The traction load scenario prediction data is reduced through power flow analysis and clustering algorithm, and extreme and typical scenarios are screened out, which solves the problems of conservatism and high calculation cost of load scenarios caused by failure to fully consider uncertainty in the existing technology, and achieves Effective data reduction and decision-making accuracy and reliability.

CN118643750BActive Publication Date: 2024-10-29SICHUAN ENERGY INTERNET RES INST TSINGHUA UNIV +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411116685.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-10-29
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

The existing technology fails to fully consider the uncertainty in the train operation process in traction load scenario prediction, resulting in the generated load scenarios becoming conservative and lacking sensitivity to actual load fluctuations, thereby weakening the accuracy and reliability of planning decisions. characteristics, and due to the large scale of load scenario prediction data considering uncertainty, the computing cost increases significantly, making it difficult to effectively reduce it.

Method used

By obtaining traction load scenario prediction data that takes into account power uncertainty and departure interval uncertainty, use power flow analysis to map train power to traction stations, and reduce secondary traction load scenario prediction data based on clustering algorithms to screen out extreme scenarios. and typical scenarios, reducing the amount of data and retaining key features.

Benefits of technology

It achieves effective reduction of prediction data considering uncertain traction load scenarios, reduces the computational burden in power system simulation and planning, simplifies the decision-making process, and ensures the accuracy and reliability of decision-making while retaining extreme and typical Key features of the scene.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118643750B_ABST
    Figure CN118643750B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of flexible DC traction power supply technology, and specifically to a method for reducing load scenarios in a traction power supply system, the method comprising: obtaining traction load scenario prediction data that takes into account power uncertainty and departure interval uncertainty; mapping the train power of the traction load scenario prediction data to the traction station based on power flow analysis to obtain secondary traction load scenario prediction data; reducing the secondary traction load scenario prediction data based on a clustering algorithm according to a preset load scenario scale; and screening out extreme scenarios and typical scenarios from the reduced secondary traction load scenario prediction data. The purpose is to solve the technical problem of a large scale of traction load scenario prediction data that takes into account uncertainty, reduce the traction load scenario prediction that takes into account uncertainty, and ensure that the reduced load scenario prediction data effectively restores the characteristics of the traction load scenario prediction data before the reduction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of flexible direct current traction power supply, and in particular to a method for reducing load scenarios in a traction power supply system. Background Art

[0002] In the field of planning and design of flexible DC traction power supply systems, accurate traction load scenario analysis is a key step to ensure system performance and economic benefits. The core of this link lies in the prediction and modeling of various potential load conditions in the electric traction system. This analysis is not limited to predicting the size of the load, but also covers the pattern of load changes over time, spatial distribution, and related uncertainty factors. The construction of traction load scenarios relies on a series of idealized operating condition settings, which comprehensively map out various load scenarios that the system may encounter. Therefore, the accuracy of load scenario prediction directly affects the reliability of planning decisions.

[0003] At present, two major strategies are commonly used in the field of engineering practice to generate high-quality traction load scenarios to assist the planning process. One is a load forecasting method based on measured data. This method is based on a large amount of historical measured data of existing lines. Through prediction models and cluster analysis, a characteristic model of the load scenario is constructed, and then the scenario is generated based on the characteristic model. The advantage of this method is that it can accurately reflect the load distribution characteristics based on a large amount of historical data, but it is limited by the availability and timeliness of measured data, which leads to certain limitations in the actual application of this method. The other is to use a more extensive load forecasting method based on simulation data calculation. This method obtains the simulated position and power of the train through traction calculation, and then combines the dynamic model of the power supply system to infer the position and power demand of the train under different operating conditions, and then synthesizes the load scenario; this method can provide more comprehensive load scenario data, but the existing technology does not fully consider the uncertainty in the train operation process when using this method, resulting in the generated load scenario tending to be conservative and lacking sensitivity to actual load fluctuations, thereby weakening the accuracy and reliability of planning decisions; therefore, it is necessary to obtain traction load scenario prediction data that takes into account the influence of uncertainty factors in train operation; however, since the scale of these load scenario prediction data considering uncertainty is large, it will lead to a significant increase in computing costs. Therefore, in order to reduce the computing burden, it is necessary to reduce the scale of load scenario prediction data. It is difficult for existing technologies to reduce these load scenario prediction data. To this end, we propose a load scenario reduction method for traction power supply systems. Summary of the invention

[0004] In order to solve the technical problem that the scale of traction load scenario prediction data considering uncertainty is large, the present invention reduces the traction load scenario prediction considering uncertainty and ensures that the load scenario prediction data after reduction effectively restores the characteristics of the traction load scenario prediction data before reduction; the present invention provides a load scenario reduction method for a traction power supply system, and the technical scheme adopted is as follows:

[0005] A method for reducing load scenarios in a traction power supply system, the method comprising:

[0006] Obtain traction load scenario prediction data considering power uncertainty and departure interval uncertainty;

[0007] Based on power flow analysis, the train power of the traction load scenario prediction data is mapped to the traction depot to obtain the secondary traction load scenario prediction data;

[0008] According to the preset load scenario scale, the secondary traction load scenario prediction data is reduced based on the clustering algorithm;

[0009] Extreme scenarios and typical scenarios are screened out from the secondary traction load scenario prediction data after reduction.

