Pre-extraction and fissure zone extraction integrated extraction system and drilling method
By constructing directional roof high-level holes in the coal seam, including main holes and branch holes, the problem of gas drainage in high-gas mines during drilling construction in coal mining is solved, and the dual effects of gas pre-drainage and goaf drainage are achieved, reducing the The construction cost and duration were determined.
Patent Information
- Application Number
- CN202410820298.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-10-01
AI Technical Summary
In the existing coal mining technology, drilling construction requires a huge amount of engineering, capital and time investment, and it is difficult to effectively solve the problem of gas extraction in the fissure zone above the coal seam, especially in high-gas mines, ordinary roof high holes and directional roof high holes There are delays in construction period and waste of manpower and property in hole construction.
A drainage system that integrates pre-drainage and fissure zone drainage is adopted. A directional roof high-level hole with the same length as the mining working face is constructed in the coal seam, including a main hole and a branch hole. The main hole is arranged in the middle and upper part of the caving zone. Branch holes include downward holes, horizontal holes and upward holes, which are used to drain gas from coal seams and fissure zones, so that one working face can solve the gas problem with one borehole.
It achieves dual gas extraction effects in coal seams and fissure zones, shortens the drilling construction period, reduces the project volume and cost, avoids construction delays and waste of manpower, property and materials, and improves gas pre-extraction efficiency.
Smart Images

Figure CN118728468A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of coal mining, and in particular to an extraction system and a drilling method integrating pre-extraction and fracture zone extraction. Background Art
[0002] Gas control in fully mechanized mining faces is a necessary control work during coal mining. Low-gas mines use high-position holes in the roof constructed by ordinary drilling rigs to extract the fissure space above the coal seam to alleviate the hidden danger of gas accumulation caused by poor ventilation in the upper corner. In high-gas mines or coal and gas outburst mines, due to the crushing of coal seam mining and the influence of pressure unloading in the cracks of the surrounding rock, a large amount of gas will flow to the fissure space in the upper corner and the upper part of the coal seam. Ordinary high-position holes in the roof constructed by ordinary drilling rigs or directional high-position holes in the roof constructed by directional drilling rigs are also necessary measures to solve the problem of excessive gas in the upper corner or working face. In addition to extracting the roof fissure zone before mining, intensive drilling and extraction of the coal seam is an enhanced measure to solve the problem of gas outburst at the source.
[0003] Since the length of the working face generally reaches 500 to 1000m, if ordinary roof high-position hole measures are adopted, the drilling length is generally about 100m due to the limited construction capacity of the drilling rig, and the length of the working face covered by the drilling is limited. Assuming that there is a drilling site of 20m and each drilling site constructs 6 to 10 holes, 25 to 50 drilling sites will be constructed, with a total drilling footage of about 15,000m to 50,000m. It takes about 50 to 90 days to complete the drilling construction, and the drilling construction cost is about 200,000 to 400,000 yuan. If a directional drilling rig is used for construction, although the mining range of the working face covered by the borehole can be increased, the construction workload is still large. Calculated based on a single borehole of 300m, a spacing of 150 to 200m between each drilling site, and five boreholes in each drilling site, the working face needs to construct a drilling footage of 5,000-12,000m. The drilling construction takes about 70 to 120 days to complete, and the drilling construction cost is about 500,000 to 800,000 yuan. It can be seen that in order to ensure the safe mining of the working face, the construction of ordinary roof high-position holes or directional roof high-position holes to extract gas from the fracture zone above the coal seam requires huge engineering workload, capital and time investment. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides an integrated extraction system and drilling method for pre-extraction and fracture zone extraction, which can realize integrated construction of coal seam drilling and fracture zone drilling and reduce the drilling workload.
