A real-time monitoring system for power tower settlement based on the Internet of Things

Through the real-time monitoring system for power tower settlement based on the Internet of Things, the settlement of power towers is monitored and analyzed in real time, the risk level is assessed and maintenance instructions are generated, which solves the problem of unreasonable resource allocation in the existing technology and improves the monitoring and control of power towers. Maintenance efficiency reduces risks.

CN118654633BActive Publication Date: 2024-10-29ZHANGYE POWER SUPPLY COMPANY OF STATE GRID GANSU ELECTRIC POWER

Patent Information

Application Number
CN202411127685.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-10-29
Estimated Expiration
2044-08-16

AI Technical Summary

Technical Problem

The existing power tower monitoring system is difficult to reasonably allocate maintenance resources based on settlement conditions, resulting in excessive attention to low-risk towers, increasing the workload of staff, and affecting monitoring and maintenance efficiency.

Method used

Adopt a real-time monitoring system for power tower settlement based on the Internet of Things, including a positioning module, a monitoring module, a settlement analysis module and a maintenance early warning module, to monitor and analyze the settlement of power towers in real time, assess the risk level, and generate corresponding maintenance instructions for reasonable allocation. Maintain resources.

Benefits of technology

Through real-time monitoring and risk assessment, it ensures that high-risk towers receive adequate attention, reduces the risk of power supply interruption and equipment damage due to settlement or collapse, reduces unexpected failures and emergency repair needs, and improves the stability and safety of power supply. sex.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118654633B_ABST
    Figure CN118654633B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of electric pole towers, and specifically is a real-time monitoring system for settlement of electric pole towers based on the Internet of Things, comprising: a positioning module: the positioning module is used to obtain the coordinates of the electric pole tower at the initial position; a monitoring module: the monitoring module is used to monitor the position information of the electric pole tower; real-time monitoring of the surface settlement, deep settlement, external displacement and stress strain of the iron tower, and grasping the structural changes of the slope; a settlement analysis module: the settlement analysis module is used to analyze the position information of the electric pole tower of the monitoring module; a maintenance early warning module; reasonable allocation of maintenance resources to ensure that pole towers with high risk levels receive sufficient attention while avoiding excessive investment in low-risk pole towers; determining the stability and safety of the electric pole tower, reducing the risk of power outage and equipment damage caused by settlement or collapse of the pole tower, and the level division is conducive to the implementation of preventive maintenance strategies, and reduces the need for unexpected failures and emergency repairs by identifying potential problems at an early stage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of power pole towers, and in particular to a real-time monitoring system for settlement of power pole towers based on the Internet of Things. Background Art

[0002] Power poles and towers are important structures used by power systems to support transmission lines. They suspend high-voltage wires above the ground to ensure that electricity is safely and efficiently transmitted from power stations to various power consumption areas. Due to natural disasters and geological factors, power poles and towers may experience problems such as settlement, displacement and tilt, which may lead to power outages or even tower collapse in severe cases. Therefore, real-time monitoring of power poles and towers is required.

[0003] The prior art also proposes some solutions for monitoring power poles and towers. For example, a patent application with publication number CN115550757A discloses a monitoring and early warning system for power distribution poles and towers. The system includes: a positioning data acquisition module, an acceleration sensor and an information processing module. The positioning data acquisition module is used to collect positioning data of the first preset position of the distribution pole tower and send it to the information processing module; the acceleration sensor is used to collect acceleration data of the second preset position of the distribution pole tower and send it to the information processing module. The invention senses the physical deformation of the distribution pole online, analyzes the collected data, parses the positioning data, and adapts to prompts of various early warning information. The electronic archive information of the distribution pole tower is integrated through the platform to provide technical support for front-line inspection personnel, grasp the operation status of the power grid, and improve the quality of power supply services.

[0004] Although the above technical solution can provide early warning information when power poles and towers sink, there are still other problems in its specific use. For example, it is difficult to reasonably allocate maintenance resources according to the settlement of power poles and towers, resulting in excessive attention to some low-risk power poles and towers, increasing the workload of staff and being unfavorable to the monitoring and maintenance of power poles and towers.

[0005] To this end, the present invention provides a real-time monitoring system for power tower settlement based on the Internet of Things. Summary of the invention

[0006] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.

[0007] The technical solution adopted by the present invention to solve the technical problem is: a real-time monitoring system for power tower settlement based on the Internet of Things described in the present invention comprises:

[0008] Positioning module: The positioning module is used to obtain the coordinates of the power tower at the initial position;

[0009] Monitoring module: The monitoring module is used to monitor the location information of the power tower; monitor the surface settlement, deep settlement, external displacement and stress strain of the tower in real time, and grasp the structural changes of the slope;

[0010] Settlement analysis module: The settlement analysis module is used to analyze the power tower location information of the monitoring module;

[0011] Maintenance warning module: The maintenance warning module is used to generate and output instructions for maintenance when the power tower sinks;

[0012] The settlement analysis module is also used to evaluate the risk level when the power tower settles:

[0013] Establish the mutual mapping relationship between the settlement analysis module and the maintenance warning module, specifically:

[0014] Calculate the settlement rate from the initial position to the position of the power tower after settlement ; It should be noted that when calculating the settlement rate of the power tower, the monitoring module has detected that the power tower has partially settled;

[0015] Pre-set minimum sedimentation rate threshold and the highest threshold ;

[0016] Calculate the inclination of power towers ;

[0017] Pre-set the minimum inclination threshold of power towers and the highest threshold ;

[0018] like , , it is a level 1 minor risk, and a signal is generated and transmitted to the maintenance warning module;

[0019] like , , it is judged as a level 2 medium risk, and a signal is generated and transmitted to the maintenance warning module;

[0020] like , , it is judged as a level 2 medium risk, and a signal is generated and transmitted to the maintenance warning module;

[0021] like , , it is judged as a level 3 serious risk, and a signal is generated and transmitted to the maintenance warning module;

[0022] Surface settlement refers to the vertical displacement of the ground or a structure surface, that is, the sinking of the ground or structure surface relative to a reference plane (such as an initial position or reference point).

[0023] Preferably, the settlement rate from the initial position to the position of the power tower after settlement is The specific calculation method is:

[0024] The positioning module obtains the coordinates of the initial position of the power pole tower, including: obtaining the coordinates of the power pole tower in the initial installation period (stable period) ;

[0025] Real-time monitoring of the location coordinates of power towers ;

[0026] Calculate the settlement rate from the initial position to the position of the power tower after settlement :

[0027] ;

[0028] in It is the value on the Z axis of the power tower coordinates during a certain period of time;

[0029] is the value on the Z axis of the power tower coordinates in the next period;

[0030] is the time difference between adjacent measurement cycles;

[0031] The inclination of the power tower The specific calculation method is:

[0032] ;

[0033] Where h is the actual height of the power tower;

[0034] is the difference in the x-axis coordinates of the power tower within an adjacent period;

[0035] It is the difference in the y-axis coordinates of the power tower within an adjacent period.

[0036] Preferably, the maintenance warning module includes instructions generated including first-level maintenance instructions, second-level maintenance instructions and third-level maintenance instructions, and the first-level maintenance instructions, second-level maintenance instructions and third-level maintenance instructions are used to correspond to different settlement risks, specifically:

[0037] like , , generate and output first-level maintenance instructions;

[0038] like , ,or , , generate and output secondary maintenance instructions;

[0039] like , , generate and output three-level maintenance instructions.

[0040] Preferably, the measures taken by the first-level maintenance instruction, the second-level maintenance instruction and the third-level maintenance instruction are specifically:

[0041] The maintenance measures of the first-level maintenance instruction include regular visual inspection, recording settlement data and periodic minor repairs;

[0042] The maintenance measures of the second-level maintenance instructions include frequent inspections;

[0043] The maintenance measures of the third-level maintenance instruction include the need for emergency intervention.

[0044] Preferably, the settlement analysis module includes a soil analysis unit, a groundwater analysis unit and a tower structure unit;

[0045] The soil analysis unit is used to analyze whether the physical properties of the soil at the bottom of the tower are normal when the second-level medium risk and the third-level severe risk occur;

[0046] The groundwater analysis unit is used to analyze whether the groundwater of the tower is normal when the second-level medium risk and the third-level severe risk occur;

[0047] The tower structure unit is used to analyze whether the tower strength is normal when the second-level medium risk and the third-level severe risk occur:

[0048] The soil analysis includes: testing the physical properties of the soil, including soil density, water content, porosity, etc., to evaluate the bearing capacity and stability of the soil;

[0049] The groundwater analysis includes: monitoring the change of groundwater level and evaluating the impact of groundwater on the tower foundation;

[0050] The tower structure analysis includes: performing corrosion tests on the tower structure.

[0051] Preferably, the soil analysis unit includes testing the physical properties of the soil, specifically:

[0052] Get soil porosity ;

[0053] The soil porosity threshold is preset as ; The soil porosity threshold It is obtained by staff according to seasonal changes;

[0054] like , then the signal is transmitted to the groundwater analysis unit;

[0055] like , then the signal is transmitted to the groundwater analysis unit and maintenance warning module;

[0056] The groundwater analysis unit comprises:

[0057] Get the water level change rate ;

[0058] Pre-set water level change rate threshold ; The water level change rate threshold It is obtained by staff according to seasonal changes;

[0059] like , then the signal is transmitted to the tower structure unit;

[0060] like , then the signal is transmitted to the tower structure unit and maintenance warning module;

[0061] The tower structure unit comprises:

[0062] Obtain the tower surface corrosion rate ;

[0063] Pre-set tower surface corrosion threshold ; The tower surface corrosion threshold It is obtained by staff based on historical experience;

[0064] like , no signal is generated;

[0065] like , the signal is transmitted to the maintenance warning module.

