A method and system for information system informatization migration based on mining technology

Through the information system information innovation migration method based on mining technology, the problem of insufficient documents and complexity in the information system migration process is solved, and automated data collection and analysis is realized, bottlenecks are identified, migration process is simplified, and the gap evaluation and optimization of new and old systems is ensured.

CN118626475BActive Publication Date: 2024-11-19WUXI RONGZHI TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411084816.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-19
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

During the process of information innovation and migration of existing information systems, there are problems such as insufficient document resources, inability to fully understand the business processes of existing systems, complex migration, difficult standardization, and inability to effectively evaluate the gap between old and new systems.

Method used

The information system information innovation migration method based on mining technology is adopted, and business process data is collected through automated scripts, data cleaning and natural language processing are used to generate BPMN business flow charts, efficiency bottlenecks are identified, and migration strategies are optimized through continuous monitoring and key indicators.

Benefits of technology

It realizes automated business process data collection and analysis, identify customized system characteristics, simplify the migration process, avoid acceptance conflicts, ensure the performance and stability of the new system, and optimize the migration effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118626475B_ABST
    Figure CN118626475B_ABST
Patent Text Reader

Abstract

The present invention provides an information system trust-based migration method and system based on mining technology, which relates to the technical field of enterprise data information management. The business process data of the existing information system is obtained through data collection and preprocessing, and the process mining technology is used to intelligently generate the BPMN business process diagram. At the same time, the human-computer interaction operation steps and related instructions and key data information between the user and the original system are captured through task mining technology to generate a real task execution information document. According to the results of process mining and task mining analysis, the bottlenecks and blocking points in the original business process and the nodes that can be optimized and improved are determined, and targeted trust-based migration strategies and plans are proposed. After the migration, the operational performance and stability of the new business system are continuously monitored, and a comprehensive evaluation is performed using key indicators. The gap between the migrated trust-based system and the original system is effectively evaluated, and acceptance conflicts are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of enterprise data information management, and specifically to an information system trust-based migration method and system based on mining technology. Background Art

[0002] In the field of information system informatization migration, there are many existing methods and processes, one of which may be the closest to the content of the present invention is business process reengineering (Business Process Reengineering, BPR);

[0003] Business process reengineering is a method to achieve organizational change and improve performance by redesigning and optimizing business processes. Its main principle is to completely rethink and reconstruct business processes based on a comprehensive analysis of existing business processes to achieve a qualitative leap. The commonly used steps and processes are as follows:

[0004] a. Identify and analyze existing processes: Detailed identification and analysis of the business processes within the organization, including description and understanding of the process inputs, outputs, activities, participants, rules, etc.;

[0005] b. Evaluate the problems and bottlenecks of existing processes: Identify existing problems, bottlenecks and improvement opportunities through analysis of existing processes, including inefficiency, redundant steps, communication barriers, etc.;

[0006] c. Design new process models: Based on the evaluation results of existing processes, redesign business processes, which may involve changes in process simplification, reorganization, automation and innovation to improve efficiency, quality and flexibility;

[0007] d. Implement and monitor new processes: Implement the redesigned process model into actual operations and monitor its execution. This includes training relevant personnel, adjusting organizational structure, and introducing support systems;

[0008] In the prior art, publication number CN117764372A discloses a business form process dynamic design and optimization method and system, which relates to the field of enterprise management technology, including obtaining first information and second information; performing data mining processing and constructing to obtain third information based on the first information; performing process automation design processing and design based on the third information and the second information to obtain fourth information; performing form generation processing based on the fourth information to obtain fifth information; performing pattern recognition processing based on the fifth information and preset interface design rules to obtain sixth information; performing time series analysis processing based on the sixth information to generate seventh information, the seventh information being a business report containing key business indicators and trends, and effectively constructing an organizational structure and role authority framework through in-depth analysis and processing of organizational structure data and historical business process data, optimizing business processes, and improving decision-making efficiency;

[0009] The shortcomings of the prior art methods are as follows:

[0010] 1. Insufficient original business process documentation resources make it difficult to understand and analyze existing processes, resulting in gaps in the migration process;

[0011] 2. It is impossible to fully understand the overall picture of the existing system business flow and the internal process details;

[0012] 3. It takes a lot of time and energy to research and collect requirements, and there will be many obstacles and challenges;

[0013] 4. The original system is highly customized, which complicates the migration process and requires extra effort to familiarize yourself with and understand the customized system and ensure that the new system functions remain consistent;

[0014] 5. Uncoordinated business processes across levels and departments will make process reengineering complex and time-consuming, and also increase the difficulty of standardization during migration;

[0015] 6. It is difficult to evaluate the gap between the migrated information innovation system and the original system, which may easily lead to acceptance conflicts;

[0016] 7. Unable to effectively discover problems in the existing business system, and all problems, whether good or bad, will be migrated to the new system;

[0017] 8. How to effectively evaluate the gap between the migrated ICT system and the original system by continuously monitoring the operational performance and stability of the new business system and using key indicators for comprehensive evaluation after the migration is the direction that needs to be improved at present;

[0018] The above information disclosed in this Background section is only for enhancement of understanding of the background of the present disclosure and therefore it may contain information that does not constitute the prior art that is already known to one of ordinary skill in the art. Summary of the invention

[0019] The purpose of the present invention is to provide an information system trust-based migration method and system based on mining technology to solve the problems raised in the above-mentioned background technology.

[0020] To achieve the above object, the present invention provides the following technical solutions:

[0021] A method for information system informatization migration based on mining technology, the specific steps include:

[0022] Step S1: collect business process data from existing information systems using automated scripts and APIs, and apply data cleaning techniques for preprocessing to remove noise data;

[0023] Step S2: Obtain business process data and conduct in-depth analysis and mining to accurately restore the real business process and automatically generate a BPMN business process diagram that can be directly used for building the information innovation system;

[0024] Step S3: Using natural language processing and machine learning, capture the interactive operation steps and key data between the user and the original system, and generate a detailed human-computer interaction task execution information document;

[0025] Step S4: Based on the analysis results of process mining and task mining, use data analysis and simulation technology to determine the efficiency bottlenecks and blocking points in the original business process, and formulate an information-based migration strategy including new technology application, process redesign and system integration;

[0026] Step S5: Analyze the existing business system and set the key indicators obtained as benchmark indicators as a benchmark comparison reference for the post-migration information innovation system;

[0027] Step S6: After the information system is migrated to the information system, the operational performance and stability of the new business system are continuously monitored to collect key indicator data of the new business process and system functions, and data preprocessing is performed on the key indicator data. At the same time, each business process of the new business system is marked to form {1, 2, ..., i, ..., n}, where i represents the i-th business process and n represents the total number of business processes;

[0028] Step S7, obtaining the key indicator data after data preprocessing in step S6, the key indicator data also includes the number of business process executions, performance indicators, system resource usage, user behavior data, business process efficiency indicators, system stability indicators, business process cost data, and user satisfaction indicators;

[0029] Step S8: Obtain performance indicators, business process execution times, system resource usage, and business process efficiency indicators, and analyze and process them to generate a first evaluation index, which is used to make a first evaluation of the effect and efficiency of the new business process;

[0030] Step S9: obtaining user behavior data, business process cost data, user satisfaction index and system stability index, and performing analysis and processing to generate a second evaluation index, which is used to conduct a second evaluation of the effect and efficiency of the new business process;

[0031] Step S10: Obtain performance indicators and system stability indicators, analyze and process them, and generate adjustment coefficients, which are used to adjust the weights of the first evaluation results and the second evaluation results;

[0032] Step S11, obtain the first evaluation index, the second evaluation index and the adjustment coefficient, analyze and process them, and construct a comprehensive adjustment model, which is used to provide a performance benchmark adjustment strategy for the new business process based on the weight distribution of the first evaluation results and the second evaluation results.

[0033] Furthermore, the adjustment strategy comprehensively judges and analyzes the bottleneck of the new system and finds out the nodes that can be optimized, and makes adjustments to the bottlenecks and the nodes that can be optimized. The adjustment of the performance benchmark includes adjustments to data processing and management, business continuity planning, and feedback mechanism optimization. The calculation formula of the comprehensive adjustment model is defined as follows:

[0034]

[0035] Where C is the comprehensive adjustment coefficient, which is used to determine the adjustment range of the performance benchmark;

[0036] d1 and d2 are two weights introduced in the model to balance the impact of E1 and E2 on the comprehensive adjustment coefficient C, and d1+d2=1 to ensure the rationality of weight distribution; A is the adjustment coefficient;

[0037] D3 is to ensure that the formula is still valid when E2 is 0. and They represent the natural logarithmic function and the natural exponential function, respectively, in order to finely adjust the effects of E1 and E2 on C;

[0038] The value range of C is set to (0,2). When C is close to 0, it means that the urgency of adjusting the current business process is low, while when C is close to 2, it means that the urgency of adjustment is high and measures need to be taken immediately to optimize the business process and system functions.

[0039] The value range of C (0,2) is divided into the following intervals, and the adjustment strategy for each interval is described:

[0040] Interval 1 (0, 0.5) is the initial adjustment stage. The application of comprehensive adjustment model C points to slight adjustments. According to the weight distribution of the results of the first and second evaluations, a small adjustment of the performance benchmark is determined. In this stage, the focus of data processing and management is on improving database efficiency and reducing response time. Business continuity planning focuses on establishing a sound backup and recovery process. The optimization of the feedback mechanism aims to achieve efficient adoption and execution of user suggestions. These measures work together to identify the bottlenecks of the new system and adjust the optimization nodes to ensure the continuous progress and performance improvement of the new system.

[0041] Interval 2 (0.5, 1.5) is the intermediate adjustment stage. The comprehensive adjustment coefficient C depicts a medium adjustment demand. The business process performance benchmark needs to make more significant adjustment strategies based on the weighted results of the two assessments. Data processing needs to be further optimized to reduce processing time. Business continuity planning needs to be strengthened to ensure uninterrupted business operation. The automation and intelligence of the feedback mechanism will accelerate problem discovery and resolution, and directly support the continuous improvement of system performance.