[0005] The first aspect of the present invention provides a pre-drainage and fracture zone drainage integrated drainage system, a directional roof high-position hole with the same length as the length of the mining face is constructed in the borehole, and the directional roof high-position hole comprises:
[0006] A main hole, the main hole comprising an inclined section and a horizontal section, the inclined section is arranged in the coal seam and extends into the rock layer above the coal seam, the horizontal section is arranged in the rock layer, the extension direction of the horizontal section is parallel to the horizontal direction of the coal seam, the horizontal section is connected to the inclined section, and the vertical height of the horizontal section is located in the middle and upper part of the caving zone;
[0007] The branch holes include downward holes, horizontal holes and upward holes. The downward holes are arranged at the lower part of the main hole and are formed by drilling toward the coal seam. The downward holes penetrate the coal seam. The horizontal holes are formed by drilling the main hole in the horizontal direction along both sides thereof. The upward holes are arranged at the upper part of the main hole and are formed by drilling the main hole toward the fracture zone.
[0008] Optionally, the horizontal section is arranged 3 to 8 m above the coal seam roof and is 15 to 25 m away from the return air lane.
[0009] Optionally, the upward holes extend to the fracture zone along the direction of the cutting eye of the mining face, and the upward holes entering the fracture zone are arranged along the horizontal direction of the coal seam, and the upward holes include the upward holes on one side of the air intake tunnel, the upward holes drilled along the extension direction of the main hole, and the upward holes on one side of the return air tunnel;
[0010] The spacing between the upward holes is 15 to 30m, the inclination angle of the upward holes on the air inlet channel side is 310 to 330°, the inclination angle of the upward holes drilled along the extension direction of the main hole is 0°, and the inclination angle of the upward holes on the return air channel side is 30 to 45°.
[0011] Optionally, the opening spacing of the downward holes is 3 to 5 m, and the downward holes and the upward holes are drilled in a staggered manner, with a staggered distance of 0.5 to 1 m;
[0012] The distance that the downward hole passes through the coal seam and enters the coal seam floor is 0.3 to 0.5 m, and the offset distance between the opening point of the downward hole and the end point of the drilling is 2 to 5 m, that is, the inclination angle of the downward hole is 30 to 45°.
[0013] Optionally, the downward hole branches in the coal seam.
[0014] Optionally, the horizontal holes are in the same horizontal plane as the main hole, and the opening spacing of the horizontal holes is 8 to 10m, and the opening angle is 5 to 10°.
[0015] Optionally, the horizontal hole is constructed 80 to 120 m along the initial mining section of the mining face.
[0016] Optionally, the horizontal holes include horizontal holes on one side of the return air channel and horizontal holes on one side of the intake air channel, the construction inclination angle between the horizontal holes on one side of the return air channel and the main holes is 0 to 60°, and the construction inclination angle between the horizontal holes on one side of the intake air channel and the main holes is 300 to 360°.
[0017] Optionally, the directional roof high-position hole is constructed by a directional drilling rig, the drilling length of the directional roof high-position hole is 500 to 1800m, the directional drilling rig has a measurement while drilling trajectory positioning system, and the torque of the directional drilling rig is 20000N·m.
[0018] A second aspect of the present invention provides a drilling method integrating pre-drainage and fracture zone drainage, which is used to complete the extraction system integrating pre-drainage and fracture zone drainage as described in any of the above embodiments, and is characterized in that it includes the following steps:
[0019] S1, constructing the main hole, drilling into the rock layer above the coal seam, and drilling in the horizontal direction of the coal seam after entering the rock layer to a certain height, until the construction length is the same as the length of the mining working face;
[0020] S2. Construct branch holes. After the main hole is formed, withdraw the drill bit and drill rod. During the withdrawal process, construct downward holes in the coal seam every 3 to 5 m, construct horizontal holes in the horizontal directions on the left and right sides every 8 to 10 m, and construct upward holes in the direction of the upper fracture zone every 15 to 30 m.