[0066] Preferably, the soil porosity The calculation is as follows:

[0067] ;

[0068] Among them, soil porosity refers to the proportion of pore space in the soil, expressed as a percentage;

[0069] Soil specific gravity Also called soil density or soil particle density, it refers to the mass of dry soil particles per unit volume, usually expressed in grams per cubic centimeter. It indicates the density of soil particles, excluding pore air or moisture; soil specific gravity The method of obtaining the soil specific gravity is as follows: first collect soil samples, dry the collected soil samples, and then remove non-soil particles such as stones from the dried soil samples by screening or flotation. Then, divide the mass of the soil particles and the volume of the soil particles to obtain the soil specific gravity. ;

[0070] Soil bulk density It refers to the original soil per unit volume.

[0071] Preferably, the water level change rate The calculation is as follows:

[0072] ;

[0073] in, and is the water level at two different time points;

[0074] and For the corresponding time.

[0075] Preferably, the groundwater analysis unit is also used to analyze whether the upper and lower amplitude values ​​of the groundwater level within a unit period are normal, and is calculated by the formula:

[0076] ;

[0077] Where f is the water level fluctuation amplitude;

[0078] is the water level observed at the ith time per unit time;

[0079] is the number per unit time in the groundwater monitoring cycle;

[0080] It is the average value of groundwater level during the monitoring period;

[0081] The larger the value, the more it indicates that the groundwater fluctuates abnormally during the monitoring period, and a signal is generated and transmitted to the maintenance warning module.

[0082] Preferably, the tower surface corrosion rate The calculation is as follows:

[0083] ;

[0084] in is the thickness loss on the tower surface at two different time points;

[0085] is the difference between two corresponding time points.

[0086] The beneficial effects of the present invention are as follows:

[0087] 1. The real-time monitoring system for power tower settlement based on the Internet of Things described in the present invention can reasonably allocate maintenance resources through the real-time monitoring system of the present invention to ensure that towers with high risk levels receive sufficient attention while avoiding excessive investment in low-risk towers; determine the stability and safety of power towers, reduce the risks of power outages and equipment damage caused by tower settlement or collapse, and the level classification helps to implement preventive maintenance strategies, reduce unexpected failures and the need for emergency repairs by identifying potential problems at an early stage.

[0088] 2. The real-time monitoring system for settlement of power poles and towers based on the Internet of Things described in the present invention can automatically update the settlement threshold of power poles and towers according to different seasons and different environments through the real-time monitoring system of the present invention, thereby ensuring that power poles and towers in different environments and different seasons can also be well monitored. BRIEF DESCRIPTION OF THE DRAWINGS

[0089] The present invention will be further described below in conjunction with the accompanying drawings.

[0090] Figure 1 It is a system diagram of the present invention. DETAILED DESCRIPTION

[0091] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0092] Power poles and towers are important structures used by the power system to support transmission lines. They suspend high-voltage wires above the ground to ensure safe and efficient transmission of electricity from power stations to various power consumption areas. Due to natural disasters and geological factors, power poles and towers may experience problems such as settlement, displacement and tilt, which may lead to power outages or even tower collapse in serious cases. Therefore, real-time monitoring of power poles and towers is required to provide early warning and processing before problems occur, in order to ensure the stability and safety of power supply.

[0093] like Figure 1 As shown, a real-time monitoring system for settlement of a power pole tower based on the Internet of Things according to an embodiment of the present invention includes a positioning module, a monitoring module, a settlement analysis module and a maintenance warning module; wherein the positioning module is used to obtain the coordinates of the power pole tower at the initial position;

[0094] The monitoring module is used to monitor the location information of the power tower; monitor the surface settlement, deep settlement, external displacement and stress strain of the tower in real time, and grasp the structural changes of the slope;

[0095] The settlement analysis module is used to analyze the power tower location information of the monitoring module;

[0096] The maintenance warning module is used to generate and output instructions for maintenance when the power tower sinks;

[0097] The settlement analysis module is also used to evaluate the risk level when the power tower settles:

[0098] Establish the mutual mapping relationship between the settlement analysis module and the maintenance warning module, specifically:

[0099] Calculate the settlement rate from the initial position to the position of the power tower after settlement ; It should be noted that when calculating the settlement rate of the power tower, the monitoring module has detected that the power tower has partially settled;

[0100] Pre-set minimum sedimentation rate threshold and the highest threshold ; The minimum and maximum thresholds of sedimentation rate are set by staff according to different seasons and environments;

[0101] Calculate the inclination of power towers ;

[0102] Pre-set the minimum inclination threshold of power towers and the highest threshold , where the minimum and maximum thresholds of the inclination of the power tower are set by the staff according to different seasons and different environments;

[0103] like , , it is a level 1 minor risk, and a signal is generated and transmitted to the maintenance warning module;

[0104] like , , it is judged as a level 2 medium risk, and a signal is generated and transmitted to the maintenance warning module;

[0105] like , , it is judged as a level 2 medium risk, and a signal is generated and transmitted to the maintenance warning module;

[0106] like , , it is judged as a level 3 serious risk, and a signal is generated and transmitted to the maintenance warning module;

[0107] Surface settlement refers to the vertical displacement of the ground surface or a structure surface, that is, the sinking of the ground surface or structure surface relative to a certain reference plane (such as the initial position or reference point);