[0042] Interval three [1.5,2) is the emergency adjustment stage, which requires rapid response and in-depth intervention. The comprehensive adjustment model C points to emergency adjustment, which requires a major upgrade of the data processing system to greatly improve the processing speed; the business continuity plan must be able to ensure stable business operation in any crisis; the feedback mechanism must be able to respond in real time and solve problems quickly. This model ensures that through in-depth analysis, key bottlenecks that affect performance are given priority and resolved.

[0043] A mining-based information system informatization migration system, the system is used to execute the mining-based information system informatization migration method, including:

[0044] Data collection and preprocessing module: used to collect business process data from existing information systems using automated scripts and APIs, and to preprocess data using data cleaning techniques to remove noise data;

[0045] Process mining and analysis module: used to obtain business process data and conduct in-depth analysis and mining, so as to accurately restore the real business process and automatically generate BPMN business process diagrams that can be directly used for the construction of the information innovation system;

[0046] Task mining and interaction analysis module: uses natural language processing and machine learning to capture the interaction steps and key data between the user and the original system, and generates detailed human-computer interaction task execution information documents;

[0047] Efficiency bottleneck identification and strategy formulation module: Based on the analysis results of process mining and task mining, it uses data analysis and simulation technology to determine the efficiency bottlenecks and blocking points in the original business process, and formulates a migration strategy for information technology including new technology application, process redesign and system integration;

[0048] Benchmark indicator setting module: used to analyze the existing business system and set the key indicators obtained as benchmark indicators as a benchmark comparison reference for the information innovation system after migration;

[0049] New system monitoring and data labeling module: used to continuously monitor the operational performance and stability of the new business system after the information system is migrated to the information system, collect key indicator data of new business processes and system functions, and perform data preprocessing on key indicator data to ensure data quality. At the same time, each business process of the new business system is labeled to form {1, 2, ..., i, ..., n}, where i represents the i-th business process and n represents the total number of business processes;

[0050] Key indicator data acquisition module: used to acquire the key indicator data after data preprocessing in step S6, the key indicator data also includes the number of business process executions, performance indicators, system resource usage, user behavior data, business process efficiency indicators, system stability indicators, business process cost data, and user satisfaction indicators;

[0051] The first evaluation index generation module is used to obtain performance indicators, business process execution times, system resource usage and business process efficiency indicators, and analyze and process them to generate a first evaluation index, which is used to make a first evaluation of the effect and efficiency of the new business process;

[0052] Second evaluation index generation module: used to obtain user behavior data, business process cost data, user satisfaction index and system stability index, and analyze and process them to generate a second evaluation index, which is used to conduct a second evaluation of the effect and efficiency of the new business process;

[0053] Adjustment coefficient generation module: used to obtain performance indicators and system stability indicators, analyze and process them, and generate adjustment coefficients, which are used to adjust the weights of the first and second evaluation results;

[0054] Comprehensive adjustment model building module: used to obtain the first evaluation index, the second evaluation index and the adjustment coefficient, and perform analysis and processing to build a comprehensive adjustment model. The model is used to provide a performance benchmark adjustment strategy for the new business process based on the weight distribution of the first and second evaluation results.

[0055] Compared with the prior art, the present invention has the following beneficial effects:

[0056] Through the process mining technology in steps S1 and S2, the present invention can automatically collect and analyze business process data from existing information systems without relying on original business process documents, thereby solving the difficulty of understanding and analysis caused by insufficient document resources;

[0057] Step S3 uses task mining technology to capture the interactive operation steps and related instructions between the user and the system, and generates detailed task execution information documents, which helps to fully understand the overall picture and internal details of the business process;

[0058] The present invention reduces the time and effort of manual research and demand collection through automation technologies such as process mining and task mining, thereby improving the efficiency of the migration process;

[0059] Step S4 analyzes the results of process mining and task mining to identify the key features and requirements of the customized system, propose targeted migration strategies, and ensure the consistency of the new system functions;

[0060] The method of the present invention can identify and solve the problem of incoordination of processes across levels and departments by comprehensively analyzing the business processes, thus simplifying the migration process;

[0061] Steps S6 to S11 can effectively evaluate the performance gap between the new and old systems through continuous monitoring and comprehensive evaluation, thus avoiding acceptance conflicts;

[0062] The present invention can discover and analyze problems and bottlenecks in existing business systems through process mining and task mining technologies, ensuring that these problems will not be indiscriminately migrated to new systems;

[0063] Steps S6 to S11 describe in detail how to effectively evaluate the performance and stability of the post-migration information innovation system through continuous monitoring and comprehensive evaluation of key indicators to ensure the optimization and improvement of the new system;

[0064] In summary, through data collection and preprocessing, the business process data of the existing information system is obtained, and the process mining technology is used to intelligently generate the BPMN business process diagram, which is directly used as the business process for building the trusted innovation system. At the same time, the task mining technology is used to capture the human-computer interaction operation steps and related instructions and key data information between the user and the original system to generate a real task execution information document. In addition, the present invention also determines the bottlenecks and blockages in the original business process and the nodes that can be optimized and improved based on the results of process mining and task mining analysis, and proposes targeted trusted innovation migration strategies and plans. After the migration, by continuously monitoring the operational performance and stability of the new business system and using key indicators for comprehensive evaluation, the gap between the trusted innovation system after migration and the original system is effectively evaluated, avoiding acceptance conflicts. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] Figure 1 It is a schematic diagram of the overall method flow of the present invention;

[0066] Figure 2 It is a system module block diagram of the present invention. DETAILED DESCRIPTION

[0067] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments.

[0068] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0069] Embodiment 1

[0070] See also Figure 1 and Figure 2 , the present invention provides a technical solution:

[0071] A method for information system informatization migration based on mining technology, the specific steps include:

[0072] Step S1: collect business process data from existing information systems using automated scripts and APIs, and apply data cleaning techniques for preprocessing to remove noise data;

[0073] Step S2: Obtain business process data and conduct in-depth analysis and mining to accurately restore the real business process and automatically generate a BPMN business process diagram that can be directly used for building the information innovation system;

[0074] Step S3: Using natural language processing and machine learning, capture the interactive operation steps and key data between the user and the original system, and generate a detailed human-computer interaction task execution information document;

[0075] Step S4: Based on the analysis results of process mining and task mining, use data analysis and simulation technology to determine the efficiency bottlenecks and blocking points in the original business process, and formulate an information-based migration strategy including new technology application, process redesign and system integration;

[0076] Step S5: Analyze the existing business system and set the key indicators obtained as benchmark indicators as a benchmark comparison reference for the post-migration information innovation system;

[0077] Step S6: After the information system is migrated to the information system, the operational performance and stability of the new business system are continuously monitored to collect key indicator data of the new business process and system functions, and data preprocessing is performed on the key indicator data. At the same time, each business process of the new business system is marked to form {1, 2, ..., i, ..., n}, where i represents the i-th business process and n represents the total number of business processes;

[0078] Step S7, obtaining the key indicator data after data preprocessing in step S6, the key indicator data also includes the number of business process executions, performance indicators, system resource usage, user behavior data, business process efficiency indicators, system stability indicators, business process cost data, and user satisfaction indicators;

[0079] Step S8: Obtain performance indicators, business process execution times, system resource usage, and business process efficiency indicators, and analyze and process them to generate a first evaluation index, which is used to make a first evaluation of the effect and efficiency of the new business process;

[0080] Step S9: obtaining user behavior data, business process cost data, user satisfaction index and system stability index, and analyzing and processing them to generate a second evaluation index, which is used to conduct a second evaluation of the effect and efficiency of the new business process;

[0081] Step S10: Obtain performance indicators and system stability indicators, analyze and process them, and generate adjustment coefficients, which are used to adjust the weights of the first evaluation results and the second evaluation results;

[0082] Step S11, obtain the first evaluation index, the second evaluation index and the adjustment coefficient, analyze and process them, and construct a comprehensive adjustment model, which is used to provide a performance benchmark adjustment strategy for the new business process based on the weight distribution of the first evaluation and the second evaluation results.

[0083] Embodiment 2

[0084] Further explanation based on the first embodiment, the acquisition of business process data of the existing information system through data collection and preprocessing specifically includes the following contents:

[0085] f1) The data types that need to be collected are determined to be business process logs, system configuration data, and user behavior data; the data acquisition methods are to export log files from the original system, directly read and export from the original system database, develop data push interfaces for the original system, and connectors for data extraction from specific business systems;

[0086] f2) The data push interface developed by the original system and the connector for data extraction from the specific business system include methods for cleaning, information masking and preprocessing of collected data to ensure the integrity and accuracy of the data;

[0087] The export of log files in the original system and the data directly read and exported from the original system database are raw data, which need to be preprocessed; the processing method is not limited to using SQL and PANDAS related statements and function packages in PYTHON;

[0088] f3) Storing the collected and processed data in a storage medium or database for subsequent analysis.

[0089] Embodiment 3

[0090] Further explanation based on Example 2, the application process mining technology is used to analyze and mine the business process data to restore the real business process. The intelligently generated BPMN business process diagram can be directly used as the business process for building the information innovation system; specifically including the following contents:

[0091] a1) Extract the event sequence of the business process from the log prepared in step S1;

[0092] a2) applying a process mining algorithm to the above event sequence, wherein the process mining algorithm adopts any one of the Alpha algorithm, the HeuristicMiner algorithm or the InductiveMiner algorithm to discover the potential business process model from the event sequence;

[0093] a3) By using the business process filter, the complex processes found above are sorted out by performing time frame filtering, process duration filtering, case performance filtering, business flow tracking filtering, and object attribute filtering in sequence;

[0094] a4) Generate and export a flowchart or BPMN model based on the results of process mining to represent the business process of the current information system;

[0095] a5) The process step information, activity information, frequency information, performance information, and other valid information of process objects related to the business process will be recorded together;

[0096] The task mining technology is used to capture the human-computer interaction operation steps and related instructions and key data information between the user and the original system, and generate a real task execution information document, which includes detailed operation process information of the human-computer interaction pages, steps, and fields, specifically including the following contents:

[0097] b1) obtaining the real business process data restored in step S2 to obtain a full picture of the end-to-end business process;

[0098] b2) Based on the activity nodes in the business process, define the task activities of human-computer interaction, that is, its fine-grained human-computer interaction operations;

[0099] b3) performing task mining on the human-computer interaction computer terminal of the above selected task activities;

[0100] b4) Start recording the steps, timestamps, page screenshots, and data fields of human-computer interaction through manual execution;

[0101] b5) After manually stopping task mining, the system will intelligently generate task step logic document materials containing the above record information, which are in doc format.

