A numerical simulation method for detecting water erosion of concrete piers

Through the numerical simulation detection method, the weak areas and strength mutation time points of the aqueduct piers were identified, the problem of erosion and erosion of the aqueduct piers was solved, and the effect of reducing maintenance costs and extending the life of the piers was achieved.

CN118657028BActive Publication Date: 2024-10-29JIANGXI ACAD OF WATER RESOURCES (JIANGXI PROVINCE DAM SAFETY MANAGEMENT CENT JIANGXI PROVINCE WATER RESOURCES MANAGEMENT CENT)
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411131579.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-10-29
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

Aqueduct piers are washed away when the river flows, resulting in weak spots. Maintenance costs are high, and it is difficult to accurately predict the most obvious damage and maintenance time points.

Method used

Using the numerical simulation detection method, by obtaining the damage model of the river erosion area and determining the parameter list of river water velocity and erosion time, the target concrete pier model was established, and finite element analysis was performed to identify weak areas and strength mutation time points.

Benefits of technology

Clearly understand the damage of concrete piers due to erosion and erosion, determine the weak areas and strength mutation time points, provide reference for reinforcement and repair of piers, ensure durability and save costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118657028B_ABST
    Figure CN118657028B_ABST
Patent Text Reader

Abstract

The present invention provides a numerical simulation detection method for water flow scouring concrete piers, and relates to the field of numerical simulation detection of concrete piers. The method comprises: obtaining a river water scouring area damage model W corresponding to the concrete pier to be monitored, obtaining a river water flow velocity V of the concrete pier to be monitored in an actual river, determining parameters corresponding to different scouring time lengths of W under the condition that the river water flow velocity is V, so as to obtain a parameter list A of W; establishing a target concrete pier model H corresponding to the concrete pier to be monitored, and performing finite element model analysis on H to determine a weak area corresponding to the concrete pier to be monitored and a time point of a strength mutation of the concrete pier to be monitored; the present invention can determine the weak area and the time point of a strength mutation during the scouring process of the concrete pier to be monitored, and provides a certain reference for the reinforcement and repair of the weak position of the concrete pier in the actual design, thereby saving the project cost while ensuring the durability of the pier.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of numerical simulation of concrete piers, and in particular to a numerical simulation detection method for water flow scouring concrete piers. Background Art

[0002] Aqueduct structure is mainly used for water diversion, irrigation, water resource dispatching, etc., and is an important part of water conservancy projects. Aqueduct structure often faces the problem of crossing the river during construction. The aqueduct piers will narrow the water-passing section of the original river channel, and the river water will form a complex flow field near the aqueduct piers, causing the flow velocity to rise within a certain range and have a significant scouring effect on the concrete piers. Since aqueducts are relatively important water conservancy facilities, aqueduct piers are usually continuously monitored and fully maintained, which will result in high monitoring and maintenance costs. Therefore, how to accurately simulate the river scouring of the piers to predict the most obvious weak points and maintenance time nodes, thereby ensuring the durability of the piers while saving project costs, has become a technical problem that needs to be solved urgently. Summary of the invention

[0003] In view of the above technical problems, the technical solution adopted by the present invention is:

[0004] According to a first aspect of the present application, a numerical simulation detection method for water flow scouring a concrete pier is provided, the method comprising the following steps:

[0005] S100, obtaining a river scouring area damage model W corresponding to the concrete pier to be monitored; wherein the parameters of W are obtained according to the river flow velocity and the scouring time;

[0006] S200, obtaining the river flow velocity V of the actual river where the concrete pier to be monitored is located;

[0007] S300, based on W and V, determine the parameters corresponding to different flushing times of W under the condition of river flow velocity V, so as to obtain a parameter list A=(A1, A2, ..., A i , …, A n ), i=1, 2,...,n; among them, A i is the parameter corresponding to W flushing i ΔT under the condition of river flow velocity V, n is the maximum number of ΔT flushed by W under the condition of river flow velocity V; ΔT is the preset duration;

[0008] S400, establishing a target concrete pier column model H corresponding to the concrete pier column to be monitored;

[0009] S500, based on A, perform finite element model analysis on H to determine the weak area corresponding to the concrete pier to be monitored and the time point of the strength mutation of the concrete pier to be monitored.