[0108] Deep subsidence refers to the vertical displacement of soil or rock at a deeper level underground due to various reasons;

[0109] Specifically, when power poles and towers sink, there are three risk levels. The first level is a slight risk, which corresponds to a small amount of settlement of the power poles and towers. The reason for this may be that the soil is relatively moist on rainy days. At this time, only staff need to observe regularly. The second level is a medium risk, which corresponds to excessive settlement or excessive deflection of the power poles and towers. At this time, staff are required to maintain the power poles and towers themselves. Analysis; the third level is a serious risk, which corresponds to both the settlement and deflection of the power poles and towers exceeding the standard. At this time, the power poles and towers should be reinforced or replaced in time, and then the groundwater of the power poles and the tower structure themselves should be monitored. This can reasonably allocate maintenance resources and is conducive to the use of power poles and towers.

[0110] In the above embodiment, the maintenance warning module outputs corresponding maintenance instructions based on the risk level, thereby reminding the staff to perform corresponding maintenance work.

[0111] The settlement rate from the initial position to the position of the power tower after settlement The specific calculation method is:

[0112] The positioning module obtains the coordinates of the initial position of the power pole tower, including: obtaining the coordinates of the power pole tower in the initial installation period (stable period) ;

[0113] Real-time monitoring of the location coordinates of power towers ;

[0114] Calculate the settlement rate from the initial position to the position of the power tower after settlement :

[0115] ;

[0116] in It is the value on the Z axis of the power tower coordinates during a certain period of time;

[0117] is the value on the Z axis of the power tower coordinates in the next period;

[0118] is the time difference between adjacent measurement cycles;

[0119] The inclination of the power tower The specific calculation method is:

[0120] ;

[0121] Where h is the actual height of the power tower;

[0122] is the difference in the x-axis coordinates of the power tower within an adjacent period;

[0123] It is the difference in the y-axis coordinates of the power tower within an adjacent period.

[0124] Specifically, the settlement rate of the power tower is calculated based on the vertical height of the current position. Given the initial coordinates of the power tower , by recording the real-time coordinates of power towers , where the real-time coordinates are calculated by receiving satellite signals through the GNSS receiver. The GNSS receiver, the tilt sensor and the camera are installed at the appropriate position of the tower. The GNSS receiver is used to receive satellite signals and provide accurate location information; the tilt sensor is used to monitor the tilt angle changes of the tower; the camera is used to monitor the environment around the tower and the condition of the tower itself in real time;

[0125] The inclination of the power tower is calculated based on the inverse tangent function. When the tangent value of the angle is known, the corresponding angle can be found through the inverse tangent function. In this way, the settlement rate and inclination of the power tower can be mapped to the risk level of the settlement of the power tower.

[0126] The maintenance warning module includes instructions generated including first-level maintenance instructions, second-level maintenance instructions and third-level maintenance instructions, and the first-level maintenance instructions, second-level maintenance instructions and third-level maintenance instructions are used to correspond to different settlement risks, specifically:

[0127] like , , generate and output first-level maintenance instructions;

[0128] like , ,or , , generate and output secondary maintenance instructions;

[0129] like , , generate and output three-level maintenance instructions;

[0130] It should be noted that corresponding response measures are formulated according to the risk level. For example, a level 1 minor risk corresponds to a level 1 maintenance instruction. When a level 1 maintenance instruction is received, the staff only needs to regularly monitor the corresponding power towers.

[0131] Level 2 medium risk corresponds to level 2 maintenance instructions. When receiving level 2 maintenance instructions, staff need to strengthen monitoring frequency and maintenance;

[0132] Level 3 serious risks correspond to level 3 maintenance instructions. When receiving level 3 maintenance instructions, staff need to take immediate measures, such as tower reinforcement or relocation, to adjust the tower status and avoid subsequent continuous settlement.

[0133] Rationally allocate maintenance resources to ensure that high-risk towers receive adequate attention while avoiding overinvestment in low-risk towers; determine the stability and safety of power towers to reduce the risk of power outages and equipment damage caused by tower settlement or collapse. Classification helps implement preventive maintenance strategies to reduce unexpected failures and the need for emergency repairs by identifying potential problems early;

[0134] Regularly review and update thresholds and risk level classifications to adapt to new monitoring data and changes in the external environment;

[0135] The specific measures taken by the first-level maintenance instructions, second-level maintenance instructions and third-level maintenance instructions are:

[0136] The maintenance measures of the first-level maintenance instruction include regular visual inspection, recording settlement data and periodic minor repairs;

[0137] For low-risk towers, regular visual inspections can help detect visible damage, corrosion, illegal climbing or other abnormal conditions on the towers, and regularly record the settlement data of the towers to monitor whether settlement has occurred or whether the settlement rate is within the control range;

[0138] Carry out minor repairs on the tower, including tightening bolts, cleaning debris around the tower foundation, repairing small cracks, etc.;

[0139] The maintenance measures of the Level 2 maintenance order include frequent inspections, such as biweekly structural inspections and settlement monitoring;

[0140] Regular structural integrity inspections are conducted on medium-risk towers to assess the tower's load-bearing capacity and structural stability;

[0141] The maintenance measures of the third-level maintenance instructions include the need for emergency intervention, such as immediate reinforcement or replacement of towers;

[0142] For high-risk towers, immediately conduct detailed structural and geological assessments to determine the current state and potential risks of the towers, and if possible, take temporary reinforcement measures, such as the use of support structures or emergency repairs, to stabilize the towers until more thorough repairs can be carried out, based on the geological engineering assessment to determine the stability of the tower foundations and possible foundation reinforcement measures;

[0143] For poles and towers with higher risk levels, detailed technical assessments are carried out, including soil analysis and structural strength testing. Maintenance resources are rationally allocated based on the risk level to ensure that high-risk poles and towers receive priority attention.

