Device and process for pulling out damaged and blocked inner pipe of large-diameter blanking hole
By designing a device for dismantling the frame body, supporting clamps and cutting clamps, the problem of the inner pipe in the large-diameter blanking hole being stuck due to wear and being unable to be pulled out was solved, improving construction efficiency and safety, and achieving stable pull-out and stabilization of the inner pipe. Quick replacement.
Patent Information
- Application Number
- CN202410922864.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The inner pipe of the large-diameter blanking hole is stuck due to wear and tear, and the inner pipe cannot be effectively pulled out and replaced with a new one, resulting in low construction efficiency and potential safety hazards.
A device including a dismantling frame body, a supporting clamp and a cutting clamp is designed. Sufficient space is provided by dismantling the frame body. The supporting clamp fixes and supports the inner tube. The cutting clamp is used to cut off the inner tube to ensure the safety of the inner tube during the extraction process. Stability and security.
It improves the safety and efficiency during the construction process, avoids construction delays and safety hazards caused by the inner tube not being fixed in place, and achieves efficient extraction and rapid replacement of the inner tube of the large-diameter blanking hole.
Smart Images

Figure CN118728299A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pipeline construction, and in particular to a device and a process for removing a damaged pipe blocked in a large-diameter feeding hole. Background Art
[0002] Large-diameter drill holes such as feeding holes and slurry holes have the advantages of high transportation efficiency, low cost and low interference. They have become the main measures to ensure mine safety, relieve the pressure of mine auxiliary transportation and simplify the underground production system. They are widely used in mine feeding, drainage, gas discharge and emergency passages, etc., and play an increasingly important role in mine construction and production operations. Large-diameter drill holes have gradually become a routine configuration in mines and are increasingly widely used. After the feeding hole is put into use, the inner tube (working tube) will continue to wear due to feeding. If it is not replaced in time before reaching the service life limit, local wear and tear will occur, causing some cement and sand and gravel to enter the annular gap between the inner tube and the outer tube from the rupture of the inner tube, and the inner tube below the damage will be locked and stuck, and it cannot be lifted up for replacement. During the use of the feeding hole, due to the high feeding efficiency, the inner tube wears rapidly after the local wear-resistant layer of the inner tube is worn out, causing local damage, locking and jamming. It is difficult to completely avoid the phenomenon. The inner tube of the feeding hole is damaged and stuck and cannot be pulled out to replace a new inner tube, and the construction efficiency is low. Summary of the invention
[0003] The present invention provides a device and process for removing a damaged and blocked inner tube of a large-diameter feeding hole, which solves the problem in the related art that the inner tube of the feeding hole is damaged and stuck and cannot be pulled out and replaced with a new inner tube, and the removal efficiency of the old inner tube is low.
[0004] The technical solution of the present invention is as follows: A device for pulling out a damaged and blocked inner tube of a large-diameter feeding hole is used to pull out an inner tube that cannot be pulled out due to wear and blocking in the feeding hole, comprising: A dismantling frame is provided above the feeding hole, and the dismantling frame has a dismantling hole, and the diameter of the dismantling hole is larger than the diameter of the feeding hole. A support fixture is provided on the dismantling frame and is located above the material removal hole. The support fixture has a support hole, and the support hole is coaxially arranged with the dismantling hole and the material removal hole. The support fixture is a plurality of support fixtures arranged in sequence up and down. A cutting fixture is arranged on the dismantling frame and is located between the supporting fixture and the feeding hole.
[0005] As a further technical solution, the cutting fixture comprises A support platform, the support platform is arranged on the dismantling frame, and the support platform has a first fixing hole, A cutting baffle, the cutting baffle is lifted and arranged on the support platform, and the cutting baffle has a second fixing hole, A lifting drive member is arranged on the support platform to drive the cutting baffle to rise and fall.
[0006] As a further technical solution, the support fixture includes The first clamp part and the second clamp part are hinged to each other at one end, the first clamp part and the second clamp part form the support hole, the inner wall of the support hole has a tooth part, and the other end of the first clamp part and the second clamp part both have a through hole, a fixing rope, the fixing rope passing through the through hole of the first clamping part and the through hole of the second clamping part, A locking piece, one end of the fixing rope is arranged on the locking piece, the locking piece has a locking hole, and the other end of the fixing rope passes through the locking hole.
[0007] As a further technical solution, the first clamping part and the second clamping part have side support holes on their sides, and further include A fixing ring, wherein the fixing ring is arranged on the dismantling frame and is in a plurality of numbers. A support rope, the support rope passes through the fixing ring, one end of which is fixedly arranged in the side support hole, and is used for supporting and fixing the support clamp. A rope reel, the support rope is wound around the rope reel, and the rope reel is used to control the tension adjustment of the support rope.
[0008] As a further technical solution, the dismantling frame includes A telescopic rod, wherein the telescopic rod is arranged in a circle and one end is swingably arranged around the top of the feeding hole. The inner tube passes through a ring, and the other end of the telescopic rod is hinged on the inner tube passing through the ring. A threading ring, wherein a plurality of the threading rings are sequentially arranged on the telescopic rod, and the support rope passes through the threading ring and then around the fixing ring.
[0009] As a further technical solution, a quick-change part is also included, and the quick-change part includes A lifting fixture, wherein the lifting fixture is fixedly arranged on the inner tube, A first holding piece and a second holding piece, wherein the first holding piece and the second holding piece form a lifting hole, the inner tube is located in the lifting hole, and the upper parts of the first holding piece and the second holding piece are both in contact with the bottom of the lifting clamp, There are two lifting members, which are respectively arranged on the first holding member and the second holding member, and the lifting members have lifting holes.
[0010] As a further technical solution, it also includes A locking piece, wherein the locking piece is arranged on the cutting baffle, and the locking piece is used for tightening the fixing rope.
