dynamically controlled according to the ideal temperature range of the melt, ensuring that the melt temperature is maintained within the optimal process window, thereby improving the efficiency and quality of polysilicon ingots.

[0103] Each temperature threshold α1, α2, and α3 corresponds to a feed amount; specifically, combined with the fuzzy set in the next step, for example, the "low temperature" threshold is set to α1, the "suitable temperature" threshold is set to α2, and the "high temperature" threshold is set to α3, where α1<α2<α3. When the melt temperature is lower than α1, the feed amount needs to be increased to speed up the melting rate; when the temperature is higher than α3, the feed amount is reduced to avoid overheating;

[0104] The ideal temperature range of the melt refers to the temperature range that the melt should maintain in order to achieve the best melting effect and product quality in polysilicon ingot casting or other smelting processes; the ideal temperature range of the melt is a very critical parameter in the polysilicon ingot casting process, which directly affects the quality and efficiency of the ingot casting. The melting temperature of the polysilicon ingot is between 1410°C and 1420°C (in the actual ingot casting process, in order to ensure that the silicon is completely melted and take into account the uneven temperature distribution, the actual operating melt temperature will be higher, and the melting temperature range is 1420°C to 1440°C). The ideal temperature range usually refers to the temperature range that can ensure that the silicon material is fully melted without causing impurity precipitation or structural defects caused by excessive heating. For example, a typical ideal temperature range is between 1420°C and 1450°C, ensuring that the silicon material can form a good crystal structure at this temperature while avoiding the adverse effects caused by excessively high temperatures.

[0105] Step S2-5: Formulate fuzzy rules. When the "low temperature" set membership of the melt temperature T in the crucible is greater than the set temperature threshold α1, control the secondary feeding device to increase the feeding amount, and the feeding amount is adjusted to; when the "suitable temperature" set membership of the melt temperature T in the crucible is greater than the set temperature threshold α2, the feeding amount of the secondary feeding device remains unchanged; when the "high temperature" set membership of the melt temperature T in the crucible is greater than the preset threshold α3, control the secondary feeding device to reduce the feeding amount and adjust the feeding amount to;

[0106] Step S2-6: Perform fuzzy reasoning to determine the fuzzy output value of the secondary feed amount according to the membership degree calculated in step S2-3 and the fuzzy rule established in step S2-5;

[0107] Step S2-7: Defuzzify the fuzzy output value of the secondary feed amount using the center of gravity method to obtain the feed amount value, wherein the center of gravity method (COG) is a defuzzification technology commonly used in fuzzy logic control, which is used to convert the fuzzy output obtained by fuzzy reasoning into a clear and usable value. In the secondary feed control of the polysilicon ingot furnace, the center of gravity method is used to convert the fuzzy output of the secondary feed amount obtained by fuzzy reasoning into a specific feed amount value, so that the actual feed control can be performed. The specific steps include:

[0108] Step S2-7-1: Calculate the membership function of the fuzzy output

[0109] First, according to the result of fuzzy reasoning, the membership function of the output fuzzy set is obtained. This function describes the membership of the output value on each possible value, that is, the degree to which the output value belongs to the fuzzy set.

[0110] Step S2-7-2: Constructing the area map of fuzzy output

[0111] Plotting the output values ​​on the x-axis and the corresponding membership on the y-axis forms a graph whose area represents the total possibility of the fuzzy output.