[0144] The settlement analysis module includes a soil analysis unit, a groundwater analysis unit and a tower structure unit;

[0145] The soil analysis unit is used to analyze whether the physical properties of the soil at the bottom of the tower are normal when the second-level medium risk and the third-level severe risk occur;

[0146] The groundwater analysis unit is used to analyze whether the groundwater of the tower is normal when the second-level medium risk and the third-level severe risk occur;

[0147] The tower structure unit is used to analyze whether the tower strength is normal when the second-level medium risk and the third-level severe risk occur:

[0148] The soil analysis includes: testing the physical properties of the soil, including soil density, water content, porosity, etc., to evaluate the bearing capacity and stability of the soil;

[0149] Using synthetic aperture radar interferometry technology, monitor the surface settlement before the tower foundation deforms and becomes unstable, and obtain the distribution of ground settlement; test the chemical properties of the soil, such as pH value, salt content, etc., to understand the corrosiveness and chemical stability of the soil;

[0150] The groundwater analysis includes: monitoring the change of groundwater level and evaluating the impact of groundwater on the tower foundation;

[0151] The tower structure analysis includes: performing corrosion tests on the tower structure;

[0152] It should be noted that when the power tower has a second-level medium risk or a third-level severe risk, it is necessary to regularly detect abnormalities in the soil, groundwater near the power tower, and the tower itself;

[0153] First: If the power tower has a secondary risk, first test and analyze the soil through the soil analysis unit, then test and analyze the groundwater, and then test and analyze the surface corrosion of the tower, and then determine the corresponding maintenance measures based on the comprehensive judgment of the three. Among them, if there is a problem in one of the secondary and tertiary risks, such as a problem with the soil, that is, the soil is relatively loose, then it is only necessary to stabilize the bottom of the tower to make the soil at the bottom of the tower more solid;

[0154] If there is a problem with the groundwater level, that is, the groundwater level is high, the tower foundation needs to be reinforced, and drainage measures can also be used to reduce the immersion of water sources on the tower foundation;

[0155] If the corrosion of the power tower itself is serious, specific improvement measures can be determined according to the corrosion situation, such as rust removal, etc. In serious cases, the tower needs to be replaced;

[0156] It should be noted that when the groundwater level is high, it will often affect the humidity of the soil. That is, when the humidity is high, it will also cause the settlement of the power tower. If the porosity of the soil is detected to be high at this time, the power tower should be reinforced in time.

[0157] When all three have problems, at this time, on the premise of first stabilizing the power pole tower, it is also necessary to determine whether the power pole tower can be used normally, whether it needs to be replaced or strengthened;

[0158] It is also necessary to clarify that when analyzing soil and groundwater, it is necessary to review historical data regularly and update thresholds and risk level classifications according to different seasons to adapt to new monitoring data and external environmental changes, so as to facilitate the stability of power towers;

[0159] For example, in the summer when there is more rainfall, when the monitoring module detects that the power pole tower is sinking and the generated output signal is a second-level maintenance instruction, after the staff conducts on-site survey, they find that the subsequent rainfall will continue to cause the power pole tower to sink, and the amount of settlement will cause a third-level serious danger. At this time, it indicates that the corresponding danger threshold can no longer output the third-level maintenance instruction in advance. At this time, the power pole tower should be repaired in time with the third-level maintenance instruction and the threshold should be updated. For example, in the summer, the minimum threshold of the settlement rate of the power pole tower can be appropriately lowered. and the highest threshold , to ensure that the maintenance warning module can better receive different maintenance instructions;

[0160] For example, in special geological environments, such as salt lake areas, due to the dissolution and corrosion of saline soil and human engineering activities, ground subsidence may occur within a certain day. In advance, the dissolution of saline soil and its corrosion rate on power towers should be used to change the different threshold instructions of power towers to ensure that the danger level of power towers can accurately correspond to maintenance instructions; in these areas, the minimum threshold of the settlement rate of power towers can be appropriately lowered. and the highest threshold And the minimum inclination threshold of power towers and the highest threshold , to ensure that the maintenance warning module can better receive different maintenance instructions;

[0161] For example, in winter, not only will the surface of power poles freeze, but in some seasonally frozen areas, not only must non-expanding materials, slope foundations or pile foundations be used for the foundations of power poles, but it is also necessary to check for hidden dangers in transmission line channels based on ice disasters in previous years, and automatically adjust the danger threshold based on the amount of rain and snow to ensure the subsequent safe and stable operation of the power grid and reliable electricity for residents; in these areas, the minimum threshold for the inclination of power poles can be appropriately lowered and the highest threshold , to ensure that the maintenance warning module can better receive different maintenance instructions.

