A device for ecological restoration of high and steep rock slopes in mines
By designing the ecological restoration device for high-steep rocky slopes in the mine, using sink components, anti-blocking components, drainage pipe components and ecological restoration structures, the problem of restricted vegetation rooting and growth has been solved, and the risk of landslide and soil reinforcement has been reduced, and the soil quality has been strengthened has been improved. The ecological restoration effect of rocky slopes.
Patent Information
- Application Number
- CN202411120738.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-15
AI Technical Summary
Existing high-steep slope anti-seepage control equipment can easily affect the soil of plant root reinforcement during the vegetation taking root, resulting in limited vegetation growth and difficulty in effectively repairing rock slopes.
An ecological restoration device for high steep rocky slopes in mines was designed, including sink components, anti-blocking components, drainage pipe components, slope support components and ecological restoration structures. Through rapid drainage, reinforcement structures and fertilizer boxes, the Suitability and soil stability of vegetation growth environment.
Through rapid drainage and reinforcement of the structure, the risk of landslide is reduced, and the growth of plant roots is promoted, the soil quality is strengthened, and the ecological restoration effect of the slope is improved.
Smart Images

Figure CN118639671B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ecological management of rock slopes, in particular to an ecological restoration device for high and steep rock slopes in mines. Background Art
[0002] The goal of rock slope ecological restoration is to restore natural ecosystem functions, reduce geological disaster risks, improve environmental quality, and enhance biodiversity through appropriate vegetation and biotechnology. The success of restoration depends on a deep understanding of the characteristics of the rock environment and effective implementation of ecological engineering. By selecting vegetation species and biotechnology suitable for the rock environment, these plants usually need to have strong drought resistance and root development in order to find enough growth space on the rock surface and fix the soil.
[0003] The patent with announcement number CN221321000U discloses a high and steep slope anti-seepage management equipment, including a slope body, a first protective layer is laid on the upper surface of the slope body, an anti-seepage layer is cast on the upper end of the first protective layer, a second protective layer is laid on the upper surface of the anti-seepage layer, a landfill area is vertically laid on the upper surface of the second protective layer, a repair layer is arranged on the upper end of the filling area, and anti-fall nets are arranged on both sides and the front end of the repair layer. The high and steep slope anti-seepage management equipment can prevent rainwater from entering the slope through the first protective layer laid on the upper surface of the slope. The anti-seepage layer can resist rain erosion, moisturize and retain water, thereby further protecting the slope and preventing slope landslides. The second protective layer can improve the internal soil structure of the slope and avoid slope landslides caused by rainwater. The filling area can make the slope surface intact and compact the underlying base layer. The final repair layer is filled with phosphogypsum-based ecological restoration materials for soil reconstruction. However, this patent still has the problem that the protective layer is easy to affect the rooting and growth of plants and affect the reinforcement of the soil by the plant root system. For this reason, an ecological restoration device for high and steep rock slopes in mines is designed. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides an ecological restoration device for high and steep rock slopes in mines, which solves the problems raised in the above-mentioned background technology.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: an ecological restoration device for high and steep rock slopes in a mine, comprising a mine body, a foundation pit is arranged at the bottom side of the mine body, a steep slope is arranged at the side of the mine body, a trough component is arranged on the inner side of the foundation pit, an anti-blocking component is arranged above the trough component, a slope support component is arranged on the side of the anti-blocking component close to the steep slope, drainage pipe components are arranged on the left and right sides of the slope support component, an ecological restoration structure is arranged on the inner side of the slope support component, a connecting component is arranged on the top side of the steep slope, and a connecting through-hole is opened on the bottom side of the connecting component.