[0010] The present invention has at least the following beneficial effects:

[0011] The numerical simulation detection method of water flow scouring concrete piers of the present invention obtains a river water scouring area damage model W corresponding to the concrete pier to be monitored, obtains the flow velocity V of the river water in the actual river of the concrete pier to be monitored, and determines the parameters corresponding to different scouring time lengths of W under the condition of the river water flow velocity V according to W and V, so as to obtain a parameter list A of W; establishes a target concrete pier model H corresponding to the concrete pier to be monitored, and performs finite element model analysis on H according to A to determine the weak area corresponding to the concrete pier to be monitored and the time point of the strength mutation of the concrete pier to be monitored; in the present invention, through the scouring simulation of different time lengths, the damage of the concrete pier due to scouring and abrasion can be clearly understood, and the weak area and the time point of the strength mutation in the scouring process of the concrete pier to be monitored can be determined, which provides a certain reference for the reinforcement and repair of the weak position of the concrete pier in the actual design, thereby saving project costs while ensuring the durability of the pier. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0013] Figure 1 The present invention provides a flowchart of a numerical simulation detection method for water flow scouring concrete piers according to an embodiment of the present invention. DETAILED DESCRIPTION

[0014] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0015] It should be noted that, based on the present disclosure, those skilled in the art should understand that an aspect described herein can be implemented independently of any other aspect, and two or more of these aspects can be combined in various ways. For example, any number of aspects described herein can be used to implement a device and / or practice a method. In addition, other structures and / or functionalities other than one or more of the aspects described herein can be used to implement this device and / or practice this method.

[0016] The following will refer to Figure 1The flowchart of the numerical simulation detection method for water flow scouring concrete piers shown in the figure introduces a numerical simulation detection method for water flow scouring concrete piers.

[0017] The numerical simulation detection method for water flow scouring concrete piers may include the following steps:

[0018] S100, obtaining a river scouring area damage model W corresponding to the concrete pier to be monitored; wherein the parameters of W are obtained according to the river flow velocity and the scouring time.

[0019] In this embodiment, the concrete pier to be monitored may be any concrete pier in the river water. Further, W may be determined by the following steps:

[0020] S110, obtaining a plurality of concrete pier column specimens; wherein the concrete parameters of each concrete pier column specimen are the same as the concrete parameters of the concrete pier column to be monitored.

[0021] In this embodiment, a number of concrete pier column specimens having the same shape and material as the concrete pier column to be monitored can be manufactured; it should be noted that the manufactured concrete pier column specimens can be understood to be completely identical to the concrete pier column to be monitored.

[0022] S120, dividing each concrete pier column specimen into a plurality of annular sub-areas from the center line outward in sequence; wherein the radii of any two sub-areas are the same.

[0023] In this embodiment, for example, the radius of the concrete pier column specimen is 100 mm, and the concrete pier column specimen is divided into 50 sub-areas according to the radius, then the radius of each sub-area is 2 mm; it should be noted that the sub-area located at the center is cylindrical, and the other sub-areas are circular.

[0024] S130, placing each concrete pier column specimen in a river with different flow rates and flushing for different preset time periods, so as to obtain a list set B of concrete pier column specimens after flushing = (B1, B2, ..., B r , …, B m ), r = 1, 2, ..., m; where B r The concrete pier column specimen is subjected to the river flow velocity V r List of concrete pier column specimens after scouring corresponding to different preset scouring time under the condition of B, m is the number of preset river flow rates; r =(B r,1 , B r,2 , …, B r,i , …, B r,n ); where B r,i The concrete pier column specimen is subjected to the river flow velocity V rThe concrete pier column specimen after scouring i×ΔT under the condition of .

[0025] In the present embodiment, it can be understood that m river flow rates and n flushing durations are preset, and for each river flow rate, n flushing duration tests can be performed; for example: under the condition that the river flow rate is V1, the river water flushes for 1 ΔT for one test, and flushes for 2 ΔT for one test, and so on, and under the condition that the river flow rate is V1, a total of n tests are performed; each test can obtain a corresponding concrete pier column specimen after river water flushing, and then obtain B.

[0026] S140, according to B, determining the volume loss rate corresponding to each sub-area of ​​the concrete pier column specimen after being flushed for different preset time periods at different river flow rates.

[0027] In this embodiment, it can be understood that due to the different combinations of river water flow rate and flushing time during the test of each concrete pier specimen, the volume loss rate of the sub-region corresponding to each concrete pier specimen may be different, and the volume loss rate of the sub-region corresponding to each concrete pier specimen can be obtained; the volume loss rate of the sub-region is the ratio of the volume lost in the sub-region to the total volume of the corresponding sub-region; it can be understood that if a sub-region is completely flushed away, then the volume loss rate of the sub-region is 1.

