Train control method, vehicle-mounted controller and train

By measuring the lateral deflection of the rail train and controlling its operation according to the preset strategy, the safety risk problem of excessive lateral deflection of the rail train in extreme situations is solved and the safe operation of the train is ensured.

CN118722771AActive Publication Date: 2024-10-01BYD CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202310365534.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-01
Estimated Expiration
2043-03-29

AI Technical Summary

Technical Problem

In extreme cases, the lateral deflection of a rail train may exceed the normal value, posing safety risks. Especially when speeding on track curves or in strong convective weather, the lateral deflection may be too large, affecting the safe operation of the train.

Method used

By measuring the distance between the train and the track beam, the lateral offset is determined, and according to the preset offset interval and control strategy, the corresponding control strategy is implemented, such as slowing down, braking or sending an alarm, to ensure that the train is within different offset intervals safe operation under conditions.

Benefits of technology

It effectively reduces the safety risk when the train deviates laterally, avoids the collision between the axle counting detection plate and the axle counting magnetic head, and ensures the safe operation of the train under extreme circumstances.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118722771A_ABST
    Figure CN118722771A_ABST
Patent Text Reader

Abstract

The invention relates to a train control method, a vehicle-mounted controller and a train so as to reduce the safety risk during transverse deviation of the train and guarantee safe operation of the train. The method comprises the steps that the transverse offset of a train is determined; under the condition that the transverse offset exceeds a preset normal transverse offset interval of the train, a target offset interval corresponding to the transverse offset is determined; determining a target control strategy corresponding to the target offset interval according to a preset corresponding relation between the target offset interval and the control strategy; and controlling the train to run according to the target control strategy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of rail transit technology, and in particular to a train control method, an on-board controller and a train. Background Art

[0002] At present, rail transit trains include double-track trains, which run on double-track tracks. The trains include guide wheels and running wheels. The guide wheels run on the inner side of the track beam, and the running wheels run on the track surface. The trains are restrained by the guide wheels and their own limit crossbars to prevent the trains from overturning during operation. However, in extreme cases, such as when the trains run at excessive speeds on the curved section of the track or encounter severe convective weather, the lateral displacement of the trains may exceed the normal value, posing certain safety risks. Summary of the invention

[0003] The purpose of the present disclosure is to provide a train control method, an on-board controller and a train, so as to reduce the safety risk when the train deviates laterally and ensure the safe operation of the train.

[0004] In order to achieve the above object, a first aspect of the present disclosure provides a train control method, the method comprising:

[0005] Determine the lateral offset of the train;

[0006] In the case where the lateral offset exceeds a preset normal lateral offset interval of the train, determining a target offset interval corresponding to the lateral offset;

[0007] Determining the target control strategy corresponding to the target offset interval according to a preset corresponding relationship between the target offset interval and the control strategy;

[0008] The train operation is controlled according to the target control strategy.

[0009] Optionally, determining a target offset interval corresponding to the lateral offset includes:

[0010] When the absolute value of the lateral offset is greater than the upper limit of the preset normal lateral offset interval and less than the preset distance between the axle counting detection plate of the train and the axle counting magnetic head, determining that the target offset interval is an abnormal offset interval;

[0011] When the absolute value of the lateral offset is greater than the preset distance, the target offset interval is determined to be an over-limit offset interval.

[0012] Optionally, the abnormal deviation interval includes at least two abnormal deviation sub-intervals determined according to at least one preset intermediate threshold value, and when the absolute value of the lateral deviation is greater than the upper limit value of the preset normal lateral deviation interval and less than a preset distance between the axle counting detection plate of the train and the axle counting magnetic head, determining that the target deviation interval is an abnormal deviation interval includes:

[0013] When the absolute value of the lateral offset is greater than the upper limit of the preset normal lateral offset interval and less than the preset distance between the axle counting detection plate and the axle counting magnetic head of the train, an abnormal offset sub-interval is determined as the target offset interval in the at least two abnormal offset sub-intervals based on the size relationship between the lateral offset and the at least one preset intermediate threshold value.

[0014] Optionally, the number of the preset intermediate threshold is one, and the preset intermediate threshold is determined by:

[0015] The difference between the upper limit value and the preset distance is determined, and a preset ratio value of the absolute value of the difference is added to the upper limit value to obtain the preset intermediate threshold value.

[0016] Optionally, determining the target control strategy corresponding to the target offset interval according to a preset correspondence between the offset interval and the control strategy includes:

[0017] In the case where the target deviation interval is the abnormal deviation interval, the target control strategy is determined to be a first control strategy, and the first control strategy includes a strategy for controlling the train to send a deviation abnormality alarm and / or decelerate operation.

