Open-type TBM (Tunnel Boring Machine) underneath crossing tunneling construction process in underground coal mine

By using airborne total station measurement and reinforcement technology in underground coal mines, combined with regular adjustment of TBM posture and advance support, the problem of construction instability caused by coal seam changes and unstable geological conditions during excavation was solved, and the excavation efficiency was improved. and security.

CN118728394APending Publication Date: 2024-10-01SHAANXI ZHENGTONG COAL IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410806064.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In underground coal mines, open TBM excavation construction may encounter problems such as changes in coal seam thickness, fragmentation, and gas pressure due to long excavation distances and passing through different rock strata or coal seams, resulting in unstable construction and low efficiency.

Method used

The position of the coal seam is determined through the measurement of the airborne total station, grouting reinforcement and anchor cable reinforcement support are carried out, the TBM posture is regularly adjusted, and advanced roof support is carried out to ensure the stability of the tunnel and construction safety.

Benefits of technology

It improves the efficiency of TBM excavation construction, reduces the impact of shoe support, saves material and labor input, solves the support problem in cross-layer excavation construction, and ensures the stability and safety of the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728394A_ABST
    Figure CN118728394A_ABST
Patent Text Reader

Abstract

The invention discloses an open-type TBM (Tunnel Boring Machine) underneath crossing tunneling construction process in an underground coal mine, which comprises the following steps of: measuring through an airborne total station in the excavation process, determining the accurate position of a coal seam, regularly measuring the posture of the TBM by using the airborne total station, adjusting through a guide system, performing advance support, and mounting a roof anchor rod. The invention relates to the technical field of mine tunneling. According to the open-type TBM underneath crossing tunneling construction technology in the underground coal mine, various problems in coal crossing tunneling in mining open-type TBM tunneling construction are solved, exploration and application of the TBM coal crossing tunneling construction technology are perfected, TBM tunneling construction efficiency is effectively improved, the influence of tight supporting of a supporting shoe in the process that a whole machine moves forwards under the coal roadway condition is reduced, and the construction period is shortened. The material input and the labor input for manually supporting the supporting shoe are saved, and the tunnel supporting problem of TBM crossing tunneling construction is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mine excavation, and in particular to a construction process for an open TBM to excavate through layers in an underground coal mine. Background Art

[0002] Tunnel boring machine (Tunnel, Boring). It is divided into open tunnel boring machine and shield tunnel boring machine. The construction processes such as excavation, support and slag discharge are carried out in parallel and continuously. It is a factory-based assembly line tunnel construction equipment with integrated mechanical, electrical, hydraulic, optical and gas systems. It has the advantages of fast excavation speed, environmental protection and high comprehensive benefits. It can realize the construction of deep-buried long tunnels in complex geographical features that are difficult to achieve with traditional drilling and blasting methods.

[0003] After searching the patent number CN116378674A, it is specifically a construction method for continuous excavation of multiple coal mine tunnels by TBM, which relates to the technical field of coal mine tunnel excavation, and includes the following steps: using TBM to excavate a serpentine tunnel in the working face of the coal mine, the serpentine tunnel includes a straight tunnel section for gas and water hazard control and an arc-shaped connecting tunnel section, and the straight tunnel sections for gas and water hazard control at the head and tail of the serpentine tunnel are connected to the mining area system tunnel; when the TBM continuously excavates to the maximum excavation length, a connecting tunnel section connected to the straight tunnel section for gas and water hazard control is excavated from the mining area system tunnel; a closed wall is formed between two adjacent straight tunnel sections for gas and water hazard control; the present invention avoids multiple disassembly, multiple transportation, multiple assembly and multiple starting of TBM excavation equipment in the mine, and there is no need to excavate multiple disassembly and assembly chambers, thereby reducing the excavation volume of auxiliary chambers; at the same time, the disassembly and transportation cycle of the TBM excavation equipment is also shortened.

