A construction method for complex cantilever steel structure
By determining the core cylinder position in the construction of complex cantilever steel structures and using support adjustment devices to align and fix the cantilever steel frames, the problem of installation accuracy control during construction is solved and the construction effect is improved.
Patent Information
- Application Number
- CN202411154604.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-22
AI Technical Summary
In the construction of complex cantilevered steel structures, it is difficult to control the vertical and horizontal cantilevered installation accuracy at the same time, which affects the construction effect.
A construction method is adopted to determine the number and position of the core cylinder, divergent installation of the cantilever steel structure from the middle to both ends, and to use a support adjustment device to align and fix the cantilever steel frame and the middle steel frame. Ensure the installation accuracy of the inter-layer structure.
Through the combination of construction methods and support adjustment devices, precise control during cantilever construction is achieved, and the construction effect and installation accuracy of complex cantilever steel structures are improved.
Smart Images

Figure CN118668932B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction, and particularly relates to a construction method for a complex cantilever steel structure. Background Art
[0002] As the functions of large public buildings become increasingly complex, the emergence of various complex shapes has increased the difficulty of structural layout, such as various complex two-way cantilever structures, which brings challenges to refined construction. Figure 2 The complex steel structure shown has a cantilevered steel structure distributed high in the air and has the characteristics of large cantilever spans, multiple continuous spans and arc-shaped arrangement.
[0003] In the construction of complex cantilever steel structures, how to simultaneously control the vertical and horizontal cantilever installation accuracy is a key factor in ensuring the construction effect of the complex cantilever steel structures. Therefore, a construction method for complex cantilever steel structures is proposed. Summary of the invention
[0004] In view of this, an object of the present invention is to provide a construction method of a complex cantilever steel structure, so as to improve the construction effect of the complex cantilever steel structure.
[0005] In order to achieve the above object, the present invention provides the following technical solutions:
[0006] The present invention provides a construction method for a complex cantilever steel structure, comprising the following construction steps:
[0007] S1. Determine the number and location of the core tube according to the on-site construction conditions;
[0008] S2. Install the cantilever steel structure from the central core tube to the core tubes at both ends simultaneously. When the cantilever steel structure is being constructed, first install the cantilever steel structure connected to the core tube, and then install the cantilever steel structure located between the adjacent core tubes and connected to the central steel structure.
[0009] S3. When installing the cantilever steel structure, first align the cantilever steel frame of the cantilever steel structure and one end surface of the middle steel frame of the middle steel structure through the support adjustment device, then fix them, and finally install the interlayer structure between the two cantilever steel frames;
[0010] S4. Construct the cantilever steel structure according to steps S1-S3 until the construction is completed.
[0011] Further, the support and adjustment device in step S3 includes a connecting plate, one end of the connecting plate is provided with a hoop connected to the middle steel structure, the other end of the connecting plate is provided with a mounting plate, the connecting plate is connected to the middle of the mounting plate, side plates are provided on both ends of the mounting plate, the upper surface of the side plate is fixed to the mounting plate, a bearing plate is provided between the two side plates, sliding rods are provided on both ends of the bearing plate facing the side plates, the bearing plate is slidably connected to the bearing plate, both ends of the sliding rod are fixedly connected to the side plates, symmetrically arranged light rods are provided at the middle parts of the inner sides of the two side plates, one end of the light rod is fixed to the side plate, a cross bar is provided on the other end of the light rod, both ends of the cross bar are respectively fixed to two symmetrically arranged light rods, a slider is provided on the symmetrically arranged light rod, the slider is slidably connected to the light rod, a push rod is provided in the middle part of the slider, one end of the push rod is fixed to the slider, a splint is provided on the other end of the push rod, a traction rope is provided on the slider, one end of the traction rope is fixed to the slider, and the other end of the traction rope passes through the cross bar and is connected to the bearing plate.
[0012] Furthermore, a winding wheel is provided on the lower surface of the supporting plate, and both ends of the winding wheel are rotatably connected to the lower surface of the supporting plate. A fixed shaft is provided on one end of the winding wheel, and a limit pin is provided on the supporting plate. The limit pin is slidably connected to the supporting plate, and the limit pin is inserted into the end of the fixed shaft to limit the rotation of the fixed shaft.
[0013] Furthermore, the polished rods are each provided with a compression spring, which is sleeved on the polished rods and located between the slider and the crossbar.
[0014] Furthermore, a plurality of evenly distributed rollers are provided on the upper surface of the bearing plate, and the rollers are arranged perpendicular to the side plates.