[0028] S150, determining a sub-region damage model corresponding to each sub-region according to the volume loss rate corresponding to each sub-region of the concrete pier column specimen after being scoured for different preset time periods at different river flow rates.

[0029] It should be noted that those skilled in the art can use the existing concrete damage model determination method according to actual needs, and determine the sub-region damage model corresponding to each sub-region according to the volume loss rate corresponding to each sub-region of the concrete pier specimen after being flushed for different preset time periods in different river water flow rates. No further details will be given here.

[0030] S160: Fit all sub-region damage models using a preset regression analysis fitting method to obtain W.

[0031] In this embodiment, it is equivalent to using a differential method to split the scouring conditions of the concrete pier to be monitored into several fixed conditions. Then, after obtaining the sub-region damage model corresponding to each sub-region, all sub-region damage models can be subjected to regression analysis and fitting to obtain the river scouring area damage model W corresponding to the concrete pier to be monitored. It should be noted that those skilled in the art can use existing regression analysis and fitting methods to obtain W according to actual needs, which will not be elaborated here.

[0032] It should be noted that the damage model W of the river scouring area corresponding to the concrete pier to be monitored can be understood as a function related to the river flow velocity and the scouring time. The corresponding parameters of W can be determined by the combination of the river flow velocity and the scouring time.

[0033] S200, obtaining the river flow velocity V of the actual river where the concrete pier to be monitored is located.

[0034] In this embodiment, in actual application, the concrete pier to be monitored is set in a river, and the river water flow rate in the concrete pier area to be monitored in the river is not fixed. It is necessary to reasonably determine the river water flow rate V of the actual river where the concrete pier to be monitored is located.

[0035] Furthermore, the flow velocity V of the concrete pier to be monitored in the actual river can be determined by the following steps:

[0036] S210, obtaining a historical river flow rates within a historical time period.

[0037] In this embodiment, the historical time period may be one year before the current time.

[0038] S220, clustering all historical river flow rates using a preset DBSCAN clustering algorithm to obtain b clusters.

[0039] It is understandable that the river flow rate is affected by the season. During the summer flood season, the river flow rate is relatively high, while in spring, autumn or winter, the river flow rate is relatively low and shows a certain regularity. Through the DBSCAN clustering algorithm, relatively similar river flow rates can be clustered into one cluster.

[0040] S230, obtaining the number of historical river flow rates in each cluster to obtain a number list NUM=(NUM1, NUM2, ..., NUM c , …, NUM b ), c=1,2,…,b; where NUM c is the number of historical river flow velocities in the cth cluster.

[0041] S240, according to NUM, determine the historical river flow velocity weight corresponding to each cluster to obtain a historical river flow velocity weight list γ=(γ1, γ2, ..., γ c , …, γ b ); where γ c is the historical river flow velocity weight corresponding to the cth cluster; γ c =NUM c / a.

[0042] In this embodiment, it can be understood that the more historical river water flow rates there are in a cluster, the longer the monitored concrete pier is flushed by the historical river water flow rate corresponding to the cluster. Therefore, the weight of the historical river water flow rate corresponding to the cluster should also be larger, so that the river water flow rate can be represented more reasonably.

[0043] S250, determining the average historical river flow rate corresponding to the historical river flow rate in each cluster, so as to obtain an average historical river flow rate list D = (D1, D2, ..., D c , …, D b ); where D c is the average historical river flow velocity corresponding to the cth cluster.

[0044] S260, according to D and γ, determine V=∑ b c=1 γ c ×D c .

[0045] In this embodiment, the flow velocity V of the river water in the concrete pier to be monitored in the actual river is determined by weighted summation, so that the determined V is more reasonable, and the accuracy of the weak area corresponding to the concrete pier to be monitored and the time point of the strength mutation of the concrete pier to be monitored is further improved.

[0046] S300, based on W and V, determine the parameters corresponding to different flushing times of W under the condition of river flow velocity V, so as to obtain a parameter list A=(A1, A2, ..., A i , …, A n ), i=1, 2,...,n; among them, A i is the parameter corresponding to W after flushing i ΔT under the condition of river flow rate V, n is the maximum number of ΔT flushed by W under the condition of river flow rate V; ΔT is the preset time.

[0047] In this embodiment, after V is determined, n combinations of river flow rate and flushing time can be established, and the parameters corresponding to W in each combination can be reversed according to W, thereby obtaining A.

[0048] S400: Establish a target concrete pier column model H corresponding to the concrete pier column to be monitored.