[0010] Furthermore, the traction load scenario prediction data considering the power uncertainty and the departure interval uncertainty is obtained, including:

[0011] Obtain train operation data and extract traction load scenario simulation data;

[0012] Conduct train power uncertainty analysis on traction load scenario simulation data and extract power analysis results;

[0013] Conduct uncertainty analysis on the traction load scenario simulation data and extract the analysis results of the departure interval;

[0014] Based on the power analysis results and the departure interval analysis results, traction load scenario prediction data is generated.

[0015] Furthermore, based on the power flow analysis, the train power of the traction load scenario prediction data is mapped to the traction station, and the secondary traction load scenario prediction data is obtained, including:

[0016] Construct a power flow model to extract the train node injection power and traction station node injection power of the traction power supply system;

[0017] The mapping relationship between the train node injection power and the traction depot node injection power is established using the nonlinear power flow equation;

[0018] The traction load scenario prediction data is reduced to a data matrix containing only traction load scenarios through mapping relationships.

[0019] Furthermore, a power flow model is constructed to extract the train node injection power and the traction station node injection power of the traction power supply system, including:

[0020] Obtain electrical parameters of the contact network and return network of the traction power supply system;

[0021] Construct an admittance matrix based on electrical parameters, and extract the train sub-matrix and traction sub-matrix in the admittance matrix;

[0022] The train node injection current and the traction depot node injection current are calculated by using the sub-matrices of the train and the traction depot and combining the node voltage column vector;

[0023] The train node injection power and the traction station node injection power are calculated based on the train node voltage, the traction station node voltage, the train node injection current and the traction station node injection current.

[0024] Furthermore, according to the preset load scenario scale, the secondary traction load scenario prediction data is reduced based on the clustering algorithm, including:

[0025] Preset the number of clusters, input the secondary traction load scenario prediction data and preset the load scenario scale;

[0026] Randomly initialize cluster centers;

[0027] The Euclidean distance between load scenarios is calculated, the secondary traction load scenario prediction data is classified according to Euclidean clustering, and the maximum average error is calculated;

[0028] Calculate the average scenario of each type of load scenario and update the cluster center;

[0029] Assign load scenarios to the new cluster centers and form new classification results. Continue to calculate the maximum average error until the maximum average error is the same and clustering is completed.

[0030] Furthermore, according to the preset load scenario scale, the secondary traction load scenario prediction data is reduced based on the clustering algorithm, and further includes:

[0031] Calculate the silhouette coefficient, cluster sum of squares, and DBI index for different numbers of clusters;

[0032] Use the elbow rule to observe the trend of cluster sum of squares and select the inflection point on the cluster sum of squares curve;

[0033] The optimal number of clusters is selected based on the inflection point on the cluster sum of squares curve, the mean value of the silhouette coefficient, and the minimum value of the DBI index.

[0034] Furthermore, extreme scenario screening includes:

[0035] The first extreme scenario causing the output voltage of the traction station to reach the minimum value or the maximum value is extracted from the secondary traction load scenario prediction data after curtailment.

[0036] Furthermore, extreme scenario screening also includes:

[0037] The second extreme scenario leading to the maximum and minimum values ​​of the traction load is extracted from the secondary traction load scenario prediction data after curtailment.

[0038] Furthermore, typical scenario screening includes:

[0039] A mixed integer linear programming model is constructed, whose goal is to minimize the increase in power consumption of the traction power supply system caused by the difference between the load scenario prediction data before and after considering power uncertainty and departure interval uncertainty, and to extract a set of typical scenarios.

[0040] Furthermore, the calculation method of the total power consumption of the traction power supply system under the load scenario prediction data considering power uncertainty and departure interval uncertainty is:

[0041] Traverse all clusters formed by the clustering algorithm, and traverse all load scenarios within each cluster;

[0042] Calculate the unit power consumption of the load scenario, select a load scenario as a typical scenario in each cluster according to the decision variables and constraints, and calculate the sum of the power consumption of all typical scenarios.

[0043] The present invention has the following beneficial effects:

[0044] The load scenario reduction method for a traction power supply system provided by the present invention, for traction load scenario prediction data considering power uncertainty and departure interval uncertainty, proposes mapping the train power of the traction load scenario prediction data to the traction station based on power flow analysis, and then reduces the secondary traction load scenario prediction data based on a clustering algorithm according to a preset load scenario scale. The clustering algorithm can identify similar scenarios and classify them into one category, thereby reducing the number of secondary traction load scenario prediction data; in the reduced scenario set, extreme scenarios and typical scenarios are further screened out, and finally the traction load scenario prediction data considering power uncertainty and departure interval uncertainty is reduced, thereby reducing the computational burden in power system simulation and planning, and simplifying the decision-making process; at the same time, the extreme scenarios and typical scenarios finally retained can effectively reflect the key features of the original data, ensuring the accuracy and reliability of decision-making. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0046] Figure 1 A schematic flow chart of a method for reducing load scenarios in a traction power supply system provided by an embodiment of the present invention;

[0047] Figure 2 A schematic diagram of a process for obtaining traction load scenario prediction data taking into account power uncertainty and departure interval uncertainty provided by an embodiment of the present invention;

[0048] Figure 3 A schematic diagram of a process for obtaining secondary traction load scenario prediction data provided by an embodiment of the present invention;

[0049] Figure 4 A schematic diagram of a process for reducing secondary traction load scenario prediction data using a clustering algorithm provided by an embodiment of the present invention;

[0050] Figure 5 A schematic diagram of the structure of a power flow model provided by an embodiment of the present invention;

[0051] Figure 6 A schematic diagram of three-dimensional distribution of load mapping results of a traction station provided by an embodiment of the present invention.

