Indoor simulation device and method for supporting tunnel segments during tunnel boring by full-face tunnel boring machine
Through the full-section tunnel boring machine excavating the indoor simulation device for tunnel pipe segment support, the pipe segment support process is simulated by rotating transmission disc and pressure sensor, which solves the problems of high experimental costs and inaccurate simulation in the existing technology, and achieves low Cost and efficient analysis of pipe sheet support mechanical analysis after tunnel excavation.
Patent Information
- Application Number
- CN202411134314.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-19
AI Technical Summary
When the existing technology simulates the mechanical response process of pipe sheet support and surrounding rock of the full-section tunnel boring machine in indoor experiments, the embedded pipe sheet method is inconsistent with the support process after excavation on the project site, resulting in differences in experimental results and actual experiments. The cost is high, affecting the construction period.
Design a full-section tunnel boring machine to excavate the tunnel pipe sheet supporting room simulation device, including arcuate outer pipe sheet and inner pipe sheet, transmission disk and drive device, and expand the pipe sheet outward or retract inward by rotating the transmission disk. Combined with the pressure sensor to monitor stress data, simulate the pressure condition of surrounding rock on the pipe sheet.
Achieve the simulation of the pipe sheet support process after excavation of microtunnels with low experimental costs and good simulation similarity, and deeply understand the mechanical mechanism between pipe sheets-surrounded rocks and pipe sheets-pipes, and optimize the compressive resistance of pipe sheets for the engineering site. Support for shear parameters.
Smart Images

Figure CN118658373B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of mechanical testing, and more specifically, to an indoor simulation device and method for supporting tunnel segments during excavation by a full-face tunnel boring machine. Background Art
[0002] The full-section tunnel boring machine (TBM) is a modern tunnel excavation tool with functions such as excavation, slag discharge, guidance, and support. The front end of the machine crushes the rock through the rotating cutterhead, and the rear end maintains the stability of the tunnel surrounding rock through the pipe segment support. It has the advantages of fast construction speed and good tunnel shape. After the full-section tunnel boring machine excavates, it can continuously assemble the pipe segments to form support conditions. However, due to the complex geological conditions at the project site and the unclear understanding of the contact between the surrounding rock and the pipe segment, it is easy to be too conservative when designing the pipe segment support parameters, resulting in a waste of materials and manpower. Therefore, in-depth understanding of the full-section tunnel boring machine pipe segment support and the surrounding rock mechanical response process is of great engineering significance for optimizing the full-section tunnel boring machine support parameters.
[0003] At present, the experimental methods for understanding the mechanical response process of the segment support and surrounding rock of the full-section tunnel boring machine can be mainly divided into field experiments and indoor experiments. At present, different technical methods have been used to analyze the mechanical response process of the segment support and surrounding rock, and provide reference significance for optimizing the segment support parameters. However, although the results of the field experiment are reliable, the experimental cost is high and has a certain impact on the construction period. In terms of indoor physical model experiments, the method of pre-embedded segments is mostly used, which is contrary to the process of segment re-support after excavation at the engineering site, resulting in differences in the contact process between the segment and the surrounding rock, which limits the in-depth understanding of the segment support and surrounding rock mechanical response process by indoor experiments. Summary of the invention
[0004] The purpose of the present application is to provide an indoor simulation device and method for supporting tunnel segments during tunnel excavation by a full-section tunnel boring machine, which can quickly simulate the pressure of surrounding rocks on the segments when the segments support the tunnel after excavation by a micro full-section tunnel boring machine, and has the advantages of low experimental cost and good simulation similarity.