[0112] Step S2-7-3: Calculate the centroid of the area

[0113] Next, calculate the center of gravity of the graph, that is, the average position of the graph on the x-axis, by integration or numerical methods. The calculation formula for the center of gravity is as follows:

[0114]

[0115] Among them, x is the output value, μ(x) is the membership of the output value, the numerator is the integral of the output value multiplied by its membership, and the denominator is the integral of the membership, which represents the total area of ​​the fuzzy output;

[0116] Integral in the numerator It represents the accumulation of the product of the output value x and its membership μ(x) within the entire fuzzy set. This integral is actually calculating the "quality moment" of the fuzzy output graph, that is, the sum of each part of the graph weighted by its distance from the origin and its quality (membership). The integral in the denominator It represents the total area of ​​the fuzzy output graph, which is the accumulation of the membership function within the entire fuzzy set. This integral gives the "total mass" of the graph. The centroid method finds the geometric center or centroid position of the graph by calculating this ratio, which is mathematically defined as the average position of the fuzzy output graph in the x-axis direction. Therefore, the calculated COG value is the clear feed amount value after defuzzification, which can be used as the basis for actual operation in the control system. In practical applications, if the membership function is continuous, the above integral can be approximated by the method of numerical integration. If the membership function is discrete, then the summation can be used instead of the integral to calculate the centroid position. In either case, the purpose is to extract a definite and actionable value from the fuzzy output.

[0117] Step S2-7-4: Convert the fuzzy output into a clear value for the amount of material added (the position of the center of gravity is the clear value after defuzzification, which can be directly used in the control system to perform specific adjustments to the amount of material added).

[0118] The above-mentioned centroid method converts the result of fuzzy reasoning into an accurate value, so that the output of the control system can accurately execute the feeding instruction, avoiding the uncertainty caused by fuzzy output. By calculating the centroid of the entire fuzzy output graph, the centroid method can fully consider all possible output values ​​and their membership. In the secondary feeding control of the polysilicon ingot furnace, the use of the centroid method to defuzzify can more accurately adjust the feeding amount, thereby improving the melting efficiency, optimizing the thermal field state, and ultimately improving the quality and production efficiency of polysilicon, so that the control system can respond accurately and promptly according to the real-time changes in the melt temperature.

[0119] Step S2-8: Convert the obtained feeding amount value into an executable control signal, output the control signal to the electric gate valve 5, realize secondary feeding by controlling the opening of the electric gate valve 5, and after realizing secondary feeding by controlling the opening of the electric gate valve 5, continue to obtain the melt temperature T in the crucible through the temperature sensor, monitor the temperature change of the melt in real time, and feed back the collected real-time temperature data to the control system. This step is used to evaluate the impact of the last feeding operation on the melt temperature, that is, whether the feeding amount adjustment effectively brings the melt temperature to the preset ideal temperature range. Based on the latest real-time temperature data, the membership of the melt temperature in the "low temperature", "suitable temperature" and "high temperature" fuzzy sets can also be recalculated, and a new round of fuzzy reasoning is performed accordingly to determine the next feeding amount adjustment strategy. Through continuous real-time feedback, the fuzzy control algorithm can dynamically optimize the control strategy according to the latest state of the melt temperature, ensuring that the feeding amount can always effectively respond to the fluctuation of the melt temperature and maintain the melt temperature within the preset ideal range.

[0120] Step S3: According to the melt temperature T in the crucible, define the rapid melting time window and the thermal field stabilization time window, wherein the rapid melting time window refers to the initial stage of the feeding cycle, when the goal is to quickly melt the silicon material to form a melt. At this stage, the feeding speed is faster to ensure that the silicon material can be quickly and evenly converted into the melt; the thermal field stabilization window refers to the time after the melt is formed, when the goal is changed to maintaining the uniformity and stability of the thermal field to facilitate the growth of the crystal. The feeding speed and feeding amount at this stage need to be more finely controlled to avoid unnecessary disturbances to the thermal field and affect the quality of the crystal. In each time window, the secondary feeding speed of the secondary feeding device is dynamically adjusted by controlling the electric gate valve 5 of the secondary feeding device. The specific control method is to control the percentage of the opening amplitude of the electric gate valve 5, and adjust the opening frequency and duration of the electric gate valve 5 according to the change of the melt temperature; wherein according to the melt temperature T in the crucible, a rapid melting time window and a thermal field stabilization time window are defined. In each time window, the secondary feeding speed of the secondary feeding device is dynamically adjusted by controlling the electric gate valve 5 of the secondary feeding device, which specifically includes:

[0121] Step S3-1: Based on the melt temperature T acquired by the temperature sensor, the melt temperature T is compared with a preset melting start temperature threshold T_start to determine the time point t_start at which the melting process starts;

[0122] In the polysilicon ingot casting process, determining the time point when the melting process starts is one of the key steps to achieve effective control. This time point is determined based on the real-time data provided by the temperature sensor - the melt temperature T. The following is a detailed description of how to determine the time point when the melting process starts based on the melt temperature T:

[0123] Preheating phase monitoring: During the crucible preheating phase, the temperature sensor will continuously monitor the temperature inside the crucible until the silicon material begins to melt. The melting of silicon material begins near its melting point, which is 1410°C for polysilicon.

[0124] Temperature trend analysis: Analyze the change trend of melt temperature T over time and find the inflection point where the temperature rises sharply. This inflection point marks the beginning of melting of silicon material, the formation of melt, and the start of the melting process. Temperature trend analysis can assist in judgment by monitoring the rate of change of temperature over time (i.e., temperature slope). When the temperature slope increases significantly, it means that the silicon material is rapidly absorbing heat and starting to melt.

[0125] Threshold setting: Based on experimental data and historical experience, a temperature threshold is set as a sign of the beginning of melting. This threshold is higher than the melting point of silicon material to ensure the exact start of the melting process.

[0126] When the melt temperature T exceeds this preset threshold for the first time, it can be determined that the melting process has begun.

[0127] Record the time point: Once the melting process is confirmed to have started, record this time point immediately. This time point will become the basis for subsequent control strategies (such as time window definition and dosing strategy adjustment).

[0128] Dynamic adjustment: Even after the melting process begins, the change in melt temperature T is continuously monitored so that the control strategy can be adjusted in time when the temperature is abnormal or the external conditions change.

[0129] Through the above steps, the time point when the melting process starts can be accurately determined based on the data of the temperature sensor, providing key reference information for subsequent secondary feeding control.

[0130] Step S3-2: Set the start time t_start of the rapid melting time window, and according to the preset melting efficiency requirements and the total amount of silicon material, preset the duration Δt_melt of the rapid melting time window, define the rapid melting time window as [t_start, t_start+Δt_melt], and the rapid melting time window as [t_start, t_start+Δt_melt], which means that the start time of the thermal field stabilization time window is the sum of the melting start time t_start and the duration Δt_melt of the rapid melting time window. This ensures that after the silicon material is fully melted, the system can smoothly transition to the stage of maintaining thermal field stability.

[0131] Step S3-3: within the rapid melting time window, dynamically adjust the secondary feeding speed v_feed_melt of the secondary feeding device in the rapid melting stage of the melt according to the melt temperature T and the preset melting efficiency requirement, so as to accelerate the melting process of the silicon material.

[0132] Step S3-4: After the rapid melting time window of the melt ends, define the thermal field stable time window as [t_stable_start, t_stable_end], where t_stable_start=t_start+Δt_melt, t_stable_start represents the start time point of the thermal field stable time window, t_stable_end represents the end time point of the thermal field stable time window, Δt_melt represents the duration of the rapid melting time window, specifically, the start time point and the end time point of the thermal field stable time window are defined based on the dynamic changes of the melting process, where t_stable_start represents the start time of the thermal field stable time window, that is, the next moment after the end of the rapid melting time window, marking a key transition point in the melting and crystal growth process, where the specific value of t_stable_end is determined according to the needs of crystal growth and the requirements of thermal field stability, and is related to the time when crystal growth is completed and the time when the thermal field reaches a predetermined stable state. In practical applications, t_stable_end needs to be dynamically adjusted by real-time monitoring of the thermal field state and crystal growth progress to ensure the optimization of the crystal growth process. By defining t_stable_start and t_stable_end, the control strategy can ensure that after the melting process is completed, the system can accurately control the thermal field, maintain a stable environment, promote uniform growth of crystals, and help improve crystal quality and production efficiency.

