A method for monitoring building construction safety
By collecting and processing data of objects transported at high altitudes in real time at the construction site, the hazard index and risk assessment warning values are calculated, and the hazardous areas are dynamically adjusted, the problem of lack of intelligent early warning in the existing technology is solved, and high altitude transportation is achieved Intelligent monitoring and early warning of objects improve construction safety and accuracy.
Patent Information
- Application Number
- CN202411133182.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-08-19
AI Technical Summary
The existing construction safety monitoring methods lack intelligent hazard monitoring and early warning mechanisms, resulting in the failure to be analyzed and warned in time, resulting in misjudgment or misjudgment, and the life safety of construction personnel cannot be effectively guaranteed.
The data acquisition module collects coordinates, speed, acceleration and wind speed data of objects transported at high places, combines the fusion processing module and monitoring module to calculate the hazard index, hazardous area radius and risk assessment warning value, and use the warning response module to issue early warning information. Adjust the range of hazardous areas and set up multi-level warning signals.
Comprehensive, real-time and intelligent monitoring of high-altitude transport objects construction scenarios has been achieved, reducing the subjectivity of human judgment, improving the accuracy and objectivity of hazard identification, and promptly warnings to ensure construction safety.
Smart Images

Figure CN118654734B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction safety monitoring, and in particular to a building construction safety monitoring method. Background Art
[0002] During the construction process, safety monitoring of the construction site is an important link, especially when transporting objects at heights, such as tower crane hoisting and crane operations. During these operations, once the transported objects are out of control or improperly operated, it is very easy to cause high-altitude falling object accidents, posing a serious threat to the lives and safety of construction workers. In order to cope with this adverse situation, effective safety monitoring of operations of transporting objects at heights is required.
[0003] The existing methods for monitoring the safety of transported objects currently rely on multiple groups of cameras to monitor the work scene, and arrange monitoring personnel to observe the work screen in the monitoring room. The monitoring personnel judge whether the high-altitude construction site is safe and the scope of the safe area, etc. However, in actual applications, when monitoring the video, the monitoring personnel mostly make subjective judgments on the degree of danger of the scene. The lack of objectivity may cause misjudgment or missed judgment, and relying on manual operations may not be able to effectively monitor multiple scenes at the same time, and thus may not be able to make an immediate response.
[0004] In addition, existing monitoring methods may lack intelligent hazard monitoring and early warning mechanisms, and may be unable to analyze potential dangers and send out signals in advance, resulting in poor practicality. Summary of the invention
[0005] The purpose of the present invention is to provide a construction safety monitoring method to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above object, the present invention provides the following technical solution: a construction safety monitoring method, comprising the following monitoring method:
[0007] The data acquisition module collects coordinate data, speed data, acceleration data and mass data of objects transported at high altitudes at the construction site, as well as wind speed data in the construction site area;
[0008] The collected coordinate data, speed data, acceleration data and mass data of the high-altitude transport object, as well as the wind speed data of the construction site area are input into the fusion processing module, and the fusion processing module outputs the center point coordinates of the high-altitude transport object, the speed vector of the high-altitude transport object, the acceleration vector of the high-altitude transport object, the weight of the transport object and the on-site wind speed;
[0009] The center point coordinates of the high-altitude transport object, the velocity vector of the high-altitude transport object, the acceleration vector of the high-altitude transport object, the weight of the transport object and the on-site wind speed are input into the monitoring module, and the monitoring module outputs the danger index, the radius of the danger zone and the risk assessment warning value;
[0010] The risk assessment warning value is input into the warning response module, and the warning response module detects the risk assessment warning value. When the risk assessment warning value is abnormal, the warning response module sends a warning message to the on-site construction personnel.
[0011] Optionally, the monitoring module includes: a danger level submodule, a danger area submodule, a danger assessment submodule and a regulation submodule.
[0012] Optionally, the danger level submodule processing process is as follows:
[0013] Input the center coordinates (x, y, z) of the high-altitude transport object, the velocity vector (x a ,y a , z a ) and the acceleration vector of the object being transported at a height (a x , a y , a z ), and based on the on-site wind speed UGAA and the weight of the transported object UGAB, output the danger index UGA. The specific formula used is as follows:
[0014] ;
[0015] X1=A2×(x a 2 +y a 2 +z a 2 );
[0016] X2=A3×(a x 2 +a y 2 +a z 2 );
[0017] in:
[0018] A1, A2, A3, A4 and A5 are (x 2 +y 2 +z 2 )、(x a 2 +y a 2 +z a 2 )、(a x2 +a y 2 +a z 2 ), weight coefficients of UGAA and UGAB;
[0019] X1 refers to the degree of dangerous change due to speed, and X2 refers to the degree of dangerous change due to acceleration.
