A kind of building scaffold manufacturing device and working method thereof
By combining the positioning and air blowing mechanisms in the construction scaffolding manufacturing device, the problem of air holes caused by environmental humidity and low welding seam adjustment efficiency during the steel pipe scaffolding welding process is solved, and an efficient and accurate welding process is achieved.
Patent Information
- Application Number
- CN202411106110.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-08-13
AI Technical Summary
During the welding process of existing steel pipe scaffolding, the humid environment causes water to decompose and produce hydrogen to form pores, which affects the welding quality. Moreover, the welds between the transverse steel pipes and diagonal steel pipes and the socket sleeves are difficult to accurately adjust, affecting the welding efficiency.
A construction scaffolding manufacturing device is designed, including a positioning mechanism and a blowing mechanism. The distance of the welding seam is determined through the lifting cylinder and transmission unit, and carbon dioxide gas and hot air are used to dry the welding seam to avoid the formation of pores. At the same time, through the arc panel and moving position cylinder to achieve precise adjustment of the weld seam.
It effectively avoids the formation of pores in the welding seam during welding, improves the welding quality, and improves the welding efficiency by accurately adjusting the welding seam distance.
Smart Images

Figure CN118616990B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building scaffold manufacturing, in particular to a building scaffold manufacturing device and a working method thereof. Background Art
[0002] Scaffolding is a kind of support set up at the construction site for workers to operate and solve vertical and horizontal transportation. It is a general term in the construction industry. It is mainly used in the exterior walls, interior decoration or places with high floor heights that cannot be directly constructed on the construction site. Among them, steel pipe scaffolding is widely used because of its strong bearing capacity and good stability. In the process of producing and processing steel pipe scaffolding, it is necessary to weld sockets on it to facilitate stacking other steel pipe scaffolding upwards to meet the needs of buildings of different heights.
[0003] In the welding process of the existing steel pipe scaffolding, the transverse steel pipe, the oblique steel pipe and the socket sleeve need to be positioned in sequence first, and then welded together by a welding device. Since the socket sleeve needs to be welded with the transverse steel pipe and the oblique steel pipe at the same time to ensure the stability of the steel pipe scaffolding, and sufficient welds need to be left between the transverse steel pipe and the oblique steel pipe and the socket sleeve, it is inconvenient to efficiently and accurately adjust the fixed transverse steel pipe and the oblique steel pipe, which is easy to affect the welding efficiency of the steel pipe scaffolding; at the same time, due to the poor ventilation and lack of sunlight in the factory, the environment of the welded steel pipe scaffolding is relatively humid, and its surface is easy to absorb moisture. The hydrogen generated by the decomposition of moisture during welding will remain in the weld to form pores, which will affect the quality of the welded steel pipe scaffolding. Summary of the invention
[0004] The technical problems solved by this solution are:
[0005] How to solve the problem that the environment of welding steel pipe scaffolding is relatively humid, its surface is easy to absorb moisture, and the hydrogen generated by the decomposition of moisture during welding will remain in the weld to form pores, affecting the quality of welded steel pipe scaffolding;
[0006] How to solve the problem that sufficient welds need to be left between the transverse steel pipes and the oblique steel pipes and the socket sleeves, and the fixed transverse steel pipes and the oblique steel pipes are inconvenient to adjust efficiently and accurately, which easily affects the welding efficiency of the steel pipe scaffolding.
[0007] The purpose of the present invention can be achieved through the following technical solutions: a building scaffolding manufacturing device, comprising a base and a work frame fixedly installed at one end of the top thereof, a limiting fixture for positioning the socket sleeve is fixedly connected to the middle of the work frame, a positioning mechanism for determining the weld distance between the transverse steel pipe and the oblique steel pipe and the socket sleeve is arranged above the limiting fixture, and a blowing mechanism for reducing the oxygen content around the socket sleeve is arranged below the limiting fixture.
[0008] A further technical improvement of the present invention is that the positioning mechanism includes a lifting cylinder fixedly connected to the top of the working frame, the protruding end of the lifting cylinder is fixedly connected to an arc panel via a mounting plate, the position of the arc panel corresponds to the position of the socket sleeve, and a transmission unit for driving the displacement of the blowing mechanism is arranged between the lifting cylinder and the working frame.