[0005] This application is implemented as follows:
[0006] The present application provides an indoor simulation method for tunnel segment support for excavation by a full-section tunnel boring machine, which is performed using an indoor simulation device for tunnel segment support for excavation by a full-section tunnel boring machine. The indoor simulation device for tunnel segment support for excavation by a full-section tunnel boring machine comprises a retaining frame, a plurality of arc-shaped outer segments and a plurality of arc-shaped inner segments alternately arranged along the circumference of the retaining frame, a transmission disc, a transmission device and a driving device for driving the transmission disc to rotate, the transmission device connects the transmission disc, the outer segments and the inner segments, the outer walls of the outer segments and the inner segments are respectively provided with at least one first pressure sensor, and the end faces of the outer segments and the inner segments along the circumferential direction are respectively provided with at least one second pressure sensor; when the transmission disc reciprocates, the transmission device drives the transmission disc to rotate. The outer tube segment and the inner tube segment expand outward to cooperate to form an annular supporting tube segment, or shrink inward until the inner tube segment is located on the inner side of the outer tube segment; the transmission device includes a plurality of push rods, and a transmission disk is provided with a plurality of arc-shaped first limiting holes corresponding to the outer tube segments one by one and a plurality of arc-shaped second limiting holes corresponding to the inner tube segments one by one, the first limiting holes and the second limiting holes are alternately arranged along the circumference of the transmission disk, the first limiting holes and the second limiting holes are respectively slidably inserted and matched with one end of a push rod, and the other end of each push rod is respectively connected to the corresponding outer tube segment and the corresponding inner tube segment, and one end of the retaining frame is provided with a plurality of positioning holes extending along the radial direction thereof, and each positioning hole is arranged at intervals along the circumference of the retaining frame, and one end of each push rod slides through a positioning hole;
[0007] The indoor simulation method for supporting tunnel segments during tunnel boring by a full-face tunnel boring machine includes the following steps:
[0008] Controlling the outer segments and the inner segments of the indoor simulation device for tunnel segment support excavated by the full-section tunnel boring machine to expand outwards and cooperate to form an annular support segment, collecting stress data detected by each first pressure sensor and each second pressure sensor as calibration stress data, and then controlling the outer segments and the inner segments of the indoor simulation device for tunnel segment support excavated by the full-section tunnel boring machine to shrink inwards;
[0009] The indoor simulation device for supporting the tunnel segments of a full-section tunnel boring machine is moved into the excavation hole excavated by the micro full-section tunnel boring machine, and the outer segments and the inner segments are controlled to expand outward to form an annular support segment to support the inner wall of the excavation hole, and the measured stress data detected by each first pressure sensor and each second pressure sensor are collected;
[0010] The surrounding rock-segment extrusion stress diagram and the segment tangential stress diagram are drawn based on the calibrated stress data and the measured stress data. ki , F ki ) and (θ mi , F mi ) is the polar coordinate point; where F ki =P ki -T ki ; F mi = / 2(P mi -T mi );θ ki is the polar angle of each first pressure sensor, θ mi is the polar angle of each second pressure sensor; ki is the measured stress data detected by each first pressure sensor, T ki is the calibration stress data detected by each first pressure sensor, P mi is the measured stress data detected by each second pressure sensor, T mi is the calibration stress data detected by each second pressure sensor; ki is the number of each first pressure sensor; mi is the number of each second pressure sensor; the polar coordinates take the center point of the transmission disk as the origin and the horizontal right direction as the polar axis.
[0011] In some optional embodiments, the transmission device includes multiple push rods, and the transmission disk is provided with multiple arc-shaped first limiting holes corresponding one-to-one to the outer tube segments and multiple arc-shaped second limiting holes corresponding one-to-one to the inner tube segments. The first limiting holes and the second limiting holes are alternately arranged along the circumference of the transmission disk. The first limiting holes and the second limiting holes are respectively slidably inserted into one end of a push rod, and the other end of each push rod is respectively connected to the corresponding outer tube segment and the corresponding inner tube segment.
[0012] In some optional embodiments, the first limiting hole and the second limiting hole extend in the circumferential direction of the transmission disk and in the radial direction of the transmission disk.
[0013] In some optional embodiments, one end of the retaining frame is provided with a plurality of positioning holes extending in the radial direction thereof, the positioning holes are arranged at intervals along the circumference of the retaining frame, and one end of each push rod slides through a positioning hole.
[0014] In some optional embodiments, the other end of the retaining frame is connected to a protective cover, and the retaining frame and the protective cover together form a housing cavity for accommodating the driving device.
[0015] In some optional embodiments, the outer wall of the retaining frame is recessed to form a segment groove, and the outer segment and the inner segment are arranged in the segment groove.
[0016] In some optional embodiments, the first pressure sensors are arranged at equal angular intervals along the circumferential direction.
