Fabricated pile foundation drilling platform and construction method

Through the unit box assembly and mud circulation device, the difficulty and environmental pollution problems of traditional drilling platforms in soft soil foundation construction are solved, and efficient and environmentally friendly drilling construction is achieved, which is suitable for different terrains and specifications, reducing costs and Construction period.

CN118728276APending Publication Date: 2024-10-01CCCC SECOND HARBOR ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410713862.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Traditional drilling platforms are difficult to construct in soft soil foundations such as beaches, cause serious environmental pollution, have long working hours, high costs, and high risks, making it difficult to popularize and apply them.

Method used

Multiple unit boxes are assembled to form a drilling platform, combined with a mud circulation device to realize mud preparation, injection and treatment, reducing environmental pollution. The casing is distributed in the center of the unit box to simplify the drilling operation process.

Benefits of technology

It reduces the cost and environmental pollution of drilling operations, improves construction efficiency and safety, simplifies the construction process, adapts to different terrain and specification requirements, shortens the construction period, and improves the reuse rate of materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728276A_ABST
    Figure CN118728276A_ABST
Patent Text Reader

Abstract

The invention relates to bridge engineering cast-in-situ bored pile construction, in particular to an assembly type pile foundation drilling platform and a construction method. Comprising a plurality of unit boxes and a slurry circulating device, the unit boxes are hollow box bodies capable of storing slurry, the unit boxes are connected with one another to form a platform foundation with a flat upper end face, and each unit box is provided with a first communicating structure communicating with the slurry of the adjacent unit box and a second communicating structure communicating with a pile foundation hole; and the slurry circulating device is communicated with one of the plurality of unit boxes and is used for preparing slurry before pile foundation construction and treating the slurry after the pile foundation construction. According to the drilling platform, a green slurry circulating system including slurry stirring, storing, using, recycling, slurry and slag separating treatment, recycling and the like is formed, the drilling construction method based on the drilling platform is easy to implement, safe, reliable and convenient to operate, the soft soil foundation pile foundation construction period is shortened, the construction quality is guaranteed, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to bored pile construction of bridge engineering, and in particular to an assembled pile foundation drilling platform and a construction method. Background Art

[0002] my country's transportation industry is developing rapidly, and large-scale bridges across rivers, seas and heavy hills and reservoirs are widely built. As a commonly used temporary structure, the construction of drilling platforms is an important control point in the entire bridge construction process. However, the site bearing capacity of rotary drilling in pile foundation construction on soft soil such as beaches is difficult to meet the conditions, and environmental protection requirements have become increasingly stringent in recent years. It is also crucial to reduce environmental pollution during pile foundation construction.

[0003] For example, the Chinese invention patent with the patent number "CN117188476A" and the title "A steel platform for rapid turnover of extra-long bored piles in tidal flats" introduces a drilling platform for tidal flats, which includes a steel casing, a mud circulation system and an assembled platform structure. The steel casing is buried in the drilling hole. The mud circulation system includes a rigid pipeline system, a mud pool and a tidal flat ground structure that supports the assembled platform structure. The tidal flat ground structure includes a groove for arranging the rigid pipeline system, a compacted part formed by backfilling sand and compacting it after the rigid pipeline system is arranged, and a geotextile layer laid on the compacted part. The rigid pipeline system connects each steel casing and the mud pool, the steel casing and the rigid pipeline system are connected and fixed, the assembled platform structure is laid on the tidal flat ground structure and the rigid pipeline system, and the assembled platform structure is fixedly connected to the steel casing. The platform structure strengthens the ground structure of the tidal flat area to meet the bearing capacity requirements, so there is no need to harden the ground with concrete in this area. It has little impact on the tidal flat environment and is suitable for ecologically sensitive areas with high environmental protection requirements.

