A paint baking device for lighter shell processing

Through the integrated paint device of spray paint room, paint room, air-cooled corridor and chain-type guide components, the problems of low efficiency, serious pollution and poor cooling effect in traditional paint technology are solved, and efficient and environmentally friendly lighter shell processing is achieved. process.

CN118635048BActive Publication Date: 2024-11-22HUNAN DONGYI ELECTRIC CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411125542.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-22
Estimated Expiration
2044-08-16

AI Technical Summary

Technical Problem

The traditional lighter shell paint process has problems such as low efficiency, high energy consumption and serious environmental pollution, especially the harmful substances are difficult to deal with during the painting process, and the cooling effect after paint is not ideal, resulting in product quality problems.

Method used

A paint device including a spray paint room, a paint room, an air-cooled corridor and a chain-type guide assembly was designed to treat spray paint waste gas through an air purification device, use high-temperature combustion and flue gas purifier to treat harmful gases, and pass through an air-cooled corridor. Achieve rapid cooling and form a continuous production assembly line.

Benefits of technology

It improves production efficiency and product quality, significantly reduces environmental pollution, ensures product surface uniformity and environmental protection performance, and avoids quality problems caused by sudden temperature drop after paint.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118635048B_ABST
    Figure CN118635048B_ABST
Patent Text Reader

Abstract

The present invention discloses a paint baking device for lighter shell processing, including a spray paint room, a paint baking room, an air-cooling corridor, a chain-belt type material guide assembly, and a material guide table. The spray paint room, the paint baking room, and the air-cooling corridor are all fixedly installed inside a workshop, and the air-cooling corridor is fixedly connected to one side of the paint baking room. A material guide table is respectively arranged between the spray paint room and the inner wall of the workshop, between the spray paint room and the paint baking room, and between the air-cooling corridor and the inner wall of the workshop. The material guide table is connected with a chain-belt type material guide assembly in a transmission manner, and the chain-belt type material guide assembly is sequentially inserted and connected inside the spray paint room, the paint baking room, and the air-cooling corridor. An air purification device is fixedly connected to one side of the outer wall of the spray paint room, and a baking room heating device is fixedly connected to one side of the outer wall of the paint baking room. The purpose of the present invention is to provide a paint baking device with high production efficiency, good product quality, stable equipment operation, and good environmental protection effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of paint baking equipment, in particular to a paint baking device for processing a lighter shell. Background Art

[0002] In the production process of lighter shells, surface treatment is a key step that directly affects the appearance and quality of the product. At present, there are some problems with the traditional surface spraying and baking processes, such as low efficiency, high energy consumption, and serious environmental pollution. These problems not only restrict the production efficiency and product quality of enterprises, but also bring greater environmental pressure.

[0003] The traditional painting process usually needs to be carried out in an open environment. The waste gas generated during the painting process is difficult to effectively treat, resulting in a large amount of harmful substances such as benzene, toluene, xylene, formaldehyde, etc. being discharged into the atmosphere, causing serious harm to the environment and human health. At the same time, the baking process after painting also needs to be carried out under high temperature conditions. The traditional baking equipment has low heating efficiency and high energy consumption, and the harmful gases generated during the baking process are also difficult to treat, further exacerbating the problem of environmental pollution.

[0004] In addition, in order to solve the problem of rapid cooling after high-temperature painting, traditional processes usually use natural cooling or simple air cooling equipment. The cooling effect is not ideal, which can easily lead to product surface quality problems such as uneven paint surface and cracking, affecting the final quality of the product.

[0005] In view of the above problems, the present invention provides a paint baking device for lighter shell processing, aiming to achieve an efficient, stable and environmentally friendly production process. The device integrates a spray paint room, a paint baking room, an air cooling corridor, a chain belt type material guide assembly and a material guide table, optimizes the connection and processing of each process, significantly improves production efficiency and product quality, and effectively reduces pollution to the environment. Summary of the invention

[0006] In view of the above-mentioned deficiencies in the prior art, the object of the present invention is to provide a paint baking device with high production efficiency, good product quality, stable equipment operation and good environmental protection.

[0007] The technical solution adopted by the present invention to achieve the above-mentioned purpose is: a paint baking device for lighter shell processing, including a paint spraying room, a paint baking room, an air-cooling corridor, a chain-belt type material guide component, and a material guide table. The paint spraying room, the paint baking room and the air-cooling corridor are all fixedly installed inside the workshop, wherein the paint spraying room is used for spraying paint on the surface of the lighter, the paint baking room is used for high-temperature paint baking on the surface of the lighter, and the air-cooling corridor is used for rapid cooling of the surface of the lighter. During the working process, the paint baking processing is prone to produce harmful substances such as benzene, toluene, xylene, formaldehyde, alcohol, ester, ketone, etc., so it is necessary to set the paint baking processing equipment in a workshop to prevent other workshops from being contaminated by harmful substances. The air-cooling corridor is fixedly connected to one side of the paint baking room, and two air-cooling corridors are respectively set between the paint spraying room and the inner wall of the workshop, between the paint spraying room and the paint baking room, and between the air-cooling corridor and the inner wall of the workshop. There is a material guide table, which is mainly used for the stable transmission of the chain-belt material guide assembly. Therefore, the installation of the material guide table should be arranged in the transmission direction of the chain-belt material guide assembly. The material guide table is connected to the chain-belt material guide assembly for transmission, and the chain-belt material guide assembly is sequentially inserted and connected in the paint spraying room, the paint baking room, and the air-cooling corridor. In the present invention, the two ends of the chain-belt material guide assembly are respectively passed through the connection between the material guide table and the inner wall of the workshop to the outside of the workshop, and are used to be connected with other processing equipment outside the workshop to form a complete production line. An air purification device is fixedly connected to one side of the outer wall of the paint spraying room. The air purification device is used to purify the exhaust gas and paint mist generated during the painting process to protect the environment and the health of workers. A baking room heating device is fixedly connected to one side of the outer wall of the baking room. The baking room heating device is used to provide heat energy for the baking room.

[0008] In one of the embodiments, the chain-belt material guide assembly includes a chain belt strip, a rotating shaft rod, a connecting bearing, a rotating shaft sleeve, a limit bearing, a guide block, a support rod, and a work frame. The upper end of the chain belt strip is fixedly connected to a plurality of rotating shaft rods, the rotating shaft rod is sleeved with a rotating shaft sleeve, the outer periphery of the rotating shaft sleeve is evenly provided with ribbed teeth, the lower end of the rotating shaft sleeve is fixedly connected to a connecting bearing, the rotating shaft rod is fixedly connected to an inner ring of the connecting bearing, the upper end of the rotating shaft rod is fixedly connected to the inner ring of the limit bearing, the limit bearing is embedded in the rotating shaft sleeve, the upper end of the rotating shaft sleeve is fixedly connected to a guide block, the upper end of the guide block is fixedly connected to a long support rod or a short support rod, on the guide blocks evenly arranged along the chain belt strip, the fixed long support rods and short support rods are alternately arranged in sequence, and the upper ends of every other support rods are fixedly connected to a work frame.