[0015] Furthermore, a cavity is provided at the end of the mounting plate, and the end of the connecting plate is slidably connected in the cavity. At least two limiting holes are provided on the mounting plate and the connecting plate. At least two plug-in rods are provided in the middle of the mounting plate, one end of the plug-in rod is slidably connected in the limiting hole, and an end plate is provided on the other end of the plug-in rod.
[0016] Furthermore, a tension spring is provided between the end plate and the mounting plate, the tension spring is sleeved on the plug-in rod, and two ends of the tension spring are respectively fixed to the end plate and the mounting plate.
[0017] Furthermore, two limit plates are provided on the connecting plate, the limit plates are fixed on the connecting plate, the mounting plate is located between the two limit plates, and the height of the limit plates is greater than the height of the mounting plate.
[0018] The beneficial effects of the present invention are:
[0019] In this technical solution, through the combination of construction methods and support adjustment devices, the vertical and horizontal positions during cantilever construction can be accurately controlled, ensuring the installation accuracy during cantilever construction, thereby improving the construction effect of complex cantilever steel structures.
[0020] Other advantages, objectives and features of the present invention will be described in the following description and will be apparent to those skilled in the art to some extent, or those skilled in the art may be taught from the practice of the present invention. The objectives and other advantages of the present invention may be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to make the purpose, technical solution and beneficial effects of the present invention clearer, the present invention provides the following drawings for illustration:
[0022] Figure 1 It is a schematic diagram of the process of the cantilever construction method in the present invention;
[0023] Figure 2 It is a schematic plan view of the complex cantilever steel structure in the present invention;
[0024] Figure 3 It is a three-dimensional schematic diagram of the support adjustment device in the present invention acting on the middle steel structure and the cantilever steel structure;
[0025] Figure 4 It is a three-dimensional schematic diagram of the support and adjustment device in the present invention;
[0026] Figure 5 It is a three-dimensional schematic diagram of another viewing angle of the support adjustment device in the present invention;
[0027] Figure 6 It is a schematic front view of the support adjustment device in the present invention;
[0028] Figure 7 for Figure 3 A local enlarged schematic diagram of point A in the middle.
[0029] The following are marked in the accompanying drawings:
[0030] 1. Core tube; 2. Middle steel structure; 3. Cantilever steel structure; 4. Cantilever steel frame; 5. Interlayer structure; 6. Connecting plate; 7. Mounting plate; 8. Hoop; 9. Side plate; 10. Load-bearing plate; 11. Slide bar; 12. Bare rod; 13. Sliding block; 14. Push rod; 15. Clamp; 16. Cross bar; 17. Traction rope; 18. Winding wheel; 19. Fixed shaft; 20. Limit pin; 21. Limit hole; 22. Limit plate; 23. Plug rod; 24. Tension spring; 25. End plate; 26. Extrusion spring; 27. Middle steel frame; 28. Middle steel structure area; 29. Cantilever steel structure area. DETAILED DESCRIPTION
[0031] like Figure 1-Figure 7 As shown, the construction method of a complex cantilever steel structure of the present invention comprises the following construction steps:
[0032] S1. Determine the number and location of the core tube 1 according to the on-site construction conditions; Figure 2 As shown, in this specific embodiment, the number of core tubes 1 is 5, and the cantilevered steel structure 3 is arranged in an arc shape, the part between the core tubes 1 is the middle steel structure area 28, and the outer part of the core tube 1 is the cantilevered steel structure area 29.
[0033] S2, the cantilever steel structure 3 is installed from the core tube 1 in the middle to the core tubes 1 at both ends at the same time. When the cantilever steel structure 3 is being constructed, the cantilever steel structure 3 connected to the core tube 1 is installed first, and then the cantilever steel structure 3 located between the adjacent core tubes 1 and connected to the middle steel structure 2 is installed; specifically, Figure 2 As shown in Figure 1, the areas are first divided according to the construction sequence, such as Figure 2 For Z1-Z9 in the figure, during the specific construction, the cantilever steel structure 3 connected to the core tube 1 in the middle in areas Z1, Z2 and Z3 is first constructed synchronously, and then the cantilever steel structure 3 connected to the middle steel structure 2 in areas Z4 and Z5 is constructed synchronously, and then the cantilever steel structure 3 connected to the core tube 1 at both ends at Z6 and Z7 is constructed, and finally the cantilever steel structure 3 connected to the middle steel structure 2 at Z8 and Z9 is constructed. The advantage of synchronous divergent construction is that it is similar to the overall symmetrical construction of the cantilever steel structure 3, which ensures the stability of the overall construction. At the same time, the construction method of first the two ends and then the middle can make the cantilever steel structure 3 in each area have good connection stability during construction, further improving the construction effect.