[0162] The soil analysis unit includes testing the physical properties of the soil, specifically:

[0163] Get soil porosity ;

[0164] The soil porosity threshold is preset as ; The soil porosity threshold It is obtained by staff according to seasonal changes;

[0165] like , then the signal is transmitted to the groundwater analysis unit;

[0166] like , then the signal is transmitted to the groundwater analysis unit and maintenance warning module;

[0167] Soil porosity: soil density. The arrangement and structure of soil particles affect density. When soil porosity is abnormal, the following situations will occur:

[0168] First, too high soil porosity may reduce soil bearing capacity and affect the stability of the tower foundation. The size of soil porosity indicates the looseness of the soil and the size of its water and air capacity. Too high porosity may lead to insufficient soil compactness, thus affecting the bearing capacity of the tower.

[0169] Second, abnormal soil porosity may increase the settlement rate of the tower. The size of the soil porosity determines the storage and movement of water in the soil. Too high a porosity may lead to excessive water, increase the soil's collapsibility, and affect the stability of the tower.

[0170] Third, abnormal soil porosity may increase the risk of soil erosion and water loss, affecting the stability of the tower foundation. Rainwater falling on the soil can cause the dispersion of aggregates, mechanical damage and compaction, affecting the porosity of the soil.

[0171] The groundwater analysis unit comprises:

[0172] Get the water level change rate ;

[0173] Pre-set water level change rate threshold ; The water level change rate threshold It is obtained by staff according to seasonal changes;

[0174] like , then the signal is transmitted to the tower structure unit;

[0175] like , then the signal is transmitted to the tower structure unit and maintenance warning module;

[0176] The tower structure unit comprises:

[0177] Obtain the tower surface corrosion rate ;

[0178] Pre-set tower surface corrosion threshold ; The tower surface corrosion threshold It is obtained by staff based on historical experience;

[0179] like , no signal is generated;

[0180] like , then the signal is transmitted to the maintenance warning module;

[0181] It should be noted that when the pole tower has a secondary moderate risk and a third severe risk, the specific situation of the secondary moderate risk and the third severe risk is determined by comprehensively judging the soil porosity, the change rate of groundwater and the corrosion rate of the pole tower; if the soil porosity and the groundwater change rate are abnormal, but the corrosion rate of the pole tower is not abnormal, then it is only necessary to stabilize the pole tower from the bottom;

[0182] If the tower is tilted and the reason is caused by changes in soil porosity and groundwater, it can be adjusted in the following ways:

[0183] First, straighten the tower by adjusting the tension of the tower's guy wires;

[0184] Second, the tower is raised by adding pads to increase the base surface of the inner corner of the tower, and the joints are filled with cement mortar;

[0185] Third, the tower can be straightened by tightening bolts;

[0186] Fourth, for the problem of slope instability, engineering measures such as anchoring and support can be adopted to strengthen it, and comprehensive assessment and treatment can be carried out in combination with influencing factors such as rainfall;

[0187] When the soil porosity and groundwater change rate are normal, but the tower corrosion is abnormal, the corroded parts of the tower need to be thoroughly derusted. For severely corroded towers, structural reinforcement or replacement of corroded parts is required to ensure the stability and bearing capacity of the tower.

[0188] The compressibility of the soil determines the degree to which the soil volume decreases under load. High compressibility will lead to greater settlement. Insufficient shear strength of the soil may cause shear deformation and settlement under the load of the tower. Chemical substances in the soil (such as sulfates, chloride ions, etc.) may corrode the tower foundation materials and reduce their bearing capacity. The permeability of the soil affects the flow of water. Soil with high permeability may cause rapid water loss, causing soil shrinkage and settlement. The size and distribution of soil particles affect the porosity and drainage capacity of the soil, which in turn affects settlement. In seasonally frozen areas, the frost heave and thaw settlement of the soil may cause instability in the tower foundation.

[0189] The soil porosity The calculation is as follows:

[0190] ;

[0191] Among them, soil porosity refers to the proportion of pore space in the soil, expressed as a percentage;

[0192] Soil specific gravity Also called soil density or soil particle density, it refers to the mass of dry soil particles per unit volume, usually expressed in grams per cubic centimeter. It indicates the density of soil particles, excluding pore air or moisture; soil specific gravity The method of obtaining the soil specific gravity is as follows: first collect soil samples, dry the collected soil samples, and then remove non-soil particles such as stones from the dried soil samples by screening or flotation. Then, divide the mass of the soil particles and the volume of the soil particles to obtain the soil specific gravity. ;

[0193] Soil bulk density It refers to the mass of the original soil per unit volume (including solid particles and pores), also expressed in grams per cubic centimeter, including the soil solid particles and the pores therein; soil bulk density The method of obtaining the soil is as follows: collect soil samples and keep the collected soil samples in their original state to maintain the natural structure of the soil. Then, measure the volume of the soil and divide the soil sample mass by the soil sample volume to obtain the soil bulk density. ;

[0194] It should be noted that when monitoring soil porosity, the threshold needs to be automatically set according to the current seasonal changes. ,as well as The calculation method is that the density and particle density of the soil will change in different seasons. At the same time, it should be noted that when collecting soil, the sampling depth, location or time of the soil should be correct, so that the soil porosity can be calculated. The calculation is used to facilitate the subsequent maintenance of power towers according to the risks in different situations.

