Remote automated monitoring method for shield tunnels

By collecting and analyzing the displacement information of the shield pipeline and identifying abnormal states in combination with the three-dimensional model, the problem of the shift of the operation path of the shield machine and the difficulty in monitoring the pipe sheet during remote automatic monitoring of shield tunnels is solved, and the construction of shield tunnels is realized. Real-time security monitoring and efficiency optimization.

CN118714478BActive Publication Date: 2024-11-08CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411199448.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-11-08
Estimated Expiration
2044-08-29

AI Technical Summary

Technical Problem

The existing remote automation monitoring methods for shield tunnels are difficult to obtain the deviation of the shield machine operating path and the stress of the pipe segment in real time, which makes it difficult to adjust the construction progress and equipment damage in a timely manner, affecting construction safety and efficiency.

Method used

By selecting construction monitoring sections, collecting shield pipeline displacement information, using wireless communication technology to transmit and preprocess data, combining three-dimensional models to identify key points and judge abnormal status, generating early warnings and adjusting excavation parameters, and monitoring the work of shield machine in real time status and soil settlement.

Benefits of technology

It realizes accurate analysis and real-time monitoring of the operating path of the shield machine, optimizes the excavation parameters, ensures construction safety, reduces monitoring costs, and improves construction efficiency and safety control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118714478B_ABST
    Figure CN118714478B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of remote automatic monitoring of tunnels, and specifically discloses a remote automatic monitoring method for shield tunnels, the method comprising: step 1, selecting a construction monitoring section according to construction needs, and collecting shield pipe displacement information of the construction monitoring section; step 2, transmitting the shield pipe displacement information to a remote control platform through wireless communication technology, and preprocessing the shield pipe displacement information; step 3, inputting the preprocessed shield pipe displacement information as a training set into a preset three-dimensional model for key point identification, and judging the abnormal state information results of each key point in real time; step 4, providing feedback and early warning according to the abnormal state information results, and adjusting the tunneling parameters of the shield machine. The present invention realizes the accurate analysis of the shield machine's running path and the real-time monitoring of the shield machine's operation tunneling process, and realizes the safe monitoring and adjustment process of the tunneling work route and the shield machine.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of remote automatic monitoring of tunnels, and in particular to a remote automatic monitoring method for shield tunnels. Background Art

[0002] With the continuous increase of urban population, urban rail transit construction has been continuously improved in recent years, and the modes of transportation have become more and more diversified. The scale of subways, roads, bridges, tunnels, etc. has also become larger and larger. Influenced by dense population and urban buildings, rail transit construction has gradually turned to the diversified development of urban underground space, and subway tunnels have become the mainstream trend of urban transportation construction. For urban construction, the use of shield method can well control surface settlement and protect the environment. Shield method construction uses shield segments to support the surrounding rocks to prevent tunnel collapse, so comprehensive monitoring through stability is particularly important.

[0003] Traditional tunnel monitoring methods are not only inefficient, but also require a lot of time and labor costs, and the monitoring data obtained is very cumbersome and difficult to store. For shield tunnels, the use of modern monitoring methods can not only ensure the safety of construction but also provide convenience for observing the health status of the tunnel during later operations.

[0004] However, although the existing remote automated monitoring method for shield tunnels uses professional monitoring equipment and wireless communication to transmit signals, it is convenient to obtain the construction status of the tunnel shield machine in real time. However, it is difficult to comprehensively analyze the route of the shield machine and the condition of the shield machine segments during the excavation construction process. It is also difficult to timely obtain the deviation of the shield machine's operating path and the stress condition of the shield machine's segments to ensure timely on-site construction progress and monitoring equipment damage based on the monitoring conditions. Summary of the invention

[0005] The purpose of the present invention is to provide a remote automated monitoring method for a shield tunnel to solve the following technical problems:

[0006] How to achieve accurate analysis of the shield machine's operating path and real-time monitoring of the shield machine's operation and excavation process, and realize safe monitoring and adjustment of the excavation work route and shield machine.

