Optimization method for pier loads in bridge span structures

By obtaining the load stabilization characteristic information and flood season data of the bridge, the pier body load optimization is solved, and the problem of insufficient stability of the bridge pier body under impact load and temperature change conditions during the flood season is improved, the adaptability and reliability of the bridge are reduced, and the Maintenance cost.

CN118607077BActive Publication Date: 2024-12-06SHANDONG TIEYING CONSTR ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411067982.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-12-06
Estimated Expiration
2044-08-06

AI Technical Summary

Technical Problem

The stability and durability of the bridge pier under the impact load and temperature change conditions during flood season are insufficient, which makes it difficult to ensure structural safety and economics.

Method used

By obtaining the load stabilization characteristic information of the bridge span structure and summer flood season data, conducting distribution analysis, building the pier body load impact optimization function and the temperature change flexibility optimization function, optimizing the load design parameters, and ensuring the stability and durability of the bridge in extreme environments. .

Benefits of technology

It significantly improves the adaptability and reliability of the bridge pier under extreme environmental conditions, ensures the stability of the bridge under the impact load and temperature changes during flood season, and reduces construction and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118607077B_ABST
    Figure CN118607077B_ABST
Patent Text Reader

Abstract

This invention discloses a method for optimizing the pier load of bridge span structures, belonging to the field of bridge structural engineering. The method includes: acquiring the stability characteristic information of the bridge span structure to be optimized for pier load; collecting summer flood season data records of the area where the bridge span structure is located, performing distribution analysis to obtain the distribution of flood season characteristic information, including impact load information and temperature change information; optimizing the pier load based on the distribution of flood season characteristic information; and optimizing the pier load for temperature change flexibility within the optimized load design parameter range based on the distribution of flood season characteristic information to obtain the optimal load design parameters as the pier load optimization result. This application solves the technical problem in the prior art where the stability and durability of bridge piers under flood season impact loads and temperature change conditions are insufficient, leading to difficulties in ensuring structural safety and economy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of bridge structure engineering, and in particular to a pier load optimization method for a bridge span structure. Background Art

[0002] With the rapid development of modern society, infrastructure construction is also advancing. As an important hub connecting various places, the safety and reliability of bridges have become particularly important. The design and maintenance of bridge structures is a very challenging topic in the engineering field. Especially in areas where natural disasters such as flood seasons or earthquakes occur frequently, bridge structures are affected by extreme weather and environmental conditions, causing structural damage or even collapse. Therefore, optimizing the load design of bridge piers and improving their adaptability and stability under various environmental conditions are crucial to ensure the safe operation of bridges.

[0003] Traditional bridge pier design usually relies on basic information about dead loads and live loads, but it is still insufficient in dealing with extreme environmental changes, such as water flow impact and temperature changes during the summer flood season. Heavy rainfall and flooding during the flood season will not only increase the load on the bridge, but also cause sudden temperature changes, which in turn affect the stability of the bridge structure. Existing technologies mostly use a simple safety factor method for design, which fails to fully consider the distribution and probabilistic characteristics of flood season impact loads and temperature change information, resulting in insufficient reliability of bridge structures in extreme environments. Summary of the invention

[0004] This application provides a pier load optimization method for a bridge span structure, aiming to solve the technical problem in the prior art that the bridge piers lack stability and durability under flood season impact loads and temperature change conditions, thereby making it difficult to ensure structural safety and economy.

[0005] In view of the above problems, the present application provides a pier load optimization method for a bridge span structure.

[0006] The present application provides a pier load optimization method for a bridge span structure, the method comprising obtaining steady-load characteristic information of the bridge span structure to be subjected to pier load optimization, the steady-load characteristic information comprising constant load information and peak live load information; collecting summer flood season data records of the area where the bridge span structure is located, performing distribution analysis, and obtaining flood season characteristic information distribution, the flood season characteristic information distribution comprising multiple flood season characteristic information and multiple flood season probability information, each flood season characteristic information comprising impact load information and temperature change information; performing pier body load impact optimization according to the flood season characteristic information distribution, and obtaining an optimized load design parameter range; performing pier body temperature change flexible optimization within the optimized load design parameter range according to the flood season characteristic information distribution, and obtaining optimal load design parameters as the pier body load optimization result.

[0007] One or more technical solutions provided in this application have at least the following technical effects or advantages:

[0008] The technical solution of obtaining the steady-load characteristic information of the bridge span structure and the summer flood season data records and performing distribution analysis has solved the technical problem in the prior art that the stability and durability of the bridge pier under the flood season impact load and temperature change conditions are insufficient, which makes it difficult to ensure the safety and economy of the structure. Specifically, by obtaining the constant load information and the peak live load information, the steady-load characteristic information is accurately calculated; the summer flood season data in the area is collected and analyzed, the impact load and temperature change information are extracted, and cluster analysis is performed to obtain the distribution of flood season characteristic information. Combined with this information, the pier load impact optimization function is constructed, and it is optimized in the load design parameter space to obtain the optimized load design parameter range. This technical solution significantly improves the adaptability and reliability of the bridge pier under extreme environmental conditions, ensures the stability of the bridge under the flood season impact load and temperature change conditions, and thus achieves the technical effect of improving the safety of the bridge structure and reducing the construction and maintenance costs.