[0102] Embodiment 4

[0103] Further explanation based on Example 3, the bottlenecks and blocking points in the original business process, as well as the nodes that can be optimized and improved, are determined based on the results of process mining and task mining analysis, and targeted information innovation migration strategies and solutions for the nodes are proposed. The solutions include the introduction of new technologies, process redesign and system integration, and specifically include the following contents:

[0104] c1) Use the process bottleneck discovery algorithm to calculate the process restored from the existing system and obtain the corresponding bottleneck analysis report;

[0105] c2) By comparing the expected process model and the actual process model that meet the business requirements, it is possible to intelligently analyze and discover potential illegal processes and unique processes, providing decision support for the migration of information technology and process optimization and reengineering;

[0106] The key indicators obtained by analyzing the existing business system are set as benchmark indicators as a benchmark comparison reference for the post-migration information innovation system, specifically including the following:

[0107] d1) The statistical indicators of the original system business process obtained in step a5 of step S2 can be manually selected and set as reference indicators for benchmark comparison; the explanation is as follows:

[0108] Collect various statistical information about the existing system business processes, including process steps, activity frequency, performance data, and other relevant process object information. Once this data is collected and recorded, manually select key statistical indicators and set these indicators as a benchmark. In the subsequent comparison process, this benchmark will be used as a reference to measure and compare whether the performance of the new system after migration or optimization meets the expected standards;

[0109] d2) During the migration to the information and innovation model, the new system business process is compared with the benchmark indicator data set in d1 during the test operation phase to evaluate and measure the gap before and after the migration;

[0110] After the information system is migrated to the information system, the existing new business system is continuously monitored, the operational performance and stability of the new business system are continuously monitored, and the bottlenecks of the new system are analyzed and nodes that can be optimized are found to ensure that the new system can be continuously improved and optimized, including the following:

[0111] e1) Integrate the system with data collection, process mining and task mining, benchmarking and monitoring capabilities with the existing system, and adopt the data collection and processing method in f1, where the original system develops a data push interface and a connector for data extraction from a specific business system;

[0112] e2) Establish a monitoring mechanism to collect key indicators and data on new business processes and system functions;

[0113] e3) Monitor the implementation of new business processes, evaluate their effectiveness and efficiency, and make adjustments and improvements as needed;

[0114] e4) Collect user feedback and opinions to improve the user experience and satisfaction of the system.

[0115] Embodiment 5

[0116] Further explained on the basis of Example 4, the business process execution times, performance indicators, system resource usage, user behavior data, business process efficiency indicators, system stability indicators, business process cost data, and user satisfaction indicators specifically include the following contents:

[0117] The business process execution times represent the execution frequency of the ith business process, and the ith business process execution times are marked as ;

[0118] The data sources are business process management systems and log files;

[0119] The performance indicators include response time and transaction processing time, and the performance indicator of the i-th business process is marked as , the response time is marked as , marking the transaction time as ;

[0120] The above data comes from monitoring systems, performance management tools, and log analysis;

[0121] Performance Indicators The calculation formula is ,in, is the average response time of the ith business process, is the average time required to complete the i-th business process transaction, It represents the business process performance index obtained by combining the two;

[0122] The system resource utilization rate includes the CPU utilization rate, memory utilization rate and network bandwidth utilization rate of the i-th business process, and the system resource utilization rate is marked as , mark the CPU usage as , mark the memory usage , marking the network bandwidth usage as ;

[0123] CPU usage is the percentage of processor resources occupied by the i-th business process;

[0124] Memory usage is the percentage of memory resources occupied by the i-th business process;

[0125] The network bandwidth utilization rate is the situation of network resources occupied by the i-th business process;

[0126] The above data comes from system resource monitoring tools;

[0127] System resource usage The calculation formula is ,in, , , Respectively represent CPU usage, memory usage and network bandwidth usage, is the average of these three, indicating the overall usage of system resources by the i-th business process;

[0128] The user behavior data includes the page visits, user operation frequency, and user interaction duration of the i-th business process, and the user behavior data is marked as , mark the page visits as , mark the user operation frequency as , mark the user interaction time as ;

[0129] Page visits are the number of visits to the i-th business process page;

[0130] User operation frequency is the frequency of user operations on the i-th business process;

[0131] User interaction duration is the length of time the user stays in the i-th business process;

[0132] The above data comes from web analysis tools, UI / UX monitoring tools, and log records;

[0133] User behavior data The calculation formula is ,in, is the number of page views, is the user operation frequency, is the user interaction duration, Represents the user behavior data that integrates these three dimensions;

[0134] The business process efficiency index includes the average execution time, process success rate, process interruption and abnormal number of the i-th business process; and the business process efficiency index is marked as , the average execution time of the process is marked as , mark the process success rate as , mark the process interruption and exception times as ;

[0135] The average process execution time indicates the average time required to complete the entire business process;

[0136] The process success rate indicates the ratio of successful completion of a business process to the number of attempts;

[0137] The number of process interruptions and exceptions indicates the occurrence of interruptions or exceptions in process execution;

[0138] Data sources: business process management system, event log;

[0139] Business process efficiency indicators The calculation formula is ,here, is the average process execution time, is the process success rate, is the number of process interruptions and exceptions. The interruptions and exceptions are treated as negative values ​​in the calculation because they have a negative impact on efficiency;

[0140] The system stability index includes the number of system failures and system recovery time of the i-th business process, and the system stability index is marked as , the number of system failures is marked as , mark the system recovery time as ;

[0141] The number of system failures is the number of times the system fails within a certain period of time;

[0142] System recovery time is the time required for the system to return to normal operation after a failure;

[0143] The data sources are system monitoring tools and IT service management tools;

[0144] System stability index The calculation formula is ,in, is the number of system failures, is the system recovery time, this expression assumes that fewer failures and shorter recovery times indicate higher stability;

[0145] The business process cost data includes the operation cost and process maintenance cost of the i-th business process, and the business process cost data is marked as , the operation cost is marked as , mark the process maintenance cost as ;

[0146] The operation cost is the cost required for the operation of the i-th business process;

[0147] The process maintenance cost is the cost required to maintain the normal operation of the i-th business process;

[0148] Data sources: financial system, cost analysis report;

[0149] Business process cost data The calculation formula is ,in, is the operating cost, is the process maintenance cost, and the two are added together to get the total cost of the entire business process;

[0150] The user satisfaction index includes the user feedback score of the i-th business process and the number of user complaints, and the user satisfaction index is marked as , the user feedback score is marked as YHFk, and the number of user complaints is marked as YHTs;

[0151] The user feedback score is the satisfaction score of the i-th business process provided by the user;

[0152] The number of user complaints is the number of times users complain about the i-th business process;

[0153] Data sources: customer service system, questionnaire;

[0154] User satisfaction index The calculation formula is ,in, is the user feedback rating, is the number of user complaints. Assuming that a higher score and a smaller number of complaints indicate a higher satisfaction rate, the number of complaints is increased by 1 to avoid division by 0.

[0155] Embodiment 6

[0156] Further explanation based on Example 5, the performance index, the number of business process executions, the system resource usage rate and the business process efficiency index are obtained, and analyzed and processed to generate a first evaluation index, which is used to perform a first evaluation on the effect and efficiency of the new business process, and specifically includes the following contents:

[0157] The first evaluation index is defined as E1, and the calculation formula is as follows:

[0158]

[0159] in, is a performance indicator that combines response time and transaction time ;

[0160] Is the system resource usage, combined with CPU usage , memory usage and network bandwidth usage ;

[0161] Is a business process efficiency indicator that combines the average execution time of the process , process success rate and the number of process interruptions and exceptions The impact of

[0162] is the number of business process executions, used as a normalization factor to balance the evaluation index;

[0163] are the weights of performance indicators, system resource utilization, and business process efficiency indicators, respectively, and To ensure the balance of the evaluation index, the specific value is determined by the expert group based on experimental data;

[0164] The value range of E1 is set to (0,1). The closer the value is to 1, the higher the performance of the business process, the efficiency of system resource use, and the efficiency of the business process itself. Otherwise, the lower the value is.

[0165] The value range (0, 1) of the first evaluation index E1 is divided into three intervals, and detailed quantitative content descriptions, judgment criteria, and rules are set for each interval. The corresponding first evaluation results are as follows:

[0166] Interval 1: 0 < E1 < 0.33. In this interval, the performance of the business process, the system resource utilization rate, and the process efficiency are at a low level, and resources are used improperly. When the first evaluation index E1 is less than 0.2, urgent intervention is required, and urgent optimization requirements are pointed out to reduce the response time and transaction processing duration and improve the resource utilization rate. When E1 takes values between 0.2 and 0.33, it indicates that improvement measures must be followed up. A small increase in individual indicators will significantly affect the overall evaluation and guide the optimization direction;

[0167] Specifically, the performance index is 30% lower than the average level, the system resource utilization rate is 15% higher than the average level, and the business process efficiency index is 25% lower than the average level; this indicates that the business process has a long response time, low transaction processing efficiency, and excessive system resource consumption; in terms of technical effects, it is necessary to immediately optimize the business process design, reduce unnecessary resource consumption, and improve the response speed and transaction processing efficiency;

[0168] The judgment criteria and rules are as follows:

[0169] In this interval, a threshold E1 = 0.2 is set. When E1 < 0.2, urgent optimization measures should be immediately started, such as adjusting the business process logic and optimizing resource allocation; when 0.2 ≤ E1 < 0.33, optimization strategies should be gradually implemented, resource usage should be regularly monitored and adjusted, and the automation level of the business process should be improved;

[0170] The interaction rules are as follows:

[0171] In this interval, a small change in any parameter will significantly affect the value of E1. If the response time is reduced by 10%, E1 will increase by 5%; if the CPU utilization rate is reduced by 5%, E1 will increase by 3%. These changes indicate that the overall efficiency and performance of the business process can be effectively improved by optimizing a single parameter;

[0172] Interval 2: 0.33 ≤ E1 < 0.67. The business process performance in this interval is medium, and there is still room for improvement in performance and resource utilization; the measurement result of E1 ranges from 0.33 to 0.67, indicating that regular optimization is required to maintain and improve performance. The threshold 0.5 is the demarcation point for judging routine optimization and enhanced monitoring; in this interval, small improvements in balancing multiple parameters can improve efficiency and effectiveness;

[0173] Specifically, the performance index Close to average, system resource usage 5% higher than the average, while the business process efficiency index Close to the average level; in terms of technical effects, continuous monitoring and optimization are needed to ensure the stable operation of business processes and efficient use of resources;

[0174] The judgment criteria and rules are as follows:

[0175] In this interval, the threshold E1=0.50 is set. When E1<0.50, conventional optimization measures are implemented, and business processes are regularly reviewed and adjusted. When 0.50≤E1<0.67, 10% performance monitoring is strengthened to ensure the optimization of resource use and the efficient operation of business processes.