[0007] The purpose of the present invention can be achieved through the following technical solutions:

[0008] A shield tunnel remote automatic monitoring method, the method comprising:

[0009] Step 1: Select a construction monitoring section according to construction needs and collect shield pipe displacement information of the construction monitoring section;

[0010] Step 2: Transmitting the shield pipe displacement information to the remote control platform through wireless communication technology, and preprocessing the shield pipe displacement information;

[0011] Step 3: Input the preprocessed shield pipe displacement information as a training set into the preset three-dimensional model to identify key points, and determine the abnormal status information results of each key point in real time;

[0012] Step 4: Provide feedback and warning based on the abnormal status information results, and adjust the tunneling parameters of the shield machine.

[0013] Preferably, the shield pipe displacement information includes the shield pipe longitudinal displacement information and the shield pipe lateral displacement information; step one includes:

[0014] The construction risk assessment system built based on the address conditions, surrounding environment and current environment determines the monitoring construction section information;

[0015] The digital distance sensor installed on the shield machine is used to monitor the plane displacement parameters, longitudinal settlement parameters, and non-directional tilt parameters of the shield pipe in real time;

[0016] The plane displacement parameters, longitudinal settlement parameters, non-directional tilt parameters and pipeline images are subjected to three-dimensional posture simulation analysis to obtain the longitudinal displacement information and lateral displacement information of the shield pipeline.

[0017] Preferably, step 2 includes:

[0018] S1, transmitting the longitudinal displacement information and the lateral displacement information of the shield pipe to the remote control platform in the form of electrical signals through wireless communication technology;

[0019] S2, the remote control platform performs signal demodulation on the longitudinal displacement information and the lateral displacement information of the shield pipe;

[0020] S3, performing data preprocessing on the demodulated shield pipe longitudinal displacement information and shield pipe lateral displacement information;

[0021] S4. Perform data fusion processing on the pre-processed shield pipe longitudinal displacement information and shield pipe lateral displacement information to obtain displacement parameters.

[0022] Preferably, step three includes:

[0023] SS1, real-time acquisition of the displacement parameter set A of the construction monitoring section, A∈ ; is the number of key points, and >3;

[0024] SS2, obtain standard displacement parameter set B by simulating and analyzing the displacement parameters of the historical construction monitoring section through a preset three-dimensional model;

[0025] SS3. Analyze and obtain the number of displacement parameter elements in set A that do not fall into the standard displacement parameter set B, and record them as set C;

[0026] SS4. Calculate the absolute value X of the difference between the displacement parameter elements in set C and the corresponding elements in standard displacement parameter set B, and determine the difference between X and the standard deviation. size:

[0027] If X is less than the standard deviation , it is determined that there is no abnormal deviation at the current key point, and the shield pipeline distribution environment information corresponding to the current key point is identified and recorded;

[0028] If X is greater than the standard deviation , it is judged that there is an abnormal deviation in the current key point and the first warning signal is issued.

[0029] Preferably, the shield pipeline distribution environment information includes: segment stress parameters , Segment joint size parameters , Segment bolt axial force parameters , and analyze the shield pipeline distribution environment information to obtain abnormal status information of each key point, including:

[0030] By formula Calculate the first Real-time pipeline distribution risk value at key points ;

[0031] in, ∈ ; The preset time period for obtaining pipeline information at the current key point; is the segment stress parameter The corresponding influence function; is the segment joint size parameter The corresponding influence function; is the segment bolt axial force parameter The corresponding influence function; is the standard segment stress parameter, is the standard segment joint size parameter; is the axial force parameter of the standard segment bolt; is the preset segment stress parameter deviation value; It is the deviation value of the preset segment joint size parameter; It is the preset segment bolt axial force parameter deviation value.

[0032] Preferably, the method for determining the abnormal status information of each key point is:

[0033] Distribute risk value into real-time pipeline The preset pipeline risk value threshold interval To compare:

[0034] like , it is determined that the pipeline at the current key point has a structural abnormality risk and generates a structural adjustment instruction;

[0035] like > , it is determined that the pipeline at the current key point has structural abnormalities and a second warning signal is issued;

[0036] If < , it is judged that there is no structural abnormality in the pipeline at the current key point.

[0037] Preferably, the method further comprises: monitoring the settlement of the construction monitoring section:

[0038] Use multiple sensors to obtain various soil settlement parameters at different key points;

[0039] According to the settlement monitoring strategy, the size of settlement state parameters is analyzed to determine the soil settlement situation.

[0040] Preferably, the settlement monitoring strategy is:

[0041] Determine the settlement monitoring frequency and settlement monitoring interval duration according to the historical soil settlement state standard curve;

[0042] Adjust the settlement monitoring frequency and settlement monitoring interval duration according to soil settlement conditions.