[0004] However, in the underground excavation construction of coal mines, the TBM in the above-mentioned patent number CN116378674A may encounter the phenomenon of changes in coal seam thickness, coal seam fragmentation, gas pressure, etc. due to the long excavation distance and the passage through different rock layers or coal seams during construction. Secondly, unstable geological conditions and low hardness of rock fragmentation may also affect the construction. In this case, it will affect the stability and efficiency of the excavation process. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides an open-type TBM underground tunneling construction process in an underground coal mine, which solves the problem that in the underground tunneling construction of TBM in a coal mine, due to the long tunneling distance and the passage through different rock layers or coal layers during construction, the coal seam thickness changes, coal seam fragmentation, gas pressure and the like may be encountered. Secondly, the unstable geological conditions and the low hardness of the broken rocks may also affect the construction, thereby affecting the stability and efficiency of the tunneling process.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: an open TBM tunneling construction process in an underground coal mine includes the following steps:

[0007] S1. When uncovering coal in a roadway, first use an airborne total station to measure and determine the exact location of the coal seam, then conduct coal uncovering work in the coal seam and pay attention to controlling the damage to the coal seam;

[0008] S2, grouting reinforcement, after the coal is uncovered in the tunnel, grouting reinforcement is carried out during excavation at the support shoe position according to the measurement results;

[0009] S3, anchor rod and cable reinforcement support, and install anchor rod and cable before the support shoe to reinforce the roadway at the support shoe part of the coal seam;

[0010] S4, TBM advances, and then starts TBM advancement on the premise that the coal seam support shoe position is stable through airborne total station measurement;

[0011] S5, attitude control, regularly use the airborne total station to measure the attitude of the TBM and adjust it through the guidance system;

[0012] S6. Slope adjustment: adjust the slope of the roadway in advance during the equipment start and drop sections to ensure smooth operation of the main machine belt;

[0013] S7. Check the support shoe. Each time you change steps and move forward, check the support shoe connection bolts to ensure that the support shoe is tight and flat.

[0014] S8, roof support, advance support, and roof anchor installation to control the tunnel roof formation;

[0015] S9. Construction monitoring and quality control, and continuous monitoring of TBM posture, support shoe status and roof construction during construction;

[0016] S10. Completion acceptance: After the construction is completed, ensure that the safety measures taken during the construction process are implemented, and also conduct a comprehensive acceptance of the tunnel forming, support quality, and equipment status.

[0017] Preferably, the tunnel is reinforced in step S3 to ensure the installation quality and depth of the anchor rods and cables.

[0018] Preferably, in step S4, the advancing speed and thrust of the TBM are controlled during advancement of the TBM, and the advancement posture is kept consistent with the tunnel construction curve.

[0019] Preferably, the working steps of the guidance system in step S5 are as follows:

[0020] Data collection: The airborne total station will continuously collect the TBM's attitude data, and the data will be transmitted to the guidance system in real time;

[0021] Data processing, the guidance system will process the received posture data, and the processed data will serve as the basis for subsequent calculations;

[0022] Attitude calculation: the guidance system will calculate the attitude of the TBM based on the measurement data and the pre-set reference system;

[0023] Attitude adjustment: Based on the calculated attitude information, the guidance system will communicate with the TBM's control system to adjust the TBM's attitude in real time.

[0024] Preferably, the attitude data includes roll, pitch and yaw angles.

[0025] Preferably, the data processing includes removing noise and outliers.

[0026] Preferably, the TBM posture is adjusted by adjusting a joystick and a hydraulic system in the machine.

[0027] Preferably, the reference system is based on a horizontal plane, and the posture is determined by calculating the deviation of each angle from the horizontal plane.

[0028] The present invention provides an open-type TBM tunneling construction process in underground coal mines. Compared with the prior art, it has the following beneficial effects:

[0029] The open-type TBM tunneling construction technology for underground coal mines uses an airborne total station to measure and determine the exact position of the coal seam during the excavation process. The airborne total station is used to measure the posture of the TBM regularly and adjusted through the guidance system. Then, advance support is carried out and roof anchor bolts are installed to control the formation of the tunnel roof. This solves various problems in coal tunneling construction using open TBMs in mines, improves the exploration and application of TBM coal seam tunneling construction technology, effectively improves TBM tunneling construction efficiency, reduces the impact of support shoe tightening during the forward movement of the entire machine under coal tunnel conditions, saves material and labor input for artificial support shoes, and solves the tunnel support problem in TBM tunneling construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of the structure of the present invention;