[0011] A process for removing a damaged pipe from a large-diameter feeding hole, comprising: S1: Install the drilling rig, hydraulic puller, inner pipe cutter, sweeping drill, lower salvage, the demolition frame, the support fixture and the cutting fixture, and build the mud pump room. S2: Use the drilling rig or the hydraulic pipe puller to pull out the inner pipe above the damaged part. When the inner pipe above the damaged part cannot be pulled out, use an inner pipe cutter to cut it at the damaged part. After cutting, use the drilling rig or the hydraulic pipe puller to pull out the inner pipe. S3: Determine the size of the casing sweeping drill tool, use a casing sweeping drill tool with a length of 10m to sweep out the blockage between the outer tube and the inner tube, and then replace it with a casing sweeping drill tool with a length of 20m. During the casing sweeping process, observe the rotation resistance of the casing sweeping drill tool. When the rotation resistance of the casing sweeping drill tool changes, stop the casing sweeping operation, and use a mud pump to extract the debris during the sweeping process. S4: using the inner tube cutter to cut the swept inner tube, with the cutting position avoiding the connection position of the two inner tubes, S5: fix the inner tube using the overshot device and lift the inner tube using the drilling rig. S6: After the inner tube is completely pulled out, a cone with a diameter 20 mm smaller than the inner diameter of the outer tube is lowered, and the sleeve sweeping drill bit is assembled to sweep away the remaining sand and gravel in the outer tube. After the sleeve sweeping drill bit is dredged, a 20m seamless steel pipe with a diameter 20 mm smaller than the inner diameter of the outer tube is used to clear the well. S7: lowering the new inner tube.
[0012] As a further technical solution, in step S2, when the inner tube is pulled out, a plurality of the supporting clamps are sequentially locked on the inner tube; In step S2, when the inner tube is pulled out in multiple sections and is not easy to separate, the cutting baffle is used to fix the connection of the inner tube. After the connection of the inner tube is fixed, the connection of the two inner tubes is cut.
[0013] As a further technical solution, in step S7, a quick-change part is used to quickly replace the inner tube.
[0014] The working principle and beneficial effects of the present invention are: In the present invention, the dismantling frame serves as a support platform for the dismantling of the inner tube. The dismantling frame has a dismantling hole, which is located directly above the feeding hole. The designed aperture is larger than the feeding hole, ensuring that there is enough space for subsequent cutting and pulling operations. The support fixture is located on the dismantling frame and directly acts on the inner tube to fix and support the inner tube, ensuring that the relative position of the inner tube is fixed during the cutting and pulling process, avoiding displacement or movement of the inner tube due to external forces, thereby avoiding hidden dangers and risks caused by the inner tube not being fixed in place during the actual processing process. The support fixtures are arranged in sequence up and down, and each fixture is provided with a support hole coaxial with the dismantling hole and the feeding hole. The positioning of the support hole can ensure that the inner tube maintains straightness when being cut or pulled out, reducing the difficulty of operation. By adjusting the position of the support fixture, it can adapt to inner tubes of different lengths to ensure the smooth progress of the cutting and pulling process. The cutting fixture is located between the support fixture and the feeding hole. It is mainly used to cut off the connection between two adjacent inner tubes that are not damaged. When two adjacent inner tubes cannot be separated, they can be quickly cut off, and the next section of the inner tube can be quickly pulled out after cutting. The construction efficiency is improved by the rapid pulling out of the undamaged inner tube. When the damaged and blocked inner tube of the feeding hole needs to be pulled out, first place the dismantling frame above the feeding hole to ensure that the dismantling hole is aligned with the feeding hole to reserve space for subsequent operations. By adjusting the support fixture, the inner tube is pulled out with other equipment after the support fixture is aligned with the inner tube. During the pulling process, the support fixture contacts and fixes the inner tube in turn to ensure that the inner tube remains stable in subsequent operations. When the adjacent inner tube is too long, the cutting fixture fixes the inner tube, and then cuts the inner tube after fixing it. After cutting, the inner tube can be placed more stably at the designated location to avoid safety hazards caused by excessive inner tube length. Pull out the inner tubes section by section until all inner tubes are successfully removed.Compared with the existing technology, the design of the supporting clamp ensures that in the actual operation process, if the inner tube is damaged or broken in the air, especially when the pulled out inner tube and the unpulled inner tube are broken under the action of traction during the traction process of the related equipment, the supporting clamp can support and fix the pulled out part of the inner tube to avoid the pulled out inner tube from falling and causing damage to personnel and equipment, thereby improving the safety during the operation. The design of the cutting clamp is to fix and protect the inner tube if it needs to be disconnected during the construction process, especially when the middle part of a single inner tube needs to be disconnected, because the pulled out inner tubes are all inner tubes that have been used for a period of time, and there is a greater probability that more inner tubes will appear. Wear. In order to avoid breakage in the parts with greater wear during the pulling process, cutting will be performed in the parts with greater wear. The existing technology has not taken this into consideration. The inner tube may break during the pulling process and require secondary salvage. The design of the cutting fixture can fix the inner tube when any part of the inner tube needs to be cut. The fixed inner tube is ensured not to shake due to cutting by the cutting fixture and several supporting fixtures, further improving the safety during the construction process. Several supporting fixtures arranged in sequence can also fix and buffer the inner tube when the end of the inner tube falls off during pulling. This avoids accidents caused by the inner tube not being fixed in place. In summary, the device for pulling out damaged and blocked inner tubes in large-diameter feeding holes improves the safety during the construction process by fixing the inner tube in different states, avoids construction delays caused by the inner tube not being fixed in place, and improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The preferred implementation modes will be described below in a clear and understandable manner with reference to the accompanying drawings to further illustrate the above-mentioned characteristics, technical features, advantages and implementation methods of the present invention.
[0016] Figure 1 It is a schematic diagram of the structure of the present invention; Figure 2 It is a structural schematic diagram of another perspective of the present invention; Figure 3 for Figure 2 The structural diagram of A in the figure; Figure 4 for Figure 2 Schematic diagram of the structure of B; Figure 5 for Figure 2 Schematic diagram of the structure of C.
[0017] In the figure: inner tube-1, dismantling frame-2, dismantling hole-201, telescopic rod-202, inner tube ring-203, threading ring-204, feeding hole-3, supporting clamp-4, supporting hole-401, first clamping part-402, second clamping part-403, tooth part-404, perforation-405, fixing rope-406, locking part-407, side supporting hole-408, fixing ring-409, supporting rope-410, rope reel-411, cutting clamp-5, supporting platform-501, first fixing hole-502, cutting baffle-503, second fixing hole-504, lifting drive part-505, quick change part-6, lifting clamp-601, first holding part-602, second holding part-603, lifting part-604, lifting hole-605, locking part-7. DETAILED DESCRIPTION
[0018] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the specific implementation methods of the present invention will be described below with reference to the accompanying drawings. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings and other implementation methods can be obtained based on these drawings without creative work.
[0019] In order to simplify the drawings, only the parts related to the invention are schematically shown in each figure, and they do not represent the actual structure of the product. In addition, in order to simplify the drawings and facilitate understanding, in some figures, only one of the parts with the same structure or function is schematically shown, or only one of them is marked. In this article, "one" not only means "only one", but also means "more than one", and "several" includes "two" and "more than two".