[0133] Step S3-5: In the thermal field stabilization time window, dynamically adjust the secondary feeding speed v_feed_stable of the secondary feeding device in the melt thermal field stabilization stage according to the melt temperature T and the thermal field state in the crucible, so as to maintain the uniformity and stability of the thermal field and promote the uniform growth of the crystal.

[0134] In the step S3-3, the secondary feeding speed v_feed_melt of the secondary feeding device in the rapid melting stage of the melt is dynamically adjusted, and in the step S3-5, the secondary feeding speed v_feed_stable of the secondary feeding device in the stable stage of the melt thermal field is dynamically adjusted using a dynamic control model established based on the melt temperature T and the thermal field state in the crucible. Specifically, the method for establishing the dynamic control model includes:

[0135] a. Data collection and preprocessing

[0136] Collect historical data on melt temperature T, temperature gradient, secondary feeding speed, secondary feeding amount, and melting efficiency during the secondary feeding process;

[0137] b. Data preprocessing

[0138] Clean the data, remove outliers and missing values, ensure the accuracy and completeness of the data, and prepare the data set for modeling;

[0139] c. Feature extraction

[0140] Feature extraction is the process of selecting input variables associated with the target variable (such as the secondary feeding speed). The principal component analysis (PCA) statistical method can be used to filter out the most influential features from the original data set. Specifically, PCA found that the melt temperature T is the most important feature affecting the secondary feeding speed, while the temperature gradient has a relatively small impact. Therefore, when building the model, the main focus is on the melt temperature T feature;

[0141] d. Model selection and training

[0142] According to the nature of the problem and the characteristics of the data, a machine learning model is selected. The machine learning model uses the support vector machine (SVM) as the model. SVM can handle small sample data and nonlinear relationships well, and is very suitable for multivariate problems such as predicting the secondary feeding rate.

[0143] e. Data partitioning

[0144] The data set is divided into a training set and a test set. 70% of the data in the data set is used as the training set to train the model, and 30% of the data is used as the test set to test the generalization ability of the model.

[0145] f. Model training

[0146] Train the model using the training set data and adjust the model parameters to minimize the prediction error;

[0147] g. Model Validation

[0148] The k-fold cross-validation method was used to evaluate the generalization ability of the model. Specifically, the training set was divided into 5 subsets using the 5-fold cross-validation method. Four subsets were used to train the model each time, and the remaining 1 subset was used as the validation set. This was repeated 5 times to evaluate the stability of the model.

[0149] h. Model testing and analysis

[0150] Model testing: Use the test set data to evaluate the prediction performance of the model and calculate the prediction error, root mean square error, and mean absolute error indicators;

[0151] Result analysis: Analyze the matching degree between the model prediction results and the actual secondary feeding speed, and evaluate the accuracy and reliability of the model;

[0152] i. Model deployment and real-time control

[0153] Model deployment: deploy the dynamic control model into the control system;

[0154] Real-time data collection: During the operation of the crucible, the melt temperature T and thermal field state are monitored and collected in real time through the temperature sensor;

[0155] Dynamic adjustment: Input the real-time data collected by the temperature sensor into the trained model, and dynamically adjust the feeding speed of the secondary feeding device according to the secondary feeding speed recommendation output by the model;

[0156] Closed-loop control: The adjusted feeding speed is fed back to the control system, and the control system realizes the dynamic secondary feeding speed adjustment of the melt by controlling the opening of the electric gate valve 5, thus forming a closed-loop control.