[0017] In some optional embodiments, the second pressure sensors are arranged at equal angular intervals along the circumferential direction.
[0018] The beneficial effect of the present application is that the indoor simulation method for tunnel segment support during tunnel excavation by a full-section tunnel boring machine provided in the present application can quickly and efficiently simulate the pressure of the surrounding rock on the segment during the tunnel support process after excavation by a micro full-section tunnel boring machine in the indoor experiment. It has the advantages of low experimental cost and good simulation similarity, and provides an effective method for in-depth understanding of the mechanical mechanism between the segment and the surrounding rock and between the segments, and provides support for optimizing the segment compression parameters and the shear parameters between the segments at the engineering site. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 A schematic structural diagram of a first-view indoor simulation device for tunnel segment support by a full-face tunnel boring machine provided in an embodiment of the present application;
[0021] Figure 2 A schematic structural diagram of a second perspective of an indoor simulation device for supporting tunnel segments for a full-face tunnel boring machine provided in an embodiment of the present application;
[0022] Figure 3 A schematic diagram of the exploded structure of an indoor simulation device for tunnel segment support by a full-face tunnel boring machine provided in an embodiment of the present application;
[0023] Figure 4 A schematic diagram of the structure of an annular support segment formed by the outer segment and the inner segment expanding outwards in an indoor simulation device for tunnel segment support by a full-section tunnel boring machine provided in an embodiment of the present application;
[0024] Figure 5 A schematic diagram of a structure in which the outer segments and the inner segments of the indoor simulation device for tunnel segment support for full-face tunnel boring machine excavation provided by an embodiment of the present application are retracted inwardly until the inner segment is located inside the outer segment;
[0025] Figure 6 A schematic diagram of the structure of a first pressure sensor and a second pressure sensor provided on an outer segment and an inner segment in an indoor simulation device for supporting a tunnel segment excavated by a full-face tunnel boring machine provided in an embodiment of the present application;
[0026] Figure 7 A schematic diagram of the structure of an indoor simulation device for supporting tunnel segments excavated by a full-section tunnel boring machine provided in an embodiment of the present application, which is installed in an excavation hole excavated by a mini full-section tunnel boring machine;
[0027] Figure 8 A schematic diagram of surrounding rock-segment extrusion stress in an indoor simulation method for supporting tunnel segments excavated by a full-face tunnel boring machine provided in an embodiment of the present application;
[0028] Fig. 9 Schematic diagram of tangential stress between segments in the indoor simulation method for supporting tunnel segments excavated by a full-section tunnel boring machine provided in an embodiment of the present application.
[0029] In the figure: 100, retaining frame; 110, outer tube segment; 120, inner tube segment; 130, push rod; 140, transmission plate; 150, first limiting hole; 160, second limiting hole; 170, first pressure sensor; 180, second pressure sensor; 190, positioning hole; 200, protective cover; 210, accommodating cavity; 220, tube segment groove; 230, connecting rod; 300, driving device; 310, excavation hole. DETAILED DESCRIPTION
[0030] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.
[0031] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0032] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0033] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the application is usually placed when in use. They are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0034] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0035] In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0036] In the present application, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0037] The features and performance of the indoor simulation device and method for supporting tunnel segments for full-face tunnel boring machines of the present application are further described in detail below in conjunction with the embodiments.
[0038] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6As shown, an embodiment of the present application provides an indoor simulation device for tunnel segment support for excavation by a full-section tunnel boring machine, which includes an annular retaining frame 100, and the outer wall of one end of the retaining frame 100 is recessed to form an annular segment groove 220 extending along its circumference, and the segment groove 220 is provided with N arc-shaped outer segments 110 and N arc-shaped inner segments 120 arranged alternately along the circumference of the retaining frame 100, and the retaining frame 100 is provided with a rotatable transmission disk 140 arranged coaxially therewith, and the transmission disk 140 is connected to each outer segment 110 and each inner segment 120 through a transmission device, and the other end of the retaining frame 100 is connected to a protective cover 200, and the retaining frame 100 and the protective cover 200 are enclosed to form a accommodating chamber 210, and the accommodating chamber 210 is provided with a driving device 300 for driving the transmission disk 140 to rotate, and the driving device 300 is a motor whose output shaft is connected to the transmission disk 140. A first pressure sensor 170 is respectively provided on the outer side wall of the outer tube segment 110 and the inner tube segment 120, and a second pressure sensor 180 is respectively provided on one end surface of the outer tube segment 110 and the inner tube segment 120 along the circumferential direction. The first pressure sensors 170 are arranged at equal angles in the circumferential direction, and the second pressure sensors 180 are arranged at equal angles in the circumferential direction. When the transmission disk 140 rotates back and forth, the transmission device drives the outer tube segment 110 and the inner tube segment 120 to expand outward to form an annular support tube segment or to shrink inward until the inner tube segment 120 is located on the inner side of the outer tube segment 110.