[0009] A further technical improvement of the present invention is that the transmission unit includes a guide frame fixedly connected to the working frame, a transmission rod movably inserted on the guide frame, the transmission rod is longitudinally arranged, a flip rod is arranged on the top of the guide frame through a pin shaft, one end of the flip rod is movably connected to the top of the transmission rod through a first lever, and the other end of the flip rod is movably connected to the protruding end of the lifting cylinder through a second lever.
[0010] A further technical improvement of the present invention is that: the distance between the first lever and the pin is half the distance between the second lever and the pin; in the process of controlling the extension of the protruding end of the lifting cylinder from half the length to the longest, the two electric heating rods are turned on to heat the air temperature in the gas storage barrel, and after the welds between the transverse steel pipe and the oblique steel pipe and the socket sleeve are determined, the air pump is turned on to inject carbon dioxide gas into the gas storage barrel, and at the same time, hot air is squeezed into the L-shaped tube through the hose, and the hot air flow ejected from the output end of the L-shaped tube will blow dry the welds between the transverse steel pipe and the oblique steel pipe and the socket sleeve and their surroundings. When the hot air in the gas storage tank is exhausted, the carbon dioxide gas will be ejected from the output end of the L-shaped tube. At this time, the extended end of the lifting cylinder is controlled to shrink from half the length to the shortest, and the transmission rod is driven downward by the flip rod in cooperation with the first lever, thereby driving the L-shaped tube to move downward, so that the distance between its output end and the socket sleeve becomes larger, so that the carbon dioxide gas ejected from the output end of the L-shaped tube squeezes the air around the socket sleeve, the horizontal steel pipe and the oblique steel pipe, and avoids the oxygen in the air from hindering the welding process.
[0011] A further technical improvement of the present invention is that the blowing mechanism includes a lifting slider slidably connected to the working frame, the lifting slider is fixedly connected to the bottom of the transmission rod, and an L-shaped tube is fixedly installed on the side of the lifting slider away from the working frame, the output end of the L-shaped tube is arranged toward the bottom of the socket sleeve, and there is a gap between the output end of the L-shaped tube and the bottom of the socket sleeve.
[0012] A further technical improvement of the present invention is that a gas storage barrel and an air pump are arranged on the base, the output end of the air pump is connected to the bottom of the gas storage barrel, electric heating rods are fixedly connected to both sides of the inner wall of the gas storage barrel, and the top of the gas storage barrel is connected to the input end of the L-shaped tube through a hose, and the input end of the air pump is connected to an external gas supply device for conveying carbon dioxide gas, and the external gas supply device is the prior art.
[0013] A further technical improvement of the present invention is that a supporting mechanism for fixing the transverse steel pipe and the oblique steel pipe is arranged on the side of the top of the base away from the working frame, the supporting mechanism includes a movable plate slidably connected to the base, a fixed plate is fixedly connected to the movable plate, a first limit seat for limiting the end of the transverse steel pipe is fixedly installed on the side of the fixed plate facing the working frame, and a second limit seat for limiting the end of the oblique steel pipe is fixedly installed on the fixed plate below the first limit seat.
[0014] A further technical improvement of the present invention is that a vertical rod is fixedly connected to the movable plate on one side of the fixed plate, a first support platform for supporting the horizontal steel pipe is fixedly installed on the top of the vertical rod, and a second support platform for supporting the oblique steel pipe is fixedly installed in the middle of the vertical rod.
[0015] A further technical improvement of the present invention is that a laterally arranged shift cylinder is fixedly installed on the top of the base through a baffle, and the protruding end of the shift cylinder is fixedly connected to the fixed plate; when the protruding end of the lifting cylinder is controlled to be extended to the longest, the arc panel is fitted with the side of the socket sleeve, and then the protruding end of the shift cylinder is controlled to extend. When one end of the transverse steel pipe and the oblique steel pipe are in contact with the arc panel, the shift cylinder is stopped in time, and then the protruding end of the lifting cylinder is controlled to shrink and reset to half the length, so that there are welds that meet the requirements between the transverse steel pipe and the oblique steel pipe and the socket sleeve, thereby ensuring the efficiency of welding the steel pipe scaffolding.