[0018] Optionally, determining the target control strategy corresponding to the target offset interval according to a preset correspondence between the offset interval and the control strategy includes:

[0019] When the target offset interval is the overrun offset interval, determining a first distance required for the running speed of the train to be reduced to a preset speed according to the current speed of the train and a preset train braking curve;

[0020] determining a second distance between the train and a first axle counting magnetic head in the direction of travel of the train;

[0021] In the case where the first distance is less than the second distance, determining that the target control strategy is a second control strategy, the second control strategy includes a strategy of controlling the train to decelerate and sending an over-limit deviation alarm;

[0022] When the first distance is greater than or equal to the second distance, the target control strategy is determined to be a third control strategy, and the third control strategy includes a strategy of controlling the train to brake and stop and sending a collision warning.

[0023] A second aspect of the present disclosure further provides a vehicle-mounted controller, comprising:

[0024] a memory having a computer program stored thereon;

[0025] A processor is used to execute the computer program in the memory to implement the steps of any one of the methods in the first aspect.

[0026] A third aspect of the present disclosure further provides a train, the train comprising a distance measuring device and an onboard controller, the distance measuring device being arranged on a running device under the train;

[0027] The distance measuring device is used to measure the distance between the distance measuring device and the inner side of the running track beam of the train, and send the measured distance to the on-board controller;

[0028] The on-board controller is used to receive the measured distance and determine the lateral offset of the train based on the measured distance, determine a target offset interval corresponding to the lateral offset when the lateral offset exceeds a preset normal lateral offset interval of the train, determine a target control strategy corresponding to the target offset interval based on a preset correspondence between the target offset interval and the control strategy, and control the operation of the train according to the target control strategy.

[0029] Optionally, the train includes an axle counting detection plate, which is connected to the undercarriage running device of the train through an elastic component, so that when the axle counting detection plate collides with an axle counting magnetic head or trackside equipment arranged on the running track of the train, the elastic component drives the axle counting detection plate to move upward.

[0030] Optionally, a surface of the axle counter detection plate away from the undercarriage running device of the train is an arc surface.

[0031] Through the above technical solution, at least the following technical effects can be achieved:

[0032] First, the lateral offset of the train is determined. When the lateral offset exceeds the preset normal lateral offset interval of the train, the target offset interval corresponding to the lateral offset is determined. Then, according to the preset correspondence between the target offset interval and the control strategy, the target control strategy corresponding to the target offset interval is determined. Finally, the train operation is controlled according to the target control strategy. By adopting this method, the lateral offset of the train is divided into intervals. When the lateral offset of the train exceeds the preset normal lateral offset interval, the train can be controlled to execute different control strategies for different offset intervals to ensure the safe operation of the train.

[0033] Other features and advantages of the present disclosure will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] The accompanying drawings are used to provide a further understanding of the present disclosure and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present disclosure but do not constitute a limitation of the present disclosure. In the accompanying drawings:

[0035] Figure 1 is a flow chart of a train control method shown in an embodiment of the present disclosure;

[0036] Figure 2 is a schematic diagram of a lateral offset interval and a control strategy shown in an embodiment of the present disclosure;

[0037] Figure 3 is a train braking test data shown in an embodiment of the present disclosure;

[0038] Figure 4 is a fitting data of train braking shown in an embodiment of the present disclosure;

[0039] Figure 5 is a schematic diagram of a train shown in an embodiment of the present disclosure;

[0040] Figure 6 is a schematic diagram of an axle counter detection board shown in an embodiment of the present disclosure;

[0041] Figure 7 It is a schematic diagram of a vehicle-mounted controller shown in an embodiment of the present disclosure. DETAILED DESCRIPTION

[0042] The specific implementation of the present disclosure is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described herein is only used to illustrate and explain the present disclosure, and is not used to limit the present disclosure.

[0043] It should be understood that the various steps described in the method implementation of the present disclosure may be performed in different orders and / or in parallel. In addition, the method implementation may include additional steps and / or omit the steps shown. The scope of the present disclosure is not limited in this respect. The term "including" and its variations used herein are open inclusions, i.e., "including but not limited to". The term "based on" means "at least partially based on". The term "one embodiment" means "at least one embodiment"; the term "another embodiment" means "at least one other embodiment"; the term "some embodiments" means "at least some embodiments". The relevant definitions of other terms will be given in the description below.

[0044] It should be noted that the concepts of "first", "second", etc. mentioned in the present disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units. It should be noted that the modifications of "one" and "multiple" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, they should be understood as "one or more".