[0009] In one of the embodiments, a transmission channel is provided in the material guide platform, a plurality of guide roller grooves are provided at the bottom of the transmission channel, a chain guide roller is rotatably connected in the guide roller groove, the upper end of the chain guide roller is transmission-connected to the chain belt strip, a slide groove opening is provided in the middle of the upper end of the material guide platform, the slide groove opening is communicated with the interior of the transmission channel, the long support rod and the short support rod are extended out of the material guide platform from the slide groove opening, bending plates are respectively fixedly connected to the tops of the transmission channels on both sides of the slide groove opening, the guide blocks are slidably connected between the two groups of bending plates, baffles are rotatably connected to the short support rods located at the upper end of the slide groove opening, a through hole is provided at the other end of the baffle, and adjacent long support rods along the transmission direction of the chain belt strip are respectively rotationally connected in the through holes.

[0010] In one of the embodiments, a paint spraying table is fixedly connected in the paint spraying room, the transmission channel extends and passes through the paint spraying table, and a mounting plate is fixedly connected in the transmission channel in the paint spraying table, and a plurality of sliding sleeves are fixedly connected to the mounting plate, and a sliding guide rod is connected to the sliding sleeve in the sliding sleeve, and the other end of the sliding guide rod is fixedly connected to one side of a friction plate, and a tensioning spring is sleeved on the outer periphery of the sliding sleeve and the sliding guide rod, one end of the tensioning spring is in conflict with the friction plate, and a side rack is embedded and connected to the other side of the friction plate, and the side rack is in contact with the outer wall of the rotating shaft sleeve in the transmission channel.

[0011] In one of the embodiments, a plurality of support rods are fixedly connected to one side of the outer wall of the paint spraying table, a pipe clamp is fixedly connected to the support rod, a cross support rod is fixedly connected to one side of the outer wall of the pipe clamp, the other end of the cross support rod is fixedly connected to the middle part of the mounting rod, a plurality of paint spray guns are fixedly connected to the mounting rod, and the nozzles of the paint spray guns are arranged toward the work station frame.

[0012] In one embodiment, the air purification device includes a water curtain purification box, a wet curtain, a return pipe, a ventilation pipe, an adsorption box, an activated carbon filter plate, a photocatalyst filter plate, an ultraviolet lamp tube, and an exhaust pipe. A water curtain purification box is fixedly connected to one side of the outer wall of the paint spraying room, one end of the water curtain purification box is fixedly connected to a first air inlet pipe, and the other end of the first air inlet pipe is arranged on the side of the upper inner wall of the paint spraying room. A plurality of wet curtains are fixedly connected in the water curtain purification box, a branch water pipe is fixedly connected between the upper end of the wet curtain and the inner wall of the water curtain purification box, and a plurality of drainage holes connected to the top of the wet curtain are opened at the lower end of the branch water pipe, one end of the branch water pipe is fixedly connected to a water supply pipe, and the other end of the water supply pipe is connected to a submersible pump, and the submersible pump is fixedly connected to In the water collection pool, the water collection pool is located in the paint spraying room on the side of the paint spraying station, the lower end of the water curtain purification box is fixedly connected with a return pipe, the lower end of the return pipe is connected to the water collection pool, one side of the outer wall of the water curtain purification box is fixedly connected with a ventilation pipe, the other end of the ventilation pipe is fixedly connected to an adsorption box, the adsorption box is fixedly connected to the top of the paint spraying room, one side of the adsorption box is fixedly connected with a plurality of activated carbon filter plates, the other side of the adsorption box is fixedly connected with two groups of oppositely arranged photocatalyst filter plates, the adsorption box between the photocatalyst filter plates is fixedly connected with an ultraviolet lamp tube, the other side of the adsorption box is fixedly connected with an exhaust pipe, the other end of the exhaust pipe is connected to the outside of the workshop, and the exhaust pipe is fixedly connected with an exhaust fan.

[0013] In one embodiment, the chain belt type material guide assembly in the paint booth is serpentine-shaped and reciprocatingly coiled, wherein the coiling nodes of the chain belt are rotatably connected to guide sprockets.

[0014] In one embodiment, the baking room heating equipment comprises an outer box body, an internal combustion furnace, a preheating box, a heat exchange pipe, and a preheating pipe. The outer box body is fixedly connected to one side of the outer wall of the baking room, and the internal combustion furnace and the preheating box are fixedly connected inside the outer box body. The preheating box is located above the internal combustion furnace, and a plurality of evenly spaced heat exchange pipes are fixedly connected inside the internal combustion furnace. One end of the heat exchange pipe is connected to a first air guide box, which is fixedly connected to one side of the upper end of the internal combustion furnace, and the other end of the heat exchange pipe is connected to an air outlet box, which is fixedly connected to the other side of the upper end of the internal combustion furnace. A heat conduction pipe is fixedly connected to the lower end of the air outlet box, and the other end of the heat conduction pipe is connected to a heat dissipation cavity at the bottom of the baking room. A plurality of grilles are embedded and connected to the inner bottom surface of the baking room and are connected to the heat dissipation cavity. A burner is fixedly connected to the bottom surface of the internal combustion furnace below the heat exchange pipe, and a distributor is fixedly connected to the internal combustion furnace below the burner. An air inlet pipe is fixedly connected to one end of the distributor. The other end of the pipe passes through the internal combustion furnace and the outer box body in sequence and is connected to the interior of the paint baking room, the upper end of the internal combustion furnace is fixedly connected to a smoke guide pipe, the other end of the smoke guide pipe is connected to a preheating box, a plurality of evenly spaced preheating pipes are fixedly connected in the preheating box, one end of the preheating pipe is connected to an air inlet box, the air inlet box is fixedly connected to one side of the heat exchange box, the other side of the air inlet box is fixedly connected to a second air inlet pipe, the other end of the second air inlet pipe is connected to the outside of the outer box body, the second air inlet pipe is fixedly connected to an inlet fan, a dustproof net is fixedly connected at the pipe mouth of the second air inlet pipe, the other end of the preheating pipe is connected to the second air guide box, the lower end of the second air guide box is fixedly connected to a heat recovery pipe, the other end of the heat recovery pipe is connected to the upper end of the first air guide box, the upper end of the preheating box is fixedly connected to an exhaust pipe, the end of the exhaust pipe is connected to a flue gas purifier, the flue gas purifier is fixedly connected to one side of the inner wall of the workshop, and the exhaust end of the flue gas purifier is connected to the outside of the workshop.