[0020] In this document, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0021] In addition, in the description of the present application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0022] Reference Figure 1~Figure 5, is an embodiment of the present invention, a device for pulling out a damaged and blocked inner pipe in a large-diameter feeding hole is proposed, which is used to pull out an inner pipe 1 in the feeding hole 3 that cannot be pulled out due to wear and stuck. The device comprises a dismantling frame 2, which is arranged above the feeding hole 3. The dismantling frame 2 has a dismantling hole 201, and the aperture of the dismantling hole 201 is larger than the aperture of the feeding hole 3. A supporting fixture 4 is arranged on the dismantling frame 2 and is located above the feeding hole 3. The supporting fixture 4 has a supporting hole 401, which is coaxially arranged with the dismantling hole 201 and the feeding hole 3. The supporting fixture 4 is a plurality of supporting fixtures arranged in sequence up and down. The cutting fixture 5 is arranged on the dismantling frame 2 and is located between the supporting fixture 4 and the feeding hole 3.
[0023] In this embodiment, the dismantling frame 2 serves as a support platform for the dismantling of the inner tube 1. The dismantling frame 2 has a dismantling hole 201, which is located directly above the feeding hole 3. Its designed aperture is larger than the feeding hole 3, ensuring that there is enough space for subsequent cutting and pulling operations. The support fixture 4 is located on the dismantling frame 2 and directly acts on the inner tube 1. It is used to fix and support the inner tube 1 to ensure that the relative position of the inner tube 1 is fixed during the cutting and pulling process, and to avoid displacement or movement of the inner tube 1 due to external forces, thereby avoiding the hidden dangers and risks caused by the inner tube 1 not being fixed in place during the actual processing process. The support fixtures 4 are arranged in sequence up and down, and each fixture is provided with a support hole 401 coaxial with the dismantling hole 201 and the feeding hole 3. The positioning of the support hole 401 can ensure that the inner tube 1 maintains straightness when being cut or pulled out, reducing the difficulty of operation. By adjusting the position of the support fixture 4, it can adapt to inner tubes 1 of different lengths to ensure the smooth progress of the cutting and pulling process. The cutting fixture 5 is located between the supporting fixture 4 and the feeding hole 3, and is mainly used to cut off the connection between two adjacent inner tubes 1 that are not damaged. When the two adjacent inner tubes 1 cannot be separated, they can be quickly cut off, and the next section of the inner tube 1 can be quickly pulled out after cutting. The construction efficiency is improved by the rapid pulling out of the undamaged inner tube 1. When the inner tube 1 of the feeding hole 3 is damaged and blocked and needs to be pulled out, the dismantling frame 2 is first placed above the feeding hole 3 to ensure that the dismantling hole 201 is aligned with the feeding hole 3 to reserve space for subsequent operations. By adjusting the supporting fixture 4, the inner tube 1 is pulled out using other equipment after the supporting fixture 4 is aligned with the inner tube 1. During the pulling process, the supporting fixture 4 contacts and fixes the inner tube 1 in turn to ensure that the inner tube 1 remains stable in subsequent operations. When the adjacent inner tube 1 is too long, the cutting fixture 5 fixes the inner tube 1, and then cuts the inner tube 1 after fixing it. After the cutting is completed, the inner tube 1 can be placed more stably at the designated location to avoid safety hazards caused by the inner tube 1 being too long. The inner tube 1 is pulled out section by section until the entire inner tube 1 is successfully removed.Compared with the prior art, the design of the supporting fixture 4 ensures that in the actual operation process, if the inner tube 1 is damaged or broken in the air, especially when the pulled out inner tube 1 and the unpulled inner tube 1 are broken under the action of traction during the traction process of the relevant equipment, the supporting fixture 4 can support and fix the pulled out part of the inner tube 1, so as to avoid the pulled out inner tube 1 from falling and causing damage to personnel and equipment after breaking, thereby improving the safety during the operation. The design of the cutting fixture 5 is to fix and protect the inner tube 1 if it needs to be disconnected during the construction process, especially when the middle part of a single inner tube 1 needs to be disconnected, because the pulled out inner tube 1 is the inner tube 1 that has been used for a period of time, and there is a greater probability that more inner tubes 1 will appear. Wear. In order to avoid breakage in the parts with greater wear during the pulling process, cutting will be performed in the parts with greater wear. The prior art has not taken this into account. The inner tube 1 may break during the pulling process and require secondary salvage. The design of the cutting fixture 5 can fix the inner tube 1 when any part of the inner tube 1 needs to be cut. The fixed inner tube 1 is ensured not to shake due to cutting under the action of the cutting fixture 5 and several supporting fixtures 4, further improving the safety during the construction process. Several supporting fixtures 4 arranged in sequence can also fix and buffer the inner tube 1 when the end of the inner tube 1 falls off during pulling, avoiding accidents caused by the inner tube 1 not being fixed in place. In summary, the device for pulling out the damaged blocked tube 1 of the large-diameter feeding hole 3 improves the safety during the construction process by fixing the inner tube 1 in different states, avoiding construction delays caused by the inner tube 1 not being fixed in place, and improving construction efficiency.
[0024] Furthermore, the cutting fixture 5 includes a support platform 501, which is arranged on the dismantling frame 2, and the support platform 501 has a first fixing hole 502. The cutting baffle 503 is raised and lowered on the support platform 501, and the cutting baffle 503 has a second fixing hole 504. The lifting drive member 505 is arranged on the support platform 501 to drive the cutting baffle 503 to rise and fall.