[0021] Compared with the prior art, the technical solution provided by the embodiment of the present invention has the following beneficial effects:
[0022] An embodiment of the present invention provides an integrated extraction system for pre-extraction and fracture zone extraction. A main hole is arranged in the middle and upper part of the caving zone. After the main hole is formed, branch holes are constructed in different directions and layers around the main hole. An upward hole is set to extract gas from the fracture zone. A horizontal hole is arranged in the caving zone to extract gas in the initial mining stage of the working face. The downward hole is used to solve the problem of coal seam pre-extraction. That is to say, the directional roof high-position hole constructed by the present invention realizes that one working face can solve the gas problem of the working face with one drill hole, achieving the effect of one hole for multiple uses, avoiding the construction delay and waste of manpower, money and materials caused by the separate construction of the working face along-layer drilling holes, ordinary roof high-position holes and directional roof high-position holes. At the same time, the directional roof high-position hole constructed by the present invention and arranged in the caving zone has only one main hole arranged above the mining face. The main hole is always in the best vertical and horizontal layers of the coal seam, which can play the dual effects of coal seam pre-extraction and goaf extraction. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.
[0024] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0025] Figure 1 A top view of a working surface drilling according to an embodiment of the present invention;
[0026] Figure 2 A top view of the distribution positions of the high-position holes and upward holes of the directional top plate according to an embodiment of the present invention;
[0027] Figure 3 A cross-sectional view of the distribution positions of the high-position holes and upward holes of the directional top plate according to an embodiment of the present invention;
[0028] Figure 4 A top view of the distribution positions of the high-position holes and horizontal holes of the directional top plate according to an embodiment of the present invention;
[0029] Figure 5 A top view of the positional relationship between the high-position hole of the directional top plate and the working surface according to an embodiment of the present invention;
[0030] Figure 6 A top view of the distribution positions of the high-position holes and downward holes of the directional top plate according to an embodiment of the present invention;
[0031] Figure 7 It is a cross-sectional view of the distribution positions of the high-position holes and downward holes of the directional top plate described in an embodiment of the present invention.
[0032] Among them, 1. Drilling site; 2. Directional roof high-position hole; 3. Caving zone; 4. Coal seam roof; 5. Downward hole; 6. Horizontal hole; 601. Horizontal hole on one side of the return air tunnel; 602. Horizontal hole on one side of the intake air tunnel; 7. Fracture zone; 8. Upward hole; 801. Upward hole on one side of the intake air tunnel; 802. Upward hole on one side of the return air tunnel; 9. Intake air tunnel; 10. Return air tunnel; 11. Coal seam floor; 12. Working face stop mining line; 13. Coal seam; 14. Initial mining section of the mining face. DETAILED DESCRIPTION
[0033] In order to more clearly understand the above-mentioned objectives, features and advantages of the present invention, the scheme of the present invention will be further described below. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict.
[0034] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein; it is obvious that the embodiments in the specification are only part of the embodiments of the present invention, rather than all of the embodiments.
[0035] Reference Figures 1 to 7 As shown, the present invention provides a pre-drainage and fracture zone drainage integrated drainage system, referring to Figure 5 As shown, a drilling site 1 is constructed outside the working face stop line 12, and the drilling site 1 is located in the coal seam 13. A directional roof high-position hole 2 with the same length as the length of the mining working face is constructed in the drilling site 1. The directional roof high-position hole 2 includes a main hole and a branch hole.
[0036] Among them, the main hole includes an inclined section and a horizontal section. The inclined section is arranged in the coal seam 13 and extends into the rock layer above the coal seam 13. The horizontal section is arranged in the rock layer. The extension direction of the horizontal section is parallel to the horizontal direction of the coal seam 13. The horizontal section is connected to the inclined section. The vertical height of the horizontal section is located in the middle and upper part of the caving zone 3; the branch hole includes a downward hole 5, a horizontal hole 6 and an upward hole 8. The downward hole 5 is arranged at the lower part of the main hole and is drilled toward the coal seam 13. The downward hole 5 penetrates the coal seam 13. The horizontal hole 6 is formed by drilling the main hole along the horizontal direction on both sides thereof. The upward hole 8 is arranged at the upper part of the main hole and is formed by drilling the main hole toward the fracture zone 7.