[0016] A working method of a building scaffold manufacturing device, the working method specifically comprising the following steps:
[0017] Step 1: Place the transverse steel pipe and the oblique steel pipe on the first support platform and the second support platform in turn, and then fix the ends of the transverse steel pipe and the oblique steel pipe through the first limit seat and the second limit seat to ensure the relative position of the transverse steel pipe and the oblique steel pipe, and then put the socket sleeve into the limit tooling for limiting. At this time, the extended end of the shift cylinder is at the shortest, and the extended end of the lifting cylinder is at half the length;
[0018] Step 2: When the extended end of the lifting cylinder is controlled to be extended to the longest, the arc panel is fitted with the side of the socket sleeve, and then the extended end of the shift cylinder is controlled to extend. When one end of the transverse steel pipe and the oblique steel pipe are in contact with the arc panel, the shift cylinder is stopped in time, and then the extended end of the lifting cylinder is controlled to shrink and reset to half the length, so that there are welds that meet the requirements between the transverse steel pipe and the oblique steel pipe and the socket sleeve, ensuring the efficiency of welding the steel pipe scaffolding;
[0019] Step 3: In the process of controlling the extension of the lifting cylinder from half the length to the longest, turn on the two electric heating rods to heat the air temperature in the gas storage barrel. After determining the welds between the horizontal steel pipe and the oblique steel pipe and the socket sleeve, turn on the air pump to inject carbon dioxide gas into the gas storage barrel. At the same time, squeeze the hot air into the L-shaped pipe through the hose. The hot air flow ejected from the output end of the L-shaped pipe will blow and dry the welds between the horizontal steel pipe and the oblique steel pipe and the socket sleeve and their surroundings to avoid the formation of pores in the welds during welding and prevent the quality of the welded steel pipe scaffolding from being affected.
[0020] Step 4: When the hot air in the gas storage barrel is emptied, carbon dioxide gas will be ejected from the output end of the L-shaped tube. At this time, the extended end of the lifting cylinder is controlled to shrink from half the length to the shortest, and the transmission rod is driven downward by the flip rod in cooperation with the first lever, thereby driving the L-shaped tube to move downward, so that the distance between its output end and the socket sleeve becomes larger, so that the carbon dioxide gas ejected from the output end of the L-shaped tube will squeeze the air around the socket sleeve, the horizontal steel pipe and the oblique steel pipe, so as to prevent the oxygen in the air from hindering the welding process.
[0021] Compared with the prior art, the present invention has the following beneficial effects:
[0022] When the present invention is in use, in the process of controlling the extended end of the lifting cylinder to extend from half the length to the longest, the two electric heating rods are turned on to heat the temperature of the air in the gas storage barrel. After the welds between the transverse steel pipe and the oblique steel pipe and the socket sleeve are determined, the air pump is turned on to inject carbon dioxide gas into the gas storage barrel, and at the same time, hot air is squeezed into the L-shaped pipe through the hose. The hot air flow ejected from the output end of the L-shaped pipe blows and dries the welds between the transverse steel pipe and the oblique steel pipe and the socket sleeve and the surrounding areas, thereby avoiding the generation of pores in the welds during welding and preventing To prevent affecting the quality of the welded steel pipe scaffolding; when the hot air in the gas storage barrel is emptied, carbon dioxide gas will be ejected from the output end of the L-shaped tube. At this time, the extended end of the lifting cylinder is controlled to shrink from half the length to the shortest, and the transmission rod is driven downward by the flip rod in cooperation with the first lever, thereby driving the L-shaped tube to move downward, so that the distance between its output end and the socket sleeve becomes larger, so that the carbon dioxide gas ejected from the output end of the L-shaped tube will squeeze the air around the socket sleeve, the horizontal steel pipe and the oblique steel pipe, so as to prevent the oxygen in the air from hindering the welding process.