[0045] Traditional rail trains use steel wheels, with the axle counter magnetic head generator installed on the outside of the rails and the axle counter magnetic head receiver installed on the inside of the rails. The occupied and cleared status of the track section is determined by the running steel wheels cutting the magnetic lines of force. During operation, the steel wheels and the magnetic heads are unlikely to collide. In addition, trains running on double-surface tracks include guide wheels and running wheels. The guide wheels run on the inside of the track beams and the running wheels run on the track surface. The train is limited by the guide wheels and its own limit crossbars to prevent the train from overturning during operation.

[0046] However, in extreme cases, such as when a train is overspeeding on a curved track section or encounters severe convective weather, the lateral deviation of the train may exceed the normal value, posing a certain safety risk. In addition, for rubber-wheeled rail trains, the train uses a metal axle counter detection plate to cut the magnetic lines of force of the axle counter magnetic head to determine the occupation and clearance status of the track section. The axle counter detection plate is installed on the running gear under the train, and the axle counter magnetic head is installed on the inner side wall of the track beam. If the lateral deviation of the train is too large, it may cause the axle counter detection plate to collide with the axle counter magnetic head, posing a greater safety risk.

[0047] In view of this, the present disclosure provides a train control method, a vehicle-mounted controller and a train to solve the above-mentioned problems.

[0048] For reference Figure 1 , an embodiment of the present disclosure provides a train control method, the method comprising:

[0049] S101. Determine the lateral offset of the train.

[0050] For example, the lateral offset of the train can be determined by setting a laser distance measuring device on the running gear under the train, measuring the real-time distance between the laser distance measuring device and the inner side of the track beam, for example, the laser distance measuring device can be set at the position of the center line of the train, recording the fixed distance between the center line of the train and the inner side of the track beam when the train stops running, and then subtracting the fixed distance from the measured distance based on the measured distance obtained by the laser distance measuring device to obtain the lateral offset of the train. The laser distance measuring device can also be set at other positions of the running gear under the train, recording the fixed distance between the laser distance measuring device and the inner side of the track beam when the train stops running or the measured distance obtained by the laser distance measuring device at this time as the reference distance, and then during the operation of the train, obtaining the real-time distance between the laser distance measuring device and the inner side of the track beam and subtracting it from the reference distance to determine the lateral offset of the train.

[0051] In addition, the image acquisition device can be used to capture the track image of the train when it is running, and then the offset distance between the center line of the train and the center line of the track can be determined based on the captured track image as the lateral offset of the train, etc. The present disclosure does not impose any restrictions on this, as long as the lateral offset of the train can be determined.

[0052] S102: When the lateral offset exceeds a preset normal lateral offset range of the train, determine a target offset range corresponding to the lateral offset.

[0053] S103 . Determine a target control strategy corresponding to the target offset interval according to a preset corresponding relationship between the target offset interval and the control strategy.

[0054] S104. Control the train operation according to the target control strategy.

[0055] By adopting the above method, the lateral offset of the train is divided into intervals. When the lateral offset of the train exceeds the preset normal lateral offset interval, the train can be controlled to execute different control strategies for different offset intervals to ensure the safe operation of the train. Furthermore, it can also avoid excessive lateral offset of the train, especially for rubber-wheeled railway trains, and reduce the risk of collision between the axle counter detection plate and the axle counter magnetic head.

[0056] In order to enable those skilled in the art to better understand the train control method provided by the present disclosure, the above steps are described in detail with examples below.

[0057] In a possible manner, the target offset interval corresponding to the lateral offset can be determined as follows: when the absolute value of the lateral offset is greater than the upper limit value of the preset normal lateral offset interval and is less than the preset distance between the axle counting detection plate and the axle counting head of the train, the target offset interval is determined to be an abnormal offset interval; and when the absolute value of the lateral offset is greater than the preset distance, the target offset interval is determined to be an out-of-limit offset interval.

[0058] For example, a preset normal lateral displacement interval can be used as a benchmark for determining whether an abnormal displacement of a train occurs, wherein the preset normal lateral displacement interval refers to a lateral displacement range that does not affect the operation of the train when the train is running, such as [-X, X]. The specific value can be determined based on factors such as the double-track spacing, the track beam width, the train width, and the wheelbase, and the present disclosure does not limit this. In addition, since the collision between the axle counter detection plate and the axle counter magnetic head may cause damage or deformation to the axle counter detection plate or the axle counter magnetic head, the distance between the axle counter detection plate and the axle counter magnetic head when the train stops running can be used as the upper limit value (preset distance) of the lateral displacement of the train. Thus, it can be obtained that the abnormal displacement interval is ±[X, S1], and the abnormal displacement interval is ±[S, ∞], wherein X is the upper limit value of the preset normal lateral displacement interval, and S is the distance between the axle counter detection plate and the axle counter magnetic head.