[0006] The trough component includes a trough body, which is arranged on the inner wall of the foundation pit, and two supporting cross columns are fixedly connected to the inner top of the trough body, and main diagonal support columns are arranged on the relatively distant sides of the two supporting cross columns, and secondary diagonal support columns are arranged on the relatively close sides of the two supporting cross columns. A fitting groove is provided on the left side of the trough body, and a splicing protrusion is fixedly connected on the right side of the trough body. Two manhole cover support strips are fixedly connected to the top of the inner wall of the trough body, and a water collecting inclined pipe is fixedly connected inside the trough body, nail column grooves are provided on both sides of the top of the trough body, and an anti-blocking splicing groove is provided on the upper surface of the trough body, and a splicing strip is fixedly connected to the top of the rear side of the trough body, and four supporting splicing grooves are provided on the top surface of the splicing strip, and the upper part of the splicing strip is fixedly connected It is connected with embedded steel bars, and the main diagonal support column is fixedly connected to the bottom surface of the inner side of the water trough body. The splicing protrusion and the shape structure of the matching groove fit each other. The water collecting inclined pipe is inclined from the inner wall of the water trough body to penetrate the top surface. It is necessary to dig a foundation pit around the steep slope side of the bottom side of the mine mountain, and then put the water trough component into the excavated foundation pit. When rainwater is collected in the water collecting inclined pipe, it will flow into the water trough body along the water collecting inclined pipe to play a drainage role. The supporting horizontal columns connected to the inner wall of the water trough body can improve the side bearing capacity of the water trough body, and increase the lateral and longitudinal force bearing capacity of the water trough body through the inclined main diagonal support columns and secondary diagonal support columns, so as to prevent the side of the water trough body from being affected by the impact of hillside sliding and collapsing and affecting drainage. Through the rapid drainage of rainwater, a large amount of water can be prevented from penetrating the steep slope surface and moving downward, causing landslides.
[0007] Furthermore, the anti-blocking component includes a blocking cover plate, an inner groove is provided on the rear side of the blocking cover plate, a blocking block is fixedly connected to the rear side of the top end of the blocking cover plate, and an insert block is fixedly connected to the bottom end of the blocking cover plate, and the insert block is plug-in connected to the anti-blocking groove. When the anti-blocking component is installed to the corresponding position on the gutter component, the insert block on the anti-blocking component is aligned with the anti-blocking groove provided on the gutter body, so that the insert block is inserted into the anti-blocking groove, and the blocking cover plate is fitted to the side of the splicing strip, so that the debris contained in the rainwater flows downward and passes through the blocking cover plate, and is blocked by the blocking block at the top of the blocking cover plate. The blocked blocking cover plate increases the amount of retained water above, and the debris on the top of the blocking cover plate is washed away along the side by the retained water, thereby preventing the debris from entering the water collecting inclined pipe with the water to cause blockage, thereby avoiding affecting the normal drainage of the water collecting inclined pipe.
[0008] Furthermore, the drain pipe component includes a connecting channel, which is arranged on the side of the sink body, and an inner channel groove is opened inside the connecting channel. The bottom end of the connecting channel is fixedly connected with a bottom strip, and the bottom surface of the top of the connecting channel is fixedly connected with an upper strip. The upper surface of the sink body is provided with a strip groove, and the strip groove and the outer shape structure of the inner channel groove are matched with each other. The left and right sides of the connecting channel are also provided with nail column grooves. During installation, the connecting channel needs to be matched with the strip groove opened on the sink body on the bottom side through the inner channel groove on the bottom side. At this time, the side of the connecting channel will fit the top surface of the sink body, and the nail column groove on the sink body and the connecting channel will be connected. The nail column grooves on the side are spliced, and concrete mortar is poured into the spliced nail column grooves at this time, and thick steel nails are inserted into the nail column grooves. After the concrete mortar is air-dried, it is fixed, and the upper detent strip at the top of the connecting channel is directly fitted with the connection of the water tank body on the side of the connecting component. At the same time, the connecting channel is used to increase the support of the water tank body at the top and the bottom of the steep slope. When the amount of water in the water tank body at the connecting component increases and is about to overflow, the connecting channel connected to the water tank body at the connecting component is used to drain the water, so that the water is discharged from the top of the steep slope to the water tank body at the bottom through the inner groove of the channel in the connecting channel, thereby alleviating the excessive accumulation of rainwater on the top of the steep slope and relieving the drainage pressure.