[0023] When the present invention is in use, when the extended end of the lifting cylinder is controlled to extend to the longest, the arc panel is fitted with the side of the socket sleeve, and then the extended end of the shift cylinder is controlled to extend. When one end of the horizontal steel pipe and the oblique steel pipe are in contact with the arc panel, the shift cylinder is stopped in time, and then the extended end of the lifting cylinder is controlled to shrink and reset to half the length, so that there are welds that meet the requirements between the horizontal steel pipe and the oblique steel pipe and the socket sleeve, thereby ensuring the efficiency of welding the steel pipe scaffolding. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0026] Figure 2 It is a schematic diagram of the positioning mechanism structure of the present invention;
[0027] Figure 3 It is a schematic structural perspective view of the mounting plate and the curved panel of the present invention;
[0028] Figure 4 It is a structural schematic diagram of the blowing mechanism of the present invention;
[0029] Figure 5 It is a schematic diagram of the supporting mechanism structure of the present invention;
[0030] Figure 6 It is a schematic structural stereogram of the position limiting tooling of the present invention.
[0031] In the figure: 1. welding robot; 2. supporting mechanism; 3. baffle; 4. base; 5. air pump; 6. blowing mechanism; 7. working frame; 8. positioning mechanism; 9. limiting tool; 201. first limiting seat; 202. fixing plate; 203. shifting cylinder; 204. second limiting seat; 205. moving plate; 206. vertical rod; 207. second supporting platform; 208. first supporting platform; 601. L-shaped tube; 602. hose; 603. electric heating rod; 604. gas storage barrel; 605. supporting frame; 606. lifting slider; 801. lifting cylinder; 802. second lever; 803. mounting plate; 804. arc panel; 805. transmission rod; 806. guide frame; 807. first lever; 808. flip rod; 809. connecting frame. DETAILED DESCRIPTION
[0032] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] See also Figure 1-Figure 6As shown, a building scaffold manufacturing device includes a base 4 and a work frame 7 fixedly installed at one end of the top thereof, a limiting fixture 9 for positioning the socket sleeve is fixedly connected to the middle of the work frame 7, the limiting fixture 9 is a prior art, a positioning mechanism 8 for determining the weld distance between the transverse steel pipe and the oblique steel pipe and the socket sleeve is arranged above the limiting fixture 9, and a blowing mechanism 6 for reducing the oxygen content around the socket sleeve is arranged below the limiting fixture 9.
[0034] See also Figure 1-Figure 3 As shown, the above-mentioned positioning mechanism 8 includes a lifting cylinder 801 fixedly connected to the top of the working frame 7 through a connecting frame 809, the lifting cylinder 801 is vertically arranged, and the protruding end of the lifting cylinder 801 is fixedly connected to a mounting plate 803, and the bottom of the mounting plate 803 is fixedly connected to an arc panel 804, and the position of the arc panel 804 corresponds to the position of the socket sleeve, and a transmission unit for driving the blowing mechanism 6 to move is arranged between the lifting cylinder 801 and the working frame 7.
[0035] See also Figure 1 and Figure 2 As shown, the above-mentioned transmission unit includes a guide frame 806 fixedly connected to the working frame 7, a transmission rod 805 is movably inserted on the guide frame 806, the transmission rod 805 is longitudinally arranged, and a flip rod 808 is arranged on the top of the guide frame 806 through a pin shaft, one end of the flip rod 808 is movably connected to the top of the transmission rod 805 through a first lever 807, and the other end of the flip rod 808 is movably connected to the protruding end of the lifting cylinder 801 through a second lever 802.
[0036] See also Figure 2As shown, the distance between the first lever 807 and the pin is half the distance between the second lever 802 and the pin; in the process of controlling the extension of the lifting cylinder 801 from half the length to the longest, the two electric heating rods 603 are turned on to heat the air temperature in the air storage barrel 604. After the welds between the transverse steel pipe and the oblique steel pipe and the socket sleeve are determined, the air pump 5 is turned on to inject carbon dioxide gas into the air storage barrel 604, and at the same time, the hot air is squeezed into the L-shaped tube 601 through the hose 602. The hot air flow ejected from the output end of the L-shaped tube 601 will blow and dry the welds between the transverse steel pipe and the oblique steel pipe and the socket sleeve and their surroundings to avoid It avoids the generation of pores in the weld during welding, thereby preventing the quality of the welded steel pipe scaffolding from being affected; when the hot air in the gas storage barrel 604 is emptied, the carbon dioxide gas will be ejected from the output end of the L-shaped tube 601. At this time, the extended end of the lifting cylinder 801 is controlled to shrink from half the length to the shortest, and the transmission rod 805 is driven to move downward by the flip rod 808 in cooperation with the first lever 807, thereby driving the L-shaped tube 601 to move downward, so that the distance between its output end and the socket sleeve becomes larger, so that the carbon dioxide gas ejected from the output end of the L-shaped tube 601 squeezes the air around the socket sleeve, the horizontal steel pipe and the oblique steel pipe, thereby preventing the oxygen in the air from hindering the welding process.