[0157] Step S3-6: monitor the vacuum degree inside the silo 1 in the secondary feeding device through the vacuum pressure sensor 3, adjust the division of the rapid melting time window and the thermal field stabilization time window and the feeding strategy, and ensure the stability of the melt state during the secondary feeding process, specifically, including:

[0158] Step S3-6-1: Continuously monitor the vacuum degree in the silo 1 through the vacuum pressure sensor 3, transmit the data to the control system, and the data analysis module processes the vacuum degree data in real time to evaluate the stability of the internal environment of the silo 1;

[0159] Step S3-6-2: In the rapid melting stage of the melt, when the melt temperature T reaches the preset ideal melting temperature range and the vacuum degree in the silo 1 is within the preset ideal range (0^-5 Pascal to 10^-8 Pascal), the rapid melting time window is shortened to accelerate the melting of the silicon material;

[0160] Step S3-6-3: In the melt thermal field stabilization stage, when the melt temperature T reaches the preset ideal melting temperature range and the vacuum degree in the silo 1 is within the preset ideal range (0^-5 Pascal to 10^-8 Pascal), adjust the opening of the electric gate valve 5 to control the secondary feeding speed v_feed_stable to maintain the uniformity and stability of the thermal field.

[0161] Specifically, the opening of the electric gate valve 5 directly affects the secondary feeding speed v_feed_stable. In the thermal field stabilization stage, if the vacuum degree in the silo 1 is in the preset ideal range (0^-5 Pascal to 10^-8 Pascal), the feeding speed is accurately controlled by adjusting the opening of the electric gate valve 5 to adapt to the thermal field changes. If the thermal field parameters indicate that the feeding speed needs to be reduced to maintain the thermal field stability, the control system will instruct the electric gate valve 5 to reduce the opening; conversely, if the thermal field can withstand a higher feeding speed, the control system will instruct the electric gate valve 5 to increase the opening. The control system automatically adjusts the opening of the electric gate valve 5 according to the real-time feedback of the thermal field state to achieve the optimal secondary feeding speed v_feed_stable. By continuously monitoring the thermal field state and adjusting the opening of the electric gate valve 5, the control system can dynamically maintain the uniformity and stability of the thermal field, and maintain the optimal conditions for crystal growth even when external conditions change.

[0162] The present invention also discloses a secondary feeding device for a polysilicon crucible, comprising an upper cover 2 connected to a silo 1, and a plurality of supporting columns 4 fixedly connected to the bottom of the silo 1, the plurality of supporting columns 4 provide stable support, and ensure the safety and stability of the silo 1 during the feeding process; the present invention is connected to an electric gate valve 5 at the bottom discharge end of the silo 1, and a blanking tee 6 is connected to the bottom of the electric gate valve 5, the discharge end of the blanking tee 6 is interconnected with the upper furnace cover of the crucible body, the blanking tee 6 serves as a channel for guiding the raw materials from the silo 1 to the crucible, and the tee design provides flexible material flow control; the present invention is connected to an electric vacuum ball valve 7 and a vacuum pressure sensor 3 on the silo 1, and the electric vacuum ball valve 7 and the vacuum pressure sensor 3 ensure that the feeding process is carried out in a high vacuum environment, prevent external impurities from entering, and maintain the purity of the melt.

[0163] The present invention can automatically control the electric gate valve 5 through the secondary feeding control method, thereby realizing the secondary feeding process, reducing manual intervention, and improving the accuracy and efficiency of feeding. Combined with the melt temperature data T and the thermal field state in the crucible, the electric gate valve 5 can dynamically adjust the feeding speed and amount to ensure the precise control of the melt temperature and the feeding process. Bengbu Fan improves the melting efficiency and crystallization quality of polysilicon through optimized feeding strategies and vacuum environment, thereby improving the overall production efficiency.