[0009] Furthermore, the slope support component includes an arch support beam, which is arranged above the splicing strip, and the bottom surface of the arch support beam is fixedly connected to four mounting blocks, the side of the arch support beam is provided with a side flow groove, the bottom end of the arch support beam is provided with a reinforcement groove, the top side surface of the side flow groove is provided with a grouting groove, the left and right sides of the arch support beam are provided with diversion inclined grooves, the inner wall of the arch support beam is fixedly connected to fixed box blocks on both sides, the top front side of the arch support beam is provided with a top groove, and the top of the arch support beam is fixedly connected to a hinge The reinforcing bars are connected, the reinforcing bar groove is sleeved and connected with the embedded reinforcing bars, the grouting groove is connected with the reinforcing bar groove, the top groove is connected with the side flow groove, the connecting steel bar is adapted to the outer shape structure of the reinforcing bar groove, and when the slope support component is installed on the splicing strip, the arch support beam is sleeved on the outside of the embedded reinforcing bars through the reinforcing bar groove on the bottom side, and the mounting block on the bottom side of the arch support beam is aligned and inserted into the supporting splicing groove, so that the embedded reinforcing bars are inserted into the reinforcing bar groove and flush with the top surface of the splicing strip, and at this time, the well-proportioned concrete mortar is poured from the grouting groove on the side of the arch support beam. The concrete mortar is allowed to enter the reinforcement groove from the grouting groove and fill the gaps around the embedded steel bars. After the concrete mortar is air-dried, the fixation between the slope support component and the gutter component can be completed. The arched structure of the arch support beam is used to improve the bearing capacity of the overall structure of the arch support beam. The arch support beam is used to divide the steep slope surface into equal-sized areas, thereby reinforcing the parts of the steep slope surface that may become loose, so that plants can be planted in the arch support beam in the future. The root system of the plant will reinforce the overall slope of the steep slope. The precast concrete structure is used to The components can shorten the construction period and improve the construction efficiency, thereby reducing the potential safety hazard of landslides caused by weather during long-term construction. At the same time, rainwater in the arch support beam will accumulate in the diversion chute. In order to prevent excessive rainwater seepage in the diversion chute, the excess rainwater is guided to flow into the top chute through the diversion chute, and then diverted to the side chute through the top chute, so that the rainwater on the side chute is finally discharged through the water collection inclined pipe. The drainage ensures that the seepage volume in different places on the steep slope is consistent, which reduces the risk of landslides and is more conducive to plant growth.
[0010] Furthermore, the ecological restoration structure includes a fertilizer box, which is installed on the top side between the two fixed box blocks. The top surface of the fertilizer box is fixedly connected to a top plate, and a plurality of drainage holes are provided in an array on the top surface of the top plate. A plurality of water outlet holes are provided in an array on the bottom surface of the fertilizer box. The connecting member is connected to the connecting steel bar through the connecting through-holes on the bottom side. A grouting groove is also provided on the top surface of the connecting member. When planting plants containing soil are placed in the arch support beam, the ecological restoration structure needs to be placed on the fixed box block, and the plant soil is allowed to cover the top of the ecological restoration structure. Fertilizer is placed in the fertilizer box and sealed with the top plate. The fertilizer box and the top plate are made of degradable materials as a whole. When rainwater penetrates through the soil of the plants planted in the arch support beam and reaches the top of the roof, the accumulated rainwater penetrates through the leakage holes on the top plate into the fertilizer box, and the rainwater in the fertilizer box dissolves the fertilizer, and the rainwater that dissolved the fertilizer penetrates out from the bottom of the fertilizer box, allowing part of the rainwater containing fertilizer to penetrate downward into the surface of the steep slope to improve the soil quality, and part of it promotes the growth of plant roots and provides nutrients for the plant roots. By improving the soil quality below the surface of the infiltrated steep slope, the rooting growth of plants is promoted, and the subsequent growth of plant roots is promoted to strengthen the soil quality. When the fertilizer in the fertilizer box is almost consumed, the fertilizer box is degraded by microorganisms in the soil to avoid affecting the growth of plant roots.
[0011] The present invention provides an ecological restoration device for high and steep rock slopes in mines. It has the following beneficial effects:
[0012] The present invention increases the lateral and longitudinal force bearing capacity of the water tank body by providing a water tank component, a water tank body, a supporting horizontal column, a main diagonal support column, a secondary diagonal support column, a fitting groove, a splicing convex block, a manhole cover support bar, and a water collecting inclined pipe, so as to prevent the side of the water tank body from collapsing due to the impact of a hillside slide and affecting drainage, and prevents a large amount of water from penetrating the steep slope surface and moving downward to cause a landslide through the rapid drainage of rainwater;
[0013] The present invention is provided with a blocking cover plate, an inner groove, a blocking block and an inserting block. The blocking block at the top of the blocking cover plate blocks the blocked blocking cover plate, so that the amount of water retained above is increased. The debris on the top of the blocking cover plate is washed away along the side by the retained water, thereby preventing the debris from entering the water collecting inclined pipe with the water to cause blockage, and avoiding affecting the normal drainage of the water collecting inclined pipe.