[0059] In a possible manner, the abnormal displacement interval includes at least two abnormal displacement sub-intervals determined according to at least one preset intermediate threshold. When the absolute value of the lateral displacement is greater than the upper limit of the preset normal lateral displacement interval and less than the preset distance between the axle counter detection plate of the train and the axle counter magnetic head, determining the target displacement interval as the abnormal displacement interval may be: when the absolute value of the lateral displacement is greater than the upper limit of the preset normal lateral displacement interval and less than the preset distance between the axle counter detection plate of the train and the axle counter magnetic head, determining an abnormal displacement sub-interval as the target displacement interval in at least two abnormal displacement sub-intervals according to the magnitude relationship between the lateral displacement and at least one preset intermediate threshold.

[0060] For example, in addition to the coarse-grained division of the lateral deviation interval of the train into three levels of normal, abnormal, and over-limit, the abnormal deviation interval can also be fine-grained to obtain multiple abnormal deviation sub-intervals. Multiple abnormal deviation sub-intervals can represent different deviation severity levels, and then different control strategies can be set for multiple abnormal deviation sub-intervals to achieve more accurate train hierarchical control. Taking the above abnormal deviation interval as ±[X, S] as an example, the intermediate threshold X<A 1 <A 2 <…<A N <S, get the abnormal deviation sub-interval ±[X, A 1 ], ±[X, A 2 ], ±[X, A N ],…,±[A N , S]. The number of intermediate thresholds can be determined according to demand and train control accuracy, and the present disclosure does not limit this.

[0061] In a possible manner, the number of preset intermediate thresholds is one, and the preset intermediate threshold is determined by determining the difference between the upper limit value and the preset distance, and adding a preset ratio value of the absolute value of the difference to the upper limit value to obtain the preset intermediate threshold.

[0062] For example, the intermediate threshold value A may be determined by the following calculation formula:

[0063] A=X+|SX| / n

[0064] Among them, n can be determined according to the demand and the control accuracy of the train, and the present disclosure does not impose any restrictions on this.

[0065] For example, if the number of preset intermediate thresholds is 1, n can be 3. For example, if X is 10 mm and S is 100 mm, the preset intermediate threshold is 40, and the abnormal deviation sub-intervals are ±[10, 40] and ±[40, 100]. If the number of preset intermediate thresholds is 2, the absolute value of the difference can be divided into three equal parts, then the first n can be 3, and the second n can be 3 / 2, so that the two preset intermediate thresholds are 40 and 70, and the abnormal deviation sub-intervals are ±[10, 40], ±[40, 70], ±[70, 100], etc., which are not limited in the present disclosure.

[0066] It should be noted that the above-mentioned determination process of the preset intermediate threshold is used as an exemplary explanation. In other possible implementation methods, when taking one preset intermediate threshold, the absolute value of the difference can also be divided into two equal parts. Taking X as 10mm and S as 100mm as an example, the preset intermediate threshold is 55, and the abnormal displacement sub-interval is ±[10, 55], ±[55, 100]. When taking multiple preset intermediate thresholds, in addition to the above-mentioned equal-proportional division of the absolute value of the difference (such as three equal divisions), it can also be divided in other ways. For example, considering that the greater the lateral displacement of the train, the greater the impact on the operation safety of the train, the smaller displacement interval can be coarse-grained, and the larger displacement interval can be fine-grained. For example, the abnormal displacement sub-intervals divided are ±[10, 40], ±[40, 60], ±[60, 80], ±[80, 100]. It can be determined specifically according to the needs and the control accuracy of the train, and the present disclosure does not limit this.

[0067] In a possible manner, based on the preset correspondence between the offset interval and the control strategy, the target control strategy corresponding to the target offset interval can be determined as follows: when the target offset interval is an abnormal offset interval, the target control strategy is determined to be the first control strategy, and the first control strategy includes a strategy for controlling the train to send an abnormal offset alarm and / or slow down operation.

[0068] For example, when the lateral offset of the train is within the preset normal lateral offset range, the train is running normally. When the lateral offset of the train is within the abnormal offset range, it means that the lateral offset of the train is large, and an abnormal offset alarm can be sent to remind the staff, or the train can be controlled to slow down and reduce safety risks.