[0049] In this embodiment, the concrete pier to be monitored blocks the flow of water, forcing the water flow to bypass the obstacles on both sides, forming a vortex near the concrete pier to be monitored, and the water flow speed increases sharply, thereby causing scouring and abrasion of the concrete pier to be monitored. The concrete pier to be monitored is damaged by scouring and abrasion, which can be divided into three stages: the surface mortar is peeled off, the internal aggregate is exposed, and the aggregate is scoured and stripped. Based on the above situation, H includes a cylindrical core area, a to-be-scoured area, an aggregate leakage area, an aggregate detachment area, and a mortar stripping area distributed from the center to the outside. The core area can be understood as an area that will not be scoured, and the to-be-scoured area can be understood as an area that has not been scoured but may be scoured; while the aggregate leakage area, the aggregate detachment area, and the mortar stripping area are areas that will be scoured by the river water; other related parameters of H are set according to the actual scouring situation and the actual materials of the concrete pier to be monitored. For example, the core area and the to-be-scoured area can be understood as an integral area. Therefore, in the finite element analysis software, the two are set to be bound.

[0050] S500, based on A, perform finite element model analysis on H to determine the weak area corresponding to the concrete pier to be monitored and the time point of the strength mutation of the concrete pier to be monitored.

[0051] Further, step S500 may include the following steps:

[0052] S510, obtaining an intermediate model WR and a preset value Q=1.

[0053] S520, setting the thickness of the aggregate separation zone and the thickness of the mortar stripping zone to 1, setting the shell offset of the mortar stripping zone to the bottom surface, and the shell offset of the aggregate separation zone to be offset by 1 toward the center of H.

[0054] S530: Determine initial parameters of the mortar stripping zone and the aggregate detachment zone of H based on W.

[0055] S540, the shell offset of the area to be scoured is offset 2 inwardly of the center of H, and the contact surface between the area to be scoured and the core area is set to be bound, so as to obtain the Qth target concrete model H corresponding to the concrete pier to be monitored Q .

[0056] S550, get WR=H Q .

[0057] S560, importing the WR into a preset finite element analysis software, applying a preset load to the WR, and flushing the WR for a period of ΔT with a river flow rate of V, so as to obtain a deformation model WR' corresponding to the WR after a period of ΔT.

[0058] S570, obtain the stress F corresponding to WR' Q , and update the parameter corresponding to WR' to AQ , to obtain the updated model GW after WR'.

[0059] S580, update Q = Q + 1, obtain WR = GW, and enter S560 to obtain the stress list F = (F1, F2, ..., F i , …, F n ); where F i is the stress corresponding to the concrete pier to be monitored after being scoured for i×ΔT under the condition of river flow velocity V.

[0060] S590: According to F, determine the weak area corresponding to the concrete pier to be monitored and the time point of sudden strength change.

[0061] In this embodiment, through the above steps S510-S590, under the condition that the river flow rate is V, a deformed model will be obtained for each simulated scouring time ΔT. The stress of the deformed model will change when a preset load is applied; by obtaining the stress corresponding to each ΔT, F can be obtained.

[0062] Further, step S590 may include the following steps:

[0063] S591, according to F, determine the stress difference between two adjacent stresses to obtain a stress difference list ΔF=(ΔF1, ΔF2, …, ΔF j ,…,ΔF n-1 ), j = 1, 2, ..., n-1; where ΔF j F j With F j+1 The stress difference between j =|F j+1 -F j |.

[0064] S592, according to ΔF, determine the stress change rate η corresponding to the concrete pier to be monitored = (η1, η2, ..., η j ,…,η n-1 ); where η j is the stress change rate corresponding to the jth ΔT of the concrete pier column scour; η j =ΔF j / ΔT.

[0065] S593, traverse η, if η j ≥η', the time point corresponding to j×ΔT is determined as the time point of the strength mutation of the concrete pier to be monitored; wherein η' is the preset threshold value of the stress change rate of the concrete pier.

[0066] In the present embodiment, it can be understood that if the strength of the concrete pier to be monitored has not undergone a significant change, then the corresponding stress will not undergo a sudden change. Therefore, when the stress of the concrete pier to be monitored undergoes a sudden change, it can be determined that the strength of the concrete pier to be monitored has undergone a significant change; therefore, through the above steps S591-S593, the time point of the sudden change in the strength of the concrete pier to be monitored can be accurately determined.

[0067] S594, obtaining the target deformation model after j ΔTs.