[0037] Among them, refer to Figure 1As shown, the present invention arranges the borehole in the middle and upper part of the caving zone 3, constructs branch holes along the main hole in different directions and layers around, the upward hole 8 is used to extract gas from the fracture zone 7, the horizontal hole 6 is arranged in the caving zone 3, and is used to extract gas in the initial mining stage of the recovery working face, and the downward hole 5 is used to solve the problem of pre-extraction of the coal seam 13. When the main hole and the branch hole are constructed, the drill rod is withdrawn to remove water and slag from the downward hole 5, thereby improving the efficiency of pre-extraction of gas from the coal seam 13. In other words, the directional roof high-position hole 2 constructed by the present invention realizes that one working face can solve the gas problem of the working face with one borehole, achieving the effect of one hole for multiple uses, avoiding construction delays and waste of manpower, money and materials caused by the separate construction of the working face layer drilling, ordinary roof high-position holes and directional roof high-position holes 2. The problem is that the layer drilling, ordinary roof high-position holes and directional roof high-position holes are all measures commonly implemented to prevent abnormal gas outburst from the working face during the mining period. The ordinary roof high-position hole is a hole constructed by an ordinary crawler drilling rig in the return air lane of the working face toward the top of the coal seam roof. The drilling rig has a construction torque of about 1200-6000N·m and does not have a drilling positioning function, so it can only construct a hole with a length of 100-150m. The directional roof high-position hole 2 constructed by the present invention is constructed by a directional drilling rig. The drilling length of the directional roof high-position hole 2 is 500 to 1800m. The directional drilling rig has a trajectory positioning system for measuring while drilling. The torque of the directional drilling rig is 20000N·m, which can accurately construct to the designed position, shortening the drilling construction period and reducing the engineering workload.
[0038] Continue to refer to Figure 1 As shown, the horizontal section is arranged 3 to 8 m above the coal seam roof 4 and the distance from the return air channel 10 is 15 to 25 m.
[0039] Further, see Figure 2 and Figure 3As shown, the upward holes 8 extend to the fracture zone 7 along the direction of the cutting eye of the mining face, and the upward holes 8 entering the fracture zone 7 are arranged along the horizontal direction of the coal seam 13. The upward holes 8 include the upward holes 801 on the side of the air intake tunnel, the upward holes drilled along the extension direction of the main hole, and the upward holes 802 on the side of the return air tunnel; the opening spacing of the upward holes 8 is 15 to 30m, the inclination angle of the upward holes 801 on the side of the air intake tunnel is 310 to 330°, the inclination angle of the upward holes drilled along the extension direction of the main hole is 0°, and the inclination angle of the upward holes 802 on the side of the return air tunnel is 30 to 45°. Specifically, the distance between the fracture zone 7 and the coal seam roof 4 is about 8 to 10 times the thickness of the coal seam 13, that is, the fracture zone 7 is generally located 35 to 50 meters above the coal seam roof 4, and the inclination angles of the upward holes 8 are the same, that is, the angles between the lines connecting the opening points of each upward hole 8 and the middle and lower positions of the fracture zone 7 and the horizontal plane are the same, while the azimuth angles of the three types of upward holes 8 constructed toward the side of the air inlet tunnel 9, along the direction of the main hole, and toward the side of the return air tunnel 10 are different. Specifically, the inclination angle of the upward hole 8 constructed toward the side of the air inlet tunnel 9 is 310 to 330°, the inclination angle of the upward hole 8 constructed along the direction of the main hole is 0°, and the inclination angle of the upward hole 8 constructed toward the side of the return air tunnel 10 is 30 to 45°.
[0040] In some embodiments, reference Figure 6 and Figure 7 As shown, the opening spacing of the downward hole 5 is 3 to 5 m, and the downward hole 5 and the upward hole 8 are staggered, the staggered distance is 0.5 to 1 m, the distance that the downward hole 5 passes through the coal seam 13 and enters the coal seam floor 11 is 0.3 to 0.5 m, the staggered distance between the opening point and the end point of the downward hole 5 is 2 to 5 m, the inclination angle of the downward hole 5 is 30 to 45°, and the downward hole 5 branches in the coal seam 13. Specifically, only one downward hole 5 is constructed at each opening point of the downward hole 5, and as the drill bit and the drill rod retreat, the downward hole 5 is constructed in sequence in a clockwise or counterclockwise direction, and after the downward hole 5 enters the coal seam 13, the borehole can be further branched in the coal seam 13, thereby increasing the coverage of the borehole, and the inclined arrangement of the downward hole 5 is conducive to draining water and returning coal slag during drilling construction and hole sealing, and further improving the efficiency of pre-extraction of gas from the coal seam 13.