[0009] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 A flow chart of a method for optimizing the pier load of a bridge span structure is provided for an embodiment of the present application.

[0011] Figure 2 A flow chart of obtaining flood season characteristic information distribution in a pier load optimization method for a bridge span structure is provided for an embodiment of the present application. DETAILED DESCRIPTION

[0012] The overall idea of ​​the technical solution provided by this application is as follows:

[0013] The embodiment of the present application provides a pier load optimization method for a bridge span structure. The pier load optimization is performed by comprehensively analyzing the steady load characteristic information of the bridge structure and the summer flood season data. First, the constant load information and peak live load information of the bridge are obtained, and the steady load characteristic information of the bridge is accurately calculated. Then, the summer flood season data of the area where the bridge is located is collected and analyzed, the impact load and temperature change information are extracted, and the distribution analysis is performed. Finally, this information is used to perform pier load impact optimization, construct an optimization function, and optimize within the load design parameter space to obtain an optimized load design parameter range. This method improves the stability and durability of the bridge under flood season impact loads and temperature change conditions.

[0014] After introducing the basic principles of the present application, various non-limiting implementation methods of the present application will be specifically described below in conjunction with the drawings in the specification.

[0015] Examples, such as Figure 1 As shown, the embodiment of the present application provides a pier load optimization method for a bridge span structure, the method comprising:

[0016] Step S100: obtaining steady-load characteristic information of a bridge span structure to be subjected to pier load optimization, wherein the steady-load characteristic information includes dead load information and peak live load information.

[0017] Specifically, the dead load information refers to the weight of the bridge structure itself, including the weight of the bridge deck, piers, abutments and ancillary structures. Peak live load information refers to the maximum dynamic load that the bridge bears under the design flow conditions, including the weight of vehicles and pedestrians. By combining the dead load information and the peak live load information, the steady load characteristic information of the bridge is formed. The steady load characteristic information is the load condition of the bridge without external interference formed by combining the dead load and peak live load information. As the basic data for bridge design and optimization, the load condition of the bridge without external interference can be better understood. This information will serve as the basis for optimizing the load on the bridge piers to ensure that the bridge has sufficient safety and reliability during design and use.

[0018] Step S200: Collect summer flood season data records of the area where the bridge span structure is located, perform distribution analysis, and obtain flood season characteristic information distribution, wherein the flood season characteristic information distribution includes multiple flood season characteristic information and multiple flood season probability information, and each flood season characteristic information includes impact load information and temperature change information.

[0019] Specifically, flood season characteristic information refers to the various environmental impact information on the bridge during the flood season, including impact load and temperature change information. Flood season probability information refers to the probability of occurrence of each group of flood season characteristic information. For example, flood impact force and temperature change in different years and their probability of occurrence.

[0020] First, collect summer flood season data records in the area where the bridge span structure is located. This data can come from meteorological departments, environmental monitoring stations or historical records. For example, the water flow impact force and temperature change data of each flood in the past ten years. This data includes: water flow impact load records (for example, the maximum water flow impact force during a flood in a certain year is 500 tons); temperature change records (for example, the maximum temperature difference during a flood in a certain year is 20 degrees Celsius)

[0021] Perform distribution analysis on the collected flood season data. The purpose is to determine each group of flood season characteristic information and its probability of occurrence. The distribution analysis method can use statistical tools or software, such as SPSS, MATLAB or Python's statistical library. According to the results of the distribution analysis, the distribution of flood season characteristic information is obtained. The distribution of flood season characteristic information includes multiple flood season characteristic information (such as impact load and temperature change information) and multiple flood season probability information (the probability of occurrence of each group of characteristic information).

[0022] Through this step, detailed flood season characteristic information distribution can be obtained. This information will be used for subsequent pier load impact optimization and temperature change flexibility optimization to ensure the safety and stability of the bridge in various extreme environments.

[0023] Step S300: Optimizing the pier body load impact according to the distribution of the flood season characteristic information to obtain an optimized load design parameter range.

[0024] Specifically, the optimized load design parameter interval refers to a set of design parameter intervals determined through the optimization process, which can ensure the safety and economy of the bridge piers under the impact loads during the flood season.

[0025] First, by analyzing the distribution of flood season characteristic information, the impact load data and their corresponding probabilities in each flood season characteristic are extracted. The pier body load impact optimization function is constructed, and the optimized load design parameter range is output. These parameters can not only withstand the flood season impact load, but also reduce the design and construction costs.