[0034] S3. When installing the cantilever steel structure 3, first align the cantilever steel frame 4 of the cantilever steel structure 3 and one end surface of the middle steel frame 27 of the middle steel structure 2 through the support adjustment device, then fix them, and finally install the interlayer structure 5 located between the two cantilever steel frames 4; Figure 2 As shown, the cantilever steel structure 3 can be understood as a cantilever truss, including cantilever steel frames 4 on both sides and an interlayer structure 5 connecting the cantilever steel frames 4 on both sides. Installing the cantilever steel frame 4 first facilitates positioning of the overall cantilever and improves the installation accuracy of the cantilever steel structure 3.
[0035] S4. Construct the cantilever steel structure 3 according to steps S1-S3 until the construction is completed.
[0036] In one practicable manner, Figure 2As shown, since the overall construction of the cantilever steel structure 3 is in an arc shape, in order to ensure that the construction meets the requirements of accuracy and appearance, a group of cantilever steel frames 4 of the cantilever steel structure 3 and the middle steel frame 27 of the middle steel structure 2 should be in a straight line after being connected. Therefore, when constructing the cantilever steel structure 3, the position accuracy of the cantilever steel frame 4 of the cantilever steel structure 3 and the middle steel frame 27 of the middle steel structure 2 is very important, so it is necessary to use a support adjustment device to control the installation accuracy of the cantilever steel frame 4.
[0037] Specifically, the support and adjustment device includes a connecting plate 6, one end of which is provided with a hoop 8 connected to the middle steel structure 2, and the other end of the connecting plate 6 is provided with a mounting plate 7, the mounting plate 7 is arranged perpendicular to the connecting plate 6, the connecting plate 6 is connected to the middle of the mounting plate 7, and side plates 9 are provided on both ends of the mounting plate 7, the upper surface of the side plate 9 is fixed on the mounting plate 7, a bearing plate 10 is provided between the two side plates 9, and sliding rods 11 are provided on both ends of the bearing plate 10 facing the side plates 9, the bearing plate 10 is slidably connected to the bearing plate 10, and the two ends of the sliding rod 11 are fixedly connected to the side plates 9, and the middle parts of the inner sides of the two side plates 9 are A symmetrically arranged light rod 12 is provided, one end of the light rod 12 is fixed to the side plate 9, a cross bar 16 is provided on the other end of the light rod 12, both ends of the cross bar 16 are respectively fixed to the two symmetrically arranged light rods 12, a slider 13 is provided on the symmetrically arranged light rod 12, the slider 13 is slidably connected to the light rod 12, a push rod 14 is provided in the middle of the slider 13, one end of the push rod 14 is fixed to the slider 13, a splint 15 is provided on the other end of the push rod 14, a traction rope 17 is provided on the slider 13, one end of the traction rope 17 is fixed to the slider 13, and the other end of the traction rope 17 passes through the cross bar 16 and is connected to the bearing plate 10.
[0038] The working principle of the above technical solution is:
[0039] The connecting plate 6 is fixed to the upper surface of the middle steel frame 27 by the clamp 8, that is, at this time, the connecting plate 6 is arranged parallel to the middle steel frame 27 and is located in a straight line, and then the cantilever steel frame 4 is hoisted on the load-bearing plate 10, and under the action of the gravity of the cantilever steel frame 4, the load-bearing plate 10 will be driven to move downward. During the movement, under the action of the traction rope 17, the slider 13 is driven to move, and then the push rod 14 and the clamping plate 15 are driven to move, that is, under the action of the clamping plate 15, the cantilever steel frame 4 will be pushed to the middle of the load-bearing plate 10, that is, at this time, the cantilever steel frame 4 is arranged parallel to the connecting plate 6, that is, the cantilever steel frame 4 and the middle steel frame 27 are located in a straight line, and then the end of the cantilever steel frame 4 is manually pushed to make the ends of the two contact with each other, so as to facilitate the precise positioning and fixed connection of the two.
