Deep rock in-situ simulation preparation curing device

By designing a deep rock in-situ simulation preparation and solidification device, three-dimensional stress loading and batch preparation are realized, which solves the limitations and resource occupation problems of deep rock simulation preparation in the existing technology, and improves the sample compactness and preparation efficiency.

CN118730664AActive Publication Date: 2024-10-01SHENZHEN UNIV +2
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411001159.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-10-01
Estimated Expiration
2044-07-25

AI Technical Summary

Technical Problem

Existing technology cannot effectively simulate the three-dimensional stress environment of deep rocks, resulting in limitations and varying degrees of density in the prepared internally stressed rock samples. Moreover, the long solidification time of the bonding material occupies experimental equipment resources, making it difficult to achieve batch preparation.

Method used

Design a deep rock in-situ simulation preparation and solidification device, which uses X-axis, Y-axis, and Z-axis loading devices and driving devices to achieve three-dimensional stress loading through mechanical means. The overall structure is small and compact, and it is convenient to turn over regularly to eliminate the solidification of adhesive materials. Gravity settling effects during the period, and supports batch preparation.

Benefits of technology

It realizes the efficient preparation of deep rock samples containing internal stress in the laboratory, ensures consistent sample density, saves laboratory space, simplifies the use of experimental equipment resources, and improves preparation efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118730664A_ABST
    Figure CN118730664A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of deep rock in-situ simulation preparation, and discloses a deep rock in-situ simulation preparation curing device which comprises a cuboid shell, and an X-axis loading device, a Y-axis loading device and a Z-axis loading device are arranged in the shell; the X-axis loading device comprises a lead screw X, a sliding block X and a push plate X, the Y-axis loading device comprises a lead screw Y, a sliding block Y and a push plate Y, the Z-axis loading device comprises a lead screw Z, a sliding block Z and a push plate Z. The X-axis loading device, the Y-axis loading device and the Z-axis loading device all form a lead screw nut mechanism, and the push plate X, the push plate Y and the push plate Z are perpendicular to one another. A cubic loading area can be defined by the push plate X, the push plate Y, the push plate Z and three surfaces of one corner of the shell; the deep rock in-situ simulation preparation curing device can simulate preparation of deep rocks containing internal stress through three-way loading in a mechanical mode, can replace a laboratory testing machine to complete loading, is small and compact in overall structure and reasonable in arrangement, and can turn over regularly when a rock sample is prepared.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of deep rock in-situ simulation preparation, and in particular to a deep rock in-situ simulation preparation and solidification device. Background Art

[0002] As shallow resources are exhausted, resource mining activities are gradually developing into deep areas. Compared with shallow resources, the geological conditions and stress environment of deep rock mass are more complex. After the rock mass is taken out from the deep, the core will experience an instantaneous release of internal stress, resulting in a certain degree of damage to the rock, making it difficult to reflect the environment and structural state of the deep engineering area. Even if the deep rock mass is taken out, it is impossible to conduct in-situ physical and mechanical experimental research on the deep rock mass at an indoor scale.

[0003] At present, in laboratory environments, research is usually carried out by simulating the preparation of deep in-situ rocks under a geostress environment. The preparation process is as follows: first, determine the particle raw materials and mass fraction according to the composition of the rock mass to be tested, put the particle raw materials into a mold, and pre-embed strain gauges in the particle gaps; then apply axial pressure and confining pressure to the mold according to different stress loading paths; after the stress loading is stable, inject adhesive material into the mold, and stop grouting when the gaps are completely filled; keep the stress loading stable, keep the mold still, and wait for the adhesive material to solidify.