[0041] In other embodiments, reference Figure 4As shown, the horizontal hole 6 is in the same horizontal plane as the main hole, and the hole spacing of the horizontal hole 6 is 8 to 10m, the hole angle is 5 to 10°, and the horizontal hole 6 is constructed 80 to 120m along the initial mining section 14 of the mining face. Specifically, the horizontal hole 6 is constructed on both sides of the main hole of the directional roof high-position hole 2, that is, the horizontal hole 6 is in the same horizontal plane as the main hole, and in the same vertical layer, that is, the inclination angle of the horizontal hole 6 and the main hole is 0°, and a horizontal hole 6 is constructed at each hole opening point, and the length of the horizontal hole 6 is determined according to the distance between the directional roof high-position hole 2 and the return air channel 10 and the air inlet channel 9. The horizontal hole 6 is only constructed 80 to 120m of the initial mining section 14 of the mining face to solve the problem of large-scale gas upwelling when the working face roof has not collapsed and the fracture zone 7 has not been formed.
[0042] The horizontal holes 6 include a horizontal hole 601 on the return air channel side and a horizontal hole 602 on the intake air channel side. The construction inclination angle of the horizontal hole 601 on the return air channel side and the main hole is 0 to 60°, and the construction inclination angle of the horizontal hole 602 on the intake air channel side and the main hole is 300 to 360°.
[0043] Taking into account the differences in the lithology of the boreholes, all the branch holes located in the rock formation are not protected, and only the main hole of the directional roof high-position hole 2 and the downward hole 5 are protected.
[0044] Some other embodiments of the present invention provide a drilling method integrating pre-drainage and fracture zone drainage, which is used to complete the extraction system integrating pre-drainage and fracture zone drainage described in any of the above embodiments, comprising the following steps:
[0045] S1, construct the main hole, drill into the rock layer above the coal seam 13, and after entering the rock layer to a certain height, drill along the horizontal direction of the coal seam 13 until the construction length is the same as the length of the mining working face;
[0046] S2. Construct branch holes. After the main hole is formed, withdraw the drill bit and drill rod. During the withdrawal process, construct downward holes 5 in the coal seam 13 every 3 to 5 m, construct horizontal holes 6 in the horizontal direction on the left and right sides every 8 to 10 m, and construct upward holes 8 in the direction of the upper fracture zone 7 every 15 to 30 m.
[0047] Among them, the inclined section is constructed in the rock layer above the coal seam 13, and the horizontal section is drilled along the horizontal direction of the coal seam 13 after entering a certain height of the rock layer, until the construction length is the same as the length of the mining working face to complete the final hole. At this time, the main hole construction is completed, and branch holes are constructed in different directions and layers in the main hole. The branch holes have a positioning function, so that the gas in the roof fracture zone 7 can be extracted at the same time as the enhanced extraction of the mined coal seam, realizing that one working face can solve the gas problem with one drill hole.
[0048] It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0049] The above description is only a specific embodiment of the present invention, so that those skilled in the art can understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments described herein, but should conform to the widest scope consistent with the principles and novel features invented herein.
Claims
1. A pre-drainage and fracture zone drainage integrated drainage system, characterized in that: A directional roof high-position hole (2) having a length equal to that of the mining face is constructed in a drilling site (1), wherein the directional roof high-position hole (2) comprises: A main hole, the main hole comprising an inclined section and a horizontal section, the inclined section being arranged in the coal seam (13) and extending into the rock layer above the coal seam (13), the horizontal section being arranged in the rock layer, the extension direction of the horizontal section being parallel to the horizontal direction of the coal seam (13), the horizontal section being connected to the inclined section, and the vertical height of the horizontal section being located in the middle and upper part of the caving zone (3); A branch hole, wherein the branch hole comprises a downward hole (5), a horizontal hole (6) and an upward hole (8), wherein the downward hole (5) is arranged at the lower part of the main hole and is formed in the drilling direction toward the coal seam (13), wherein the downward hole (5) penetrates the coal seam (13), wherein the horizontal hole (6) is formed by drilling the main hole in the horizontal direction along both sides thereof, and wherein the upward hole (8) is arranged at the upper part of the main hole and is formed by drilling the main hole toward the fracture zone (7).