[0043] Beneficial effects of the present invention:

[0044] (1) The present invention selects a construction monitoring section according to construction needs and collects the displacement information of the shield pipe in the construction monitoring section; by combining the collected displacement information parameters with the pipeline image and using three-dimensional modeling software to perform posture simulation analysis, the actual displacement of the shield pipe during the construction process can be intuitively displayed, thereby obtaining the displacement information; through three-dimensional posture simulation, the longitudinal displacement information and lateral displacement information of the shield pipe can be accurately obtained, which can actively evaluate the working status of the shield machine, optimize the excavation parameters, and ensure construction safety.

[0045] (2) The present invention uses the pre-processed shield pipe displacement information as a training set to input the preset three-dimensional model to identify key points, and judge the abnormal status information results of each key point in real time. The pre-processed data is analyzed by machine learning using a preset three-dimensional model to identify key points, so as to identify the operation mode and trend of the shield machine at each key point; and by judging in real time whether the displacement of each key point exceeds the safety threshold, and generating abnormal status information results, a basis is provided for subsequent early warning and equipment adjustment.

[0046] (3) The present invention continuously evaluates and dynamically adjusts the frequency and interval duration of settlement monitoring according to the progress of construction, changes in geological conditions and actual soil settlement conditions, ensuring that the monitoring strategy can not only detect and respond to settlement anomalies in a timely manner, but also reasonably control monitoring costs and optimize construction efficiency and safety control.

[0047] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0049] Figure 1 This is a step diagram of the shield tunnel remote automatic monitoring method of the present invention;

[0050] Figure 2 This is a step diagram of the method for obtaining displacement parameters in step 2 of the present invention;

[0051] Figure 3 This is a step diagram of the method for obtaining abnormal status information results of key points in step three of the present invention. DETAILED DESCRIPTION

[0052] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0053] Although the existing remote automated monitoring method for shield tunnels uses professional monitoring equipment and wireless communication to transmit signals, it is convenient to obtain the construction status of the tunnel shield machine in real time. However, it is difficult to comprehensively analyze the route of the shield machine and the condition of the shield machine segments during the excavation construction process. It is also difficult to timely obtain the deviation of the shield machine's operating path and the stress condition of the shield machine's segments to ensure timely on-site construction progress and monitoring equipment damage based on the monitoring situation.

[0054] To solve the above technical problems, please refer to Figure 1 As shown, the present invention is a remote automatic monitoring method for a shield tunnel, and the specific method comprises the following steps:

[0055] Step 1: Select a construction monitoring section according to construction needs and collect shield pipe displacement information of the construction monitoring section;

[0056] Step 2: Transmitting the shield pipe displacement information to the remote control platform through wireless communication technology, and preprocessing the shield pipe displacement information;

[0057] Step 3: Input the preprocessed shield pipe displacement information as a training set into the preset three-dimensional model to identify key points, and determine the abnormal status information results of each key point in real time;

[0058] Step 4: Provide feedback and warning based on the abnormal status information results, and adjust the tunneling parameters of the shield machine.

[0059] In the above technical scheme, the present invention collects and preprocesses the displacement information of the shield pipeline and identifies the information through a preset three-dimensional model, analyzes and obtains the status information of each key point that meets the monitoring section, analyzes the abnormal status information, and makes adjustments based on the feedback of the abnormal status information results.

[0060] First, according to the construction needs, select the construction monitoring section and collect the shield pipe displacement information of the construction monitoring section. By selecting the construction monitoring section, in the specific implementation process, according to the on-site construction design and geological conditions, select the key or high-risk construction sections as monitoring points to ensure that potential problems can be discovered in time, and then collect the shield pipe displacement information, and use sensors and other equipment to monitor the displacement of the shield pipe in real time, including lateral displacement, longitudinal settlement and inclination angle. These data are crucial for evaluating the instability of the shield machine caused by the change of the working path of the shield machine and the displacement of the underground structure.