[0004] But in fact, this plan also has some problems. This plan requires the insertion of steel casing as a bearing foundation. There is no platform to rely on during the construction of the steel casing, which makes the construction difficult and will also have an adverse impact on the local tidal flat environment. Secondly, the platform structure of this plan is relatively complex, involving many pipeline structures, some of which need to be buried on the tidal flat ground, further increasing the difficulty of construction. It is found that this construction platform has many restrictions and is difficult to promote and apply. Moreover, through the summary of the construction of steel trestles and platforms for multiple projects, it is found that the construction time of traditional water trestles and drilling platforms has a series of problems and shortcomings that restrict construction, such as large volume, long cycle, difficult organization, high cost, high risk, tight construction period and poor environmental protection. Summary of the invention

[0005] The purpose of the present invention is to solve the deficiencies of the above-mentioned background technology and to provide an assembled pile foundation drilling platform and a construction method.

[0006] The technical solution of the present invention is: an assembled pile foundation drilling platform, comprising:

[0007] A plurality of unit boxes, each of which is a hollow box body capable of storing mud, is connected to each other to form a platform foundation with a flat upper end surface, and each unit box is provided with a first connecting structure connected to the mud of an adjacent unit box and a second connecting structure connected to a pile foundation hole;

[0008] The mud circulation device is connected to a certain unit box among the multiple unit boxes and is used for preparing mud before pile foundation construction and processing mud after pile foundation construction.

[0009] According to an assembled pile foundation drilling platform provided in the present application, the unit box is a square box structure, including a bottom plate, a top plate and a side plate arranged between the bottom plate and the top plate; a connecting structure for connecting adjacent unit boxes into one is arranged on the top plate.

[0010] According to an assembled pile foundation drilling platform provided in the present application, a casing is also provided in the unit box; the casing is a hollow cylindrical structure which is open at both ends and vertically penetrates the top plate and the bottom plate, and the outer side surface of the casing forms a mud storage space with the top plate, the bottom plate and the side plates.

[0011] According to the assembled pile foundation drilling platform provided in the present application, the axis of the casing coincides with the vertical center line of the unit box.

[0012] According to an assembled pile foundation drilling platform provided in the present application, the first connecting structure includes a plurality of first connecting holes arranged on the side plate; the first connecting holes are located at the lower end of the side plate; the first connecting holes of the side plates of adjacent unit boxes that are in contact with each other are connected to each other.

[0013] According to an assembled pile foundation drilling platform provided in the present application, the second connecting structure includes a plurality of second connecting holes arranged at the lower end of the casing; the second connecting holes are located at the lower end of the casing and are used to connect the inner and outer sides of the casing.

[0014] According to the assembled pile foundation drilling platform provided in the present application, the mud circulation device comprises:

[0015] A sedimentation tank, which is used as a tank unit for mud preparation and mud sedimentation treatment, and is connected to the unit box through a mud pump;

[0016] A desander, which is connected to the sedimentation tank and is used to remove sand from the mud in the sedimentation tank after the pile foundation construction is completed;

[0017] A filter press is connected to the desander and is used for filter pressing the sandy soil separated by the desander.

[0018] The present application also provides a pile foundation drilling construction method, wherein the construction method uses the above-mentioned assembled pile foundation drilling platform to perform construction operations, including:

[0019] Prepare multiple unit boxes according to the pile foundation drilling requirements, hoist the unit boxes to the pile foundation construction area, and connect adjacent unit boxes to form a platform foundation;

[0020] preparing mud and injecting the mud into the mud storage space of the unit box;

[0021] The drilling rig is moved to the platform foundation, and the pile foundation drilling operation is carried out based on the load of the unit box. During the drilling process, mud is injected into the pile foundation hole through the unit box;

[0022] After the pile foundation hole is constructed to the designed elevation, stop injecting mud into the pile foundation hole, pour concrete into the pile foundation hole to construct the pile foundation, and deal with the discharged mud;

[0023] The drilling rig moves to the next construction location and carries out construction according to the above process in sequence until all construction points are completed.