[0176] The interaction rules are as follows:

[0177] In this range, the effect of parameter changes on E1 is relatively stable, and the response time Reduced by 5%, E1 increased by 2%; CPU usage The decrease was 3% and the increase in E1 was 1%. These changes indicate that it is necessary to comprehensively consider the optimization of multiple parameters to achieve a balanced improvement in the overall business process;

[0178] Interval 3: 0.67≤E1<1. In the interval where E1 is higher than 0.67, the business process has excellent performance and high resource utilization efficiency. This index indicates that only fine-tuning is needed to maintain efficient operation. 0.85 is used as the threshold for optimization adjustment and maintenance status, indicating that it is desirable to maintain the current optimization level above 0.85. In this interval, the business process is close to the ideal state, and detailed adjustments will continue to be finely managed.

[0179] Specific performance indicators 10% above average system resource usage Near or below average, while business process efficiency indicators 15% higher than the average level; in terms of technical performance, the business process runs efficiently and resources are used reasonably. It is necessary to maintain the current status and make small optimization adjustments;

[0180] The judgment criteria and rules are as follows:

[0181] In this range, the threshold E1 is set to 0.85. When E1<0.85, small optimizations and adjustments are implemented, such as fine-tuning business processes within 5% to further improve efficiency. When 0.85≤E1<1, the current optimization state is maintained, and performance evaluation and resource monitoring are performed regularly.

[0182] The interaction rules are as follows:

[0183] In this range, parameter optimization has little effect on E1; response time Reduced by 2%, E1 increased by 1%; CPU usage A decrease of 1% and an increase of 0.5% in E1 indicate that the business process is close to the optimal state and that small adjustments can maintain efficient operation.

[0184] Embodiment 7

[0185] Further explanation based on Example 6, user behavior data, business process cost data, user satisfaction index and system stability index are obtained, and analyzed and processed to generate a second evaluation index, which is used to conduct a second evaluation of the effect and efficiency of the new business process; specifically, the following contents are included:

[0186] The second evaluation index is defined as E2, and the calculation formula is as follows:

[0187]

[0188] in represents the importance of the corresponding indicator in E2, and the total weight W is the sum of these weights, that is, ; p1 is an adjustment factor, which is used to limit the value range of E2; and p1 is a positive value greater than zero; and p1 were determined by an expert group based on experimental data;

[0189] The parameters are defined as follows:

[0190] is the user behavior data indicator of the i-th business process;

[0191] Represents the total cost data of the i-th business process;

[0192] is the user satisfaction index of the i-th business process;

[0193] is the system stability indicator of the i-th business process;

[0194] The value range of E2 is set to (0,1), where a value close to 0 indicates that the new business process performs poorly in terms of user behavior, cost, satisfaction, and stability and needs urgent improvement; a value close to 1 indicates that the new business process performs well in these aspects;

[0195] The results of the second assessment are as follows:

[0196] When E2 is close to 0, it is an inefficient interval (E2<0.2), indicating that users have low participation in the business process, high costs, low satisfaction, and poor system stability, which prompts managers to take immediate measures to optimize business processes;

[0197] When E2<0.1, it means that the business process is in a critically inefficient state and needs to immediately optimize user participation, reduce costs, improve satisfaction and system stability;

[0198] If user behavior data increases by 10% and E2 increases by 5%, it shows that optimizing user experience can significantly improve the overall evaluation;

[0199] When E2 is in the middle range, it is the improvement interval (0.2≤E2<0.8), which indicates that the business process performs well in some aspects but needs improvement in other aspects;

[0200] When 0.2≤E2<0.5, it indicates that there are areas for improvement, with a specific focus on cost control and improving user satisfaction;

[0201] When 0.5≤E2<0.8, the business process performs well in some aspects, but further detailed analysis is needed to identify specific improvement points;

[0202] If the cost decreases by 10% and E2 increases by 2%, it means that the improvement of cost efficiency has a positive impact on the overall evaluation of the business process;

[0203] When E2 is close to 1, it is in the high efficiency range (E2 ≥ 0.8), which means that the business process performs very well in all aspects considered, but still needs continuous monitoring and fine-tuning to maintain its advantages;

[0204] When E2 ≥ 0.9, the business process performs well, but requires continuous monitoring and fine-tuning to maintain high efficiency and satisfaction;

[0205] Even if user satisfaction increases by 5%, E2 only increases by 0.5%, indicating that in the high-efficiency range, a small increase in user satisfaction has limited impact on the overall evaluation;

[0206] To avoid division by zero in the E2 formula, make sure that the cost and number of failures Add a non-zero constant.

[0207] Embodiment 8

[0208] Further explanation based on the seventh embodiment, the performance index and the system stability index are obtained, analyzed and processed, and an adjustment coefficient is generated. The coefficient is used to adjust the weight of the first evaluation result and the second evaluation result. Specifically, it includes the following contents:

[0209] The adjustment coefficient is defined as A, and the calculation formula is as follows:

[0210]

[0211] Among them, e1 is a positive normalization constant used to ensure that the adjustment coefficient A is within a suitable value range;

[0212] e2 and e3 are exponential weights used to adjust the influence of performance indicators and stability indicators;

[0213] is the system stability indicator of the i-th business process;

[0214] is the performance indicator of the i-th business process;

[0215] Set the value range of A to (0.5, 1.5), which means that the adjustment coefficient can reduce the weight of the original evaluation result by taking values in (0.5 < A < 1) or increase it by taking values in (1 < A < 1.5) to reflect the actual impact of stability and performance;

[0216] When 0.5 < A < 1, it means that the system stability is high or the performance is low, and the weight of the original evaluation result needs to be reduced. At this time, the high stability of the system reduces the impact of insufficient performance;

[0217] When A = 1, it indicates that the original evaluation result has already reflected the current situation well and does not need to be adjusted;

[0218] When A > 1, it means that the performance is high or the system stability is low, and the weight of the original evaluation result needs to be increased to emphasize the advantage of performance or the deficiency of stability;

[0219] To meet the above rules, select the values of e1, e2, and e3. For example, let e1 = 1, e2 = 1, and e3 = 1, then the adjustment coefficient A will directly reflect the relative importance of performance and stability indicators; through the collection and analysis of actual data, further adjust these coefficients to optimize the model;

[0220] The specific weight distribution is as follows:

[0221] Scenario 1, the performance indicator has a greater impact:

[0222] When the performance of the business process is crucial for user satisfaction and business results and has a greater impact on system stability, the value range of e2 is [0.6, 0.7], and the value range of e3 is [0.3, 0.4], which ensures that the sum of the weights is 1;

[0223] In this scenario, if e2=0.7 and e3=0.3 are determined, the performance index has more than twice the impact on the adjustment factor A as the system stability; this means that if the performance index improves by 10%, the adjustment factor A will increase by 7%, while if the system stability improves year-on-year, A will only increase by 3%;

[0224] Scenario 2: The impact on system stability is significant:

[0225] When the stability of the system is critical to business continuity and customer trust, and the relative performance indicators have a greater impact, the value range of e2 is [0.3, 0.4], and the value range of e3 is [0.6, 0.7], which ensures that the sum of the weights is 1;

[0226] In this scenario, e2=0.3 and e3=0.7 are determined, so the influence of system stability on the adjustment factor A is more than twice the influence of the performance index; this means that if the system stability improves by 10%, the adjustment factor A will increase by 7%, while if the performance index improves year-on-year, A will only increase by 3%;

[0227] The value is determined based on the following:

[0228] The specific value of the weight is determined based on a professional assessment of the business impact. In scenario one, performance directly affects user experience and business efficiency, so it gets a higher weight. In scenario two, stability becomes the focus because frequent system failures can lead to a decrease in customer trust and even violate the service level agreement (SLA), thus getting a greater weight.

[0229] This approach uses real-time data collected from IT service management tools and system monitoring tools to implement specific weightings and accurately adjust the evaluation results to reflect the true performance of business processes;

[0230] This mathematical model is calculated using real-time monitoring data; for example, IT service management tools and system monitoring tools can provide the necessary value; in this way, A provides a dynamic weight adjustment mechanism based on actual performance data, which helps to more accurately evaluate the performance of information systems after the migration to information-based innovation.

[0231] Embodiment 9

[0232] Further explanation is given on the basis of Example 8, the first evaluation index, the second evaluation index and the adjustment coefficient are obtained, and analyzed and processed to construct a comprehensive adjustment model, which is used to provide a performance benchmark adjustment strategy for the new business process according to the weight distribution of the first evaluation results and the second evaluation results, and the adjustment strategy comprehensively judges and analyzes the bottleneck of the new system and finds out the nodes that can be optimized, and adjusts the bottleneck and the nodes that can be optimized. The adjustment of the performance benchmark includes adjustment of data processing and management, business continuity planning and feedback mechanism optimization, and specifically includes the following contents:

[0233] The adjustment strategy comprehensively judges and analyzes the bottlenecks of the new system and finds out the nodes that can be optimized, and makes adjustments based on the bottlenecks and the nodes that can be optimized. The adjustment of the performance benchmark includes adjustments to data processing and management, business continuity planning, and feedback mechanism optimization to ensure that the new system can be continuously improved and optimized.