[0014] The present invention is provided with a connecting channel, an inner groove of the channel, a bottom notch, an upper notch, and a notch groove. The connecting channel connected to the water tank body at the connecting component is used for drainage, so that water is discharged from the top of the steep slope surface to the water tank body at the bottom through the inner groove of the channel in the connecting channel, thereby alleviating excessive accumulation of rainwater on the top of the steep slope surface and relieving drainage pressure.
[0015] The present invention is provided with an arch support beam, a mounting block, a side flow groove, a reinforcement groove, a grouting groove, a diversion chute, a fixed box block, a top groove, and connecting steel bars. The steep slope surface is divided into equal-sized areas through the arch support beam, so that the part of the steep slope surface that may be loose is reinforced, so that plants can be planted in the arch support beam later, and the overall slope surface of the steep slope surface is reinforced by the growing root system of the plants. The use of prefabricated concrete components can shorten the construction period and improve the construction efficiency, thereby reducing the safety hazard of landslides caused by weather during long-term construction. At the same time, drainage is used to ensure that the water seepage in different places of the steep slope surface is consistent, which reduces the risk of landslides and is more conducive to plant growth.
[0016] The present invention is provided with a fertilizer box, a top plate, a leaking hole and a water outlet hole, so that part of rainwater containing fertilizer can penetrate downwards into the surface of the steep slope to improve the soil quality, and part of rainwater can promote the growth of plant roots and provide nutrients for the plant roots. The soil quality below the surface of the infiltrated steep slope can be improved to promote the root growth of plants, and the soil quality can be strengthened for the subsequent growth of plant roots. When the fertilizer in the fertilizer box is almost consumed, the fertilizer box is degraded by microorganisms in the soil to avoid affecting the growth of plant roots. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a structural schematic diagram of the partial layout of the overall mine mountain body of the present invention;
[0018] Figure 2 It is a structural schematic diagram of the integral water tank component of the present invention;
[0019] Figure 3 For the present invention as a whole Figure 2 A is a schematic diagram of the enlarged structure of the middle part;
[0020] Figure 4 It is a structural schematic diagram of the integral anti-blocking component of the present invention;
[0021] Figure 5 It is a structural schematic diagram of the integral drain pipe component of the present invention;
[0022] Figure 6 It is a schematic diagram of the overall water tank body structure of the present invention;
[0023] Figure 7 It is a schematic diagram of the structure of the integral slope supporting component of the present invention;
[0024] Figure 8 It is a structural schematic diagram of the integral fertilizer box of the present invention;
[0025] Fig. 9 It is a schematic diagram of the partial connection of integrally adjacent slope supporting components of the present invention.
[0026] In the figure: 1, mine body; 2, foundation pit; 3, steep slope; 4, water tank component; 41, water tank body; 42, supporting cross column; 43, main diagonal support column; 44, secondary diagonal support column; 45, fitting groove; 46, splicing protrusion; 47, manhole cover support bar; 48, water collecting inclined pipe; 49, nail column groove; 410, anti-blocking splicing groove; 411, splicing bar; 412, supporting splicing groove; 413, embedded steel bar; 5, anti-blocking component; 51, blocking cover plate; 52, inner through groove; 53, blocking block; 54, plug block; 6. Drain pipe components; 61. Connecting channel; 62. Inner channel of channel; 63. Bottom strip; 64. Upper strip; 65. Strip groove; 7. Slope support components; 71. Arch support beam; 72. Mounting block; 73. Side flow channel; 74. Reinforcement groove; 75. Grouting groove; 76. Diversion chute; 77. Fixed box block; 78. Top groove; 79. Connecting steel bars; 8. Ecological restoration structure; 81. Fertilizer box; 82. Top plate; 83. Leakage hole; 84. Water outlet hole; 9. Connecting components; 10. Connecting through-hole. DETAILED DESCRIPTION