[0015] In one embodiment, a vent is provided at the upper end of the air-cooling corridor away from the paint room, and an air cooler is installed at the vent, and the air cooler is tilted toward the paint room.

[0016] Beneficial effects of the present invention:

[0017] 1. Efficient production: Through the continuous transmission of the chain-belt material guide assembly, the painting, baking and air cooling processes can be seamlessly connected, realizing automated and continuous production, greatly improving production efficiency, and reducing manual operations and intermediate stop time;

[0018] 2. Enhanced stability: The transmission channel and chain guide roller structure set in the guide table ensure the stable and smooth operation of the chain belt during the transmission process, avoid the shaking and tilting of the material during the transmission process, and improve the uniformity and quality of the product surface treatment;

[0019] 3. Environmental performance: The air purification device fixedly connected to the outer wall of the paint spraying room can effectively purify the exhaust gas generated during the painting process and reduce the emission of harmful substances; the harmful gases generated during the painting process are treated by high-temperature combustion and flue gas purifiers to ensure that the discharged air meets environmental protection standards and significantly reduce the pollution of production to the environment;

[0020] 4. High space utilization: The chain-belt guide assembly is coiled in a snake-like shape in the paint room, which not only effectively utilizes the space, but also prolongs the residence time of the lighter shell in the paint room, ensuring a more uniform and thorough paint effect, and improving the appearance quality and durability of the product;

[0021] 5. Rapid cooling: After the lighter shell is painted, it enters the air-cooling corridor through the chain-belt guide assembly. The air cooler blows cold air into the air-cooling corridor through the vents to quickly and evenly cool the high-temperature lighter shell, avoiding quality problems caused by sudden temperature drops on the product surface, such as cracking of the paint surface.

[0022] 6. Prevent interference: The design of the support rods and the workstation frame ensures the stable placement of materials during the transmission process and avoids mutual interference between the support rods. At the same time, the design of the baffle and through-hole prevents small animals from entering the transmission channel, thus improving the safety and operation stability of the equipment;

[0023] In summary, the present invention significantly improves the efficiency, quality and environmental performance of lighter shell processing by optimizing the painting, baking paint and air cooling processes, and provides related manufacturing companies with an efficient, stable and environmentally friendly production solution. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the overall arrangement structure of the present invention;

[0025] Figure 2 This is a schematic diagram of the internal connection structure of the material guide table of the present invention;

[0026] Figure 3 It is a schematic diagram of the cross-sectional connection structure of the rotating shaft sleeve of the present invention;

[0027] Figure 4 This is a schematic diagram of the cross-sectional structure of the paint spraying room of the present invention;

[0028] Figure 5 for Figure 4 Schematic diagram of the detailed structure of the A1 part;

[0029] Figure 6 This is a schematic diagram of the cross-sectional connection structure of the water curtain purification box of the present invention;

[0030] Figure 7 It is a schematic diagram of the cross-sectional connection structure of the adsorption box of the present invention;

[0031] Figure 8 This is a schematic diagram of the top view of the cross-sectional connection structure of the paint booth of the present invention;

[0032] Fig. 9 It is a schematic diagram of the cross-section connection structure of the baking room heating equipment of the present invention;

[0033] Fig.10 It is a schematic diagram of the cross-sectional structure of the air-cooling corridor of the present invention.

[0034] In the figure: 1 spray paint room, 2 paint room, 3 air cooling corridor, 4 chain belt type material guide assembly, 5 material guide table, 6 air purification device, 7 baking room heating equipment, 100 chain belt strip, 101 shaft rod, 102 connecting bearing, 103 shaft sleeve, 104 limit bearing, 105 guide block, 106 work station frame, 107 long support rod, 108 short support rod, 200 transmission channel, 201 guide roller groove, 202 Chain guide roller, 203 slide slot, 204 bending plate, 205 baffle, 300 spray booth, 301 mounting plate, 302 sliding sleeve, 303 sliding guide rod, 304 friction plate, 305 tension spring, 306 side rack, 307 support rod, 308 pipe clamp, 309 cross support rod, 310 spray gun, 400 water curtain purification box, 401 wet curtain, 402 return pipe, 403 ventilation pipe, 40 4 adsorption box, 405 activated carbon filter plate, 406 photocatalyst filter plate, 407 ultraviolet lamp, 408 exhaust pipe, 409 first air inlet pipe, 410 branch pipe, 411 water supply pipe, 412 submersible pump, 413 water collection tank, 414 exhaust fan, 500 guide sprocket, 501 outer box, 502 internal combustion furnace, 503 preheating box, 504 heat exchange tube, 505 preheating tube, 506 first guide Bellows, 507 air outlet box, 508 heat pipe, 509 heat dissipation cavity, 510 grille, 511 burner, 512 distributor, 513 air connection pipe, 514 smoke guide pipe, 515 air inlet box, 516 second air inlet pipe, 517 air inlet fan, 518 dust screen, 519 second air guide box, 520 heat recovery pipe, 521 smoke exhaust pipe, 522 flue gas purifier, 600 vent, 601 air cooler. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] See also Figure 1-Figure 10A paint baking device for lighter shell processing includes a paint spraying room 1, a paint baking room 2, an air-cooling corridor 3, a chain-belt type material guide component 4, and a material guide table 5. The paint spraying room 1, the paint baking room 2 and the air-cooling corridor 3 are all fixedly installed inside the workshop, wherein the paint spraying room 1 is used for spraying paint on the surface of the lighter, the paint baking room 2 is used for high-temperature paint baking on the surface of the lighter, and the air-cooling corridor 3 is used for rapid cooling of the surface of the lighter. During the working process, the paint baking process is prone to produce harmful substances such as benzene, toluene, xylene, formaldehyde, alcohol, ester, ketone, etc. Therefore, it is necessary to set the paint baking processing equipment in a workshop to prevent other workshops from being contaminated by harmful substances. The air-cooling corridor 3 is fixedly connected to one side of the paint baking room 2. A material guide table 5 is respectively arranged between the paint spraying room 1 and the inner wall of the workshop, between the paint spraying room 1 and the paint baking room 2, and between the air-cooling corridor 3 and the inner wall of the workshop. 5 is mainly used for the stable transmission of the chain-belt material guide assembly 4, so the installation of the material guide table 5 should be arranged in the transmission direction of the chain-belt material guide assembly 4, the material guide table 5 is connected with the chain-belt material guide assembly 4 for transmission, and the chain-belt material guide assembly 4 is sequentially inserted and connected in the paint spraying room 1, the paint baking room 2, and the air-cooling corridor 3. In the present invention, the two ends of the chain-belt material guide assembly 4 are respectively passed through the connection between the material guide table 5 and the inner wall of the workshop to the outside of the workshop, and are used to be connected with other processing equipment outside the workshop to form a complete production line. An air purification device 6 is fixedly connected to one side of the outer wall of the paint spraying room 1. The air purification device 6 is used to purify the exhaust gas and paint mist generated during the painting process to protect the environment and the health of workers. A baking room heating device 7 is fixedly connected to one side of the outer wall of the baking room 2. The baking room heating device 7 is used to provide heat energy for the baking room 2.