[0025] In this embodiment, the cutting fixture 5 includes a support platform 501 and a cutting baffle 503. The support platform 501 is fixed on the dismantling frame 2 and is used to carry the cutting baffle 503 and the lifting drive 505 to ensure the stability of the entire cutting fixture 5. The first fixing hole 502 is used to fix the inner tube 1 in the subsequent inner tube 1 cutting process to ensure the accuracy of the cutting position. The cutting baffle 503 is driven by the lifting drive 505 to achieve the clamping and fixing of different positions of the inner tube 1. The distance between the support platform 501 and the cutting baffle 503 is adjusted by the lifting drive 505 to adapt to different types of cutting fixtures 5. The cutting baffle 503 is designed with a second fixing hole 504, which cooperates with the first fixing hole 502 on the support platform 501 to ensure the stability and positioning accuracy of the cutting baffle 503 during the cutting process. In addition, the lifting design of the cutting baffle 503 enables it to adapt to the cutting requirements of inner tubes 1 of different diameters and positions, thereby improving the adaptability of the device. Driven by the lifting drive 505, the cutting baffle 503 can move up and down, align with the cutting position of the inner tube 1, and perform cutting operations through external cutting tools such as cutting saws, laser cutters, etc. or manual cutting tools. The lifting drive 505 can be an electric, pneumatic or hydraulic drive system, which must have sufficient thrust and precision to ensure the stable lifting and lowering of the cutting baffle 503. By controlling the output of the lifting drive 505, the position of the cutting baffle 503 can be accurately adjusted to achieve adaptability to different cutting positions of the inner tube 1 and different tool cutting requirements. When it is necessary to cut the inner tube 1, first, the support table 501 is fixed on the dismantling frame 2 to ensure that the cutting position is aligned with the cutting point of the inner tube 1. Then, the inner tube 1 is fixed by the cooperation of the first fixing hole 502 and the second fixing hole 504 to ensure the stability of the cutting part of the inner tube 1 during the cutting process. At the same time, it is ensured that the inner tube 1 of the cut lower section is easy to pull out after the cutting is completed. Under the positioning of the cutting baffle 503, the inner tube 1 is cut using an external cutting tool until the entire cutting process is completed. When the prior art cuts the inner tube 1, the method often adopted is to cut the inner tube 1 below the feed opening, and then lift the inner tube 1 after cutting. If the feed opening and the inner tube 1 are stuck during the pulling process, or serious damage is found during the pulling process, the inner tube 1 needs to be pulled out and processed, or put back into the feed hole 3 for secondary cutting and then pulled out. However, pulling out the inner tube 1 at this time has great risks. If the inner tube 1 is put back into the feed hole 3, the inner tube 1 will spin during the secondary cutting and will be difficult to fix. The design of the cutting fixture 5 is that when the inner tube 1 is found to be damaged, the inner tube 1 can be firmly fixed before cutting, and the lower section of the cut inner tube 1 can be fixed on the support platform 501 after cutting, which is convenient for the operator to take out the inner tube 1, reduces the labor intensity of the operator, reduces possible safety hazards, and improves the construction efficiency on site.
[0026] Furthermore, the support clamp 4 includes a first clamp portion 402 and a second clamp portion 403, which are hinged to each other at one end, and the first clamp portion 402 and the second clamp portion 403 form a support hole 401, and the inner wall of the support hole 401 has a tooth portion 404, and the other ends of the first clamp portion 402 and the second clamp portion 403 both have a through hole 405, and a fixing rope 406 passes through the through hole 405 of the first clamp portion 402 and the through hole 405 of the second clamp portion 403, and one end of the fixing rope 406 is arranged on a locking member 407, and the locking member 407 has a locking hole, and the other end of the fixing rope 406 passes through the locking hole.
[0027] In this embodiment, the first clamp 402 and the second clamp 403 are the main structures constituting the support fixture 4, and are hinged to each other to form an adjustable support hole 401 for fixing the inner tube 1. The hinged fixing method forms an openable and closable structure, which is convenient for the quick fixation of the inner tube 1 after passing through the support hole 401. The inner wall of the support hole 401 is designed with a tooth portion 404 to increase the friction with the surface of the inner tube 1 and ensure the stability of the inner tube 1 during cutting and extraction. The inner tube 1 of the pulled-out part is a discarded pipe in actual production. At this time, in order to ensure the safety of on-site construction, the tooth portion 404 will bite into the outer side of the tube wall of the inner tube 1 to ensure a firm fixing effect and avoid the potential safety hazards caused by the falling of the inner tube 1 during the extraction process. The first clamp 402 and the second clamp 403 can adapt to inner tubes 1 of different diameters by opening and closing each other, ensuring the stable fixation of the inner tube 1 in the support hole 401. The fixing rope 406 is used to connect the first clamp 402 and the second clamp 403, and the clamp is tightened and loosened by the cooperation of the locking member 407. The fixing rope 406 needs to have sufficient strength and wear resistance to ensure that it will not break or wear during operation. The rope body passes through the perforation 405 of the first clamp 402 and the second clamp 403 to tightly connect the two parts. Through the cooperation of the fixing rope 406 and the locking member 407, the first clamp 402 and the second clamp 403 can be tightened to ensure the stability of the inner tube 1 in the support hole 401. The locking member 407 is used as a locking device for the fixing rope 406 to adjust and fix the tension of the fixing rope 406 to ensure the stability of the support clamp 4. The locking member 407 is designed with a locking hole, one end of the fixing rope 406 is fixed on the locking member 407, and the other end passes through the locking hole. By adjusting the length and tension of the fixing rope 406, the support clamp 4 is tightened. By adjusting the length of the fixing rope 406 passing through the locking hole, the tension between the first clamp 402 and the second clamp 403 can be changed, thereby achieving the tightening or loosening of the inner tube 1. When using the support clamp 4, the first clamp 402 and the second clamp 403 of the support clamp 4 are opened, the inner tube 1 passes through the support hole 401, and the first clamp 402 and the second clamp 403 are close to ensure that the inner tube 1 contacts and bites the teeth 404 on the inner wall of the support hole 401. The fixing rope 406 is passed through the through holes 405 of the first clamp 402 and the second clamp 403, and the length of the fixing rope 406 is adjusted to ensure that the first clamp 402 and the second clamp 403 are close to the inner tube 1. The other end of the fixing rope 406 is passed through the locking hole of the locking member 407, and the tension of the fixing rope 406 is adjusted through the locking member 407 to achieve stable fixation of the inner tube 1. Check the fixing state of the support clamp 4 to ensure that the inner tube 1 remains stable during the subsequent cutting and extraction process.Through the design of the support clamp 4, during the actual construction process, once the inner tube 1 is pulled out and shakes or breaks, the support clamp 4 can firmly fix the inner tube 1 on the plumb line where the discharge port is located, so as to avoid the safety hazard caused by the material sticking around the inner tube 1 falling down. At the same time, when the inner tube 1 is always on the plumb line where the discharge port is located, the risk of the inner tube 1 falling down is also reduced.
[0028] Furthermore, the first clamp 402 and the second clamp 403 have side support holes 408 on their sides, and also include fixing rings 409. The fixing rings 409 are arranged on the dismantling frame 2, and there are several of them. The support rope 410 passes through the fixing ring 409, and one end is fixed in the side support hole 408 for supporting and fixing the support clamp 4. The support rope 410 is wound around a rope reel 411, and the rope reel 411 is used to control the tension adjustment of the support rope 410.