[0037] See also Figure 1 and Figure 4 As shown, the above-mentioned blowing mechanism 6 includes a lifting slider 606 which is slidably connected to the working frame 7 through a first guide rail, the lifting slider 606 is fixedly connected to the bottom of the transmission rod 805, and the side of the lifting slider 606 away from the working frame 7 is fixedly installed with an L-shaped tube 601 through a support frame 605, the output end of the L-shaped tube 601 is arranged toward the bottom of the socket sleeve, and there is a gap between the output end of the L-shaped tube 601 and the bottom of the socket sleeve.
[0038] See also Figure 4 As shown, a gas barrel 604 and an air pump 5 are provided on the above-mentioned base 4, the output end of the air pump 5 is connected to the bottom of the gas barrel 604, both sides of the inner wall of the gas barrel 604 are fixedly connected with electric heating rods 603, and the top of the gas barrel 604 is connected to the input end of the L-shaped tube 601 through a hose 602, and the input end of the air pump 5 is connected to an external gas supply device for conveying carbon dioxide gas, and the external gas supply device is a prior art.
[0039] See also Figure 5As shown, a support mechanism 2 for fixing transverse steel pipes and oblique steel pipes is arranged on the side of the top of the above-mentioned base 4 away from the working frame 7, and the support mechanism 2 includes a movable plate 205 slidably connected to the base 4 through a second guide rail, and a fixed plate 202 is fixedly connected to the movable plate 205, and a first limit seat 201 for limiting the end of the transverse steel pipe is fixedly installed on the side of the fixed plate 202 facing the working frame 7, and a second limit seat 204 for limiting the end of the oblique steel pipe is fixedly installed on the fixed plate 202 below the first limit seat 201.
[0040] See also Figure 5 As shown, a vertical rod 206 is fixedly connected to the movable plate 205 on one side of the fixed plate 202, a first support platform 208 for supporting the horizontal steel pipe is fixedly installed on the top of the vertical rod 206, and a second support platform 207 for supporting the oblique steel pipe is fixedly installed in the middle of the vertical rod 206.
[0041] See also Figure 1 and Figure 5 As shown, a laterally arranged shift cylinder 203 is fixedly installed on the top of the above-mentioned base 4 through a baffle 3, and the protruding end of the shift cylinder 203 is fixedly connected to the fixed plate 202; when the protruding end of the lifting cylinder 801 is controlled to be extended to the longest, the arc panel 804 is fitted with the side of the socket sleeve, and then the protruding end of the shift cylinder 203 is controlled to extend. When one end of the horizontal steel pipe and the oblique steel pipe are in contact with the arc panel 804, the shift cylinder 203 is stopped in time, and then the protruding end of the lifting cylinder 801 is controlled to shrink and reset to half the length, so that there are welds that meet the requirements between the horizontal steel pipe and the oblique steel pipe and the socket sleeve, thereby ensuring the efficiency of welding the steel pipe scaffolding.
[0042] See also Figure 1 As shown, a welding robot 1 for welding and fixing the transverse steel pipe and the oblique steel pipe to the socket sleeve is fixedly arranged on the back of the above-mentioned base 4, and the welding robot 1 is a prior art.