[0031] Figure 2 This is a cross-sectional view of the tunnel construction by TBM through-layer excavation according to the present invention. DETAILED DESCRIPTION

[0032] The technical solutions in the embodiments of the present invention are described clearly and completely. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] See also Figure 1-2The embodiment of the present invention provides a technical solution: an open TBM tunneling construction process in an underground coal mine, comprising the following steps:

[0034] During excavation construction, it is necessary to design a tunnel support plan, including specific measures for grouting reinforcement and anchor reinforcement support, and prepare TBM equipment, grouting materials, anchors and other support materials.

[0035] S1. When removing coal from the tunnel, use an airborne total station to measure and determine the exact location of the coal seam. Carry out coal removal work in accordance with the design requirements and pay attention to controlling the damage to the coal seam.

[0036] S2. Grouting reinforcement: After the coal is uncovered in the tunnel, grouting reinforcement is carried out during excavation at the support shoe position according to the measurement results. Appropriate grouting materials and grouting pressure are selected to ensure the reinforcement effect.

[0037] S3. Anchor rod and cable reinforcement support: Anchor rods and cables are installed before the support shoe to reinforce the tunnel at the support shoe part of the coal seam, ensuring the installation quality and depth of the anchor rod and cable to enhance the stability of the coal seam.

[0038] S4, TBM advancement. On the premise of ensuring the stability of the coal seam support shoe, start the TBM for advancement, control the advancement speed and thrust of the TBM, and keep the advancement posture consistent with the tunnel construction curve.

[0039] S5. Attitude control: Use the airborne total station to measure the attitude of the TBM regularly, and adjust it through the guidance system to prevent the TBM attitude from deviating due to the soft coal seam.

[0040] The airborne total station is a device used to measure roll, pitch and yaw angles, which can be used to measure the attitude of the TBM (tunnel boring machine). The guidance system analyzes the data measured by the total station and performs calculations and analysis to determine the attitude of the TBM and make adjustments. The working steps of the guidance system are as follows:

[0041] 1. Data collection: The airborne total station continuously collects the TBM's attitude data, including roll, pitch and yaw angles, which are transmitted to the guidance system in real time (roll, pitch and yaw angles include readings from sensors such as accelerometers, gyroscopes and compasses).

[0042] 2. Data processing: The guidance system will process the received attitude data, such as removing noise and outliers, and filtering and calibrating the measurement data to improve data quality and accuracy. The processed data will serve as the basis for subsequent calculations. Taking into account the errors and uncertainties of sensor measurements, the guidance system usually uses error compensation algorithms to correct the measurement results to improve the accuracy of attitude calculations.

[0043] 3. Attitude calculation: The guidance system will calculate the attitude of the TBM based on the measurement data and the pre-set reference system. Usually, the reference system will be based on the horizontal plane, and the attitude is determined by calculating the deviation of various angles from the horizontal plane. This usually includes calculating the roll, pitch and yaw angles and converting them into corresponding rotation matrices or quaternions.

[0044] 4. Attitude adjustment: Based on the calculated attitude information, the guidance system will communicate with the TBM's control system to adjust the TBM's attitude in real time. This can be achieved by adjusting the joystick, hydraulic system or other control mechanisms in the machine.

[0045] S6. Slope adjustment: adjust the slope of the roadway in advance when the equipment is starting and descending to ensure smooth operation of the main machine belt, prevent the belt from getting stuck, and ensure normal operation of the main machine belt.

[0046] S7. Check the support shoe. Each time you change steps and move forward, check the support shoe connecting bolts to ensure that the support shoe is tightened and flat to prevent the support shoe connecting bolts from breaking and causing the support shoe to fall off.

[0047] S8. Roof support: carry out advance support, install roof anchor rods, control the formation of the tunnel roof, and ensure the safety and reliability of the roof.