[0234] The calculation formula of the comprehensive adjustment model is defined as follows:

[0235]

[0236] Where C is the comprehensive adjustment coefficient, which is used to determine the adjustment range of the performance benchmark;

[0237] d1 and d2 are two weights introduced in the model to balance the impact of E1 and E2 on the comprehensive adjustment coefficient C, and d1+d2=1 to ensure the rationality of weight distribution; A is the adjustment coefficient;

[0238] d3 is a small positive number introduced to ensure that the formula is still valid when E2 is 0. In this embodiment, d3=0.01;

[0239] and They represent the natural logarithmic function and the natural exponential function respectively, in order to finely adjust the effects of E1 and E2 on C; specifically, the natural logarithm helps to smoothly adjust the effect of E1 on the comprehensive adjustment coefficient C, while the exponential function ensures that when E2 approaches zero, its effect on C will not increase infinitely, thus providing numerical stability;

[0240] The design of this model takes into account that in the information system informatization migration method, the adjustment of the new business process performance benchmark needs to comprehensively consider multiple factors, including performance indicators, system resource utilization, business process efficiency indicators, user behavior data, cost data, user satisfaction and system stability indicators;

[0241] The value range of C is affected by d1, d2, E1, E2 and A. Theoretically, the value of C is a set of positive real numbers. The value range of C is set to (0, 2). When C is close to 0, it means that the urgency of adjusting the current business process is low, and when C is close to 2, it means that the urgency of adjustment is high and measures need to be taken immediately to optimize the business process and system functions.

[0242] The value range of C (0,2) is divided into the following intervals, and the adjustment strategy for each interval is described:

[0243] Interval 1 (0, 0.5) is the initial adjustment stage. The application of comprehensive adjustment model C points to slight adjustments. According to the weight distribution of the results of the first and second evaluations, a small adjustment of the performance benchmark is determined. In this stage, the focus of data processing and management is on improving database efficiency and reducing response time. Business continuity planning focuses on establishing a sound backup and recovery process. The optimization of the feedback mechanism aims to achieve efficient adoption and execution of user suggestions. These measures work together to identify the bottlenecks of the new system and adjust the optimization nodes to ensure the continuous progress and performance improvement of the new system.

[0244] In the range of 0 to 0.5 in the C value range, the technical effect indicates that the business process needs slight adjustment. Specifically, if the comprehensive adjustment coefficient C is in the range of 0 to 0.25, the performance benchmark of the business process is within 10% of the target, and only a small number of key links in the business process need to be focused on. If C is between 0.25 and 0.5, the performance benchmark is increased to 15%, indicating that it is necessary to focus on specific links in the process and increase the data processing speed by 10% or reduce the resource utilization by 5%.

[0245] The judgment criteria and rules are as follows:

[0246] In order to monitor the business process in detail, 0.375 is set as the threshold for fine-tuning. If C<0.375, it is recommended to conduct an assessment once a month; if C is between 0.375 and 0.5, the assessment is increased to once every two weeks. Through this adjustment, the business process is ensured to be maintained in a relatively stable optimization state, while also providing space for continuous improvement when necessary;

[0247] The interaction rules are as follows:

[0248] In this range, every increase of E1 or E25% corresponds to an increase of 0.1 in C value; this is in line with expectations, that is, as performance and stability increase, the required adjustment range decreases, and the response time is improved by optimizing the algorithm. If it decreases by 10%, E1 will increase by 5%, which will cause the C value to drop by 0.05, thus reducing the adjustment frequency;

[0249] For data processing and management adjustments: When the C value is between 0 and 0.25, data processing optimization is achieved by enhancing database indexes or integrating redundant data, with the goal of reducing query response time by at least 5%. If C is between 0.25 and 0.5, in addition to previous measures, further data compression and optimized storage structure can achieve at least 10% improvement in data processing performance;

[0250] Adjustment of business continuity planning: At this stage, continuity planning focuses on minimizing the risk of business interruption. For intervals with lower C values, disaster recovery plans are established or optimized to ensure that key business processes have at least one backup execution path. For intervals with C values ​​close to 0.5, the continuity plans of all business processes need to be reviewed and tested so that they can quickly recover to normal operations in any emergency situation.

[0251] Feedback mechanism optimization: In the initial stage, the optimization of the feedback mechanism needs to focus on accurately capturing the performance data of users and the system. At the low end of the C value, it should ensure that at least 80% of user feedback can be processed and responded to in a timely manner. When the C value is close to 0.5, the automation of the feedback system should be improved to achieve real-time monitoring and rapid response to 95% of user feedback.

[0252] Interval 2 (0.5, 1.5) is the intermediate adjustment stage. The comprehensive adjustment coefficient C depicts a medium adjustment demand. The business process performance benchmark needs to make more significant adjustment strategies based on the weighted results of the two assessments. Data processing needs to be further optimized to reduce processing time. Business continuity planning needs to be strengthened to ensure uninterrupted business operation. The automation and intelligence of the feedback mechanism will accelerate problem discovery and resolution, and directly support the continuous improvement of system performance.

[0253] When the C value is between 0.5 and 1.5, it means that the business process needs moderate adjustment. In this range, if C is close to 0.5, it means that the gap between the performance benchmark and the target is between 15% and 25%, and a 20% optimization of key process nodes is required. If C is close to 1.5, the gap increases to 30%, and a comprehensive 35% optimization of multiple process nodes is required.

[0254] The judgment criteria and rules are as follows:

[0255] In this intermediate adjustment stage, 1.0 is set as the key monitoring threshold. When C<1.0, it is recommended to conduct business process evaluation on a quarterly basis. If C is between 1.0 and 1.5, monthly evaluation is required. This rule design can flexibly adjust the evaluation frequency and optimization strategy according to the actual performance of the business process.

[0256] The interaction rules are as follows:

[0257] In this range, every 10% increase in E1 or every 10% decrease in E2 will cause the C value to decrease by 0.2. If the system stability index By reducing the number of system failures If it is increased by 20%, the C value will be reduced by 0.1, which further emphasizes the importance of improving system stability in the intermediate adjustment stage;

[0258] Data processing and management adjustments: When C is close to 0.5, data processing optimization can reduce invalid or duplicate data by at least 15% by implementing data cleaning. When C is close to 1.5, the data architecture needs to be restructured to improve data processing efficiency by at least 25%, and advanced analysis tools need to be introduced to identify potential performance issues.

[0259] Adjustment of business continuity planning: At the intermediate stage, business continuity planning must ensure at least 90% system stability coverage of key business processes by establishing a real-time monitoring system; if C exceeds 1.0, an automated failover mechanism needs to be introduced to reduce the impact of potential interruptions on business processes and ensure 99% operation time;

[0260] Feedback mechanism optimization: When the C value is between 0.5 and 1.0, the feedback mechanism should improve the overall response efficiency by at least 20% by developing a self-service portal that allows users to directly report problems and suggestions. When the C value exceeds 1.0, AI-based analytical tools need to be deployed to predict and resolve at least 30% of potential problems before users provide feedback.

[0261] Interval 3 [1.5,2) is the emergency adjustment stage, which requires rapid response and in-depth intervention. Comprehensive adjustment model C points to emergency adjustment, which requires major upgrades to the data processing system to significantly increase the processing speed; business continuity planning must be able to ensure stable business operation in any crisis; feedback mechanisms must be able to respond in real time and quickly solve problems. This model ensures that through in-depth analysis, key bottlenecks that affect performance are given priority and solved;

[0262] When the C value reaches the range of 1.5 to 2, it indicates that the urgency of adjusting the business process is very high. At this time, the gap between the performance benchmark and the target exceeds 30%, which means that at least 50% of the nodes of the business process need to be optimized to ensure significant performance improvement and at least 30% improvement in resource utilization.

[0263] The judgment criteria and rules are as follows:

[0264] In this emergency adjustment phase, 1.75 is used as the threshold for emergency adjustment. A C value exceeding this value indicates that the business process needs to be evaluated weekly. If the C value is between 1.5 and 1.75, it is evaluated every two weeks to ensure a quick response to any performance or stability degradation.

[0265] The interaction rules are as follows:

[0266] During this emergency adjustment phase, any small improvement in any indicator will lead to a significant change in the C value. A 5% improvement in either E1 or E2 will result in a 0.3 decrease in the C value. By increasing transaction speed If it increases by 10%, the C value will decrease by 0.15, thus reducing the urgency of adjusting the business process;

[0267] Data processing and management adjustments: For the high C range, the urgent optimization of data processing capabilities becomes the top priority; it is necessary to introduce an efficient data stream processing system and use an in-memory database to increase data access speed by at least 40%; at the same time, implement an automatic data monitoring and correction mechanism to ensure data quality and consistency;

[0268] Business continuity planning adjustment: During the emergency adjustment phase, not only should we ensure that all business processes have redundant execution paths, but we should also conduct stress testing to ensure that at least 95% of business availability is maintained under extreme conditions. In addition, we should introduce instant backup and rapid recovery strategies for key business processes to reduce the business impact of any potential failures.

[0269] Feedback mechanism optimization: When the C value is above 1.5, real-time feedback and problem solving become particularly important. It is necessary to develop a comprehensive feedback analysis platform to ensure 100% capture rate of user and system performance feedback and respond within 10 minutes after the problem occurs, greatly improving user satisfaction and system adaptability.

[0270] The adjustment logic of the above-mentioned intervals can be displayed using corresponding mathematical expressions. This embodiment does not go into details, but only describes the adjustment logic in detail through description. Therefore, the adjustment logic of the above-mentioned intervals can serve as an improvement point of this embodiment.

