Gob-side entry retaining air leakage prevention method for easy self-setting-off top coal caving working face
By using methods such as flexible form walls, grouting, and T-shaped grouting pipes in gob-side lanes in the top coal caving face that are prone to spontaneous combustion, air leakage in the goaf is blocked, the air leakage problem caused by cracks in the tunnel roof is solved, and the goaf efficiency is improved. The tightness of the area and the stability of the tunnel ensure safe and reliable reuse.
Patent Information
- Application Number
- CN202411058421.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-10-01
AI Technical Summary
During the process of retaining tunnels along the gob of the top coal caving face that is prone to spontaneous combustion, cracks in the roof of the tunnel are prone to cause air leakage, which increases the risk of spontaneous combustion of coal left in the goaf. Moreover, the air leakage carries toxic and harmful gases, causing the gas concentration in the return air tunnel to exceed the limit. , affecting the air volume of the working surface.
Flexible form walls are used to seal the goaf, and the passage between the retained tunnel and the goaf is blocked to prevent air leakage through grouting on the roof of the retained tunnel, burying T-shaped grouting pipes and sealing joints. Specific steps include setting grouting anchors or cables, burying T-shaped grouting pipes, grouting at the gap between the flexible form wall and the tunnel roof, and sealing the joints with concrete shotcrete or organic materials.
It effectively reduces air leakage in the goaf area of the working face, prevents spontaneous combustion of leftover coal, ensures the reinforcement and overall stability of the tunnel roof, and ensures the safe and reliable reuse of the gob-side tunnel.
Smart Images

Figure CN118728433A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mining, and in particular relates to a method for preventing air leakage along gob-side lanes in a top coal caving working face prone to spontaneous combustion. Background Art
[0002] The technology of retaining lanes along the goaf is not only of practical significance for the technical transformation of production mines, easing the tension between mining and excavation, and extending the life of mines, but also an important way for coal enterprises to improve production safety conditions and technical and economic indicators, reduce costs and increase efficiency. Under the current situation, with the implementation of favorable policies on retaining lanes along the goaf issued by various ministries and commissions of the state, the technology of retaining lanes along the goaf is being promoted and applied in many domestic groups and mines, among which the flexible mold technology of retaining lanes along the goaf is more widely used.
[0003] The flexible formwork gob-side lane-keeping technology uses a flexible formwork concrete wall to isolate the laneway from the goaf, and the lane-keeping is used as the next working face drift. During the implementation of the lane-keeping, as the working face is pushed forward, different degrees of mine pressure will appear in the lane of the lagging working face, which will cause the lane roof to be easily plastically damaged and cracked to conduct the goaf, which will inevitably cause air leakage and oxygen supply in the goaf. However, for the gob-side lane-keeping of the top coal working face prone to spontaneous combustion, the lane is generally excavated along the bottom plate of the coal seam, and the roof of the lane is the coal seam. When the mine pressure appears, the roof is more likely to crack. In the process of leaving the lane, some coal will be left in the goaf. In addition, the coal seam is prone to spontaneous combustion. Therefore, the air leakage from the cracks in the roof increases the risk of spontaneous combustion of the coal in the goaf. At the same time, the wind flow escaping from the goaf carries toxic and harmful gases in the goaf, causing the concentration of toxic and harmful gases in the return air lane to exceed the limit. Moreover, air leakage is also easy to cause insufficient air volume at the working face. Summary of the invention
[0004] The purpose of the present invention is to provide a method for preventing air leakage along the goaf of a top coal caving working face prone to spontaneous combustion, thereby solving the air leakage problem existing in the goaf of the goaf.
[0005] In order to achieve the above-mentioned purpose, the technical scheme adopted by the present invention is: a method for preventing air leakage in the goaf-retaining lanes along the working face of top coal caving that is prone to spontaneous combustion. As the working face of top coal caving that is prone to spontaneous combustion is mined, a flexible mold wall is constructed along the side of the working face slot to enclose the goaf under the joint protection of the gangue retaining support and the end support. The grouting method of the roof of the lane-retaining lane, the grouting method of burying T-shaped grouting pipes and the sealing method of the joints are adopted to block the lane-retaining lane and the goaf to prevent air leakage.