[0061] Specifically, as an implementation mode of the present invention, the shield pipe displacement information includes the shield pipe longitudinal displacement information and the shield pipe lateral displacement information; the specific method of implementing the above step 1 is:

[0062] The construction risk assessment system built based on the address conditions, surrounding environment and current environment determines the monitoring construction section information;

[0063] The digital distance sensor installed on the shield machine is used to monitor the plane displacement parameters, longitudinal settlement parameters, and non-directional tilt parameters of the shield pipe in real time;

[0064] The plane displacement parameters, longitudinal settlement parameters, non-directional tilt parameters and pipeline images are subjected to three-dimensional posture simulation analysis to obtain the longitudinal displacement information and lateral displacement information of the shield pipeline.

[0065] In the above technical solution, a construction risk assessment system is constructed and a digital distance sensor is used to monitor the displacement parameters of the shield pipe in real time. The construction risk assessment system is an important technology to ensure engineering safety and quality in modern tunnel construction.

[0066] The monitoring section information is determined based on the risk assessment system. First, the neural network model is input based on the address conditions, surrounding environment and current environment for machine training to build a construction risk assessment system. By comprehensively considering factors such as geological structure, groundwater level, surrounding buildings and pipeline distribution, the risk factors that may be encountered during the construction process are evaluated, and a scientific basis is provided for construction decisions. According to the risk assessment results, the construction sections that need to be monitored are determined. The sections generally include areas with complex geological conditions, dense surrounding facilities or special protection requirements.

[0067] Furthermore, the plane displacement parameters, longitudinal settlement parameters and non-directional inclination parameters of the shield pipe are monitored in real time; terrain data are acquired through geographic information systems such as GIS combined with geological models. Specifically, by setting a high-precision digital distance sensor installed on the shield machine, the displacement changes of the shield pipe during the construction process can be monitored in real time, wherein the relevant parameters of the displacement change include the plane displacement parameters based on the position of the pipeline in the change of the road section during the three-dimensional monitoring process, the longitudinal settlement parameters and non-directional inclination parameters; wherein the plane displacement parameters reflect the lateral movement of the shield pipe on the construction plane; the longitudinal settlement parameters reflect the settlement or rise of the shield pipe in the vertical direction; the non-directional inclination parameters reflect the change of the inclination angle of the shield pipe in three-dimensional space.

[0068] Finally, a three-dimensional posture simulation analysis is performed; by combining the collected displacement information parameters with the pipeline image, the posture simulation analysis is performed using the three-dimensional modeling software, which can intuitively display the actual displacement of the shield pipeline during the construction process, and then obtain the displacement information. Through three-dimensional posture simulation, the longitudinal and lateral displacement information of the shield pipeline can be accurately obtained, which can actively evaluate the working status of the shield machine, optimize the excavation parameters, and ensure construction safety.

[0069] In the above method, the specific content set in this step one can not only monitor the displacement changes during the shield construction process in real time, but also provide decision-making support for the construction team to ensure the necessary technical means for construction quality and safety.

[0070] Second, the shield pipe displacement information is transmitted to the remote control platform through wireless communication technology, and the shield pipe displacement information is preprocessed. The collected displacement information is transmitted to the remote control platform by using wireless communication technology (such as Wi-Fi, 4G / 5G, LoRa, etc.) to ensure the real-time and security of data transmission; and the original data is preprocessed on the remote control platform, including data cleaning, format conversion, outlier detection, etc., to prepare for subsequent analysis and modeling.

[0071] For details, please refer to Figure 2 As shown, as an embodiment of the present invention, step 2 includes:

[0072] S1, transmitting the longitudinal displacement information and the lateral displacement information of the shield pipe to the remote control platform in the form of electrical signals through wireless communication technology;

[0073] S2, the remote control platform performs signal demodulation on the longitudinal displacement information and the lateral displacement information of the shield pipe;

[0074] S3, performing data preprocessing on the demodulated shield pipe longitudinal displacement information and shield pipe lateral displacement information;

[0075] S4. Perform data fusion processing on the pre-processed shield pipe longitudinal displacement information and shield pipe lateral displacement information to obtain displacement parameters.

[0076] In the above technical scheme, in order to achieve stable data transmission, this embodiment adopts wireless transmission technology such as Wi-Fi, 4G / 5G, LoRa, etc. to transmit the signal to the remote control platform in real time; secondly, after the remote control platform receives the electrical signal containing displacement information, the data collected by the digital sensor is wirelessly transmitted to the demodulation module for signal demodulation, and the received electrical signal is converted back to the original displacement data and then transmitted to the monitoring platform in the computer module. The complete transmission of data and the readability display of data are realized through signal demodulation. Signal demodulation is an important step in data communication, which ensures the integrity and readability of data; further, the demodulated displacement information is preprocessed, including data cleaning, outlier detection, data format conversion, etc., to remove noise, correct errors and unify data formats, so as to ensure the accuracy and efficiency of subsequent data processing; finally, the preprocessed shield pipeline longitudinal displacement information and lateral displacement information are subjected to data fusion processing.