[0024] According to a pile foundation drilling construction method provided in the present application, the method of connecting adjacent unit boxes into one to form a platform foundation includes: hoisting a square unit box to the pile foundation construction area, so that the side panels of adjacent unit boxes fit tightly together, and then using the connecting structure on the top of the unit box to connect the adjacent unit boxes into one, and connecting the adjacent unit boxes in sequence until all the unit boxes form a whole.

[0025] According to a pile foundation drilling construction method provided in the present application, the method of injecting mud into the mud storage space of the unit box includes: preparing mud in a sedimentation tank of a mud circulation device, pumping the mud in the sedimentation tank into a certain unit box by a mud pump, opening the first connecting hole at the lower end of the side plate of the unit box, and allowing the mud to flow in the adjacent unit box until the mud enters the mud storage space of the unit box to be operated.

[0026] The advantages of the present application are as follows: 1. The present application prepares unit boxes and assembles the unit boxes to form a drilling operation platform, which can adapt to different ground operation requirements. By changing the number of unit boxes, it can adapt to the operation requirements of operation areas of different sizes. There is no need to change the ground of the operation area. The mud required in the drilling operation process can be prepared and processed without causing any pollution to the operation environment area. The operation platform can be repeatedly used, which greatly reduces the cost of drilling operations and improves the efficiency of drilling operations. It has great promotion value.

[0027] 2. The unit box structure of the present application is simple. The required unit box structure can be formed by the top plate, bottom plate and side plate. The unit box adopts a square structure. Adjacent unit boxes fit tightly together without leaving any gaps. The platform foundation formed is stable and firm, and the safety of drilling operations is greatly improved.

[0028] 3. The present application arranges casing on the unit box to facilitate the subsequent drilling operation. During the subsequent drilling operation, the drilling operation can be carried out without constructing the casing structure. Compared with the existing operation method that requires the casing to be constructed in advance, the present application saves a lot of processes and improves the operation efficiency;

[0029] 4. The casing of the present application is arranged at the center of the unit box, so that the casing can be evenly distributed on the platform foundation formed by the unit box, which can ensure the structural stability of the entire platform foundation on the one hand, and facilitate the operation of the drilling equipment on the other hand, and reserve sufficient platform walking space for the drilling equipment;

[0030] 5. The present application provides a first connecting hole at the lower end of the side plate, and uses the first connecting hole to connect adjacent unit boxes, so that mud can flow freely in the mud storage space of the adjacent unit boxes, making the mud flow more convenient and the operation simple, thereby improving the efficiency of mud injection during drilling operations;

[0031] 6. The present application sets a second connecting hole at the lower end of the casing, through which the injection of mud during drilling operation can be conveniently controlled, the operation is very simple, and the structural design is exquisite;

[0032] 7. The mud circulation device of the present application has a simple structure and has the functions of mud preparation and mud treatment. The mud circulation device will not cause pollution to the surrounding environment, thereby improving the environmental protection requirements of drilling operations;

[0033] 8. The drilling construction method of the present application is based on the platform foundation formed by the unit box for drilling operations. The entire construction method is very simple, the construction efficiency is extremely high, the drilling operation stability and safety are excellent, and the mud will be digested and processed by itself during the construction process, and will not be discharged to cause pollution to the surrounding environment;

[0034] 9. The platform foundation of the present application is very convenient to assemble. The platform foundation formed by the unit box is stable and firm. The assembly and disassembly are very simple. The formed platform foundation structure is firm and can adapt to various terrains and specifications.

[0035] 10. The mud required for the drilling operation of this application is prepared by itself. The mud can flow in the unit box until it flows into the pile foundation hole being drilled. The overall operation is simple and will not cause pollution to the environment.