[0271] Embodiment 10

[0272] Further explanation based on Example 9, in this example, in order to verify the effectiveness of the adjustment strategy of the new business process performance benchmark and its comprehensive judgment analysis, six different test objects are set, and these test objects represent six different business processes or system modules, each of which undergoes two evaluations to collect necessary data on the performance benchmark;

[0273] First, for each test object, within one month after the new system was deployed and running stably, the first round of evaluation E1 was conducted to collect data on key performance indicators such as response time, transaction processing speed, system stability, user satisfaction, data processing efficiency, and resource utilization. These data provided an initial reference point for subsequent performance benchmark adjustments;

[0274] Then, after the new system has been running for three months, a second round of evaluation, E2, is conducted to collect the same performance indicator data again; this helps capture any performance changes caused by the system migration and allows the stability and long-term performance of the new system to be evaluated;

[0275] For each evaluation indicator, the corresponding adjustment coefficient A is determined based on business needs and expected goals;

[0276] After analyzing the above data, the adjustment priority is determined based on the C value. For business processes with a low comprehensive adjustment coefficient, such as business process D, the current urgency is low, and appropriate optimization measures are taken. For business processes with a high comprehensive adjustment coefficient, such as business process C, immediate measures need to be taken to make large-scale adjustments to improve performance and resource efficiency.

[0277] All data records strictly follow the principles of experimental science to ensure the accuracy and reliability of the data. By comparing the results of E1 and E2, we can not only discover and analyze the performance bottlenecks and optimization nodes of the new system, but also continuously improve and optimize the performance benchmark of the new system based on data processing and management, business continuity planning, and feedback mechanism adjustments; the experimental data can be found in Table 1 below:

[0278] Table 1

[0279] Test subjects Response time (E1) (seconds) Response time (E2) (seconds) Transaction processing speed (E1) (tps) Transaction processing speed (E2) (tps) System stability (E1) (%) System stability (E2) (%) User satisfaction (E1) (%) User satisfaction (E2) (%) Data processing efficiency (E1) Data processing efficiency (E2) Resource utilization rate (E1) (%) Resource utilization rate (E2) (%) Adjustment factor (A) Comprehensive adjustment coefficient (C) Business Process A 2 1.8 220 240 98 99 85 90 1 1.1 60 55 1.05 0.48 Business Process B 3 2.5 200 210 95 97 80 85 0.9 1 65 60 1.1 0.75 Business Process C 4 3.2 180 190 90 95 75 80 0.8 0.95 70 65 1.15 1.05 Business Process D 1.5 1.2 250 260 99 99.5 90 92 1.1 1.2 55 50 1 0.35 Business Process E 3.5 3 190 200 92 94 78 82 0.85 0.9 68 63 1.12 0.95 Business Process F 2.5 2 210 220 96 98 82 87 0.95 1.05 62 57 1.08 0.65

[0280] Response time: Shorter response time indicates better performance;

[0281] Transaction processing speed (Transactions per Second, tps): A higher value means that the system can handle more transactions;

[0282] System stability: expressed as a percentage, with values ​​close to 100% indicating higher stability;

[0283] User satisfaction: expressed as a percentage, a high value means that users are more satisfied with the system;

[0284] Data processing efficiency: expressed as a multiple, a value higher than 1 indicates improved efficiency;

[0285] Resource utilization rate: expressed as a percentage, with lower rates indicating greater resource efficiency;

[0286] Adjustment factor A: Adjust according to the specific needs and performance goals of the business process;

[0287] Comprehensive adjustment coefficient C: calculation result, used to evaluate the urgency of business process adjustment. The lower the value, the lower the urgency of adjustment, and the higher the value, the higher the urgency of adjustment.

[0288] The data analysis is as follows:

[0289] By comparing the data in Table 1, we can analyze the specific beneficial effects of the comprehensive adjustment model and its creativity and novelty effects;

[0290] First, observe the response time and transaction processing speed indicators. From E1 to E2, we can see that the response time of all business processes has decreased, while the transaction processing speed has increased. This shows that after the initial deployment and stable operation period, the performance benchmark of the new business process has been improved to a certain extent. For example, the response time of business process A has improved from 2 seconds in E1 to 1.8 seconds in E2, an improvement of 10%; the transaction processing speed has increased from 220tps to 240tps, an increase of 9.09%. Such changes directly reflect the optimization of the new system in terms of processing capacity and response efficiency.

[0291] Continuing to analyze system stability and user satisfaction, the improvement of system stability can reduce system downtime and increase user trust in business processes. The improvement of user satisfaction is directly related to user experience and customer retention rate of the business. For example, the system stability of business process C increased from 90% in E1 to 95% in E2, an increase of 5.56%, while user satisfaction increased from 75% to 80%, an increase of 6.67%. These improvements show that by implementing a new system and adjusting strategies, problems can be effectively reduced and user experience can be improved.

[0292] Further analysis of data processing efficiency and resource utilization. The improvement of data processing efficiency means that the system can process the same amount of data faster, while the decrease in resource utilization indicates that the computing resources used by the system are more efficient. For example, the data processing efficiency of business process E increased from 0.85 of E1 to 0.9 of E2, an increase of 5.88%, and the resource utilization decreased from 68% to 63%, an improvement of 7.35%. The improvement of these indicators shows that the invention has achieved remarkable results in optimizing data management and computing resource allocation.

[0293] Next, analyze the relationship between the numerical changes of various parameters in the comprehensive adjustment model C formula:

[0294] d1 and d2 are weight parameters, reflecting the relative importance of E1 and E2 in performance adjustment. When d1 increases, the impact of E1 on C increases, indicating that more attention is paid to the results of the initial evaluation; conversely, increasing d2 indicates that more attention is paid to subsequent evaluations;

[0295] Increases in E1 and E2 usually mean improved performance, but according to the formula, a larger E1 will increase the value of C, while a larger E2 will reduce the value of C. This design embodies a balancing mechanism: early performance improvements need to be taken seriously, but if subsequent evaluations significantly improve, it indicates that the system is on the right track and the urgency of adjustment can be reduced accordingly;

[0296] A is an adjustment coefficient. Its change directly affects the value of C. A larger A will reduce the value of C. This means that when facing greater business challenges or high performance goals, the adjustment strategy of the performance benchmark can be controlled by adjusting A.

[0297] Based on the above analysis, the specific technical effects of the three adjustment stages are defined:

[0298] Initial adjustment phase C is between 0 and 0.5:

[0299] Technical effect: Minor optimization, such as improving database efficiency by 5% to 10%;

[0300] The value of C is 0.45, which indicates that the performance has been initially improved and the adjustment area that needs attention is small;

[0301] Intermediate adjustment stage C is in the range of 0.5 to 1.5:

[0302] Technical effect: Moderate optimization, such as a 15% to 25% reduction in data processing time and a 10% to 20% improvement in resource utilization;

[0303] The C value is 0.75 to 1.25, indicating that the performance gap with the target is increasing and more significant optimization of key process nodes is needed;

[0304] Emergency adjustment stage C is between 1.5 and 2:

[0305] Technical effect: Deep optimization, such as at least 30% improvement in system stability and 40% increase in data access speed;

[0306] The value of C is above 1.5, indicating that the urgency of adjusting the business process is very high, requiring rapid response and in-depth intervention;

[0307] Through the quantitative representation of these percentages, not only can the goals be clarified, but also specific and executable adjustment strategies can be formulated, which reflects the creativity and novelty effects of the invention content in the embodiments, and it provides a quantitative method to evaluate and adjust new business processes to ensure continuous improvement and optimization of business processes;

[0308] In summary, the beneficial effects of this application are as follows:

[0309] It provides users with a completely transparent and visual journey throughout the entire life cycle of the trusted innovation system migration. Through process mining, task mining technology and tools, it greatly solves the pain points of discovering and identifying the steps of the original business process during the migration process. It can greatly reduce the resources and time costs of project investment, and ensure the validity and reliability of business process data and models. The business process is visualized and each link, activity and relationship of the process is displayed in a graphical way. This helps users and developers better understand and master the current business process, thereby providing a clear foundation and guidance for trusted innovation migration.

[0310] Process mining and task mining technologies can discover existing problems, bottlenecks and improvement opportunities by analyzing the business process models and task steps obtained through mining. Process mining and task mining can help identify redundant activities, inefficient links and unnecessary delays, thereby supporting the optimization and improvement of business processes and steps. By optimizing the process, efficiency can be improved, resource waste can be reduced, and productivity and quality can be improved.

[0311] Process mining and task mining can help discover potential risks and problems and provide corresponding control measures. By analyzing the business process model, potential errors, loopholes and security risks can be discovered, so that corresponding measures can be taken to identify and control risks, which helps to improve the security and reliability of information systems and reduce potential risks and losses.

[0312] Process mining and task mining technologies can provide support for the continuous improvement and monitoring of trust-based information systems. By mining and analyzing business processes, a monitoring mechanism for business processes can be established, key indicators and data can be collected, and the execution effect and efficiency of the processes before and after implementation can be evaluated and compared, and timely adjustments and improvements can be made. This helps to maintain the efficient operation of the information system and continuously improve the quality and effectiveness of business processes.