[0004] At present, when simulating the preparation of deep in-situ rocks under the in-situ stress environment in the laboratory, stress loading is usually performed on a conventional triaxial testing machine to complete the preparation. However, the conventional triaxial testing machine can only load different values ​​of axial pressure and confining pressure. From the perspective of three-dimensional stress, the stress values ​​in two directions in the conventional triaxial testing machine are always equal, and it is impossible to achieve different loading paths for three-dimensional stress, so the prepared internal stress rock samples have limitations. In addition, the stress loading and holding process needs to be completed on the testing machine. The commonly used triaxial stress testing machine is usually fixedly installed, and the solidification process of the bonding material takes up to 28 days. The preparation process of in-situ rocks occupies a lot of experimental equipment resources, making it difficult to achieve batch preparation; at the same time, due to the long solidification time, the material's own gravity sedimentation is affected during the period of waiting for the bonding material to solidify, resulting in different densities of the upper and lower parts of the prepared in-situ rock samples, and the internal stress of the in-situ rock also deviates from the set value. Summary of the invention

[0005] The purpose of the present invention is to overcome the shortcomings of the prior art and provide an in-situ simulation preparation and solidification device for deep rocks, which can simulate the preparation of deep rocks containing internal stress by mechanically loading different stresses in three directions, and the overall structure of the device is small and compact and the layout is reasonable.

[0006] The objective of the present invention is achieved through the following technical solutions: A deep rock in-situ simulation preparation and solidification device, comprising a rectangular shell, wherein an X-axis loading device, a Y-axis loading device and a Z-axis loading device are arranged in the shell; the X-axis loading device comprises a screw rod X, a slider X and a push plate X, wherein the screw rod X is rotatably connected to the shell, the slider X is slidably connected to the shell, the slider X is threadedly connected to the screw rod X, and the push plate X is fixedly connected to the slider X; the Y-axis loading device comprises a screw rod Y, a slider Y and a push plate Y, wherein the screw rod Y is rotatably connected to the shell, the slider Y is slidably connected to the shell, and the push plate X is fixedly connected to the slider X. The slider Y is threadedly connected to the screw rod Y, and the push plate Y is fixedly connected to the slider Y; the Z-axis loading device includes a screw rod Z, a slider Z, and a push plate Z, the screw rod Z is rotatably connected to the housing, the slider Z is slidably connected to the housing, the slider Z is threadedly connected to the screw rod Z, and the push plate Z is fixedly connected to the slider Z; the push plate X, push plate Y and push plate Z are perpendicular to each other, and a side of the push plate X away from the slider X, a side of the push plate Y away from the slider Y, a side of the push plate Z away from the slider Z and three faces of a corner of the housing can enclose a cubic loading area.

[0007] Furthermore, a driving device is also provided in the housing, and the driving device includes a loading motor, a gear shaft, a hollow shaft, a lifting device, an intermediate gear, a transmission shaft X, and a transmission shaft Y; the gear shaft, the hollow shaft, the transmission shaft X, and the transmission shaft Y are all parallel to the screw rod Z, the gear shaft is rotatably connected to the housing, and the loading motor is used to drive the gear shaft to rotate; the intermediate gear is rotatably sleeved on the hollow shaft, the lifting device is used to drive the hollow shaft to move axially, the intermediate gear is meshed with the gear shaft, and the intermediate gear is slidably adapted to the gear shaft; The transmission shaft X is rotatably connected to the housing, a first bevel gear X is fixedly sleeved on one end of the transmission shaft X, a second bevel gear X is fixedly sleeved on the screw rod X, and the first bevel gear X is meshed with the second bevel gear X; the transmission shaft Y is rotatably connected to the housing, a first bevel gear Y is fixedly sleeved on one end of the transmission shaft Y, a second bevel gear Y is fixedly sleeved on the screw rod Y, and the first bevel gear Y is meshed with the second bevel gear Y; the screw rod Z, the transmission shaft X, and the transmission shaft Y are all fixedly sleeved with driven gears, and the three driven gears can be respectively meshed with the intermediate gear.

[0008] Furthermore, the lifting device includes a lifting motor, a lifting screw and a guide rod, the lifting motor and the guide rod are fixedly arranged in the shell, the lifting screw is rotatably arranged in the shell, the lifting screw passes through the hollow shaft along the axis of the hollow shaft and is threadedly connected to the hollow shaft, the output end of the lifting motor is fixedly connected to one end of the lifting screw, the guide rod is parallel to the lifting screw, and a sliding hole is penetrated on the hollow shaft, and the sliding hole is slidably adapted to the guide rod.

[0009] Furthermore, both ends of each tooth on the intermediate gear are provided with pointed guides.