[0036] The drilling platform of the present application forms a green circulation system for mud from mud mixing, storage, use, recycling, slurry residue separation and treatment, reuse, etc. The drilling construction method based on the drilling platform is simple, safe, reliable and easy to operate, which shortens the construction period of soft soil pile foundation, ensures construction quality and reduces construction cost; it shows good technical characteristics and superior economic performance, and has great promotion value; by connecting multiple unit boxes into a whole, the local settlement of the conventional construction platform is avoided, and the stability and safety of the drilling rig during the drilling process are guaranteed; compared with traditional steel cofferdam platforms, trestle steel platforms, etc., this solution reduces the investment in steel, while increasing the reuse rate of materials, shortens the construction period, facilitates construction, and has significant economic benefits; the drilling platform can be quickly assembled and disassembled, and has good portability; it can be applied to pile foundation construction in different construction environments and different strata, and has a wide range of applications. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 : A top view of the drilling platform layout of the present application;

[0038] Figure 2 : Schematic diagram of connection of adjacent unit boxes of this application;

[0039] Figure 3 : Schematic diagram of the rotary drilling rig of the present application performing drilling operations based on a drilling platform;

[0040] Wherein: 1 - unit box; 11 - top plate; 12 - bottom plate; 13 - side plate; 14 - casing; 15 - connection structure; 16 - first connecting hole; 17 - second connecting hole;

[0041] 2—Sedimentation tank; 3—Desander; 4—Filter press. DETAILED DESCRIPTION

[0042] The embodiments of the present invention are described in detail below, wherein the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0043] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0044] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0045] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0046] The present application relates to an assembled pile foundation drilling platform. The drilling platform of the present application is mainly used for drilling operations on soft soil foundations. The rotary drilling rig based on the drilling platform of the present application can perform rotary drilling at the construction point of the natural foundation to form a pile foundation hole, and finally pour concrete into the pile foundation hole to form a pile foundation. The drilling platform of the present application is an assembled structure, which is easy to install and disassemble, and is suitable for platform assembly on soft soil foundations. During the drilling operation, the drilling platform of the present application is equipped with mud preparation and mud treatment devices, which will not cause the problem of mud discharge affecting the surrounding environment, and has good environmental protection.

[0047] Specifically, Figures 1 to 3 As shown, the assembled pile foundation drilling platform of the present application includes a plurality of unit boxes 1 and a mud circulation device. The unit box 1 is a hollow box that can store mud. The plurality of unit boxes 1 are interconnected to form a platform foundation with a flat upper end surface. Each unit box 1 is provided with a first connecting structure connected to the mud of an adjacent unit box 1 and a second connecting structure connected to the pile foundation hole. The plurality of unit boxes 1 are spliced ​​together to form a platform foundation required for the drilling operation. The unit boxes 1 have uniform specifications and can adapt to different needs by increasing or decreasing the number and changing the arrangement. The mud circulation device is connected to a certain unit box 1 among the plurality of unit boxes 1 and is used to prepare mud before the pile foundation construction and to process the mud after the pile foundation construction. The mud circulation device can provide mud for the drilling construction and can also process the excess mud after the pile foundation construction is completed to avoid external discharge and affect the surrounding environment.

[0048] During actual construction, multiple unit boxes 1 are prepared according to the pile foundation drilling requirements, and the unit boxes 1 are hoisted to the pile foundation construction area, and adjacent unit boxes 1 are connected as a whole to form a platform foundation; mud is prepared and injected into the mud storage space of the unit box 1; the drilling rig is moved to the platform foundation, and the pile foundation drilling operation is carried out based on the bearing of the unit box 1. During the drilling process, mud is injected into the pile foundation hole through the unit box 1; after the pile foundation hole is constructed to the designed elevation, the injection of mud into the pile foundation hole is stopped, and concrete is poured into the pile foundation hole to construct the pile foundation, and the discharged mud is processed; the drilling rig is moved to the next construction location, and construction is carried out according to the above process, in sequence, until the construction of all construction points is completed.

[0049] In some embodiments of the present application, the present embodiment optimizes the structure of the above-mentioned unit box 1, such as Figure 1 and 2 As shown, the unit box 1 of this embodiment is a square box structure, including a bottom plate 12, a top plate 11 and a side plate 13 arranged between the bottom plate 12 and the top plate 11. The top plate 11 is provided with a connecting structure 15 that connects adjacent unit boxes 1 into one.