[0029] In this embodiment, a fixing ring 409 is arranged on the dismantling frame 2, and is used for bypassing the support rope 410, and the external support and positioning of the support clamp 4 are realized through the support rope 410. There are several fixing rings 409, which are distributed at appropriate positions of the dismantling frame 2 to ensure the uniform distribution of the support rope 410 and the stable fixation of the support clamp 4. Through the connection between the fixing ring 409 and the support rope 410, the weight and external force of the support clamp 4 can be evenly distributed on the dismantling frame 2, thereby improving the stability of the overall structure. As a link connecting the fixing ring 409 and the support clamp 4, the support rope 410 plays a key role in transmitting external force and controlling the position of the support clamp 4. The support rope 410 passes through the fixing ring 409, one end of which is fixed in the side support hole 408 of the support clamp 4, and the other end is wound on the rope reel 411 to form a closed-loop support system. The tension of the support rope 410 can be adjusted by the control of the rope reel 411, thereby achieving fine adjustment of the position of the support clamp 4 and ensuring the stability of the support clamp 4 during the cutting and extraction process. The rope reel 411 serves as the control center of the tension of the support rope 410 and is responsible for adjusting the tension of the support rope 410 to achieve precise control of the support clamp 4. The rope reel 411 is designed with a manual or electric adjustment mechanism, which can adjust the winding amount of the support rope 410 as needed, thereby controlling the tension of the support rope 410. By rotating the rope reel 411, the winding amount of the support rope 410 can be increased or decreased, thereby adjusting the tension of the support rope 410 and achieving fine adjustment of the rise, fall or position of the support clamp 4. Workflow: One end of the support rope 410 passes through the fixing ring 409, and the other end is fixed in the support hole 401 of the support clamp 4 to ensure the connection between the support clamp 4 and the removal frame 2. The tension of the support rope 410 is adjusted by the rope reel 411 so that the support fixture 4 reaches the predetermined position, ensuring the stability of the inner tube 1 in the support hole 401. Under the stable support of the support fixture 4, the inner tube 1 is cut and pulled out, during which the tension of the support rope 410 can be fine-tuned by the rope reel 411 to ensure the smooth progress of the operation. After the operation is completed, the tension of the support rope 410 is released by the rope reel 411, the fixation of the support fixture 4 is released, and an operation cycle is completed. Through the coordinated action of the fixing ring 409, the support rope 410 and the rope reel 411, the device realizes the precise control and stable support of the support fixture 4, and improves the safety and efficiency of the operation of pulling out the damaged and blocked inner tube in the large-diameter feeding hole. In addition, the rope reel 411 has a plurality of winding shafts, which are arranged in sequence. When the previous winding shaft rotates a plurality of times, the next winding shaft rotates with the rotation of the previous winding shaft. By adjusting the number of rotations of different winding shafts, different support fixtures 4 are clamped at different heights of the inner tube 1 in sequence. By controlling different support fixtures 4 with the same rope reel 411, the cost of the equipment is reduced, and the space usage is also reduced. The support fixtures 4 are clamped in sequence and rise with the inner tube 1, which ensures the stability of the inner tube 1 during the extraction process and reduces the possibility of accidents.
[0030] Furthermore, the dismantling frame 2 includes a telescopic rod 202, which is arranged in a circle and one end is swingably set around the top of the discharge hole 3. The other end of the telescopic rod 202 is hinged on the inner tube ring 203. Several threading rings 204 are arranged on the telescopic rod 202 in sequence. The support rope 410 passes through the threading ring 204 and then bypasses the fixed ring 409.
[0031] In this embodiment, the telescopic rod 202 serves as the main supporting structure for dismantling the frame 2, ensuring the stability and adjustability of the entire device. The telescopic rod 202 is arranged in a circle, one end of which is set around the top of the feeding hole 3 by swinging, and the other end is hinged on the inner tube ring 203 to form an adjustable support structure. The design of the telescopic rod 202 enables the entire device to adapt to the feeding holes 3 of different lengths of the inner tube 1, while ensuring sufficient supporting force. The telescopic and swinging capabilities of the telescopic rod 202 enable the device to adjust the support range and angle according to actual needs, ensuring the stability of the inner tube 1 during cutting and extraction. The inner tube ring 203 serves as the terminal connection point of the telescopic rod 202, which is used to fix the other end of the telescopic rod 202, and its main function is to provide a path for the lifting rope to pass through. The inner tube ring 203 is designed as a ring structure, which is connected to the telescopic rod 202 by a hinged manner, and can adapt to the swing and extension of the telescopic rod 202, ensuring the structural stability of the entire device. The inner tube ring 203 is hinged with the telescopic rod 202, so that the adjustment of the telescopic rod 202 will not affect the guide path of the hoisting rope, ensuring the stable transmission of the support rope 410 between the fixed ring 409 and the support fixture 4. The threading ring 204 is arranged on the telescopic rod 202, which is used to guide the support rope 410, ensure the smooth transmission of the support rope 410 between the fixed ring 409 and the telescopic rod 202, and avoid the rope from twisting or knotting during movement. There are several threading rings 204, which are arranged on the telescopic rod 202 in sequence to form a guide path for the support rope 410, ensuring the straightness and stability of the support rope 410 during the transmission process. After the support rope 410 passes through the threading ring 204, it bypasses the fixed ring 409. Through the guiding effect of the threading ring 204, the friction and resistance of the support rope 410 during the transmission process can be reduced, and the uniform distribution of the tension of the support rope 410 can be ensured, thereby achieving stable support for the support fixture 4. The overall workflow is to swing one end of the telescopic rod 202 around the top of the feeding hole 3, and hinge the other end on the inner tube ring 203 to form a support structure surrounding the feeding hole 3. The support rope 410 passes through the threading ring 204 in turn, bypasses the fixing ring 409, and is finally fixed in the support hole 401 of the support fixture 4 to form a closed-loop support system. According to the actual position and size of the inner tube 1, adjust the telescopic rod 202 to extend and swing, ensure that the tension of the support rope 410 is evenly distributed, and the support fixture 4 is stably fixed. Under the stable support of the support fixture 4, the inner tube 1 is cut and pulled out, and the angle of the telescopic rod 202 can be fine-tuned as needed to ensure the smooth operation.Through the coordinated action of the telescopic rod 202, the inner tube ring 203 and the threading ring 204, the device realizes the precise guidance of the support rope 410 and the stable support of the entire device, thereby improving the efficiency and safety of the operation of pulling out the damaged and blocked inner tube of the large-diameter feeding hole. After the inner tube 1 is pulled out, the telescopic rod 202 is retracted, the locking piece 407 is opened, and the swing of the inner tube 1 is limited by the action of the inner tube ring 203 and the lifting piece. After the inner tube ring 203 falls to the lowest point, the inner tube 1 is placed in the specified position.