[0313] Embodiment eleven:

[0314] A mining-based information system informatization migration system, the system is used to execute the mining-based information system informatization migration method, including:

[0315] Data collection and preprocessing module: used to collect business process data from existing information systems using automated scripts and APIs, and to preprocess data using data cleaning techniques to remove noise data;

[0316] Process mining and analysis module: used to obtain business process data and conduct in-depth analysis and mining, so as to accurately restore the real business process and automatically generate BPMN business process diagrams that can be directly used for the construction of the information innovation system;

[0317] Task mining and interaction analysis module: uses natural language processing and machine learning to capture the interaction steps and key data between the user and the original system, and generates detailed human-computer interaction task execution information documents;

[0318] Efficiency bottleneck identification and strategy formulation module: Based on the analysis results of process mining and task mining, it uses data analysis and simulation technology to determine the efficiency bottlenecks and blocking points in the original business process, and formulates a migration strategy for information technology including new technology application, process redesign and system integration;

[0319] Benchmark indicator setting module: used to analyze the existing business system and set the key indicators obtained as benchmark indicators as a benchmark comparison reference for the information innovation system after migration;

[0320] New system monitoring and data labeling module: used to continuously monitor the operational performance and stability of the new business system after the information system is migrated to the information system, collect key indicator data of new business processes and system functions, and perform data preprocessing on key indicator data to ensure data quality. At the same time, each business process of the new business system is labeled to form {1, 2, ..., i, ..., n}, where i represents the i-th business process and n represents the total number of business processes;

[0321] Key indicator data acquisition module: used to acquire the key indicator data after data preprocessing in step S6, the key indicator data also includes the number of business process executions, performance indicators, system resource usage, user behavior data, business process efficiency indicators, system stability indicators, business process cost data, and user satisfaction indicators;

[0322] The first evaluation index generation module is used to obtain performance indicators, business process execution times, system resource usage and business process efficiency indicators, and analyze and process them to generate a first evaluation index, which is used to make a first evaluation of the effect and efficiency of the new business process;

[0323] Second evaluation index generation module: used to obtain user behavior data, business process cost data, user satisfaction index and system stability index, and analyze and process them to generate a second evaluation index, which is used to conduct a second evaluation of the effect and efficiency of the new business process;

[0324] Adjustment coefficient generation module: used to obtain performance indicators and system stability indicators, analyze and process them, and generate adjustment coefficients, which are used to adjust the weights of the first and second evaluation results;

[0325] Comprehensive adjustment model building module: used to obtain the first evaluation index, the second evaluation index and the adjustment coefficient, and perform analysis and processing to build a comprehensive adjustment model. The model is used to provide a performance benchmark adjustment strategy for the new business process based on the weight distribution of the first and second evaluation results.

[0326] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.

[0327] The above embodiments may be implemented in whole or in part by software, hardware, firmware or any other combination thereof. When implemented by software, the above embodiments may be implemented in whole or in part in the form of a computer program product. Those skilled in the art may appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein may be implemented by electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed by hardware or software methods depends on the specific application and design constraints of the technical solution.

[0328] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, and may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0329] The above description is only a specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application.

Claims

1. A method for information system informatization migration based on mining technology, characterized in that: The specific steps include: Step S1: collect business process data from existing information systems using automated scripts and APIs, and apply data cleaning techniques for preprocessing to remove noise data; Step S2: Obtain business process data and conduct in-depth analysis and mining to accurately restore the real business process and automatically generate a BPMN business process diagram that can be directly used for building a trusted innovation system; Step S3: Use natural language processing and machine learning to capture the interactive operation steps and key data between the user and the original system, and generate a detailed human-computer interaction task execution information document, specifically including the following contents: Obtain the business process data restored in step S2 to obtain a complete picture of the end-to-end business process; Define the task activities of human-computer interaction based on the activity nodes in the business process; Perform task mining on a human-computer interactive computer terminal for selected task activities; Start with manual execution and record the steps, timestamps, page screenshots, and data fields of human-computer interaction; After manually stopping task mining, the system generates task step logic document materials containing the above recorded information; Step S4: Based on the analysis results of process mining and task mining, use data analysis and simulation technology to determine the efficiency bottlenecks and blocking points in the original business process, and formulate an information-based migration strategy including new technology application, process redesign and system integration; Step S5: Analyze the existing business system and set the key indicators obtained as benchmark indicators as a benchmark comparison reference for the post-migration information innovation system; Step S6: After the information system is migrated to the information system, key indicator data of new business processes and system functions are collected, and data preprocessing is performed on the key indicator data. At the same time, each business process of the new business system is marked to form {1, 2, ..., i, ..., n}, where i represents the i-th business process and n represents the total number of business processes; Step S7, obtaining the key indicator data after data preprocessing in step S6, the key indicator data also includes the number of business process executions, performance indicators, system resource usage, user behavior data, business process efficiency indicators, system stability indicators, business process cost data, and user satisfaction indicators; Step S8: Obtain performance indicators, business process execution times, system resource usage, and business process efficiency indicators, and analyze and process them to generate a first evaluation index, which is used to make a first evaluation of the effect and efficiency of the new business process; Step S9: obtaining user behavior data, business process cost data, user satisfaction index and system stability index, and analyzing and processing them to generate a second evaluation index, which is used to conduct a second evaluation of the effect and efficiency of the new business process; Step S10: Obtain performance indicators and system stability indicators, analyze and process them, and generate adjustment coefficients, which are used to adjust the weights of the first evaluation results and the second evaluation results; Step S11, obtain the first evaluation index, the second evaluation index and the adjustment coefficient, analyze and process them, and construct a comprehensive adjustment model, which is used to provide a performance benchmark adjustment strategy for the new business process based on the weight distribution of the first evaluation and the second evaluation results.

2. According to the method of information system informatization migration based on mining technology in claim 1, it is characterized by: The data types of the business process data are business process log, system configuration data and user behavior data.

3. According to claim 2, a method for information system informatization migration based on mining technology is characterized by: The business process data is obtained and analyzed and mined in depth, so as to accurately restore the real business process and automatically generate a BPMN business process diagram that can be directly used for the construction of the information innovation system; specifically Includes the following: Obtain the business process log in the business process data and extract the event sequence of the business process; Apply the process mining algorithm to the above event sequence to discover the potential business process model from the event sequence. The process mining algorithm is the Alpha algorithm. Use the business process filter to filter by time frame, process duration, case performance, business flow tracking, and object attributes; Based on the results of process mining and combing, a flowchart is generated and exported to represent the business process of the current information system; Record process step information, activity information, frequency information, and performance information related to business processes.

4. According to claim 3, a method for information system informatization migration based on mining technology is characterized by: Based on the analysis results of process mining and task mining, data analysis and simulation technology are used to determine the efficiency bottlenecks and blocking points in the original business process, and to formulate an information-based migration strategy including new technology application, process redesign and system integration, which specifically includes the following contents: Use the process bottleneck discovery algorithm to calculate the process restored from the existing system and obtain the corresponding bottleneck analysis report; The key indicators obtained from the analysis of the existing business system are set as benchmark indicators as a benchmark comparison reference for the information and innovation system after migration.

5. According to claim 4, a method for information system informatization migration based on mining technology is characterized in that: The business process execution times, performance indicators, system resource usage, user behavior data, business process efficiency indicators, system stability indicators, business process cost data, and user satisfaction indicators specifically include the following: The business process execution times represent the execution frequency of the ith business process, and the ith business process execution times are marked as YWs. i ; The performance indicator of the i-th business process is marked as XNb i , the response time is marked as XNx i , mark the transaction processing time as XNc i ; Performance Index XNb i The calculation formula is Among them, XNx i is the average response time of the ith business process, XNc i is the average time required to complete the i-th business process transaction, XNb i It represents the business process performance index obtained by combining the two; The system resource utilization rate includes the CPU utilization rate, memory utilization rate and network bandwidth utilization rate of the i-th business process, and the system resource utilization rate is marked as ZYf i , mark the CPU usage as ZYp i , Mark memory usage ZYn i , and mark the network bandwidth usage as ZYk i ; System resource usage ZYf i The calculation formula is Among them, ZYp i 、ZYn i , ZYk i Respectively represent CPU usage, memory usage and network bandwidth usage, ZYf i is the average of these three, indicating the overall usage of system resources by the i-th business process; The user behavior data includes the page visits, user operation frequency, and user interaction duration of the i-th business process, and the user behavior data is marked as YHXw i , mark the page visits as YHFw i , Mark the user operation frequency as YHPf i , Mark the user interaction time as YHJh i ; User behavior data i The calculation formula is Among them, YHFw i is the page views, YHPf i is the user operation frequency, YHJh i is the user interaction duration, YHXw i Represents the user behavior data that integrates these three dimensions; The business process efficiency index includes the average execution time, process success rate, process interruption and abnormal number of the i-th business process; and the business process efficiency index is marked as YWXl i , and mark the average execution time of the process as YWZt i , mark the process success rate as YWCg i , Mark the number of process interruptions and exceptions as YWDs i ; Business process efficiency indicator YWXl i The calculation formula is Among them, YWZt i is the average execution time of the process, YWCg i is the process success rate, YWDs i It is the number of process interruptions and exceptions. The number of interruptions and exceptions is treated as negative values ​​during calculation; The system stability index includes the number of system failures and system recovery time of the i-th business process, and the system stability index is marked as XTWd i , the number of system failures is marked as XTGz i , mark the system recovery time as XTHt i ; System stability index XTWd i The calculation formula is Among them, XTGz i is the number of system failures, XTHt i is the system recovery time, The business process cost data includes the operation cost and process maintenance cost of the i-th business process, and the business process cost data is marked as YWCb i , the operation cost is marked as CZb i , mark the process maintenance cost as WHb i ; Business process cost data YWCb i The calculation formula is YWCb i =CZb i +WHb i , where CZb i is the operating cost, WHb i is the process maintenance cost, and the two are added together to get the total cost of the entire business process; The user satisfaction index includes the user feedback score of the i-th business process and the number of user complaints, and the user satisfaction index is marked as YHMy i , the user feedback score is marked as YHFk, and the number of user complaints is marked as YHTs; User satisfaction index YHMy i The calculation formula is Among them, YHFk i is the user feedback rating, YHTs i is the number of user complaints.

6. According to claim 5, a method for information system informatization migration based on mining technology is characterized in that: The performance index, the number of business process executions, the system resource usage rate and the business process efficiency index are obtained, and analyzed and processed to generate a first evaluation index, which is used to make a first evaluation of the effect and efficiency of the new business process, and specifically includes the following contents: The first evaluation index is defined as E1, and the calculation formula is as follows: in, is a performance indicator that combines the response time XNx i and transaction processing time XNc i ; It is the system resource utilization rate, which combines the CPU utilization rate ZYpi and the memory utilization rate ZYn i and network bandwidth usage ZYk i ; It is a business process efficiency indicator, combining the average process execution time YWZt i 、Process success rate YWCg i And the number of process interruptions and exceptions YWDs i The impact of Yj i is the number of business process executions, used as a normalization factor to balance the evaluation index; w1, w2, and w3 are the weights of performance indicators, system resource utilization, and business process efficiency indicators, respectively, and w1+w2+w3=1 to ensure the balance of the evaluation index; The value range of E1 is set to (0,1). The closer the value is to 1, the higher the performance of the business process, the efficiency of system resource use, and the efficiency of the business process itself. Otherwise, the lower the value is. The value range (0,1) of the first evaluation index E1 is divided into three intervals, and each interval is described in detail with quantitative content, and judgment criteria and rules are set. The corresponding first evaluation results are as follows: Interval 1: 0 < E1 < 0.