[0068] S595, obtaining the minimum distance between the side wall of the river scouring area of ​​the deformation model and the axis of the target deformation model.

[0069] S596: Determine the area corresponding to the minimum distance from the axis of the target deformation model as the weak area corresponding to the concrete pier to be monitored.

[0070] In this embodiment, after determining the time point of the sudden change in strength of the concrete pier to be monitored, it is possible to obtain the target deformation model corresponding to which ΔT. By analyzing the scouring area in the target deformation model, the weak area corresponding to the model to be monitored is obtained. In the subsequent monitoring process, the weak area can be monitored in a focused manner.

[0071] The numerical simulation detection method of water flow scouring concrete piers in this embodiment obtains a river water scouring area damage model W corresponding to the concrete pier to be monitored, obtains the flow velocity V of the river water in the actual river of the concrete pier to be monitored, and determines the parameters corresponding to different scouring time lengths of W under the condition of river water flow velocity V according to W and V, so as to obtain a parameter list A of W; establishes a target concrete pier model H corresponding to the concrete pier to be monitored, and performs finite element model analysis on H according to A to determine the weak area corresponding to the concrete pier to be monitored and the time point of strength mutation of the concrete pier to be monitored; in the present invention, through the scouring simulation of different time lengths, it is possible to clearly understand the damage of the concrete pier due to scouring and abrasion, determine the weak area and the time point of strength mutation during the scouring process of the concrete pier to be monitored, and provide a certain reference for the reinforcement and repair of the weak position of the concrete pier in the actual design, thereby saving project costs while ensuring the durability of the pier.

[0072] In addition, although the steps of the method in the present disclosure are described in a specific order in the drawings, this does not require or imply that the steps must be performed in this specific order, or that all the steps shown must be performed to achieve the desired results. Additionally or alternatively, some steps may be omitted, multiple steps may be combined into one step, and / or one step may be decomposed into multiple steps, etc.

[0073] Although some specific embodiments of the present invention have been described in detail by way of example, it should be understood by those skilled in the art that the above examples are only for illustration, not for limiting the scope of the present invention. It should also be understood by those skilled in the art that various modifications may be made to the embodiments without departing from the scope and spirit of the present invention.

Claims

1. A numerical simulation detection method for water flow scouring concrete piers, characterized in that: The method comprises the following steps: S100, obtaining a river scouring area damage model W corresponding to the concrete pier to be monitored; wherein the parameters of W are obtained according to the river flow velocity and the scouring time; S200, obtaining the river flow velocity V of the actual river where the concrete pier to be monitored is located; S300, based on W and V, determine the parameters corresponding to different flushing times of W under the condition of river flow velocity V, so as to obtain a parameter list A=(A1, A2, ..., A i , …, A n ), i=1, 2,...,n; among them, A i is the parameter corresponding to W flushing i ΔT under the condition of river flow velocity V, n is the maximum number of ΔT flushed by W under the condition of river flow velocity V; ΔT is the preset duration; S400, establishing a target concrete pier column model H corresponding to the concrete pier column to be monitored; S500, based on A, perform finite element model analysis on H to determine the weak area corresponding to the concrete pier to be monitored and the time point of sudden strength change of the concrete pier to be monitored; H includes a cylindrical core area, an area to be scoured, an aggregate leakage area, an aggregate separation area, and a mortar stripping area, which are distributed outward from the center in sequence; Step S500 includes the following steps: S510, obtaining an intermediate model WR and a preset value Q=1; S520, setting the thickness of the aggregate separation zone and the thickness of the mortar stripping zone to 1, setting the shell offset of the mortar stripping zone to the bottom surface, and the shell offset of the aggregate separation zone to be offset by 1 toward the center of H; S530, determining initial parameters of the mortar stripping zone and the aggregate detachment zone of H according to W; S540, the shell offset of the area to be scoured is offset by 2 toward the center of H, and the contact surface between the area to be scoured and the core area is set to be bound, so as to obtain the Qth target concrete model H corresponding to the concrete pier to be monitored Q ; S550, get WR=H Q ; S560, importing the WR into a preset finite element analysis software, applying a preset load to the WR, and flushing the WR for a period of ΔT with a river flow rate of V, so as to obtain a corresponding deformation model WR' of the WR after a period of ΔT; S570, obtain the stress F corresponding to WR' Q , and update the parameter corresponding to WR' to A Q , to obtain the updated model GW after WR'; S580, update Q = Q + 1, obtain WR = GW, and enter S560 to obtain the stress list F = (F1, F2, ..., F i , …, F n ); where F i is the stress corresponding to the concrete pier to be monitored after being scoured for i×ΔT under the condition of river flow velocity V; S590, determining the weak area corresponding to the concrete pier to be monitored and the time point of sudden strength change according to F; Step S590 includes the following steps: S591, according to F, determine the stress difference between two adjacent stresses to obtain a stress difference list ΔF=(ΔF1, ΔF2, …, ΔF j ,…,ΔF n-1 ), j = 1, 2, ..., n-1; where ΔF j F j With F j+1 The stress difference between j =|F j+1 -F j |; S592, according to ΔF, determine the stress change rate η corresponding to the concrete pier to be monitored = (η1, η2, ..., η j ,…,η n-1 ); where η j is the stress change rate corresponding to the jth ΔT of the concrete pier column scour; η j =ΔF j / ΔT; S593, traverse η, if η j ≥η', the time point corresponding to j×ΔT is determined as the time point of the strength mutation of the concrete pier to be monitored; wherein η' is the preset threshold value of the stress change rate of the concrete pier; S594, obtaining a target deformation model after j ΔTs; S595, obtaining the minimum distance between the side wall of the river scouring area of ​​the deformation model and the axis of the target deformation model; S596: Determine the area corresponding to the minimum distance from the axis of the target deformation model as the weak area corresponding to the concrete pier to be monitored.