[0052] Figure 7 Provided for one embodiment of the present invention is a two-dimensional distribution diagram of the load mapping result of the traction station;

[0053] Figure 8 A schematic diagram of a cluster sum of squares curve provided by an embodiment of the present invention;

[0054] Fig. 9 A schematic diagram of a contour coefficient curve provided by an embodiment of the present invention;

[0055] Fig.10 A schematic diagram of a DBI index curve provided by an embodiment of the present invention;

[0056] Fig.11 A schematic diagram of performance comparison results of different clustering algorithms based on silhouette coefficient provided by an embodiment of the present invention;

[0057] Fig.12 An example of screening results for extreme scenarios provided by an embodiment of the present invention Figure 1 ;

[0058] Fig.13 An example of screening results for extreme scenarios provided by an embodiment of the present invention Figure 2 ;

[0059] Fig.14 A schematic diagram of typical scene screening results for original scenes provided by an embodiment of the present invention;

[0060] Fig.15 A schematic diagram of typical scenario screening results for load scenario prediction data considering uncertainty provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0061] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the following is a detailed description of the load scenario reduction method of a traction power supply system proposed by the present invention, its specific implementation method, structure, characteristics and effects, in combination with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "another embodiment" does not necessarily refer to the same embodiment. In addition, specific features, structures or characteristics in one or more embodiments may be combined in any suitable form.

[0062] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.

[0063] A specific scheme of a load scenario reduction method for a traction power supply system provided by the present invention is described in detail below with reference to the accompanying drawings.

[0064] See also Figure 1 , which shows a flow chart of a method for reducing load scenarios in a traction power supply system provided by an embodiment of the present invention, the method comprising:

[0065] Step S100: obtaining traction load scenario prediction data considering power uncertainty and departure interval uncertainty;

[0066] See also Figure 2 , step S100 specifically includes:

[0067] Step S110: acquiring train operation data and extracting traction load scenario simulation data;

[0068] Step S120: performing train power uncertainty analysis on the traction load scenario simulation data and extracting power analysis results;

[0069] Step S130: performing departure interval uncertainty analysis on the traction load scenario simulation data and extracting departure interval analysis results;

[0070] Step S140: Generate traction load scenario prediction data based on the power analysis results and the departure interval analysis results. For each train at the sampling time, the traction load scenario simulation data is combined with the random departure interval and train power uncertainty to generate traction load scenario prediction data. The final expression for generating traction load scenario prediction data is:

[0071] , (1)

[0072] In formula (1), represents a traction load scenario prediction data set; express Train in The simulated position at the time; Indicates Train in Simulation power at the time, express Train in The location at the moment, express Train in The power at the moment, express Train in The position after taking into account the random departure interval; express Train in The power after taking into account the random departure interval; express Train in The power uncertainty at the moment; Indicates that random departure intervals are taken into account; represents the sampling time; Indicates the total number of sampling moments; Indicates a train; represents the total number of trains; the goal of step S400 is to combine the power analysis results and the departure interval analysis results to generate prediction data for the traction load scenario, in which the results of train position, power and uncertainty analysis are integrated; the purpose of step S100 of the present application is to construct a traction load scenario prediction data set, which contains the predicted positions and powers of all trains at each sampling time, while taking into account the randomness of the departure interval and the uncertainty of power, Indicates that after considering the random departure interval back, The train's new position is set to its The simulated position at the time is because the randomness of the departure interval affects the time when the train arrives at the next location; This means that after considering the random departure interval After the power change, yes Train in The power uncertainty at a given moment reflects the possible random fluctuations in power. It is recorded in ,against The load scenario prediction data for each train includes the location and power information of the train and a description of how this information changes over time and is affected by uncertainty; it provides more refined traction load scenario prediction data, which can be used to optimize train scheduling strategies.

[0073] Since the above traction load scenario prediction data takes into account the power uncertainty and departure interval uncertainty of the train, the existing method is difficult to apply to the reduction of the above traction load scenario prediction data set; if the above traction load scenario prediction data set is directly used to verify the power supply capacity of the traction power supply system and calculate the power consumption, it will lead to low planning and design efficiency and increased calculation cost; for the above traction load scenario prediction data set, the traction load scenario prediction data can be expressed as the following matrix from the perspective of position and power data:

[0074] (2)

[0075] In formula (2), represents the traction load scenario prediction data matrix; To indicate the Train under each load scenario location; For the Train under each load scenario Power; represents the sampling time; the matrix contains the parameters of the positions and powers of multiple trains. Due to the discrete distribution of train positions, the existing methods are unable to perform scene reduction.