[0077] It should be noted that data fusion refers to the integration of data from different sensors or different time points to obtain more comprehensive and accurate information; in shield construction, data fusion processing can help analysts more accurately evaluate the displacement of the pipeline and provide support for construction decisions; and through the fusion processing of the longitudinal displacement information and lateral displacement information of the shield pipeline, the longitudinal displacement and lateral displacement of the shield pipeline can be comprehensively analyzed to obtain more accurate displacement parameters, mainly including displacement amount, displacement rate and possible displacement trend, providing data support for construction safety and quality control.

[0078] Third, the pre-processed shield pipe displacement information is used as a training set to input the preset three-dimensional model for key point identification, and the abnormal status information results of each key point are judged in real time. By using the preset three-dimensional model to perform machine learning analysis on the pre-processed data, key points are identified to identify the operation mode and trend of the shield machine at each key point; and by judging in real time whether the displacement of each key point exceeds the safety threshold, and generating abnormal status information results, it provides a basis for subsequent early warning and adjustment.

[0079] For details, please refer to Figure 3 As shown, as an implementation mode of the present invention, step three includes:

[0080] SS1, real-time acquisition of the displacement parameter set A of the construction monitoring section, A∈ ; is the number of key points, and >3;

[0081] SS2, obtain standard displacement parameter set B by simulating and analyzing the displacement parameters of the historical construction monitoring section through a preset three-dimensional model;

[0082] SS3. Analyze and obtain the number of displacement parameter elements in set A that do not fall into the standard displacement parameter set B, and record them as set C;

[0083] SS4. Calculate the absolute value X of the difference between the displacement parameter elements in set C and the corresponding elements in standard displacement parameter set B, and determine the difference between X and the standard deviation. size:

[0084] If X is less than the standard deviation , it is determined that there is no abnormal deviation at the current key point, and the shield pipeline distribution environment information corresponding to the current key point is identified and recorded;

[0085] If X is greater than the standard deviation , it is judged that there is an abnormal deviation in the current key point and the first warning signal is issued.

[0086] In the above technical solution, this embodiment processes and analyzes the displacement parameters. Specifically, first, a displacement parameter set A of the construction monitoring section is obtained; and the elements of the set are defined. The displacement parameter elements are defined as a group including the longitudinal displacement and the lateral displacement of the shield pipe at the same time after data fusion processing. The first group is recorded as , the set A is ; Then, the displacement parameters of the historical construction monitoring section are simulated and analyzed by the preset three-dimensional model to obtain the standard displacement parameter set B; the form of the elements of the displacement parameter set B is the same as that of the set A, and the data of the standard displacement parameter set B is mainly obtained by obtaining various geological information of the current section according to the relevant tunnel railway department, combined with the numerical standard value obtained by machine simulation analysis of the longitudinal displacement and lateral displacement data of the same section of the historical shield pipeline; then, the number of displacement parameter elements in the set A that do not fall into the standard displacement parameter set B is analyzed and recorded as the set C; finally, the absolute value X of the difference between the displacement parameter elements in the set C and the elements in the standard displacement parameter set B at the corresponding position is calculated, and the difference between X and the standard deviation is judged. Size: If X is less than the standard deviation , then it is judged that there is no abnormal deviation at the current key point, and the shield pipeline distribution environment information corresponding to the current key point is identified and recorded; if X is greater than the standard deviation value , it is judged that there is an abnormal deviation in the current key point and the first warning signal is issued.

[0087] As an implementation mode of the present invention, shield pipeline distribution environment information includes: segment stress parameters , Segment joint size parameters , Segment bolt axial force parameters , and analyze the shield pipeline distribution environment information to obtain abnormal status information of each key point, including:

[0088] By formula Calculate the first Real-time pipeline distribution risk value at key points ;

[0089] in, ∈ ; The preset time period for obtaining pipeline information at the current key point; is the segment stress parameter The corresponding influence function; is the segment joint size parameter The corresponding influence function; is the segment bolt axial force parameter The corresponding influence function; is the standard segment stress parameter, is the standard segment joint size parameter; is the axial force parameter of the standard segment bolt; is the preset segment stress parameter deviation value; It is the deviation value of the preset segment joint size parameter; It is the preset segment bolt axial force parameter deviation value.