[0195] The water level change rate The calculation is as follows:

[0196] ;

[0197] in, and is the water level at two different time points;

[0198] and is the corresponding time;

[0199] It should be noted that the water level change rate When monitoring, it is also necessary to check whether the water level changes in different seasons exceed the normal seasonal fluctuation range, where the normal seasonal fluctuation range refers to the range of natural rise and fall due to seasonal changes (such as rainfall, drought, snowmelt, etc.) in a year. For example, in the rainy season, increased rainfall will lead to increased groundwater recharge and rising groundwater levels; in the dry season, reduced rainfall may cause groundwater levels to drop.

[0200] When the water level change rate When an abnormality occurs, it may cause changes in soil moisture at the contact position with the tower. The height of the groundwater level affects the saturation of the soil, and then affects the bearing capacity and settlement potential of the soil. When this happens, the tower foundation needs to be reinforced, and the specific foundation reinforcement methods are: leveling the foundation, setting temporary guy wires, operating the zipper hoist to adjust the position of the tower legs, and backfilling and removing tools after the foundation pit is reinforced or other measures are taken to keep the foundation pit stable.

[0201] The groundwater analysis unit is also used to analyze whether the upper and lower amplitude values ​​of the groundwater level in a unit period are normal, and is calculated by the formula:

[0202] ;

[0203] Where f is the water level fluctuation amplitude;

[0204] is the water level observed at the ith time per unit time;

[0205] is the number per unit time in the groundwater monitoring cycle;

[0206] It is the average value of groundwater level during the monitoring period;

[0207] The larger the f value is, the more it indicates that the groundwater fluctuates abnormally during the monitoring period, and a signal is generated and transmitted to the maintenance warning module;

[0208] It should be noted that by calculating the groundwater level fluctuation amplitude f within a certain period, the larger the f value is, the more abnormal the groundwater level amplitude is within the current period, that is, the water level change may be a long-term fluctuation. The certain period can be within one month, and the calculation is performed every two days within one month, where n is the number of two days in a month. It is the average of the sum of the water level values ​​detected every two days; when the groundwater level is abnormal, the bearing capacity and stability of the foundation can be improved by various technical means such as earth and stone filling, vibration compaction, and cast-in-place pile reinforcement; and it should be noted that when there are seasonal changes, the groundwater may rise suddenly during the rainy season. At this time, some drainage measures can be formulated to drain the rising groundwater away from the tower to ensure the safety of the tower.

[0209] The tower surface corrosion rate The calculation is as follows:

[0210] ;

[0211] in is the thickness loss on the tower surface at two different time points;

[0212] is the difference between two corresponding time points;

[0213] Chemical substances in the soil (such as sulfates, chloride ions, etc.) may corrode the tower foundation materials and reduce their bearing capacity; and rainwater and pollutants in the atmosphere will also corrode the galvanized layer on the tower foundation surface. First, record the tower surface thickness at one time point. , and then record the tower surface thickness at the next time point , this time point can be once every half a month, the difference between the two time points is calculated, and the ratio calculation with the difference of the time points is performed to obtain the surface corrosion rate of the tower within a certain period;

[0214] It should be noted that if the corrosion rate on the tower surface When the surface of the pole tower is high, in addition to rust removal, anti-corrosion coatings should also be applied to the surface of the pole tower, which usually includes three layers: primer, intermediate paint and topcoat. The primer uses zinc-rich paint to increase adhesion, the intermediate paint serves as a transition layer, and the topcoat uses weather-resistant materials such as epoxy resin or polyurethane, thereby improving the corrosion resistance of the power pole tower and extending its service life.