[0039] The transmission device includes 2N push rods 130, and the transmission disk 140 is provided with N arc-shaped first limiting holes 150 corresponding to the outer tube segments 110 and N arc-shaped second limiting holes 160 corresponding to the inner tube segments 120. The first limiting holes 150 and the second limiting holes 160 both extend along the circumferential direction of the transmission disk 140 and extend along the radial direction of the transmission disk 140. The N first limiting holes 150 and the N second limiting holes 160 are alternately arranged along the circumferential direction of the transmission disk 140. The 2N push rods 130 One end of each push rod 130 is respectively slidably inserted into the N first limiting holes 150 and the N second limiting holes 160, and the other ends of the 2N push rods 130 are respectively connected to the corresponding N outer segments 110 and the corresponding N inner segments 120 through the connecting rods 230; the end of the retaining frame 100 away from the driving device 300 is provided with 2N positioning holes 190 extending along the radial direction thereof, and each positioning hole 190 is arranged at intervals along the circumference of the retaining frame 100, and one end of each push rod 130 slides through a positioning hole 190. In this embodiment, N=3, and in other optional embodiments, N can also be a positive integer greater than 1.
[0040] In addition, the diameter of the excavation hole 310 obtained by excavating the indoor micro full-section tunnel boring machine tunnel is D1, then the diameter of the annular supporting segment formed by the outer segment 110 and the inner segment 120 expanding outward is D1, and the diameter of the circle formed by the three outer segments 110 when the outer segment 110 and the inner segment 120 contract inward is Dy, and the diameter of the circle formed by the three inner segments 120 is Dn.
[0041] The thickness of the outer tube segment 110 and the inner tube segment 120 is equal and is t, the width of the outer tube segment 110 and the inner tube segment 120 along the axial direction is q, the number of the outer tube segment 110 and the inner tube segment 120 is equal to N=3, and the outer arc length of the outer tube segment 110 along the circumferential direction is L ww The inner arc length of the outer tube segment 110 along the circumferential direction is L wn The outer arc length of the inner tube segment 120 along the circumferential direction is L nw The inner arc length of the inner tube segment 120 along the circumferential direction is L nn In order to realize that the inner segment 120 and the outer segment 110 are assembled into a ring-shaped support segment when expanding outward, L ww >L wn , L nn >L nw , and the splicing length meets the following requirements:
[0042] N(L ww +L nw ) =πD1 (Formula 1)
[0043] When the centers of the outer segment 110 and the inner segment 120 are distributed at equal angles along the circumferential direction, the first pressure sensors 170 respectively provided on the outer side walls of the outer segment 110 and the inner segment 120 have a better monitoring effect on the extrusion stress of the surrounding rock, that is, the outer arc length of the outer segment 110 is L ww The outer arc length of the inner tube segment 120 is L nw The following relationship exists:
[0044] L ww =L nw (Formula 2)
[0045] When the angles between the connecting surfaces of the outer arc edge and the inner arc edge of the outer segment 110 and the inner segment 120 and the cut surface of the outer arc and the cut surface of the inner arc edge are 45° respectively, the extrusion load between two adjacent outer segments 110 and inner segments 120 can be made the same in radial and circumferential directions, which is conducive to maximizing the measurement range of the first pressure sensor 170.