[0027] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0028] See also Figure 1-9 , one embodiment of the present invention is: an ecological restoration device for a high and steep rock slope in a mine, comprising a mine body 1, a foundation pit 2 is arranged at the bottom side of the mine body 1, a steep slope surface 3 is arranged at the side of the mine body 1, a water trough component 4 is arranged at the inner side of the foundation pit 2, an anti-blocking component 5 is arranged above the water trough component 4, a slope support component 7 is arranged on the side of the anti-blocking component 5 close to the steep slope surface 3, drainage pipe components 6 are arranged on the left and right sides of the slope support component 7, an ecological restoration structure 8 is arranged on the inner side of the slope support component 7, a connecting component 9 is arranged at the top side of the steep slope surface 3, and a connecting through hole 10 is opened at the bottom side of the connecting component 9;
[0029] The trough member 4 includes a trough body 41, which is arranged on the inner wall of the foundation pit 2. Two supporting cross columns 42 are fixedly connected to the top of the inner part of the trough body 41. A main diagonal support column 43 is arranged on the side relatively far away from the two supporting cross columns 42, and a secondary diagonal support column 44 is arranged on the side relatively close to the two supporting cross columns 42. A fitting groove 45 is provided on the left side of the trough body 41, and a splicing protrusion 46 is fixedly connected to the right side of the trough body 41. Two well cover support strips 47 are fixedly connected to the top of the inner wall of the trough body 41, and a water collecting inclined pipe 48 is fixedly connected inside the trough body 41. Nail column grooves 49 are provided on both sides of the top of the trough body 41, and the upper surface of the trough body 41 An anti-blocking groove 410 is provided, a splicing strip 411 is fixedly connected to the top of the rear side of the water tank body 41, four supporting grooves 412 are provided on the top surface of the splicing strip 411, and embedded steel bars 413 are fixedly connected to the top of the splicing strip 411. The main diagonal support column 43 is fixedly connected to the inner bottom surface of the water tank body 41, and the shape and structure of the splicing protrusion 46 and the matching groove 45 fit each other. The water collecting inclined pipe 48 is obliquely penetrated from the top surface of the inner wall of the water tank body 41 to increase the lateral and longitudinal force bearing capacity of the water tank body 41, prevent the side of the water tank body 41 from being impacted and collapsed by the landslide and affecting the drainage, and prevent a large amount of water from penetrating the steep slope surface 3 and moving downward to cause landslides through the rapid drainage of rainwater.
[0030] The anti-blocking component 5 includes a blocking cover plate 51, an inner groove 52 is provided on the rear side of the blocking cover plate 51, a blocking block 53 is fixedly connected to the rear side of the top end of the blocking cover plate 51, and an insert block 54 is fixedly connected to the bottom end of the blocking cover plate 51, and the insert block 54 is plugged into the anti-blocking groove 410, and is blocked by the blocking block 53 on the top of the blocking cover plate 51. The blocked blocking cover plate 51 increases the amount of retained water above, and the retained water flushes the debris above the blocking cover plate 51 along the side, thereby preventing the debris from entering the water collecting inclined pipe 48 with the water to cause blockage, thereby avoiding affecting the normal drainage of the water collecting inclined pipe 48.
[0031] The drain pipe component 6 includes a connecting channel 61, which is arranged on the side of the trough body 41. A channel inner groove 62 is opened inside the connecting channel 61. A bottom strip 63 is fixedly connected to the bottom end of the connecting channel 61, and an upper strip 64 is fixedly connected to the bottom surface of the top of the connecting channel 61. A strip groove 65 is opened on the upper surface of the trough body 41. The strip groove 65 and the channel inner groove 62 are matched with each other in shape structure. Nail column grooves 49 are also opened on the left and right sides of the connecting channel 61. The connecting channel 61 connected to the trough body 41 at the connecting component 9 drains water, allowing water to be discharged from the top of the steep slope surface 3 to the bottom of the trough body 41 through the channel inner groove 62 of the connecting channel 61, thereby alleviating excessive accumulation of rainwater on the top of the steep slope surface 3 and relieving drainage pressure.