[0040] In an operative manner, a winding wheel 18 is provided on the lower surface of the supporting plate 10, and both ends of the winding wheel 18 are rotatably connected to the lower surface of the supporting plate 10, and a fixed shaft 19 is provided on one end of the winding wheel 18. A limit pin 20 is provided on the supporting plate 10, and the limit pin 20 is slidably connected to the supporting plate 10. The limit pin 20 is inserted into the end of the fixed shaft 19 to limit the rotation of the fixed shaft 19. By rotating the winding wheel 18, the initial length of the traction rope 17 can be controlled, that is, the distance of the supporting plate 10 relative to the slider 13 can be controlled, so that the device can be used to position and clamp cantilever steel frames 4 of different heights (the spacing direction between the supporting plate 10 and the slider 13 represents the height direction). In specific implementation, the length of the traction rope 17 should be sufficient. When the cantilever steel frame 4 moves to the point where its upper surface is flush with the upper surface of the middle steel frame 27 under the action of gravity, the clamping plate 15 just pushes the cantilever steel frame 4 to the middle of the supporting plate 10.
[0041] In one practicable manner, the bare rod 12 is provided with a compression spring 26, which is sleeved on the bare rod 12 and located between the slider 13 and the crossbar 16. After the cantilever steel frame 4 is installed, it is only necessary to loosen the clamp 8, and then, under the action of the hoisting device, slide the support adjustment device along the length direction of the installed cantilever steel frame 4. After sliding out, the load-bearing plate 10 loses its force, and under the action of the compression spring 26, it will drive the slider 13 to reset, that is, drive the clamp 15 to reset, so as to facilitate the next use. It is not difficult to understand that rollers or other methods of reducing friction can be set on the clamp 15 to facilitate the sliding separation of the clamp 15 from the cantilever steel frame 4.
[0042] In one feasible manner, a plurality of evenly distributed rollers are provided on the upper surface of the load-bearing plate 10, and the rollers are arranged perpendicular to the side plates 9. The arrangement of the rollers further reduces the sliding friction of the cantilevered steel frame 4 on the load-bearing plate 10, making it easier for the staff to push.
[0043] In one practicable manner, a cavity is provided at the end of the mounting plate 7, and the end of the connecting plate 6 is slidably connected in the cavity. At least two limiting holes 21 are provided on the mounting plate 7 and the connecting plate 6, and at least two plug-in rods 23 are provided in the middle of the mounting plate 7. One end of the plug-in rod 23 is slidably connected in the limiting hole 21, and an end plate 25 is provided on the other end of the plug-in rod 23. That is, by changing the position of the plug-in rod 23, the connection position between the connecting plate 6 and the mounting plate 7 can be changed, thereby overcoming the problem that the space on one side of the installed cantilever steel structure 3 is narrow under special circumstances, resulting in the inability to use the support adjustment device. Specifically, the connecting plate 6 can be slid and arranged close to one end of the mounting plate 7 (the mounting plate 7 is close to the end of the cantilever steel structure 3 installed last time), that is, when installing this end, only a smaller installation space is needed, and then the traction rope 17 on this side is adjusted to loosen the winding wheel 18 on this side, that is, it will not drive the slider 13 to move, and then the winding wheel 18 on the other side is arranged normally, and the length of the push rod 14 is adjusted to make the upper surface of the cantilever steel frame 4 flush with the middle steel frame 27, and the push rod 14 pushes the cantilever steel frame 4 to a position in a straight line with the middle steel frame 27.
[0044] In one feasible manner, the push rod 14 is a telescopic setting, such as the telescopic rod in the prior art. The telescopic setting can be used for cantilever trusses of different thicknesses, that is, by adjusting the length of the traction rope 17 and the length of the push rod 14, the cantilever steel frames 4 of different heights and thicknesses can be positioned and installed. At the same time, the setting of the telescopic rod can also be better adapted to the working condition where the position on one side is narrow and the device needs to adjust the length of the push rod 14 on one side.
[0045] In one feasible manner, a tension spring 24 is provided between the end plate 25 and the mounting plate 7. The tension spring 24 is sleeved on the plug-in rod 23, and the two ends of the tension spring 24 are respectively fixed on the end plate 25 and the mounting plate 7. The tension spring 24 always presses the plug-in rod 23 down in the limiting hole 21 to prevent it from vibrating out.
[0046] In one feasible manner, two limit plates 22 are provided on the connecting plate 6, the limit plates 22 are fixed on the connecting plate 6, the mounting plate 7 is located between the two limit plates 22, the height of the limit plates 22 is greater than the height of the mounting plate 7, and the two limit plates 22 are in contact with both sides of the mounting plate 7, thereby limiting the relative rotation between the mounting plate 7 and the connecting plate 6, thereby further ensuring the positioning accuracy.