[0046] The thickness t of the segment is much smaller than the diameter D1 of the supporting segment assembled into a ring when the inner segment 120 and the outer segment 110 expand outwards. ;
[0047] The outer arc length L of the outer tube segment 110 along the circumferential direction ww and the inner length L along the circumferential direction wn The following relationship exists:
[0048] (Formula 3);
[0049] The outer arc length L of the inner tube segment 120 along the circumferential direction nw and the inner length L along the circumferential direction nn The following relationship exists:
[0050] (Formula 4);
[0051] The transmission plate 140 is provided with three first limiting holes 150 and three second limiting holes 160. The diameter of the transmission plate 140 is smaller than D n The reserved hollow hole in the middle is sleeved on the output shaft of the motor. The second limiting hole 160 corresponding to the inner tube sheet 120 is composed of an arc, wherein the height difference between the starting point and the end point of the arc in the radial direction of the center circle of the transmission plate 140 is The first limiting hole 150 corresponding to the outer tube segment 110 is composed of two arc sections, and the height difference between the starting point and the end point of the first arc section in the radial direction of the center circle of the transmission plate 140 is The height difference between the starting point and the end point of the second arc in the radial direction of the center circle of the transmission disk 140 is 0. The two-arc design of the first limiting hole 150 corresponding to the outer tube segment 110 enables the transmission disk 140 to drive the outer tube segment 110 to move radially outward to expand to the propped-up position first when rotating, and the inner tube segment 120 moves radially outward to expand to the propped-up position later, which can effectively avoid the collision problem between the inner tube segment 120 and the outer tube segment 110 during the outward expansion and movement.
[0052] The embodiment of the present application also provides an indoor simulation method for supporting tunnel segments when a full-section tunnel boring machine is used, which is performed using the indoor simulation device for supporting tunnel segments when a full-section tunnel boring machine is used, and includes the following steps:
[0053] Step 1: Use a mini full-face tunnel boring machine to dig a hole 310, and connect each of the first pressure sensor 170 and the second pressure sensor 180 to a pressure collector;
[0054] Step 2: Control the driving device 300 of the indoor simulation device for tunnel segment support excavation by the full-section tunnel boring machine to drive the transmission disk 140 to rotate, so that when the transmission disk 140 rotates, the first limiting hole 150 and the second limiting hole 160 respectively push each push rod 130 to move, and then use each push rod 130 to push each outer segment 110 and the inner segment 120 to expand outward to form an annular support segment, collect the stress data detected by each first pressure sensor 170 and each second pressure sensor 180 as calibration stress data, and then control the driving device 300 of the indoor simulation device for tunnel segment support excavation by the full-section tunnel boring machine to drive the transmission disk 140 to rotate in the opposite direction, so that when the transmission disk 140 rotates in the opposite direction, the first limiting hole 150 and the second limiting hole 160 respectively push each push rod 130 to move in the opposite direction, and then use each push rod 130 to push the outer segment 110 and the inner segment 120 to shrink inward;
[0055] Step 3: Move the indoor simulation device for supporting tunnel segments excavated by a full-section tunnel boring machine into the excavation hole 310 excavated by the micro full-section tunnel boring machine and support it with a supporting device, control the driving device 300 of the indoor simulation device for supporting tunnel segments excavated by the full-section tunnel boring machine to drive the transmission disk 140 to rotate, and when the transmission disk 140 rotates, the first limiting hole 150 and the second limiting hole 160 respectively push each push rod 130 to move, and then use each push rod 130 to push each outer segment 110 and the inner segment 120 to expand outward to cooperate to form an annular support segment to support the inner wall of the excavation hole 310, and collect the measured stress data detected by each first pressure sensor 170 and each second pressure sensor 180;
[0056] Step 4: Use (θ ki , F ki ) and (θ mi , F mi ) is used as the polar coordinate point to draw the surrounding rock-segment extrusion stress diagram and the inter-segment tangential stress diagram;
[0057] Among them, F ki =P ki -T ki ; F mi = / 2(P mi -T mi );θ ki is the polar angle of each first pressure sensor 170, θ mi is the polar angle of each second pressure sensor 180; P ki is the measured stress data detected by each first pressure sensor 170, T ki is the calibration stress data detected by each first pressure sensor 170, P miis the measured stress data detected by each second pressure sensor 180, T mi is the calibration stress data detected by each second pressure sensor 180; ki is the serial number of each first pressure sensor 170; mi is the serial number of each second pressure sensor 180; the polar coordinates take the center point of the transmission disk 140 as the origin and the horizontal right direction as the polar axis.