[0037] In one embodiment, the chain-belt material guide assembly 4 includes a chain belt strip 100, a rotating shaft rod 101, a connecting bearing 102, a rotating shaft sleeve 103, a limit bearing 104, a guide block 105, a support rod, and a work station frame 106. The chain belt strip 100 serves as the main body of the transmission system and is used to support and transmit the lighter housing. A plurality of rotating shaft rods 101 are fixedly connected to the upper end of the chain belt strip 100. A rotating shaft sleeve 103 is sleeved on the rotating shaft rod 101. The outer periphery of the rotating shaft sleeve 103 is evenly provided with ridged teeth. The lower end of 103 is fixedly connected to a connecting bearing 102, the rotating shaft rod 101 is fixedly connected to the inner ring of the connecting bearing 102, the upper end of the rotating shaft rod 101 is fixedly connected to the inner ring of the limit bearing 104, the limit bearing 104 is embedded in the rotating shaft sleeve 103, the upper end of the rotating shaft sleeve 103 is fixedly connected to a guide block 105, the upper end of the guide block 105 is fixedly connected to a long support rod 107 or a short support rod 108, and the long support rod 107 and the short support rod 108 are fixedly connected to the guide blocks 105 evenly arranged along the chain belt 100. The short support rods 108 are arranged alternately in sequence, and the upper ends of every other support rods are fixedly connected to the workstation frame 106. In the specific work, the chain belt 100 is the main transmission structure of the transmission system. In this process, the chain belt 100 drives the rotating shaft rod 101 connected to its upper end to transmit, and the connecting bearing 102 and the limit bearing 104 can make the rotating shaft sleeve 103 on the rotating shaft rod 101 rotate relatively, and ensure the stability of the rotating shaft sleeve 103. The support rod located at the upper end of the rotating shaft sleeve 103 forms a stable support The structure has a work station frame 106 fixedly connected to the upper end of the support rod for carrying the lighter casing. The design of the chain-belt material guide assembly 4 ensures the stability and accuracy of the lighter casing during transmission. The cooperation of the rotating shaft rod 101, the rotating shaft sleeve 103, the connecting bearing 102 and the limit bearing 104 can realize the smooth operation of the chain belt 100, and the stability of the whole system is further enhanced by the guide block 105 and the staggered long support rods 107 and the short support rods 108.

[0038] In one of the embodiments, a transmission channel 200 is provided in the material guide platform 5, and the transmission channel 200 is used for the transmission of the chain strip 100. A plurality of guide roller grooves 201 are provided at the bottom of the transmission channel 200, and a chain guide roller 202 is rotatably connected in the guide roller groove 201. The upper end of the chain guide roller 202 is transmission-connected to the chain strip 100. The chain guide roller 202 includes a guide roller and a side guide plate. The side guide plates are fixedly connected to both ends of the guide roller, wherein the side guide plates are used to limit the transmission direction of the chain strip 100 to ensure the smooth operation of the chain strip 100. A slide groove opening 203 is provided in the middle of the upper end of the material guide platform 5, and the slide groove opening 203 is connected to the inside of the transmission channel 200. The long support rod 107 and the short support rod 108 are extended from the guide platform 5 by the chute opening 203, and the tops of the transmission channels 200 on both sides of the chute opening 203 are fixedly connected with bending plates 204 respectively, and the guide blocks 105 are slidably connected between the two sets of bending plates 204, which can ensure the smooth transmission of the upper half of the device, and the short support rods 108 located at the upper end of the chute opening 203 are rotatably connected with baffles 205, and the other end of the baffles 205 is provided with through holes, and the adjacent long support rods 107 along the transmission direction of the chain belt 100 are rotatably connected in the through holes, and the baffles 205 are alternately overlapped in sequence, which can block the chute opening 203, thereby preventing small animals from entering the transmission channel 200, thereby affecting the transmission of the transmission system;

[0039] In this embodiment, the chain belt 100 moves smoothly in the material guide platform 5 through the transmission effect of the chain guide roller 202. The design of the guide roller groove 201 and the chain guide roller 202 ensures the stability of the chain belt 100 and avoids deviation or jamming; the long support rod 107 and the short support rod 108 extend out of the material guide platform 5 through the slide groove opening 203, and the slide groove opening 203 is connected to the transmission channel 200, so that the support rod can move freely in the slide groove opening 203, and the support rod is guided to move along the predetermined path through the cooperation of the bending plate 204 and the guide block 105. The support rod is fixedly connected with a station frame 106 for placing and fixing materials (such as lighter shells). The design of the baffle 205 and the through hole ensures the coordinated movement between the support rods, avoids mutual interference between the support rods, keeps the material stable during the transmission process, and can prevent small animals from entering the transmission channel 200 through the slide groove opening 203.

[0040] In one embodiment, a paint spraying table 300 is fixedly connected in the paint spraying room 1, providing a stable platform for paint spraying operation, and a transmission channel 200 extends and passes through the paint spraying table 300 to ensure that materials can be smoothly transmitted in the paint spraying table 300. A mounting plate 301 is fixedly connected in the transmission channel 200 located in the paint spraying table 300, and a plurality of sliding sleeves 302 are fixedly connected to the mounting plate 301. The sliding sleeves in the sliding sleeves 302 are connected to sliding guide rods 303, and the other end of the sliding guide rod 303 is fixedly connected to one side of the friction plate 304. A tensioning spring 305 is sleeved on the outer periphery of the sliding sleeve 302 and the sliding guide rod 303, and one end of the tensioning spring 305 is in conflict with the friction plate 304. A side rack 306 is embedded and connected to the other side of the friction plate 304, and the side rack 306 is connected to the transmission channel 2 00, the outer wall of the rotating shaft sleeve 103 in the 304 is in contact with the outer wall of the rotating shaft sleeve 103. When in use, the elastic force of the tensioning spring 305 acts on the opposite side of the friction plate, so that the friction plate 304 has a force applied in the direction of the rotating shaft sleeve. Under this force, the side rack 306 on the other side of the friction plate 304 is in contact with the outer wall of the rotating shaft sleeve 103. At this time, when the chain belt 100 is transmitted, the chain belt 100 drives the rotating shaft rod 101 and the rotating shaft sleeve 103 to move along the transmission channel 200, and the ridged tooth bar on the outer wall of the rotating shaft sleeve 103 is meshed with the side rack 306. Through the movement of the rack, the rotating shaft sleeve 103 is driven to rotate, and the rotating shaft sleeve 103 drives the long support rod 107 to rotate, and the long support rod 107 drives the top work station 106 to rotate. During the painting process, it is convenient to carry out all-round painting operations on the lighter.