[0032] The slope support member 7 includes an arch support beam 71, which is arranged above the splicing strip 411. Four mounting blocks 72 are fixedly connected to the bottom surface of the arch support beam 71. A side flow groove 73 is provided on the side of the arch support beam 71. A reinforcing groove 74 is provided at the bottom of the arch support beam 71. A grouting groove 75 is provided on the top surface of the side flow groove 73. A diversion chute 76 is provided on the left and right sides of the arch support beam 71. Both sides of the inner wall of the arch support beam 71 are fixedly connected with a fixed box block 77. A top groove 78 is provided on the front side of the top of the arch support beam 71. A connecting steel bar 79 is fixedly connected to the top of the arch support beam 71. The reinforcing groove 74 is sleeved and connected with the embedded steel bar 413. The grouting groove 75 is connected with the reinforcing groove 74. The top groove 78 is connected to the side flow groove 73, the connecting steel bar 79 is adapted to the outer shape structure of the reinforcing groove 74, and the steep slope surface 3 is divided into equal-sized areas by the arch support beam 71, so that the part of the steep slope surface 3 that may be loose is reinforced, so that plants can be planted in the arch support beam 71 later, and the overall slope of the steep slope surface 3 can be reinforced by the growing root system of the plants. The use of precast concrete components can shorten the construction period and improve the construction efficiency, thereby reducing the safety hazard of landslides caused by weather during long-term construction. At the same time, drainage is used to ensure that the water seepage in different places of the steep slope surface 3 remains consistent, which reduces the risk of landslides and is more conducive to plant growth.
[0033] The ecological restoration structure 8 includes a fertilizer box 81, which is installed on the top side between the two fixed box blocks 77. The top surface of the fertilizer box 81 is fixedly connected with a top plate 82. The top surface array of the top plate 82 is provided with a plurality of leakage holes 83. The bottom surface array of the fertilizer box 81 is provided with a plurality of water outlet holes 84. The connecting member 9 is connected with the connecting steel bar 79 through the connecting through hole 10 on the bottom side. The top surface of the connecting member 9 is also provided with a grouting groove 75. When the planting plants containing soil are placed in the arch support beam 71, the ecological restoration structure needs to be placed. 8 is placed on the fixed box block 77, and the plant soil is covered on the top of the ecological restoration structure 8, so that part of the rainwater containing fertilizer can penetrate the surface of the steep slope 3 to improve the soil quality, and part of it can promote the growth of plant roots and provide nutrients for the plant roots. By improving the soil quality below the surface of the infiltration steep slope 3, the root growth of plants is promoted, and the subsequent plant root growth and soil quality are strengthened. When the fertilizer in the fertilizer box 81 is almost consumed, the fertilizer box 81 is degraded by microorganisms in the soil to avoid affecting the growth of plant roots.
[0034] When in use, it is necessary to dig a foundation pit 2 around the side of the steep slope 3 on the bottom side of the mine body 1, and then put the water trough component 4 into the dug foundation pit 2. When rainwater is collected in the water collecting inclined pipe 48, it will flow into the water trough body 41 along the water collecting inclined pipe 48 to play a drainage role. The supporting horizontal column 42 connected to the inner wall of the water trough body 41 can improve the side bearing capacity of the water trough body 41, and increase the horizontal and vertical force bearing capacity of the water trough body 41 through the inclined main diagonal support column 43 and the secondary diagonal support column 44, so as to prevent the side of the water trough body 41 from collapsing due to the impact of the hillside sliding and affecting the drainage. Through the rapid drainage of rainwater, a large amount of water is prevented from penetrating the surface of the steep slope 3 and moving downward to cause landslides.
[0035] When the anti-blocking component 5 is installed to the corresponding position on the water tank component 4, the plug block 54 on the anti-blocking component 5 is aligned with the anti-blocking groove 410 opened on the water tank body 41, so that the plug block 54 is inserted into the anti-blocking groove 410, and the blocking cover plate 51 is attached to the side of the splicing strip 411, so that when the debris contained in the rainwater flows downward and passes through the blocking cover plate 51, it is blocked by the blocking block 53 at the top of the blocking cover plate 51, and the blocked blocking cover plate 51 increases the amount of water retained above, and the debris on the top of the blocking cover plate 51 is washed away along the side by the retained water, thereby preventing the debris from entering the water collecting inclined pipe 48 with the water to cause blockage, and avoiding affecting the normal drainage of the water collecting inclined pipe 48;