[0090] In the above technical solution, the distribution information of the shield pipe in this embodiment includes the sensor routes arranged inside and around the segments in the shield operation, and the corresponding positions are numbered to confirm the data type obtained. The specific data type includes the segment stress parameters , Segment joint size parameters , Segment bolt axial force parameters ; According to the environment and site characteristics of the monitored tunnel, the proportion of each data type is comprehensively determined, and then its influence function related to pipeline monitoring is judged. The specific method of analyzing the shield pipeline distribution environment information to obtain the abnormal state information of each key point is to use the formula to calculate the segment stress parameter , Segment joint size parameters , Segment bolt axial force parameters And its influence function, through the formula Calculate the first Real-time pipeline distribution risk value at key points .

[0091] Among them, the standard segment stress parameter , Standard segment joint size parameters , Standard segment bolt axial force parameters All of them are obtained by machine simulation based on historical experience, which will not be described in detail here; the preset segment stress parameter deviation value , preset segment joint size parameter deviation value , preset segment bolt axial force parameter deviation value All are pre-selected and set based on empirical data, and will not be described in detail here; the influence function , , The different average value proportions of the influence of soil, water and other geological conditions on the monitoring positions set for the segments, the size of joints and the axial force of the segment bolts during the shield machine construction process are selected according to the changes in the final pipeline structure distribution, thereby improving the accuracy of judgment under different monitoring conditions.

[0092] Step 4: Feedback warnings based on abnormal status information results, and adjust the tunneling parameters of the shield machine. For the judgment of abnormal status information, when an abnormal state is detected, the system should immediately issue a warning to notify the construction team and relevant management personnel so that timely measures can be taken; and according to the warning information status, the tunneling parameters of the shield machine, such as advancement speed, earth pressure balance, etc., are adjusted to adapt to the current geological conditions and construction needs to ensure construction safety and quality.

[0093] Specifically, as an implementation of the present invention, the method of judging the abnormal status information of each key point according to the size of the pipeline distribution risk value obtained by the calculation formula in step three is:

[0094] Distribute risk value into real-time pipeline The preset pipeline risk value threshold interval To compare:

[0095] like , it is determined that the pipeline at the current key point has a structural abnormality risk and generates a structural adjustment instruction;

[0096] like > , it is determined that the pipeline at the current key point has structural abnormalities and a second warning signal is issued;

[0097] like < , it is judged that there is no structural abnormality in the pipeline at the current key point.

[0098] In the above technical solution, in this embodiment, by analyzing and implementing the pipeline distribution risk value, it is possible to further analyze the impact of the tunneling construction process on the current pipeline structure and determine the degree of impact. Specifically, by numerical comparison, it is determined that , it is judged that there is a risk of structural abnormality in the pipeline at the current key point, and a structural adjustment instruction is generated to adjust the overall excavation speed and improve the impact of soil pressure settlement; when > When , it is determined that the pipeline at the current key point has structural abnormalities, and a second warning signal is issued to stop the current excavation process and conduct inspection and maintenance of the shield machine segment structure; when < When the pipeline at the current key point is judged to have no structural abnormality, the current operation process continues.

[0099] In addition to the above technical solutions, as an implementation mode of the present invention, a monitoring method is also designed, which specifically includes: monitoring the settlement of the construction monitoring section:

[0100] Use multiple sensors to obtain various soil settlement parameters at different key points;

[0101] According to the settlement monitoring strategy, the size of settlement state parameters is analyzed to determine the soil settlement situation.

[0102] In the above technical solution, in this embodiment, multiple sensors, such as soil settlement sensors, inclinometers, strain gauges, etc., are deployed at key points of the construction monitoring section to monitor the settlement, inclination and strain state of the soil. Various settlement state parameters, including soil settlement amount, settlement rate, soil moisture, temperature and other environmental parameters, are collected in real time through sensors. These data provide a basis for subsequent analysis. Furthermore, the data collected by the sensor is transmitted to the data processing center for data cleaning, format conversion and preliminary analysis to ensure the accuracy and availability of the data; and according to the preset settlement monitoring strategy, the size and change trend of the settlement state parameters are analyzed to determine the soil settlement situation.