[0041] Please refer to the attached Figure 5 In the present invention, the sliding sleeve 302 and the sliding guide rod 303 are combined to form a telescopic rod structure that can be freely extended and retracted, and the telescopic rod structure is evenly arranged along the transmission channel 200, and then the ends of the sliding guide rod 303 are fixedly connected to the friction plate 304, and the tensioning spring 305 is sleeved on the outer periphery of the sliding sleeve 302 and the sliding guide rod 303, that is, the combined telescopic rod structure is sleeved with a tensioning spring 305, one end of the tensioning spring 305 is in conflict with the mounting plate 301, and the other end of the tensioning spring 305 is in conflict with the friction plate 304. At this time, the tensioning spring 305 applies elastic force to the friction plate 304, and the transmission channel 200 is connected to the transmission with a chain belt. The side rack 306 on one side of the friction plate 304 is in conflict with the relatively transmitted several rotating shaft sleeves 103 under the elastic force of the tensioning spring 305. At this time, the arrangement of the friction plate 304 is consistent with the transmission direction of the rotating shaft sleeve 103. Therefore, during the transmission process of the rotating shaft sleeve 103, the rotating shaft sleeve 103 is driven to rotate relatively by the friction force between the rotating shaft sleeve 103 and the friction plate 304, and the rotating shaft sleeve 103 and the friction plate 304 slide relatively radially. Therefore, the vertical force on the friction plate 304 can be ignored, and the tensioning spring 305 will not rebound back and forth without the action of external force.

[0042] In one of the embodiments, a plurality of support rods 307 are fixedly connected to one side of the outer wall of the paint spraying station 300, and a pipe clamp hoop 308 is fixedly connected to the support rod 307. A cross support rod 309 is fixedly connected to one side of the outer wall of the pipe clamp hoop 308, and the other end of the cross support rod 309 is fixedly connected to the middle part of the mounting rod. A plurality of paint spray guns 310 are fixedly connected to the mounting rod, and the nozzles of the paint spray guns 310 are arranged toward the work station frame 106, wherein the support rod 307 provides a stable foundation, and the pipe clamp hoop 308 is used to fix the cross support rod 309 to ensure the stable position of the cross support rod 309. The cross support rod 309 is fixedly connected to the middle part of the mounting rod. This connection method ensures the stability of the mounting rod. The mounting rod serves as a fixing point for the paint spray gun 310, which provides a stable support for the paint spray gun 310, and the paint spray gun 310 is used to spray paint on the lighter on the work station frame 106.

[0043] In one embodiment, the air purification device 6 includes a water curtain purification box 400, a wet curtain 401, a return pipe 402, a ventilation pipe 403, an adsorption box 404, an activated carbon filter plate 405, a photocatalyst filter plate 406, an ultraviolet lamp tube 407, and an exhaust pipe 408. A water curtain purification box 400 is fixedly connected to one side of the outer wall of the paint spraying room 1, and one end of the water curtain purification box 400 is fixedly connected to a first air inlet pipe 409, and the other end of the first air inlet pipe 409 is arranged on one side of the inner wall of the upper end of the paint spraying room 1. A plurality of wet curtains 401 are fixedly connected in the water curtain purification box 400, and a branch water pipe 410 is fixedly connected to the upper end of the wet curtain 401. A plurality of drainage holes connected to the top of the wet curtain 401 are opened at the lower end of the branch water pipe 410, and a water supply pipe 411 is fixedly connected to one end of the branch water pipe 410, and the other end of the water supply pipe 411 is connected to a submersible pump 412, and the submersible pump 412 is fixedly connected to the water collection tank. 413, the water collection pool 413 is located in the paint spraying room 1 on one side of the paint spraying station 300, the lower end of the water curtain purification box 400 is fixedly connected to the return pipe 402, the lower end of the return pipe 402 is connected to the water collection pool 413, the outer wall of the water curtain purification box 400 is fixedly connected to the ventilation pipe 403, the other end of the ventilation pipe 403 is fixedly connected to the adsorption box 404, the adsorption box 404 is fixedly connected to the top of the paint spraying room 1, one side of the adsorption box 404 is fixedly connected to a plurality of activated carbon filter plates 405, the other side of the adsorption box 404 is fixedly connected to two groups of oppositely arranged photocatalyst filter plates 406, the adsorption box 404 between the photocatalyst filter plates 406 is fixedly connected to the ultraviolet lamp tube 407, the other side of the adsorption box 404 is fixedly connected to the exhaust pipe 408, the other end of the exhaust pipe 408 is connected to the outside of the workshop, and the exhaust pipe 408 is fixedly connected to the exhaust fan 414;

[0044] In the present invention, the working mechanism of the air purification device 6 is:

[0045] 1. Preliminary purification:

[0046] The polluted air in the spray booth 1 enters the water curtain purification box 400 through the first air inlet pipe 409;

[0047] When the air passes through the wet curtain 401, the water curtain captures the particles and some harmful substances in the air. The water on the water curtain is evenly distributed through the branch water pipe 410 and flows through the wet curtain 401, ensuring a continuous purification effect.

[0048] 2. Water circulation system:

[0049] The water at the bottom of the water curtain purification box 400 flows back to the water collection tank 413 through the return pipe 402, thereby realizing the recycling of water and reducing the waste of water resources;

[0050] 3. Further purification:

[0051] The initially purified air enters the adsorption box 404 through the ventilation pipe 403;

[0052] In the adsorption box 404, the air first passes through the activated carbon filter plate 405 to further remove harmful gases and organic matter;

[0053] The air filtered by the activated carbon then passes through the photocatalyst filter plate 406, and under the irradiation of the ultraviolet lamp 407, the strong oxidation effect of the photocatalyst decomposes the remaining harmful substances;

[0054] 4. Final emissions:

[0055] The air that has undergone multiple purifications is finally discharged to the outside of the workshop through the exhaust duct 408, ensuring that the exhausted air meets environmental protection standards.

[0056] In one embodiment, the chain belt type material guide assembly 4 in the paint booth 2 is serpentine-shaped and reciprocatingly coiled. This structure can effectively utilize space and make the conveying path longer, thereby increasing the paint baking time and improving the paint baking effect. The winding nodes of the chain belt 100 are rotatably connected to the guide sprocket 500. The guide sprocket 500 is used to guide the direction of the chain belt 100 so that it can smoothly perform serpentine coiling and reduce friction and wear. At the same time, a guide chain roller 202 is rotatably connected to the bottom of the paint booth 2 on the conveying path to improve the transmission stability of the chain belt 100.