[0215] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A real-time monitoring system for power tower settlement based on the Internet of Things, characterized by: include: Positioning module: The positioning module is used to obtain the coordinates of the power tower at the initial position; Monitoring module: The monitoring module is used to monitor the location information of power towers; Settlement analysis module: The settlement analysis module is used to analyze the power tower location information of the monitoring module; Maintenance warning module: The maintenance warning module is used to generate and output instructions for maintenance when the power tower sinks; The settlement analysis module is also used to evaluate the risk level when the power tower settles: Establish the mutual mapping relationship between the settlement analysis module and the maintenance warning module, specifically: Calculate the settlement rate from the initial position to the position of the power tower after settlement ; Pre-set minimum sedimentation rate threshold and the highest threshold ; Calculate the inclination of power towers ; Pre-set the minimum inclination threshold of power towers and the highest threshold ; like , , it is a level 1 minor risk, and a signal is generated and transmitted to the maintenance warning module; like , , it is judged as a level 2 medium risk, and a signal is generated and transmitted to the maintenance warning module; like , , it is judged as a level 2 medium risk, and a signal is generated and transmitted to the maintenance warning module; like , , it is judged as a level 3 serious risk, and a signal is generated and transmitted to the maintenance warning module; The settlement rate from the initial position to the position of the power tower after settlement The specific calculation method is: The positioning module obtains the coordinates of the initial position of the power tower, including: obtaining the coordinates of the power tower at the initial installation stage ; Real-time monitoring of the location coordinates of power towers ; Calculate the settlement rate from the initial position to the position of the power tower after settlement : ; in It is the value on the Z axis of the power tower coordinates during a certain period of time; is the value on the Z axis of the power tower coordinates in the next period; is the time difference between adjacent measurement cycles; The inclination of the power tower The specific calculation method is: ; Where h is the actual height of the power tower; is the difference in the x-axis coordinates of the power tower within an adjacent period; is the difference in the y-axis coordinates of the power tower within an adjacent period; The maintenance warning module includes instructions generated including first-level maintenance instructions, second-level maintenance instructions and third-level maintenance instructions, and the first-level maintenance instructions, second-level maintenance instructions and third-level maintenance instructions are used to correspond to different settlement risks, specifically: like , , generate and output first-level maintenance instructions; like , ,or , , generate and output secondary maintenance instructions; like , , generate and output three-level maintenance instructions; The specific measures taken by the first-level maintenance instructions, second-level maintenance instructions and third-level maintenance instructions are: The maintenance measures of the first-level maintenance instruction include regular visual inspection, recording settlement data and periodic minor repairs; The maintenance measures of the second-level maintenance instructions include frequent inspections; The maintenance measures of the third-level maintenance instructions include the need for emergency intervention; The settlement analysis module includes a soil analysis unit, a groundwater analysis unit and a tower structure unit; The soil analysis unit is used to analyze whether the physical properties of the soil at the bottom of the tower are normal when the second-level medium risk and the third-level severe risk occur; The groundwater analysis unit is used to analyze whether the groundwater of the tower is normal when the second-level medium risk and the third-level severe risk occur; The tower structure unit is used to analyze whether the tower strength is normal when the second-level medium risk and the third-level severe risk occur: The soil analysis includes: testing the physical properties of the soil, including soil density, water content, porosity, etc., to evaluate the bearing capacity and stability of the soil; The groundwater analysis includes: monitoring the change of groundwater level and evaluating the impact of groundwater on the tower foundation; The tower structure analysis includes: performing corrosion tests on the tower structure; The soil analysis unit includes testing the physical properties of the soil, specifically: Get soil porosity ; The soil porosity threshold is preset as ; like , then the signal is transmitted to the groundwater analysis unit; like , then the signal is transmitted to the groundwater analysis unit and maintenance warning module; The groundwater analysis unit comprises: Get the water level change rate ; Pre-set water level change rate threshold ; like , then the signal is transmitted to the tower structure unit; like , then the signal is transmitted to the tower structure unit and maintenance warning module; The tower structure unit comprises: Obtain the tower surface corrosion rate ; Pre-set tower surface corrosion threshold ; like , no signal is generated; like , the signal is transmitted to the maintenance warning module.

2. According to the Internet of Things-based real-time monitoring system for power tower settlement according to claim 1, it is characterized in that: The soil porosity The calculation is as follows: ; Among them, soil porosity refers to the proportion of pore space in the soil, expressed as a percentage; Soil specific gravity Also called soil density or soil particle density, it refers to the mass of dry soil particles per unit volume; Soil bulk density It refers to the original soil per unit volume.

3. According to the Internet of Things-based real-time monitoring system for power tower settlement according to claim 1, it is characterized in that: The water level change rate The calculation is as follows: ; in, and is the water level at two different time points; and For the corresponding time.

4. The real-time monitoring system for power tower settlement based on the Internet of Things according to claim 3 is characterized in that: The groundwater analysis unit is also used to analyze whether the upper and lower amplitude values ​​of the groundwater level in a unit period are normal, and is calculated by the formula: ; Where f is the water level fluctuation amplitude; is the water level observed at the ith time per unit time; is the number per unit time in the groundwater monitoring cycle; It is the average value of groundwater level during the monitoring period; The larger the f value is, the more it indicates that the groundwater fluctuates abnormally during the monitoring period, and a signal is generated and transmitted to the maintenance warning module.

5. The real-time monitoring system for power tower settlement based on the Internet of Things according to claim 1 is characterized in that: The tower surface corrosion rate The calculation is as follows: ; in is the thickness loss on the tower surface at two different time points; is the difference between two corresponding time points.

Citation Information

Patent Citations

  • Electric power distribution tower monitoring and early warning system

    CN115550757A

  • Electric tower monitoring system and electric tower monitoring method applied to electric tower monitoring system

    CN115540940A

  • Power transmission tower on-line monitoring system and monitoring method

    CN116358628A

Cited By

  • Iron tower settlement monitoring and energy-saving early warning system based on laser scanning technology

    CN121783084A