[0069] For example, Figure 2 As shown, different control strategies can be formulated for different abnormal displacement sub-intervals. Taking the above X as 10mm, S as 100mm, and the abnormal displacement sub-intervals of ±[10, 40] (first sub-interval) and ±[40, 100] (second sub-interval) as examples, when the lateral displacement of the train is in the first sub-interval (the displacement is small), a three-level alarm can be issued, and the staff (such as the dispatcher) checks the alarm information by checking the train operation data, or calling the train camera to check the train operation status, and issues manual commands according to the train operation status, such as section speed limit or deceleration operation. Of course, the train can also be automatically decelerated, and the present disclosure does not limit this. Until the lateral displacement of the train is reduced to the preset normal lateral displacement interval, the train can re-accelerate and operate normally.

[0070] Alternatively, when the lateral offset of the train is in the second sub-interval (larger offset), a second-level alarm may be issued, and the train may be automatically decelerated, for example, by 100% common braking deceleration until the lateral offset of the train is reduced to a preset normal lateral offset interval, and then the train may be accelerated and operated normally again. Of course, the staff may also view the alarm information and perform manual processing, which is not limited in the present disclosure.

[0071] In addition, when there are multiple abnormal offset sub-intervals, such as the abnormal offset sub-intervals of ±[10, 40], ±[40, 60], ±[60, 80], and ±[80, 100], considering that the greater the lateral offset of the train, the greater the impact on the train's operating safety, the abnormal offset sub-interval can be used to characterize the positive correlation between the larger the lateral offset of the train, the higher the alarm level of the corresponding control strategy, and the greater the deceleration of the train. Control strategies corresponding to multiple abnormal offset sub-intervals can be set, and the specific requirements can be determined, and the present disclosure does not impose any restrictions on this.

[0072] In a possible manner, based on the preset correspondence between the offset interval and the control strategy, the target control strategy corresponding to the target offset interval can be: when the target offset interval is an over-limit offset interval, the first distance required for the train's running speed to be reduced to the preset speed is determined based on the train's current speed and the preset train braking curve, and the second distance between the train and the first axle counting head in the train's running direction is determined; when the first distance is less than the second distance, the target control strategy is determined to be the second control strategy, and the second control strategy includes a strategy for controlling the train to decelerate and send an over-limit offset alarm; or when the first distance is greater than or equal to the second distance, the target control strategy is determined to be the third control strategy, and the third control strategy includes a strategy for controlling the train to brake and stop and send a collision alarm.

[0073] It should be noted that the axle counting section of the train track is divided according to the axle counting magnetic head. When the lateral offset of the train is greater than the preset distance between the axle counting magnetic head and the axle counting detection plate, the axle counting detection plate of the train that continues to run will collide with the axle counting magnetic head in the running direction of the train. In order to minimize the loss caused by the collision, the train can be controlled to slow down. Further, it is considered whether the running speed of the train is lower than the preset speed when the collision occurs, and the train is controlled to slow down or brake to stop. The preset speed can be determined according to the test, based on the ability to ensure the safe operation of the train, and the present disclosure does not limit this.

[0074] For example, refer to Figure 2 When the lateral offset of the train is in the over-limit offset range (the offset is too large), a first-level alarm can be issued and the train can be automatically decelerated, for example, according to the train's 100% normal braking deceleration operation, controlling the train to run at a low speed, such as 10km / h or km / h. The present disclosure does not impose any restrictions on this.

[0075] Furthermore, considering whether the running speed of the train is lower than a preset speed when a collision occurs, a preset train braking curve can be first determined based on experiments. Figure 3 This is the braking data of a Yunba train when it is fully loaded and decelerates from 80km / h to 10km / h according to 100% normal braking. Figure 3 The data shows that when the train speed is below 30km / h, the deceleration remains unchanged, and it can be calculated according to uniform deceleration, and then a linear fit is performed on the data between 80km / h and 30km / h to obtain Figure 4 Preset train braking curve shown.

[0076] For example, assuming that at a certain moment the lateral offset of the train is greater than the preset distance between the axle counter magnetic head and the axle counter detection plate, the speed of the train is V0 at this time. First, the distance S2 (second distance) between the maximum safe front position of the train and the first axle counter magnetic head in the train running direction can be determined based on the positioning. The distance S between the train and the starting point of the current axle counter section a , and then determine the distance S between the axle counter magnetic head and the starting point of the current axle counter section b , S a and S b The absolute value of the difference is determined as S2. Then, the distance S1 (first distance) required for the train to decelerate from V0 to a preset speed is determined according to the preset train braking curve. For example, the distance S required for V0 to decelerate to 30 km / h can be determined according to the following calculation formula (1): c , the distance S required to decelerate from 30 km / h to the preset speed is determined according to the following calculation formula (2): d , S c and S d Add them together to get S1:

[0077]

[0078]

[0079] Among them, -0.0142v+1.5248 is the fitting function of the preset train braking curve before 30km / h, v represents the speed variable, t represents the time variable, t0 represents the initial time, t c It indicates the time required for the train to decelerate from V0 to 30 km / h. 8.3 means 30 km / h is converted to 8.3 m / s. t d represents the time required for the train to decelerate from 30km / h to the preset speed, and a represents the deceleration rate of the train from 30km / h to the preset speed, for example, 1.2m / s. Then S c and S d Add them together to get S1.