[0020] Optionally, the dangerous area submodule processing process is as follows:
[0021] Based on the velocity vector (x a ,y a , z a ) and the acceleration vector of the object being transported at a height (a x , a y , a z ), and input the initial safety distance UGBA and reaction time T, and output the radius UGB of the danger zone. The specific formula used is as follows:
[0022] UGB=UGBA+UGBB×T+(UGBC / 2)×T 2 ;
[0023] ;
[0024] ;
[0025] in:
[0026] UGBB refers to the magnitude of the velocity vector, and UGBC refers to the magnitude of the acceleration vector;
[0027] UGBA+UGBB×T refers to the radius of the danger zone where the object moves within the reaction time;
[0028] (UGBC / 2)×T 2 Refers to the degree to which acceleration affects the change in position of an object during reaction time.
[0029] Optionally, the risk assessment submodule processing process is as follows:
[0030] Based on the danger index UGA and the radius of the danger zone UGB, α and β are input to limit the weight of the danger index UGA and the radius of the danger zone UGB, and the risk assessment warning value UGC is output. The specific formula used is as follows:
[0031] UGC=α×UGA+[β×(UGB-UGBA)] / (UGB+μ);
[0032] in:
[0033] μ refers to a positive number to prevent the denominator from being zero;
[0034] α×UGA refers to the comprehensive contribution of UGA.
[0035] Optionally, the processing process of the regulation submodule is as follows:
[0036] S1: If UGC>TH, then run S2;
[0037] If UGC≤TH, S2 will not be executed;
[0038] S2:A2 new =A2+φ(UGC-TH);
[0039] To set loop limits:
[0040] Limitation 1: |A2 new -A2|<0.02, then stop the loop;
[0041] Limitation 2: If the current number of loops is ≥ 10, the loop will stop;
[0042] When any one of the constraints 1 and 2 is satisfied, the loop terminates and the convergence condition is achieved;
[0043] in:
[0044] TH=50;
[0045] A2 new After the loop (x a 2 +y a 2 +z a 2 )’s weight coefficient;
[0046] Based on the difference between the risk assessment warning value UGC and the comparison threshold TH as the influencing factor, the rate of change of A2 is controlled by adjusting the coefficient φ, and input A2 to output A2 new , A2 new Replace A2 in the criticality submodule to adjust the criticality index UGA and achieve loop termination of A2 based on loop limits.
[0047] Optionally, the processing process of the early warning response module is as follows:
[0048] S1: Input UGC into the early warning response module. If UGC>85, the risk probability level 1 is output, and a red warning light and high-frequency warning sound are emitted at the construction site;
[0049] S2: Input UGC into the early warning response module. If 40<UGC≤80, the risk probability level 2 is output, and a purple warning light and high-frequency warning sound are emitted at the construction site;
[0050] S3: Input UGC into the early warning response module. If 10<UGC≤40, the risk probability level 3 is output, and a blue warning light and low-frequency prompt sound are emitted at the construction site;
[0051] S4: Input UGC into the early warning response module. If UGC ≤ 10, the output is the fourth level of risk occurrence probability, and a green warning light is emitted at the construction site.
[0052] Optionally, the devices used in the data acquisition module are a high-definition camera, a GPS positioning device, an acceleration sensor, a weight sensor and a wind speed sensor.
[0053] Compared with the prior art, the present invention has the following beneficial effects:
[0054] 1. The detection module of the present invention calculates the danger index through the danger level submodule. The danger index is an indicator based on multiple risk factors to evaluate the danger level at a certain moment or in a certain area. Therefore, a more comprehensive and accurate danger index can be obtained. The danger index reflects the danger level of the construction scene of high-altitude transportation objects in real time. The quantitative index can ensure the real-time monitoring and reduce the subjectivity of human judgment based on data analysis, thereby improving the accuracy and objectivity of danger identification.