[0010] Furthermore, the shell includes a bottom plate, and the side of the push plate Z away from the slider Z is arranged opposite to the bottom plate. The shell is connected with a first cover plate and a second cover plate by bolts. The side of the push plate X away from the slider X is arranged opposite to the first cover plate, and the side of the push plate Y away from the slider Y is arranged opposite to the second cover plate. The push plate X, push plate Y, push plate Z, the first cover plate, the second cover plate and the bottom plate together enclose the loading area.

[0011] Furthermore, a hollow cube mold box is provided in the loading area, and the mold box is made of elastic material, and the six faces of the mold box are respectively abutted against the push plate X, push plate Y, push plate Z, the first cover plate, the second cover plate and the bottom plate; a central stress plate and eight corner stress plates are provided in the mold box, and the eight corner stress plates are distributed to form a simulated cube, and the central stress plate is located at the geometric center of the simulated cube.

[0012] Furthermore, a first grouting pipe and a first return slurry pipe are provided on one side of the mold box close to the first cover plate, the other end of the first grouting pipe and the other end of the first return slurry pipe both pass through the first cover plate to be connected with the outside of the shell, the first return slurry pipe is provided at a corner of the mold box close to the push plate Y and close to the push plate Z, and the first grouting pipe is provided at a corner of the mold box close to the push plate Y and close to the bottom plate; a second grouting pipe and a second return slurry pipe are provided on one side of the mold box close to the second cover plate, the other end of the second grouting pipe and the other end of the second return slurry pipe both pass through the second cover plate to be connected with the outside of the shell, the second return slurry pipe is provided at a corner of the mold box close to the push plate X and close to the push plate Z, and the second grouting pipe is provided at a corner of the mold box close to the push plate X and close to the bottom plate.

[0013] The beneficial effects of the present invention are: The deep rock in-situ simulation preparation and curing device includes a rectangular shell, and a loading area is formed at one corner of the shell, which is used to load the mold box when preparing in-situ rock samples containing internal stress. An X-axis loading device, a Y-axis loading device and a Z-axis loading device are arranged in the preparation device, which can load stress in the X-axis direction, the Y-axis direction and the Z-axis direction to the mold box respectively, and each loading device is a screw nut mechanism based on a trapezoidal screw, which forms a self-locking after loading is completed to maintain the stability of the loading force. A driving device is also integrated in the shell, and the driving device includes a loading motor, a gear shaft, a hollow shaft, a lifting device, an intermediate gear, a transmission shaft X, and a transmission shaft Y. Through the design of the transmission structure, the loading motor can be used to complete the stress loading process in the X-axis direction, the Y-axis direction and the Z-axis direction respectively. The entire device has a compact structure and a reasonable layout, and can replace the laboratory testing machine to complete the loading. The device is generally in the shape of a rectangular parallelepiped. On the one hand, it can be turned over regularly during the curing stage to eliminate the influence of the material's own gravity sedimentation during the solidification of the adhesive material, so that the density of each part of the prepared in-situ rock sample is basically consistent; on the other hand, the device is easy to stack, which is beneficial to saving laboratory space when multiple devices are used simultaneously for batch preparation of in-situ rock samples. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a schematic diagram of the external structure of a deep rock in-situ simulation preparation and solidification device of the present invention; Figure 2 It is a schematic diagram of the disassembled structure of a deep rock in-situ simulation preparation and solidification device before the mold box is installed in the present invention; Figure 3 The internal structure of a deep rock in-situ simulation preparation and solidification device of the present invention is shown in FIG. Figure 1 ; Figure 4 The internal structure of a deep rock in-situ simulation preparation and solidification device of the present invention is shown in FIG. Figure 2 ; Figure 5 It is a schematic structural diagram of a lifting device in a deep rock in-situ simulation preparation and solidification device of the present invention; Figure 6 This is a schematic diagram of the structure of a gear A in a deep rock in-situ simulation preparation and solidification device of the present invention; In the figure, 1-housing, 2-mold box, 3-loading motor, 4-bottom plate, 5-first cover plate, 6-second cover plate, 7-first grouting pipe, 8-first return slurry pipe, 9-second grouting pipe, 10-second return slurry pipe, 11-screw X, 12-slider X, 13-push plate X, 14-transmission shaft X, 15-first bevel gear X, 16-second bevel gear X, 21-screw Y, 22-slider Y, 23-push plate Y, 24-transmission shaft Y, 25-first bevel gear Y, 26-second bevel gear Y, 31-screw Z, 32-slider Z, 33-push plate Z, 41-tooth shaft, 42-intermediate gear, 43-hollow shaft, 44-driven gear, 45-lifting motor, 46-lifting screw, 47-guide rod, 48-pointed guide. DETAILED DESCRIPTION

[0015] The technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following.