[0080] It should be noted that the above calculation expression is based on Figure 3 The train corresponding to the data is used as an example. In actual applications, the preset train braking curves of trains of different models may be different, and the corresponding calculation formulas may also be different. The specific adjustments are made according to the actual situation, and the present disclosure does not impose any restrictions on this.

[0081] For example, when S1 is less than S2, it indicates that the train can reduce the running speed of the train to a preset speed before the axle counter detection plate collides with the axle counter magnetic head. In this case, the train can be controlled to slow down and send an over-excursion alarm (second control strategy). When S1 is greater than or equal to S2, it indicates that the train cannot reduce the running speed of the train to a preset speed before the axle counter detection plate collides with the axle counter magnetic head. In this case, the train can be controlled to brake and stop and send a collision alarm (third control strategy). Of course, the staff can also check the over-excursion alarm or collision alarm, and then perform manual control. In addition, the running status of the train and the reason for triggering the braking stop can also be sent to the dispatching center, and after the train brakes and stops, the staff can take temporary stops or control the train to run at a low speed to the platform. Specifically, corresponding measures can be taken according to relevant operating regulations, and this disclosure will not be repeated here.

[0082] Based on the same inventive concept, the present disclosure also provides a vehicle-mounted controller, comprising:

[0083] a memory having a computer program stored thereon;

[0084] The processor is used to execute the computer program in the memory to implement the steps of the above-mentioned train control method.

[0085] Based on the same inventive concept, the present disclosure also provides a train, referring to Figure 5 The train 500 includes a distance measuring device 501 and an onboard controller 502. The distance measuring device 501 is arranged on the running device under the train. The distance measuring device 501 is used to measure the measured distance between the distance measuring device 501 and the inner side of the running track beam of the train, and send the measured distance to the onboard controller. The onboard controller 502 is used to receive the measured distance and determine the lateral offset of the train according to the measured distance. When the lateral offset exceeds the preset normal lateral offset interval of the train, the target offset interval corresponding to the lateral offset is determined. According to the preset corresponding relationship between the target offset interval and the control strategy, the target control strategy corresponding to the target offset interval is determined, and the train operation is controlled according to the target control strategy.

[0086] For example, the distance measuring device may be a laser distance measuring device, which may be set at the position of the center line of the train, record the fixed distance between the center line of the train and the inner side of the track beam when the train stops running, and then subtract the fixed distance from the measured distance according to the measured distance obtained by the laser distance measuring device to obtain the lateral offset of the train. The laser distance measuring device may also be set at other positions of the running device under the vehicle, record the fixed distance between the laser distance measuring device and the inner side of the track beam when the train stops running or the measured distance obtained by the laser distance measuring device at this time as the reference distance, and then obtain the real-time distance between the laser distance measuring device and the inner side of the track beam during the running of the train, and subtract it from the reference distance to determine the lateral offset of the train.

[0087] In addition, the ranging device can also be an image acquisition device, which acquires the track image of the train when it is running, and then determines the offset distance between the center line of the train and the center line of the track according to the acquired track image as the lateral offset of the train, etc. The present disclosure does not impose any restrictions on this, as long as the lateral offset of the train can be determined.

[0088] The above train can divide the lateral offset into intervals. When the lateral offset of the train exceeds the preset normal lateral offset interval, the train can be controlled to execute different control strategies for different offset intervals to ensure the safe operation of the train. Furthermore, it can also avoid excessive lateral offset of the train, especially for rubber-wheeled railway trains, and reduce the risk of collision between the axle counter detection plate and the axle counter magnetic head.

[0089] It is worth pointing out that the axle counter detection board of the train is rigidly connected to the running device under the vehicle. If the axle counter detection board collides with the axle counter magnetic head, it is a rigid collision. Even if the speed of the train is low when the collision occurs, it will still cause certain damage to the axle counter detection board or the axle counter magnetic head. In addition, the cable wiring trough is installed on the installation platform on the inner side of the track beam. If the trough is accidentally lifted, it may also collide with the axle counter monitoring board.