[0055] 2. The detection module of the present invention calculates the radius of the danger zone through the danger zone sub-module. The radius of the danger zone can be accurately delineated through monitoring video and on-site data, so as to clarify which areas construction personnel should avoid entering, and can dynamically adjust the scope of the danger zone according to the progress of construction and changes in the site. Through the changes in the radius of the danger zone, management personnel can reasonably allocate resources such as safety warning signs and protective facilities, thereby ensuring the maximization of the safety protection effect, and calculate the clear scope of the danger zone to remind construction personnel to always be vigilant.
[0056] 3. The detection module of the present invention calculates the risk assessment warning value through the hazard assessment submodule. The calculation of the risk assessment warning value comprehensively considers the status of the objects transported at high altitudes and environmental factors to conduct a comprehensive risk assessment, and can set different levels of warning signals according to the results of the risk assessment, so as to ensure that relevant personnel can take corresponding measures in time, provide scientific decision-making basis for project managers, and avoid misjudgment and missed judgment caused by a single factor.
[0057] 4. The detection module of the present invention calculates A2 through the control submodule, and affects the speed-related values in the danger level submodule through the risk assessment warning value, thereby enhancing the weight of the monitoring indicators related to speed, and the real-time response capability helps to quickly identify and respond to potential safety risks. By dynamically adjusting the weight, the safety monitoring system can accurately capture the impact of speed-related risk factors on the overall safety situation. BRIEF DESCRIPTION OF THE DRAWINGS
[0058] Figure 1 This is a flow chart of the steps of the building construction safety monitoring method;
[0059] Figure 2 This is a schematic diagram of the overall structure of the building construction safety monitoring method;
[0060] Figure 3 This is a structural diagram of the monitoring module of the building construction safety monitoring method. DETAILED DESCRIPTION
[0061] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0062] The present construction safety monitoring method is different from the existing construction safety monitoring method. In the existing construction safety monitoring method, there will be construction scenes of objects being transported at high places. In order to prevent the harm of falling objects from high altitudes to construction workers, it is necessary to install monitoring equipment at the construction site to monitor the objects being transported at high places to prevent construction workers from entering dangerous areas. However, when monitoring the surveillance video, the monitoring personnel often manually judge the degree of danger of the scene, which lacks objectivity and may lead to incorrect judgments due to subjective factors.
[0063] The algorithm unit of this construction safety monitoring method uses the Internet of Things technology and cooperates with a variety of sensor equipment to comprehensively collect and organize multiple data on the construction site, and can automatically process monitoring information in real time, and continuously monitor the movement trajectory and status of objects transported at high altitudes. Once an abnormal situation is found, the early warning mechanism is immediately triggered to ensure that dangerous events can be discovered and handled in time, thereby eliminating the influence of human factors on the judgment results and improving the objectivity and accuracy of the judgment. By building an intelligent hazard monitoring and early warning system, comprehensive, real-time and intelligent monitoring of construction scenes of objects transported at high altitudes is achieved, effectively preventing the occurrence of high-altitude falling object accidents and ensuring the safety of the lives of construction workers.
[0064] Example 1: Please refer to Figures 1 to 3 , this implementation provides a construction safety monitoring method, including the following monitoring methods:
[0065] The data acquisition module collects coordinate data, speed data, acceleration data and mass data of objects transported at high altitudes at the construction site, as well as wind speed data in the construction site area;
[0066] The collected coordinate data, speed data, acceleration data and mass data of the high-altitude transport object, as well as the wind speed data of the construction site area are input into the fusion processing module, and the fusion processing module outputs the center point coordinates of the high-altitude transport object, the speed vector of the high-altitude transport object, the acceleration vector of the high-altitude transport object, the weight of the transport object and the on-site wind speed;
[0067] The center point coordinates of the high-altitude transport object, the velocity vector of the high-altitude transport object, the acceleration vector of the high-altitude transport object, the weight of the transport object and the on-site wind speed are input into the monitoring module, and the monitoring module outputs the danger index, the radius of the danger zone and the risk assessment warning value;
[0068] The risk assessment warning value is input into the warning response module, and the warning response module detects the risk assessment warning value. When the risk assessment warning value is abnormal, the warning response module issues a warning message to the on-site construction personnel;
[0069] The monitoring module includes: a danger level submodule, a danger area submodule, a danger assessment submodule and a control submodule.