2. The integrated extraction system for pre-extraction and fracture zone extraction according to claim 1 is characterized in that: The horizontal section is arranged 3 to 8 m above the coal seam roof (4), and is 15 to 25 m away from the return air lane (10).
3. The integrated pre-drainage and fracture zone drainage system according to claim 1 is characterized in that: The upward holes (8) extend along the direction of the cut eye of the mining face to the fracture zone (7), and the upward holes (8) entering the fracture zone (7) are arranged along the horizontal direction of the coal seam (13). The upward holes (8) include an upward hole (801) on one side of the air intake tunnel, an upward hole drilled along the extension direction of the main hole, and an upward hole (802) on one side of the return air tunnel; The opening spacing of the upward holes (8) is 15 to 30 meters, the inclination angle of the upward holes (801) on the side of the air inlet tunnel is 310 to 330 degrees, the inclination angle of the upward holes drilled along the extension direction of the main hole is 0 degrees, and the inclination angle of the upward holes (802) on the side of the return air tunnel is 30 to 45 degrees.
4. The integrated pre-drainage and fracture zone drainage system according to claim 1, characterized in that: The opening spacing of the downward holes (5) is 3 to 5 m, and the downward holes (5) and the upward holes (8) are drilled in a staggered manner, with a staggered distance of 0.5 to 1 m; The distance that the downward hole (5) passes through the coal seam (13) and enters the coal seam floor (11) is 0.3 to 0.5 m, the offset distance between the opening point and the end point of the downward hole (5) is 2 to 5 m, and the inclination angle of the downward hole (5) is 30 to 45°.
5. The integrated pre-drainage and fracture zone drainage system according to claim 4 is characterized in that: The downward hole (5) branches in the coal seam (13).
6. The integrated pre-drainage and fracture zone drainage system according to claim 1, characterized in that: The horizontal holes (6) are located at the same horizontal plane as the main holes, and the opening spacing of the horizontal holes (6) is 8 to 10m, and the opening angle is 5 to 10°.
7. The integrated pre-drainage and fracture zone drainage system according to claim 6, characterized in that: The horizontal hole (6) is constructed 80 to 120 m along the initial mining section (14) of the mining face.
8. The integrated pre-drainage and fracture zone drainage system according to claim 6, characterized in that: The horizontal holes (6) include a horizontal hole (601) on the side of the return air channel and a horizontal hole (602) on the side of the intake air channel. The horizontal hole (601) on the side of the return air channel and the main hole have a construction inclination angle of 0 to 60°, and the horizontal hole (602) on the side of the intake air channel and the main hole have a construction inclination angle of 300 to 360°.
9. The integrated pre-drainage and fracture zone drainage system according to claim 1, characterized in that: The directional roof high-position hole (2) is constructed by a directional drilling rig, the drilling length of the directional roof high-position hole (2) is 500 to 1800 m, the directional drilling rig is provided with a measurement while drilling trajectory positioning system, and the torque of the directional drilling rig is 20000 N·m.
10. A drilling method for integrated pre-drainage and fracture zone drainage, used to complete the integrated pre-drainage and fracture zone drainage system as claimed in any one of claims 1 to 9, characterized in that: The following steps are involved: S1, constructing the main hole, drilling into the rock layer above the coal seam (13), and drilling in the horizontal direction of the coal seam (13) after entering the rock layer to a certain height, until the construction length is the same as the length of the mining working face; S2. After constructing the branch holes and forming the main hole, withdraw the drill bit and drill rod. During the process of withdrawing the drill, construct the downward hole (5) into the coal seam (13) every 3 to 5 m, construct the horizontal hole (6) in the horizontal direction on both sides every 8 to 10 m, and construct the upward hole (8) towards the upper fracture zone (7) every 15 to 30 m.