[0090] Therefore, in the possible way, refer to Figure 6 The train includes an axle counting detection plate, which is connected to the undercarriage running device of the train through an elastic component so that when the axle counting detection plate collides with an axle counting magnetic head or trackside equipment arranged on the running track of the train, the elastic component drives the axle counting detection plate to move upward.

[0091] For example, the axle counter detection plate is connected to the undercarriage running device of the train through an elastic component. If the axle counter detection plate collides with the axle counter magnetic head or trackside equipment (such as a wire trough) arranged on the running track of the train, the axle counter detection plate will compress the spring and move upward under the action of external force, thereby reducing the damage caused by the collision to the axle counter detection plate, the axle counter magnetic head or the trackside equipment.

[0092] In possible ways, refer to Figure 6 The side of the axle counter detection plate that is away from the undercarriage running device of the train is an arc surface.

[0093] For example, the side of the axle counter detection plate away from the undercarriage running device of the train is an arc surface. Taking the plane view of the axle counter detection plate as an example, it can be as follows: Figure 6 The semicircle shown may also be a fan-shaped, semi-elliptical, or other shapes with one side away from the running device under the vehicle being an arc edge, and the present disclosure does not limit this. In this way, if the axle counter detection plate collides with the axle counter magnetic head or trackside equipment (such as a wire trough) arranged on the running track of the train, due to the guiding effect of the arc surface, the axle counter detection plate will compress the spring and move upward under the action of the external force, passing along the surface of the axle counter magnetic head or trackside equipment, further reducing the damage caused by the collision to the axle counter detection plate, the axle counter magnetic head or the trackside equipment.

[0094] It should be noted that, at present, the axle counter detection plate is usually rectangular, and the size of the axle counter detection plate is designed according to the requirements of the magnetic line cutting induction of the axle counter magnetic head, and the installation position of the axle counter detection plate is designed according to the distance from the magnetic head and the equipment limit of the train. Taking the axle counter detection plate as an example, which needs to be greater than 300×150mm (length×height) and the distance between the axle counter detection plate (lower surface) and the track beam surface is 435mm, if a semicircular axle counter detection plate is designed, the radius r of the semicircular axle counter detection plate is greater than or equal to 212mm, and the rectangular axle counter detection plate uses the distance between the lower surface and the track beam surface as the installation reference distance. Considering that the area of ​​the semicircular axle counter detection plate close to the lower surface gradually decreases, in order to avoid affecting the induction effect, the semicircular axle counter detection plate uses the distance between the upper surface and the track beam surface as the installation reference distance, that is, 285mm (435mm-150mm). The above specific values ​​are only used as an exemplary description, and are determined according to actual applications and needs. Axle counter detection plates of other shapes can be designed based on the above principles, and the present disclosure will not repeat them here.

[0095] Figure 7 is a block diagram of a vehicle-mounted controller 700 according to an exemplary embodiment. Figure 7 The onboard controller 700 includes a processor 701, which may be one or more, and a memory 702 for storing a computer program executable by the processor 701. The computer program stored in the memory 702 may include one or more modules, each corresponding to a set of instructions. In addition, the processor 701 may be configured to execute the computer program to perform the above-mentioned train control method.

[0096] In addition, the vehicle controller 700 may further include a power supply component 705 and a communication component 703. The power supply component 705 may be configured to perform power management of the vehicle controller 700, and the communication component 703 may be configured to implement communication of the vehicle controller 700, for example, wired or wireless communication. In addition, the vehicle controller 700 may further include an input / output (I / O) interface 704. The vehicle controller 700 may operate based on an operating system stored in the memory 702, such as Windows Server 2000. TM , Mac OS X TM , Unix TM , Linux TM etc.

[0097] In another exemplary embodiment, a computer-readable storage medium including program instructions is also provided, and when the program instructions are executed by a processor, the steps of the above-mentioned train control method are implemented. For example, the non-transitory computer-readable storage medium can be the above-mentioned memory 702 including program instructions, and the above-mentioned program instructions can be executed by the processor 701 of the onboard controller 700 to complete the above-mentioned train control method.

[0098] In another exemplary embodiment, a computer program product is also provided. The computer program product includes a computer program executable by a programmable device, and the computer program has a code portion for executing the above-mentioned train control method when executed by the programmable device.

[0099] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings; however, the present disclosure is not limited to the specific details in the above embodiments. Within the technical concept of the present disclosure, a variety of simple modifications can be made to the technical solution of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.

[0100] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.

[0101] In addition, various embodiments of the present disclosure may be arbitrarily combined, and as long as they do not violate the concept of the present disclosure, they should also be regarded as the contents disclosed by the present disclosure.