[0016] The in-situ simulation preparation of deep rock includes the following steps: S1. Place the granular raw materials into a mold box and embed strain gauges in the gaps between the particles; S2, applying pressure to the mold box according to different stress loading paths until the stress value detected by the strain gauge reaches the set value and the stress loading is stable; S3, filling the mold box with adhesive material; S4. Cure until the adhesive material is completely solidified.

[0017] Figures 1 to 6The deep rock in-situ simulation preparation and curing device shown is a special device for loading a mold box to complete the deep rock in-situ simulation preparation process. Its structure includes a rectangular shell 1, and a loading area is formed in one corner of the shell 1. An X-axis loading device, a Y-axis loading device and a Z-axis loading device are arranged in the shell 1, wherein: the X-axis loading device comprises a screw rod X11, a slider X12 and a push plate X13, the screw rod X11 is rotatably connected to the shell 1, the slider X12 is slidably connected to the shell 1, the slider X12 is threadedly connected to the screw rod X11, and the push plate X13 is fixedly connected to the slider X12; the Y-axis loading device comprises a screw rod Y21, a slider Y22 and a push plate Y23, the screw rod Y21 is rotatably connected to the shell 1, the slider Y22 is slidably connected to the shell 1, the slider Y22 is threadedly connected to the screw rod Y21, and the push plate Y23 is fixedly connected to the slider Y22; the Z-axis loading device comprises a screw rod Z31, a slider Z32 and a push plate Z33, the screw rod Z31 is rotatably connected to the shell 1, the slider Z32 is slidably connected to the shell 1, the slider Z32 is threadedly connected to the screw rod Z31, and the push plate Z33 is fixedly connected to the slider Z32. The screw rods X11, Y21 and Z31 are trapezoidal screw rods, which can respectively drive the push plates X13, Y23 and Z33 to move when they rotate. The push plates X13, Y23 and Z33 are perpendicular to each other, and the side of the push plate X13 away from the slider X12, the side of the push plate Y23 away from the slider Y22, the side of the push plate Z33 away from the slider Z32 and the three faces of the corner of the housing 1 can enclose a cubic loading area.

[0018] When simulating the preparation of deep in-situ rock samples, the mold box 2 filled with granular aggregate is placed in the loading area. Among the six faces of the mold box 2, three faces are respectively abutted against the three faces of one corner of the shell 1, and the other three faces are respectively abutted against the push plate X13, push plate Y23, and push plate Z33. Each face of the mold box 2 is made of elastic material. As the screw rod X11, screw rod Y21, and screw rod Z31 rotate, the mold box 2 can be loaded with pressure in three directions respectively. The loading force can cause the corresponding force-bearing surface of the mold box 2 to deform, and then transmit the loading force to the granular aggregate in the mold box 2, so that the strain gauge detection value in the mold box 2 reaches the set value. After loading is completed, the screw rods X11, screw rod Y21, and screw rod Z31 stop rotating. Due to the self-locking characteristics of the trapezoidal screw, the loading stress can be kept stable.

[0019] The deep rock in-situ simulation preparation and curing device has a compact overall structure and can replace laboratory testing machines. It can perform three-dimensional loading when preparing rock samples, and the three-dimensional loading forces can be different. The device is in the shape of a rectangular parallelepiped. On the one hand, it can be turned over regularly during the curing stage to eliminate the influence of the gravity sedimentation of the adhesive material during the solidification period, so that the density of each part of the prepared in-situ rock sample is basically the same; on the other hand, the device is easy to stack, which is conducive to saving laboratory space when multiple devices are used to prepare in-situ rock samples in batches at the same time.