[0047] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.
Claims
1. A construction method for a complex cantilever steel structure, characterized in that: The construction steps include: S1. Determine the number and location of the core tubes (1) according to the on-site construction conditions; S2, installing the cantilever steel structure (3) from the middle core tube (1) to the core tubes (1) at both ends simultaneously, wherein when the cantilever steel structure (3) is being constructed, the cantilever steel structure (3) connected to the core tube (1) is first installed, and then the cantilever steel structure (3) located between adjacent core tubes (1) and connected to the middle steel structure (2) is installed; S3. When installing the cantilever steel structure (3), firstly align the cantilever steel frame (4) of the cantilever steel structure (3) and one end surface of the middle steel frame (27) of the middle steel structure (2) by using the support adjustment device, then fix them, and finally install the interlayer structure (5) located between the two cantilever steel frames (4); S4, constructing the cantilever steel structure (3) according to steps S1-S3 until the construction is completed; The support and adjustment device in step S3 comprises a connecting plate (6), one end of which is provided with a hoop (8) connected to the middle steel structure (2), the other end of which is provided with a mounting plate (7), the connecting plate (6) being connected to the middle of the mounting plate (7), both ends of which are provided with side plates (9), the upper surface of which is fixed to the mounting plate (7), a bearing plate (10) being provided between the two side plates (9), both ends of which are provided with sliding rods (11) facing the side plates (9), the bearing plate (10) being slidably connected to the bearing plate (10), both ends of which are fixedly connected to the side plates (9), and symmetrically arranged light guides being provided at the middle of the inner sides of the two side plates (9). A rod (12), one end of the light rod (12) is fixed to the side plate (9), the other end of the light rod (12) is provided with a cross bar (16), the two ends of the cross bar (16) are respectively fixed to two symmetrically arranged light rods (12), the symmetrically arranged light rods (12) are provided with sliders (13), the sliders (13) are slidably connected to the light rods (12), a push rod (14) is provided in the middle of the slider (13), one end of the push rod (14) is fixed to the slider (13), the other end of the push rod (14) is provided with a clamping plate (15), the slider (13) is provided with a traction rope (17), one end of the traction rope (17) is fixed to the slider (13), and the other end of the traction rope (17) passes through the cross bar (16) and is connected to the bearing plate (10).
2. The construction method of a complex cantilever steel structure according to claim 1, characterized in that: A winding wheel (18) is provided on the lower surface of the supporting plate (10), and both ends of the winding wheel (18) are rotatably connected to the lower surface of the supporting plate (10). A fixed shaft (19) is provided on one end of the winding wheel (18). A limit pin (20) is provided on the supporting plate (10), and the limit pin (20) is slidably connected to the supporting plate (10). The limit pin (20) is inserted into the end of the fixed shaft (19) to limit the rotation of the fixed shaft (19).
3. The construction method of a complex cantilever steel structure according to claim 1, characterized in that: The polished rod (12) is provided with a compression spring (26), the compression spring (26) is sleeved on the polished rod (12) and is located between the slider (13) and the crossbar (16).
4. The construction method of a complex cantilever steel structure according to claim 1, characterized in that: A plurality of evenly distributed rollers are provided on the upper surface of the bearing plate (10), and the rollers are arranged perpendicular to the side plates (9).
5. The construction method of a complex cantilever steel structure according to claim 1, characterized in that: A cavity is provided at the end of the mounting plate (7), and the end of the connecting plate (6) is slidably connected in the cavity. At least two limiting holes (21) are provided on the mounting plate (7) and the connecting plate (6). At least two plug-in rods (23) are provided in the middle of the mounting plate (7), and one end of the plug-in rod (23) is slidably connected in the limiting hole (21), and an end plate (25) is provided on the other end of the plug-in rod (23).
6. The construction method of a complex cantilever steel structure according to claim 5, characterized in that: A tension spring (24) is provided between the end plate (25) and the mounting plate (7); the tension spring (24) is sleeved on the plug-in rod (23), and two ends of the tension spring (24) are respectively fixed to the end plate (25) and the mounting plate (7).
7. The construction method of a complex cantilever steel structure according to claim 5, characterized in that: Two limit plates (22) are provided on the connecting plate (6), the limit plates (22) are fixed on the connecting plate (6), the mounting plate (7) is located between the two limit plates (22), and the height of the limit plates (22) is greater than the height of the mounting plate (7).