[0026] Through this step, the impact load capacity of the bridge piers can be effectively improved, while the design cost can be reduced, ensuring the safety and economy of the bridge during the flood season.

[0027] Step S400: According to the distribution of the flood season characteristic information, within the optimized load design parameter range, the pier body temperature change flexibility optimization is performed to obtain the optimal load design parameters as the pier body load optimization result.

[0028] Specifically, the temperature-dependent flexibility optimization of the pier body refers to reducing the probability of cracks while maintaining economy by optimizing the flexibility of the pier under temperature changes.

[0029] First, the temperature variation information and its corresponding occurrence probability are extracted from the distribution of flood season characteristic information. The temperature variation information describes the temperature variation during the flood season. For example, the maximum temperature difference is 20 degrees Celsius and the occurrence probability is 10%. Next, within the previously obtained optimized load design parameter range (such as 4,500 tons to 5,500 tons), these design parameters are optimized for temperature variation flexibility. The purpose of temperature variation flexibility optimization is to ensure that the piers will not crack under temperature changes while improving the impact load capacity, thereby improving the flexibility and durability of the structure. A temperature variation flexibility optimization function for the pier body is constructed, which comprehensively considers the temperature variation adaptability and construction cost.

[0030] During the optimization process, the initial load design parameters are first randomly generated within the optimized load design parameter range. For example, several design parameters are randomly generated within the range of 4500 tons to 5500 tons. Finite element analysis tools (such as ANSYS and ABAQUS) are used to simulate and design these design parameters to evaluate their flexibility and fission probability under different temperature change conditions. According to the calculation results, the parameters with the highest flexibility are selected as cluster centers, and other parameters are clustered and adjusted. For example, the parameters with the highest flexibility are selected as cluster centers, and other parameters are clustered and fine-tuned. Then, the parameters are further adjusted based on the cluster centers, and multiple iterative optimizations are performed until the flexibility reaches the maximum value. Finally, the optimal load design parameters are output. These parameters can not only withstand the impact loads during the flood season, but also maintain good flexibility and durability during temperature changes, ensuring the safety and economy of the bridge structure.

[0031] Through the above steps, the temperature change flexibility optimization can be carried out within the optimized load design parameter range, and finally the optimal load design parameters can be obtained. This parameter can not only withstand the impact load during the flood season, but also maintain the flexibility of the structure in the temperature difference change, reduce the probability of fission, and ensure the optimal performance and economy of the bridge in various extreme environments.

[0032] Furthermore, the steady load characteristic information of the bridge span structure to be subjected to pier body load optimization is obtained, including: obtaining the constant load information of the bridge span structure; obtaining the peak live load information according to the design flow of the bridge span structure, and calculating and obtaining the steady load characteristic information in combination with the constant load information.

[0033] Specifically, the design flow refers to the traffic flow considered when the bridge is designed, which is used to calculate the maximum live load that the bridge will bear during use, for example, the maximum number and weight of vehicles passing through the bridge per hour.

[0034] First, the weight of each component is extracted from the current bridge design drawings and structural calculations. For example, the weight of the bridge deck is 1,000 tons, the weight of the pier is 500 tons, and the weight of the auxiliary structure is 50 tons. Also, during the construction process, the weight of each part is determined by actual measurement and weighing. In this way, the dead load information of the current bridge span structure is obtained.

[0035] Next, in order to obtain peak live load information, traffic flow analysis and dynamic load calculation are required. Traffic flow surveys can be conducted by using traffic monitoring systems or statistical tools (such as traffic flow meters, video surveillance) to investigate the traffic flow on the bridge and determine the number of vehicles and pedestrians during peak hours. Based on the traffic flow data, structural analysis software (such as SAP2000, ETABS) is used to calculate the dynamic load of the bridge under peak flow. For example, the total weight of vehicles during peak hours is 200 tons and the total weight of pedestrians is 20 tons.

[0036] Finally, the dead load information and peak live load information are combined to calculate the steady load characteristic information of the bridge. This process usually uses structural analysis and calculation tools to combine static and dynamic loads to obtain the total load of the bridge under normal conditions. For example: Dead load information: bridge deck weight 1000 tons + pier weight 500 tons + auxiliary structure weight 50 tons = 1550 tons; Peak live load information: total vehicle weight 200 tons + total pedestrian weight 20 tons = 220 tons; Steady load characteristic information: Total load = dead load information 1550 tons + peak live load information 220 tons = 1770 tons

[0037] Through the above steps, the stable load characteristic information of the bridge can be accurately obtained and calculated. This information will serve as the basic data for subsequent pier load optimization to ensure that the bridge has sufficient safety and reliability during design and use.