[0036] During installation, the connecting channel 61 needs to be matched with the strip groove 65 opened on the bottom side of the water tank body 41 through the channel inner groove 62 on the bottom side. At this time, the side of the connecting channel 61 will fit the top surface of the water tank body 41, and the nail column groove 49 on the water tank body 41 and the nail column groove 49 on the side of the connecting channel 61 are spliced. At this time, concrete mortar is poured into the spliced nail column groove 49, and the thickened steel nail is inserted into the nail column groove 49. After the concrete mortar is air-dried, it is fixed, and the upper strip 64 at the top of the connecting channel 61 is connected to the connecting member. The connection of the water tank body 41 on the side of the 9 can be directly matched, and the connecting groove 61 is used to increase the support of the water tank body 41 at the top and the bottom of the steep slope surface 3. When the water volume in the water tank body 41 at the connecting member 9 increases and is about to overflow, the connecting groove 61 connected to the water tank body 41 at the connecting member 9 is drained, and the water is discharged from the top of the steep slope surface 3 to the bottom of the water tank body 41 through the inner groove 62 of the channel in the connecting groove 61, thereby relieving excessive rainwater accumulation on the top of the steep slope surface 3 and relieving drainage pressure;
[0037] When the slope support component 7 is installed on the splicing strip 411, the arch support beam 71 is sleeved on the outside of the embedded steel bar 413 through the reinforcement groove 74 on the bottom side, and the mounting block 72 on the bottom side of the arch support beam 71 is aligned with the support splicing groove 412 and inserted, so that the embedded steel bar 413 is inserted into the reinforcement groove 74 and flush with the top surface of the splicing strip 411. At this time, the well-proportioned concrete mortar is poured from the grouting groove 75 on the side of the arch support beam 71, so that the concrete mortar enters the reinforcement groove 74 from the grouting groove 75 and fills the gap around the embedded steel bar 413. After the concrete mortar is air-dried, the fixation between the slope support component 7 and the gutter component 4 is completed. The arched structure of the arch support beam 71 improves the bearing capacity of the overall structure of the arch support beam 71, and the steep slope surface 3 is divided into equal-sized areas through the arch support beam 71. Thus, the part of the steep slope surface 3 that may be loosened is reinforced, so that plants can be planted in the arch support beam 71 later. The root system of the plants will reinforce the entire slope of the steep slope surface 3. The use of precast concrete components can shorten the construction period and improve the construction efficiency, thereby reducing the potential safety hazard of landslides caused by weather during long-term construction. At the same time, rainwater in the arch support beam 71 will accumulate in the diversion chute 76. In order to prevent excessive water seepage under the diversion chute 76, the excess rainwater is guided to flow into the top chute 78 through the diversion chute 76, and then diverted to the side flow chute 73 through the top chute 78, so that the rainwater on the side flow chute 73 is finally discharged through the water collecting inclined pipe 48. The water seepage in different places of the steep slope surface 3 is ensured to be consistent through drainage, which reduces the risk of landslides and is more conducive to plant growth.
[0038] When placing the planted plants containing soil in the arch support beam 71, the ecological restoration structure 8 needs to be placed on the fixed box block 77, and the plant soil is covered on the top of the ecological restoration structure 8, and fertilizer is placed in the fertilizer box 81 and sealed with a top plate 82. The fertilizer box 81 and the top plate 82 are made of degradable materials as a whole. When rainwater penetrates through the plant soil planted in the arch support beam 71 and reaches the top of the top plate 82, the accumulated rainwater penetrates through the leakage holes 83 on the top plate 82 into the fertilizer box 81, and the fertilizer box 81 is filled with fertilizer. The rainwater dissolves the fertilizer, and the rainwater containing the fertilizer seeps out from the bottom side of the fertilizer box 81, so that part of the rainwater containing the fertilizer seeps downward into the surface of the steep slope 3 to improve the soil quality, and part of the rainwater promotes the growth of plant roots and provides nutrients for the plant roots. By improving the soil quality below the surface of the infiltrated steep slope 3, the rooting and growth of plants is promoted, and the subsequent growth of plant roots is promoted to strengthen the soil quality. When the fertilizer in the fertilizer box 81 is almost consumed, the fertilizer box 81 is degraded by microorganisms in the soil to avoid affecting the growth of plant roots.