[0076] Step S200: Based on the power flow analysis, the train power of the traction load scenario prediction data is mapped to the traction depot to obtain the secondary traction load scenario prediction data; specifically, for the data matrix in the above formula (2), in the flexible DC traction power supply system, the electric energy from the public power grid is converted into electric energy by the traction depot and then supplied to the train running at a certain position on the line through the overhead line; since the position of the traction depot is generally fixed, the train power under different scenarios can be mapped to the traction depot, so as to facilitate the subsequent scenario reduction;

[0077] See also Figure 3 , step S200 specifically includes:

[0078] Step S210: construct a power flow model to extract the train node injection power and the traction station node injection power of the traction power supply system; for details, please refer to Figure 5 The power flow model of the flexible DC traction power supply system constructed in this embodiment mainly includes an upstream overhead contact network, a downstream return network, rails, a traction station and a locomotive (i.e., a train). Since the stray current to the ground of the return network is relatively small compared to the injection current of the overhead contact network, the influence of the stray current to the ground of the return network is ignored in this embodiment, and only the modeling of the overhead contact network is focused on;

[0079] Step S210 specifically includes:

[0080] Step S211: obtaining electrical parameters of the contact network and return network of the traction power supply system; at least including electrical parameters such as resistance, reactance and conductance;

[0081] Step S212: construct an admittance matrix based on electrical parameters, and extract the train sub-matrix and traction sub-matrix in the admittance matrix; construct the admittance matrix of the traction power supply system according to the electrical parameters obtained in step S211, the admittance matrix reflects the electrical connection relationship and electrical parameters between the nodes in the traction power supply system, and it is usually composed of self-admittance and mutual admittance, wherein the self-admittance is the admittance of the node itself to the ground, and the mutual admittance is the admittance of the interaction between the nodes; the construction of the admittance matrix is ​​based on Kirchhoff's law and circuit theory, and the electrical parameters of the contact network and the return network are converted into a matrix form, and the sub-matrices related to the train node and the traction sub-matrix are extracted from the overall admittance matrix, because the train and the traction sub-matrix are key nodes in the system, and their dynamics directly affect the operating state of the system;

[0082] Step S213: Calculate the train node injection current and the traction station node injection current by using the sub-matrices of the train and the traction station and combining the node voltage column vector. The expression is:

[0083] (3)

[0084] In formula (3), represents the train sub-matrix; represents the traction matrix; represents the node voltage column vector, i.e., the voltage values ​​of all nodes in the traction load system; represents the train node injected current; represents the node injection current of the traction station; the sub-matrices of the train and traction station are generated by the combined contact network and rail impedance; Equation (3) represents the relationship between node voltage and node current, which reflects the basic physical relationship between voltage, current and impedance in the circuit based on Ohm's law;

[0085] Step S214: Calculate the train node injection power and the traction station node injection power based on the train node voltage, the traction station node voltage, the train node injection current, and the traction station node injection current. The expression is:

[0086] (4)

[0087] In formula (4), Indicates the train node voltage, corresponding to Train nodes; Indicates the node voltage of the traction station, corresponding to A traction point node; represents the node injection current calculated by equation (3); represents the train node injection power; Indicates the power injected into the traction station node;

[0088] Step S220: Using the nonlinear power flow equation, a mapping relationship between the train node injection power and the traction station node injection power is established, and the expression is:

[0089] (5)

[0090] In formula (5), represents the injected power of the traction depot node; Formula (5) is obtained by using the known train node power And related matrix inverse operation and matrix multiplication, the power of the traction station node is calculated , the relationship between node voltage and power is found;

[0091] For ease of expression, the above formula (5) can also be restated in a more compact form:

[0092] (6)

[0093] In formula (6), Represents the mapping function from train power to traction depot power; the mapping function is nonlinear and can be obtained by solving the nonlinear power flow equation; that is, given the injected power of any train, the injected power of the corresponding traction depot can be mapped through this function;

[0094] Step S230: Reduce the traction load scenario prediction data to a data matrix containing only the traction load scenario through mapping relationships; specifically, through the above power flow analysis, the train power on the line can be mapped to each traction station, and the mapping relationship is shown in equations (5) and (6); It should be noted that in the flexible DC traction power supply system, the system-level control strategy has an important influence on the power flow distribution; this is because the control strategy determines the distribution method of power in the system, especially in the DC system, the control strategy is directly related to the regulation of voltage, current and power, which in turn affects the stability and efficiency of the system; the control strategy adopted by the flexible DC traction power supply system usually includes voltage control, current control and power control, etc. Different control objectives will lead to different system responses. For example, voltage control is to maintain the voltage level at a specific point in the system, while power control is to ensure that the transmitted active power or reactive power meets the demand; in the flexible DC traction power supply system, the control strategy is to maintain the voltage level at a specific point in the system, and the ... In the DC traction power supply system, the traction station (also called substation or converter station) usually adopts a constant voltage control method, which means that the output voltage of the traction station is set at a fixed value. No matter how the load changes, the system will try to maintain this voltage level. This control method is conducive to stable power supply and ensures that the train can obtain stable power supply under different load conditions; when performing power flow analysis, the capacity of the traction station node needs to be set to a larger value, which means that it is assumed that the traction station can provide more power than the actual demand to ensure that the traction station has sufficient voltage control capability and can maintain voltage stability even under high load or fault conditions. The larger capacity setting also provides a safety margin to prevent overload; therefore, it is necessary to set the capacity of the traction station node to a larger value during the solution process, preferably 3 times the rated capacity, and the classic Newton-Raphson method can be used for solution. The final load scenario is shown in the following formula:

[0095] (7)

[0096] In formula (7), represents a data matrix containing only the load scenario of the traction station; compared with the data matrix in formula (2), formula (7) only includes the load data of the traction station; in addition, since the power flow analysis of the traction load system is carried out, the voltage distribution results under different load scenarios can also be obtained And the current distribution results , these results are consistent with the reduced data matrix Having the same dimensionality means that each load scenario has a corresponding voltage and current distribution, which is crucial for understanding the behavior of the system under different load conditions.