[0070] In this embodiment, the construction safety monitoring method forms a safety monitoring system through the mutual cooperation of four sub-modules, and the overall method is based on automated data analysis and algorithm calculation, which reduces human intervention and improves the degree of automation and accuracy of monitoring. Through real-time monitoring and dynamic evaluation, potential safety risks can be discovered and handled in a timely manner, which improves the real-time and effectiveness of monitoring, avoids the subjectivity and uncertainty of human judgment, and sets up a multi-level warning system based on the calculation of hazard index and risk assessment warning value, which can send out warning signals in time before dangerous events occur, providing valuable time for on-site construction personnel to take preventive measures, and can reasonably allocate safety resources and improve safety protection effects and economic benefits through accurate hazard area assessment and comprehensive risk assessment results.
[0071] See also Figures 1 to 3 , the processing process of the danger level submodule is as follows:
[0072] Input the center coordinates (x, y, z) of the high-altitude transport object, the velocity vector (x a ,y a , z a) and the acceleration vector of the object being transported at a height (a x , a y , a z ), and output the danger index UGA based on the on-site wind speed UGAA and the weight of the transported object UGAB.
[0073] ;
[0074] X1=A2×(x a 2 +y a 2 +z a 2 );
[0075] X2=A3×(a x 2 +a y 2 +a z 2 );
[0076] in:
[0077] A1, A2, A3, A4 and A5 are (x 2 +y 2 +z 2 )、(x a 2 +y a 2 +z a 2 )、(a x 2 +a y 2 +a z 2 ), weight coefficients of UGAA and UGAB;
[0078] X1 refers to the degree of dangerous change due to speed, and X2 refers to the degree of dangerous change due to acceleration.
[0079] In this embodiment: first, an initial danger threshold is set according to the danger index UGA. The value of this threshold is 75, which means that when UGA exceeds this value, the danger level of the construction scene reaches a level that requires attention. As the construction progresses and the situation on site changes, the threshold can be dynamically adjusted according to the actual situation. For example, when high-risk factors are found on site, the threshold can be lowered to increase the warning sensitivity; conversely, the threshold can be appropriately increased to reduce false alarms. The data acquisition module collects the status data of objects transported at high altitudes in real time and calculates UGA based on this submodule, and compares the calculated UGA value with the preset threshold. If the UGA value exceeds the threshold, the warning mechanism is triggered. After the warning mechanism is triggered, a warning signal can be sent to monitoring personnel and construction personnel through sound and light alarms, monitoring billboards, and mobile terminals to remind them of the potential risk of falling objects from high altitudes.
[0080] UGA is an indicator that combines multiple risk factors. It is used to evaluate the degree of danger at a certain moment or in a certain area, thereby obtaining a more comprehensive and accurate danger index. UGA is a quantitative indicator that reflects the degree of danger of construction scenes of high-altitude transportation objects in real time. This submodule dynamically calculates the danger index by analyzing the status of high-altitude transportation objects, the location and behavior of construction personnel in real time in the monitoring video, thereby ensuring the real-time nature of monitoring. Based on data analysis, it reduces the subjectivity of human judgment, improves the accuracy and objectivity of danger identification, and can warn of potential risks of falling objects from high altitudes in advance according to the danger index, providing a time window for timely measures.
[0081] This submodule solves the problem of subjectivity, misjudgment and missed judgment of human judgment. It automatically calculates the danger index through algorithms to improve the accuracy of judgment. At the same time, it enhances the real-time monitoring and can instantly reflect the dynamic changes of objects transported at high altitudes, providing strong support for the prevention of falling objects from high altitudes. UGA can reflect the degree of danger of construction scenes in real time. When UGA exceeds the preset threshold, it can immediately trigger the early warning mechanism and remind monitoring personnel and construction personnel to pay attention to potential risks of falling objects from high altitudes. UGA provides scientific decision-making basis for project managers, helping them to formulate corresponding safety monitoring and emergency response strategies according to the current degree of danger. Through intelligent calculation of UGA, the subjectivity and misjudgment rate of human judgment are reduced, and the efficiency and accuracy of monitoring are improved.