[0039] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A device for ecological restoration of steep rock slopes in a mine, comprising a mine body (1), characterized in that: A foundation pit (2) is arranged at the bottom side of the mine body (1), a steep slope surface (3) is arranged at the side of the mine body (1), a water trough component (4) is arranged at the inner side of the foundation pit (2), an anti-blocking component (5) is arranged above the water trough component (4), a side slope support component (7) is arranged on the side of the anti-blocking component (5) close to the steep slope surface (3), drainage pipe components (6) are arranged on the left and right sides of the slope support component (7), an ecological restoration structure (8) is arranged at the inner side of the slope support component (7), a connecting component (9) is arranged at the top side of the steep slope surface (3), and a connecting through hole (10) is opened at the bottom side of the connecting component (9); The water tank component (4) comprises a water tank body (41), the water tank body (41) being arranged on the inner wall of the foundation pit (2), the inner top of the water tank body (41) being fixedly connected to two supporting cross columns (42), a main diagonal support column (43) being arranged on the relatively distant side of the two supporting cross columns (42), a secondary diagonal support column (44) being arranged on the relatively close side of the two supporting cross columns (42), a fitting groove (45) being provided on the left side of the water tank body (41), a splicing protrusion (46) being fixedly connected to the right side of the water tank body (41), and the water tank body (41) being fixedly connected to the inner top of the water tank body (41). Two manhole cover support strips (47) are fixedly connected to the top of the inner wall of the trough body (41); a water collecting inclined pipe (48) is fixedly connected inside the trough body (41); nail column grooves (49) are provided on both sides of the top of the trough body (41); an anti-blocking splicing groove (410) is provided on the upper surface of the trough body (41); a splicing strip (411) is fixedly connected to the top of the rear side of the trough body (41); four supporting splicing grooves (412) are provided on the top surface of the splicing strip (411); and embedded steel bars (413) are fixedly connected to the top of the splicing strip (411); The anti-blocking component (5) comprises a blocking cover plate (51), an inner through groove (52) is provided on the rear side of the blocking cover plate (51), a blocking block (53) is fixedly connected to the rear side of the top end of the blocking cover plate (51), and an insert block (54) is fixedly connected to the bottom end of the blocking cover plate (51), and the insert block (54) is plug-connected to the anti-blocking groove (410); The drain pipe component (6) comprises a connecting channel (61), the connecting channel (61) being arranged on the side of the water tank body (41), the connecting channel (61) having an inner channel groove (62) therein, the bottom end of the connecting channel (61) being fixedly connected to a bottom strip (63), the top bottom surface of the connecting channel (61) being fixedly connected to an upper strip (64), the upper surface of the water tank body (41) being provided with a strip groove (65), the outer shape structure of the strip groove (65) and the inner channel groove (62) being mutually matched, and nail column grooves (49) being also provided on the left and right sides of the connecting channel (61); The slope support member (7) comprises an arch support beam (71), the arch support beam (71) being arranged above the splicing strip (411), the bottom surface of the arch support beam (71) being fixedly connected to four mounting blocks (72), the side surface of the arch support beam (71) being provided with a side flow groove (73), the bottom end of the arch support beam (71) being provided with a reinforcement groove (74), the top side surface of the side flow groove (73) being provided with a grouting groove (75), the left and right sides of the arch support beam (71) being provided with diversion inclined grooves (76), the inner walls of the arch support beam (71) being fixedly connected to fixed box blocks (77), the top front side surface of the arch support beam (71) being provided with a top groove (78), and the top of the arch support beam (71) being fixedly connected to a connecting steel bar (79).
2. The device for ecological restoration of high and steep rock slopes in mines according to claim 1 is characterized by: The main oblique support column (43) is fixedly connected to the inner bottom surface of the water tank body (41); the shape and structure of the splicing protrusion (46) and the matching groove (45) match each other; and the water collecting inclined pipe (48) is obliquely penetrated from the inner wall of the water tank body (41) to the top surface.
3. The ecological restoration device for high and steep rock slopes in mines according to claim 2 is characterized by: The reinforcing bar groove (74) is sleeve-connected with the embedded steel bar (413), the grouting groove (75) is connected with the reinforcing bar groove (74), the top groove (78) is connected with the side flow groove (73), and the connecting steel bar (79) is adapted to the outer shape and structure of the reinforcing bar groove (74).
4. The device for ecological restoration of high and steep rock slopes in mines according to claim 3 is characterized by: The ecological restoration structure (8) comprises a fertilizer box (81), the fertilizer box (81) being installed on the top side between two fixed box blocks (77), the top surface of the fertilizer box (81) being fixedly connected to a top plate (82), the top surface of the top plate (82) being provided with a plurality of water leakage holes (83) in an array, and the bottom surface of the fertilizer box (81) being provided with a plurality of water outlet holes (84) in an array.
5. The device for ecological restoration of high and steep rock slopes in mines according to claim 4 is characterized by: The connecting member (9) is sleeved and connected to the connecting steel bar (79) through the connecting through-hole (10) on the bottom side, and a grouting groove (75) is also provided on the top surface of the connecting member (9).