[0006] As a preferred technical solution of the present invention, the method for grouting the roof of a lane retaining roadway is specifically as follows:
[0007] Step 1, according to the design of the lane retention tunnel, a row of grouting anchor rods or a row of grouting anchor cables are driven on one side of the lane retention tunnel close to the flexible formwork wall and ahead of the top coal caving working face; the diameter of the grouting anchor rods is not less than 20mm and the length is not less than 1800mm, and the diameter of the grouting anchor cables is not less than 22mm and the length is not less than 4300mm; the grouting anchor rods or grouting anchor cables are driven at a distance of 300-1000mm from the flexible formwork wall; the spacing between the grouting anchor rods or grouting anchor cables is 800-2400mm;
[0008] Step 2, after two cycles of pressure stepping of the top coal working face, grouting is carried out in the retained tunnel through grouting anchor rods or grouting anchor cables. The grouting effect is checked by drilling peek, and then the parameters of the grouting anchor rods or grouting anchor cables are optimized and adjusted according to the grouting effect.
[0009] As a preferred technical solution of the present invention, the buried T-type grouting pipe grouting method is specifically as follows: first, the T-type grouting pipe flower pipe and the T-type grouting pipe grouting port are processed in advance, and then the T-type grouting pipe flower pipe is pre-buried between the flexible formwork wall and the tunnel roof, and after the flexible formwork wall is cast, the T-type grouting pipe grouting port is connected to the grouting pipe connected to the grouting equipment in the tunnel, and finally, the gap between the flexible formwork wall and the tunnel roof is grouted in the tunnel until the slurry can no longer be injected.
[0010] As a preferred technical solution of the present invention, the grouting material used for grouting includes inorganic material, organic material or modified material.
[0011] As a preferred technical solution of the present invention, the joint sealing method includes sealing the joints between the flexible formwork wall and the tunnel roof and between the flexible formwork wall walls to prevent air leakage in the goaf after the flexible formwork wall is cast; the joint sealing range is 500-1000mm; the joint sealing method adopts sealing methods such as concrete spraying or organic material spraying.
[0012] As a preferred technical solution of the present invention, the concrete spraying adopts concrete spraying material with a thickness of not less than 50mm, and the strength of the concrete used for spraying is not less than C20; the organic material spraying adopts polyurethane spraying material with a thickness of 10-20mm.
[0013] The beneficial effects of the present invention are as follows: the present invention is a method for preventing air leakage in goaf-retaining lanes along the working face of top coal caving that is prone to spontaneous combustion. When goaf-retaining lanes along the working face of top coal caving that is prone to spontaneous combustion is carried out, a plurality of methods are used in combination to ensure the airtightness of the goaf area of the goaf-retaining lane-retaining working face, effectively reduce air leakage in the goaf area of the working face, and is beneficial to fire prevention and extinguishing of the working face. At the same time, grouting reinforcement is performed on the tunnel roof to ensure the overall stability of the goaf-retaining lane, which is beneficial to the secondary safe and reliable reuse of the goaf-retaining lane. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0015] Figure 1 It is a schematic diagram of the position relationship between the working face and the reserved lane in a method for preventing air leakage along the goaf of a top coal caving working face prone to spontaneous combustion according to the present invention;
[0016] Figure 2 It is a schematic cross-sectional diagram of a grouting pipe arrangement for a method for preventing air leakage along a goaf-retained lane in a top coal caving working face prone to spontaneous combustion according to the present invention;
[0017] Figure 3 It is a schematic diagram of a T-shaped grouting pipe for preventing air leakage in a gob-side lane retaining method of a top coal working face prone to spontaneous combustion according to the present invention;
[0018] Figure 4 It is a schematic diagram of sealing joints of a method for preventing air leakage along goaf-retained lanes in a top coal working face prone to spontaneous combustion according to the present invention.