[0050] The unit box 1 may also be in other forms, such as a regular pentagon, a regular hexagon, etc., as long as the adjacent unit boxes 1 can be closely fitted together to form a platform foundation. The connection structure 15 of this embodiment may be a snap-fit ​​structure or other forms of connection structure, as long as the function of connecting the top plates 11 of adjacent unit boxes 1 together and being able to be disassembled later can be met.

[0051] The specifications of the unit box 1 can be designed according to actual needs, and a suitable unit box 1 structure can be selected and manufactured according to the requirements of pile foundation construction.

[0052] In addition, a casing 14 is provided in the unit box 1 of this embodiment. The casing 14 is a hollow cylindrical structure with openings at both ends and vertically passing through the top plate 11 and the bottom plate 12. The outer side surface of the casing 14 forms a mud storage space with the top plate 11, the bottom plate 12 and the side plate 13.

[0053] The casing 14 facilitates the operation of the rotary drilling rig, and there is no need to construct a steel casing during subsequent drilling operations. Such a design structure can greatly improve the operating efficiency and reduce the difficulty of construction.

[0054] The casing 14 of this embodiment is located at the center of the unit box 1, that is, the axis of the casing 14 coincides with the vertical center line of the unit box 1. This ensures that the casing 14 is evenly distributed on the platform foundation, and there is enough space for the rotary drilling rig to move between adjacent casings 14.

[0055] In actual operation, multiple unit boxes 1 are prepared according to the pile foundation drilling requirements, and the multiple unit boxes 1 are transported to the pile foundation construction area. The square unit boxes 1 are arranged together in vertical columns and horizontal rows, and then the connecting structure 15 on the top plate 11 is used to connect the adjacent unit boxes 1, so that the unit boxes 1 are assembled together to form a platform foundation.

[0056] In a further embodiment of the present application, the first connecting structure and the second connecting structure are optimized. Specifically, Figure 1 and 2 As shown, the first communication structure includes a plurality of first communication holes 16 disposed on the side plate 13, the first communication holes 16 are located at the lower end of the side plate 13, and the first communication holes 16 of the side plates 13 of adjacent unit boxes 1 that are attached to each other are connected to each other;

[0057] The second communication structure includes a plurality of second communication holes 17 disposed at the lower end of the casing 14 . The second communication holes 17 are located at the lower end of the casing 14 and are used to connect the inside and outside of the casing 14 .

[0058] The first connecting hole 16 and the second connecting hole 17 control the valve or switch to open and close. When the first connecting hole 16 is opened, the mud between the adjacent unit boxes 1 is in a connected state, and the mud in the unit box 1 with a high liquid level can enter the unit box 1 with a low liquid level through the interconnected first connecting holes 16. The second connecting hole 17 is a structure for injecting mud into the pile foundation hole. When the rotary drilling rig performs rotary drilling in the casing 14, the second connecting hole 17 is opened, and the mud in the unit box 1 will flow into the pile foundation hole through the second connecting hole 17.

[0059] In actual operation, when assembling the unit boxes 1, the adjacent unit boxes 1 are assembled according to the set positions, that is, the first communication holes 16 of the adjacent unit boxes 1 are aligned with each other, ensuring that when the first communication holes 16 are opened, the adjacent unit boxes 1 can be connected through the aligned first communication holes 16;

[0060] When the rotary drilling rig performs rotary drilling operations in the casing 14, the second connecting hole 17 is opened to discharge the mud stored in the unit box 1 into the pile foundation hole, and the mud condition in the pile foundation hole is observed at all times. When the mud is insufficient, the first connecting hole 16 can be opened to introduce the mud in the adjacent unit box 1 into the unit box 1 under construction, and finally discharged into the pile foundation hole for mud replenishment.

[0061] In other embodiments of the present application, the above-mentioned mud circulation device is optimized. Specifically, Figure 1 As shown, the mud circulation device of this embodiment includes a sedimentation tank 2, a desander 3 and a filter press 4. The sedimentation tank 2 serves as a tank unit for mud preparation and mud sedimentation treatment. The sedimentation tank 2 is connected to the unit box 1 through a mud pump; the desander 3 is connected to the sedimentation tank 2 for desanding the mud in the sedimentation tank 2 after the pile foundation construction is completed; the filter press 4 is connected to the desander 3 for filter press treatment of the sandy soil separated by the desander 3.