33. In this interval, the performance of the business process, the utilization rate of system resources, and the process efficiency are at a relatively low level. When the first evaluation index E1 is less than 0.2, emergency intervention is required to reduce the response time and transaction processing duration and improve the resource utilization rate. When E1 ranges from 0.2 to 0.33, it indicates that improvement measures must be followed up. A small increase in individual indicators will significantly affect the overall evaluation and guide the optimization direction; Interval 2: 0.33 ≤ E1 < 0.

67. The business processes in this interval perform moderately, and there is still room for improvement in performance and resource utilization. The measurement result of E1 ranging from 0.33 to 0.67 indicates that regular optimization is required to maintain and improve performance; Interval 3: 0.67 ≤ E1 < 1. In the interval where E1 is higher than 0.67, the business process performance is excellent and the resource utilization efficiency is high.

7. According to claim 6, a method for information system informatization migration based on mining technology is characterized by: Obtain user behavior data, business process cost data, user satisfaction indicators, and system stability indicators, and perform analysis and processing to generate a second evaluation index, which is used to conduct a second evaluation of the effectiveness and efficiency of the new business process; specifically including the following: Define the second evaluation index as E2, and the calculation formula is as follows: where wa, wb, wc, and wd represent the importance of the corresponding indicators in E2, and the total weight W is the sum of these weights, that is, W = wa + wb + wc + wd; p1 is an adjustment factor used to limit the value range of E2; and p1 is a positive value greater than zero; The parameter definitions are as follows: is the user behavior data indicator of the i-th business process; Yj Y i =CZb i +WHb i Represents the total cost data of the i-th business process; is the user satisfaction index of the i-th business process; is the system stability indicator of the i-th business process; Set the value range of E2 to (0, 1), where being close to 0 indicates that the new business process performs poorly in terms of user behavior, cost, satisfaction, and stability and requires urgent improvement; being close to 1 indicates that the new business process performs excellently in these aspects; The second evaluation results are as follows: When E2 is in the low-efficiency interval, the low-efficiency interval is 0.1 ≤ E2 < 0.2, indicating that users have low participation in the business process, high costs, low satisfaction, and poor system stability, which prompts managers to immediately take measures to optimize the business process; When E2 < 0.1, it indicates that the business process is in a critically low-efficiency state, and it is necessary to immediately optimize user participation, reduce costs, improve satisfaction, and system stability; If the user behavior data increases by 10% and E2 increases by 5%, it shows that optimizing the user experience can improve the overall evaluation; When 0.2 ≤ E2 < 0.5, it indicates that there are 10% aspects to be improved, specifically focusing on cost control and user satisfaction improvement; When 0.5 ≤ E2 < 0.8, 20% to 25% of the business processes perform well, but further detailed analysis is required to identify specific improvement points; If the cost is reduced by 10% and E2 increases by 2%, it shows that the improvement of cost efficiency has a positive impact on the overall evaluation of the business process; When E2 is in the high-efficiency interval, the high-efficiency interval is E2 ≥ 0.8, indicating that the business process performs very well in all aspects considered, but continuous monitoring and minor adjustments are still required to maintain its advantages; Even if the user satisfaction increases by 5% and E2 only increases by 0.5%, it shows that in the high-efficiency interval, a small increase in user satisfaction has a limited impact on the overall evaluation.

8. According to claim 7, a method for information system informatization migration based on mining technology is characterized by: Obtain the performance index and system stability index, analyze and process them to generate an adjustment coefficient, which is used to adjust the weights of the first evaluation and the second evaluation results; specifically include the following: Define the adjustment coefficient as A, and the calculation formula is as follows: where e1 is a positive normalization constant used to ensure that the adjustment coefficient A is within the set value range; e2 and e3 are exponential weights used to adjust the influence of the performance index and the stability index; is the system stability indicator of the i-th business process; is the performance indicator of the ith business process; Set the value range of A to (0.5, 1.5); When 0.5 < A < 1, it indicates that the system performance is low and the weight of the original evaluation result needs to be reduced; When A = 1, it indicates that the original evaluation result has reflected the current situation and no adjustment is required; When A > 1, it indicates that the performance is high and the weight of the original evaluation result needs to be increased.

9. The method for information system informatization migration based on mining technology according to claim 8 is characterized by: Obtain the first evaluation index, the second evaluation index and the adjustment coefficient, analyze and process them to construct a comprehensive adjustment model, which is used to provide an adjustment strategy for the performance benchmark of the new business process according to the weight distribution of the first evaluation and the second evaluation results, and this adjustment strategy comprehensively judges and analyzes the bottlenecks of the new system and finds out the nodes that can be optimized, and makes adjustments for the bottlenecks and the nodes that can be optimized. The adjustment of this performance benchmark includes adjusting data processing and management, business continuity planning and feedback mechanism optimization. Specifically, it includes the following: The adjustment strategy is to comprehensively judge and analyze the bottlenecks of the new system and find out the nodes that can be optimized, and make adjustments for the bottlenecks and the nodes that can be optimized. The adjustment of this performance benchmark includes adjusting data processing and management, business continuity planning and feedback mechanism optimization. Define the calculation formula of the comprehensive adjustment model as follows: where C is the comprehensive adjustment coefficient used to determine the adjustment range of the performance benchmark; d1 and d2 are two positive weights introduced in the model to balance the influence of E1 and E2 on the comprehensive adjustment coefficient C, and d1 + d2 = 1; A is the adjustment coefficient; D3 is to ensure that the formula is still valid when E2 is 0. and They represent the natural logarithmic function and the natural exponential function, respectively, in order to finely adjust the effects of E1 and E2 on C; Set the value range of C to (0, 2). When C is closer to 0, it indicates that the urgency of the current business process adjustment is lower, and when C is closer to 2, it indicates that the urgency of the adjustment is higher and immediate measures need to be taken to optimize the business process and system functions; And divide the value range (0, 2) of C into the following several intervals, and describe the adjustment strategies for each interval: Set interval one. Interval one is greater than 0 and less than 0.5, which is the initial adjustment stage. The application of the comprehensive adjustment model points to a slight adjustment. According to the weight distribution of the first evaluation and the second evaluation results, determine a small adjustment of the performance benchmark; Set interval two. Interval two is greater than or equal to 0.5 and less than 1.5, which is the intermediate adjustment stage. The comprehensive adjustment coefficient depicts a medium adjustment requirement. The performance benchmark of the business process needs to adopt a more significant adjustment strategy according to the weight results of the two evaluations. Data processing needs to be further optimized to reduce processing time, and business continuity planning needs to be strengthened to ensure uninterrupted business operation; Set interval three. Interval three greater than or equal to 1.5 and less than 2 is the emergency adjustment stage, which requires rapid response and in-depth intervention. The comprehensive adjustment model points to emergency adjustment, which requires a major upgrade of the data processing system to greatly improve the processing speed; the feedback mechanism must be able to respond in real time and solve problems quickly. The model ensures that through in-depth analysis, key bottlenecks that affect performance are given priority attention and resolved.

10. An information system informatization migration system based on mining technology, characterized by: The system is used to execute the information system informatization migration method based on mining technology as described in any one of claims 1 to 9, including: Data collection and preprocessing module: used to collect business process data from existing information systems using automated scripts and APIs, and to preprocess data using data cleaning techniques to remove noise data; Process mining and analysis module: used to obtain business process data and conduct in-depth analysis and mining, so as to accurately restore the real business process and automatically generate BPMN business process diagrams that can be directly used for the construction of the information innovation system; Task mining and interaction analysis module: uses natural language processing and machine learning to capture the interaction steps and key data between the user and the original system, and generates detailed human-computer interaction task execution information documents; Efficiency bottleneck identification and strategy formulation module: Based on the analysis results of process mining and task mining, it uses data analysis and simulation technology to determine the efficiency bottlenecks and blocking points in the original business process, and formulates a migration strategy for information technology including new technology application, process redesign and system integration; Benchmark indicator setting module: used to analyze the existing business system and set the key indicators obtained as benchmark indicators as a benchmark comparison reference for the information innovation system after migration; New system monitoring and data labeling module: used to continuously monitor the operational performance and stability of the new business system after the information system is migrated to the information system, collect key indicator data of new business processes and system functions, and perform data preprocessing on key indicator data to ensure data quality. At the same time, each business process of the new business system is labeled to form {1, 2, ..., i, ..., n}, where i represents the i-th business process and n represents the total number of business processes; Key indicator data acquisition module: used to acquire the key indicator data after data preprocessing in step S6, the key indicator data also includes the number of business process executions, performance indicators, system resource usage, user behavior data, business process efficiency indicators, system stability indicators, business process cost data, and user satisfaction indicators; The first evaluation index generation module is used to obtain performance indicators, business process execution times, system resource usage and business process efficiency indicators, and analyze and process them to generate a first evaluation index, which is used to make a first evaluation of the effect and efficiency of the new business process; Second evaluation index generation module: used to obtain user behavior data, business process cost data, user satisfaction index and system stability index, and analyze and process them to generate a second evaluation index, which is used to conduct a second evaluation of the effect and efficiency of the new business process; Adjustment coefficient generation module: used to obtain performance indicators and system stability indicators, analyze and process them, and generate adjustment coefficients, which are used to adjust the weights of the first and second evaluation results; Comprehensive adjustment model building module: used to obtain the first evaluation index, the second evaluation index and the adjustment coefficient, and perform analysis and processing to build a comprehensive adjustment model. The model is used to provide a performance benchmark adjustment strategy for the new business process based on the weight distribution of the first and second evaluation results.