Claims

1. A train control method, characterized in that: The method comprises: Determine the lateral offset of the train; In the case where the lateral offset exceeds a preset normal lateral offset interval of the train, determining a target offset interval corresponding to the lateral offset; Determining the target control strategy corresponding to the target offset interval according to a preset corresponding relationship between the target offset interval and the control strategy; The train operation is controlled according to the target control strategy.

2. The method according to claim 1, characterized in that The determining a target offset interval corresponding to the lateral offset includes: When the absolute value of the lateral offset is greater than the upper limit of the preset normal lateral offset interval and less than the preset distance between the axle counting detection plate of the train and the axle counting magnetic head, determining that the target offset interval is an abnormal offset interval; When the absolute value of the lateral offset is greater than the preset distance, the target offset interval is determined to be an over-limit offset interval.

3. The method according to claim 2, characterized in that The abnormal deviation interval includes at least two abnormal deviation sub-intervals determined according to at least one preset intermediate threshold value, and when the absolute value of the lateral deviation is greater than the upper limit value of the preset normal lateral deviation interval and less than the preset distance between the axle counting detection plate of the train and the axle counting magnetic head, determining that the target deviation interval is an abnormal deviation interval includes: When the absolute value of the lateral offset is greater than the upper limit of the preset normal lateral offset interval and less than the preset distance between the axle counting detection plate and the axle counting magnetic head of the train, an abnormal offset sub-interval is determined as the target offset interval in the at least two abnormal offset sub-intervals based on the size relationship between the lateral offset and the at least one preset intermediate threshold value.

4. The method according to claim 3, characterized in that The number of the preset intermediate thresholds is one, and the preset intermediate thresholds are determined in the following manner: The difference between the upper limit value and the preset distance is determined, and a preset ratio value of the absolute value of the difference is added to the upper limit value to obtain the preset intermediate threshold value.

5. The method according to any one of claims 2 to 4, characterized in that: The determining, according to a preset correspondence between the offset interval and the control strategy, a target control strategy corresponding to the target offset interval includes: In the case where the target deviation interval is the abnormal deviation interval, the target control strategy is determined to be a first control strategy, and the first control strategy includes a strategy for controlling the train to send a deviation abnormality alarm and / or decelerate operation.

6. The method according to claim 2, characterized in that The determining, according to a preset correspondence between the offset interval and the control strategy, a target control strategy corresponding to the target offset interval includes: When the target offset interval is the overrun offset interval, determining a first distance required for the running speed of the train to be reduced to a preset speed according to the current speed of the train and a preset train braking curve; determining a second distance between the train and a first axle counting magnetic head in the direction of travel of the train; In the case where the first distance is less than the second distance, determining that the target control strategy is a second control strategy, the second control strategy includes a strategy of controlling the train to decelerate and sending an over-limit deviation alarm; When the first distance is greater than or equal to the second distance, the target control strategy is determined to be a third control strategy, and the third control strategy includes a strategy of controlling the train to brake and stop and sending a collision warning.

7. A vehicle-mounted controller, characterized in that: include: a memory having a computer program stored thereon; A processor, configured to execute the computer program in the memory to implement the steps of the method according to any one of claims 1 to 6.

8. A train, characterized in that: The train comprises a distance measuring device and a vehicle-mounted controller, wherein the distance measuring device is arranged on a running device under the vehicle of the train; The distance measuring device is used to measure the distance between the distance measuring device and the inner side of the running track beam of the train, and send the measured distance to the on-board controller; The on-board controller is used to receive the measured distance and determine the lateral offset of the train based on the measured distance, determine a target offset interval corresponding to the lateral offset when the lateral offset exceeds a preset normal lateral offset interval of the train, determine a target control strategy corresponding to the target offset interval based on a preset correspondence between the target offset interval and the control strategy, and control the operation of the train according to the target control strategy.

9. The train according to claim 8, characterized in that The train includes an axle counting detection plate, which is connected to the undercarriage running device of the train through an elastic component so that when the axle counting detection plate collides with an axle counting magnetic head or trackside equipment arranged on the running track of the train, the elastic component drives the axle counting detection plate to move upward.

10. The train according to claim 9, characterized in that A surface of the axle counter detection plate away from the undercarriage running device of the train is an arc surface.

Citation Information

Patent Citations

  • Railway locomotive and vehicle operating attitude measurement system

    CN101580071A

  • Derailment pre-warning method in rail traffic system

    CN110588719A

  • Bogie instability detection method and system

    CN112829795A

  • Car coupler state monitoring system

    CN113859309A