[0062] Before the construction of the pile foundation hole, the mud required for the drilling operation is prepared in the sedimentation tank 2, the first connecting hole 16 on the unit box 1 is opened, and the mud in the sedimentation tank 2 is injected into the unit box 1 through a mud pump. The mud flows in the adjacent unit box 1 until it is filled into the mud storage space of the unit box 1 to be constructed; after the rotary drilling rig completes the construction of the pile foundation hole in the casing 14, concrete is poured into the pile foundation hole, and the discharged mud is recovered to the sedimentation tank, first through the sedimentation treatment in the sedimentation tank 2, and then the mud is further desanded by the desander 3, and finally the separated sandy soil is pressed into a mud cake by the filter press 4, which can be reused as roadbed filling; the mud precipitated in the sedimentation tank 2 can be discharged into the unit box 1 again for repeated use.

[0063] When the drilling platform of the present application is performing drilling construction, a plurality of unit boxes 1 are prepared according to the pile foundation drilling requirements, the plurality of unit boxes 1 are transported to the pile foundation construction area, the square unit boxes 1 are arranged together in a longitudinal column and a transverse row, and the adjacent unit boxes 1 are assembled according to the set positions, even if the first connecting holes 16 of the adjacent unit boxes 1 are aligned with each other, it is ensured that when the first connecting holes 16 are opened, the adjacent unit boxes 1 can be connected through the aligned first connecting holes 16, and then the unit boxes 1 that are close together are connected by using the connecting structure 15 on the top plate 11, so that the unit boxes 1 are assembled together to form the platform foundation;

[0064] Prepare the mud required for drilling operation in the sedimentation tank 2, open the first connecting hole 16 on the unit box 1, and inject the mud in the sedimentation tank 2 into the unit box 1 through the mud pump. The mud flows in the adjacent unit boxes 1 until it is filled into the mud storage space of the unit box 1 to be constructed;

[0065] The rotary drilling rig moves to the first construction point on the platform foundation, performs rotary drilling construction through the casing 14 corresponding to the first construction point, opens the second connecting hole 17, discharges the mud stored in the unit box 1 into the pile foundation hole, and always observes the mud condition in the pile foundation hole. When the mud is insufficient, the first connecting hole 16 can be opened to introduce the mud in the adjacent unit box 1 into the unit box 1 under construction, and finally discharges it into the pile foundation hole for mud replenishment;

[0066] After the pile foundation hole construction reaches the set elevation, concrete is poured into the pile foundation hole, and the mud discharged from the pile foundation hole is sucked into the sedimentation tank 2 by a mud pump and a pipeline. After the sedimentation treatment in the sedimentation tank 2, the precipitated mud in the sedimentation tank 2 can be discharged into the unit box 1 again for reuse, and the clarified part in the sedimentation tank 2 enters the desander 3, and the desander 3 is used to further desand the clarified mud, and finally the separated sandy soil is pressed into a mud cake by the filter press 4, which can be used for roadbed filling and reuse;

[0067] Drive the rotary drilling rig to move to the next construction point, and carry out the pile foundation construction of the next construction point according to the above process, and carry out it in sequence until the construction operations of all pile foundations are completed.

[0068] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. An assembled pile foundation drilling platform, characterized in that: include, A plurality of unit boxes (1), wherein the unit boxes (1) are hollow boxes capable of storing mud, the plurality of unit boxes (1) are interconnected to form a platform foundation having a flat upper end surface, and each unit box (1) is provided with a first connecting structure connected to the mud of an adjacent unit box (1) and a second connecting structure connected to a pile foundation hole; A mud circulation device is connected to a certain unit box (1) among the plurality of unit boxes (1) and is used for preparing mud before pile foundation construction and processing mud after pile foundation construction.