[0019] In the figure, 1. Gangue retaining support, 2. End support, 3. Flexible formwork wall, 4. T-type grouting pipe, 5. Grouting anchor rod (or grouting anchor cable), 6. Tunnel roof, 7. Blocking range, 8. T-type grouting pipe flower pipe, 9. T-type grouting pipe grouting port, 10. Working face drift, 11. Top coal caving working face, 12. Tunnel with reserved entry, 13. Goaf. DETAILED DESCRIPTION
[0020] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0021] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.
[0022] Example 1
[0023] like Figures 1 to 4As shown, the present invention is a method for preventing air leakage along the goaf of a top coal caving working face prone to spontaneous combustion. The goaf-keeping means that as the top coal caving working face 11 prone to spontaneous combustion is pushed forward, a flexible mold wall 3 is constructed along the side of the working face drift 10 under the joint protection of the gangue retaining support 1 and the end support 2 to seal the goaf 13, forming an air leakage-proof passage that blocks the goaf-keeping tunnel 12 and the goaf 13. The air leakage-proof methods used include a grouting method for the top plate of the goaf-keeping tunnel, a grouting method for burying a T-shaped grouting pipe, and a method for sealing the joints.
[0024] Obviously, the method for preventing air leakage along the goaf of the top coal caving working face prone to spontaneous combustion of the present invention combines multiple methods when the goaf is retained in the top coal caving working face prone to spontaneous combustion, so as to ensure the airtightness of the goaf area of the goaf of the goaf-retaining working face, effectively reduce the air leakage in the goaf area of the working face, and is beneficial to the fire prevention and extinguishing of the working face. At the same time, the grouting reinforcement of the roadway roof is carried out to ensure the overall stability of the goaf-retaining drift, which is beneficial to the secondary safe and reliable reuse of the goaf-retaining drift.
[0025] Example 2
[0026] like Figure 1 As shown, in a method for preventing air leakage along the goaf-retaining lane in a top coal caving working face prone to spontaneous combustion, the method for grouting the roof of the lane-retaining lane is specifically as follows:
[0027] Step 1, according to the design of the lane retention tunnel, a row of grouting anchor rods 5 (or a row of grouting anchor cables) are installed on one side of the lane retention tunnel 12 close to the flexible formwork wall 3 and ahead of the top coal caving working face 11; the diameter of the grouting anchor rods is not less than 20 mm and the length is not less than 1800 mm, the diameter of the grouting anchor cables is not less than 22 mm and the length is not less than 4300 mm; the grouting anchor rods 5 (or a row of grouting anchor cables) are installed at a distance of 300-1000 mm from the flexible formwork wall; the spacing between the grouting anchor rods 5 (or a row of grouting anchor cables) is 800-2400 mm;
[0028] Step 2, after two cycles of pressure stepping of the top coal caving working face 11, grouting is carried out in the retained tunnel 12 through the grouting anchor rods 5 (or a row of grouting anchor cables are installed), and the grouting effect is checked by drilling peeking, and then the parameters of the grouting anchor rods 5 (or a row of grouting anchor cables are installed) are optimized and adjusted according to the grouting effect.
[0029] The specific grouting method for burying the T-shaped grouting pipe 4 is as follows: first, the T-shaped grouting pipe flower pipe 8 and the T-shaped grouting pipe grouting port 9 are processed in advance, and then the T-shaped grouting pipe flower pipe 8 is pre-buried between the flexible formwork wall 3 and the tunnel roof 6, and after the flexible formwork wall 3 is poured, the T-shaped grouting pipe grouting port 9 is connected to the grouting pipe connected to the grouting equipment in the tunnel 12, and finally, the gap between the flexible formwork wall 3 and the tunnel roof 6 is grouted in the tunnel until the slurry cannot be injected.
[0030] The grouting materials used in grouting include inorganic materials, organic materials or modified materials.