[0057] In one embodiment, the baking room heating equipment 7 includes an outer box body 501, an internal combustion furnace 502, a preheating box 503, a heat exchange tube 504, and a preheating tube 505. The outer box body 501 is fixedly connected to one side of the outer wall of the baking room 2, and the internal combustion furnace 502 and the preheating box 503 are fixedly connected inside the outer box body 501. The preheating box 503 is located above the internal combustion furnace 502. A plurality of evenly spaced heat exchange tubes 504 are fixedly connected inside the internal combustion furnace 502. One end of the heat exchange tube 504 is connected to the first air guide box 506. The first air guide box 506 is fixedly connected to one side of the upper end of the internal combustion furnace 502. The heat exchange tube The other end of 504 is connected to the air outlet box 507, and the air outlet box 507 is fixedly connected to the other side of the upper end of the internal combustion furnace 502. The lower end of the air outlet box 507 is fixedly connected to a heat conduction pipe 508, and the other end of the heat conduction pipe 508 is connected to the heat dissipation cavity 509 at the bottom of the paint booth 2. The inner bottom surface of the paint booth 2 is embedded with a plurality of grid nets 510 connected to the heat dissipation cavity 509. The bottom surface of the internal combustion furnace 502 located below the heat exchange tube 504 is fixedly connected to a burner 511, and a distributor 512 is fixedly connected to the internal combustion furnace 502 below the burner 511, and one end of the distributor 512 is fixedly connected to an air connection pipe 513, the other end of the air connection pipe 513 passes through the internal combustion furnace 502 and the outer box body 501 in sequence and is connected to the inside of the paint room 2, the upper end of the internal combustion furnace 502 is fixedly connected with a smoke guide pipe 514, the other end of the smoke guide pipe 514 is connected to the preheating box 503, and a plurality of evenly spaced preheating pipes 505 are fixedly connected in the preheating box 503, one end of the preheating pipe 505 is connected to an air inlet box 515, the air inlet box 515 is fixedly connected to one side of the heat exchange box, and the other side of the air inlet box 515 is fixedly connected to a second air inlet pipe 516, the other end of the second air inlet pipe 516 is connected to the outside of the outer box body 501, and the second inlet An inlet fan 517 is fixedly connected inside the air duct 516, a dust screen 518 is fixedly connected to the mouth of the second inlet duct 516, the other end of the preheating pipe 505 is connected to the second air guide box 519, a heat recovery pipe 520 is fixedly connected to the lower end of the second air guide box 519, the other end of the heat recovery pipe 520 is connected to the upper end of the first air guide box 506, a smoke exhaust pipe 521 is fixedly connected to the upper end of the preheating box 503, the end of the smoke exhaust pipe 521 is connected to a smoke purifier 522, the smoke purifier 522 is fixedly connected to one side of the inner wall of the workshop, and the exhaust end of the smoke purifier 522 is connected to the outside of the workshop;When in use, first start the air inlet fan 517, and ignite the burner 511 in the internal combustion furnace 502 to generate heat. At this time, the flame heats the heat exchange tube 504 in the internal combustion furnace 502, and the high-temperature flue gas is sent to the preheating box 503 along the smoke guide pipe 514. The high-temperature flue gas heats the preheating tube 505 in the preheating box 503. Then, the air inlet fan 517 sends air into the air inlet box 515, and the air in the air inlet box 515 evenly enters the preheating tube 505. The air is preheated in the preheating tube 505. The preheated air enters the second air guide box 519. The air in the second air guide box 519 enters the first air guide box 506 along the heat recovery pipe 520, and then enters the first air guide box 506 evenly. The heat exchange tube 504 is heated at high temperature in the heat exchange tube 504, and the heated high-temperature air enters the air outlet box 507. The high-temperature air in the air outlet box 507 is transferred to the heat dissipation cavity 509 at the bottom of the paint booth 2 along the heat conduction pipe 508. The hot air in the heat dissipation cavity 509 is evenly distributed to the interior of the paint booth 2 through a plurality of grille meshes 510 embedded and connected to the bottom surface of the paint booth 2, so as to perform high-temperature paint baking on the lighter inside the paint booth 2. The harmful gas generated during the paint baking process can enter the internal combustion furnace 502 through the air connection pipe, and some of the harmful substances are burned and decomposed under high-temperature oxidation, and then discharged together with the exhaust gas generated by the combustion through the exhaust pipe 521, and purified and discharged through the flue gas purifier 522. ;

[0058] In one of the embodiments, a vent 600 is provided at the upper end of the air-cooling corridor 3 away from the paint room 2, and an air cooler 601 is installed at the vent 600. The air cooler 601 is tilted toward the paint room 2, and the lighter that has been painted enters the air-cooling corridor 3 from the paint room 2. During this process, the air cooler 601 blows cold air into the air-cooling corridor 3, and the material (lighter) on the chain-belt material guide assembly 4 is cooled by the cold air.

[0059] The present invention provides a paint baking device for lighter shell processing, aiming to achieve an efficient, stable and environmentally friendly production process. The device mainly includes a paint spraying room 1, a paint baking room 2, an air cooling corridor 3, a chain belt type material guide component 4 and a material guide table 5. The following is the detailed working principle of the device:

[0060] 1. Paint spraying room 1

[0061] Function: Used to spray paint the lighter shell.

[0062] Workflow:

[0063] The lighter shell is placed on the station frame 106 of the chain-belt type material guide assembly 4 and enters the paint spraying room 1;

[0064] A paint spraying table 300 is fixed in the paint spraying room 1 to provide a stable platform for paint spraying operations;

[0065] The rotating shaft sleeve 103 is meshed with the side rack (306), and the rotating shaft sleeve 103 is driven to rotate through the movement of the chain belt 100, thereby driving the long support rod 107 and the station frame 106 to rotate, so as to achieve all-round painting of the lighter shell;

[0066] The waste gas generated during the painting process is treated by the air purification device 6 connected to the outer wall of the paint spraying room 1, and is discharged after purification to prevent pollution.

[0067] 2. Paint room 2

[0068] Function: To apply high temperature paint to the lighter shell after spraying.

[0069] Workflow:

[0070] The painted lighter shell enters the paint booth 2 through the chain-belt material guide assembly 4;

[0071] The paint booth 2 includes heating equipment such as an outer box 501, an internal combustion furnace 502, a preheating box 503, a heat exchange tube 504 and a preheating tube 505;

[0072] The hot air enters the heat exchange tube 504 from the preheating box 503 for high temperature heating, and then enters the heat dissipation cavity 509 at the bottom of the paint booth 2, and is evenly distributed to the interior of the paint booth 2 through the grid 510, and the lighter shell is subjected to high temperature paint.