[0082] See also Figures 1 to 3 , the processing of the dangerous area submodule is as follows:
[0083] Based on the velocity vector (x a ,y a , z a ) and the acceleration vector of the object being transported at a height (a x , a y , az ), and input the initial safety distance UGBA and reaction time T (i.e. the time required for the system or observer to perceive the danger and react), and output the radius UGB of the danger zone. The specific formula used is as follows:
[0084] UGB=UGBA+UGBB×T+(UGBC / 2)×T 2 ;
[0085] ;
[0086] ;
[0087] in:
[0088] UGBB refers to the magnitude of the velocity vector, and UGBC refers to the magnitude of the acceleration vector;
[0089] UGBA+UGBB×T refers to the radius of the danger zone where the object moves within the reaction time;
[0090] (UGBC / 2)×T 2 Refers to the degree to which acceleration affects the change in position of an object during reaction time.
[0091] In this embodiment: UGB is a region radius that is dynamically adjusted according to the current dangerous situation, which is used to define the scope of the dangerous impact, and UGB is based on the numerical values involved in the calculation in UGA for coordinated calculation. This association enables the system to dynamically adjust the delineation of dangerous areas according to actual conditions, providing more accurate and real-time guidance for safety personnel, and UGB can accurately delineate dangerous areas based on monitoring videos and on-site data, and then clarify which areas construction personnel should avoid entering, and can dynamically adjust the scope of dangerous areas according to the progress of construction and changes on site, thereby ensuring the timeliness and accuracy of the evaluation. Safety warning signs and protective facilities can be reasonably configured through the calculation of UGB to improve the safety protection effect;
[0092] In this module, accurate danger zone assessment is carried out to avoid the risk of construction workers mistakenly entering danger zones, improve construction safety, and dynamically adjust the scope of danger zones to ensure that the assessment results are consistent with the actual construction situation, thereby enhancing the practicality of the assessment. UGB is a dangerous zone scope dynamically delineated based on the real-time status of objects transported at high altitudes and the surrounding environment, and can be adjusted and improved according to actual conditions. Through changes in UGB, managers can reasonably allocate resources such as safety warning signs and protective facilities to ensure maximum safety protection effects, and clarify the scope of danger zones, which can remind construction workers to always be vigilant and avoid entering danger zones, thereby improving overall safety awareness.
[0093] See also Figures 1 to 3 ,The hazard assessment submodule processes as follows:
[0094] Based on the danger index UGA and the radius of the danger zone UGB, α and β are input to limit the weight of the danger index UGA and the radius of the danger zone UGB, and the risk assessment warning value UGC is output. The specific formula used is as follows:
[0095] UGC=α×UGA+[β×(UGB-UGBA)] / (UGB+μ);
[0096] in:
[0097] μ refers to a positive number to prevent the denominator from being zero;
[0098] α×UGA refers to the comprehensive contribution of UGA.
[0099] In this embodiment: the calculation of UGC comprehensively evaluates the overall construction environment or the risk level of a specific area, and the calculation of UGC is based on the comprehensive consideration of UGA and UGB as well as other risk factors, so that the system can fully grasp the risk status in the construction process and provide decision makers with more comprehensive and in-depth risk information, thereby facilitating the formulation of more scientific and reasonable safety management measures;
[0100] The calculation of UGC comprehensively considers multiple aspects such as the status of objects transported at high altitudes and environmental factors, conducts a comprehensive risk assessment, and can set early warning signals of different levels according to the results of the risk assessment to ensure that relevant personnel can take corresponding measures in a timely manner, providing scientific decision-making basis for project managers, and helping them to better formulate and adjust safety monitoring strategies. UGC achieves the comprehensiveness and accuracy of risk assessment, avoiding misjudgment or omission caused by a single factor. UGC can comprehensively reflect the overall safety risk level of the construction scene and provide project managers with a comprehensive risk assessment report. Through continuous monitoring and analysis of UGC, deficiencies in safety monitoring can be discovered in a timely manner, and corresponding improvement measures can be taken to continuously improve construction safety.
[0101] See also Figures 1 to 3 , the processing of the regulation submodule is as follows:
[0102] S1: If UGC>TH, then run S2;
[0103] If UGC≤TH, S2 will not be executed;
[0104] S2:A2 new =A2+φ(UGC-TH);
[0105] To set loop limits:
[0106] Limitation 1: |A2new -A2|<0.02, then stop the loop;
[0107] Limitation 2: If the current number of loops is ≥ 10, the loop will stop;
[0108] When any one of the constraints 1 and 2 is satisfied, the loop terminates and the convergence condition is achieved;
[0109] in:
[0110] TH=50;
[0111] A2 new After the loop (x a 2 +y a 2 +z a 2 )’s weight coefficient;
[0112] Based on the difference between the risk assessment warning value UGC and the comparison threshold TH as the influencing factor, the rate of change of A2 is controlled by adjusting the coefficient φ, and input A2 to output A2 new , A2 new Replace A2 in the criticality submodule to adjust the criticality index UGA and achieve loop termination of A2 based on loop limits.