[0020] Further, such as Figure 3 , Figure 4 As shown, a driving device is also provided in the housing 1, and the driving device includes a loading motor 3, a gear shaft 41, a hollow shaft 43, a lifting device, an intermediate gear 42, a transmission shaft X14, and a transmission shaft Y24. The gear shaft 41, the hollow shaft 43, the transmission shaft X14, and the transmission shaft Y24 are all parallel to the screw Z31, and the gear shaft 41 is rotatably connected to the housing 1. The output end of the loading motor 3 is connected to one end of the gear shaft 41 through a gear box, and is used to drive the gear shaft 41 to rotate. The intermediate gear 42 is rotatably sleeved on the hollow shaft 43, and the lifting device is used to drive the hollow shaft 43 to move axially, and the intermediate gear 42 is meshed with the gear shaft 41, and the intermediate gear 42 is slidably adapted to the gear shaft 41. The screw Z31, the transmission shaft X14, and the transmission shaft Y25 are all fixedly sleeved with a driven gear 44. Under the drive of the lifting device, the hollow shaft 43 drives the intermediate gear 42 to move axially. During the movement, the intermediate gear 42 can be meshed with three driven gears 44 respectively.

[0021] When the intermediate shaft 42 moves to mesh with the driven gear 44 on the screw rod Z31, under the drive of the loading motor 3, the screw rod Z31 can be driven to rotate through the gear shaft 41, the intermediate gear 42 and the driven gear 44, thereby driving the push plate Z33 to move, and completing the loading process in the Z-axis direction. The transmission shaft X14 is rotatably connected to the housing 1, and a first bevel gear X15 is fixedly sleeved at one end of the transmission shaft X14, and a second bevel gear X16 is fixedly sleeved on the screw rod X11, and the first bevel gear X15 is meshed with the second bevel gear X16; when the intermediate shaft 42 moves to mesh with the driven gear 44 on the transmission shaft X14, under the drive of the loading motor 3, the transmission shaft X14 can be driven to rotate through the gear shaft 41, the intermediate gear 42 and the driven gear 44, and then the screw rod X11 is driven to rotate through the first bevel gear X15 and the second bevel gear X16, thereby driving the push plate X13 to move, and completing the loading process in the X-axis direction. The above-mentioned transmission shaft Y24 is rotatably connected to the shell, and a first bevel gear Y25 is fixedly sleeved on one end of the transmission shaft Y24, and a second bevel gear Y26 is fixedly sleeved on the screw rod Y21, and the first bevel gear Y25 is meshed with the second bevel gear Y26; when the intermediate shaft 42 moves to mesh with the driven gear 44 on the transmission shaft Y24, under the drive of the loading motor 3, the transmission shaft Y24 can be driven to rotate through the gear shaft 41, the intermediate gear 42 and the driven gear 44, and then the screw rod Y11 is driven to rotate through the first bevel gear Y25 and the second bevel gear Y26, thereby driving the push plate Y13 to move, completing the loading process in the Y-axis direction.

[0022] The driving device is arranged inside the housing 1, and can automatically complete stress loading in three directions of the loading area when controlling the loading motor 3 and the lifting device. The entire device has a compact structure and a reasonable layout. Specifically, the shell 1 as a whole can be a cubic structure, and a middle partition is arranged in the shell 1 to divide the shell 1 into an upper and lower area. The aforementioned lifting device, gear shaft 41, intermediate gear 42, hollow shaft 43, transmission shaft X14, transmission shaft Y24, screw Z31, slider Z32 and each driven gear 44 are all arranged in the upper area; the lower area is divided into four small areas, one of which is the aforementioned loading area, and an area is provided on one side of the loading area to install the aforementioned screw X11, slider X12, first bevel gear X15, and second bevel gear X16, and an area is provided on the other side of the loading area to install the aforementioned screw Y21, slider Y22, first bevel gear Y25, and second bevel gear Y26. The fourth small area is used to install the loading motor 3, a control box, etc. The control box is provided with a controller for controlling the loading motor 3 and the lifting device, and the control box is provided with a circuit interface for powering the entire device through an external power supply.