[0097] Step S300: According to the preset load scenario scale, the secondary traction load scenario prediction data is reduced based on the clustering algorithm; specifically, since the data matrix scale of the traction load scenario contained in the above formula (7) is still large, it will cause a heavy calculation burden in the scenario-based planning, so it is further reduced; in order to ensure the calculation efficiency of scenario reduction, a clustering algorithm is used to reduce the load scenario, wherein the clustering algorithm can select the mean clustering algorithm, the hierarchical clustering algorithm, the density clustering algorithm, and the Gaussian clustering algorithm; in this embodiment, the mean clustering algorithm is taken as an example, and the algorithm flow chart of its application in traction load scenario reduction is shown in FIG. Figure 4 As shown; step S300 specifically includes:

[0098] Step S310: Select the number of clusters, input secondary traction load scenario prediction data and preset load scenario scale;

[0099] Step S320: inputting secondary traction load scenario prediction data and preset load scenario scale and cluster number;

[0100] Step S330: randomly initialize the cluster center, which is the representative point of each cluster;

[0101] Step S340: Calculate the Euclidean distance between load scenarios, classify the secondary traction load scenario prediction data according to Euclidean clustering, and calculate the maximum average error; Euclidean distance is a method for measuring the distance between two points in a multidimensional space. According to the size of the distance, each load scenario is assigned to the cluster where the nearest cluster center is located; the maximum average error is used to evaluate the stability of clustering and the representativeness of the cluster center;

[0102] Step S350: Calculate the average scenario of each category and update the cluster center; in each cluster, calculate the average value of all load scenarios and use it as the new cluster center. The cluster center is updated to better reflect the characteristics of the cluster to which it belongs, making the clustering more compact and representative;

[0103] Step S360: Assign load scenarios to new cluster centers and form new partitions, continue to calculate the maximum average error until the average errors are the same to complete clustering; continue to update cluster centers and reallocate scenarios until the cluster centers no longer change or reach a preset number of iterations, at which point it is considered that the optimal partition has been achieved; by reducing the number of scenarios through the clustering algorithm, the amount of data in the data matrix of the traction load scenarios can be further reduced. At the same time, the clustering algorithm retains the most representative scenarios, ensuring that the reduced data set can still reflect the complexity and uncertainty of the system. The reduced number of scenarios enables planners and engineers to focus more on analyzing and processing key scenarios, thereby making more efficient decisions.

[0104] In addition, when applying a clustering algorithm, choosing the optimal number of clusters is crucial for reducing load scenarios. The choice of the number of clusters affects the accuracy of data analysis and directly affects the final clustering results. If the number of clusters is not chosen properly, it may lead to inaccurate or meaningless reduction results for the secondary traction load scenario prediction data. For example, in the clustering results, if a certain type of traction load scenario differs too much, the clustering results cannot be applied. Therefore, it is necessary to evaluate the specified number of clusters to determine whether its selection is appropriate. In order to determine which clustering algorithm performs better in reducing the prediction data for the secondary traction load scenario, this application evaluates the performance of different clustering algorithms to achieve the selection of the optimal number of clusters. Three methods are selected in this application to evaluate the rationality of the clustering algorithm, namely the elbow rule, the silhouette coefficient method, and the DBI index method, specifically including:

[0105] (1) Calculate the silhouette coefficient of each load scenario. This coefficient is an effective indicator for evaluating the clustering effect. It combines the two factors of cohesion and separation. It can evaluate the clustering performance of different algorithms based on the same original data. Specifically, for a load scenario in a cluster, , its silhouette coefficient can be calculated by formula (8):

[0106] (8)

[0107] In formula (8), Representing load scenarios The silhouette coefficient; Representation sample The average distance to the nearest neighbor cluster reflects the separation between clusters; Representation sample The average distance to other samples in the cluster reflects the compactness of the cluster. The range of the silhouette coefficient is [−1, 1]. The closer it is to 1, the better the clustering effect.

[0108] (2) Calculate the DBI index (DaviesBouldin), the expression is:

[0109] (9)

[0110] In formula (9), represents the number of clusters; Indicates The average distance between all load scenarios in a cluster and the center scenario of the cluster; Indicates The center of the cluster; Indicates Clusters and The Euclidean distance of the center scene of each cluster; using the DBI index, the number of clusters corresponding to the minimum value is usually selected as the optimal number of clusters;

[0111] (3) Use the elbow rule to observe the changing trend of the cluster sum of squares and select the inflection point on the cluster sum of squares curve. The elbow rule is to determine the optimal number of clusters by plotting the change curve of the intra-cluster sum of squares with the number of clusters and using intuitive observation. The calculation formula of the intra-cluster sum of squares is as follows:

[0112] (10)

[0113] In formula (10), represents the number of clusters; It is The number of load scenarios in a cluster; Indicates The first load scenarios; It is The cluster centers of the clusters; Indicates The first Load scenario to The Euclidean distance between the cluster centers of the clusters; SSE is an indicator to measure the internal consistency of the clusters. The principle is that as the number of clusters increases, SSE will theoretically decrease. This is because more clusters mean smaller clusters, making the points in each cluster closer. However, when the number of clusters increases to a certain extent, the reduction in SSE will decrease significantly, forming an "elbow" effect, which means that additional clustering does not bring significant SSE improvement. The value is considered to be a reasonable number of clusters;

[0114] Through the above-mentioned selection index of the optimal number of clusters, the elbow rule, silhouette coefficient and DBI index are comprehensively considered to select an optimal number of clusters. Specifically, the rationality of the optimal number of clusters finally selected can be verified by evaluating indicators such as the compactness and separation of the clustering results. Finally, an optimal number of clusters is determined to execute the clustering algorithm. Through precise clustering, different types of load behaviors can be more accurately identified, thereby improving the accuracy of load scenario reduction.