[0164] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for controlling secondary charging of a polysilicon ingot furnace, characterized in that: The following steps are involved: Step S1: starting the ingot casting furnace, preheating it to an initial temperature, adding silicon material into a crucible in the ingot casting furnace, and obtaining the melt temperature T in the crucible and the thermal field state in the crucible through a temperature sensor; Step S2: according to the melt temperature T in the crucible, the secondary feeding amount is calculated by a real-time dynamic programming method, and the secondary feeding amount is set by a control system; Step S2-1: three fuzzy sets are defined in the feeding control system by using a fuzzy control algorithm. The fuzzy sets include "low temperature", "suitable temperature" and "high temperature". Each set covers a different range of the melt temperature in the crucible. There are overlapping areas between the fuzzy sets to reflect the continuity and fuzziness of the melt temperature change. Step S2-2: defining a membership function for each fuzzy set to quantify the degree of membership of the melt temperature in the crucible in the set; Step S2-3: Calculate the membership degree of the melt temperature T in step S1 in the fuzzy sets of "low temperature", "suitable temperature" and "high temperature"; Step S2-4: according to the preset ideal temperature range of the melt, the temperature thresholds α1, α2, and α3 are set by the control system, and each temperature threshold corresponds to a feed amount; Step S2-5: Formulate fuzzy rules. When the "low temperature" set membership of the melt temperature T in the crucible is greater than the set temperature threshold α1, control the secondary feeding device to increase the feeding amount; when the "suitable temperature" set membership of the melt temperature T in the crucible is greater than the set temperature threshold α2, the feeding amount of the secondary feeding device remains unchanged; when the "high temperature" set membership of the melt temperature T in the crucible is greater than the preset threshold α3, control the secondary feeding device to reduce the feeding amount; Step S2-6: Perform fuzzy reasoning to determine the fuzzy output value of the secondary feed amount according to the membership degree calculated in step S2-3 and the fuzzy rule established in step S2-5; Step S2-7: Defuzzify the fuzzy output value of the secondary feeding amount by using the centroid method to obtain the feeding amount value; Step S2-8: converting the obtained feeding amount value into an executable control signal, outputting the control signal to the electric gate valve (5), and realizing secondary feeding by controlling the opening of the electric gate valve (5); Step S3: defining a rapid melting time window and a thermal field stabilization time window according to the melt temperature T in the crucible, and dynamically adjusting the secondary feeding speed of the secondary feeding device by controlling the electric gate valve (5) of the secondary feeding device within each time window; Step S3-1: Based on the melt temperature T acquired by the temperature sensor, the melt temperature T is compared with a preset melting start temperature threshold T_start to determine the time point t_start at which the melting process starts; Step S3-2: Set the start time t_start of the rapid melting time window, and according to the preset melting efficiency requirement and the total amount of silicon material, preset the duration Δt_melt of the rapid melting time window, and define the rapid melting time window as [t_start, t_start+Δt_melt]: Step S3-3: within the rapid melting time window, dynamically adjusting the secondary feeding speed v_feed_melt of the secondary feeding device in the rapid melting stage of the melt according to the melt temperature T and the preset melting efficiency requirement, so as to accelerate the melting process of the silicon material; Step S3-4: After the rapid melting time window of the melt ends, define the thermal field stabilization time window as [t_stable_start, t_stable_end]; In step S3-4, t_stable_start=t_start+Δt_melt, wherein t_stable_start represents the starting time point of the thermal field stabilization time window, t_stable_end represents the ending time point of the thermal field stabilization time window, and Δt_melt represents the duration of the rapid melting time window; Step S3-5: within the thermal field stabilization time window, dynamically adjusting the secondary feeding speed v_feed_stable of the secondary feeding device in the melt thermal field stabilization stage according to the melt temperature T and the thermal field state in the crucible; The dynamic adjustment of the secondary feeding speed v_feed_melt of the secondary feeding device in the rapid melting stage of the melt in step S3-3 and the dynamic adjustment of the secondary feeding speed v_feed_stable of the secondary feeding device in the stable stage of the melt thermal field in step S3-5 are both performed dynamically using a dynamic control model established based on the melt temperature T in the crucible and the thermal field state; Step S3-6: The vacuum degree inside the silo (1) in the secondary feeding device is monitored by the vacuum pressure sensor (3), and the division of the rapid melting time window and the thermal field stabilization time window and the feeding strategy are adjusted to ensure the stability of the melt state during the secondary feeding process.