[0023] When implementing it, Figure 5As shown, the lifting device comprises a lifting motor 45, a lifting screw 46 and a guide rod 47. The lifting motor 45 and the guide rod 47 are fixedly arranged in the housing 1. The lifting screw 46 is rotatably arranged in the housing 1. The lifting screw 46 penetrates the hollow shaft 43 along the axis of the hollow shaft 43 and is threadedly connected to the hollow shaft 43. The output end of the lifting motor 45 is fixedly connected to one end of the lifting screw 46. The guide rod 47 is parallel to the lifting screw 46. A sliding hole is penetrated on the hollow shaft 43, and the sliding hole is slidably adapted to the guide rod 47. The lifting device as a whole adopts a screw nut mechanism. When the lifting motor 45 rotates, it can drive the lifting screw 46 to rotate, thereby driving the hollow shaft 43 to slide along the guide rod 47, so as to adjust the position of the intermediate gear 42 so that it can mesh with each driven gear 44 respectively. In the adjustment process, the position of the intermediate gear 42 can be judged by the number of revolutions of the lifting screw 46 driven by the lifting motor 45, so as to facilitate the automatic control of the adjustment action by the controller.

[0024] Further, such as Figure 6 As shown, both ends of each tooth on the intermediate gear 42 are provided with a pointed guide 48, and the pointed guide 48 is inclined to both sides with the center of the tooth end face. When the intermediate gear 42 is adjusted along the direction of the lifting screw 46, if the intermediate gear 42 is out of phase with the driven gear 44 to be meshed, the inclined surface of one side of the pointed guide 48 first contacts the end face edge of the corresponding tooth of the driven gear 44, and as the intermediate gear 42 continues to move toward the driven gear 44, the intermediate gear 42 rotates a certain angle on the hollow shaft 43 under the guidance of the pointed guide 48 (in this process, the loading motor 3 is in the power-off state, and the output shaft and the gear shaft 41 of the loading motor 3 rotate with the intermediate gear 42 at a corresponding angle) until the intermediate gear 42 meshes with the driven gear 44. By providing the pointed guide 48, the phase of the intermediate gear 42 can be automatically adjusted when the intermediate gear 42 is adjusted to mesh with different driven gears 44, so as to avoid the occurrence of top teeth.

[0025] In specific implementation, Figure 2As shown, the housing 1 includes a bottom plate 4, a side of the push plate Z33 away from the slider Z32 is arranged opposite to the bottom plate 4, a first cover plate 5 and a second cover plate 6 are connected to the housing 1 by bolts, a side of the push plate X13 away from the slider X12 is arranged opposite to the first cover plate 5, a side of the push plate Y23 away from the slider Y22 is arranged opposite to the second cover plate 6, and the push plate X13, the push plate Y23, the push plate Z33, the first cover plate 5, the second cover plate 6 and the bottom plate 4 together form the aforementioned loading area. When in use, the first cover plate 5 and the second cover plate 6 can be disassembled, the hollow cube mold box 2 can be placed in the loading area, and then the first cover plate 5 and the second cover plate 6 can be installed. During loading, the six surfaces of the mold box 2 are respectively in contact with the push plate X13, the push plate Y23, the push plate Z33, the first cover plate 5, the second cover plate 6 and the bottom plate 4. The push plate X13 moves toward the first cover plate 5 to realize X-direction loading of the mold box 2, the push plate Y23 moves toward the second cover plate 6 to realize Y-direction loading of the mold box 2, and the push plate Z33 moves toward the bottom plate 4 to realize Z-direction loading of the mold box 2.

[0026] The mold box 2 is made of an elastic material with a certain degree of ductility. When loading is performed in the above-mentioned directions, the loading force can be transmitted to the inside of the mold box 2 through elastic deformation. It should be noted here that since the force-bearing surfaces of the mold box 2 in contact with each push plate during loading have a certain degree of concave deformation, it will make it difficult to demold the rock sample. Here, elastic materials are used on each surface of the mold box 2. After the rock sample is prepared after curing, each force-bearing surface rebounds and resets (or has a tendency to rebound and reset) when the mold box 2 is taken out, making the subsequent demolding process easier.