[0032] Furthermore, it also includes a quick-change component 6, which includes a lifting clamp 601. The lifting clamp 601 is fixedly set on the inner tube 1. The first clamp 602 and the second clamp 603 form a lifting hole 605. The inner tube 1 is located in the lifting hole 605. The upper parts of the first clamp 602 and the second clamp 603 are both abutted against the bottom of the lifting clamp 601. There are two lifting components 604, which are respectively set on the first clamp 602 and the second clamp 603. The lifting components 604 have a lifting hole 605.
[0033] In this embodiment, the lifting clamp 601 is directly fixed on the inner tube 1 as the core component of the quick-change part 6, and is used to connect the inner tube 1 with the first holding piece 602 and the second holding piece 603 to achieve stable lifting, lowering and positioning of the inner tube 1. The lifting clamp 601 is designed with a fixed structure matching the surface of the inner tube 1 to ensure the stable connection between the inner tube 1 and the lifting clamp 601 during the lifting process to prevent the inner tube 1 from sliding or falling off. The lifting clamp 601 is tightly combined with the inner tube 1 by welding or other means to ensure that the inner tube 1 can move synchronously with the lifting clamp 601 during the lifting operation. The first holding piece 602 and the second holding piece 603 together constitute a lifting holding piece, which is used to hold the inner tube 1 to form a lifting hole 605 to ensure the stability and safety of the inner tube 1 during the lifting process. The first holding piece 602 and the second holding piece 603 are designed with a lifting hole 605 matching the diameter of the inner tube 1, which can tightly hold the inner tube 1 to ensure stability during the lifting process. The upper parts of the two holding pieces are in contact with the bottom of the lifting fixture 601 to form a stable support structure. The first holding piece 602 and the second holding piece 603 cooperate with each other to form an enclosure for the inner tube 1. The lifting and positioning of the inner tube 1 are achieved through the connection of the lifting fixture 601. The lifting piece 604, as an actuator for the lifting operation, is responsible for connecting with lifting equipment such as a crane, a winch, etc. through a lifting hole 605 to achieve the lifting and positioning of the inner tube 1. There are two lifting pieces 604, which are respectively arranged on the first holding piece 602 and the second holding piece 603. Each lifting piece 604 has a lifting hole 605 for connecting with a hook or rope of the lifting equipment. After the lifting hole 605 of the lifting piece 604 is connected with the lifting equipment, the lifting of the inner tube 1 is achieved through the pulling force of the lifting equipment, ensuring the stability and safety of the lifting process. Overall workflow: First, fix the lifting fixture 601 on the inner tube 1 to ensure the tight connection between the lifting fixture 601 and the inner tube 1. The first holding piece 602 and the second holding piece 603 are arranged around the inner tube 1 to form a lifting hole 605, so as to ensure that the inner tube 1 is located in the lifting hole 605, and the upper parts of the first holding piece 602 and the second holding piece 603 are in contact with the bottom of the lifting clamp 601 to form a stable supporting structure. The lifting piece 604 is respectively arranged on the first holding piece 602 and the second holding piece 603, and is connected to the lifting device through the lifting hole 605 of the lifting piece 604. Through the pulling force of the lifting device, the lifting piece 604, the lifting holding piece and the lifting clamp 601 are coordinated to realize the smooth lifting and positioning of the inner tube 1, and complete the extraction operation of the inner tube 1. Through the lifting and fixing design of the quick-change piece 6, the device realizes the efficient and safe extraction of the inner tube 1 of the large-diameter feeding hole 3. Similarly, when the inner tube 1 is installed, the quick-change piece 6 can also realize the rapid installation of the descending inner tube 1 and lower it into the feeding port. In the actual construction process, the quick-change component 6 is mainly used to realize the installation of the inner tube 1. Two adjacent inner tubes 1 can be quickly welded at the feed port position using the cutting fixture 5 through the quick-change component 6. After welding, rapid installation and construction can be achieved, thereby improving construction efficiency and safety.
[0034] A process for extracting a damaged pipe from a large-diameter feeding hole, using a device for extracting a damaged pipe from a large-diameter feeding hole, comprising: S1: Install the drilling rig, hydraulic puller, inner pipe cutter, sweeping drill, lower salvage, dismantle the frame 2, support fixture 4 and cutting fixture 5, and repair the mud pump room. S2: Use a drill or hydraulic pipe puller to pull out the inner pipe 1 above the damaged part. If the inner pipe 1 above the damaged part cannot be pulled out, use an inner pipe cutter to cut it at the damaged part. After cutting, use a drill or hydraulic pipe puller to pull out the inner pipe 1. S3: Determine the size of the casing sweeping drill tool, use a 10m long casing sweeping drill tool to sweep out the blockage between the outer tube and the inner tube, then change to a 20m casing sweeping drill tool. During the casing sweeping process, observe the rotation resistance of the casing sweeping drill tool. When the rotation resistance of the casing sweeping drill tool changes, stop the casing sweeping operation. Use a mud pump to pump out the debris during the sweeping process. S4: Use the inner tube cutter to cut the swept inner tube 1, and avoid the connection position of the two inner tubes 1. S5: Use a salvage device to fix the inner tube 1, and use a drilling rig to lift the inner tube 1. S6: After the inner tube 1 is completely lifted out, a cone with a diameter 20mm smaller than the inner diameter of the outer tube is lowered, and a sweep drill bit is assembled to sweep out the remaining sand and gravel in the outer tube. After the sweep drill bit is dredged, a 20m seamless steel pipe with a diameter 20mm smaller than the inner diameter of the outer tube is used to clear the well. S7: Lower the new inner tube 1.