[0038] Further, such as Figure 2 As shown, summer flood season data records of the area where the bridge span structure is located are collected, and distribution analysis is performed to obtain flood season characteristic information distribution, including: collecting multiple summer flood season data within a preset historical time range of the area where the bridge span structure is located as summer flood season data records; analyzing the summer flood season data records to obtain impact load information records and temperature change information records; clustering the impact load information records and temperature change information records to obtain multiple clustering results, and using the central impact load information and central temperature change information in each clustering result as multiple flood season characteristic information; according to the number of impact load information and temperature change information in the multiple clustering results, multiple flood season probability information is calculated, and the flood season characteristic information distribution is constructed in combination with the multiple flood season characteristic information.

[0039] Specifically, summer flood season data records refer to various environmental data records of the area where the bridge is located during the summer flood season, including information such as flood impact force and temperature changes. For example, summer flood season data records for the past ten years. Impact load information records the impact force data generated by water flow on bridge piers during the flood season. For example, the maximum impact force of a flood during the summer flood season of a certain year is 500 tons. Flood season characteristic information refers to representative data extracted from the clustering results, which describes the environmental characteristics during the flood season. For example, the central impact load of a group of clustering results is 450 tons, and the central temperature changes to 18 degrees Celsius. Flood season probability information refers to the probability of occurrence of each group of flood season characteristic information. For example, the probability of occurrence of a group of flood season characteristic information is 15%.

[0040] In the process of optimizing the pier load of the bridge span structure, it is necessary to first collect the summer flood season data records of the area where the bridge is located. These data come from the flood impact force and temperature change information of the past few years. By analyzing these historical data in detail, the impact load and temperature change information records of each year can be extracted. In order to better understand and utilize these data, clustering algorithms are used to group these data, and each group of data represents a flood season feature. Through clustering analysis, the central impact load and central temperature change information of each group of data can be obtained as flood season characteristic information. Then, according to the number of each group of data in the entire data set, the occurrence probability of each group of flood season characteristic information is calculated to form flood season probability information. Finally, these flood season characteristic information and corresponding probability information are combined to construct a detailed flood season characteristic information distribution. These distribution data will be used for subsequent pier load optimization to ensure the stability and safety of the bridge under various flood season conditions.

[0041] Furthermore, the summer flood season data records are analyzed to obtain impact load information records and temperature change information records, including: collecting a sample flood season data set, and marking the maximum water flow impact force and the maximum temperature difference under each sample flood season data, obtaining a sample impact load information set and a sample temperature change information set, and training a flood season feature analyzer; using the flood season feature analyzer to analyze the summer flood season data records to obtain impact load information records and temperature change information records.

[0042] Specifically, the sample flood season data set refers to multiple sets of flood season data collected over a period of time in the past, and each set of data includes information such as flood impact force and temperature change. For example, the maximum water flow impact force and maximum temperature difference data set for each flood season in the past ten years. The sample impact load information set refers to the maximum water flow impact force set of each sample flood season data. The sample temperature change information set refers to the maximum temperature difference set of each sample flood season data.

[0043] First, multiple flood season data in the past period are collected to form a sample flood season data set. Each set of data contains the maximum water flow impact force and maximum temperature difference of the flood season. For example, the data in 2010 is the maximum water flow impact force of 450 tons and the maximum temperature difference of 18 degrees Celsius.

[0044] Next, these sample data are annotated, and the maximum water flow impact force and maximum temperature difference of each sample are recorded to form a sample impact load information set and a sample temperature change information set. Then, these sets are used to train a flood season feature analyzer. Through machine learning algorithms (such as regression analysis or decision trees), the analyzer can identify and predict the impact load and temperature change characteristics of the flood season.

[0045] After the training is completed, the flood season feature analyzer is used to analyze the newly collected summer flood season data records. The analyzer will extract new impact load information records and temperature change information records from them. For example, by analyzing the summer flood season data of a certain year, the maximum water flow impact force is 480 tons and the maximum temperature difference is 19 degrees Celsius, and these information are recorded.

[0046] Specifically, the key to building a flood season feature analyzer is to collect and process historical data, select appropriate machine learning algorithms, and perform model training. First, collect historical flood season data for the area where the bridge is located, including the maximum water flow impact force and maximum temperature difference in each flood season. Preprocess these data to ensure the integrity and consistency of the data. Then, divide the data into a training set and a test set. The training set is used to train the model, and the test set is used to verify the model performance. Next, select an appropriate machine learning algorithm, such as linear regression, decision tree, or random forest, based on the characteristics of the data. Use the training set to train the model so that it can identify and predict the impact load and temperature change characteristics of the flood season. During the training process, cross-validation techniques can be used to optimize model parameters to prevent overfitting. Finally, use the test set to verify the prediction accuracy of the model, and adjust the model parameters to improve its performance. The trained model is the flood season feature analyzer, which can be used to analyze and predict new flood season data, thereby extracting useful impact load and temperature change information to provide support for bridge pier load optimization.