[0027] When preparing the in-situ rock sample, first fill the mold box 2 with granular aggregate, then preset the central stress sheet and eight corner stress sheets in the aggregate. The eight corner stress sheets are distributed to form a simulated cube. The faces of the simulated cube are parallel to the faces of the mold box, and the central stress sheet is located at the geometric center of the simulated cube. When stress is loaded in various directions, the stress values ​​of the buried points are monitored by the eight corner stress sheets and the central stress sheet, and the loading values ​​in the X, Y, and Z directions are adjusted in real time until the set value is reached and the stress is kept stable before injecting the adhesive material. It should be noted that in the prepared rock sample, the part within the simulated cube area is the in-situ rock sample containing internal stress for experimental research.

[0028] Furthermore, a first grouting pipe 7 and a first return slurry pipe 8 are provided on one side of the mold box 2 close to the first cover plate 5, and the other ends of the first grouting pipe 7 and the other ends of the first return slurry pipe 8 both pass through the first cover plate 5 to be connected with the outside of the shell 1, and the first return slurry pipe 8 is provided at a corner of the mold box 2 close to the push plate Y23 and close to the push plate Z33, and the first grouting pipe 7 is provided at a corner of the mold box 2 close to the push plate Y23 and close to the bottom plate 4; a second grouting pipe 9 and a second return slurry pipe 10 are provided on one side of the mold box 2 close to the second cover plate 6, and the other ends of the second grouting pipe 9 and the other ends of the second return slurry pipe 10 both pass through the second cover plate 6 to be connected with the outside of the shell 1, and the second return slurry pipe 10 is provided at a corner of the mold box 2 close to the push plate X13 and close to the push plate Z33, and the second grouting pipe 9 is provided at a corner of the mold box 2 close to the push plate X13 and close to the bottom plate 4. After completing stress loading, the adhesive material can be injected into the mold box 2 through the first grouting pipe 7 and the second grouting pipe 9. After the adhesive material flows out stably from the first return grouting pipe 8 and the second return grouting pipe 10, the surface grouting material has filled the mold box 2. At this time, the first grouting pipe 7, the first return grouting pipe 8, the second grouting pipe 9, and the second return grouting pipe 10 are blocked and then maintenance can be carried out. In the process of injecting the adhesive material, the device is placed so that the first grouting pipe 7 and the second grouting pipe 9 are located at the bottom of the entire device. The method of injecting from bottom to top is conducive to filling the mold box 2 with adhesive material and eliminating gaps; at the same time, the first grouting pipe 7 and the second grouting pipe 9 are basically located at the diagonal position of the bottom surface of the mold box 2. The simultaneous grouting of the first grouting pipe 7 and the second grouting pipe 9 can further ensure that the mold box 2 is filled with adhesive material.

[0029] The above is only a preferred embodiment of the present invention. It should be understood that the present invention is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art do not deviate from the spirit and scope of the present invention, and should be within the scope of protection of the claims attached to the present invention.

Claims

1. A deep rock in-situ simulation preparation and solidification device, characterized in that: A rectangular parallelepiped housing is provided with an X-axis loading device, a Y-axis loading device and a Z-axis loading device; The X-axis loading device comprises a screw rod X, a slider X, and a push plate X, wherein the screw rod X is rotatably connected to the housing, the slider X is slidably connected to the housing, the slider X is threadedly connected to the screw rod X, and the push plate X is fixedly connected to the slider X; The Y-axis loading device comprises a screw rod Y, a slider Y, and a push plate Y, wherein the screw rod Y is rotatably connected to the housing, the slider Y is slidably connected to the housing, the slider Y is threadedly connected to the screw rod Y, and the push plate Y is fixedly connected to the slider Y; The Z-axis loading device comprises a screw rod Z, a slider Z, and a push plate Z, wherein the screw rod Z is rotatably connected to the housing, the slider Z is slidably connected to the housing, the slider Z is threadedly connected to the screw rod Z, and the push plate Z is fixedly connected to the slider Z; The push plates X, Y and Z are perpendicular to each other. The side of the push plate X away from the slider X, the side of the push plate Y away from the slider Y, the side of the push plate Z away from the slider Z and the three faces of the corner of the shell can enclose a cubic loading area.