2. A method for controlling secondary charging of a polycrystalline silicon ingot casting furnace according to claim 1, characterized in that: The temperature sensors in step S1 are arranged on the furnace top, the furnace inner wall and the furnace bottom wall of the crucible, and the temperature sensors are either thermocouples or thermal resistors.

3. The method for controlling secondary charging of a polycrystalline silicon ingot casting furnace according to claim 1, characterized in that: After the secondary feeding is achieved by controlling the opening of the electric gate valve (5) in step S2-8, the temperature sensor is used to obtain the melt temperature T in the crucible, monitor the temperature change of the melt in real time, and feed the collected real-time temperature data back to the fuzzy control algorithm.

4. The method for controlling secondary charging of a polysilicon ingot casting furnace according to claim 1, characterized in that: In step S3-6, the vacuum degree inside the material bin (1) in the secondary feeding device is monitored by the vacuum pressure sensor (3), and the division of the rapid melting time window and the thermal field stabilization time window and the feeding strategy are adjusted, including: Step S3-6-1: Continuously monitor the vacuum degree in the silo (1) through the vacuum pressure sensor (3), transmit the data to the control system, and the data analysis module processes the vacuum degree data in real time to evaluate the stability of the internal environment of the silo (1); Step S3-6-2: During the rapid melting stage of the melt, when the melt temperature T reaches a preset ideal melting temperature range and the vacuum degree in the silo (1) is within the preset ideal range, the rapid melting time window is shortened to accelerate the melting of the silicon material; Step S3-6-3: In the melt thermal field stabilization stage, when the melt temperature T reaches a preset ideal melting temperature range and the vacuum degree in the silo (1) is within the preset ideal range, the opening of the electric gate valve (5) is adjusted to control the secondary feeding speed v_feed_stable to maintain the uniformity and stability of the thermal field.

5. The method for controlling secondary charging of a polycrystalline silicon ingot casting furnace according to claim 1, characterized in that: The method for establishing the dynamic control model comprises: a. Data collection and preprocessing Collect historical data on melt temperature T, temperature gradient, secondary feeding speed, secondary feeding amount, and melting efficiency during the secondary feeding process; b. Data preprocessing Clean the data, remove outliers and missing values, ensure the accuracy and completeness of the data, and prepare the data set for modeling; c. Feature extraction Extract features related to the secondary feeding speed from the collected data set, and screen out the features that have the greatest impact on the secondary feeding speed through principal component analysis; d. Model selection and training Select a machine learning model based on the nature of the problem and the characteristics of the data. The machine learning model uses any model of linear regression, support vector machine, neural network or random forest; e. Data partitioning Divide the data set into a training set and a test set, with the ratio of training set to test set being 70%:30% or 80%:20%; f. Model training Train the model using the training set data and adjust the model parameters to minimize the prediction error; g. Model Validation The k-fold cross-validation method was used to evaluate the generalization ability of the model; h. Model testing and analysis Model testing: Use the test set data to evaluate the prediction performance of the model and calculate the prediction error, root mean square error, and mean absolute error indicators; Result analysis: Analyze the matching degree between the model prediction results and the actual secondary feeding speed, and evaluate the accuracy and reliability of the model; i. Model deployment and real-time control Model deployment: deploy the dynamic control model into the control system; Real-time data collection: During the operation of the crucible, the melt temperature T and thermal field state are monitored and collected in real time through the temperature sensor; Dynamic adjustment: Input the real-time data collected by the temperature sensor into the trained model, and dynamically adjust the feeding speed of the secondary feeding device according to the secondary feeding speed recommendation output by the model; Closed-loop control: The adjusted feeding speed is fed back to the control system, and the control system realizes dynamic secondary feeding speed adjustment of the melt by controlling the opening of the electric gate valve (5), thereby forming a closed-loop control.