2. The numerical simulation detection method for water flow erosion of concrete piers according to claim 1 is characterized in that: W is determined by the following steps: S110, obtaining a plurality of concrete pier column specimens; wherein the concrete parameters of each concrete pier column specimen are the same as the concrete parameters of the concrete pier column to be monitored; S120, dividing each concrete pier column specimen into a plurality of annular sub-areas from the center line outward in sequence; wherein the radii of any two sub-areas are the same; S130, placing each concrete pier column specimen in a river with different flow rates and flushing for different preset time periods, so as to obtain a list set B of concrete pier column specimens after flushing = (B1, B2, ..., B r , …, B m ), r = 1, 2, ..., m; where B r The concrete pier column specimen is subjected to the river flow velocity V r List of concrete pier column specimens after scouring corresponding to different preset scouring time under the condition of B, m is the number of preset river flow rates; r =(B r,1 , B r,2 , …, B r,i , …, B r,n ); where B r,i The concrete pier column specimen is subjected to the river flow velocity V r The concrete pier column specimen after scouring i×ΔT under the condition of ; S140, according to B, determining the volume loss rate corresponding to each sub-area of ​​the concrete pier after being flushed for different preset time periods at different river flow rates; S150, determining a sub-region damage model corresponding to each sub-region according to a volume loss rate corresponding to each sub-region of the concrete pier column after being washed for different preset time periods at different river flow rates; S160: Fit all sub-region damage models using a preset regression analysis fitting method to obtain W.

3. The numerical simulation detection method for water flow erosion of concrete piers according to claim 2 is characterized in that: The shape of the concrete pier column specimen is the same as the shape of the concrete pier column to be monitored.

4. The numerical simulation detection method for water flow erosion of concrete piers according to claim 1 is characterized in that: The flow velocity V of the concrete pier to be monitored in the actual river is determined by the following steps: S210, obtaining a historical river flow rates within a historical time period; S220, clustering all historical river flow rates using a preset DBSCAN clustering algorithm to obtain b clusters; S230, obtaining the number of historical river flow rates in each cluster to obtain a number list NUM=(NUM1, NUM2, ..., NUM c , …, NUM b ), c=1,2,…,b; where NUM c is the number of historical river flow velocities in the cth cluster; S240, according to NUM, determine the historical river flow velocity weight corresponding to each cluster to obtain a historical river flow velocity weight list γ=(γ1, γ2, ..., γ c , …, γ b ); where γ c is the historical river flow velocity weight corresponding to the cth cluster; γ c =NUM c / a; S250, determining the average historical river flow rate corresponding to the historical river flow rate in each cluster, so as to obtain an average historical river flow rate list D = (D1, D2, ..., D c , …, D b ); where D c is the average historical river flow velocity corresponding to the cth cluster; S260, according to D and γ, determine V=∑ b c=1 γ c ×D c .

Citation Information

Patent Citations

  • Three-dimensional numerical simulation method and system for scouring submarine pipeline by fluid

    CN113947042A

  • Bridge foundation maximum scour depth rapid prediction method based on artificial intelligence

    CN116861821A