[0115] Step S400: Filter out extreme scenarios and typical scenarios from the secondary traction load scenario prediction data after reduction; specifically, in scenario-based planning methods, attention is often paid to the extreme and typical characteristics of load scenarios; for example, when performing economic statistical calculations related to power consumption, carbon emissions, etc., it is usually performed under typical load scenarios, and it is generally believed that the system can operate for a long time under typical load scenarios; and when determining the site selection and capacity determination scheme, it is usually performed under extreme scenarios, because extreme conditions are the standard for testing whether the traction load system can operate safely and reliably. Under extreme conditions, the capacity and voltage indicators of the traction station are more likely to reach the limit value;

[0116] The extreme operating state of the system is usually related to the safe operation constraints of the system. The safe operation constraints include the allowable output voltage range and the allowable output power of the traction station. The allowable output voltage range of the traction station is usually determined by the modulation ratio of the converter equipment in the traction station, and the allowable output power of the traction station usually depends on the capacity of the traction station. The above-mentioned safe operation constraints are an important basis for extreme scenario screening. Extreme scenario screening specifically includes:

[0117] Step S410: extracting the first extreme scenario that causes the output voltage of the traction station to reach the minimum value or the maximum value from the secondary traction load scenario prediction data after the reduction;

[0118] Step S420: extracting the second extreme scenario leading to the maximum and minimum values ​​of the traction load from the reduced secondary traction load scenario prediction data;

[0119] The expression for filtering extreme scenarios is:

[0120] (11)

[0121] (12)

[0122] In formula (11) and formula (12), Indicates the screening of voltage extreme scenarios; Indicates the screening of extreme power scenarios; , It is a set of extreme operating scenarios related to the maximum and minimum voltage values ​​of the traction station; , It is a set of extreme operating scenarios related to the maximum and minimum values ​​of traction power; It means to solve the minimum value; Indicates the maximum value to be solved; extreme scenarios represent the maximum and minimum voltage or power requirements that the traction system may encounter; the identification of extreme scenarios helps to ensure the safety and reliability of the system under the worst conditions. By understanding the behavior of the system under extreme voltage and power requirements, safer protection mechanisms and control strategies can be designed to prevent system failures, thereby making more reasonable design decisions.

[0123] The principle of screening typical scenarios is to ensure that the difference between load scenarios before and after considering uncertainty is not too large; for example, for two groups of load scenarios, one group considers uncertainty and the other does not consider uncertainty, the system power consumption obtained by power supply calculation using these two groups of load scenario data should be as small as possible; the screening of typical scenarios specifically includes:

[0124] Step S430: construct a mixed integer linear programming model, the goal of which is to minimize the increase in power consumption of the traction power supply system caused by the difference between the load scenario prediction data before and after considering power uncertainty and departure interval uncertainty, and extract a typical scenario set; the objective function of the model is shown in the following formula:

[0125] (13)

[0126] In formula (13), It is the power consumption obtained by considering the load scenario statistics of uncertainty; is the power consumption obtained by the load scenario statistics without considering uncertainty; this objective function aims to minimize the system power consumption after considering uncertainty Compared with the system power consumption without considering uncertainty The load scenario without considering uncertainty is the simulated traction load scenario data in step S110;

[0127] The calculation method of the total power consumption of the traction power supply system under the load scenario prediction data considering power uncertainty and departure interval uncertainty is:

[0128] Step S431: traverse all clusters formed after the clustering algorithm is used, and traverse all load scenarios within each cluster;

[0129] Step S432: Calculate the unit power consumption of the load scenario according to the decision variables According to the constraints, a load scenario is selected as a typical scenario in each cluster, and the total power consumption of all typical scenarios is calculated. The expression is:

[0130] (14)

[0131] After the clustering algorithm in step 300, the load scenario matrix shown in formula (7) is finally divided into K clusters. These K clusters are respectively represented as ; Then the clusters obtained by clustering can be used and calculated by formula (14); In formula (14), G represents the number of load scenarios contained in each cluster; Represents a decision variable, with a value of 0 or 1. If the scenario is selected, it is 1, otherwise it is 0; Indicates The first The cost or unit power consumption of each load scenario; by traversing all clusters and all load scenarios in each cluster, determining which scenarios are selected based on the decision variables, and then adding up the costs or power consumption of the selected scenarios, the total power consumption of the system after considering uncertainty can be obtained. , and finally a set of load scenario data can be found so that the total power consumption of the system is minimized under uncertainty conditions;

[0132] Secondly, for the same cluster, the decision variables also need to satisfy the following constraints:

[0133] (15)

[0134] The constraint in formula (15) ensures that for each cluster, there is no duplication and all clusters are fully covered;

[0135] In summary, the screening of typical scenarios greatly reduces the amount of data that needs to be processed in scenario-based planning, reduces the calculation time, and the reduced number of scenarios enables planners and engineers to focus more on analyzing and processing key scenarios, thereby making more efficient decisions; the typical scenarios finally screened out retain the most representative and practical scenario information, ensuring that the reduced data set can still reflect the complexity and uncertainty of the system; at the same time, by minimizing the difference between the system power consumption after considering uncertainty and the power consumption without considering uncertainty, the system design can be optimized and energy waste can be reduced. The typical scenarios of power uncertainty and departure interval uncertainty are considered, which enhances the system's adaptability and robustness to uncertain conditions.