[0047] Through this step, the summer flood season characteristic information of the bridge area can be effectively analyzed and extracted, providing accurate data support for the subsequent pier load optimization.

[0048] Further, according to the distribution of flood season characteristic information, the pier body load impact optimization is performed, including: extracting and obtaining the flood season impact load distribution according to the distribution of flood season characteristic information, wherein the flood season impact load distribution includes multiple impact load information and multiple flood season probability information; obtaining a load design parameter space, wherein the load design parameter space includes multiple load design parameters whose design load is greater than or equal to the steady load characteristic information; and constructing a pier body load impact optimization function according to the flood season impact load distribution, as shown in the following formula:

[0049] ;

[0050] Among them, PLF is the shock fitness, and is the weight, M is the number of multiple impact load information, is the weight assigned according to the i-th impact load information, is the ratio of the impact load designed according to the load design parameters to the i-th impact load information, In order to calculate the cost of building the pier according to the load design parameters, is the preset construction cost; according to the pier body load impact optimization function, the pier body load design parameters are optimized in the load design parameter space to obtain the optimized load design parameter range.

[0051] Specifically, the load design parameter space refers to the parameter range considered when designing the bridge pier load, ensuring that these parameters can meet the stable load characteristic information. For example, the design parameter space can include load design parameters between 4,000 tons and 6,000 tons.

[0052] The distribution of flood season impact loads is extracted based on the distribution of flood season characteristic information, which includes the value of each impact load and its corresponding probability. Then, the load parameter space of the bridge design is determined to ensure that these parameters can meet the stable load characteristic information. Next, the distribution of flood season impact loads is used to construct an optimization function that comprehensively considers impact adaptability and construction cost.

[0053] During the optimization process, the algorithm is used to iteratively optimize within the load design parameter space to find the load design parameters that can maximize impact adaptability and minimize construction costs. Finally, the optimized load design parameter range is output, such as 4,600 tons to 5,400 tons. These parameters can reduce construction costs while ensuring that the bridge can withstand the impact load during the flood season. Through this optimization process, the stability and economy of the bridge structure under various environmental conditions are ensured.

[0054] Furthermore, according to the pier body load impact optimization function, the pier body load design parameters are optimized in the load design parameter space, including: randomly generating multiple first load design parameters in the load design parameter space; performing simulation design according to the multiple first load design parameters to obtain multiple first design impact loads and multiple first construction costs, and calculating multiple first impact fitnesses based on the pier body load impact optimization function; according to the multiple first impact fitnesses, selecting the first load design parameters corresponding to the largest number of first impact fitnesses as cluster centers, clustering the other multiple first load design parameters to obtain several load design parameter sets; taking the cluster center as the adjustment direction, adjusting the first load design parameters in the several load design parameter sets, simulating design and calculating to obtain multiple adjusted impact fitnesses, and updating the load design parameter with the maximum impact fitness in the adjusted load design parameter set as the cluster center; continuing to perform iterative optimization until convergence, outputting the load design parameter group with the largest final impact fitness sum, and obtaining the optimized load design parameter interval.

[0055] Specifically, the first load design parameters refer to a set of initial design parameters randomly generated in the parameter space, which are used to start the optimization process. The first design impact load is the initial impact load obtained by simulating the design according to the first load design parameters. The first construction cost is the initial construction cost obtained by simulating the design according to the first load design parameters. The first impact fitness is the impact fitness corresponding to the initial design parameters calculated according to the optimization function.

[0056] First, multiple initial design parameters are randomly generated in a predetermined load design parameter space. These initial parameters are used to start the optimization process. By using finite element analysis tools (such as ANSYS, ABAQUS), these initial design parameters are simulated and designed to obtain the impact load and cost corresponding to each parameter. Then, the impact fitness of each design parameter is calculated according to the constructed optimization function. The optimization function comprehensively considers the impact load fitness and cost, and measures the pros and cons of each design parameter by calculating the fitness value.

[0057] Next, select several design parameters with the highest fitness as cluster centers and cluster the remaining design parameters. Based on the cluster centers, adjust the design parameters in the cluster results, and perform simulation design and shock fitness calculation again. In this way, the design parameters are continuously adjusted, and their corresponding shock fitness is calculated, and the design parameters are gradually optimized.

[0058] The process continues to iterate until the impact adaptability no longer increases significantly (i.e., convergence conditions are reached). The optimized load design parameter range outputted in the end can maximize the impact load adaptability of the bridge pier body and has a reasonable cost. In this way, the stability and economy of the bridge under the impact load during the flood season are ensured through scientific optimization methods.

[0059] Furthermore, a simulation design is performed according to the multiple first load design parameters to obtain multiple first design impact loads, including: collecting a set of sample load design parameters according to the construction design data of the pier body, and collecting the pier body impact load after each sample load design parameter is constructed to obtain a sample pier body impact load set; using the sample load design parameter set and the sample pier body impact load set to train an impact load simulation designer; based on the impact load simulation designer, a simulation design prediction is performed on the multiple first load design parameters to obtain multiple first design impact loads.