[0113] In this embodiment: the formula is an iterative cycle type control calculation, wherein TH is a comparison threshold, which is specifically, if the UGC needs to respond very sensitively to small risk changes, then TH should be set relatively low.
[0114] On the contrary, if UGC can tolerate larger risk fluctuations, then TH can be set relatively high, and the TH value can be set according to the distribution of historical risk levels. For example, a certain percentile of UGC in history can be selected as TH.
[0115] In this submodule, the value of UGC is used to affect the speed-related values, that is, the degree of change of danger X1 affected by speed in the danger degree submodule. The iterative submodule adjusts the value of A2 in real time according to the current UGC. When UGC is higher, the increase in A2 will be greater, thereby enhancing the weight of the monitoring indicators related to speed. This real-time response capability helps to quickly identify and respond to potential safety risks. By dynamically adjusting the weights, the safety monitoring system can accurately capture the impact of speed-related risk factors on the overall safety status, thereby helping to improve the precision and accuracy of monitoring and reduce the possibility of false alarms and missed alarms. In construction, resources are limited. By dynamically adjusting the monitoring focus, the system can allocate resources more effectively and ensure that more attention and management efforts are invested in areas with higher risks.
[0116] Through iterative optimization and cyclic adjustment, the safety monitoring system can more comprehensively cover the safety risk points in the construction process, thereby effectively improving construction safety. This helps reduce the occurrence of safety accidents and protect the lives and property of construction workers. On the premise of ensuring safety, dynamic monitoring can also help improve construction efficiency. The overall system has the ability of real-time data processing, intelligent analysis and dynamic adjustment, which in turn promotes the research and development and application of related technologies.
[0117] See also Figures 1 to 3 ,The processing process of the early warning response module is as follows:
[0118] S1: Input UGC into the early warning response module. If UGC>85, the risk probability level 1 is output, and a red warning light and high-frequency warning sound are emitted at the construction site;
[0119] At this level, the probability of risk occurrence is high, the potential loss is extremely large, and the social impact is extensive and serious. The potential economic losses and casualties may be extremely large, and may cause serious social panic or instability.
[0120] S2: Input UGC into the early warning response module. If 40<UGC≤80, the risk probability level 2 is output, and a purple warning light and high-frequency warning sound are emitted at the construction site;
[0121] The probability of risk occurrence at this level is high, the potential loss is large, the social impact is significant, the potential economic loss or casualties are large, and it may have a significant impact on local areas or specific groups;
[0122] S3: Input UGC into the early warning response module. If 10<UGC≤40, the risk probability level 3 is output, and a blue warning light and low-frequency prompt sound are emitted at the construction site;
[0123] The probability of risk occurrence at this level is moderate, the potential loss is moderate, the social impact is limited, the potential economic loss or casualties are small, and it may cause certain impacts on individual personnel or the local environment
[0124] S4: Input UGC into the early warning response module. If UGC ≤ 10, the risk probability level 4 is output and a green warning light is emitted at the construction site;
[0125] At this level, the probability of risk occurrence is low, the potential loss is small, the social impact is weak, the potential economic losses or casualties are extremely small, and there is almost no impact on society and the environment.
[0126] In this embodiment: four levels of risk probability are divided based on the UGC value, among which level one is the highest and level four is the lowest, and different risk levels and response measures are implemented according to the divided levels, thereby playing a role in intelligent safety monitoring method, and the response measures are responsive, accurate and effective, so as to ensure that timely measures can be taken to reduce losses when dangerous incidents occur. Warning lights of different colors reflect different response levels and probabilities of risk occurrence, and thus can intuitively provide prompts and warnings, achieve excellent monitoring effects, and cooperate with warnings and prompt sounds of different frequencies, thereby playing a comprehensive prompt and warning effect from the aspects of sound and light.