2. The assembled pile foundation drilling platform according to claim 1, characterized in that: The unit box (1) is a square box structure, comprising a bottom plate (12), a top plate (11), and a side plate (13) arranged between the bottom plate (12) and the top plate (11); a connecting structure (15) for connecting adjacent unit boxes (1) into one body is arranged on the top plate (11).

3. The assembled pile foundation drilling platform according to claim 2, characterized in that: A casing (14) is also provided in the unit box (1); the casing (14) is a hollow cylindrical structure with openings at both ends and vertically penetrating the top plate (11) and the bottom plate (12); the outer side surface of the casing (14) forms a mud storage space with the top plate (11), the bottom plate (12) and the side plate (13).

4. The assembled pile foundation drilling platform according to claim 3, characterized in that: The axis of the casing (14) coincides with the vertical center line of the unit box (1).

5. The assembled pile foundation drilling platform according to claim 2, characterized in that: The first connecting structure comprises a plurality of first connecting holes (16) arranged on the side plate (13); the first connecting holes (16) are located at the lower end of the side plate (13); and the first connecting holes (16) of the side plates (13) of adjacent unit boxes (1) that are attached to each other are connected to each other.

6. The assembled pile foundation drilling platform according to claim 3, characterized in that: The second communication structure comprises a plurality of second communication holes (17) arranged at the lower end of the protective tube (14); the second communication holes (17) are located at the lower end of the protective tube (14) and are used to connect the inner and outer sides of the protective tube (14).

7. The assembled pile foundation drilling platform according to claim 1, characterized in that: The mud circulation device comprises: A sedimentation tank (2), the sedimentation tank (2) serving as a tank unit for mud preparation and mud sedimentation treatment, the sedimentation tank (2) being connected to the unit box (1) via a mud pump; A desander (3), the desander (3) being connected to the sedimentation tank (2) and used for desanding the mud in the sedimentation tank (2) after the pile foundation construction is completed; A filter press (4), wherein the filter press (4) is connected to the desander (3) and is used for filter pressing the sandy soil separated by the desander (3).

8. A pile foundation drilling construction method, characterized in that: The construction method uses an assembled pile foundation drilling platform as described in any one of claims 1 to 7 to perform construction operations, including: A plurality of unit boxes (1) are prepared according to the pile foundation drilling requirements, the unit boxes (1) are hoisted to the pile foundation construction area, and adjacent unit boxes (1) are connected as a whole to form a platform foundation; preparing mud, and injecting the mud into the mud storage space of the unit box (1); The drilling rig is moved to the platform foundation, and the pile foundation drilling operation is performed based on the load of the unit box (1). During the drilling process, mud is injected into the pile foundation hole through the unit box (1); After the pile foundation hole is constructed to the designed elevation, stop injecting mud into the pile foundation hole, pour concrete into the pile foundation hole to construct the pile foundation, and deal with the discharged mud; The drilling rig moves to the next construction location and carries out construction according to the above process in sequence until all construction points are completed.

9. A pile foundation drilling construction method as claimed in claim 8, characterized in that: The method for connecting adjacent unit boxes (1) into one body to form a platform foundation comprises: hoisting a square unit box (1) to a pile foundation construction area, so that the side panels (13) of the adjacent unit boxes (1) are tightly fitted together, and then connecting the adjacent unit boxes (1) into one body by using a connecting structure (15) at the top of the unit box (1), and connecting the adjacent unit boxes (1) in sequence until all the unit boxes (1) form a whole.

10. A pile foundation drilling construction method as claimed in claim 8, characterized in that: The method for injecting mud into the mud storage space of a unit box (1) comprises: preparing mud in a sedimentation tank (2) of a mud circulation device, pumping the mud in the sedimentation tank (2) into a certain unit box (1) by a mud pump, opening a first connecting hole at the lower end of a side plate (13) of the unit box (1), and allowing the mud to flow in an adjacent unit box (1) until the mud enters the mud storage space of the unit box (1) to be operated.