[0043] A working method of a building scaffold manufacturing device, the working method specifically comprising the following steps:
[0044] Step 1: If Figure 1 , Figure 5 and Figure 6 As shown, the transverse steel pipe and the oblique steel pipe are placed on the first support platform 208 and the second support platform 207 in sequence, and then the ends of the transverse steel pipe and the oblique steel pipe are fixed by the first limit seat 201 and the second limit seat 204 to ensure the relative position of the transverse steel pipe and the oblique steel pipe, and then the socket sleeve is placed in the limit tooling 9 for limiting. At this time, the extended end of the shift cylinder 203 is at the shortest, and the extended end of the lifting cylinder 801 is at half the length;
[0045] Step 2: If Figure 1and Figure 2 As shown, when the extended end of the lifting cylinder 801 is extended to the maximum, as shown in Figure 2 , Figure 3 and Figure 5 As shown, the arc plate 804 is fitted with the side of the socket sleeve, and then the extended end of the shift cylinder 203 is controlled to extend. When one end of the transverse steel pipe and the oblique steel pipe are in contact with the arc plate 804, the shift cylinder 203 is stopped in time, and then the extended end of the lifting cylinder 801 is controlled to shrink and reset to half the length, so that there are welds that meet the requirements between the transverse steel pipe and the oblique steel pipe and the socket sleeve, ensuring the efficiency of welding the steel pipe scaffolding;
[0046] Step 3: If Figure 2 and Figure 4 As shown, in the process of controlling the extended end of the lifting cylinder 801 to extend from half the length to the longest, the two electric heating rods 603 are turned on to heat the temperature of the air in the gas storage barrel 604. After the welds between the transverse steel pipe and the oblique steel pipe and the socket sleeve are determined, the air pump 5 is turned on to inject carbon dioxide gas into the gas storage barrel 604, and at the same time, the hot air is squeezed into the L-shaped tube 601 through the hose 602, as shown in FIG. Figure 1 and Figure 4 As shown, the hot air flow ejected from the output end of the L-shaped tube 601 will blow and dry the welds between the transverse steel pipe and the oblique steel pipe and the socket sleeve and their surroundings to avoid the formation of pores in the welds during welding and to prevent the quality of the welded steel pipe scaffolding from being affected;
[0047] Step 4: If Figure 1 and Figure 4 As shown in FIG. 6 , when the hot air in the gas storage barrel 604 is exhausted, the carbon dioxide gas will be ejected from the output end of the L-shaped tube 601. Figure 2 and Figure 4 As shown, the extended end of the lifting cylinder 801 is controlled to shrink from half its length to the shortest, and the transmission rod 805 is driven downward by the flip rod 808 in cooperation with the first lever 807, thereby driving the L-shaped tube 601 to move downward, so that the distance between its output end and the socket sleeve becomes larger, so that the carbon dioxide gas ejected from the output end of the L-shaped tube 601 squeezes away the air around the socket sleeve, the horizontal steel pipe and the oblique steel pipe, and when the welding robot 1 welds the weld, the oxygen in the air is prevented from hindering the welding process.
[0048] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.
Claims
1. A construction scaffold manufacturing device, comprising a base (4) and a work frame (7) fixedly mounted at one end of the top thereof, characterized in that: A limiting fixture (9) for positioning the socket sleeve is fixedly connected to the middle of the work frame (7), a positioning mechanism (8) for determining the distance between the horizontal steel pipe and the oblique steel pipe and the socket sleeve is arranged above the limiting fixture (9), and a blowing mechanism (6) for reducing the oxygen content around the socket sleeve is arranged below the limiting fixture (9); The positioning mechanism (8) comprises a lifting cylinder (801) fixedly connected to the top of the working frame (7); the protruding end of the lifting cylinder (801) is fixedly connected to a curved panel (804) via a mounting plate (803); the position of the curved panel (804) corresponds to the position of the socket sleeve; a transmission unit for driving the blowing mechanism (6) to move is provided between the lifting cylinder (801) and the working frame (7); the transmission unit comprises a guide frame (806) fixedly connected to the working frame (7); A transmission rod (805) is movably inserted on the guide frame (806), and a flip rod (808) is rotatably arranged on the top of the guide frame (806). One end of the flip rod (808) is movably connected to the top of the transmission rod (805) via a first lever (807), and the other end of the flip rod (808) is movably connected to the protruding end of the lifting cylinder (801) via a second lever (802). The distance between the first lever (807) and