[0058] The indoor simulation device and method for tunnel segment support during tunnel excavation by a full-section tunnel boring machine provided in the embodiment of the present application can simulate the pressure of the surrounding rock on the segments during the process of segment support of the tunnel after excavation by a micro full-section tunnel boring machine in indoor experiments. It has the advantages of low experimental cost and good simulation similarity, and breaks through the defect that the segment support mechanism is inconsistent with the actual situation in traditional physical model experiments using pre-buried segments. It realizes integrated monitoring of automatic segment support and load after indoor experimental micro tunnel excavation, and can provide a method for in-depth understanding of the mechanical mechanism between segment and surrounding rock and segment and segment, providing support for optimizing the segment compression parameters and the shear parameters between segments at the engineering site.
[0059] Example
[0060] The embodiment of the present application provides a method for simulating indoor support of tunnel segments excavated by a full-section tunnel boring machine, which is performed using the above-mentioned indoor simulation device for simulating indoor support of tunnel segments excavated by a full-section tunnel boring machine. The parameters of the indoor simulation device for simulating indoor support of tunnel segments excavated by a full-section tunnel boring machine are as follows:
[0061] The diameter D1 of the excavation hole 310 excavated by the indoor micro full-face tunnel boring machine is set to 200 mm. The diameter D1 of the annular support segment formed by the outer segment 110 and the inner segment 120 expanding outward is 200 mm. The diameter D1 of the circle formed by the outer segment 110 after the outer segment 110 and the inner segment 120 shrink inward is y is 184 mm. The diameter D of the circle formed by the outer segment 110 and the inner segment 120 after the inner segment 120 shrinks inwards is n It is 170mm.
[0062] The number N of the outer tube segment 110 and the inner tube segment 120 is 3, the thickness t of the outer tube segment 110 and the inner tube segment 120 is 8 mm, the width q of the outer tube segment 110 and the inner tube segment 120 along the axial direction is 60 mm, the angle between the outer arc edge and the inner arc edge connecting surface of the outer tube segment 110 and the inner tube segment 120 and the outer arc tangent surface and the inner arc tangent surface is 45°, and the centers of the outer tube segment 110 and the inner tube segment 120 are arranged at equal angles along the circumferential direction, then the outer arc length L of the outer tube segment 110 along the circumferential direction is ww The inner arc length L of the outer tube segment 110 along the circumferential direction is 104.67 mm. wnis 80.28 mm, and the outer arc length L of the inner tube segment 120 along the circumferential direction nw is 104.67 mm, and the inner arc length L of the inner tube segment 120 along the circumferential direction is nn It is 112.28mm.
[0063] Three first limiting holes 150 and three second limiting holes 160 are arranged on the transmission disk 140. The first limiting hole 150 corresponding to the outer tube segment 110 is composed of two arc sections. The height difference between the starting point and the end point of the first arc section in the radial direction of the center circle of the transmission disk 140 is 7 mm, and the height difference between the starting point and the end point of the second arc section in the radial direction of the center circle of the transmission disk 140 is 0; the second limiting hole 160 corresponding to the inner tube segment 120 is composed of an arc section, wherein the height difference between the starting point and the end point of the arc in the radial direction of the center circle of the transmission disk 140 is 15 mm.
[0064] A first pressure sensor 170 is respectively disposed at the center of the outer wall of the outer tube segment 110 and the inner tube segment 120. The polar angle of each first pressure sensor 170 is θ ki (i=1,2,3,4,5,6)=(0°,60°,120°,180°,240°,300°), the outer tube segment 110 and the inner tube segment 120 are respectively provided with a second pressure sensor 180 on the end surface along the circumferential direction, and the polar angle θ of each second pressure sensor 180 is mi (i=1,2,3,4,5,6)=(30°,90°,150°,210°,270°,330°); the polar coordinates are based on the center point of the transmission disk 140 as the origin, and the horizontal right direction as the polar axis.