[0073] The harmful gases generated during the painting process enter the internal combustion furnace 502 through the air duct, burn and decompose at high temperature, and are finally purified and discharged through the smoke exhaust pipe 521 and the smoke purifier 522 to ensure environmental protection.

[0074] 3. Air-cooled corridor 3

[0075] Function: Rapidly cool down the lighter shell after high-temperature painting.

[0076] Workflow:

[0077] The lighter shell after high temperature painting enters the air cooling corridor 3 through the chain belt type material guide assembly 4;

[0078] A vent 600 is provided at the upper end of the air-cooling corridor 3, and an air-cooling machine 601 is installed thereon. The air-cooling machine 601 is tilted toward the paint room 2.

[0079] The cold air is blown into the air cooling corridor 3 through the air cooling machine 601, which quickly reduces the temperature of the lighter shell and ensures the quality and safety of the paint.

[0080] 4. Chain belt guide assembly 4

[0081] Function: To realize the smooth transmission of lighter shell between various processes.

[0082] Workflow:

[0083] The chain-belt material guide assembly 4 runs through the spray booth 1, the paint booth 2 and the air-cooling corridor 3 to ensure smooth transmission of materials between various links;

[0084] The two ends of the assembly extend from the connection between the guide table 5 and the inner wall of the workshop to the outside of the workshop, forming a complete production line with other equipment;

[0085] The component is designed with a guide block 105, a long support rod 107, a short support rod 108, a guide sprocket 500 and a chain guide roller 202, etc., to ensure the smooth operation and stable transmission of the chain belt 100.

[0086] 5. Material guide table 5

[0087] Function: To improve the conveying stability of the chain-belt material guide assembly 4.

[0088] Workflow:

[0089] A transmission channel 200 is provided in the material guide table 5 for the chain belt 100 to transmit, so as to ensure that the material remains stable during the transmission process;

[0090] The support rod is fixedly connected to a work station frame 106 for placing and fixing the lighter housing so as to facilitate spray painting or baking varnish treatment.

[0091] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0092] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A paint baking device for lighter shell processing, comprising a paint spraying room (1), a paint baking room (2), an air cooling corridor (3), a chain belt type material guide assembly (4), and a material guide table (5), characterized in that: The spray paint room (1), the baking paint room (2) and the air cooling corridor (3) are all fixedly installed inside the workshop. The air cooling corridor (3) is fixedly connected to one side of the baking paint room (2). A material guide table (5) is respectively arranged between the spray paint room (1) and the inner wall of the workshop, between the spray paint room (1) and the baking paint room (2), and between the air cooling corridor (3) and the inner wall of the workshop. A chain-belt type material guide component (4) is connected to the material guide table (5) in a transmission manner, and the chain-belt type material guide component (4) is sequentially inserted and connected inside the spray paint room (1), the baking paint room (2), and the air cooling corridor (3). An air purification device (6) is fixedly connected to one side of the outer wall of the spray paint room (1), and a baking room heating device (7) is fixedly connected to one side of the outer wall of the baking paint room (2); A transmission channel (200) is provided in the material guide table (5), the chain-belt material guide assembly (4) is transmission-connected in the transmission channel, a paint spraying table (300) is fixedly connected in the paint spraying room (1), the transmission channel (200) extends and passes through the paint spraying table (300), and a mounting plate (301) is fixedly connected in the transmission channel (200) located in the paint spraying table (300), a plurality of sliding sleeves (302) are fixedly connected to the mounting plate (301), and the sliding sleeves (302) are fixedly connected in the mounting plate (301). The sliding sleeve is connected to a sliding guide rod (303), the other end of the sliding guide rod (303) is fixedly connected to one side of a friction plate (304), the outer periphery of the sliding sleeve tube (302) and the sliding guide rod (303) is sleeved with a tensioning spring (305), one end of the tensioning spring (305) is in contact with the friction plate (304), the other side of the friction plate (304) is embedded and fixedly connected with a side rack (306), and the side rack (306) is drivingly connected to a chain belt type material guide assembly (4) in the transmission channel (200); The baking room heating equipment (7) comprises an outer box (501), an internal combustion furnace (502), a preheating box (503), a heat exchange tube (504), and a preheating tube (505); the outer box (501) is fixedly connected to one side of the outer wall of the baking room (2); the internal combustion furnace (502) and the preheating box (503) are fixedly connected inside the outer box (501); the preheating box (503) is located above the internal combustion furnace (502); a plurality of evenly spaced heat exchange tubes (504) are fixedly connected inside the internal combustion furnace (502); one end of the heat exchange tube (504) is connected to a first air guide box (506); the first air guide box (506) is fixedly connected to one side of the upper end of the internal combustion furnace (502); the heat exchange tube (504) The other end of the heat exchange tube (504) is connected to an air outlet box (507), the air outlet box (507) is fixedly connected to the other side of the upper end of the internal combustion furnace (502), the lower end of the air outlet box (507) is fixedly connected to a heat conduction pipe (508), the other end of the heat conduction pipe (508) is connected to a heat dissipation cavity (509) at the bottom of the paint booth (2), a plurality of grille nets (510) are embedded and fixedly connected to the inner bottom surface of the paint booth (2) and are connected to the heat dissipation cavity (509), the bottom surface of the internal combustion furnace (502) located below the heat exchange tube (504) is fixedly connected to a burner (511), a distributor (512) is fixedly connected to the internal combustion furnace (502) below the burner (511), one end of the distributor (512) is fixedly connected to an air connection pipe (511), and the heat exchange tube (511) is fixedly connected to the inner bottom surface of the internal combustion furnace (502). 3), the other end of the air connection pipe (513) passes through the internal combustion furnace (502) and the outer box (501) in sequence and then communicates with the interior of the paint room (2), the upper end of the internal combustion furnace (502) is fixedly connected with a smoke guide pipe (514), the other end of the smoke guide pipe (514) is connected with the preheating box (503), a plurality of evenly spaced preheating pipes (505) are fixedly connected inside the preheating box (503), one end of the preheating pipe (505) is connected with an air inlet box (515), the air inlet box (515) is fixedly connected to one side of the heat exchange box, the other side of the air inlet box (515) is fixedly connected with a second air inlet pipe (516), the other end of the second air inlet pipe (516) is connected with the outside of the outer box (501), the first An inlet fan (517) is fixedly connected inside the second air inlet pipe (516); a dust screen (518) is fixedly connected at the pipe mouth of the second air inlet pipe (516); the other end of the preheating pipe (505) is connected to the second air guide box (519); a heat recovery pipe (520) is fixedly connected to the lower end of the second air guide box (519); the other end of the heat recovery pipe (520) is connected to the upper end of the first air guide box (506); a smoke exhaust pipe (521) is fixedly connected to the upper end of the preheating box (503); a terminal end of the smoke exhaust pipe (521) is connected to a smoke purifier (522); the smoke purifier (522) is fixedly connected to one side of the inner wall of the workshop, and an exhaust end of the smoke purifier (522) is connected to the outside of the workshop.