[0127] In the specific implementation process, the three algorithm units in this method are used to form a construction safety monitoring method system, which uses the on-site wind speed UGAA, the weight of the transported object UGAB, the center point coordinates (x, y, z) of the high-altitude transported object, and the speed vector (x a ,y a , z a ) and the acceleration vector of the object being transported at a height (a x , a y , a z ) is substituted into the danger level submodule to calculate the danger index UGA. UGA is an indicator that combines multiple risk factors and is used to evaluate the danger level at a certain moment or in a certain area, thereby obtaining a more comprehensive and accurate danger index. UGA can reflect the quantitative indicators of the danger level of the construction scene of high-altitude transportation objects in real time, thereby ensuring the real-time monitoring, and based on data analysis, it reduces the subjectivity of human judgment and improves the accuracy and objectivity of danger identification;
[0128] By dividing the velocity vector (x a ,y a , z a ) and the acceleration vector of the object being transported at a height (a x , a y , a z ) is substituted into the dangerous area submodule to calculate the radius UGB of the dangerous area. UGB can accurately delineate the dangerous area through monitoring video and on-site data, so as to clarify which areas construction workers should avoid entering, and can dynamically adjust the scope of the dangerous area according to the progress of construction and changes on site, thereby ensuring the timeliness and accuracy of the assessment. Through the changes in UGB, management personnel can reasonably allocate resources such as safety warning signs and protective facilities, thereby ensuring the maximum safety protection effect, and calculate the clear scope of the dangerous area to remind construction workers to stay vigilant at all times;
[0129] The risk assessment warning value UGC is calculated by substituting the hazard index UGA and the radius UGB of the danger zone into the hazard assessment submodule. The calculation of UGC comprehensively considers the status of objects transported at high altitudes and environmental factors, conducts a comprehensive risk assessment, and can set different levels of warning signals according to the results of the risk assessment, thereby ensuring that relevant personnel can take corresponding measures in a timely manner, providing scientific decision-making basis for project managers, avoiding misjudgment and missed judgment caused by a single factor, and through continuous monitoring and analysis of UGC, it can timely discover deficiencies in safety monitoring, and take corresponding improvement measures to continuously improve construction safety;
[0130] And based on the threshold calculation of the risk assessment warning value, the weight coefficient A2 of the speed vector can be continuously iterated and adjusted, and the speed-related values are affected by the value of UGC, thereby enhancing the weight of the monitoring indicators related to speed. The real-time response capability helps to quickly identify and respond to potential safety risks, and by dynamically adjusting the weights, the safety monitoring system can accurately capture the impact of speed-related risk factors on the overall safety status, which helps to improve the precision and accuracy of monitoring. This method enables the overall multiple sub-modules to cooperate with each other in calculation, and can also perform overall cycles and iterations, so that the overall method has the effect of automated optimization and updating, and thus better adaptability.
[0131] Example 2: Please refer to Figure 1 , Figure 2 and Figure 3 ,The devices used in the data acquisition module are high-definition cameras, GPS positioning ,devices, acceleration sensors, weight sensors and wind speed sensors.
[0132] In this embodiment: by installing a GPS positioning device on an object being transported at a height, the position coordinates of the object in three-dimensional space can be provided in real time and accurately, which helps to accurately assess the movement state and potential risks of the object;
[0133] By installing the acceleration sensor on the high-altitude transport object, the acceleration of the object in three axes can be measured, which is of great significance for evaluating the dynamic characteristics of the object and predicting its motion trajectory;
[0134] Weighing objects transported at heights through weight sensors can directly measure the mass of the objects and provide key parameters for risk assessment;
[0135] By installing wind speed sensors around objects being transported at height, wind speed and direction can be measured in real time, providing important data for evaluating the impact of wind on the movement of objects;
[0136] By installing multiple sets of high-definition cameras around the construction site, the construction situation can be monitored in real time and video images can be provided to assist in determining the location and status of objects, while recording the on-site situation for subsequent analysis. By combining high-definition cameras with image recognition technology, the data of multiple sensors can be fused based on a fusion processing module. For example, data matching between high-definition cameras and GPS positioning devices can be performed to calibrate the data, thereby reducing the deviation between sensors. Video frames can also be parsed based on video data captured by high-definition cameras using video analysis software to extract location information, speed data, and acceleration data of objects transported at high altitudes, and then compared with sensor data to achieve the purpose of fusion processing to reduce errors.