[0103] In this design, the process of judging soil settlement also involves threshold setting. By setting the normal threshold range of settlement state parameters, once the monitored parameters exceed the threshold, it is considered abnormal settlement, and it is judged to have an impact on construction safety and the surrounding environment. In addition, it also includes analyzing the trend of settlement state parameters over time, identifying possible settlement acceleration or deceleration, and providing a basis for predicting settlement trends and formulating response measures; judging soil settlement in real time: continuously monitoring the settlement state parameters of key points to ensure that settlement anomalies can be discovered in time and provide early warnings for the construction team.

[0104] Based on the analysis results of the settlement status, support is provided for construction decisions, which may include adjusting the construction method, adding support structures, taking reinforcement measures, etc., to control the settlement risk and ensure the safety and smooth progress of the construction process.

[0105] The establishment of a settlement monitoring process reflects the emphasis on environmental monitoring and safety control in modern construction. Real-time monitoring and analysis of settlement conditions through technical means can effectively prevent and respond to potential risks in the construction process and protect the safety of the surrounding environment and facilities.

[0106] As an implementation mode of the present invention, the settlement monitoring strategy is:

[0107] Determine the settlement monitoring frequency and settlement monitoring interval duration according to the historical soil settlement state standard curve;

[0108] Adjust the settlement monitoring frequency and settlement monitoring interval duration according to soil settlement conditions.

[0109] In the above technical scheme, a settlement monitoring strategy involved in the settlement monitoring process in this embodiment is historical data analysis: first, analyze the soil settlement status data accumulated in historical construction projects, and construct a historical soil settlement status standard curve, which reflects the typical patterns and trends of soil settlement under different construction stages and conditions; based on the historical soil settlement status standard curve, set the initial settlement monitoring frequency and interval duration; usually, the monitoring frequency is higher in the early stages of construction or in areas with complex geological conditions to ensure that potential problems are discovered in time; as the construction progresses and the geological conditions are understood, the monitoring frequency may be appropriately reduced. Then, based on the data feedback from real-time monitoring, collect real-time data changes and standard curves for analysis, and dynamically adjust the monitoring parameters according to the soil settlement conditions, including adjusting the settlement monitoring frequency and the settlement monitoring interval duration, mainly including:

[0110] Increase monitoring frequency: If the monitored sedimentation rate or amount exceeds the normal range of the historical standard curve, or an abnormal sedimentation trend occurs, the monitoring frequency should be increased immediately and the monitoring interval should be shortened so that data can be obtained more frequently and potential problems can be discovered and dealt with in a timely manner.

[0111] Reduce monitoring frequency: On the contrary, if the construction progresses smoothly, the settlement status is stable, and the monitoring data continues to be within the normal range of the historical standard curve, you can consider moderately reducing the monitoring frequency and extending the monitoring interval to reduce unnecessary monitoring costs.

[0112] Finally, the frequency and duration of settlement monitoring should be continuously evaluated and dynamically adjusted according to the progress of construction, changes in geological conditions and actual soil settlement conditions, to ensure that the monitoring strategy can not only detect and respond to settlement anomalies in a timely manner, but also reasonably control monitoring costs and optimize construction efficiency and safety control.

[0113] The above design process reflects the trend of intelligence and informatization in modern shield construction. Through real-time monitoring and intelligent analysis, it can effectively improve construction efficiency, reduce safety risks, and provide an important development direction for future tunnel construction technology.

[0114] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device, equipment, and non-volatile computer storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0115] The above specific embodiments of this specification are described. Other embodiments are within the scope of all attached files. In some cases, the actions or steps recorded in all files can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the process depicted in the accompanying drawings does not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0116] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined in this application, they shall all fall within the protection scope of the present invention.