[0035] In this embodiment, a process for pulling out damaged and blocked inner pipes in large-diameter feeding holes is designed, and the steps are as follows: S1: Install the drilling rig, hydraulic puller, inner pipe cutter, sweeping drill, lower salvage device, dismantle the frame 2, support fixture 4 and cutting fixture 5, ensure that all equipment is in good working condition, and carry out infrastructure construction: build a mud pump room to provide the necessary mud circulation system for subsequent sweeping operations and debris extraction. S2: Preliminary pulling out of the damaged inner pipe 1, including attempting to pull out the damaged inner pipe 1: Use a drilling rig or hydraulic pipe puller to try to pull out the inner pipe 1 above the damaged part. If the resistance is too great and it cannot be pulled out, proceed to the next step. Use the inner pipe cutter to cut the inner pipe 1 at the damaged part. After cutting, use the drilling rig or hydraulic pipe puller again to lift the inner pipe 1 to ensure that the damaged part of the inner pipe 1 is completely removed. S3: Clean the gap between the outer tube and the inner tube 1. Before cleaning, the size of the drill tool must be determined. Use a 10m long sweeping drill tool to clear the blockage between the outer tube and the inner tube 1, then replace it with a 20m long sweeping drill tool. Continue to clean until the rotation resistance changes, and stop the sweeping operation. During the sweeping process, use a mud pump to extract the debris to ensure that the gap between the outer tube and the inner tube 1 is unobstructed. S4: Cut the swept inner tube 1. Use an inner tube cutter to cut off the swept inner tube 1. Note that the cutting position should avoid the connection position of the two inner tubes 1 to avoid damaging the outer tube or the undamaged inner tube 1. S5: Salvage and lift the inner tube 1. Use a salvage tool to fix the cut inner tube 1 to ensure the stability of the inner tube 1 during the lifting process. Use a drilling rig to lift the inner tube 1 and gradually lift the inner tube 1 out of the feed hole 3 until all the inner tubes 1 are safely pulled out. S6: After cleaning the outer tube and pulling out all the inner tubes 1, lower a cone with a diameter 20mm smaller than the inner diameter of the outer tube, assemble a sweeping drill bit to sweep out the remaining sand and gravel in the outer tube, and ensure that the inner wall of the outer tube is clean. Use a seamless steel pipe with a diameter 20mm smaller than the inner diameter of the outer tube to clear the well and verify whether the inside of the outer tube is unobstructed. S7: Lower the new inner tube 1. After the cleaning and verification work is completed, lower the new inner tube 1 to restore the normal operation of the feed hole 3. Through the above steps, the process uses professional equipment and fine operation to achieve efficient and safe removal of damaged and blocked inner tubes 1 in large-diameter feed holes 3, providing an efficient and safe construction process for pipeline maintenance and cleaning in industrial production.
[0036] Further, in step S2, when the inner tube 1 is pulled out, several supporting clamps 4 are locked on the inner tube 1 in sequence; in step S2, when the inner tube 1 is pulled out in multiple sections and is not easy to separate, the cutting baffle 503 is used to fix the connection of the inner tube 1. After the connection of the inner tube 1 is fixed, the connection of the two inner tubes 1 is cut.
[0037] In this embodiment, step S2 is refined. When the inner tube 1 is pulled out, multiple support clamps 4 are locked on the inner tube 1 in sequence to ensure the stability and safety of the inner tube 1 during the pulling out process. The locking function of the support clamp 4 can effectively prevent the inner tube 1 from shaking during the lifting process, and avoid secondary damage or other safety risks caused by the vibration of the inner tube 1. When the inner tube 1 is pulled out, if it is in a state of multiple sections and it is not convenient to separate directly, the connection of the inner tube 1 is first fixed with the cutting baffle 503. The fixing effect of the cutting baffle 503 ensures the accuracy and safety of the cutting operation, and prevents the inner tube 1 from moving during the cutting process, resulting in the offset of the cutting position or the uneven cutting surface. After fixing the connection of the inner tube 1, the cutting baffle 503 or the inner tube cutter is used to accurately cut the connection of the two inner tubes 1. When cutting, it is necessary to ensure that the cutting surface is flat to avoid additional stress or damage during the cutting process, and ensure that the cut inner tube 1 segment can be safely and smoothly removed from the discharge hole 3. The operation process is as follows: first, use a drill or a hydraulic pipe puller to pull out the inner pipe 1, and multiple support clamps 4 are locked on the inner pipe 1 in turn to ensure the stability of the pulling process. After the inner pipe 1 is pulled out, evaluate whether it can be easily separated into multiple sections. If it is not easy to separate, proceed to the next step. Use the cutting baffle 503 to fix the connection of the inner pipe 1 to ensure the stability of the cutting position. Aim for precise cutting at the connection of the inner pipe 1, and pay attention to keeping the cutting surface flat during cutting to avoid additional damage. After the cutting is completed, the inner pipe 1 segment can be safely and smoothly removed from the feed hole 3 to complete the separation. Through the combination of the locking of the support clamp 4 and the segmented cutting of the inner pipe 1, this process ensures the safety and efficiency of the removal process of the damaged and blocked inner pipe 1 in the large-diameter feed hole 3, especially when facing complex working conditions, it can respond flexibly, thereby improving the efficiency and safety of pipeline maintenance and cleaning.
[0038] Furthermore, in step S7, the inner tube 1 is quickly replaced using the quick-change component 6.
[0039] In this embodiment, the design of the quick-change part 6 allows the inner tube 1 to be quickly connected to external equipment such as lifting equipment, fixing devices, etc., reducing the preparation time and manpower requirements during the replacement of the inner tube 1. The quick-change part 6 has a safety locking mechanism to ensure the stability and safety of the inner tube 1 during the replacement process, and to prevent the inner tube 1 from slipping or being damaged due to unstable connection. The quick-change part 6 can assist in lifting the new inner tube 1 to the specified position, achieve fast and accurate positioning, and ensure the seamless connection between the new inner tube 1 and the original pipeline. Replacement process: First prepare the new inner tube 1: ensure that the specifications of the new inner tube 1 match the original inner tube 1, and check the integrity of the surface and interface of the inner tube 1. Connect the quick-change part 6: Connect the quick-change part 6 to the new inner tube 1 to ensure that the connection is firm and the quick-change part 6 can withstand the load during the lifting and positioning process. Lifting and positioning: Use the lifting equipment to lift the new inner tube 1 to the entrance of the feeding hole 3 through the quick-change part 6, adjust the position, and ensure that the new inner tube 1 is correctly connected to the original pipeline. Safety locking: The safety locking mechanism of the quick-change part 6 stably fixes the new inner tube 1 in the feeding hole 3, ensuring the stability and safety of the inner tube 1 in subsequent use. Separate the quick-change part 6: After confirming that the new inner tube 1 is installed in place, safely separate the quick-change part 6 to complete the quick replacement of the inner tube 1. Through the use of the quick-change part 6, the replacement steps of the inner tube 1 in the process of removing the damaged and blocked inner tube of the large-diameter feeding hole are simplified, which improves the efficiency of pipeline maintenance and cleaning, while ensuring the safety of operation and the accuracy of the replacement of the inner tube 1.