[0065] The following steps are involved:
[0066] Step 1: Connect the six first pressure sensors 170 and the six second pressure sensors 180 to the pressure acquisition instrument, control the driving device 300 of the indoor simulation device for tunnel segment support of the full-section tunnel boring machine to drive the transmission disk 140 to rotate, and when the transmission disk 140 rotates, the first limiting hole 150 and the second limiting hole 160 respectively push each push rod 130 to move, and then use each push rod 130 to push each outer segment 110 and the inner segment 120 to expand outward to form a ring-shaped support segment, and wait for the data of the first pressure sensor 170 to stabilize and record the values T of the six first pressure sensors 170 ki (i=1,2,3,4,5,6) = (0.02,0.03,0.05,0.02,0.06,0.04), 6 second pressure sensors T mi(i=1,2,3,4,5,6)=(0.44,0.52,0.47,0.63,0.56,0.48) values, and then the driving device 300 of the indoor simulation device for tunnel segment support excavation by the full-section tunnel boring machine is controlled to drive the transmission disk 140 to rotate in the opposite direction. When the transmission disk 140 rotates in the opposite direction, the first limiting hole 150 and the second limiting hole 160 respectively push each push rod 130 to move in the opposite direction, and then each push rod 130 is used to push the outer segment 110 and the inner segment 120 to retract inward.
[0067] Step 2: Figure 7 As shown, the indoor simulation device for supporting the tunnel segments excavated by the full-section tunnel boring machine is moved into the excavation hole 310 excavated by the miniature full-section tunnel boring machine and supported by the supporting device, and the driving device 300 of the indoor simulation device for supporting the tunnel segments excavated by the full-section tunnel boring machine is controlled to drive the transmission plate 140 to rotate. When the transmission plate 140 rotates, the first limiting holes 150 and the second limiting holes 160 respectively push the push rods 130 to move, and then the push rods 130 push the outer segments 110 and the inner segments 120 to expand outwards to form an annular support segment to support the inner wall of the excavation hole 310, and collect the stress data P measured by the six first pressure sensors 170 ki (i=1,2,3,4,5,6) = (1.35,1.76,1.85,1.62,1.55,1.33), 6 second pressure sensors 180 values P mi (i=1,2,3,4,5,6)=(1.23,1.11,1.25,1.31,1.29,1.20). After the recording is completed, the driving device 300 of the indoor simulation device for controlling the full-section tunnel boring machine to excavate the tunnel segment support drives the transmission disk 140 to rotate in the opposite direction. When the transmission disk 140 rotates in the opposite direction, the first limiting hole 150 and the second limiting hole 160 respectively push each push rod 130 to move in the opposite direction, and then use each push rod 130 to push the outer segment 110 and the inner segment 120 to shrink inward and escape from the excavation hole 310.
[0068] According to formula F ki =P ki -T ki , F mi = / 2(P mi -T mi ) Calculate the extrusion stress F of the surrounding rock on the segment ki (i=1,2,3,4,5,6)=(1.33,1.73,1.80,1.60,1.49,1.29), tangential stress F between segments mi (i=1,2,3,4,5,6)=(0.56,0.42,0.55,0.48,0.52,0.51).
[0069] Combined with the polar angle θ of each first pressure sensor 170 and each second pressure sensor 180 ki and θ mi , (θ ki , F ki ) and (θ mi , F mi ) is used as the polar coordinate point to draw the surrounding rock-segment extrusion stress diagram as shown in Figure 8 As shown, the tangential stress diagram between the segments is drawn as shown Fig. 9 shown.
[0070] The embodiments described above are part of the embodiments of the present application, rather than all of the embodiments. The detailed description of the embodiments of the present application is not intended to limit the scope of the present application for protection, but merely represents the selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.