[0136] Next, in order to verify the effectiveness of the load scenario reduction method for the traction power supply system proposed in the present invention, this application provides a specific embodiment to verify the above load scenario reduction method:

[0137] In this specific implementation, the load scenario analysis of a part of the Tianjin Jing-Jin intercity railway is taken as an example to explore how to verify the above load scenario reduction method. The total length of the line is about 13 km. In terms of uncertainty description, the uncertainty of train power and departure interval is considered by the method described in step S100, and different time offsets are considered respectively. , that is, when uncertainty is not considered, ; When considering the uncertainty of departure interval, Take separately The standard deviation and mean of the normal distribution describing power uncertainty are assumed to be , confidence Take separately A series of values ​​that gradually increase in As increases, the uncertainty of train power distribution gradually decreases:

[0138] Table 1

[0139]

[0140] Table 1 records the relevant parameters of the traction load scenario analysis of Tianjin Jing-Jin Intercity Railway

[0141] First, see Figure 6 , Figure 7 As shown, Figure 6 The three-dimensional distribution of the load mapping result after step S200 is recorded in Figure 7 What is recorded is the two-dimensional distribution of the load mapping result of the traction after step S200; It can be understood that, based on the mapping method based on the flow analysis in step S200 of this application, the discrete variable of the train position in the traction load scenario is eliminated, thereby reducing the data dimension of the traction load.

[0142] Then, in order to evaluate whether the selection of the number of clusters is reasonable, this application also designs a case study for analysis and verification. In the case study of this application, the number of clusters preset for the test is First, we analyzed the data based on the mean clustering algorithm and plotted the intra-cluster sum of squares, silhouette coefficient, and DBI index versus the number of test clusters. Figure 8 , Fig. 9 and Fig.10 As shown in the figure, the evaluation results of cluster number selection under different methods are recorded respectively: Figure 8 The results show that when the number of test clusters is around 300, the intra-cluster sum of squares changes significantly. Specifically, when the number of test clusters is When the number of test clusters is Within the range, the intra-cluster sum of squares increases sharply; Fig. 9 The results in Figure 2 show that the value of the silhouette coefficient is larger when the number of test clusters is around 300; Fig.10 The results show that the minimum value of the DBI index also appears around 300. It is worth noting that Fig. 9 Still attached Fig.10 The extreme values ​​of the indicators in the figure do not appear exactly when the number of test clusters is 300. However, due to the small range of variation of the values ​​of the silhouette coefficient or DBI index indicators in the figure, it can still be considered that the number of test clusters 300 is the optimal number of clusters.

[0143] See also Fig.11 , Fig.11 The performance comparison results of different clustering algorithms based on the silhouette coefficient are recorded in the document; before performing scene reduction in step S300, it is necessary to select a suitable clustering algorithm. This application selects four clustering algorithms for comparison, including the mean clustering algorithm, the hierarchical clustering algorithm, the density clustering algorithm, and the Gaussian clustering algorithm; it can be understood that for different scenes, the performance of the mean clustering algorithm is relatively stable. For most scenes, the silhouette coefficient is in the range of 0.5-1.0, and the average value of the silhouette coefficient is 0.5732; for some scenes, the silhouette coefficient is negative; the performance of the hierarchical clustering algorithm is slightly better than that of the mean clustering algorithm, with an average silhouette coefficient of 0.5972; the performance of the Gaussian clustering algorithm is second, with an average silhouette coefficient of 0.3644; and the performance of the density clustering algorithm is poor; in terms of the execution time of different algorithms, the hierarchical clustering algorithm has the fastest execution time of 0.05s; the execution time of the mean clustering algorithm is second, which is 0.09s, and the execution time of the Gaussian clustering algorithm is the longest, which is 4.3s;

[0144] In order to verify the extreme scenario screening method described in step 400, the present application conducted a case analysis. In the case, three relatively serious traction station faults were considered. The faulty traction stations were traction stations 2, 3, and 4. First, the corresponding maximum power moments of the traction stations under various traction station faults were analyzed. When the above traction stations failed, the corresponding maximum power moments were 454s, 219s, and 219s, respectively. The results are shown in the attached figure. Fig.12 and 13 As shown in the attached Fig.12 and 13 From the results shown, in terms of peak power, the most extreme operating condition is when traction station 3 is out of operation and the load section is 219s, with a peak power of about 5.5MW. This shows that in this specific scenario, the system is under the greatest load pressure. The identified extreme scenarios reveal the vulnerability of the system in the face of specific faults, which helps to design more robust emergency response plans and redundant configurations to mitigate the impact of potential faults.

[0145] In addition, the model proposed in step S400 of this application screens typical scenarios. In order to verify the effectiveness of the model proposed in this article, 300 original load scenarios are randomly selected for comparison. Fig.14 and 15 As shown, Fig.14 Filter results for typical scenes of 300 original scenes, Fig.15 The figure shows the typical scenario screening results of the load scenario prediction data considering uncertainty; when using the mixed integer programming model to screen typical scenarios, power uncertainty and departure interval uncertainty were considered, and the final solution took 1.1779 seconds, and the objective function value was 241.3563MWs, which shows that considering uncertainty does bring additional energy consumption costs. This reminds us that in system design and operation, we must balance the risks brought by uncertainty and the additional costs incurred; it can be seen that by identifying extreme scenarios, the safety and reliability of the system can be enhanced to ensure that the system can still maintain basic operation under the most unfavorable conditions; the screening of typical scenarios helps to optimize the system design. By focusing on the most representative operating conditions, unnecessary complexity can be reduced, while ensuring that the system can effectively cope with normal operating conditions.