the pin is half the distance between the second lever (802) and the pin. The blowing mechanism (6) comprises a lifting slider (606) slidably connected to the working frame (7), the lifting slider (606) being fixedly connected to the bottom of the transmission rod (805), and an L-shaped tube (601) being fixedly installed on the side of the lifting slider (606) away from the working frame (7), the output end of the L-shaped tube (601) being arranged toward the bottom of the socket sleeve, and a gap being present between the output end of the L-shaped tube (601) and the bottom of the socket sleeve, an air storage barrel (604) and an air pump (5) being arranged on the base (4), the output end of the air pump (5) being in communication with the bottom of the air storage barrel (604), electric heating rods (603) being fixedly connected to both sides of the inner wall of the air storage barrel (604), and the top of the air storage barrel (604) being in communication with the input end of the L-shaped tube (601) via a hose (602); A support mechanism (2) for fixing the transverse steel pipe and the oblique steel pipe is arranged on a side of the top of the base (4) away from the working frame (7), the support mechanism (2) comprising a movable plate (205) slidably connected to the base (4), a fixed plate (202) fixedly connected to the movable plate (205), a first limiting seat (201) for limiting the end of the transverse steel pipe fixedly installed on the side of the fixed plate (202) facing the working frame (7), and a second limiting seat (201) for limiting the end of the oblique steel pipe fixedly installed on the fixed plate (202) below the first limiting seat (201). A second limiting seat (204) at the end of the steel pipe, a vertical rod (206) is fixedly connected to the movable plate (205) on one side of the fixed plate (202), a first support platform (208) for supporting the horizontal steel pipe is fixedly installed on the top of the vertical rod (206), and a second support platform (207) for supporting the oblique steel pipe is fixedly installed in the middle of the vertical rod (206), a shift cylinder (203) is fixedly installed on the top of the base (4) through a baffle (3), and the protruding end of the shift cylinder (203) is fixedly connected to the fixed plate (202); The working method of the building scaffold manufacturing device specifically comprises the following steps: Step 1: Place the transverse steel pipe and the oblique steel pipe on the first support platform (208) and the second support platform (207) in sequence, then fix the ends of the transverse steel pipe and the oblique steel pipe by means of the first limit seat (201) and the second limit seat (204), and then place the socket sleeve into the limit tooling (9) for limiting. At this time, the extended end of the shift cylinder (203) is at its shortest, and the extended end of the lifting cylinder (801) is at half its length; Step 2: When the extended end of the lifting cylinder (801) is extended to the longest, the arc plate (804) is fitted with the side of the socket sleeve, and then the extended end of the shift cylinder (203) is controlled to extend. When one end of the transverse steel pipe and the oblique steel pipe are in contact with the arc plate (804), the shift cylinder (203) is stopped in time, and then the extended end of the lifting cylinder (801) is controlled to shrink and reset to half the length, so that there are welds that meet the requirements between the transverse steel pipe and the oblique steel pipe and the socket sleeve; Step 3: While the extended end of the lifting cylinder (801) is being controlled to extend from half its length to its longest length, the two electric heating rods (603) are turned on to heat the air temperature in the gas storage barrel (604). After the welds between the transverse steel pipe and the oblique steel pipe and the socket sleeve are determined, the air pump (5) is turned on to inject carbon dioxide gas into the gas storage barrel (604). At the same time, hot air is squeezed into the L-shaped pipe (601) through the hose (602). The hot air flow ejected from the output end of the L-shaped pipe (601) blows and dries the welds between the transverse steel pipe and the oblique steel pipe and the socket sleeve and their surroundings to avoid the formation of pores in the welds during welding. Step 4: When the hot air in the gas storage barrel (604) is exhausted, the carbon dioxide gas will be ejected from the output end of the L-shaped tube (601). At this time, the extended end of the lifting cylinder (801) is controlled to shrink from half its length to the shortest, and the transmission rod (805) is driven to move downward by the flip rod (808) in cooperation with the first lever (807), thereby driving the L-shaped tube (601) to move downward, so that the distance between its output end and the socket sleeve becomes larger, so that the carbon dioxide gas ejected from the output end of the L-shaped tube (601) squeezes away the air around the socket sleeve, the transverse steel pipe and the oblique steel pipe.