2. The deep rock in-situ simulation preparation and solidification device according to claim 1 is characterized in that: A driving device is also provided in the housing, and the driving device includes a loading motor, a gear shaft, a hollow shaft, a lifting device, an intermediate gear, a transmission shaft X, and a transmission shaft Y; The gear shaft, the hollow shaft, the transmission shaft X, and the transmission shaft Y are all parallel to the screw rod Z. The gear shaft is rotatably connected to the housing, and the loading motor is used to drive the gear shaft to rotate; The intermediate gear is rotatably sleeved on the hollow shaft, the lifting device is used to drive the hollow shaft to move axially, the intermediate gear is meshed with the gear shaft, and the intermediate gear is slidably adapted to the gear shaft; The transmission shaft X is rotatably connected to the housing, one end of the transmission shaft X is fixedly sleeved with a first bevel gear X, the screw rod X is fixedly sleeved with a second bevel gear X, and the first bevel gear X is meshed with the second bevel gear X; The transmission shaft Y is rotatably connected to the housing, a first bevel gear Y is fixedly sleeved on one end of the transmission shaft Y, a second bevel gear Y is fixedly sleeved on the screw rod Y, and the first bevel gear Y is meshed with the second bevel gear Y; The screw rod Z, the transmission shaft X and the transmission shaft Y are all fixedly sleeved with driven gears, and the three driven gears can be meshed with the intermediate gears respectively.

3. The deep rock in-situ simulation preparation and solidification device according to claim 2 is characterized in that: The lifting device includes a lifting motor, a lifting screw and a guide rod. The lifting motor and the guide rod are fixedly arranged in the shell, and the lifting screw is rotatably arranged in the shell. The lifting screw passes through the hollow shaft along the axis of the hollow shaft and is threadedly connected to the hollow shaft. The output end of the lifting motor is fixedly connected to one end of the lifting screw, and the guide rod is parallel to the lifting screw. A sliding hole is penetrated on the hollow shaft, and the sliding hole is slidably adapted to the guide rod.

4. The deep rock in-situ simulation preparation and solidification device according to claim 2 is characterized in that: Both ends of each tooth on the intermediate gear are provided with pointed guides.

5. The deep rock in-situ simulation preparation and solidification device according to claim 2 is characterized in that: The shell includes a bottom plate, and a side of the push plate Z away from the slider Z is arranged opposite to the bottom plate. A first cover plate and a second cover plate are connected to the shell by bolts. A side of the push plate X away from the slider X is arranged opposite to the first cover plate, and a side of the push plate Y away from the slider Y is arranged opposite to the second cover plate. The push plate X, push plate Y, push plate Z, the first cover plate, the second cover plate and the bottom plate together enclose the loading area.

6. The deep rock in-situ simulation preparation and solidification device according to claim 5 is characterized in that: A hollow cubic mold box is provided in the loading area, the mold box is made of elastic material, and the six faces of the mold box are respectively in contact with the push plate X, push plate Y, push plate Z, the first cover plate, the second cover plate and the bottom plate; A central stress sheet and eight corner stress sheets are arranged in the mold box. The eight corner stress sheets are distributed to form a simulated cube, and the central stress sheet is located at the geometric center of the simulated cube.

7. The deep rock in-situ simulation preparation and solidification device according to claim 6 is characterized in that: A first grouting pipe and a first return slurry pipe are provided on one side of the mold box close to the first cover plate, the other end of the first grouting pipe and the other end of the first return slurry pipe both pass through the first cover plate and are connected to the outside of the shell, the first return slurry pipe is provided at a corner of the mold box close to the push plate Y and close to the push plate Z, and the first grouting pipe is provided at a corner of the mold box close to the push plate Y and close to the bottom plate; A second grouting pipe and a second return slurry pipe are connected to one side of the mold box close to the second cover plate, the other end of the second grouting pipe and the other end of the second return slurry pipe both pass through the second cover plate and are connected to the outside of the shell, the second return slurry pipe is arranged at a corner of the mold box close to the push plate X and close to the push plate Z, and the second grouting pipe is arranged at a corner of the mold box close to the push plate X and close to the bottom plate.

Citation Information

Patent Citations

  • Triaxial test apparatus and method suitable for weak rocks

    CN106248482A

  • Testing device and method for simulating hole wall loading under in-situ stress condition

    CN110426289A

  • High-pressure rock grouting test experiment system and test method thereof

    CN113552323A

  • Simulation experiment device for geotechnical engineering

    CN114018710A

  • Rock mass in-situ stress curing method and curing system

    CN114199647A