[0146] In summary, the load scenario reduction method for the traction power supply system provided in the present application, for the traction load scenario prediction data considering power uncertainty and departure interval uncertainty, proposes mapping the train power of the traction load scenario prediction data to the traction depot based on power flow analysis, and then reducing the secondary traction load scenario prediction data based on the clustering algorithm according to the preset load scenario scale. The clustering algorithm can identify similar scenarios and classify them into one category, thereby reducing the number of secondary traction load scenario prediction data; in the reduced scenario set, extreme scenarios and typical scenarios are further screened out, and finally the traction load scenario prediction data considering power uncertainty and departure interval uncertainty is reduced, thereby reducing the computational burden in power system simulation and planning, and simplifying the decision-making process; at the same time, the extreme scenarios and typical scenarios finally retained can effectively reflect the key characteristics of the original data, ensuring the accuracy and reliability of decision-making.

[0147] It should be noted that the sequence of the above embodiments of the present invention is for description only and does not represent the advantages and disadvantages of the embodiments. The processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0148] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.

Claims

1. A method for reducing load scenarios in a traction power supply system, characterized in that: The method comprises: Obtain traction load scenario prediction data considering power uncertainty and departure interval uncertainty; Based on power flow analysis, the train power of the traction load scenario prediction data is mapped to the traction depot to obtain the secondary traction load scenario prediction data, including: Construct a power flow model to extract the train node injection power and traction station node injection power of the traction power supply system, including: Obtain the electrical parameters of the contact network and return network of the traction power supply system; construct an admittance matrix based on the electrical parameters, and extract the train sub-matrix and traction sub-matrix in the admittance matrix; use the train and traction sub-matrices, combined with the node voltage column vector, to calculate the train node injection current and the traction sub-matrix injection current; calculate the train node injection power and the traction sub-matrix injection power based on the train node voltage, the traction sub-station node voltage, the train node injection current and the traction sub-station node injection current; The mapping relationship between the train node injection power and the traction depot node injection power is established using the nonlinear power flow equation; The traction load scenario prediction data is reduced to a data matrix containing only traction load scenarios through mapping relationships; According to the preset load scenario scale, the secondary traction load scenario prediction data is reduced based on the clustering algorithm, including: presetting the number of clusters, inputting the secondary traction load scenario prediction data and the preset load scenario scale; randomly initializing the cluster center; calculating the Euclidean distance between the load scenarios, classifying the secondary traction load scenario prediction data according to the Euclidean clustering, and calculating the maximum average error; calculating the average scenario of each type of load scenario, and updating the cluster center; assigning the load scenario to the new cluster center and forming a new classification result, and continuing to calculate the maximum average error until the maximum average error is the same to complete the clustering; calculating the silhouette coefficient, cluster sum of squares and DBI index under different cluster numbers; using the elbow rule to observe the changing trend of the cluster sum of squares, and selecting the inflection point on the cluster sum of squares curve; based on the inflection point on the cluster sum of squares curve, the mean of the silhouette coefficient and the minimum value of the DBI index, selecting the optimal number of clusters; Extreme scenarios and typical scenarios are screened out from the secondary traction load scenario prediction data after reduction.

2. The load scenario reduction method for the traction power supply system according to claim 1, characterized in that: Obtain traction load scenario prediction data that takes into account power uncertainty and train headway uncertainty, including: Obtain train operation data and extract traction load scenario simulation data; Conduct train power uncertainty analysis on traction load scenario simulation data and extract power analysis results; Conduct uncertainty analysis on the traction load scenario simulation data and extract the analysis results of the departure interval; Based on the power analysis results and the departure interval analysis results, traction load scenario prediction data is generated.

3. The load scenario reduction method for a traction power supply system according to any one of claims 1 to 2, characterized in that: Extreme scenario screening includes: The first extreme scenario causing the output voltage of the traction station to reach the minimum value or the maximum value is extracted from the secondary traction load scenario prediction data after curtailment.

4. The method for reducing load scenarios of a traction power supply system according to claim 3, characterized in that: Extreme scenario screening also includes: The second extreme scenario leading to the maximum and minimum values ​​of the traction load is extracted from the secondary traction load scenario prediction data after curtailment.

5. The method for reducing load scenarios of a traction power supply system according to claim 4, characterized in that: Typical scenario screening includes: A mixed integer linear programming model is constructed, whose goal is to minimize the increase in power consumption of the traction power supply system caused by the difference between the load scenario prediction data before and after considering power uncertainty and departure interval uncertainty, and to extract a set of typical scenarios.

6. The method for reducing load scenarios of a traction power supply system according to claim 5, characterized in that: The calculation method of the total power consumption of the traction power supply system under the load scenario prediction data considering power uncertainty and departure interval uncertainty is: Traverse all clusters formed by the clustering algorithm, and traverse all load scenarios within each cluster; Calculate the unit power consumption of the load scenario, select a load scenario as a typical scenario in each cluster according to the decision variables and constraints, and calculate the sum of the power consumption of all typical scenarios.

Citation Information

Patent Citations

  • Power transmission channel expansion planning method considering uncertain factors and scene reduction

    CN109978404A

  • IIES risk avoidance optimization method and system considering renewable energy uncertainty

    CN115271445A