[0048] S9. Construction monitoring and quality control. Continuously monitor the construction process, including TBM posture, support shoe status, roof conditions, etc., regularly evaluate the support effect, and adjust the construction plan according to actual conditions.

[0049] S10. Completion acceptance: ensure that safety measures are implemented during the construction process, prevent accidents, manage the environment of the construction site, and reduce the impact on the surrounding environment. After the construction is completed, a comprehensive acceptance is carried out, including tunnel formation, support quality, equipment status, etc.

[0050] During the excavation process, the airborne total station is used to measure and determine the exact position of the coal seam. The airborne total station is used regularly to measure the posture of the TBM and make adjustments through the guidance system. Then, advance support is carried out and roof anchors are installed to control the formation of the tunnel roof. This can avoid changes in coal seam thickness, coal seam fragmentation, gas pressure and other phenomena. Secondly, unstable geological conditions and low rock fragmentation hardness may also affect the construction.

[0051] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0052] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. The open TBM tunneling construction process in underground coal mines is characterized by: The following steps are involved: S1. When uncovering coal in a roadway, first use an airborne total station to measure and determine the exact location of the coal seam, then conduct coal uncovering work in the coal seam and pay attention to controlling the damage to the coal seam; S2, grouting reinforcement, after the coal is uncovered in the tunnel, grouting reinforcement is carried out during excavation at the support shoe position according to the measurement results; S3, anchor rod and cable reinforcement support, and install anchor rod and cable before the support shoe to reinforce the roadway at the support shoe part of the coal seam; S4, TBM advances, and then starts TBM advancement on the premise that the coal seam support shoe position is stable through airborne total station measurement; S5, attitude control, regularly use the airborne total station to measure the attitude of the TBM and adjust it through the guidance system; S6. Slope adjustment: adjust the slope of the roadway in advance during the equipment start and drop sections to ensure smooth operation of the main machine belt; S7. Check the support shoe. Each time you change steps and move forward, check the support shoe connection bolts to ensure that the support shoe is tight and flat. S8, roof support, advance support, and roof anchor installation to control the tunnel roof formation; S9. Construction monitoring and quality control, and continuous monitoring of TBM posture, support shoe status and roof construction during construction; S10. Completion acceptance: After the construction is completed, ensure that the safety measures taken during the construction process are implemented, and also conduct a comprehensive acceptance of the tunnel forming, support quality, and equipment status.

2. The open-type TBM tunneling construction process in underground coal mines according to claim 1 is characterized in that: The tunnel reinforcement in step S3 ensures the installation quality and depth of the anchor rods and cables.

3. The construction process for tunneling through layers of an open TBM in an underground coal mine according to claim 1 is characterized in that: In the step S4, the advancing speed and thrust of the TBM are controlled during the advancement of the TBM, and the advancement posture is kept consistent with the tunnel construction curve.

4. The construction process for tunneling through layers of an open TBM in an underground coal mine according to claim 1 is characterized in that: The working steps of the guidance system in step S5 are as follows: Data collection: The airborne total station will continuously collect the TBM's attitude data, and the data will be transmitted to the guidance system in real time; Data processing, the guidance system will process the received posture data, and the processed data will serve as the basis for subsequent calculations; Attitude calculation: the guidance system will calculate the attitude of the TBM based on the measurement data and the pre-set reference system; Attitude adjustment: Based on the calculated attitude information, the guidance system will communicate with the TBM's control system to adjust the TBM's attitude in real time.

5. The construction process for tunneling through layers of an open TBM in an underground coal mine according to claim 4 is characterized in that: The attitude data includes roll, pitch and yaw angles.

6. The construction process for tunneling through layers of an open TBM in an underground coal mine according to claim 4 is characterized in that: The data processing includes removing noise and outliers.

7. The construction process for tunneling through layers of an open TBM in an underground coal mine according to claim 4 is characterized in that: The adjustment of the TBM posture is controlled by adjusting the joystick and hydraulic system in the machine.

8. The construction process for tunneling through layers of an open TBM in an underground coal mine according to claim 4 is characterized in that: The reference system is based on the horizontal plane, and the posture is determined by calculating the deviation of each angle from the horizontal plane.