Claims

1. A remote automated monitoring method for a shield tunnel, characterized in that: The method comprises: Step 1: Select a construction monitoring section according to construction needs and collect shield pipe displacement information of the construction monitoring section; Step 2: Transmit the shield pipe displacement information to the remote control platform through wireless communication technology, and pre-process the shield pipe displacement information; Step 3: Input the preprocessed shield pipe displacement information as a training set into the preset three-dimensional model for key point identification, and judge the abnormal state information results of each key point in real time; the abnormal state information of each key point includes: By formula Calculate the first Real-time pipeline distribution risk value at key points ;in, ∈ ; The preset time period for obtaining pipeline information at the current key point; is the segment stress parameter The corresponding influence function; is the segment joint size parameter The corresponding influence function; is the segment bolt axial force parameter The corresponding influence function; is the standard segment stress parameter, is the standard segment joint size parameter; is the axial force parameter of the standard segment bolt; is the preset segment stress parameter deviation value; It is the deviation value of the preset segment joint size parameter; is the preset segment bolt axial force parameter deviation value; Distribute risk value into real-time pipeline The preset pipeline risk value threshold interval To compare: If , it is determined that the pipeline at the current key point has a structural abnormality risk and generates a structural adjustment instruction; like > , it is determined that the pipeline at the current key point has structural abnormalities and a second warning signal is issued; like < , it is judged that there is no structural abnormality in the pipeline at the current key point; Step 4: Provide feedback and warning based on the abnormal status information results, and adjust the tunneling parameters of the shield machine.

2. The shield tunnel remote automatic monitoring method according to claim 1 is characterized in that: The shield pipe displacement information includes the shield pipe longitudinal displacement information and the shield pipe lateral displacement information; the step one includes: The construction risk assessment system built based on the address conditions, surrounding environment and current environment determines the monitoring construction section information; The digital distance sensor installed on the shield machine is used to monitor the plane displacement parameters, longitudinal settlement parameters, and non-directional tilt parameters of the shield pipe in real time; The plane displacement parameters, longitudinal settlement parameters, non-directional tilt parameters and pipeline images are subjected to three-dimensional posture simulation analysis to obtain the longitudinal displacement information and lateral displacement information of the shield pipeline.

3. The shield tunnel remote automatic monitoring method according to claim 2 is characterized in that: The second step comprises: S1, transmitting the longitudinal displacement information and the lateral displacement information of the shield pipe to the remote control platform in the form of electrical signals through wireless communication technology; S2, the remote control platform performs signal demodulation on the longitudinal displacement information and the lateral displacement information of the shield pipe; S3, performing data preprocessing on the demodulated shield pipe longitudinal displacement information and shield pipe lateral displacement information; S4. Perform data fusion processing on the pre-processed shield pipe longitudinal displacement information and shield pipe lateral displacement information to obtain displacement parameters.

4. The shield tunnel remote automatic monitoring method according to claim 3 is characterized in that: The step three comprises: SS1, real-time acquisition of the displacement parameter set A of the construction monitoring section, A∈ ; is the number of key points, and >3; SS2, obtain standard displacement parameter set B by simulating and analyzing the displacement parameters of the historical construction monitoring section through a preset three-dimensional model; SS3. Analyze and obtain the number of displacement parameter elements in set A that do not fall into the standard displacement parameter set B, and record them as set C; SS4. Calculate the absolute value X of the difference between the displacement parameter elements in set C and the corresponding elements in standard displacement parameter set B, and determine the difference between X and the standard deviation. size: If X is less than the standard deviation , it is determined that there is no abnormal deviation at the current key point, and the shield pipeline distribution environment information corresponding to the current key point is identified and recorded; If X is greater than the standard deviation , it is judged that there is an abnormal deviation in the current key point and the first warning signal is issued.

5. The shield tunnel remote automatic monitoring method according to claim 4 is characterized in that: The shield pipeline distribution environment information includes: segment stress parameters , Segment joint size parameters , Segment bolt axial force parameters , and analyze the shield pipeline distribution environment information to obtain abnormal status information of each key point.

6. The shield tunnel remote automatic monitoring method according to claim 1, characterized in that: Also includes: Monitoring the settlement of the construction monitoring section: Use multiple sensors to obtain various soil settlement parameters at different key points; According to the settlement monitoring strategy, the size of settlement state parameters is analyzed to determine the soil settlement situation.

7. The shield tunnel remote automatic monitoring method according to claim 6, characterized in that: The settlement monitoring strategy is: Determine the settlement monitoring frequency and settlement monitoring interval duration according to the historical soil settlement state standard curve; Adjust the settlement monitoring frequency and settlement monitoring interval duration according to soil settlement conditions.