[0060] Specifically, construction design data refers to the specific design data of the bridge pier, including materials, geometric dimensions, structural forms, etc.

[0061] First, according to the construction design data of the bridge pier, a set of sample load design parameters are collected, and the pier impact loads obtained by these parameters after actual construction or simulation are recorded. Then, an impact load simulation designer is trained using the collected sample load design parameter set and sample pier impact load set.

[0062] Specifically, the process of building an impact load simulation designer includes data collection, preprocessing, model selection, training, and validation. First, collect the sample load design parameter sets used in the construction of bridge piers and their corresponding sample pier impact load sets. These data can come from actual measurements or historical records to ensure that they cover a variety of design parameters and impact load conditions. Next, preprocess the data to handle missing values, outliers, and perform standardization to better train the model. Then, select a suitable machine learning algorithm to build the model. Commonly used algorithms include linear regression, decision trees, random forests, and neural networks. When selecting an algorithm, consider the amount of data, data characteristics, and interpretability of the model. Use the preprocessed data to train the model, and optimize the model parameters through cross-validation to prevent overfitting. After the model training is completed, use an independent test data set to verify the prediction performance of the model and evaluate its accuracy and robustness. After verifying the model performance, it can be used to predict the impact load corresponding to the new load design parameters. Throughout the process, the use of Python machine learning libraries such as scikit-learn, TensorFlow, or PyTorch can greatly simplify the model building, training, and verification process, ensuring that the impact load simulation designer is efficient and reliable.

[0063] The trained impact load simulation designer can simulate and predict the new initial load design parameters. Input multiple initial load design parameters to obtain the corresponding first design impact load.

[0064] Through this step, the impact load information under different design parameters can be quickly obtained, providing data support for subsequent load optimization. This data-driven approach improves design efficiency and prediction accuracy, ensuring the safety and stability of the bridge under various load conditions.

[0065] Further, according to the flood season characteristic information distribution, within the optimized load design parameter interval, the pier body temperature change flexibility optimization is performed to obtain the optimal load design parameters as the pier body load optimization result, including: according to the flood season characteristic information distribution, extracting and obtaining the flood season temperature change information distribution, wherein the flood season temperature change information distribution includes multiple temperature change information and multiple flood season probability information; according to the flood season temperature change information distribution, constructing the pier body temperature change flexibility optimization function, as shown in the following formula:

[0066] ;

[0067] Among them, PFF is the flexible fitness, and is the weight, M is the number of multiple impact load information, is the weight assigned according to the i-th impact load information, is the fission probability of the pier designed according to the load design parameters under the i-th temperature change information, In order to calculate the cost of building the pier according to the load design parameters, is a preset construction cost; within the optimized load design parameter range, a first optimized load design parameter is randomly generated, and a simulation design is performed in combination with the multiple temperature change information to obtain a first fission probability set, wherein a sample load design parameter set, a sample temperature change information set and a sample fission probability set are collected, a temperature change simulation designer is trained, and a simulation design prediction is performed on the first optimized load design parameter to obtain a first fission probability set; a first optimized construction cost of the first optimized load design parameter is obtained, and a first flexible fitness is calculated based on the pier body temperature change flexibility optimization function in combination with the first fission probability set; optimization is continued within the optimized load design parameter range, and the optimal load design parameter with the largest flexible fitness is output as the pier body load optimization result.

[0068] Specifically, firstly, the temperature change information and its probability are extracted according to the distribution of flood season characteristic information to form the temperature change information distribution. Then, the temperature change information is used to construct an optimization function, which comprehensively considers the temperature change adaptability and construction cost.

[0069] In the optimized load design parameter range, multiple design parameters are randomly generated, and the extracted temperature change information is combined for simulation design to obtain a first fission probability set, which is a fission probability set under temperature change conditions obtained by simulation design based on the optimized load design parameters. Then, these data are used to train a temperature change simulation designer, which fits the data through a machine learning algorithm so that it can predict the fission probability of new design parameters under temperature change conditions.