[0031] Example 3
[0032] like Figure 1 As shown, in a method for preventing air leakage along goaf-retained lanes in a top coal working face prone to spontaneous combustion of the present invention, a method for sealing joints includes sealing the joints between the flexible formwork wall 3 and the tunnel roof 6 and the joints between the walls of the flexible formwork wall 3 after the flexible formwork wall 3 is cast to prevent air leakage in the goaf 13; the range of the joint sealing is 500-1000mm; the joint sealing method adopts sealing methods such as concrete spraying or organic material spraying.
[0033] Concrete spraying uses concrete spraying materials with a thickness of not less than 50mm, and the strength of the concrete used for spraying is not less than C20; organic material spraying uses polyurethane spraying materials with a thickness of 10-20mm.
[0034] The above description shows and describes several preferred embodiments of the invention, but as mentioned above, it should be understood that the invention is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the invention concept described herein through the above teachings or the technology or knowledge of the relevant field. Changes and modifications made by those skilled in the art should be within the scope of protection of the claims attached to the invention without departing from the spirit and scope of the invention.
Claims
1. A method for preventing air leakage along the goaf of a coal-laying working face prone to spontaneous combustion, characterized in that: As the self-igniting top coal working face is mined, a flexible mold wall is constructed along the working face drift tunnel to enclose the goaf under the joint protection of the gangue retaining support and the end support. The grouting method of the tunnel roof, the grouting method of burying T-shaped grouting pipes and the sealing method of the joints are used to block the tunnel and the goaf to prevent air leakage.
2. The method for preventing air leakage along the gob retaining lane in the top coal caving working face prone to spontaneous combustion according to claim 1 is characterized in that: The method for grouting the top slab of the lane retaining roadway is specifically as follows: Step 1, according to the design of the lane retention tunnel, a row of grouting anchor rods or a row of grouting anchor cables are driven on one side of the lane retention tunnel close to the flexible formwork wall and ahead of the top coal caving working face; the diameter of the grouting anchor rods is not less than 20mm and the length is not less than 1800mm, and the diameter of the grouting anchor cables is not less than 22mm and the length is not less than 4300mm; the grouting anchor rods or grouting anchor cables are driven at a distance of 300-1000mm from the flexible formwork wall; the spacing between the grouting anchor rods or grouting anchor cables is 800-2400mm; Step 2, after two cycles of pressure stepping of the top coal working face, grouting is carried out in the retained tunnel through grouting anchor rods or grouting anchor cables. The grouting effect is checked by drilling peek, and then the parameters of the grouting anchor rods or grouting anchor cables are optimized and adjusted according to the grouting effect.
3. The method for preventing air leakage along the gob retaining lane in the top coal caving working face prone to spontaneous combustion according to claim 2 is characterized in that: The buried T-type grouting pipe grouting method is specifically as follows: firstly, the T-type grouting pipe flower pipe and the T-type grouting pipe grouting port are processed in advance, and then the T-type grouting pipe flower pipe is pre-buried between the flexible formwork wall and the tunnel roof, and after the flexible formwork wall is cast, the T-type grouting pipe grouting port is connected to the grouting pipe connected with the grouting equipment in the tunnel, and finally, the gap between the flexible formwork wall and the tunnel roof is grouted in the tunnel until the slurry cannot be injected.
4. The method for preventing air leakage along the gob retaining lane in the top coal caving working face prone to spontaneous combustion according to claim 3 is characterized in that: The grouting materials used in grouting include inorganic materials, organic materials or modified materials.
5. The method for preventing air leakage along the gob retaining lane in the top coal caving working face prone to spontaneous combustion according to claim 4 is characterized in that: The joint sealing method includes sealing the joints between the flexible formwork wall and the tunnel roof and between the flexible formwork wall walls to prevent air leakage in the goaf after the flexible formwork wall is cast; the joint sealing range is 500-1000mm; the joint sealing method adopts concrete spraying or organic material spraying.
6. The method for preventing air leakage along the gob retaining lane in the top coal caving working face prone to spontaneous combustion according to claim 5 is characterized in that: The concrete spraying adopts concrete spraying material with a thickness of not less than 50mm, and the strength of the concrete used for spraying is not less than C20; the organic material spraying adopts polyurethane spraying material with a thickness of 10-20mm.