[0137] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction safety monitoring method, characterized in that: The monitoring steps include: Step 1: Collect coordinate data, speed data, acceleration data, mass data of objects transported at high altitudes at the construction site, and wind speed data in the construction site area through a data acquisition module; Step 2: Input the data collected by the data acquisition module into the fusion processing module, and output the center point coordinates of the high-altitude transport object, the velocity vector of the high-altitude transport object, the acceleration vector of the high-altitude transport object, the weight of the transport object and the on-site wind speed; Step 3: Input the data output by the fusion processing module into the monitoring module, and output the danger index, the radius of the danger zone and the risk assessment warning value; Step 4: Input the risk assessment warning value into the warning response module. The warning response module detects the risk assessment warning value. When the risk assessment warning value is abnormal, the warning response module issues a warning message to the on-site construction personnel. The monitoring module comprises: Danger level submodule, danger area submodule, danger assessment submodule and regulation submodule; The processing process of the danger level submodule is as follows: Input the center coordinates (x, y, z) of the high-altitude transport object, the velocity vector (x a ,y a , z a ) and the acceleration vector of the object being transported at a height (a x , a y , a z ), and based on the on-site wind speed UGAA and the weight of the transported object UGAB, output the danger index UGA. The specific formula used is as follows: ; X1=A2×(x a 2 +y a 2 +z a 2 ); X2=A3×(a x 2 +a y 2 +a z 2 ); in: A1, A2, A3, A4 and A5 are (x 2 +y 2 +z 2 )、(x a 2 +y a 2 +z a 2 )、(a x 2 +a y 2 +a z 2 ), weight coefficients of UGAA and UGAB; X1 refers to the degree of dangerous change due to speed, and X2 refers to the degree of dangerous change due to acceleration; The dangerous area submodule processing process is as follows: Based on the velocity vector (x a ,y a , z a ) and the acceleration vector of the object being transported at a height (a x , a y , a z ), and input the initial safety distance UGBA and reaction time T, and output the radius UGB of the danger zone. The specific formula used is as follows: UGB=UGBA+UGBB×T+(UGBC / 2)×T 2 ; ; ; in: UGBB refers to the magnitude of the velocity vector, and UGBC refers to the magnitude of the acceleration vector; UGBA+UGBB×T refers to the radius of the danger zone where the object moves within the reaction time; (UGBC / 2)×T 2 Refers to the degree to which acceleration affects the change in position of an object during reaction time; The risk assessment submodule processing process is as follows: Based on the danger index UGA and the radius of the danger zone UGB, α and β are input to limit the weight of the danger index UGA and the radius of the danger zone UGB, and the risk assessment warning value UGC is output. The specific formula used is as follows: UGC=α×UGA+[β×(UGB-UGBA)] / (UGB+μ); in: μ refers to a positive number to prevent the denominator from being zero; α×UGA refers to the comprehensive contribution degree of UGA; The processing process of the regulatory submodule is as follows: S1: If UGC>TH, then run S2; If UGC≤TH, S2 will not be executed; S2: A2new=A2+φ(UGC-TH); To set loop limits: Limitation 1: |A2 new -A2|<0.02, then stop the loop; Limitation 2: If the current number of loops is ≥ 10, the loop will stop; When any one of the constraints 1 and 2 is satisfied, the loop terminates and the convergence condition is achieved; Based on the difference between the risk assessment warning value UGC and the comparison threshold TH as the influencing factor, the rate of change of A2 is controlled by adjusting the coefficient φ, and input A2 to output A2 new , A2 new Replace A2 in the danger level submodule to adjust the danger index UGA and achieve loop termination of A2 based on loop limits; in: TH=50; A2 new After the loop (x a 2 +y a 2 +z a 2 )’s weight coefficient; The processing process of the early warning response module is as follows: S1: Input UGC into the early warning response module. If UGC>85, the risk probability level 1 is output, and a red warning light and high-frequency warning sound are emitted at the construction site; S2: Input UGC into the early warning response module. If 40<UGC≤80, the risk probability level 2 is output, and a purple warning light and high-frequency warning sound are emitted at the construction site; S3: Input UGC into the early warning response module. If 10<UGC≤40, the risk probability level 3 is output, and a blue warning light and low-frequency prompt sound are emitted at the construction site; S4: Input UGC into the early warning response module. If UGC ≤ 10, the output is the fourth level of risk occurrence probability, and a green warning light is emitted at the construction site.
2. The construction safety monitoring method according to claim 1, characterized in that: The devices used in the data acquisition module are a high-definition camera, a GPS positioning device, an acceleration sensor, a weight sensor and a wind speed sensor.