[0070] Specifically, the process of building a temperature change simulation designer includes data collection, preprocessing, model selection, training and validation. First, collect the sample load design parameter set of the bridge pier and its corresponding sample temperature change information set. These data can come from actual measurements or historical records to ensure the diversity and representativeness of the data. Then, preprocess the data, handle missing values ​​and outliers, and perform standardization to better train the model. Next, select a suitable machine learning algorithm to build a temperature change simulation designer. Common algorithms include linear regression, support vector machine (SVM), decision tree, random forest, and neural network. Select a suitable algorithm based on the amount and complexity of the data. For example, linear regression or SVM can be selected when the amount of data is small, and random forest or neural network can be selected when the data complexity is high. Use the preprocessed data to train the model, and optimize the model parameters through cross-validation to prevent overfitting. Cross-validation can effectively evaluate the generalization ability of the model, find the best parameter combination by adjusting the parameters, and improve the prediction performance of the model. After the model training is completed, use an independent test data set to verify the prediction accuracy of the model and evaluate its performance on unseen data. After the model is verified, it can be used to predict the fission probability of new load design parameters under temperature change conditions. Throughout the process, the use of Python machine learning libraries such as scikit-learn, TensorFlow, or PyTorch can greatly simplify the model construction, training, and verification process, ensuring the efficiency and reliability of the temperature change simulation designer. In this way, the constructed temperature change simulation designer can accurately predict the temperature change effect under different load design parameters, providing strong support for the load optimization of the bridge pier.

[0071] Finally, the temperature variation simulation designer is used to simulate the initial design parameters, predict the probability of fission, and calculate the flexibility. According to the calculation results, the design parameters with the highest flexibility are selected as the basis, and the design parameters are adjusted continuously, and simulation design and flexibility fitness calculation are performed until the flexibility fitness reaches the maximum value. Finally, the output optimized load design parameter range can not only withstand the impact load during the flood season, but also maintain good flexibility under temperature variation conditions, ensuring the optimal performance and economy of the bridge under various environmental conditions.

[0072] In summary, the pier load optimization method for a bridge span structure provided in the embodiment of the present application has the following technical effects:

[0073] 1. By obtaining the steady-load characteristic information of the bridge span structure and collecting summer flood season data, a detailed distribution analysis is conducted to ensure that the optimization design can fully consider the effects of dead load and live load as well as flood season impact load and temperature change on the bridge piers. This comprehensive analysis and optimization method can significantly improve the reliability and durability of the bridge pier structure, especially under extreme environmental conditions such as flood season, thereby extending the service life of the bridge and reducing maintenance and repair costs.

[0074] 2. By collecting and analyzing the summer flood season data in the area where the bridge is located, extracting the impact load information and temperature change information, and performing cluster analysis, a detailed distribution of flood season characteristic information can be constructed. This method can accurately describe the environmental impact on the bridge under different flood season conditions, provide important data support for load optimization, improve the adaptability and stability of design parameters under different flood season conditions, and ensure the safety of the bridge in extreme weather.

[0075] 3. By constructing the pier body load impact optimization function, scientific optimization can be performed within the load design parameter space to balance the impact adaptability and construction cost. This optimization method can maximize the impact load capacity of the pier structure, while controlling the construction cost, improving the economy and feasibility of the design, and ensuring the stability and durability of the bridge under various load conditions.

[0076] 4. Perform temperature-dependent flexibility optimization within the optimized load design parameter range, construct a temperature-dependent flexibility optimization function, and finally obtain the optimal design parameters through simulation design and iterative optimization. This method can significantly reduce the probability of fission caused by temperature difference, improve the flexibility and stability of the pier structure under temperature change conditions, and ensure the long-term safety and reliability of the bridge under different temperature change conditions.

[0077] Any step of the method described above can be stored as a computer instruction or program in an unlimited computer memory, and can be called and recognized by an unlimited computer processor to implement any method in the embodiments of the present application, without any unnecessary restrictions.

[0078] Furthermore, the first or second mentioned above may not only represent an order relationship, but may also represent a specific concept, and / or refer to multiple elements that can be selected individually or in full. Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.