Claims
1. A method for simulating indoor support of tunnel segments for full-face tunnel boring machines, characterized in that: The method is carried out using an indoor simulation device for tunnel segment support excavated by a full-section tunnel boring machine. The indoor simulation device for tunnel segment support excavated by a full-section tunnel boring machine includes a retaining frame, a plurality of arc-shaped outer segments and a plurality of arc-shaped inner segments alternately arranged along the circumference of the retaining frame, a transmission disc, a transmission device and a driving device for driving the transmission disc to rotate. The transmission device connects the transmission disc, the outer segments and the inner segments. The outer walls of the outer segments and the inner segments are respectively provided with at least one first pressure sensor, and the end faces of the outer segments and the inner segments along the circumferential direction are respectively provided with at least one second pressure sensor; when the transmission disc reciprocates, the transmission device drives the outer segments and the inner segments to expand outward to cooperate to form an annular support tube segment, or shrinks inwardly until the inner tube segment is located on the inner side of the outer tube segment; the transmission device includes a plurality of push rods, the transmission disk is provided with a plurality of arc-shaped first limiting holes corresponding to the outer tube segment one by one and a plurality of arc-shaped second limiting holes corresponding to the inner tube segment one by one, the first limiting holes and the second limiting holes are alternately arranged along the circumference of the transmission disk, the first limiting holes and the second limiting holes are respectively slidably inserted and matched with one end of a push rod, the other end of each of the push rods is respectively connected to the corresponding outer tube segment and the corresponding inner tube segment, one end of the retaining frame is provided with a plurality of positioning holes extending along the radial direction thereof, each of the positioning holes is arranged at intervals along the circumference of the retaining frame, and one end of each of the push rods slides through one of the positioning holes; The indoor simulation method for supporting tunnel segments during tunnel boring by a full-face tunnel boring machine includes the following steps: Controlling the outer segment and the inner segment of the indoor simulation device for supporting tunnel segments excavated by the full-section tunnel boring machine to expand outwards and cooperate to form an annular supporting segment, collecting stress data detected by each of the first pressure sensors and each of the second pressure sensors as calibration stress data, and then controlling the outer segment and the inner segment of the indoor simulation device for supporting tunnel segments excavated by the full-section tunnel boring machine to shrink inwards; The indoor simulation device for supporting tunnel segments excavated by a full-section tunnel boring machine is moved into an excavation hole excavated by a micro full-section tunnel boring machine, the outer segments and the inner segments are controlled to expand outwards to cooperate to form an annular support segment to support the inner wall of the excavation hole, and the measured stress data detected by each of the first pressure sensors and each of the second pressure sensors are collected; The surrounding rock-segment extrusion stress diagram and the inter-segment tangential stress diagram are drawn based on the calibrated stress data and the measured stress data. ki , F ki ) and (θ mi , F mi ) is the polar coordinate point; where F ki =P ki -T ki ; F mi = / 2(P mi -T mi );θ ki is the polar angle of each of the first pressure sensors, θ mi is the polar angle of each of the second pressure sensors; ki is the measured stress data detected by each of the first pressure sensors, T ki is the calibration stress data detected by each of the first pressure sensors, P mi is the measured stress data detected by each of the second pressure sensors, T mi is the calibration stress data detected by each of the second pressure sensors; ki is the serial number of each of the first pressure sensors; mi is the serial number of each of the second pressure sensors; the polar coordinates take the center point of the transmission disk as the origin and the horizontal right direction as the polar axis.
2. The indoor simulation method for supporting tunnel segments excavated by a full-face tunnel boring machine according to claim 1, characterized in that: The first limiting hole and the second limiting hole extend in the circumferential direction of the transmission disk and in the radial direction of the transmission disk.
3. The indoor simulation method for supporting tunnel segments excavated by a full-face tunnel boring machine according to claim 1, characterized in that: The other end of the retaining frame is connected to a protective cover, and the retaining frame and the protective cover together form an accommodating cavity for accommodating the driving device.
4. The indoor simulation method for supporting tunnel segments excavated by a full-face tunnel boring machine according to claim 1, characterized in that: The outer wall of the retaining frame is recessed to form a tube segment groove, and the outer tube segment and the inner tube segment are arranged in the tube segment groove.
5. The indoor simulation method for supporting tunnel segments in a full-face tunnel boring machine according to claim 1, characterized in that: The first pressure sensors are arranged at equal angular intervals along the circumferential direction.
6. The indoor simulation method for supporting tunnel segments in a full-face tunnel boring machine according to claim 1, characterized in that: The second pressure sensors are arranged at equal angular intervals along the circumferential direction.