2. A paint baking device for lighter shell processing according to claim 1, characterized in that: The chain belt type material guide assembly (4) comprises a chain belt strip (100), a rotating shaft rod (101), a connecting bearing (102), a rotating shaft sleeve (103), a limit bearing (104), a guide block (105), a support rod, and a work station frame (106); the upper end of the chain belt strip (100) is fixedly connected to a plurality of rotating shaft rods (101); a rotating shaft sleeve (103) is sleeved on the rotating shaft rod (101); the outer peripheral side wall of the rotating shaft sleeve (103) is in conflict with the side rack (306); the outer periphery of the rotating shaft sleeve (103) is evenly provided with ridged teeth; the ridged teeth and the side rack (306) are meshed and connected with each other; the lower end of the rotating shaft sleeve (103) is fixedly connected to the connecting bearing (102); The rotating shaft rod (101) is fixedly connected to the inner ring of the connecting bearing (102); the upper end of the rotating shaft rod (101) is fixedly connected to the inner ring of the limit bearing (104); the limit bearing (104) is embedded in the rotating shaft sleeve (103); the upper end of the rotating shaft sleeve (103) is fixedly connected to a guide block (105); the upper end of the guide block (105) is fixedly connected to a long support rod (107) or a short support rod (108); the long support rods (107) and the short support rods (108) are fixed on the guide blocks (105) evenly arranged along the chain belt (100) and are arranged alternately in sequence; the upper ends of every other support rod are fixedly connected to a work station frame (106).

3. A paint baking device for lighter shell processing according to claim 2, characterized in that: A plurality of guide roller grooves (201) are provided at the bottom of the transmission channel (200), a chain guide roller (202) is rotatably connected in the guide roller groove (201), the upper end of the chain guide roller (202) is transmission-connected to the chain belt (100), a slide groove opening (203) is provided in the middle of the upper end of the material guide platform (5), the slide groove opening (203) is connected to the inside of the transmission channel (200), and the long support rod (107) and the short support rod (108) are both extended out of the material guide platform from the slide groove opening (203). (5), the tops of the transmission channels (200) on both sides of the slide slot opening (203) are respectively fixedly connected with bending plates (204), the guide blocks (105) are slidably connected between the two sets of bending plates (204), and the short support rods (108) located at the upper end of the slide slot opening (203) are rotatably connected with baffles (205), and the other end of the baffles (205) is provided with through holes, and the adjacent long support rods (107) along the transmission direction of the chain belt (100) are respectively rotatably connected in the through holes.

4. A paint baking device for lighter shell processing according to claim 1, characterized in that: A plurality of support rods (307) are fixedly connected to one side of the outer wall of the paint spraying table (300); a pipe clamp (308) is fixedly connected to the support rod (307); a cross support rod (309) is fixedly connected to one side of the outer wall of the pipe clamp (308); the other end of the cross support rod (309) is fixedly connected to the middle of a mounting rod; a plurality of paint spray guns (310) are fixedly connected to the mounting rod; and the spray nozzles of the paint spray guns (310) are arranged toward the work station frame (106).

5. A paint baking device for lighter shell processing according to claim 1, characterized in that: The air purification device (6) comprises a water curtain purification box (400), a wet curtain (401), a water return pipe (402), a ventilation pipe (403), an adsorption box (404), an activated carbon filter plate (405), a photocatalyst filter plate (406), an ultraviolet lamp tube (407), and an exhaust pipe (408). One side of the outer wall of the paint spraying room (1) is fixedly connected to the water curtain purification box (400), one end of the water curtain purification box (400) is fixedly connected to a first air inlet pipe (409), and the other end of the first air inlet pipe (409) is arranged on the spraying room. On one side of the inner wall of the upper end of the paint room (1), a plurality of wet curtains (401) are fixedly connected in the water curtain purification box (400), a branch water pipe (410) is fixedly connected between the upper end of the wet curtain (401) and the inner wall of the water curtain purification box (400), a plurality of drainage holes connected to the top of the wet curtain (401) are opened at the lower end of the branch water pipe (410), a water supply pipe (411) is fixedly connected to one end of the branch water pipe (410), and the other end of the water supply pipe (411) is connected to a submersible pump (412), and the submersible pump (412) is fixedly connected to the collecting The water collecting pool (413) is located in the paint spraying room (1) on one side of the paint spraying station (300); the lower end of the water curtain purification box (400) is fixedly connected to a return pipe (402); the lower end of the return pipe (402) is connected to the water collecting pool (413); one side of the outer wall of the water curtain purification box (400) is fixedly connected to a ventilation pipe (403); the other end of the ventilation pipe (403) is fixedly connected to an adsorption box (404); the adsorption box (404) is fixedly connected to the top of the paint spraying room (1); the adsorption box A plurality of activated carbon filter plates (405) are fixedly connected to one side of the interior of the adsorption box (404); two groups of oppositely arranged photocatalyst filter plates (406) are fixedly connected to the other side of the interior of the adsorption box (404); an ultraviolet lamp tube (407) is fixedly connected to the interior of the adsorption box (404) between the photocatalyst filter plates (406); an exhaust pipe (408) is fixedly connected to the other side of the adsorption box (404); the other end of the exhaust pipe (408) is connected to the outside of the workshop; and an exhaust fan (414) is fixedly connected to the interior of the exhaust pipe (408).

6. A paint baking device for lighter shell processing according to claim 3, characterized in that: The chain belt type material guide assembly (4) in the paint booth (2) is coiled back and forth in a serpentine shape, wherein the coiling nodes of the chain belt strip (100) are all rotatably connected to guide sprockets (500).

7. A paint baking device for lighter shell processing according to claim 1, characterized in that: A vent (600) is provided at the upper end of the air cooling corridor (3) on a side away from the paint booth (2), and an air cooling machine (601) is installed at the vent (600), and the air cooling machine (601) is arranged to be inclined toward the paint booth (2).

Citation Information

Patent Citations

  • Tool for processing bottle bodies

    CN109454072A

  • Automobile hub new paint UV curing and painting line

    CN111085376A

  • Semi-automatic hanging, spraying and drying integrated system for rod component

    CN115121423A

  • Automatic spraying device for nonmetal

    CN118162305A

  • Paint spraying, drying and cooling integrated device

    CN213943610U