Claims

1. A method for optimizing the pier load of a bridge span structure, characterized in that: The method comprises: Acquiring stable load characteristic information of a bridge span structure for which pier load optimization is to be performed, wherein the stable load characteristic information includes dead load information and peak live load information; Collecting summer flood season data records of the area where the bridge span structure is located, performing distribution analysis, and obtaining flood season characteristic information distribution, wherein the flood season characteristic information distribution includes multiple flood season characteristic information and multiple flood season probability information, and each flood season characteristic information includes impact load information and temperature change information; According to the distribution of the flood season characteristic information, the pier body load impact optimization is performed to obtain the optimized load design parameter range; According to the distribution of the flood season characteristic information, within the optimized load design parameter range, the pier body temperature change flexibility optimization is performed to obtain the optimal load design parameters as the pier body load optimization result; According to the distribution of the flood season characteristic information, the pier body load impact optimization is performed, including: Extracting and obtaining flood season impact load distribution according to the flood season characteristic information distribution, wherein the flood season impact load distribution includes a plurality of impact load information and a plurality of flood season probability information; Acquire a load design parameter space, wherein the load design parameter space includes a plurality of load design parameters whose design loads are greater than or equal to the stable load characteristic information; According to the impact load distribution during the flood season, the pier load impact optimization function is constructed as follows: ; Among them, PLF is the shock fitness, and is the weight, M is the number of multiple impact load information, is the weight assigned according to the i-th impact load information, is the ratio of the impact load designed according to the load design parameters to the i-th impact load information, In order to calculate the cost of building the pier according to the load design parameters, The preset construction cost; According to the pier body load impact optimization function, the pier body load design parameters are optimized in the load design parameter space to obtain an optimized load design parameter interval; Wherein, according to the pier body load impact optimization function, the optimization of the pier body load design parameters is performed in the load design parameter space, including: Randomly generating a plurality of first load design parameters in the load design parameter space; Performing simulation design according to the plurality of first load design parameters to obtain a plurality of first design impact loads and a plurality of first construction costs, and calculating and obtaining a plurality of first impact fitness degrees based on the pier body load impact optimization function; According to the plurality of first impact fitnesses, first load design parameters corresponding to the largest plurality of first impact fitnesses are selected and obtained as cluster centers, and the other plurality of first load design parameters are clustered to obtain a plurality of load design parameter sets; Taking the cluster center as the adjustment direction, adjusting the first load design parameter in the plurality of load design parameter sets, simulating the design and calculating to obtain a plurality of adjustment impact fitnesses, and updating the load design parameter with the maximum impact fitness in the adjusted load design parameter set as the cluster center; Continue iterative optimization until convergence, output the load design parameter group with the maximum final impact fitness sum, and obtain the optimized load design parameter range; According to the distribution of the flood season characteristic information, within the optimized load design parameter range, the pier body temperature change flexibility optimization is performed to obtain the optimal load design parameters as the pier body load optimization result, including: Extracting and obtaining flood season temperature change information distribution according to the flood season characteristic information distribution, wherein the flood season temperature change information distribution includes a plurality of temperature change information and a plurality of flood season probability information; According to the distribution of temperature change information during the flood season, a flexible optimization function of pier body temperature change is constructed as follows: ; Among them, PFF is the flexible fitness, and is the weight, M is the number of multiple impact load information, is the weight assigned according to the i-th impact load information, is the fission probability of the pier designed according to the load design parameters under the i-th temperature change information, In order to calculate the cost of building the pier according to the load design parameters, The preset construction cost; In the optimized load design parameter interval, a first optimized load design parameter is randomly generated, and a simulation design is performed in combination with the multiple temperature change information to obtain a first fission probability set, wherein a sample load design parameter set, a sample temperature change information set and a sample fission probability set are collected, a temperature change simulation designer is trained, and a simulation design prediction is performed on the first optimized load design parameter to obtain a first fission probability set; Obtaining a first optimized cost of the first optimized load design parameter, combining the first fission probability set, and calculating a first flexibility fitness based on the pier body temperature variation flexibility optimization function; Continue to optimize within the optimized load design parameter range, and output the optimal load design parameters with the maximum flexibility adaptability as the pier body load optimization result.

2. The pier load optimization method for a bridge span structure according to claim 1, characterized in that: Obtain the steady load characteristic information of the bridge span structure for which pier load optimization is to be performed, including: Obtaining the dead load information of the bridge span structure; According to the design flow of the bridge span structure, the peak live load information is obtained, and combined with the dead load information, the steady load characteristic information is calculated and obtained.

3. The pier load optimization method for a bridge span structure according to claim 1, characterized in that: Collect summer flood season data records of the area where the bridge span structure is located, perform distribution analysis, and obtain flood season characteristic information distribution, including: Collecting a plurality of summer flood season data within a preset historical time range of the area where the bridge span structure is located as summer flood season data records; Analyze the summer flood season data records to obtain impact load information records and temperature change information records; Clustering the impact load information records and the temperature change information records to obtain multiple clustering results, and using the central impact load information and the central temperature change information in each clustering result as multiple flood season characteristic information; According to the number of impact load information and temperature change information in the multiple clustering results, multiple flood season probability information is calculated and obtained, and the flood season characteristic information distribution is constructed by combining the multiple flood season characteristic information.

4. The method for optimizing the pier load of a bridge span structure according to claim 3, characterized in that: The summer flood season data records are analyzed to obtain impact load information records and temperature change information records, including: Collect sample flood season data sets, and mark the maximum water flow impact force and maximum temperature difference under each sample flood season data, obtain sample impact load information sets and sample temperature change information sets, and train the flood season feature analyzer; The flood season characteristic analyzer is used to analyze the summer flood season data records to obtain impact load information records and temperature change information records.

5. The method for optimizing the pier load of a bridge span structure according to claim 1, characterized in that: Performing simulation design according to the plurality of first load design parameters to obtain a plurality of first design impact loads includes: According to the construction design data of the pier body, a sample load design parameter set is collected, and the pier body impact load after each sample load design parameter is constructed is collected to obtain a sample pier body impact load set; Using the sample load design parameter set and the sample pier body impact load set, training an impact load simulation designer; Based on the impact load simulation designer, the plurality of first load design parameters are simulated and designed for prediction to obtain a plurality of first design impact loads.