[0040] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A device for extracting a damaged inner tube from a large-diameter feeding hole, used for extracting an inner tube (1) that is stuck in a feeding hole (3) due to wear and cannot be extracted, characterized in that: include A dismantling frame (2), the dismantling frame (2) being arranged above the material discharge hole (3), the dismantling frame (2) having a dismantling hole (201), the diameter of the dismantling hole (201) being larger than the diameter of the material discharge hole (3), A support clamp (4), the support clamp (4) being arranged on the dismantling frame (2) and located above the material discharge hole (3), the support clamp (4) having a support hole (401), the support hole (401) being coaxially arranged with the dismantling hole (201) and the material discharge hole (3), and the support clamp (4) being a plurality of support clamps (4) arranged in sequence up and down, A cutting fixture (5), wherein the cutting fixture (5) is arranged on the dismantling frame (2) and is located between the supporting fixture (4) and the material discharge hole (3).
2. The device for removing a damaged pipe from a large-diameter feed hole according to claim 1 is characterized in that: The cutting fixture (5) comprises A support platform (501), the support platform (501) being arranged on the dismantling frame (2), the support platform (501) having a first fixing hole (502), a cutting baffle (503), the cutting baffle (503) being arranged on the support platform (501) in a lifting manner, the cutting baffle (503) having a second fixing hole (504), A lifting drive member (505), wherein the lifting drive member (505) is arranged on the support platform (501) and drives the cutting baffle (503) to rise and fall.
3. The device for removing a damaged pipe from a large-diameter feed hole according to claim 2 is characterized in that: The supporting fixture (4) comprises A first clamping part (402) and a second clamping part (403), wherein the first clamping part (402) and the second clamping part (403) are hinged to each other at one end, the first clamping part (402) and the second clamping part (403) form the support hole (401), the inner wall of the support hole (401) has a toothed part (404), and the other ends of the first clamping part (402) and the second clamping part (403) both have a through hole (405), a fixing rope (406), the fixing rope (406) passing through the through hole (405) of the first clamping part (402) and the through hole (405) of the second clamping part (403), A locking member (407), one end of the fixing rope (406) being arranged on the locking member (407), the locking member (407) having a locking hole, and the other end of the fixing rope (406) passing through the locking hole.
4. The device for removing a damaged pipe from a large-diameter feed hole according to claim 3 is characterized in that: The first clamping part (402) and the second clamping part (403) have side support holes (408) on their sides, and further include A fixing ring (409), wherein the fixing ring (409) is arranged on the dismantling frame (2), and there are a plurality of fixing rings (409). a support rope (410), wherein the support rope (410) passes through the fixing ring (409), one end of which is fixedly disposed in the side support hole (408) and is used for supporting and fixing the support clamp (4). A rope reel (411), the support rope (410) being wound around the rope reel (411), the rope reel (411) being used to control the tension adjustment of the support rope (410).
5. The device for removing a damaged pipe from a large-diameter feed hole according to claim 4 is characterized in that: The dismantling frame (2) comprises A telescopic rod (202), wherein the telescopic rod (202) is arranged in a circle and one end is swingably arranged around the top of the feeding hole (3). The inner tube passing ring (203) is provided, and the other end of the telescopic rod (202) is hingedly connected to the inner tube passing ring (203). A threading ring (204), wherein a plurality of the threading rings (204) are sequentially arranged on the telescopic rod (202), and the support rope (410) passes through the threading ring (204) and then passes around the fixing ring (409).
6. The device for removing a damaged pipe from a large-diameter feed hole according to claim 1 is characterized in that: It also includes a quick-change component (6), wherein the quick-change component (6) includes a lifting clamp (601), wherein the lifting clamp (601) is fixedly arranged on the inner tube (1), A first holding piece (602) and a second holding piece (603), wherein the first holding piece (602) and the second holding piece (603) form a lifting hole (605), the inner tube (1) is located in the lifting hole (605), and the upper parts of the first holding piece (602) and the second holding piece (603) are both in contact with the bottom of the lifting clamp (601). A lifting member (604), wherein the lifting members (604) are two in number and are respectively arranged on the first holding member (602) and the second holding member (603), and the lifting members (604) have lifting holes (605).
7. The device for removing a damaged pipe from a large-diameter feed hole according to claim 3 further comprises A locking member (7), wherein the locking member (7) is arranged on the cutting baffle (503), and the locking member (407) is used for tightening the fixing rope (406).
8. A process for removing a damaged pipe from a large-diameter feed hole, characterized in that: The device for removing a damaged pipe from a large-diameter feeding hole according to any one of claims 1 to 7 comprises: S1: installing a drilling rig, a hydraulic puller, an inner pipe cutter, a sweeping drill, a lower salvage device, the demolition frame (2), the support fixture (4) and the cutting fixture (5), and repairing a mud pump room. S2: Use the drilling rig or the hydraulic pipe puller to pull out the inner pipe (1) above the damaged part. When the inner pipe (1) above the damaged part cannot be pulled out, use an inner pipe cutter to cut it at the damaged part. After cutting, use the drilling rig or the hydraulic pipe puller to pull out the inner pipe (1). S3: Determine the size of the casing sweeping drill tool, use a casing sweeping drill tool with a length of 10 m to sweep out the blockage in the gap between the outer tube and the inner tube (1), and then replace it with a casing sweeping drill tool with a length of 20 m. During the casing sweeping process, observe the rotational resistance of the casing sweeping drill tool. When the rotational resistance of the casing sweeping drill tool changes, stop the casing sweeping operation. During the sweeping process, use a mud pump to extract the debris. S4: using the inner tube cutter to cut the swept inner tube (1), with the cutting position avoiding the connection position of the two inner tubes (1). S5: using the salvage device to fix the inner tube (1), and using the drilling rig to lift the inner tube (1), S6: After the inner tube (1) is completely pulled out, a cone with a diameter 20 mm smaller than the inner diameter of the outer tube is lowered, and the sleeve sweeping drill bit is assembled to sweep away the remaining sand and gravel in the outer tube. After the sleeve sweeping drill bit is dredged, a 20 m seamless steel pipe with a diameter 20 mm smaller than the inner diameter of the outer tube is used to clear the well. S7: lowering the new inner tube (1).
9. A process for removing a damaged pipe from a large-diameter feed hole according to claim 8, characterized in that: In step S2, when the inner tube (1) is pulled out, a plurality of the supporting clamps (4) are sequentially locked on the inner tube (1); In step S2, when the inner tube (1) is pulled out in multiple sections and is difficult to separate, the cutting baffle (503) is used to fix the connection of the inner tube (1). After the connection of the inner tube (1) is fixed, the connection between the two inner tubes (1) is cut.
10. A process for removing a damaged pipe from a large-diameter feed hole according to claim 9, characterized in that: In step S7, the inner tube (1) is quickly replaced using a quick-change component (6).